Loading...
HomeMy WebLinkAboutARB202000116 Correspondence 2020-10-28 Margaret Maliszewski From: Kelsey Schlein <kelsey@shimp-engineering.com> Sent: Wednesday, October 28, 2020 11:31 AM To: Margaret Maliszewski Cc: Rachel Moon Subject: Re: Albemarle Business Campus - SDP/ARB Package Attachments: 10262020_ABC-BLOCKS_ARB_Application_11_2015_SIGNED.pdf; 10262020_ABC-BLOCKS _ARB_Preliminary_SP_CHECKLIST.pdf; 10262020_76-46A_PSP-REV.pdf; 10052020 _S D P2020-66_76-46A-PS P.pdf CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. On Wed, Oct 28, 2020 at 11:30 AM Kelsey Schlein <kelsey@shimp-engineering.com>wrote: Hey Margaret, On Monday we submitted: • ARB packet prepared by SAA o includes renderings, elevations, and floor plans • Initial site plan submitted earlier this month • updated sheets from initial site plan showing the revised footprint and door locations for Block 5 (this has not been submitted to community development for site plan review because these changes were made by the architects after the initial site plan was submitted to the County earlier this month; these sheets were provided to show the ARB what changes have been made to Block 5 since the initial was submitted. These changes will be reflected in the final site plan submittal) • preliminary ARB application • preliminary ARB checklist I've attached the ARB packet that we submitted, please let me know if you did not see this come through the digital portal. The files are large and so I'm following up with a second email with the other documents that were submitted. Best, Kelsey On Wed, Oct 28, 2020 at 11:18 AM Margaret Maliszewski <MMaliszewski@albemarle.org>wrote: Kelsey and Rachel, I'm looking at the new submittals. I thought the Block 5 plan was going to be submitted with architecture, but I see no architectural drawings—just 2 site plan submittals, both labeled as initials. Did I misunderstand? Margaret 1 From: Kelsey Schlein <kelsey@shimp-engineering.com> Sent: Wednesday, October 21, 2020 4:33 PM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Cc: Rachel Moon <rachel@shimp-engineering.com> Subject: Re: Albemarle Business Campus -SDP/ARB Package CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Got it, thanks Margaret. On Wed, Oct 21, 2020 at 4:16 PM Margaret Maliszewski <MMaliszewski@albemarle.org>wrote: We need to provide ARB comments on the Initial Site Plan. If you'd like to also provide an updated version of the plan that is better coordinated with the building, that is fine. Please just make sure it is easy to distinguish one plan from the other, and please highlight the differences on the updated plan. Thanks. Margaret 1 From: Kelsey Schlein <kelsey@shimp-engineering.com> Sent: Wednesday, October 21, 2020 3:48 PM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Cc: Rachel Moon <rachel@shimp-engineering.com> Subject: Re: Albemarle Business Campus- SDP/ARB Package CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hey Margaret, As a follow up, our submission on Monday will be exclusive to Block 5 (the self storage/flex building) whereas our initial site development plan was for the entirety of the ABC property (5 blocks/13.63 acres). On Wed, Oct 21, 2020 at 3:43 PM Rachel Moon <rachel@shimp-engineering.com>wrote: 2 Margaret, We are working to submit a preliminary ARB application on Monday, October 26 for Albemarle Business Campus (SDP202000066) and have a question about which site plan we should use for ARB review. We were going to use our initial site plan submittal from October 8 as part of the ARB package, however, we have been coordinating with the architects to incorporate their designs into our site plan so some information has changed since that initial submission. Would you and the board prefer that we create a separate ARB SDP package with the updated information or should we utilize what we submitted as our initial site plan? Thank you, RACHEL MOON Rachel@Shimp-Engmeennq corn Shimp Engineering,P.C. 912 East High St Charlottesville, VA 22902 434 227 5140 //shimpdesign.com KELSEY SCHLEIN Project Manager/Land Planner i ¢ KelseyftShimp-Engineennq corn Shimp Engineering,P.C. 912 East High St Charlottesville.VA 22902 434 227 5140//shimpdesign corn 3 KELSEY SCHLEIN Project Manager/Land Planner KelsevaShimp-Englneennq.com Shimp Engineering,P.C. 912 East High St Charlottesville,VA 22902 434 227 5140//shimpdesign corn KELSEY SCHLEIN Project Manager/Land Planner Kelsey@Shimp-Engineenng corn Shimp Engineering,P.C. 912 East High St Charlottesville,VA 22902 434 227 5140 II shimpdesign corn KELSEY SCHLEIN Project Manager/Land Planner Kelsey@Shimp-Engineering corn Shimp Engineering,P.C. 912 East High St Charlottesville.VA 22902 434 227 5140/I shimpdesign corn 4