HomeMy WebLinkAboutWPO202100055 VSMP - SWPPP 2021-09-23of All COUNTY OF ALBEMARLE ?� 'v Department of Community Development .' 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 !' Tel. (434) 296-5832 • Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP) Project Name: Address: For Construction Activities At: 695 Moores Creek Lane Charlottesville, VA 22902 Prepared by: Name: Hazen and Prepared for: Name: Rivanna Water and Sewer SWPPP Preparation Date: 09/10/2021 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part H, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) The Rivanna Water & Sewer Authority is proposing a new switchgear building and extension of the existing ductbank network. The switchgear building will be pre -manufactured and placed on a new concrete pad. Concrete encased ductbanks and manholes will be placed to connect the new switchgear building to the existing switchgear building and the existing ductbank network. In addition, RWSA will be performing tests on the existing ductbank network to determine the overall condition of conduits within the network. Conduits in poor condition may require spot replacements throughout the project site. All disturbed areas will be returned to their existing grade of either grass or asphalt. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 1 1 x 17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County 9VAC25-840-40. MINIMUM STANDARDS. A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANEM STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANEM VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASIN$ SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. THIS CHAPTER. I. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TMP SHALL BE 134 b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY FOLLOWING MANNER: CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. § 62.1-44.15:52 OF THE CODE OF VIRGINIA. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES TO THE POINT OF ANALYSIS WITHIN THE CHANNEL 15 ONE HUNDRED TIMES HISTORICAL NOTES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN FORMER 4VAC50-30-90 DEFINED FROM VR625-02-00 § 4; EFF SEPTEMBER 13, CAPACITY OF A SEDIMENT BASIN SHALL SHALL BE CONTROLLED BY A SEDIMENT BASIN.134CUBIC YARDS PER ACRE OF THE MINIMUM STORAGE QUESTION; OR 1990; AMENDED, VIRGINIA REGISTER VOLUME 11, ISSUE 11, EFF. MARCH 22, DRAINAGE AREA. THE OUTFACE SYSTEM SHALL, A AT A MINIMUM, MAINTAIN THE T (A) NATURAL CHANNELS SHALL BE ANALYZED I THE USE OF A 1995; VOLUME 29, ISSUE I EFT. VOLUME 30, 21, 2, E AMENDED AND STRUCTURAL INTEGRITY FF THE BASIN DURING A 25-YEAR STORM OF TWO-YEAR STORM TO VERIFY THAT OF BE WILL NOT OVERTOP RENUMBERED, VIRGINIA REGISTER VOLUME 30, ISSUE 2, EFF. OCTOBER 23, 24-HOUR DURATION. RUNOFF COEFFICIENTS USED N RUNOFF CALCULATIONS CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED O0. BANKS. 2013. SHALL CORRESPOND HI A BARE EARTH CONDITION OR IZED rnummOuc EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. S. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED S) THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13. WHEN A WE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14. ALL APPUCABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: NO MORE THAN 300 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 1. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE SIABILZTION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH (b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED O0. KINKS; AND IQ PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALL$ INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALB INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THEIMPROVEMEWS. B. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. I. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. IF OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. b. ALL ON- SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. 1. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. I. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. I. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY ROW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN O0. EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE 57E WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANTTO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW KATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-87048OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM(VSMP) REGULATIONS. n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. STATIRORYAUTHORITY SITE SEEDING SCHEDULE AND NOTES APPLICATION RATES IN POUNDVACRE SEED PLANTING STRAW MIXTURE SEASON SEED LIME' FERTILIZER— MULCH'- COMMENTS PREFEREDSEASONS: P FEB 15-APR 30 200 4000 1000 4000 SEPT1-SEF1­SO SEPT1-OCT31 FEB 15-MARCH 30 OVERSEED WITH TYPE P TW SEPT 1-FEB 15 100 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TER FES16-APR SO 100 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TSU MAY1-AUG31 50 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON P- I W LBIAC KENTUCKY 31 TALL FESCUE 5 LBIAC PERENNIAL RYEGRAS I 5 LELAC KEN UCKY BLUEGRASS TW -50 LBIAC ANNUAL RYEGRASS 50 LRLAC CEREAL (WINTER) RYE TER- 100 LBIAC ANNUAL RYEGRASS TSU - 50 LEAD GERMAN MILLET SEED MIXTURES TO BE USED ON THE PROJECT FOR PERMANENT (P), TEMPORARY WINTER Uw), TEMPORARY SPRING (TSP) AND TEMPORARY SUMMER (TSU) SHALL BE AS FOLLOWS (ACCEPTABLE SUBSTRUMS PER SECTION 3,31 AND 3.32 OF THE VA EROSION AND SEDIMENT CONTROL HANDBOOK MUST BE APPROVED BY ENGINEER) 1. SCARIFY 2' DEPTH OF SUBGRADE PRIOR TO PLACING TOPSOIL. 2. TOPSOIL SHALL BE SPREAD AT P INCH CONSOLIDATED DEPTH 3. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, OF HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. IN FINE SOILS, SEEDS SHOULD BE DRILLED 114 - V2INCH, IN COARSE, SANDY SOILS, SEEDS SHALL BE PLANTED NO DEEPER THAN 3L4 INCH. COVER BROADCAST SEED BY LIGHTLY RAKING OR CHAIN DRAGGING; THEN FIRM SURFACE WITH A ROLLER OR CULTIPACKER TO PROVIDE GOOD SEED CONTACT. 4. ON CUT AND FILL SLOPES 2:1 OR STEEPER ADD 20 LES/AC OF WEEPING LOVEGRASS TO THE P SEED MIXTURE IN THE SPRING AND ADD 20 LBSIAC ANNUAL RYEGRASS IN FALL AND WINTER. LIME SHALL BE APPLIED AT A MINIMUM OF 2 TONS PER ACRE WITH 3 TONS PER ACRE IN CLAY SOILS. APPLICATION RATES ANDIOR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST. TACK MULCH BY APPLYING AT 0.10 GAI/YW. RATE REQUIREMENTS FOR TEMPORARY SEEDING SHALL BE BASED UPON A PH TEST AS SUCH: <4.2 3TONSIACRE 4.2-5.2 3TONSIACRE 5.2-6.0 1 TONIACRE •• FERTILIZER SHALL BE I0-20-10 MIX OR EQUIVALENT NUTRIENTS. ALTERNATIVE METHODS OF MULCHING MAYBE UTILIZED. ALTERNATIVE METHOD: REQUIREMENTS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. eNcilaisR: J. NEWBOLD PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION HAZENANDSAWVER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA27607 LICENSE NO.: C-0381 RIVANNA WATER &SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA CIVIL VIRGINIA MINIMUM STANDARDS DATE: SEPTEMBER2021 DESIGNEDBY: A. MARCH HAZEN NO.: 31430-006 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK AWRRF ELECTRICAL INFRASTRUCTURE IMPROVEMENTS CHECKEDBY: M. SANTOWASSO DRAWING NUMBER: CO2 2 95% DESIGN SUBMITTAL W14121 JN IF THIS BAR WES NOT 0 1IY 1' MEASURE V THEN DRAWING IS NOT TO FULL SCALE nmiEsiiii 1 `A% DESIGN SUBMITTAL `WC1 JN REV ISSUED FOR DATE BY G31 0 '%Ai lop r: Jul aim i M IS. LIMITS OF DISTURBANCE CONCRETE PAD FOR BWITCHGEAR BUILDING ELECTRICAL MANHOLE, TYP. TEMPORARY GRAVEL 0 tfj bI' fg8• .T A y. o 0 8 V o '�i=4" CURB INLET • �lJ¢'� ioiii.r iiiir �o�eno�®ooii�i o�yr o ��riavi ern raw mi�.��..o oi� r or..rvi is i1 f1 i i Ii, IImin I-- J. is; 1 �M .EHR C�U.Eps �b ❑ m cM \ 5 LE: 1 �1p� r 1 PROJECT ENGINEER : J. NEWBOLO PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION HazenCHARLOTTESVILLE, - HAZEN AND SAWYER 4011 W EIGH,NO BOULEVARD, A27607500 RALEGH,NORTHCAROLNA27607 LICENSE NO.: C-0381 RIVANNA WATER &SEWER AUTHORITY VIRGINA WPO CIVIL EROSION AND SEDIMENT CONTROL PLAN DATE: SEPTEMBER2021 DESIGNEDBY: A. MARCH HAZEN NO: 31430-006 GRAM BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK AWRRF ELECTRICAL INFRASTRUCTURE IMPROVEMENTS CHECKEDBY: M.SANTOWASSO DRAWING NDMBER: I 2 a s%DESIGNSUBMITTAL 9114121 IFT GBARWESNOT 0 1n• r MEASUREI"THEN DRAWING IS NOT TO FULL SCALE 1 W%DEBIGNBUBMITTPL lJN a1Brz1 JN REV ISSUED FOR DATE BY B'-0' MAX ELEVATION SECTION SILT FENCE SILT FENCE NOTE: 1. EXTRA STRENGTH SILT FENCE MATERIAL (AS APPROVED BY ENGINEER) WITH T-0 POST SPACING DOES NOT REWIRE MESH SUPPORT FENCE. 2. SILT FENCE MATERIAL SHALL BE WIRED DIRECTLY TO POST. C-31-0400 STABILIZED OUTLET FOR SILT FENCE C-31-0403 CURB OPENING WITHOUT GRATE MANHOLE OVERFLOW GAP AGGREGATE POUCH — NOTES'. CURB FILTER GUTTERGATOR®BY ACF ENVIRONMENTAL OR APPROVED EQUAL 1, INSTALL CURB FILTERS ATALL INLETS WITHOUT GRATES TO KEEP SILT, SEDIMENTAND CONSTRUCTION DEBRIS OUT OF THE STORM SYSTEM 2. THE CURB FILTER SHALL BE DANDY CURB AS MANUFACTURED BY DANDY PRODUCTS INC, OR EQUAL. SUBMIT SHOP SHOP DRAWING FOR THE CURB FILTERS. 3. THE CURB FILTER SHALL FORM OF A CYLINDRICAL TUBE PLACED IN FRONT OF AND EXTENDING BEYOND THE INLET OPENING ON BOTH SIDES. 4. THE CURB FILTER SHALL HAVE A POUCH ON THE STREET SIDE OF THE UNIT FOR STONE AGGREGATE TO HOLD THE FILTER IN PUCE. 5. THE CURB FILTER SHALL BE CONSTRUCTED OF A HIGH VISIBILITY ORANGE MONOFILAMENT FABRIC. S. FILL POUCH WITH 1157 STONE AGGREGATE TO A LEVEL TAT LEAST HALF -FULL) THAT WILL KEEP UNIT IN PLACE DURING A RAIN EVENT AND CREATE A SEAL BETWEEN THE CURB FILTER AND THE SURFACE OF THE STREET. L CENTER THE UNIT AGAINST CURB OR MEDIAN INLET OPENING SO THAT THE CURB SIDE OF THE UNIT CREATES A SEAL WITH THE CURB OR MEDIAN BARRIER AND INLET STRUCTURE. THERE WILL BE APPROMMATELYTWELVE (12) INCHES OF THE INLET PROTECTION UNIT OVERHANGING ON EACH S1DE OF THE OPENING. B. THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM SURFACE AND VICINITY OF UNIT AFTER EACH RAIN EVENT. CURB INLET PROTECTION C-31-0414 rvP ....... MIN T SURFACE ASPHALT SURFACE COURSE CUT SECTION/'" "\'! NOTE: THE 2-ASPHALT CONCRETE SURFACE COURSE AND THE TACK COAT SHALL NOT BE PLACED UNTIL CCMPIETION OF ALL OTHER WORK IN CONTRACT. TYPICAL ROADWAY SECTION C-32-0551 FILL SECTI 'REGATE BASE WORSE I SEPARATOR GEOTEXTILE FINISHED GRADE _ MIN CONSTRUCTIONSTONE ENTRANCE =L III1 IDE ELEVATION. FOISTIONG GROUND �IIIIIIIII� 5 -� _ DROP POOL PLAN VIEW y� MENG.P. ... SECTION B—B Savor: Adapted from 19�grylaed S1m dat& for Soil Plate 3.1ib1 Pm — —A r-1-1 anA V. T1CYI!' CONCRETE CURB ANDGUTTER IN. I:lgO v 13 R r 11YY' SLOPE NOTES: 1. CONTRACTION JOINTS SHALL BE PLACED AT IO FOOT INTERVALS, OR 15 FOOT INTERVALS WHEN A MACHINE IS USED TO PLACE THE CURB. 2 EXPANSIONJOIWSSHPLLBEPIACEDAT90FWTINT RVALSPND ADJACENTTO ALL RIGID OBJECTS. CURB AND GUTTER C-32-0530 eNcIeiER: J. NEWBOLD PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION HamnCHARLOTTESVILLE, —� HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEGH,NORTHCAROLNA27607 LICENSE NO.: C-0381 RIVANNA WATER &SEWER AUTHORITY VIRGINA DETAILS CIVIL STANDARD DETAILS DATE: SEPTEMBER2021 DESIGNEDBY: A. MARCH HA2eNNm 31430-006 DRAwN av: A. MARCH CONTRACT NO.: 1 MOORES CREEK AWRRF ELECTRICAL INFRASTRUCTURE IMPROVEMENTS CHECKEDBY: M. SANTOWASSO DRAWING NUMBER: CD1 2 B5%DESIGN SUBMITTAL W14121 JN IFTHIS BAR WE8 NOT 0 ,/2' ,' M.Ll El'THENDRAWINGnmiEI IS NOT TO FULL SCALE 1 `A%DEBIGN SUBMITTAL yy21 JN REV ISSUED FOR DATE BY Section 5. Stormwater Management Plan (Provide a reduced 11 x 17 copy of the latest stormwater management plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County / oo)' 00 0 O N 353 357 i 353 fi0 0 D0 -2 ao— — LEGEND ® IMPERVIOUS AREA,(ADDED) OPEN SPACE DIRECTION OF SURFACE FLOW 0 LIMITS OF DISTURBANCE CONCRETE PAD FOR SWITCHGEAR BUILDING ELECTRICAL MANHOIE TYP. PEAK FLOW CALCULATIONS COVER DESCRIPTKIN SG CN Ane CNIMPERVIOUS A 98 0.00 Do B FB 98 0.00 0.0 LAWN A 39 0.00 0.0 61 0.38 23.2 TOTALS O.A 23 COMPOSITE CN Bi TIME OF CONCENTRATION, k(HOURS) 0.10 STORM FREQUENCY(YR) 2 10 RAINFALL (IN) 3.88 5.59 RUNOFF, O O.OS I 1.ID PEAK FLM(US) COVER DEBCRIPTpN HBO CN Am CNZAIV] IMPERVOUS A 98 0.00 0.0 B 98 0.01 1.0 (AWN A 39 0.00 0.0 B 61 0.3T 22.6 TOTALS 0.4 24 COMPOSITE CNI 82 TIME OF CONCENTRATION, I,(HOURS) 0.10 STORM FREQUENCY(YR) 2 10 RAINFALL (IN) 3.88 5.5A RUNOFF,O 0.89 1.78 PEAK FLOW (CFS) 0.4 1.0 VRRM COMPLIANCE mmmmo® 000000 o©oo©o i—..—W^�00000a 00 momlmo® 000000 000000 00 000 oa0 o00 �000 0 PLAN SCALE: 1" = 20' w.Fwl mmmlw;weww 30 10 00 220• SCALE: 1" = 20' ENGINEER: J. NEWBOLD PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION HazenCHARLOTTESVILLE, — HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER &SEWER AUTHORITY VIRGINA WPO CIVIL STORMWATER MANAGEMENT PLAN DATE: SEPTEMBER2021 DESIGNEDBY: A. MARCH HAZEN NO: 31430-006 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK AWRRF ELECTRICAL INFRASTRUCTURE IMPROVEMENTS CHECKEDBY: M. SANTOWASSO DMwNc NI1MBEa: ---- 2 0% DESIGN SUBMITTAL 9114121 Jry IFTHISBnaooEsrvoT o 1n 1. MEASURE("THEN DRAWING IS NOT TO FULL SCALE 1 W%DESIGN BUBMITTPL aanl JN REV ISSUED FOR DATE BY Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section AA) A. Plan showing pollution activities and prevention practices (Provide a reduced I W7 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County � sA- �SF=S IS B � / CONTRACTOR IAIW ANI STOCKPILE PREA IAA �S 9 is APPROXIMATE LOCATION OF CONCRETEWASHOUTAND 13 PORTABLE RESTROOM E3 — — — �` 1666 LIMITS OF DISTURBANCE 5 b CONCRETE PAD FOR SWfTCHGEAR BUILDING 353 i rc b 35l �6 ELECTRICAL MANHOLE. TYP. 353 f x x Iril. F'. •'g. d:.;. ;A a0 ''•am 4. 8 v 0 p a' A is; 1 �M �EHR CCU Eps �b ❑ m 1�, cM \ xxo s LE: 1 -i r 1 PROJECT PR ENGINEER : J. NEWBOLo PRELIMINARY DESIGN DO NOT USED FOR CONSTRUCTION HazenCHARLOTTESVILLE, — HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER &SEWER AUTHORITY VIRGINA WPO CIVIL POLLUTION PREVENTION PLAN DATE: SEPTEMBER2021 DESIGNEDBY: A. MARCH RA NO: 31430-006 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK AWRRF ELECTRICAL INFRASTRUCTURE IMPROVEMENTS CHECKEDBY: M.SANTOWASSO DRAWING NDmBER: ---- 2 A5%DESIGN SUBMITTAL slum JN IFTHIS BAR ooESNOT o /m /. MEASURE rTHENDFAwING IS NOT TO FULL SCALE 1 50% DESIGN SUBMITTAL aam JN REV ISSUED FOR DATE BY B. Sources of Pollutants, locations, and Drevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures C. Sources of Pollutants, continued. Common activities and minimum control and prevention ractices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and on- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip Paving operations Roads and driveways pans and absorbent/oil dry for all paving machines to limit leaks and spills Direct concrete wash water into a leak - Concrete washout Current location and detail shown proof container or leak -proof settling and cement waste on plan basin that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting, and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Water shall be filtered, settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on Plan. Designated areas for material delivery Material delivery and storage Designated area shown on plan and storage. Placed near construction entrances, away from waterways and drainage paths Follow manufacturer's instructions Material use during building process Building areas . MSDS's attached. waste collection area will not receive a substantial amount of runoff from upland Solid waste disposal Current designated container areas areas and does not drain directly to a on plan waterway. Containers have lids covered before periods of rain, or are in a covered area. Scheduled collection to prevent Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures overfilling. MATERIALS NOT TO BE BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be Sanitary waste Current locations shown on plan provided, and located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or Wash Waters Wash areas shown on plan better control as specified on plan. Minimize the discharge of pollutants from a ui ment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) I13 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) IRWSA and Hazen & Sawyer will have staff and inspectors on site to ensure compliance with I pollution prevention practices. Final responsibility will be on the persons designated by the Contractor at the Pre -construction meeting. Persons Responsible: F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows; Report all spills, leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section AA.e.) G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) Due to the small scope of the project, exact Pollution Prevention training will be designated at the Pre -Construction meeting. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. (Provide detailed measures for any applicable TMDL) According to the 2016 TMDL Report, Moores Creek stream segment is severely impaired for its aquatic life use. Sediment was selected as the most probable stressor. To reduce sediment loading to Moores Creek, erosion and sediment control measures will be used throughout construction and post construction. Temporary measures include silt fence, inlet protection, and temporary seeding. Permanent seeding is the only permanent measure necessary; permanent seeding will be applied to all disturbed areas after construction activities. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370) "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Operator Name: G. Austin Mans, EIT Company: Rivanna Water and Sewer Authority Title: Civil Engineer Signature: Date: Issued—10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority 1, Austin Marrs (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the Moores Creek Advanced Water RRF construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: Date: Contractor Dependent - Information will be completed after project is awarded and prior to pre -construction meeting Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2014 Expiration Date: June 30, 2019 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIASTORMWATER MANAGEMENT PROGRAM AND THE VIRGINIASTORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth herein. General Permit No.: VAR10 Page 1 of 21 PART DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post -construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post -construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. 4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations. In addition, the operator shall implement the following items: General Permit No.: VAR10 Page 2 of 21 a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator implements the following: a. The exceptional water(s) shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. General Permit No.: VAR10 Page 3 of 21 D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrantflushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: General Permit No.: VAR10 Page 4 of 21 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. 2. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. 3. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator must select, install, implement and maintain control measures as identified in the SW PPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II B to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter must include a signed certification consistent with Part III K. General Permit No.: VAR10 Page 5 of 21 PART II STORMWATER POLLUTION PREVENTION PLAN A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator must develop the missing elements and include them in the SWPPP. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; General Permit No.: VAR10 Page 6 of 21 (5) Locations where concentrated stormwater is discharged; (6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on -site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection purposes. 2. Erosion and sediment control plan. a. An erosion and sediment control plan approved by the VESCP authority as authorized under the Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain erosion and sediment control plan approval from a VESCP authority or does not adopt department -approved annual standards and specifications shall submit the erosion and sediment control plan to the department for review and approval. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications, that adequately: (1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; (3) Minimizes the amount of soil exposed during the construction activity; (4) Minimizes the disturbance of steep slopes; (5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless infeasible; (7) Minimizes soil compaction and, unless infeasible, preserves topsoil; (8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, excavating, or other land -disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and General Permit No.: VAR10 Page 7 of 21 (9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. New construction activities. A stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25- 870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain stormwater management plan approval from a VSMP authority or does not adopt department -approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval. b. Existing construction activities. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the VSMP Regulation, including but not limited to the water quality and quantity requirements. The SWPPP shall include a description of, and all necessary calculations supporting, all post - construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant -generating activities and the pollutant that is expected to be exposed to stormwater; b. Describe the location where the potential pollutant -generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant -generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); General Permit No.: VAR10 Page 8 of 21 (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, and sanitary wastes; and (8) Address any other discharge from the potential pollutant -generating activities not addressed above; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SW PPP. 5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit, and exceptional waters. The SW PPP shall: a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters identified in 9VAC25-260-30 A 3 c, when applicable; b. Provide clear direction that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B 5. General Permit No.: VAR10 Page 9 of 21 6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. B. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures must be accomplished as described in Part II G. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP. The SW PPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part 11 F. General Permit No.: VAR10 Page 10 of 21 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. D. SW PPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on -site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are present, notice of the SW PPP's location must be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SW PPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II F identifies a control measure that is not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II F identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. F. SWPPP Inspections. 1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. Inspections shall be conducted at a frequency of: General Permit No.: VAR10 Page 11 of 21 (1) At least once every five business days; or (2) At least once every 10 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. b. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. c. Representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the report required by Part II F. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land -disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; General Permit No.: VAR10 Page 12 of 21 (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department - approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (a) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9) Identify any pollutant generating activities not identified in the pollution prevention plan; and General Permit No.: VAR10 Page 13 of 21 (10) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. G. Corrective actions. 1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. General Permit No.: VAR10 Page 14 of 21 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator must comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; c. The date(s) and time(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results 1. The operator shall update the SW PPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. General Permit No.: VAR10 Page 15 of 21 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this general permit or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. General Permit No.: VAR10 Page 16 of 21 Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 1 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain a. A description of the noncompliance and its cause; b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case -by -case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing as part of the SW PPP. The reports shall contain the information listed in Part III 1 2. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468- 8892. General Permit No.: VAR10 Page 17 of 21 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870- 420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized General Permit No.: VAR10 Page 18 of 21 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect position); and c. The signed and dated written authorization is included in the SW PPP. A copy must be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 90 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in general permit conditions on 'bypassing" (Part III U) and "upset' (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. General Permit No.: VAR10 Page 19 of 21 Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. General Permit No.: VAR10 Page 20 of 21 b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology -based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology - based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject tojudicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause(s) of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. General Permit No.: VAR10 Page 21 of 21 X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permits. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1, this state permit maybe automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Section 12. Inspection logs (Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part H, section B and F.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County SWPPP INSPECTIONS In accordance with 9VAC25-880-70, Part I B.4.d and Part II F of the General VPDES Permit for Discharges of Stormwater from Construction Activities: 1. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: a. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day, and b. Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the tern of this general permit. 2. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land -disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; (d) Cut and fill slopes; (c) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge , or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8)Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9)Identify any pollutant generating activities not identified in the pollution prevention plan; and (10)Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary ) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. VSMP INSPECTION REPORT Project: GCP Number: Notice of Coverage posted? ❑ YES ❑ NO SWPPP available for review? ❑ YES ❑ NO Inspection Date/Time Inspection Conducted By must be the Qualified Personnel identified in the SWPPP) Date of Last Rainfall Measureable Amount ❑ Not applicable since inspection frequency is at least once every four business days Storm Event Record the information and a description of any discharges occurring at the time of the inspection Record any land -disturbing activities that have occurred outside the approved erosion and sediment control plan Have controls Are controls been installed in effectively Describe any maintenance needs or other deficiencies that were Inspection requirements: accordance with minimizing identified and the location of the deficiencies (e.g. have controls been the approved sediment inappropriately or incorrectly used?) ECP? discharges? All perimeter erosion and sediment ❑ YES ❑ NO ❑ YES ❑ NO controls (silt fence, etc.) Soil stockpiles and borrow areas (for stabilization or sediment trapping ❑ YES ❑ NO ❑ YES ❑ NO measures) Completed earthen structures, such as dams, dikes, ditches, and diversions for ❑ YES ❑ NO ❑ YES ❑ NO stabilization Cut and fill slopes ❑ YES ❑ NO ❑ YES ❑ NO Sediment basins and traps, sediment barriers, and other measures (installed to ❑ YES ❑ NO ❑ YES ❑ NO control sediment discharges from stormwater) Temporary or permanent channels, flumes, or other slope drain structures (installed to ❑ YES ❑ NO ❑ YES ❑ NO convey concentrated runoff down cut and rill slopes) Storm inlets (to ensure that sediment laden stormwater does not enter without first ❑ YES ❑ NO ❑ YES ❑ NO being filtered or similarly treated) Construction entrances and access routes ❑ YES ❑ NO ❑YES ❑ NO (for minimizing mud/sediment tracking) Have stabilization activities begun on areas that have reached final grade or that will remain dormant for more than 14 days? ❑ YES ❑ NO Were stabilization activities completed within seven days of reaching final grade or stopping work on areas that have reached ❑ YES ❑ NO final grade or that will remain dormant for more than 14 days? nspect for the presence of the following: resent? Location flows of stormwater in conveyances (such as rills, rivulets hat have not been filtered, settled, or similarly treated prior 7discharge, ❑ YES ❑ NO (or evidence thereof) en runoff that has not been filtered or settled to remove❑YES ❑ NO pior to discharge Sediment deposition in areas that drain to unprotected stormwater inlets ❑ YES ❑ NO or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper ❑ YES ❑ NO installation, lack of maintenance, or inadequate design Sediment deposition on any property (including public and private ❑ YES ❑ NO streets) outside of the construction activity covered by the general permit Required stabilization (initiated or completed on portions of the site?) ❑ YES ❑ NO Sediment basins/traps without adequate wet or dry storage volume ❑ YES ❑ NO Sediment basins where the riser appears to be leaking, water appears to be leaving the basin around the barrel pipe (rather than through it), or ❑ YES ❑ NO the dewatering device appears to be dewatering basin from below the water surface Sediment traps that allow stormwater to discharge from below the ❑ YES ❑ NO surface of the wet storage portion of the trap Land disturbance outside of the approved limits of disturbance I ❑ YES ❑ NO Inspect the pollution prevention controls associated with the pollutant generating activities identified in the Pollution Prevention Plan Inspect the pollution prevention controls Have the controls been properly Are controls Describe any maintenance needs or other associated with the pollution generating activities implemented as effectively minimizing deficiencies that were identified and the location of the deficiencies (e.g. have controls identified in Table 8.1 of the SWPPP outlined on the PPP pollutant discharges? been inappropriately or incorrectly used) sheet? Clearing, grading or excavating ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Paving operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Concrete washout and concrete waste ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO disposal Structure construction, stucco, painting ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO or cleaning Dewatering operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Material delivery and storage ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Material use during building process ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Solid waste disposal ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Sanitary waste disposal (ports johns) ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Landscaping operations ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Vehicle Fueling or Maintenance ❑ N/A ❑ YES ❑ NO ❑ YES ❑ NO Other (describe) ❑ YES ❑ NO ❑ YES ❑ NO Other (describe) ❑ YES ❑ NO ❑ YES ❑ NO Other (describe) ❑ YES ❑ NO ❑ YES ❑ NO Other (describe) ❑ YES ❑ NO ❑ YES ❑ NO Other (describe) ❑ YES ❑ NO ❑ YES ❑ NO Identify the material(s) and document the location or presence of any evidence of pollutant discharges that are not authorized by the general permit Identify the location(s) where any additional control measures are needed that did not exist at the time of the inspection List the corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection any corrective acn< that have not been "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Signature: Name: Date: Title: (must be either the Operator or Delegated Authority, not necessarily the person who conducted the inspection)