Re: SUB202100082 Dunlora Park Phase II Final Plat — First Review Comments
Dear Cameron,
We received comments dated August 25, 2021 regarding the above referenced project and offer the
following responses:
1. [14-302 (A)(3)] Please revise the instrument number for the Dunlora Drive ROW. Staff review of
previously recorded plats finds that ROW was dedicated with DB 4967 page 133, not DB 4697 page 133.
Please verify and revise the label if necessary.
Response: Label revised.
2. [114- 302 (A)(4) and 14- 317] Instrument evidencing maintenance of certain improvements. Prior to
approval of the final plat application, submit maintenance agreement ensuring the perpetual maintenance
of all improvements that will be privately owned/ maintained by the HOA. This includes the open space
areas, the private alley, private easements, and any other improvements that are to be maintained by the
HOA in perpetuity. County Attorney approval is required prior to final plat approval. Rev. 1: Draft HOA
covenants were provided on August 12th that have provisions for maintenance of improvements
within private drainage easements, private sanitary easements. and open space parcels. However,
the declaration did not mention the improvements within the private alley easement. An
instrument evidencing maintenance of the private alley must be recorded with the plat. Does the
applicant want to incorporate the private alley into the draft declaration, or provide a separate
maintenance agreement for the alley? Staff is providing a copy of the County's standard private
improvement maintenance agreement for reference. This could be revised specifically for the
private alley easement. or it could be used to add sections to the draft declaration already
submitted to address the private alley easement.
Response: Revised deeds attached.
3. [ 14- 302 ( A)( 5)] This final plat is proposing to create the new residential parcels in Dunlora Park
Phase II and all proposed easements that will serve this phase. There is currently a major site plan
amendment, SDP202100023, under review for this phase of the project. In order for the major amendment
to be approved, all proposed public easements must be platted and recorded, and then the major
amendment must be updated to state the recorded instrument numbers of all new easements.
c. [ 14- 426, 14- 431, and 14- 433] All proposed public easements must include a deed of dedication
that will be recorded with the plat. Engineering staff will prepare the deeds for the proposed public
drainage easements and this will be sent to the applicant at a further date. Rev. 1: Comment stands. see
Engineering Division comments.
Response: Will await deeds.
d. [ 14- 203 ( D)] Since this is a combined final subdivision plat ( creating new lots) and easement plat that
requires deeds, a fee of $817.00 must be submitted prior to final plat approval. Rev. 1: Comment not
fully addressed. This comment was originally made because the application originally submitted
for this plat had selected the " Subdivision following Final Site Plan Approval" option as the
applicable fee. That fee is $ 742.00. Per applicant comment response letter, a fee of $817.00 was
999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com 434.977.0205
Project
10/15/2021
submitted in April. Staff have verified that the $ 817.00 fee was submitted and received. This
comment is hereby revised because the total fee that needs to be paid is the fee for both a final
plat following final site plan approval ($ 742.00) and the easement plat application with a deed fee
899.00) = total $ 1, 641.00. Please submit payment for the remaining $ 824.00 balance.
Response: Per email on 9-29 this has been resolved.
5. [14-316] Please see attached VDOT comments regarding the alley entrance onto Varick Street. VDOT
must grant approval to the alley entrance onto Varick Street prior to final plat approval. Rev. 1: Comment
stands pending completion of VDOT review.
Response: It looks like VDOT has no objection to the site plan SDP202100023 as of 7-6. Their
comment letter from May 4 says the plat is generally acceptable.
6. [14-410 (D)] Alleys must be a minimum of 20' wide unless the county engineer determines that the
proposed design incorporates features that assure public safety and welfare. Pending completion of
Engineering Division review, the alley may need to be widened in order to comply with minimum design
requirements of Section 14-410. Rev. 1: Comment not fully addressed, please see Engineering
Division comments. Several easement lines are not listed in the line table.
Response: Line table updated per Engineering comments.
7. [14-404, 14-435] The private alley is the single point of access for lots 29-34. Prior to final subdivision
plat approval, the private alley shall be built or bonded. Rev. 1: Please see attached Engineering
Division comments.
Response: Per the owners, the request to establish a bond fee has been paid, and we have our bond
amount. However, they're holding off on bonding right now until we get additional plan approvals.
Engineering Comments
2. Incorporate 5/11/21 SDP202100023 Engineering review comments in plat, wherever relevant;
for example:
d. Ref. SDP202100023 8/ 13/ 21 Engineering review items at 4j., requesting certain easements be
shown/ labeled.
e. Show / label SWM facility access easement, consistent with SDP202100023 and WP0201600058
Amendment #4, pending /to be submitted
Response: Lindley Place serves as access for SWM facility easement. Labels have been added on
sheets V7 & V2 to establish this.
4. Provide private access easement agreement for variable width private alley for Planning Division
review and approval. Rev. 1) Persists.
Response: See attached deeds.
5. Ensure private access easement agreement (above) considers expense of repair to private
access easement that may be associated with maintenance repair or replacement of private sanitary
lateral that may occur only on one of the SF lots. For example, repair to lateral serving Lot 33 may occur
on Lot 32 within (or outside) the variable width private alley easement. In this instance, the private
access maintenance agreement should assign expense of repair for lateral serving Lot 33 that occurs on
Lot 32 and may require repair of an alley serving all three lots. Engineering defers to Planning. V1, Note
17 assigns alley maintenance expense to the HOA; this may be problematic in event alley repair is
required following private sanitary lateral repair, maintenance, or replacement. Notes 17 and 18 may
introduce expense responsibility conflict/s. Rev. 1) Persists.
Response: See attached deeds.
7. 20' public drainage easement requires deed of easement. Once all final plat review comments
are addressed, Engineering will format a deed of dedication of public drainage easement template for
Applicant notarized signature/s. Rev. 1) Persists.
Response: Will await deeds.
999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 2 of 3
Project
10/15/2021
8. An approved WPO Plan Amendment (#4) is required prior to Final Plat Approval. Ref. 5/11/21
Engineering review comments on Major FSP Amendment, SDP202100023, which makes ref. to WPO
Plan Amendment request.
Response: Noted.
9. New:
a. Please list AE10, AE11, AE13, AE14, AE19 in Access Easement Table.
Response: Added.
b. If Access Easement includes AE15, please list in easement table.
c. If AE15 exists, please clarify location on Sheet V1 of plat.
Response: AE1 S did not exist. Renumbered AEI S-AE18 with this submission however.
d. If development requires private water lateral easements, please provide, show, and label. If lateral
is to benefit a particular lot, recommend label clarify benefit.
Response: The private utility easement shown on sheet V2 covers both the sewer laterals and water
laterals.
10. As mentioned with SDP202100023 review comments, final subdivision and (site plan) major
amendment approvals require WP0201600058 Amendment # 4 review and approval. WPO plan
approval requires nutrient credit purchase since SDP202100023 Sheet 1 indicates nutrient credits will be
purchased. WP0201600058 Amendment # 4 also requires a SWM facility maintenance agreement be
recorded, and requires SWM facility and facility access deed of easement be recorded with this final
subdivision plat. A public drainage deed of easement will also need to be recorded with this final
subdivision plat. WP0201600058 Amendment #4 may be approved prior to nutrient purchase, and prior
to plat recordation, but nutrient purchase is required prior to receiving a Grading Permit for grading
proposed with the amended plan.
Response: Noted.
Thank you for your time in the review of this plat. Please let us know if you have any questions or further
comments.
Thanks,
ROUDABUSK CAIZ
&ASSOCIATES, INC
W1LAND BUR ND
ENDINEERINO
LAND PLANNINA
434.977.0205
w .roudabushxom
Office Hours:
M-F 7:30-4:00
Bethany Velasquez
Roudabush, Gale & Assoc., Inc. I Survey
Physical Address:
999 Second St. SE
Suite 201
Charlottesville, VA 229o2
Mailinu Address:
435 Merchant Walk Sq.
Suite 300-159
Charlottesville, VA 229o2
999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 3 of 3