Loading...
HomeMy WebLinkAboutSDP201100082 Review Comments 2012-01-05I 10 Short Review Comments Report for: SDP201100082 —[B—oar's Head Inn & Sports Club Expansion -11 SubApplication Type: ImajorAmendment Date Completed: 01/03/2012 Reviewer: Phi1012 Custer Division: Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 01/03/2012 Reviewer: Joanne Purtsezova Division: Planning Review Status: Requested Changes Reviews Comments Date Completed: 01/03/2012 Reviewer: Sarah Baldwin Division: Admin Zoning Review Review Status: Requested Changes Reviews Comments: 1. It appears that work is proposed (removal of golf path) on parcel 75-63 (noted incorrectly on plan as 75-83) and (proposed employee parking) on 59D2-01-2 (noted incorrectly as 59D201--15). Any parcels subject to this plan must be part of the application plan itself as well as any associated approvals/conditions. Tax Map 75-63 is also subject to SP 96-53 and the conditions must be shown on the proposed plan. 3. Please indicate the square footage of the proposed structure. 4. It is unclear what parking standards are used in the calculation of parking spaces. If some additional parking standards or waivers are being utitlized, they may be subject to a parking study and will require Zoning Administrator approval. See 4.12.7-4.12.10. 5. Please provide an upated Parking Calculation for uses on the entire site, including a breakdown of the utilized parking standards. 6. The Event Management Plan recognizes shared spaces with other uses, which may require a shared parking request and analysis under 4.12.10. Date Completed: 12/29/2011 Reviewer: Joanne Purtsezova Division: Planning Review Status: Approved Reviews Comments: (20' buffer grading waiver request) Date Completed: 12/30/2011 Reviewer: Jay Schlothauer Division: Inspections Review Status: No Objection Reviews Comments: Date Completed Reviewer: Review Status: Based on plans dated December 12, 2011. No comments or conditions. 12/22/2011 Robbie Gilmer Division: Fire Rescue Requested Changes Reviews Comments: Based on plans dated 12-12-11 1. Fire lane access to property should be no less than 18 feet at any point. 2. Fire Department Connection needs to be located on the South east side of the building within 100 feet of a fire hydrant. 3. Fire Department Connection needs to have a proper sign marking connection. 4. Clarify the maximum load limit for the 10,000 gallon cistern. Page: 1 of 2 County of Albemarle Printed On: January 05, 2012 5. Fire Hydrspacing for this property needs to be ever7e00 feet. 6. Required Fire Flow for this building is 1180 gpm @ 20 psi. Date Completed: Reviewer: Review Status: 01/04/2012 Joel DeNunzio Pending Division: VDOT Reviews Comments: Date Completed: 12/28/2011 Reviewer: Alexander Morrison Division: ACSA Review Status: Requested Changes Reviews Comments: I......................... _......................... ............. .......................................... I ................... Date Completed: 12/30/2011 Reviewer: Andrew Slack Division: E911 Review Status: No Objection Reviews Comments: Date Completed: 01/04/2012 Reviewer: Unassigned Division: RWSA Review Status: Requested Changes Reviews Comments: Date Completed: 12/29/2011 Reviewer: Joanne Purtsezova Division: Planning Review Status: Approved Reviews Comments: Date Completed: 01/04/2012 Reviewer: Joanne Purtsezova Division: Planning Review Status: Pending Reviews Comments: ISoils Report received from Thomas Jefferson Soils and Water Conservation district Page: 2 of 2 County of Albemarle Printed On: January 05, 2012