Loading...
HomeMy WebLinkAboutWPO201300040 Bond Estimates 2021-10-01 (2)Project Name: Erosion and Sediment Control Plan for Ashcroft Phase 3 Subdivision Tax Map 78A, Parcel 1, Rivanna District, Albemarle Co., Virginia WPO file number: WP0201300040 TMP(s): 078AO-00-00-00100, 078AO-03-00-000FO Date Estimate Completed: 8116121 by RGA ; chk.bytA,10/1/21 Stormwater Management Bond Estimate Item Item Number 1 standard manhole frame top (not inlet) z drop inlet or grate 3 manhole structure (per ft. rise) 4 pipe, mp, crop (15 to 48") 5 aggregate base or drainage stone 6 Biofilter 7 SWM-1 8 SWM-2 9 hafifter soil mix(CY) 10 trash rack/ anti vortex devices 11 maintenance access road (LF) 12 rip, rap, placed 13 14 survey and layout (pace per 0.1 mi.) 15 mobilization 16 as -built drawings (per facility) 17 materials testing (per facility) 18 compaction testing (per dam) No. Unit Unit Cost Cost (installed) F0 as $500.00 $0.00 0 es $3,500.00 $0.00 9 ft $460.00 $4.060.00 in d 1 ES-1.2 1 EC-1 136.0 ft $40.00 $6,400.00 10 8 in d 135.0 ft L 6.0 ft W 3.8 ton $36.00 $132.30 3.0 ea $10,000.00 $30,000.00 1 as $190.00 $190.00 1 as $75,000.00 $75,000.00 3 as $10,000.00 $30,000.00 6 ft $1,500.00 $9,420.00 436 ft $50.00 $21,750.00 depth 0.8 ft length _ 186.0 ft width 20.0 (tons) 223.2 $60.00 $13,392.00 acres 6=00" basins ` $11,650.00 $2,600.00 $2,000.00 $4,000.00 Nas as $2,000.00 $4000.00 ee $3,000.00 $6.000,00 manufactured facilities (attach manufacturers or contractors pace as a base) see D. Greene email, August 23, 3031339 PM $0.00 cost sum $218,384.30 contlrgerwy $21,838A3 Total $240,230 10/1/2021