Loading...
HomeMy WebLinkAboutSUB199900236 Review Comments 1999-11-18 RECEIVED `1?-e NOV 18 1999 ,.,4016050 PLANNING AND COMMUNITY DEVELOPMENT COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 701 VDOT WAY CHARLOTTESVILLE, 22911 A. G. TUCKER COMMISSIONER RESIDENT ENGINEER November 18, 1999 Sub-99-236,Holly Memorial, TMP 32-42G, 32-42H Route 29N Mr. Dan Mahon • Dept. of Planning&Community Development 401 McIntire Road Charlottesville,VA 22902 Dear Mr. Mahon: We have the following comments regarding the above subdivision application: • These parcels may be impacted by the proposed Route 29 widening project. Attached is a copy of the latest available plan in the vicinity of these parcels. • No direct access to US 29 will be allowed from these parcels. All access to these parcels must occur along future road extension to Worth Crossing. The attached 29 widening plan includes a slightly different roadway alignment than the 50' reserved strip in the submitted subdivision plan. • Note 3 on the subdivision plans appears to be incorrect; TMP-32-92G should be changed to TMP-32-42G. • We recommend that these two parcels(Lot W and revised TMP-32-42G)contribute to the cost of a traffic signal at the Timberwood Boulevard/Worth Crossing intersection in the event a traffic signal is warranted at some point in the future. • We recommend that inter-parcel access be provided to the cemetary parcel to the south(TMP 32-42F). If you should have concerns with these comments, please discuss with our office prior to sharing with the applicant. Sincerely, • R.P. Ball Transportation Planner Cc: Karen Kilby Marshall Barron Jim Kesterson TRANSPORTATION FOR THE 21ST CENTURY