COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
701 VDOT WAY
CHARLOTTESVILLE, 22911 A. G. TUCKER
COMMISSIONER RESIDENT ENGINEER
November 18, 1999
Sub-99-236,Holly Memorial, TMP 32-42G, 32-42H
Route 29N
Mr. Dan Mahon
• Dept. of Planning&Community Development
401 McIntire Road
Charlottesville,VA 22902
Dear Mr. Mahon:
We have the following comments regarding the above subdivision application:
• These parcels may be impacted by the proposed Route 29 widening project. Attached is a
copy of the latest available plan in the vicinity of these parcels.
• No direct access to US 29 will be allowed from these parcels. All access to these parcels
must occur along future road extension to Worth Crossing. The attached 29 widening plan
includes a slightly different roadway alignment than the 50' reserved strip in the submitted
subdivision plan.
• Note 3 on the subdivision plans appears to be incorrect; TMP-32-92G should be changed to
TMP-32-42G.
• We recommend that these two parcels(Lot W and revised TMP-32-42G)contribute to the
cost of a traffic signal at the Timberwood Boulevard/Worth Crossing intersection in the
event a traffic signal is warranted at some point in the future.
• We recommend that inter-parcel access be provided to the cemetary parcel to the south(TMP
32-42F).
If you should have concerns with these comments, please discuss with our office prior to sharing
with the applicant.
Sincerely,
•
R.P. Ball
Transportation Planner
Cc: Karen Kilby
Marshall Barron
Jim Kesterson