Loading...
HomeMy WebLinkAboutSDP202100009 Correspondence 2021-10-01 (4)SHIMP ENGINEERING, P.C. Design Focused Engineering October 1, 2021 Tori Kanellopoulos County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Response Letter #3 for SDP2021-00009 999 Rio Road — Final Site Plan Dear Ton, Thank you for your review of the final site plan for 999 Rio Road. This letter contains responses to County comments dated June 16, 2021.Our responses are as follows: 1. 18-32.6.2 Requirements of a final site plan. a. Show any proposed ROW dedication. This will need to be completed with a plat. i. REV 2: Per applicant's response, this will be completed with the final plat that is under review (SUB2021- 58). RESPONSE: Comment received. 2. 18-4.6.1 Frontage. The amenity area for Block 2 must include a private street for frontage for Lots 8- 18. The application plan for the ZMA also shows a private street. The private street easement must extend to the front of each lot for frontage purposes. i. REV 2: Per applicant' s response, this will be completed with the final plat that is under review (SUB2021- 58). Note that lot lines need to extend to the private street easement. This also needs to be labeled' private street easement' on the site plan and plat, not access easement'. Lots 8- 13 and a portion of Lot 18 are not adjacent to the private street easement. Please extend the dimensions of the private street easement. RESPONSE: This has been resolved with SUB2021-58. While the lot lines have not been moved, the label has been revised to read "Private Street Easement." 3. Additional applications: The following applications and approvals are required prior to final site plan approval: a. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: All new and adjusted easements must be shown on an easement plat, which must be approved prior to final site plan approval, and must match the final site plan. The DB/ PG of new easements must be shown on the final site plan. i. REV 2: In progress. Easements must be approved prior to plan approval, which can be done with SUB2021-58 (final plat). Once easements are recorded, add DB/ PG to final site plan. RESPONSE: SUB2021-58 is currently under review. b. 18-32.7.4.1: Approval of a VSMP Plan is required prior to final site plan approval. See Engineering comments. i. REV 2: VSMP is under review. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com RESPONSE: The VSMP Plan has been approved since the issuance of the comment letter. c. Chapter 14: A final subdivision plat will be required for subdividing the lots. This can be approved before or after final site plan approval. i. REV 2: A final plat (SUB2021- 58) is under review. RESPONSE: Comment received. d. 18-30.6: A certificate of appropriateness (COA) from the ARB is required prior to final site plan approval. i. REV 2: ARB review comments were provided on May 24, 2021. RESPONSE: The Certificate of Appropriateness has been provided with this submission. If you have any questions or concerns about these revisions, please feel free to contact me at Rachel&shimp-en ineering com or by phone at 434-227-5140. Regards, Rachel Moon Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com