Loading...
HomeMy WebLinkAboutSP202100015 Checklist 2021-09-20SPECIAL USE PERMIT CHECKLIST for Midway Transmission Line Upgrade/ TMP07200-00-00-00700 etc. �OF A1,�� l After the mandatory pre -application meeting, county staff will mark this checklist appropriately so `IRGtN1P that it is clear to the applicant the information from Section 33.33 that must be submitted with the official application smc Required for Provided with application? application SECTION 33.33 (County Staff) (Applicant) X X NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print or some other method that can be distinguished when copied with a black and white YES NO copier/printer. Xv A narrative of the project proposal, including its public need or benefit; X A narrative of the proposed project's consistency with the comprehensive plan, X A narrative of the proposed project's impacts on public facilities and public infrastructure. Xv A narrative of the proposed project's impacts on environmental features. X A narrative of the proffers proposed to address impacts from the proposed project. X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; X A conceptual plan showing the existing and proposed facilities (towers/poles, lines, other related facilities) X 1) entrance, driveways, and parking (application/plan should distinguish between new permanent entrances/access roads, temporary construction entrances, and existing access ways.) X 2) typical cross -sections to show proportions, scale and StFeetseapej^F^« seetiG^ G14; (For this project, show cross -sections or photo -simulations of ground -level views of the proposed towers, to demonstrate appearance in landscape) X 3) the general location of pedestrian and bicycle facilities; Xv 4) building envelopes, (only if new structures or substation equipment are proposed) SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 xN/A 5) parking envelopes (only if new parking is proposed); x 6) public spaces and amenities; x 7) areas to be designated as conservation and/or preservation areas; (see note below about vegetation management) x 8) conceptual stormwater detention facility locations; X 9) conceptual grading (if any is proposed); N/A Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. • Narrative should address plans for vegetation management in the corridor. Another SP recently approved by the Board included requirements (in line with that utility's plan) to apply Integrated Vegetation Management (IVM) within the corridor rather than mowing/clearing. If possible, we would recommend that this proposal also include the use of IVM. • Narrative should address: (1) need for upgrade and for increased pole/wire height; (2) reasons for addressing only portion of corridor (unless eventual application covers entire corridor within County); and (3) the project's relationship to the recently -approved Midway Solar project, if any, and the reasons forending this portion of the upgrade at the Midway Solar site. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. /1 Signature of person completing this 9 ecklist 9/17/21 Date Briana Eddy/Booth & Associates, LLC 919-851-8770 Print Name Phone SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2