HomeMy WebLinkAboutWPO202100055 Plan - VSMP 2021-09-23RIVANNA WATER &SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINIA
R
WA
VAN N
ER
HOR
P
MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY:
ELECTRICAL INFRASTRUCTURE IMPROVEMENTS
' \ -�l
of VViirgima��
-631
y 250 r ;)1421
Charlottesville / `-
20
} - } 1-64 E " 12 _
Rd 1-
Exit 120 C
Y
PRELIMINARY DESIGN - DO NOT USE FOR CONSTRUCTION
388 ,
20
317
`.4
Monticello
LOCATION MAP
NOT TO SCALE
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
MOORES CREEK ADVANCED
WATER RESOURCE
RECOVERY FACILITY
Michael Santowasso 2021 .09.21
11:17:33-04'00'
i
i
HAZE N NO. 31430-006
SEPTEMBER 2021
w
SHEET
INDEX
PIPE ABBREVIATIONS
A
AIR
SHEET No.
SHEET NAME
AL
ALUM SOLUTION
NAOCL
SODIUM HYPOCHLORITE
HOLDING
POND PUMP STATION
ADS
ANAEROBICALLY DIGESTED SLUDGE
NRCY
NITRIFIED RECYCLE FLOW
GENERAL
BS
BLENDED SLUDGE
NPW
NON POTABLE WATER
E190
POWER PLANS
BWD
BACKWASH DRAIN
OF
OUTFALL
--
COVER
E191
MCC-10A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
BWS
BACKWASH SUPPLY
PD
PROCESS DRAIN
G1
SHEET INDEX
E192
MCC-10A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
E193
ELEMENTARY CONTROL SCHEMATIC AND CONDUIT AND WIRE SCHEDULES
BWW
BACKWASH WASTE
PE
PRIMARY EFFLUENT
CAS
CAUSTIC SOLUTION
POL
POLYMER
CEN
CENTRATE
PS
PRIMARY SLUDGE
CIVIL
PRIMARY
CLARIFIER
CS
CHLORINE SOLUTION
PTE
PRELIMINARY TREATMENT EFFLUENT
E200
POWER PLANS
D
DRAIN
PW
POTABLE WATER
C01
NOTES AND LEGEND
E201
MCC-3A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
DATR
DATA ACCORDING TO RECORD
RAS
RETURN ACTIVATED SLUDGE
CO2
VIRGINIA MINIMUM STANDARDS
E202
MCC-3A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
DFM
DRAIN FORCE MAIN
S
SAMPLE
E203
RISER DIAGRAM AND CONDUIT AND WIRE SCHEDULES
DG
DIGESTER GAS
SA
SERVICE AIR
SITE
DP
DRY POLYMER
SBE
SEDIMENTATION BASIN EFFLUENT
BLOWER
BUILDING
DS
DIGESTED SLUDGE
SC
SCUM
C10
OVERALL SITE PLAN
DSU
DIGESTED SUPERNATANT
SD
STORM DRAIN
C11
EXISITNG CONDITIONS AND DEMOLITION PLAN
E380
POWER PLAN
EW
EFFLUENT WATER
SCE
SECONDARY CLARIFIER EFFLUENT
C12
EXISTING YARD PIPING PLAN
FA
FOUL AIR
SF
STEP FEED
C13
FINAL SITE PLAN
FBP
FILTER BYPASS
SPD
SUMP PUMP DISCHARGE
EFFLUENT
PUMPING STATION
FE
FINAL EFFLUENT
SR
SEPTAGE RETURN
FM
FORCE MAIN
SS
SANITARY SEWER
CD1
STANDARD DETAILS
E580
POWER PLANS
FTE
FILTERED EFFLUENT
SW
SEAL WATER
CD2
STANDARD DETAILS
E581
MCC-16A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
G
NATURAL GAS
TS
THICKENED SLUDGE
E582
MCC-16A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
GTO
GRAVITY THICKENER OVERFLOW
V
VENT
E583
ELEMENTARY CONTROL SCHEMATIC AND CONDUIT AND WIRE SCHEDULE
ELECTRICAL
HOCL
SODIUM HYPOCHLORITE
WAS
WASTE ACTIVATED SLUDGE
HWR
HOT WATER RETURN
WCS
WATER CANNON SUPPLY
GENERAL
SOLIDS HANDLING
BUILDING
HWS
HOT WATER SUPPLY
ME
METHANOL
PIPE MATERIALS
E1
LEGEND AND SYMBOLS, GENERAL NOTES AND ABBREVIATIONS
E640
POWER PLANS
ML
MIXED LIQUOR
CI
CAST IRON
E3
OVERALL DEMOLITION SINGLE LINE DIAGRAM
E641
MCC-18A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
MLW
MIXED LIQUOR WASTE
DI
DUCTILE IRON
E4
OVERALL PROPOSED SINGLE LINE DIAGRAM
E642
EXISTING MSP-18A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
MS
METAL SALTS
RCP
REINFORCED CONCRETE PIPE
E5
DUCTBANK AND CONDUIT AND WIRE SCHEDULES
E643
MCC-18A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
MUW
MAKEUP WATER
PVC
POLYVINYL CHLORIDE
SITE WORK
SWITCHGEAR BUILDING
E010
OVERALL SITE PLAN
E011
PARTIAL SITE PLAN
E900
E900 - POWER PLAN
E012
PARTIAL SITE PLAN
E013
PARTIAL SITE PLAN
E014
PARTIAL SITE PLAN
ED1
STANDARD DETAILS
E015
PARTIAL SITE PLAN
ED2
STANDARD DETAILS
E016
PARTIAL SITE PLAN
E017
PARTIAL SITE PLAN
E018
PARTIAL SITE PLAN
MAINTENANCE
BUILDING
E100
POWER PLANS
E101
MCC-8A DEMOLITION SINGLE LINE DIAGRAMS AND ELEVATIONS
E102
MCC-8A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
E103
ELEMENTARY CONTROL SCHEMATIC AND CONDUIT AND WIRE SCHEDULES
GRIT REMOVAL BUILDING
E140
POWER PLANS
E141
MCC-4A DEMOLITION SINGLE LINE DIAGRAM AND ELEVATION
E142
MCC-4A PROPOSED SINGLE LINE DIAGRAM AND ELEVATION
E143
ELEMENTARY CONTROL SCHEMATICS
E144
RISER DIGRAM AND CONDUIT AND WIRE SCHEDULES
PROJECT
ENGINEER: J. NEWBOLD
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLEHazen, VIRGINA
DATE: EPTEMBER 2021
DESIGNED BY: A. MARCH
HAZENNO.: 31430-006
PRELIMINARY DESIGN
DRAWN BY: A. MARCH
DO NOT USED FOR
CONSTRUCTION
_
HAZEN AND SAWYER
INDEX AND ABBREVIATIONS
CONTRACT NO.: 1
MOORES CREEK AWRRF
CHECKED BY: M. SANTOWASSO
DRAWING
Michael Santowasso 2021.09.21
11:18:24-04'00'
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH,NORTHCAROLINA27607
LICENSE NO.: C-0381
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
NUMBER:
G1
2
95% DESIGN SUBMITTAL
9/14/21
JN
IF THIS BAR DOES NOT 0 1/2" ill
MEASURE1"THEN DRAWING
IS NOT TO FULL SCALE
1
LREV
50% DESIGN SUBMITTAL
4/6/21
JN
ISSUED FOR
DATE
BY
� x
� U
a a
w a
O
a �
W N
W ry
c
It
f) 0
x
20
LL a
GENERAL NOTES:
1. IN ADDITION TO SURVEY (SEE C10), SITE INFORMATION HAS BEEN TAKEN FROM HAZEN
AND SAWYER RECORD DRAWINGS FROM PROJECT #31037-039 TITLED "MOORES CREEK
WASTEWATER TREATMENT PLANT NUTRIENT REMOVAL IMPROVEMENTS", DATED
SEPTEMBER, 2014.
2. HORIZONTAL CONTROL IS REFERENCED TO NAD 83, VIRGINIA SOUTH ZONE, AND
VERTICAL CONTROL IS REFERENCED TO NAVD 88.
3. FLOOD PLAIN ELEVATIONS FROM FEDERAL EMERGENCY MANAGEMENT AGENCY
(FEMA) FLOOD INSURANCE RATE MAP FIRM PANEL 0289D
MAP NUMBER 51003CO289D DATED FEBRUARY 04, 2005
THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD.
4. CONTRACTOR SHALL VERIFY FIELD CONDITIONS BEFORE COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS
AND DIMENSIONS WHERE NEW WORK WILL MATCH EXISTING. DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO THE
COMMENCEMENT OF WORK.
5. CONTRACTOR SHALL OBTAIN ALL THE NECESSARY PERMITS FROM THE
APPROPRIATE AUTHORITIES, DEPARTMENTS, AND/OR AGENCIES HAVING
JURISDICTION PRIOR TO COMMENCING WORK.
6. CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO EXISTING PAVEMENT,
TREES, VEGETATION, STRUCTURES, AND UTILITIES THAT ARE NOT INDICATED TO BE
DEMOLISHED OR REMOVED. ANY DAMAGE TO EXISTING PAVEMENT, TREES,
VEGETATION, STRUCTURES, AND UTILITIES NOT INDICATED TO BE DEMOLISHED OR
REMOVED SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
7. UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORD INFORMATION. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY THEIR EXACT LOCATION AND TO AVOID
DAMAGE TO THEM. THE CONTRACTOR SHALL CONTACT VIRGINIA 811 AT PHONE
NUMBER 811 OR 1-800-552-7001 TO REQUEST UNDERGROUND UTILITY LOCATION
MARK -OUT AT LEAST THREE (3) WORKING DAYS BUT NO MORE THAN TEN (10)
WORKING DAYS PRIOR TO BEGINNING EXCAVATION, INCLUDING SOIL DRILLING. THE
CONTRACTOR SHALL ALSO CONTACT AND REQUEST UTILITY LOCATION MARK -OUT
FROM BURIED UTILITY OWNERS WITH UTILITIES ON THE PROJECT SITE THAT ARE
NOT PARTICIPANTS OF VIRGINIA 811.
8. WHERE PROPOSED WORK IS IN THE VICINITY OF UTILITY POLES, SUCH THAT
SUPPORT OF THE POLE(S) WILL BE REQUIRED, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR NOTIFYING THE UTILITY OF THE WORK. IT WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE UTILITY FOR
SUPPORT OF THE POLE.
9. WHERE OVERHEAD POWER LINES ARE PRESENT, CONTRACTOR MUST CONTACT THE
UTILITY PRIOR TO CONSTRUCTION ACTIVITIES TO DETERMINE THE MINIMUM
REQUIRED EQUIPMENT CLEARANCE (MEC) DISTANCE BASED UPON LINE STRENGTH.
10. DURING EXCAVATION AND PLACEMENT OF UTILITIES THE CONTRACTOR SHALL
COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS AND SHALL SUBMIT TO THE
ENGINEER FOR REVIEW SHEET PILING, SHORING AND/OR BRACING DESIGNS AS MAY
BE NECESSARY TO COMPLY WITH THESE REGULATIONS.
11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DESIGN AND INSTALLATION OF
ALL EXCAVATION SUPPORT AT LOCATIONS AS MAY BE SUGGESTED ON CONTRACT
DRAWINGS OR FOR THEIR OWN CONVENIENCE. CONTRACTOR SHALL SUBMIT ALL
NECESSARY CALCULATIONS, DRAWINGS, ETC. PREPARED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA AS MAY BE
NECESSARY FOR REVIEW BY THE ENGINEER PRIOR TO INSTALLATION.
REQUIREMENTS FOR EXCAVATION SUPPORT DESIGN MAY BE FOUND IN
SPECIFICATION SECTION 02200 EARTHWORK, SECTION 3.03.
12. GROUNDWATER FROM ALL DEWATERING OPERATIONS SHALL BE DISCHARGED TO AN
ENVIRONMENTALLY ACCEPTABLE LOCATION IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS, OR AS DIRECTED BY THE ENGINEER.
13. ALL TEMPORARY FACILITIES ARE SUBJECT TO THE SAME HEALTH AND SAFETY
REQUIREMENTS AS PERMANENT FACILITIES, AS SPECIFIED IN THE CONTRACT
DOCUMENTS AND HEALTH SAFETY PLAN (HASP).
14. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS GENERATED
DURING THE PROJECT OFF SITE AT A PROPERLY PERMITTED DISPOSAL FACILITY.
SITE INFORMATION / EROSION AND SEDIMENT CONTROL
NARRATIVE
PROJECT DESCRIPTION:
VARIOUS ELECTRICAL IMPROVEMENTS ACROSS MULTIPLE BUILDINGS WITHIN THE
MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY (MCAWRRF).
THERE WILL BE ONE AREA OF GROUND DISTURBANCE ACTIVITY TO INSTALL A NEW
DUCTBANK.
EXISTING SITE CONDITIONS:
THE PROJECT IS AT MCAWRRF LOCATED AT 695 MOORES CREEK LANE,
CHARLOTTESVILLE VA 22902. THE PROPERTY IS LOCATED IN UNINCORPORATED
ALBEMARLE COUNTY. THE PROPOSED DISTURBANCE WILL BE LOCATED ADJACENT TO
SECONDARY CLARIFIERS, AND AERATION BASINS. TOPOGRAPHY IN THESE THREE
AREAS ARE GENTLY SLOPED ALONG THE EXISTING INFRASTRUCTURE, RANGING IN
ELEVATIONS FROM 344 FT TO 380 FT. ALL AREAS BEING BUILT UPON ARE GRASSED
AREAS WITH PREVIOUS UNDERGROUND DEVELOPMENT.
THE NEAREST BODY OF WATER IS MOORES CREEK, WHICH IS APPROXIMATELY 250 FT
DOWNSTREAM FROM THE NEAREST PROJECT AREA. MOORES CREEK ULTIMATELY
DISCHARGES TO THE RIVANNA RIVER. ACCORDING TO THE 2016 TMDL REPORT,
MOORES CREEK STREAM SEGMENT IS SEVERELY IMPACTED FOR ITS AQUATIC LIFE
USE. SEDIMENT WAS SELECTED AS THE MOST PROBABLE STRESSOR. THE PROJECT IS
LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD.
THE MCAWRRF PARCEL IS BOUND TO THE SOUTH BY THE 1-64 CORRIDOR. TO THE
WEST AND NORTH ARE MULTIPLE OPEN PARCELS, ZONED RURAL AND LIGHT
INDUSTRIAL. TO THE NORTHEAST AND EAST ARE TWO ADDITIONAL PARCELS, BOTH
OWNED BY RIVANNA WATER AND SEWER AUTHORITY.
OFF -SITE AREAS:
THERE WILL BE NO OFFSITE DISTURBANCE IN THIS PROJECT
SOILS:
SOIL TYPES FOUND AT THE MCAWRRF SITE WERE IDENTIFIED BASED ON INFORMATION
OBTAINED FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA),
NATURAL RESOURCE CONSERVATION SERVICE (NRCS). THE SITE LIMITS OF
DISTURBANCE IS COMPOSED OF ONE SOILS TYPE, RABUN CLAY LOAM, 7 TO 15
PERCENT SLOPES (71C). RABUN CLAY LOAM IS IN HSG B.
EROSION AND SEDIMENT CONTROL MEASURES:
TEMPORARY MEASURES:
• CONSTRUCTION ENTRANCE PER STD 3.02
• SILT FENCE PER STD 3.05
• TEMPORARY SEEDING PER STD 3.31
• GRAVEL CURB INLET SEDIMENT FILTER PER STD 3.07-6
PERMANENT MEASURES:
• PERMANENT STABILIZATION: AREAS OF THE SITE THAT WILL NOT BE PAVED WILL
BE SEEDED AND MULCHED ACCORDING TO THE VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK REQUIREMENTS PER STD 3.32.
EROSION AND SEDIMENT CONTROL MAINTENANCE NOTES:
IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED
AFTER EACH RAINFALL OR WEEKLY, WHICHEVER IS MORE FREQUENT, AND SHOULD BE
CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULE:
1. EROSION AND SEDIMENT CONTROLS WILL BE CHECKED REGULARLY FOR
UNDERMINING OR DETERIORATION AND BUILDUP OR CLOGGING WITH SEDIMENT.
CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY.
2. FREQUENT INSPECTIONS AND CLEANING OF MUD AND DEBRIS FOUND OUTSIDE
OF THE LIMITS OF DISTURBANCE IS REQUIRED, ALONG WITH ANY OTHER
REMEDIES REQUIRED BY THE COUNTY.
3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND
OF GRASS IS MAINTAINED. AREAS SHALL BE RESEEDED AS NEEDED. TEMPORARY
STABILIZATION WILL BE USED AS REQUIRED BY THE COUNTY.
LEGEND
EROSION AND SEDIMENT CONTROL
EXISTING
EROSION & SEDIMENTATION CONTROL CONSTRUCTION SEQUENCING
1. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM THE ENGINEER, OWNER, AND REGULATORY
AGENCIES FOR DEVIATIONS FROM THE APPROVED EROSION AND SEDIMENT CONTROL PLAN.
2. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE' VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK" AND CHAPTER 104 (EROSION AND SEDIMENT CONTROL) OF THE VIRGINIA
CODE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
3. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL TEMPORARY
SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL
INSTALL SILT FENCE AS SHOWN ON THE DRAWING FOR TEMPORARY PERIMETER EROSION
CONTROL.
4. FOLLOWING THE INSTALLATION OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL
MEASURES,THE CONTRACTOR MAY BEGIN EARTHWORK OPERATIONS. ALL STRIPPED TOPSOIL
SHALL BE STOCKPILED IN THE DESIGNATED STOCKPILE/LAYDOWN AREAS AND TEMPORARY
SEEDING MEASURES SHOULD BE EMPLOYED THROUGHOUT CONSTRUCTION. STOCKPILE
LOCATIONS SHALL REMAIN MORE THAN 50 FT FROM STORM DRAINS AND/OR STREAMS. UNLESS NO
REASONABLE ALTERNATIVES ARE AVAILABLE, EARTHWORK, STORAGE OF MATERIAL, ETC IS
PROHIBITED OUTSIDE THE DESIGNATED LIMITS OF DISTURBANCE.
5. SOIL STOCKPILE AND LAYDOWN AREAS SHALL HAVE PERIMETER SEDIMENT CONTROL MEASURES
AND TEMPORARY OR PERMANENT STABILIZATION MEASURES INSTALLED AS SOON AS POSSIBLE
AND AT COMPLETION OF STOCKPILING AND LAYDOWN ACTIVITIES. STOCKPILE SIDE SLOPES SHALL
NOT EXCEED 3H : 1V UNLESS APPROVED BY ENGINEER. TOP OF STOCKPILE SHALL BE GRADED
WITH A MINIMUM 5% SLOPE TO INSURE PROPER DRAINAGE.
6. CONTRACTOR MAY USE TEMPORARY STOCKPILE/ LAYDOWN AREA AS SHOWN ON THE PLANS FOR
SOIL STOCKPILING. IF ADDITIONAL STORAGE AREA IS REQUIRED THE CONTRACTOR IS
RESPONSIBLE FOR IDENTIFYING AN OFFSITE LOCATION AND TRANSPORTATION REQUIREMENTS
TO AND FROM THE OFFSITE STOCKPILE LOCATION. ALL EXCESS OR UNSUITABLE MATERIAL SHALL
BE DISPOSED OF AT A PERMITTED DISPOSAL SITE. THE CONTRACTOR SHALL OBTAIN ALL
NECESSARY PERMITS FOR OFF -SITE DISPOSAL.
7. ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS SHALL BE PROTECTED TO PREVENT THE
DEPOSITION OF MATERIALS ONTO TRAVERSED OFFSITE ROADWAYS. IF MATERIAL IS TRACKED
ONTO OFFSITE ROADWAYS, IT SHALL BE REMOVED IMMEDIATELY. DO NOT UTILIZE A WATER HOSE
TO CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY DESIGNED AND
FUNCTIONING SEDIMENT CONTROL DEVICE. PROPER PRECAUTIONS SHALL BE TAKEN TO ENSURE
MATERIALS DEPOSITED ONTO OFFSITE ROADWAYS ARE REMOVED SO THEY DO NOT ENTER YARD
INLETS, CATCH BASINS, SEWERS, WETLANDS, SURFACE WATER BODIES, OR ROADSIDE SWALES.
8. WHERE CONCRETE EQUIPMENT WASHING IS REQUIRED, THIS MUST BE DONE IN AN APPROVED
"CONCRETE CONTAINMENT AREA". CONTRACTOR SHALL NOT DISCHARGE ANY CONCRETE
WASHOUT WATER INTO SEWERS, SURFACE WATER BODIES OR ONTO THE GROUND. ALL WASHOUT
WATER MUST BE REMOVED FROM THE SITE(S) DAILY. SEE DETAIL 1/CD-2.
9. ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES
DURING LAND DISTURBANCE ACTIVITIES AND UNTIL FINAL STABILIZATION IS ACHIEVED.
SEDIMENT -LADEN GROUNDWATER ENCOUNTERED DURING TRENCHING, BORING, OR OTHER
ACTIVITIES SHALL BE PUMPED INTO A SEDIMENT TRAPPING DEVICE PRIOR TO BEING DISCHARGED
INTO A STREAM, POND, SWALE, OR CATCH BASIN. NO DEWATERING FLOW SHALL BE DISCHARGED
DIRECTLY TO GRADE WITHOUT TREATMENT.
10. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED THROUGHOUT THE DURATION OF
CONSTRUCTION ACTIVITIES ON ANY AREA WHICH WILL REMAIN UNDISTURBED FOR MORE THAN 7
WORKING DAYS OR 14 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL SLOPES STEEPER THAN
3H:1 V SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND
COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS.
ALL OTHER SLOPES OF 3H:1 V OR FLATTER, EXCEPT THOSE GREATER THAN 50 FT IN LENGTH,
SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR OTHER
STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS.
11. PERMANENT SEEDING SHALL BE INSTALLED, IN THE PROPER PLANTING SEASON, FOR ALL AREAS
REACHING FINAL GRADE WHICH WILL NOT BE DISTURBED AGAIN. IF PLANTING SEASON IS NOT
APPROPRIATE FOR PERMANENT SEEDING CONTRACTOR SHALL RE -SEED AREA WITH PERMANENT
SEEDING WHEN SEASON ALLOWS.
12. UPON COMPLETION OF FINAL GRADING, PERMANENT STRUCTURAL OR VEGETATIVE STABILIZATION
SHALL BE ESTABLISHED.
13. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT
THE DURATION OF CONSTRUCTION ACTIVITIES AND THE SITE HAS BEEN PERMANENTLY
STABILIZED WITH STRUCTURAL AND/OR PERMANENT VEGETATIVE MEASURES.
14. CONTRACTOR SHALL PERFORM SITE INSPECTION AND MAINTENANCE ONCE EVERY5 BUSINESS
DAYS AND WITHIN 24 HOURS AFTER MEASURABLE STORM EVENT.
15. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY SEDIMENT CONTROL MEASURES
MAY BE REMOVED UPON APPROVAL FROM THE ENGINEER AND ALBEMARLE COUNTY. ANY AREAS
DISTURBED BY THE REMOVAL OF EROSION CONTROL MEASURES SHALL BE RETURNED TO THE
ORIGINAL, OR BETTER, CONDITION BEFORE SEEDED, MULCHED, AND FERTILIZED.
ABBREVIATIONS
OVERALL EROSION & SEDIMENTATION CONTROL NOTES
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT
CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS
AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND THE
VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS 9VAC25-840.
2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION
CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE
WEEK PRIOR TO THE FINAL INSPECTION.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CONSTRUCTION
ACTIVITIES.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE
SITE AT ALL TIMES.
5. THE CONTRACTOR IS ENCOURAGED TO PHASE CONSTRUCTION TO MINIMIZE EXPOSED SOIL AREAS
THROUGHOUT THE PROJECT.
6. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE
PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR
SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND
APPROVAL BY THE PLAN APPROVING AUTHORITY.
7. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES
WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC.
FROM SILTATION AND EROSION.
8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES
DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS
ACHIEVED.
9. EACH EROSION AND SEDIMENTATION CONTROL MEASURE SHALL BE INSPECTED AT LEAST ONCE
EVERY FOUR BUSINESS DAYS OR AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 24
HOURS FOLLOWING A MEASURABLE STORM EVENT. IN THE EVENT THAT A MEASURABLE STORM EVENT
OCCURS WHEN THERE ARE MORE THAN 48 HOURS BETWEEN BUSINESS DAYS, THE INSPECTION SHALL
BE CONDUCTED ON THE NEXT BUSINESS DAY.
10. ALL DUCTBANK WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION
TECHNIQUES. ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN ONE DAYS TIME
SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF THE TRENCH.
DUCTBANK CONDUITS SHALL BE CAPPED AT THE END OF EACH WORK DAY TO PREVENT SEDIMENT
FROM ENTERING PIPE. TRENCH SHALL BE BACKFILLED AT END OF EACH WORK DAY AND DISTURBED
AREA SEEDED WITH TEMPORARY SEEDING MEASURES, AS APPROPRIATE.
11. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
12. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE,
PERMANENT VEGETATION IS ESTABLISHED ON ALL DISTURBED AREAS, AND APPROVAL BY THE
ENGINEER IS GIVEN. AREAS WHERE EROSION AND SEDIMENTATION CONTROL MEASURES ARE
REMOVED SHALL BE REGRADED AND SEEDED TO MATCH ORIGINAL SITE CONDITIONS.
- 1_1D- 1_1D-
LIMITS OF DISTURBANCE
x
FENCE -
- - - -
- YARD PIPING
NEW DEMO EXISTING
EDP
EDGE OF PAVEMENT
G
GAS
®
IP
INLET PROTECTION
CONCRETE SIDEWALK ------
STORM DRAIN LINE
LOD
LIMITS OF DISTURBANCE
SS
SANITARY SEWER
BUILDING/STRUCTURE
® O
O
MANHOLE
CE
O
GRAVEL CONSTRUCTION
ENTRANCE
� 300-
CONTOUR
OHE
OVERHEAD ELECTRIC
W
WATER
GRAVEL ROAD
302.00
x
SPOT ELEVATION
YARD INLET
FOC
FIBER OPTIC CABLE
R
PROPERTY LINE
SF
SF
SILT FENCE
CONCRETE CURB
--
PROPERTY LINE
=jit=
CURB INLET
LP
LIGHT POLE
CENTER LINE
T AND GUTTER
TS
TEMPORARY SEEDING
---
EASEMENT
FLARED END SECTION
UGE
UNDERGROUND
a �a : d
e. s e. CONCRETE PAD/PAVING
ps
PERMANENT SEEDING
�vv V V APPROXIMATE WOODLINE
(F.E.S.)
ELECTRIC
-Q-
POWER POLE
PP
POWER POLE
DC
DUST CONTROL
O
BOLLARD
PROJECT
ENGINEER: J. NEWBOLD
DESIGNED BY: A. MARCH
DRAWN BY: A. MARCH
CHECKED BY: M. SANTOWASSO
2 95% DESIGN SUBMITTAL 9/14/21 JN
1 50% DESIGN SUBMITTAL 4/6/21 JN M THIS BAR DOES NOT 0 1/2" 1"
MEASURE 1" THEN DRAWING
REV ISSUED FOR DATE BY IS NOT TO FULL SCALE
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 2021.09.21
11:18:46-04'00'
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
CIVIL
NOTES AND LEGEND
DATE: SEPTEMBER 2021
HAZEN NO.: 31430-006
CONTRACT NO.: 1
DRAWING
NUMBER:
C01
9VAC25-840-40. MINIMUM STANDARDS.
SITE SEEDING SCHEDULE AND NOTES
REV
A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA,
TECHNIQUES AND METHODS:
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT
FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS.
PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE
LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND
BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT
TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON
SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED
FROM THE PROJECT SITE.
3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON
DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT
VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND
COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND
WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS
AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE
CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND
SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES
PLACE.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN
STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER
INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND
CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY
THE TRAP OR BASIN.
a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134
CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY
CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF
FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES
SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE
CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE
STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF
24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS
SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS
EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A
MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE
ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION
SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL
THE PROBLEM IS CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE
OR OTHER PROTECTION SHALL BE PROVIDED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER
CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS
OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY
REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS
SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT
TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT
POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED
FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL
MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER
MATERIALS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION
VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY
VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS
PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE
MET.
15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED
IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE
WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE
CRITERIA:
a. NO MORE THAN 300 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE
TIME.
b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF
TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR
PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH,
AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
FLOWING STREAMS OR OFF -SITE PROPERTY.
d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH
PROJECT
ENGINEER:
DESIGNED BY:
DRAWN BY:
THIS CHAPTER.
f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT
OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE
ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY.
SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN
THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT
LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER
THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE
DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT
SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND
DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR
DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND
CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT
INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE
CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE
SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR
MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR
THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM,
DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE
SYSTEM SHALL BE PERFORMED.
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE
FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA
TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES
GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN
QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A
TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP
CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE
ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER
WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO
DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL
BED OR BANKS; AND
(c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF
A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED
WITHIN THE PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY
CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE
APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM
WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE
EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE
TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT
PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF
OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE
PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO
INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER
DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP
AUTHORITY TO PREVENT DOWNSTREAM EROSION.
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE
THEIMPROVEMENTS.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING
WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT
CONDITION OF THE SUBJECT PROJECT.
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER
DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR
MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH
THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON
RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A
RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE
OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A
STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL.
h. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR
SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE
OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION
FACILITY.
j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL
LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL
DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT
PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE
CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC
PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL
BE USED IN ALL ENGINEERING CALCULATIONS.
A. MARCH
CHECKED BY: M. SANTOWASSO
95% DESIGN SUBMITTAL 9/14/21 JBY
IF THIS BAR DOES NOT 0 1/2" 1"
50% DESIGN SUBMITTAL 4/6/21MEASURE 1" THEN DRAWING
ISSUED FOR DATE IS NOT TO FULL SCALE
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 2021.09.21
11:19:06-04'00'
k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL
BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL,
CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER
WATERS OF THE STATE.
I. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR
STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY
AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS
SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR
NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I)
DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS;
(II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL
RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE
ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR,
24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK
FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED
CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK
FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF
VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION
DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED
CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS
DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54
OR 62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT
AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER
QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT
(§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT
REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN
ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATIONS.
n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET
OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE
REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION.
STATUTORY AUTHORITY
§ 62.1-44.15:52 OF THE CODE OF VIRGINIA.
HISTORICAL NOTES
FORMER 4VAC50-30-40, DERIVED FROM VR625-02-00 § 4; EFF SEPTEMBER 13,
1990; AMENDED, VIRGINIA REGISTER VOLUME 11, ISSUE 11, EFF. MARCH 22,
1995; VOLUME 29, ISSUE 4, EFF. NOVEMBER 21, 2012; AMENDED AND
RENUMBERED, VIRGINIA REGISTER VOLUME 30, ISSUE 2, EFF. OCTOBER 23,
2013.
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
APPLICATION RATES IN POUNDS/ACRE
SEED
PLANTING
STRAW
MIXTURE
SEASON
SEED
LIME*
FERTILIZER**
MULCH***
COMMENTS
PREFERED SEASONS:
P
FEB 15 - APR 30
200
4000
1000
4000
SEPT 1 - SEPT 30
SEPT 1 - OCT 31
FEB 15 - MARCH 30
OVERSEED WITH TYPE P
TW
SEPT 1 - FEB 15
100
*
600
4000
SEED MIXTURE DURING
NEXT PLANTING SEASON
OVERSEED WITH TYPE P
TSP
FEB 16-APR 30
100
*
600
4000
SEED MIXTURE DURING
NEXT PLANTING SEASON
OVERSEED WITH TYPE P
TSU
MAY 1 - AUG 31
50
600
4000
SEED MIXTURE DURING
NEXT PLANTING SEASON
P - 190 LB/AC KENTUCKY 31 TALL FESCUE
5 LB/AC PERENNIAL RYEGRASS
5 LB/AC KENTUCKY BLUEGRASS
TW - 50 LB/AC ANNUAL RYEGRASS
50 LB/AC CEREAL (WINTER) RYE
TSP - 100 LB/AC ANNUAL RYEGRASS
TSU - 50 LB/AC GERMAN MILLET
SEED MIXTURES TO BE USED ON THE PROJECT FOR PERMANENT (P), TEMPORARY WINTER (TW), TEMPORARY
SPRING (TSP) AND TEMPORARY SUMMER (TSU) SHALL BE AS FOLLOWS (ACCEPTABLE SUBSTITUTES PER SECTION
3,31 AND 3.32 OF THE VA EROSION AND SEDIMENT CONTROL HANDBOOK MUST BE APPROVED BY ENGINEER)
1. SCARIFY 2" DEPTH OF SUBGRADE PRIOR TO PLACING TOPSOIL.
2. TOPSOIL SHALL BE SPREAD AT 4" INCH CONSOLIDATED DEPTH
3. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, OF HYDROSEEDER ON A FIRM,
FRIABLE SEEDBED. IN FINE SOILS, SEEDS SHOULD BE DRILLED 1/4 - 1/2 INCH. IN COARSE, SANDY SOILS, SEEDS
SHALL BE PLANTED NO DEEPER THAN 3/4 INCH. COVER BROADCAST SEED BY LIGHTLY RAKING OR CHAIN
DRAGGING; THEN FIRM SURFACE WITH A ROLLER OR CULTIPACKER TO PROVIDE GOOD SEED CONTACT.
4. ON CUT AND FILL SLOPES 2:1 OR STEEPER ADD 20 LBS/AC OF WEEPING LLVEGRASS TO THE P SEED MIXTURE IN
THE SPRING AND ADD 20 LBS/AC ANNUAL RYEGRASS IN FALL AND WINTER.
LIME SHALL BE APPLIED AT A MINIMUM OF 2 TONS PER ACRE WITH 3 TONS PER ACRE IN CLAY SOILS.
APPLICATION RATES AND/OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST.
TACK MULCH BY APPLYING AT 0.10 GAL/YD2. RATE REQUIREMENTS FOR TEMPORARY SEEDING SHALL BE
BASED UPON A pH TEST AS SUCH:
<4.2 3 TONS/ACRE
4.2-5.2 2 TONS/ACRE
5.2-6.0 1 TON/ACRE
** FERTILIZER SHALL BE 10-20-10 MIX OR EQUIVALENT NUTRIENTS.
*** ALTERNATIVE METHODS OF MULCHING MAYBE UTILIZED. ALTERNATIVE METHODS SHALL CONFORM TO
REQUIREMENTS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
CIVIL
VIRGINIA MINIMUM STANDARDS
DATE: SEPTEMBER 2021
HAZEN NO.: 31430-006
CONTRACT NO.: 1
DRAWING
NUMBER:
CO2
r w
d
MAIN PLANT ENTRANCE
\
PROPERTY LINE, TYP.
MCAWRRF PROPERTY I
100 YEAR FLOODPLAIN
100'STREAM BUFFER
LIMITS OF DISTURBANCE —
BM1
\ . Ile, a �
-� �o0 \�.. LIMITS OF GROUND SURVEY
HOLDING
POND 2
HOLDING POND PUMP
STATION, SEE E190
�1
O
�- v
MAIN
CONTROL
BUILDING
,I
�.,, : A • .
i
.e
ADMINISTRATION
BUILDING
PRIMARY CLARIFIERS, SEE E200
BLOWER BUILDING, SEE E380
MAINTENANCE SHOP BUILDING, SEE E100
PLAN
SCALE: 1" = 150'
RIVANNA
PUMP
STATION
%
100YR X
jI
k�
o°
0
/ J
I
i
i
0o JQ }
/ /
�i100YR �
EFFLUENT PUMPING STATION, SEE E580
SOLIDS HANDLING BUILDING, SEE E640
GRIT REMOVAL BUILDING. SEE E140
f --
PROJECT SITE TABLE
OWNER:
RIVANNA WATER & SEWER AUTHORITY
COUNTY:
ALBEMARLE
STATE:
VIRGINIA
ENGINEER:
HAZEN AND SAWYER,
4011 WESTCHASE BLVD.
SUITE 500
RALEIGH, NC 27607
PROJECT:
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
PROJECT #:
31430-006
SURVEY:
DRAPER ADEN ASSOCIATES
110 AVON STREET
CHARLOTTESVILLE, VA22902
(434)295-2105
DATE: JANUARY 15, 2021
SURVEY NO.
19060494-020503
DATUM:
HORIZ: NAD-83 VIRGINIA SOUTH ZONE
VERT: NAVD-88
BENCHMARKS (SHOWN ON C11):
BM1
BM2
N:3893827.9960 N:3893939.2910
E:11493412.6220 E:11493955.3390
ELEV:351.85 ELEV:359.62'
100 YEAR FLOODPLAIN ELEVATION: 324.00'
REFERENCE: FEMA MAP # 51003CO289D
DATED FEBRUARY 4, 2005
LIMITS OF DISTURBANCE: 19,000 SF
PROJECT
ENGINEER: J. NEWBOLD
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
2021.09.21
Michael Santowasso11:19:27-04'00'
en
-
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA27607
LICENSE NO.: C-0381
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
SITE
CIVIL
OVERALL SITE PLAN
DATE: EPTEMBER 2021
DESIGNED BY: A. MARCH
HAZEN NO.: 31430-006
DRAWN BY: A. MARCH
CONTRACT NO.: 1
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
CHECKED BY: M. SANTOWASSO
DRAWING
NUMBER:
C10
2
95% DESIGN SUBMITTAL
9/14/21
JN
IF THIS BAR DOES NOT 0 1/2" 1"
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
1
50% DESIGN SUBMITTAL
4/6/21
JN
REV
ISSUED FOR
DATE
BY
I
345 / g46
F_ - — —
W-0
0
BULKCHEMICAL
STORAGE
U
u
/_Do1 —001 —Ool —001 —001 —001
,5yo
LOD—]
°
vd..
r0
a�e
o
i o
z3of
O
Paz
.9
•
O
a
I
LIMITS OF GROUND
LIMITS OF
DISTURBANCE, TYP.
ELECTRICAL
DISTRIBUTION BUILD
STANDBY POWER GE
353
O
DEMOLISH CURB ANI
0
BENCHMARK 1
CHISELED SQUARE ON
LIGHT POLE 48 , o DEMOLISH ASPHALT PAVEMENT,
ELEV: 351.85 I Mry Lo
Lo
to n SEE NOTE 1
OJ
O
J
352
N M MOORES CREEK LN (PRIVATE) -
m l\\) C
/ V
353
354 r ELECTRICAL PULLBOX, TYP. ❑oJ
\
355 Oo �T
356 I I y60
357 0 0
O
358 Lo
359 L LOD— LOD— LOD— LOD— LOD— LOD— D °"
0 360
C/w
m
AEATION BASIN No. 2
AEATION BASIN No. 3
AEATION BASIN No. 4
PROJECT
ENGINEER: J. NEWBOLD
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 211:19 :48-.21
8-04'00'
DESIGNED BY: A. MARCH
DRAWN BY: A. MARCH
CHECKED BY: M. SANTOWASSO
2
95% DESIGN SUBMITTAL
9/14/21
JN
IF THIS BAR DOES NOT 0 1/2" 1"
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
1
50% DESIGN SUBMITTAL
4/6/21
JN
REV
ISSUED FOR
DATE
BY
0
4p
0
x
X
SLUDGE PUMPING
STATION
X
NOTES:
1. CONTRACTOR SHALL DEMOLISH ASPHALT TO
ENSURE ONE LANE OF MOORES CREEK LANE IS
ACCESSIBLE TO PLANT STAFF AT ALL TIMES.
SECONDARY
CLARIFIER 1
f X �
a,
.. . _ • • � . ° .. mayy,-_-___-_--
_
y a.,
�ed � � 'n : � C v:a ... �$ P � E .. e. a •a 3�.^� C �° �Q d 6�
.�•4Vss
❑..a Q° a• . v q- ..
a
a 1
a"
36
■ yo, e_d_ ■ '• v. .ad" a .. .
O
.n a a y .a•. •.y • ,a' y 361
a a
_ .S :.d !.. •.< a �. .a 9' a :a• •a �' a.. .. e
6 ... °
/7777777777777777
10 El
150 a.
BLOWER / I (I 12° p a
:1�11��1IR i�7�G
g ul I A� 12;
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
i
a
. a
a
� O D/w
z %
r
•
PLAN °
d�
ALE: 1" = 20' �� J
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
PRIMARY
CLARIFIER 3
BENCHMARK 2
CHISELED SQUARE
ON LIGHT POLE 58
ELEV: 359.62
PRIMARY
CLARIFIER 2
VENTS
ACCESS COVER
e20 10 0 20'
VENTS ALE: 1' �n, k
w � `l
DATE: SEPTEMBER 2021
HAZEN NO.: 31430-006
SITE CIVIL CONTRACT NO.: 1
DRAWING
EXISITNG CONDITIONS AND DEMOLITION PLAN NUMBER:
C11
2
1' CAS
T UGE -
- I— UGE
95% DESIGN SUBMITTAL
I REV I ISSUED FOR
—I
I
I
1
I
LIMITS OF GROUND SURVEY
I
I
DOMINION ENERGY
UTILITY TRANSFORMER
I
i
UTILITY METERING PEDESTAL
AEATION BASIN No. 1
C/W
AEATION BASIN No. 2
AEATION BASIN No. 3
AEATION BASIN No. 4
C/W
PROJECT
ENGINEER: J. NEWBOLD
DESIGNED BY: A. MARCH
DRAWN BY: A. MARCH
CHECKED BY: M. SANTOWASSO
9/14/21 JN IF THIS BAR DOES NOT 0 1/2" 1"
4/6/21 JN MEASURE 1" THEN DRAWING
DATE BY IS NOT TO FULL SCALE
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 9.09.21
11: 0:08-04'00'
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
J
--- — —— — — — — — — —
T�46� PE ---
SITE
CIVIL
EXISTING YARD PIPING PLAN
SECONDARY
CLARIFIER 1
1—
==62 FANAOTR�
' IMAJ
" ill�,OCL/l
C
8' H*M/_%ATR
8' HWS/'_1g34
L7
2 G/bATR --
C/W
PRIMARY
CLARIFIER 2
DATE: SEPTEMBER 2021
HAZEN NO.: 31430-006
CONTRACT NO.:
DRAWING
NUMBER:
C12
i
T
SILT FENCE
C-31-0400 345 346 -
c
STABILIZED OUTLET m
FOR SILT FENCE
C-31-0403
iIR�mm
MATCH EXISTING PAVEMENT
,� C-32-0556 I MN
M
ASPHALT PAVEMENT
C-32-0551 11
— 352 3 _
CURB INLET PROTECTION, TYP. 354 -
C-31-0414 — 355
356
CONTRACTOR LAYDOWN/STOCKPILE AREA
Of
PS DC I 1 I I
I ' i O CONCRETE WASHOUT X
PLATFORM X X
I
---�g I I I
LOD—
.35-
I. II
- ��--------4
! o w ¢ FUTURE
0 w j AUXILIARY FUEL
.'a.- N 0- W TANKAREA
•.9 I I I
s� I I
IP __r1 Lo
r � I tp
m v=-0 -- —
CONCRETE PAD FOR
SWITCHGEAR BUILDING
S-03-0508
ELECTRICAL MANHOLE, TYP.
CURB AND GUTTER, TYP.
C-32-0530
TEMPORARY GRAVEL
354 CONSTRUCTION ENTRANCE/EXIT
C-31-0490
,y60
ELECTRICAL DUCTBANK, TYP.
E-33-0101 C-01-0106
W
N
to M
I o
359 LL LOD— LOD— LOD g4OFa�_LOD— LOffjL�lp� °a[
�a�' o �'It�lttl�lttpltlhfryll
a
C/w
C/w
J
a
El
15o
a
0mr®
a
0
I�dJ a d
a °S.
° a
so
'y' a_-:,
- a 4, a a 359' .a .4.
) 4
a y
a A.
a-
O ,
360
1XI
CRgSS
Ills"
"C',
a
C/w
a
a:
.a. s
� a Q
!2O C/w
El
z
VENTS
ACCESS
COVER
g °
❑
V
C/w
me
ACCESS COVER
d <:
P ° a
2
10 0 20'
VENTS SALE: 1"
l
PROJECT
ENGINEER:
J. NEWBOLD
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
DATE: EPTEMBER 2021
DESIGNED BY: A. MARCH
HAZENNO.: 31430-006
PRELIMINARY DESIGNHazen
SITE
DRAWN BY:
A. MARCH
DO NOT USED FOR
CONSTRUCTION
_
HAZEN AND SAWYER
CIVIL
FINAL SITE PLAN
CONTRACT NO.: 1
MOORES CREEK AWRRF
CHECKED BY: M. SANTOWASSO
DRAWING
4011 WESTCHASE BOULEVARD, SUITE 500
ELECTRICAL INFRASTRUCTURE
NUMBER
2
95% DESIGN SUBMITTAL
9/14/21
JN
IF THIS BAR DOES NOT
MEASURE 1 "THEN DRAWING
IS NOT TO FULL SCALE
0 1/2" 1"
2021.09.21
MichaeiSantowasso 0:29-04'00'
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
IMPROVEMENTS
C13
1
50% DESIGN SUBMITTAL
4/6/21
JN
REV
ISSUED FOR
DATE
BY
U)
W
W
z
J
i
r I I
8'-0" MAX
STEEL POST
TOP STRAND
STAY WIRES
GALV WIRE FABRIC
AND SILT FENCE
MATERIAL. BURY TOE
OF MATERIAL FABRIC A
MIN OF 8"
BOTTOM STRAND
GRADE LINE
T
.�
z_ mQ
LL
o LU
ih W
H
J
LL
z
CO 2
MIN
1
ELEVATION SECTION
SILT FENCE SILT FENCE
NOTE:
1. EXTRA STRENGTH SILT FENCE MATERIAL (AS APPROVED BY
ENGINEER) WITH 6-0" POST SPACING DOES NOT REQUIRE MESH
SUPPORT FENCE.
2. SILT FENCE MATERIAL SHALL BE WIRED DIRECTLY TO POST.
C-31-0400
Q. ,.,,,,
o z
iv 2
CURB OPENING
WITHOUT GRATE
OVERFLOW GAP
AGGREGATE
POUCH —
NOTES:
MANHOLE
CURB FILTER
GUTTERGATOR O BY
ACF ENVIRONMENTAL
OR APPROVED EQUAL
1. INSTALL CURB FILTERS AT ALL INLETS WITHOUT GRATES TO KEEP SILT, SEDIMENT AND
CONSTRUCTION DEBRIS OUT OF THE STORM SYSTEM
2. THE CURB FILTER SHALL BE DANDY CURB AS MANUFACTURED BY DANDY PRODUCTS INC., OR
EQUAL. SUBMIT SHOP A SHOP DRAWING FOR THE CURB FILTERS.
3. THE CURB FILTER SHALL FORM OF A CYLINDRICAL TUBE PLACED IN FRONT OF AND EXTENDING
BEYOND THE INLET OPENING ON BOTH SIDES.
4. THE CURB FILTER SHALL HAVE A POUCH ON THE STREET SIDE OF THE UNIT FOR STONE
AGGREGATE TO HOLD THE FILTER IN PLACE.
5. THE CURB FILTER SHALL BE CONSTRUCTED OF A HIGH VISIBILITY ORANGE MONOFILAMENT
FABRIC.
6. FILL POUCH WITH #57 STONE AGGREGATE TO A LEVEL (AT LEAST HALF -FULL) THAT WILL KEEP
UNIT IN PLACE DURING A RAIN EVENT AND CREATE A SEAL BETWEEN THE CURB FILTER AND THE
SURFACE OF THE STREET.
7. CENTER THE UNIT AGAINST CURB OR MEDIAN INLET OPENING SO THAT THE CURB SIDE OF THE
UNIT CREATES A SEAL WITH THE CURB OR MEDIAN BARRIER AND INLET STRUCTURE. THERE WILL
BE APPROXIMATELY TWELVE (12) INCHES OF THE INLET PROTECTION UNIT OVERHANGING ON
EACH SIDE OF THE OPENING.
8. THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM SURFACE
AND VICINITY OF UNIT AFTER EACH RAIN EVENT.
CURB INLET PROTECTION
C-31-0414
1992
STONE CONSTRUCTIONENTRANCE
70' MIN. EXISTING
PAVEMENT
FILTER • MOUNTABLE
(OPTIONAL>
SIDE ELEVATION
EXISTING GROUND
'
(OPTIONAL)
•iF••
_ 44PAVEMENT
1
•'`.�';
nib.,'_
— —_ p ��Gr: �`�.1:�.',..,I�
COURSE AGGREGATE TO SEDIMENT
B
TRAPPING DEVICE
MUST EXTEND FULL WIDTH
OF INGRESS • EGRESS
OPERATION
ILTER • SECTION
REINFORCED CONCRETE DRAIN SPACE
B-B
AdaptedSECTION
9: Standards
Erosion and Sediment Control, and Va. DSWC
STABILIZED OUTLET FOR SILT FENCE FINISHED
12"
2'-6"
MIN
GRADE
C-31-0403 VARIES -SEE SITE PLAN
6°
CONCRETE CURB
CL
AND GUTTER
ASPHALT
VARIES 4'-0" EQUAL EQUAL 4'-0"
PAVEMENT-
12" SLOPE AT 1/4:12 SLOPE AT 1/4:12
MIN 2" ASPHALT
U 3 R 1 1/2"
SLOPE
TYP SURFACE COURSE
3.5" ASPHALT TACK COAT
U
BASE COURSE
3.1 SLOPE g 1 12:1 12:1 3'1
U DO U
S�Opc _
\�� �\7
-
PROJECT
ENGINEER: J. NEWBOLD
DESIGNED BY: A. MARCH
DRAWN BY: A. MARCH
CHECKED BY: M. SANTOWASSO
2 95% DESIGN SUBMITTAL 9/14/21 JN
1 50% DESIGN SUBMITTAL 4/6/21 JN M THIS BAR DOES NOT 0 1/2" 1"
MEASURE 1" THEN DRAWING
REV ISSUED FOR DATE BY IS NOT TO FULL SCALE
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 2021.0921
11:20:50-04'00'
CUT SECTION
NOTE:
THE 2" ASPHALT CONCRETE SURFACE COURSE AND THE
TACK COAT SHALL NOT BE PLACED UNTIL COMPLETION OF
ALL OTHER WORK IN CONTRACT.
FILL SECTION
8" AGGREGATE BASE COURSE
TYPE I SEPARATOR GEOTEXTILE
COMPACTED SUB -GRADE
TYPICAL ROADWAY SECTION
C-32-0551
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
NOTES:
1. CONTRACTION JOINTS SHALL BE PLACED AT 10 FOOT INTERVALS, OR 15
FOOT INTERVALS WHEN A MACHINE IS USED TO PLACE THE CURB.
2. EXPANSION JOINTS SHALL BE PLACED AT 90 FOOT INTERVALS AND
ADJACENT TO ALL RIGID OBJECTS.
CURB AND GUTTER
C-32-0530
DETAILS
CIVIL
STANDARD DETAILS
DATE: SEPTEMBER 2021
HAZEN NO.: 31430-006
CONTRACT NO.: 1
DRAWING
NUMBER:
CD1
FOR ASPHALT PAVEMENT OVER CONCRETE
CONCRETE - MATCH
EXISTING, 6" MIN
AGGREGATE BASE
COURSE, MATCH
EXISTING, 6" MIN-
1/2 S
ASPHALT SURFACE
COURSE, MATCH
EXISTING, 2" MIN
COMPACTE�
BACKFILL
z
iv
NOTES
W
TYPE A
IN EARTH
C-01-0100
FOR ASPHALT PAVEMENT
EXISTING PAVEMENT
ASPHALTBASE
COURSE, 3.5" MIN
AGGREGATE BASE
COURSE, MATCH
EXISTING, 6" MIN
TYPEISEPARATOR
GEOTEXTILE
1. SEE C-01-0107 FOR TRENCH
WIDTH, "W'VALUES.
2. SEE C-01-0100 THRU
C-01-0105 FOR PIPE BEDDING
DETAILS.
3. THIS DETAIL SHALL APPLY TO
W BOTH PIPING AND CONCRETE
ENCASED DUCTBANKS.
SEE NOTE 1
TYPICAL TRENCH
C-01-0106
PROJECT
ENGINEER:
DESIGNED BY:
DRAWN BY:
A. MARCH
CHECKED BY: M. SANTOWASSO
2 95% DESIGN SUBMITTAL 9/14/21 JN
1 50% DESIGN SUBMITTAL 4/6/21 JN M THIS BAR DOES NOT 0 1/2" 1"
MEASURE 1" THEN DRAWING
REV ISSUED FOR DATE By IS NOT TO FULL SCALE
PRELIMINARY DESIGN
DO NOT USED FOR
CONSTRUCTION
Michael Santowasso 2021.09.21
11:21:16-04'00'
COMPACTED
BACKFILL
SELECT BACKFILL
MATERIAL (NO
MATERIAL LARGER
THAN 2")
TRENCH EXCAVATION LIMITS
INTERNAL
DIAMETER
OF PIPE
W
WIDTH OF TRENCH
MAX
W=MIN
4"-6"
3,-9"
21-0"
8"-10"
3,-9"
2'-2"
12"
3'-9"
O.D.+2'
14"-16"
4'-2"
O.D.+2'
18"
4'-4"
O.D.+2'
20",21"
4'-8"
O.D.+2'
24"
4'-11"
O.D.+2'
27"
5'-9"
O.D.+2'
30"
6'-7"
O.D.+2'
36"
T-4"
O.D.+2'
42"
8'-2"
O.D.+2'
48"
8'-9"
O.D.+2'
54"
9'-4"
O.D.+2'
60"
9'-10"
O.D.+2'
72"
11'-0"
O.D.+2'
78"
11'-8"
O.D.+2'
84"
12'-0"
O.D.+2'
90"
12'-6"
O.D.+2'
96"
13'-0"
O.D.+2'
108"
14'-0"
O.D.+2'
DEPTH
OF
CUT
S
MAXIMUM PAVEMENT
REPLACEMENT WIDTH
0-6'
S=W+4'
>6-8'
S=W+8'
>8-10'
S=W+12'
>10-12'
S=W+16'
>12-14'
S=W+20'
>14-16'
S=W+24'
>16-18'
S=W+28'
>18'
S=W+32'
W = TRENCH WIDTH AT BOTTOM OF
PIPE. TRENCH SIDE SLOPES SHALL
BE IN ACCORDANCE WITH OSHA
REQUIREMENTS.
C-01-0107
Hazen
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
6" MIN
EDGE DISTANCE
BLDG EDGE/EQUIP EDGE
8" MIN #57 STONE
COMPACTED SUBGRADE
NEW ASPHALT PAVEMENT
SEE C-32-0550
CUT BACK EXIST CUT BACK EXIST BASE
6" MIN FROM BASE
SLOPE
EXIST SURFACE
COURSE
TACK COAT
#5@8"
T&B, EW
COURSE 12" MIN
ASPHALT SURFACE
COURSE, 2" MIN
TACK COAT
ASPHALT BASE
COURSE, 3.5" MIN
AGGREGATE BASE COURSE
EXIST BASE COURSE
TYPICAL PAVEMENT JUNCTION
C-32-0556
#5@8" EW
AS REQUIRED
FOR EQUIPMENT
#5@8"
" MINIMUM DEPTH FROM FINISHED GRADE TO BOTTOM OF
FOUNDATION PER GENERAL STRUCTURAL NOTES (FROST DEPTH)
NOTE:
UNLESS NOTED OTHERWISE, CONTRACTOR SHALL HAVE THE OPTION OF
PLACING EQUIPMENT FOUNDATION WITH A CONSTANT THICKNESS OF D + 6" OR
AS AN 8" SLAB WITH THICKENED EDGE AROUND THE FOUNDATION PERIMETER.
EXTERIOR EQUIPMENT FOUNDATION
S-03-0508
RIVANNA WATER & SEWER AUTHORITY
CHARLOTTESVILLE, VIRGINA
MOORES CREEK AWRRF
ELECTRICAL INFRASTRUCTURE
IMPROVEMENTS
2'-0"
DETAILS
CIVIL
STANDARD DETAILS
DATE: SEPTEMBER 2021
HAZEN NO.
CONTRACT NO.:
DRAWING
NUMBER:
31430-006
1
CD2