HomeMy WebLinkAboutSDP198200035 Approval - County 1982-10-19 4.
- `,1 ' �� OF ALSE-41
O . pF ALg.,
G ?.
•
%�IRGIl���
ROBERT W. TUCKER, JR. DEPARTMENT of PLANNING RONALD S. KEELER
Director of Planning 401 McIntire Road Assistant Director of Planning
Charlottesville, Va. 22901-4596 R. KEITH MABE
804- 296-5823 Principal Planner
NANCY MASON CAPERTON
October 20, 1982 Senior Planner
KATHERINE L. IMHOFF
Planner
Mr. Richard T. Heath, D.D.S.
North Berkshire Road
Charlottesville, VA 22901
RE: Richard Heath Office Building Site Plan
(Portion of parcel 9, TM 61W)
Dear Mr. Heath,
The Albemarle County Planning Commission, at its meeting on October 19, 1982,
approved the above-noted site plan subject to the following:
1. A building permit can be processed when the following conditions have
been met by the applicant:
a. Note specifications for interior walkways;
b. Planning Staff approval of amendments to landscaping plan to include
planting pine buffer along western property line;
c. County Engineer approval of final stormwater detention plan, to include
relocation of 6' wide rip-rapped drainage filter and construction of
basin with all appurtenant structures;
d. Installation of internal sidewalks and curbing as per specifications
approved by the County Engineer;
e. Compliance with the Soil Erosion $ Sedimentation Control Ordinance
(Note protective measures for the cemetary on the grading plan) ;
f. Virginia Department of Highways E Transportation approval of commercial
entrance;
g. Fire Official approval of handicapped provisions and dumpster location;
h. Albemarle County Service Authority approval of water and sewer plans;
i. , Planning Staff approval of permanent fencing around the cemetary.
2. Prior to the issuance of a certificate of occupancy the following conditions
must be met:
a. Fire Official approval of fire flow;
b. All required improvements must be constructed, planted, or bonded.
•
-:
.
Richard Heath
page 2
In order to expedite the completion of the above items, please have the
appropriate agency or department notify Linda Thompson (296-5832) in the Inspections
Department, in writing, that the applicable conditions have been met:
Please note that the Zoning Ordinance requires that construction be commenced
within eighteen (18) months of the date of approval or the approval will be void.
If you have any questions, please do not hesitate to call me.
Sincerely,
cr1614'iri;V
/171/1"
Katherine L. Imhoff
Planner
KLI/jcw
cc: Planning Staff
Pat Cooke
Robert Vaughn
B. Aubrey Huffman Associates
Maynard Elrod
Byron Coburn
Lou Rossie