HomeMy WebLinkAboutZMA200000009 Study 2001-09-11 Traffic Impact Study
North Pointe Development
Albemarle County, Virginia
Prepared for:
Towers Limited Partnership
and
Great Eastern Management
Company
Prepared by:
Wilbur Smith Associates
!!�//1 ECoNoM1sr
Wilbur Smith Associates
September 11 , 2001
//I►\\ G1NEERS
11111* PLANNERS
ISOM ECONONIIs s
\\V//
Wilbur Smith Associates
September 11, 2001
Mr. Don Wagner 10 East Franklin Street
Great Eastern Management Company Richmond,VA 23219-2131
51
2619 Hydraulic Road (o04)(804) 643-66
644-zi09 fax
Charlottesville, Virginia 22901 wilbursmith corn
SUBJECT: North Pointe Traffic Impact Assessment
Albemarle County, Virginia
Dear Mr. Wagner:
In accordance with our contract, we are pleased to present findings of our traffic impact
assessment for the mixed-use development of North Pointe, located in Albemarle County, Virginia.
This letter report outlines the study methodology and findings.
Project Site
The proposed development will consist of multi-use land uses on the east side of Seminole Trail
(U.S. Route 29) north of Proffit Road / Airport Road (State Route 649) to opposite and just slightly
north of Lewis & Clark Drive, which is the main entrance from U.S. 29 to the Universityof Virginia
Real Estate Foundation's (UREF's) North Fork Research Park. North Pointe will have one
entrance from Proffit Road at Worth Crossing extended approximately 700' from U.S. 29.
Additionally, there will be three entrances along U.S. 29, (from thesouth) the first (Road "El") will
be located 1700' from Proffit Road / Airport Road, second, (Road"E3") will be located 2400' from
Road "El" and the third, (Road "D") opposite Lewis & Clark Drive is located approximately 2750'
from Road "E3". The U.S. 29 entrances are consistent with the agreement between the applicant
and the County which led, in 1994, to the Comprehensive Plan Amendment which brought the
North Pointe property into the growth area for a combination of residential, office and commercial
uses and to VDOT - Charlottesville Residency and Albemarle County comments of 23 February
01.
Development Assumptions
Figure 1 shows the general location of North Pointe as it relates to the surrounding road network.
For purposes of this study, it is assumed that the development will be in place by the year 2010.
Table 1 summarizes the land use and site generated traffic for the North Pointe development.
Total daily site generated traffic at full development is estimated to be 29,418 vehicle trips. The full
development site generated trips include applicable pass-by and internal capture rates which are
consistent with VDOT Charlottesville Residency comments of 23 February 01.
Existing Traffic Conditions
Figure 2 summarizes existing AM and PM peak hol.x vehicle turning movements at the applicable
intersections along U.S. Route 29 and Proffit Road. These counts were performed by WSA on
Tuesday, December 5th, 2000. Actual count data can be found in Appendix A. As agreed at our
27 September 00 scoping meeting with VDOT Charlottesville Residency representatives and
Albany NY,Anaheim CA,Atlanta GA,Baltimore MD,Bangkok Thailand,Burlington VT Charleston SC.Charleston WV Chicago IL,Cincinnati OH.Cleseland OH
Columbia SC, Columbus OH, Dallas TX, Dubai UAE, Falls Church NA, Greemrllc SC Hong Kong, Houston TX. Iselin NJ, Kansas City MO, Knoxville TN
Lansing Ml.Lexington KY,London UK,Milwaukee AVI Mumbai India,Myrtle Beach SC.Ness Ibsen CT Orlando FL,Philadelphia PA,Pittsburgh PA.Portland NIL
Poughkeepsie NY,Raleigh NC,Richmond VA Salt Lake Cits ITT. San Francisco CA,Tallahassee FL.Tampa FL,Tempe AZ,Trenton NJ,\\ashnigton DC
Employee-Owned Compam
rr _
. r7.J s....
i as , ,^.,.
Imo,
t.
\- -,
,„,.. .„
_,
— I \ f--..... .
LEWIS&." 4▪ D"D„ /�/ •t .„ ,, I V.
CLARK DR'• ; N., t!' { \`.i•T., ,: f ,.
cq
a4 i APTS.\ f-Q €.��• \; i pJ
'" i t� TF ?T221
\,....
sp,
----fl--f ;:-".. , , _ . 1 ..;,_ ,:,.. 4.,- . ,_
E t,- ..:,
p •- 1. f --•-•-•-• i 1 . ' - '---:"-- ---7.''' s- 4.-
,�` /-, 1 . 1 1 i.r • !'-... %'
1 L rT"~ rr
vie' s i ii .
CYPRESS DR •�, -�!• _: , ONDO •, �,,2 �t, ```
r
,, • ,,,,,,,
w ,,
tot
•
-,_,
GRAVEL e r 3 :, #�
DRIVEWAY -L gym' ...' ; 'APT1. + • ` .,, - COTTAGE
t.: , Ili Ire • i` 0.`,41 .;-�--,+ , i -
HOTEL 0
''• . "- --
\ 1
,-,1 ' .?\'A O I •1. i.�
L. 14i- L .'O ,�
i 11
91 .1 '&®-rile OFFICE ; . ..-�
OUTPARCELS' I pp t 4r.
, , I % tJ O 4 ti't p • ti
AIRPORT I Y' f.x`4 i--�°. °7.'76 4% -q- I!
ACRES (N) ,, _-s� ' t 0 Elr -s+, :•,s(1;
a 4� q .� �,
i a0 p t%n.3. r
AIRPORT I cxi� .4 t-c.
i try✓ 0:5 6. \ ,'_
CRES (S) _ .. `'
-pi,I-t + i. " — - — • a,. _�"-'3
"= +F' -pf,Ja,i;,+c4 p ,t_,.-�-" ,. :o' LEGEND.
!I.,,,xi : 'y. U•r • INTERSECTION
Aft P_ 3y�-�1 i:,L ,.i In
#1, kilt%' +%. }. .f ANALYZED(SEE
AIRPORT DR .'_ '' I(_,� , d ' ��5 3L� FIGURES 5 SA )
i 1:i.;.,,,
E
/MN` NI-igure i
�NNW
Site Map 1
O
LEGEND
M —00
(7) 00-AM Peak Hour
•
LEWIS&
CLARK DR (00)-PM Peak Hour
(252)29 • 1
(241)21 1
N O
N r
.-4 N 00
00
O \O N
rn
`N-'
� 01
00 N `'
M ON W
CYPRESS DR 1 n
(10)3 t v
(7)20 o rn CI'
" t 28(59)
M rY N tr)
rnrn `' '� ^L f 15(24)
Q .� ^.
'^a 7-. c 7 N j p63(68)
M u
1/40 cc, (65)38__t� 1
AIRPORT i 1 (40)21-4 O en [-
I
ACRES (N) (118) 101—4 rn v N
o rn
(2)0
(4) 10 T o
.....—
co — SATURDAY
—. N
et. v v 12/2/00 WSA Counts.
N
vN
AIRPORT
CRES (S)
(0)6 f 1 t C7
( )8 I 1 z
v oo u= O
3 0o M V
� .-.
oN � No
v, rn" 97(182) o—
; 3(3)
FO -e-83(77) v o`^ f-299(258)
AIRPORT DR IF i--159(93) PROFFIT RD J j L ,F55(50)
(189)72 t I I (5) 10_J fr
(128 48--► v v v (278)213-*. I
) r- h 00 _ O
(157)94� ^ 6 (-4 (73)54 v v'
v en - co
SOURCE:WSA Tuesday, 12/5/00 counts.
.�K� ' Figure
I-M US
`l Wir Existing Background Traffic 2
\ v ',,
Albemarle County representatives, we would collect traffic data at the intersection of U.S. 29 and
Proffit Road on a Saturday during the a.m. and p.m. peak periods and compare the data to thatof
a weekday. If the weekday data were greater than the weekend we would not analyze the
weekend peak periods.
Projected Year 2010 Background Traffic
To estimate the local background traffic in place at the time of full development of North Pointe,
recent traffic growth patterns were reviewed. Table 2 summarizes average daily traffic on the U.S.
Route 29 road segment between Hollymead Drive (State Route 1520) and State Route 1510 from
1993 to 1997. The average annual growth rate as specified by VDOT ant Albemarle County is
four percent. This growth rate is applied to the existing background traffic in Figure 2 to produce
the projected 2010 background traffic shown in Figure 3. Additionally, the UREF North Fork
Development at Phase I traffic is inclucd and assumed to be in place, although, as directed by
VDOT, the improvements on Route 29 which UREF will be required to construct are not included
in the intersection analysis.
Site Traffic
The percent distribution for the residential, Office/industrel Park, shopping center and out parcel
land uses of North Pointe are shown on Figures 4a through 4c respectively. This distribution is
applied to the site generated trips illustrated in Table 1 to establish the projected site traffic shown
on Figure 4. Additionally, Figure 4 includes the internal capture that reduces the trips generated
onto the surrounding public roadways. The internal capture is realistically assumed based on
trends in the development of large multiuse parcels such as North Pointe. North Pointe will
provide necessary residential (apartment to single family and empty nesters), commercial and
office space that provides a resident or office employee the services they desire without accessing
the local roadways.
Background Plus Site Traffic
The site traffic in Figure 4 is superimposed onto the background traffic in 2010 to come up with the
projected site and background traffic volumes (Total Traffic) illustrated in Figure 5. The total traffic
provides the basis for the roadway capacity analyses. Figure 5a shows the approximate internal
site traffic volumes and Figure 5b shows the projected average daily traffic (ADT) along the internal
road network. As stated earlier these figures reflect the reduction in sitegenerated traffic that
traverses the surrounding roadways.
Roadway Adequacy Analyses
Intersection capacity analyses for AM and PM peak hour conditions were analyzed for the traffic
volumes depicted in Figures 5 and 5a using the roadway geometrics shown in Figures 6 and 6a.
The highway capacity analysis can be found in Appendix B. Generally speaking, the roadway
analysis indicates that U.S. 29 will fail during the peak a.m. and p.m. periods for both the 2010
background and the 2010 total traffic scenarios at the proposed signaled intersections. In other
words, for a few hours each day these intersections will generally not meet VDOT standards for an
intersection on an arterial highway whether or not North Pointe is developed.
*
q
00 SOURCE: WSA Tuesday, 12/5/00 counts grown 4%annually.
A
O M N
00 - a; (*)Future UREF North Fork Development added.
N LEWIS& l vi
CLARKLEGEND:
DR
♦ 00-AM Peak Hour
(1672)103* I
(1169)195* t (00)-PM Peak Hour
* 00
* 00
, N N
N
Co• r. V
.11
N 0 Ol
v N N..
-zr )
CYPRESS DR
♦ N
(15)4 v
(10)301 t v
L41 (87)
en en O O 7
• rn N " f22(36)
" � J 1L �93(101)
7 N N
M
O *
N M (96)56A 1 r
AIRPORT j 1 (59)31
ACRES (N)
M VCA
D CD
(175) 149� = v
(3)0 1 N �,
,-(6) 15 ' -
— SATURDAY*cn
0 v ,-v 12/2/00 WSA Counts.
M O.
M
O
....
N
AIRPORT I
ACRES (S) �I
(0)9 f 1 t C7
(l)8— o x
^ o I—, Cn
N P4 6,
.. � * 3 U
� .7,
.-. ,
197(293)* r" o L4(4)
ON N -+
-•
N `v ---141(123)* (4- 515(415)*
1AIRPORT DR J r235(138)
PROFFIT RD J l L ♦ 81 (74)
f
*(401)199� r•-•
(7) 15_ t
*(210)75--► ° c 2 *(490 328--► r
*(514)190— v M p. •—00
(108)80 1 N en* N*
ii11Mkk Figure
MINN) Projected 2010 Background Traffic 3
M
�
A N d' 25(22)
LEWIS& 10(6)
NCLARK DR 1 L. r7(23)
1 I" 0, I
_ o _
CO<_3_,.
,... ,....
........
CO WI
CO N
V O, rn
~ _45(90)
IL 206(285) SITE
GRAVEL
DRIVEWAY t r
ON CrN
See
N
Figure 5a
N
co v v
O 00
o
for
N L77(303)
AIRPORT I L
r123474) Imernal
ACRES (N) i Site
(--- t r Traffic
O N
^ N
• cl
00 CV CA
M M
i
M
AIRPORT
ACRES(S)
t
LEGEND: 0
00-AM Peak Hour _ 00 � v)
M 0
(00)-PM Peak Hour o N - N t+1 � v
`tvvccv A_ 18(10) ,0roo ni n
36(62) I I 76(139)
AIRPORT DR 1 �— 32(162) PROFFIT RD J� 1 "► f 1 g 10
( )
•
(90)53 A t r c
(216)76
(49)24—► I (21)5
SOURCE: ITE Trip Generation M
O
Manual,6th Ed. ,o
4iike.. Figure
ENIIIMSI
IMMO MINN
‘ii\\Mr Site Generated Traffic
4
MA All Parcels
o o t__(10%)
LEWIS&
NCLARK DR L v"(5%)
Residential
(5%)
GRAVEL I L (55%)
DRIVEWAY t r
0 0
0 o SITE
N
AIRPORT C„
ACRES (N)
0
� 1
„,„
AIRPORT
ACRES (S)
t 0
or4
3
o
AIRPORT DR (10%) PROFFIT RD � 5%
5%-11- r
LEGEND: 1 0%
00-%Site Entering o 0
o v)
0
(00)-%Site Exiting
riiKOih. Figure
NMI MIMI
\\�C.C1 Site Generated Traffic Distribution 4a
Residential
111 A
- N
LEWIS& I L t (2%)
NCLARK DR
1
t
M
M (13%) SITE
L r_ (30%)
GRAVEL
-
DRIVEWAY
N I
N
a+
N
Office/
Ind. Park
rn
AIRPORT (35%)
ACRES S(N)
t r
00
kr) o
N ,t
0
AIRPORT
ACRES S(S) i
1
F v)
o
1
o
�
l 5% 10%
AIRPORT DR 1 L . f-(5%) PROFFIT RD i' f 5%
5% A i 5%__A
LEGEND: 5%—� (5%)—► t
00-%Site Entering o
(00)-%Site Exiting
iiik��. Figure
\M Site Generated Traffic Distribution
4b
\i\iSA Office/Ind. Park
Vl
LEWIS &
CLARK DR it
5% � I
0 0
V'1 Vl
� N
0,
N
SITE
GRAVEL
DRIVEWAY
tcn o (30%)
AIRPORT L (30%) Out Parcels
ACRES S(N)
Shopping
Center
0
AIRPORT
ACRES S(S)
F
O
O
3 �
^o
„ " oo
.�.N (5%) .N..^..'".
AIRPORT DR / __(20%) PROFFIT RD J L L ]0%
5%
LEGEND: 5% 25% o
00-%Site Entering N N N
(00)-%Site Exiting
Araks Figure
NOMA
wimurma Site Generated Traffic Distribution 4c
Shopping Center & Out Parcels
0
• .t N
00 00
v N 35(28)
0 00
M f-0(0)
LEWIS& I r-37(23)
CLARK DR y i
(1672)103
o (1205 09�
o v O rn
1 t r
N - ^
i en
7 M O - \O
i 1 ," Nt
N' v' 45(90)
CYPRESS . GRAVEL 1 L , 206(285) SITE
DR (15)4
III I
(10)30� DRIVE t r
— N
C N 00 —
v O en N
CA N
I-- r. en N
M V1 M M
See
� N
� ,
N M -
69(303) Figure 5a
AIRPORT1L
123(445)
ACRES (N) J for
1 (3)0
(6) 15 1 1 r Internal
N ON N Site
M .--
vl en M Traffic
M O v
r. N
d'
AIRPORT J I u;
ACRE S (S) +
• -110)9(
(1)8-•-• o v
N
WORTH
LEGEND: t
•v
v CROSSING
00-AM Peak Hour ,;;.-- o
,.c
',* 215(303) o - 80(134)
(00)-PM Peak Hour M o v .-
`" -177(185) `� `�' v' -4-533(425)
AIRPORT DR 1 1 L ,�267(300) PROFFIT RD J 1 L ,�81(74)
(491)252 t t J (214)91 t!
(259)99., v1 r,1 1 (511)333-.-
(514)190 v ff 108 80 `� v^
SOURCE:WSA Tuesday, � M v ( ) -
N — 00
.�
12/5/00 counts grown 4%annually.
ME\ Figure
SIMI MINI/om. 2010 Total Traffic 5
N MA .
RD"D"
SINGLE
v o0
'1"
! 2 FAMILY N
� � M [-
18(11) (43)13 t
J L
�2(45) (47)20 1 �* ° N
rn i o0
1
N
c4 (6)9 • f RD"B"
(22)36 , I CONDO �/
�' oN 1
d °.° o (2)5
v `� 0000 (9)19 -;roo
o, -a- r- M
a �_ 190(193) rI
O M
RD`E3" �— 24(28) ..
4 o
�v^
� 1 - - �
W (289)156—� (99)29 t t 6(7)
i ri) (138)119� (227)13 j- -IT110- �1(2)
sO M
OFFICE M .�
OFFICE °----, .c:> A -4' t 1/1-
(34)73
(9)18-17
oo 6 OFFICE
— r N
v 98(20) APART RETIRE(RD"C")"' .,
1, L
4 �8(6) L
28(6)
PARCELSO `� I9(110)� i— 20(67) RD"E2„ o
(8)42 A SHOP 00 rn
145(361)� L 4(22)
(26)4—� r j f-- 21(122)
M cv (67)20 M M 1
' SHOP (77)13 t r
M
E-,,,
a.N (110)19� NI M
00 N. 01 ro
10 en ,-.1
M N O V vl ,7 M
N .-. N o0
IM A 60(126) 48(278)
RD"E1'� I --4- 63(365) —96(223) 10.. 35(202)
SHOP
(334)205 (268)96 ►•� I (317)133-4
(484)159—� (315)93 + o (163)83—� M
o v
t — oo
SHOP SHOP
„nil 1 15(87)
(86)15 II II'
PROFFIT RD
O N
—
00 M
O
O, o0
M
M
DRAWN TO SHOW TRAFFIC ONLY. SEE FIGURE 1 FOR BE 1'I'ER VISUALIZATION.
OMKebk
■ Figure
tAIMIN1 2010 Internal Site Traffic
\MII�
MA
5a
RD"D" 1,353 .
SINGLE
2 FAMILY N
o k
00
H N
RD"B„
!� N
00
I— N
CONDO
o0
6,354 4,528 N
RD"E3"
o0
N
OFFICE
oo
OFFICE APART RETIRE(RD"C")
OFFICE
o
N
OUT 2,174 2,736 RD"E2"
PARCELS SHOP
N SHOP N
kris
13,068 9,606 8,712
RD"E 1" SHOP
N
N
00
00 01
cri SHOP SHOP
PROFFIT RD 4,728 O0
DRAWN TO SHOW TRAFFIC ONLY.SEE FIGURE 1 FOR BEI.1"ER VISUALIZATION.
AIM
i i Figure
2010 Internal Site Traffic
NomI1/
\/,cA ADT 5b
LEWIS& J I I L
CLARK DR +i
CYPRESS .111
DR GRAVEL *1!►
1It DRIVE +kr
SITE
AIRPORT �J 1
ACRES (N) i
rn
N
AIRPORT (�
ACRES (S)
H
O
u
AIRPORT DR -J11`► f PROFFIT RD
-► 1f tf I -i I�
-i'
I
tINIIMMI Figure
MEN/ Preliminary Road Improvements
NalmrWSA Future Analysis 6
I
iRD"D„ A
_4J ¢ SINGLE
_+ 2 FAMILY N
'It
N �UL
RD«B„
� 4-1ttr
0 Z)t-'4
F CONDO � �
oc_ . - - 'Itt
1 2 �
w
.1 RD"E3" _ 4 l tt
OFFICE .4L .t_
OFFICE APART
RETIRE(RD"C")
OFFICE tt I
OUT + # RD"E2" J 4 L A-
PARCELS i - SHOP
f' fi t' ' lttr
SHOP
t--- p-011-
_ .1L --4-
RD"El" —� lr
SHOP
-► —i —►
—►
SHOP -464 SHOP
-----t t...
PROFFIT RD
I
I ///I1
arimumis Figure
1111111111110 Internal Road Geometrics
MA 6a
The intersection of U.S. 29 and Lewis and Clark Drive was identified in earlier studies for UREF as , /
being deficient at full build out to the extent that an interchange was proposed. Therefore, needed V
significant improvements to this intersection are not the result of the North Pointe development.
Conversely, the signalization of U.S. 29 and Airport Acres (N) commercial entrance will provide for
acceptable side street access to U.S. 29 but the U.S. 29 through movement will fail with and
without the UREF U.S. 29 improvements. As was the case at Lewis and Clark Drive, failure of
Jthrough movements on U.S. 29 at this intersection is independent of the development of North
Pointe. The failure of through movement for all the proposed signalized intersections along U.S.
29 is a symptom of the fact that U.S. 29 fom the Albemarle County line to Charlottesville City
Limits is the major commercial artery for Albemarle and adjoining counties, as well as a major
North-South travel corridor through Central Virginia. The signalization of the Profitt Road and
Worth Crossing intersection will provide the much-needed relief as indicated by the results of the
2010 background traffic analysis.
Table 3 summarizes results of the intersection capacity analyses.
Conclusions
The following summarizes conclusions reached based cn the previously described traffic analyses.
• U. S. 29-Left turn lanes (in the median) and right turn lanes should be provided at the
crossovers at Airport Acres (northern entrance) and at the main entrance. A right turn
lane should be provided for northbound traffic at the third entrance at the intersection of
Lewis and Clark Dr.
• To the extent right-of-way is available, left and right turn lanes should be provided on
Proffit Road at the Proffit Road entrance (Worth Crossing).
• The entrance roads from Route 29 into North Pointe should be four-lane undivided (70'
minimum right of way)for a minimum distance of 200' in from U.S. 29 to provide for two
lanes entering and two lanes exiting.
• The entrance road from Proffit Rd should be three•lane undivided (50' minimum right of
way) to provide for one lane in and two lanes out. The entrances to the retail shops off
of this entrance road are right in/right out only.
• "Road A" (primary north-south internal road) should be four-lane divided (90' minimum
right of way) from the southern entrance (Road El) to the northern entrance (Road D).
This will provide for a five lane typical section, which will allow for a center turn lane.
• "Road E2," which provides access to the office space and out parcels, should be a bur
lane undivided facility (70' minimum right of way).
• "Road A," north of"Road D," a two-lane undivided facility (50' minimum right of way) is
necessary to accommodate the projected traffic.
• The roads intersecting "Road A" (Road B, Condo, Road C, and Shop) should be two-
lane, undivided facilities (50' minimum right of way).
• Signalization should be provided at the main commercial entrance located on U.S. 29
opposite Airport Acres (N), at the center entrance from U.S. 29, i.e. the intersection of
Road "E3" and U.S. 29, at the intersection of Proffit Rd. and Worth Crossing which
provides access from Proffit Rd., and subject to further study as more detailed plans for
the commercial area are developed internally at Worth Crossing and Rd."El" and, at
the intersection of Roads"El" and "E2" south of the out parcels.
We trust this study provides the needed traffic information for you in planning for this important
project, and proceeding with its development.
Respectfully submitted,
WILBUR SMITH ASSOCIATES
os‘Cejrid. Wallace
Project Manager
JTW/jtw
Table 1
TRIP GENERATION
North Point Development-Albemarle County,Virginia
AM PEAK PM PEAK
LAND USE ITE CODE UNITS 24-HOUR ENTER EXIT ENTER EXIT
Office/Industrial Park: ^'
Industrial Park a• Oa 130 70,000 Square Feet I q G 1,095 66 15 16 61
General Office 3. act_ 710 150,000 Square Feet Li (3 1,812 227 31 42 205
-5%Office Internal Capture "J 91 11 2 2 10
General Office Subtotal: 1,721 215 29 40 195
Office/Industrial Park Total: 2,817 282 44 56 256
Shopping Center. 820 425,000 Square Feet/77 17,283 231 148 783 848
-15%Shopping Center Internal Capture 2,592 35 22 117 127
Shopping Center Total: 14,691 196 125 666 721
Out Parcels:
Hotel 25 , 310 250 Occupied Rooms 2,230 96 70 280 291
/,Convenience Market w/Gas Pumps 0 853 3,200 Square Feet 2,706 73 73 97 97
Drive-In Bank / 912 3,600 Square Feet 1,014 25 20 99 99
Fast Food w/Drive-Through Window S 834 3,200 Square Feet 1,588 81 78 56 51
Drugstore with Drive-Through Window p(S' 881 10,000 Square Feet 882 15 11 51 53
Out Parcels Subtotal(w/out Hotel): 6,189 195 183 302 300
-25%Pass-By Traffic w/out Hotel 1,547 49 46 76 75
Out Parcels Subtotal(w/out Hotel): T 4,642 146 137 227 225
Out Parcels Total(with Hotel): 9j/ `` 6,872 242 207 506 516
Residential:
Single-Family/Detached Housing 210 390 Dwelling Units 3,626 71 212 234 132
Residential Condominium/Townhouse 230 60 Dwelling Units 422 6 28 27 13
Apartments(50 units North Point,200 units Dr.Hurt Property) 220 250 Dwelling Units 1,633 20 107 103 51
Retirement Community(Empty Nesters)' 250 90 Dwelling Units 248 7 8 12 10
Residential Total: 5,929 104 356 376 205
-15%Residential Internal Capture 889 16 53 56 31
Residential Total: , 88 302 320 175
GRAND TOTAL: K.,..29,418 808 678 1,548 1,668
SOURCE:"Trip Generation Handbook,6th ed;"Institute of Transportation Engineers
NOTE:(*)Because weekday is not availbale,used Saturday for 24 hour average daily trip.
Table 2
PERCENT GROWTH RATE
North Point Development - Charlottesville, Virginia
Seminole Trail (Rt 29) between Rt 631 (Rio Rd) and Rt 1520 (Hollymead Dr)
AVERAGE
DAILY PERCENT
YEAR TRAFFIC CHANGE
1993 36,000 -
1994 37,000 2.70
1995 38,000 2.63
1996 40,000 5.00
1997 38,000 -5.26
AVERAGE YEAR GROWTH: 1 .3%
AVERAGE YEAR GROWTH USED: 2%
Seminole Trail (Rt 29) between Rt 1520 (Hollymead Dr) & Rt 1510
AVERAGE
DAILY PERCENT
YEAR TRAFFIC CHANGE
1993 28,000 -
1994 30,000 6.67
1995 30,000 0.00
1996 32,000 6.25
1997 33,000 3.03
AVERAGE YEAR GROWTH: 3.9%
% AVERAGE YEAR GROWTH USED: 4%
SOURCE: VDOT Primary Roads Books.
- 111111 a
Table 3
LOS SUMMARY
North Point Developement-Albemarle County,VA
Scenario
Intersection Approach Existing 2010 Background 2010 Total
AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak
LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay
Profit and Worth EB A 7.9 A 7 9 A 8 6 A 8 2 A 9.2 A 9.7 C 32.8 D 47.8
WB A 7 8 A 7.8 A 8.2 A 8.7 A 8.2 A 8.8 D 47.7 D 36.3
NB B 10 B 10.9 B 11 4 B 14.9 D 30.7 F 365.5 D 42.3 D 50.8
SB C 17.9 C 19.6 E 35.2 E 48.3 F 271.3 F 281 6 D 39.9 D 52.5
` ,a�. "i,°aa''.4i,.•sx�«:.Ttfi+ a_ ..: .a ! .,.;� ,�*` ti.� .,�y.
Rt 29 and Airport EB D 51.7 F 197.6 F 91.7 F 209.2 F 154.2 F 293.5
WB E 62,8 F 168.5 F 126.5 D 43 F 162.8 F 124,8
NB C 29.9 E 56.3 E 71.5 F 200.3 F 101.1 F 299.5
SB D 50.5 D 35,1 F 256.6 F 376 F 378,2 F 395,6
g ^,*t ,�$:::ti+ -, A, .. ..y ',�^ ?k. d„ §>3 F ,."S b,y rs r4.,;r„y�.�e 4 tx-: rt+: '!�-,,n.' f .", 4% �
t�1,gt,-��'`?' �, ?� ,3y': `�"<r�t'�,,,>;: F�,:, .., ;,s, ,stla"+��*fi ,�� „: ,dz+>,..:,,v,�°e ,. ,:.�^.''ra,:*�E}k�*i*�� ,�,,15'r.- .. r;t. sYz��s�• ' 'p�f'3�P`�w�,t�em,a�`<�,.t�E�#s.�;.0E.
Rt 29 and Airport Acres(S) EB
WB
NB B 13.4 B 13 1 C 24.1 F 50 3 D 32.9 F 136.4
SB
nt
x
Rt 29 and Airport Acres(N) EB D 41.7 D 52.3
(Commercial Entrance) WB F - D 40 D 37.7
NB C 19 C 153 F 558 F 91 5 F 764 F 149.1 F - F
SB E 39 F - F 357.2 F
�R., s »'e Z7`'':: Y Y.�«,>.:
,.:�, r i §"tir,':3;''',2�e'x':.U ^y^t+• �+�3. s,`a i�-r '�4• o_�U�:'-,b�, .' ,.:_�.�
Rt 29 and Cypress EB
WB
NB C 194 B 123 F 52.2 E 42 F 637 F 616
SB
,.70 r ., " „j,. ,ktaiWa' .M-.<
Rt 29 and Lewis&Clark EB C 24 6 F 106 9 D 53.1 F 235.9 F 80.4 F 242.2
(Residential Entrance) WB
NB F 171 2 B 10 8 F 132.3 F 128.7 F 132.6 F 221.6
SB F 303.9 F 167.9 F 443.9 F 310.7
ak.}' � Fx Y✓ U v
Rt 29 and Business Entran -EB - - - - - - - -
WB - - - - - - - E 60.3 F 128.2
NB - - - - - - - - B 14.1 F 178.3
SB - - - - - - F 132.9 F 113
Items shown in BOLD indicate signalized intersections.
I
APPENDIX A
WILBUR SMITH ASSOCIATES
DEC. 2 & 5, 2000
TURNING MOVEMENT COUNTS
I
TURNING MOVEMENT COUNT FORM
COUNTY. Albemarle LOCATION. Rt 29&Cypress Dr.
DATE 12/6/00 DAY OF WEEK.Wednesday
COUNTED BY F I. INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 CYPRESS DR PEAK
FROM TO L T T R L R TOTAL TOTAL
6:00 6:15 0 88 191 0 4 1 284 1,775
6:15 6:30 3 107 295 0 0 2 407 2,136
6:30 6:45 1 182 347 2 2 4 538 2,542
6:45 7:00 2 166 371 1 1 5 546 2,726
7:00 7:15 1 171 465 1 3 4 645 2,940
7:15 7:30 1 183 620 1 1 7 813 2,986
7:30 7:45 0 225 488 2 0 7 722 2,796
7:45 8:00 1 282 473 0 2 2 760 2,684
8:00 8:15 7 243 437 0 0 4 691 2,394
8:15 8:30 1 203 414 1 1 3 623 1,703
8:30 8:45 0 195 412 2 0 1 610 1,080
8:45 9:00 0 172 296 0 2 0 470 470
PK HR TOTALS 9 933 2,018 3 3 20 2,986 10,860
PK HR FACTOR 0 83 0.83 0.81 0 81 0 72 0 72
TOTAL 11 1,674 3,605 7 9 28 5,334
' NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 CYPRESS DR PEAK
FROM TO L T T R L R TOTAL TOTAL
16:00 16:15 8 401 238 0 0 3 650 2,884
16:15 16:30 4 418 289 3 2 3 719 3,129
16:30 16:45 4 451 298 2 6 2 763 3,200
16:45 17:00 6 456 288 0 2 0 752 3,292
17:00 17:15 3 504 381 2 1 4 895 3,239
17:15 17:30 3 458 322 0 5 2 790 2,344
17:30 17:45 1 533 317 1 2 1 855 1,554
17:45 18:00 5 384 305 1 3 1 699 699
18:00 18:15 4 378 305 1 2 0 690 2,111
18:15 18:30 5 352 241 1 0 1 600 1,421
18:30 18:45 4 269 205 3 4 1 486 821
18:45 19:00 4 165 158 2 4 2 335 335
PK HR TOTALS 13 1,951 1,308 3 10 7 3,292 10,429
PK HR FACTOR 0.92 0.92 0.86 0 86 0.61 0 61
TOTAL 34 3,605 2,438 9 21 16 6,123
TURNING MOVEMENT COUNT FORM Show INTERSECTION
North DIAGRAM
COUNTY Albemarle LOCATION:Rt 29&Airport Dr.
DATE. 12/5/00 DAY OF WEEK.Tuesday
COUNTED BY.S T.&F.I. INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON WESTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT DR PROFFIT RD PEAK
FROM TO L T R L T R L T R L T R TOTAL TOTAL
6:00 6:15 _ 24 53 1 6 45 7 5 2 13 11 3 3 173 1,344
6:15 6:30 21 73 19 9 84 11 2 5 6 14 2 7 253 1,844
6:30 6:45 18 124 6 19 210 13 8 6 15 13 6 6 444 2,337
6:45 7:00 28 152 16 18 175 19 9 4 11 26 11 5 474 2,682
7:00 7:15 36 118 3 39 350 26 14 15 17 26 10 19 673 3,124
7:15 7:30 30 183 7 39 335 16 23 12 25 39 12 25 746 3.127
7:30 7.45 32 176 14 50 363 25 18 18 25 40 16 12 789 3,007
7:45 8:00 42 252 13 24 421 12 12 7 12 45 36 40 916 2,877
8:00 8:15 40 163 20 26 275 16 19 11 32 35 19 20 676 2,626
8:15 8:30 41 177 21 15 235 16 15 10 21 28 21 26 626 1,950
8:30 8:45 39 201 16 27 225 18 11 17 29 40 12 24 659 1,324
8:45 9:00 34 170 14 23 275 18 15 17 26 29 16 28 665 665
PK HR TOTALS 144 774 54 139 1,394 69 72 48 94 159 83 97 3,127 11,637
PK HR FACTOR 0.79 0.79 0.79 0.88 0.88 0.88 0 86 0.86 0.86 0 70 0 70 0.70
TOTAL 294 1,440 108 243 2,479 147 127 107 187 282 142 194 5,750
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON WESTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT DR PROFFIT RD PEAK
FROM TO L T R L T R L T R L T R TOTAL TOTAL
16.00 16:15 47 347 21 20 172 28 30 24 23 26 12 32 782 3,714
16:15 16:30 62 419 30 47 196 22 23 19 22 20 10 25 895 3,931
16:30 16:45 47 350 24 42 252 20 40 20 43 15 21 51 925 4,174
16:45 17:00 57 395 40 42 358 21 49 25 49 19 17 40 1,112 4,361
17:00 17:15 49 364 33 53 254 27 56 49 37 29 21 27 999 4,107
17:15 17:30 44 460 21 43 352 21 46 23 41 20 18 49 1,138 3,108
17:30 17:45 53 417 32 53 324 22 38 31 30 25 21 66 1,112 1,970
17:45 18:00 29 373 31 34 227 14 28 16 37 17 15 37 858 858
18:00 18:15 43 303 28 38 248 22 29 17 49 11 15 31 834 3,180
18:15 18:30 53 293 40 17 301 13 17 12 50 34 15 25 870 2,346
18:30 18:45 35 276 26 11 234 24 13 5 43 17 10 19 713 1,476
18:45 19:00 49 258 20 31 224 49 25 26 47 13 5 16 763 763
PK HR TOTALS 203 1,636 126 191 1,288 91 189 128 157 93 77 182 4,361 13,546
PK HR FACTOR 0.94 0.94 0.94 0.93 0.93 0.93 0.83 0.83 0.83 0.79 0.79 0.79
TOTAL 388 3,125 232 334 2,135 175 310 207 282 171 135 327 7,821
TURNING MOVEMENT COUNT FORM
i
COUNTY: Albemarle LOCATION Rt 29& North Fork Research Park
DATE 1/10/01 DAY OF WEEK Wednesday
COUNTED BY. C T.D INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 NORTH FORK RES. PARK PEAK
FROM TO L T T R L R TOTAL TOTAL
6.00 6.15 3 66 166 2 2 1 240 1,738
6:15 6:30 9 99 275 10 3 1 397 2,122
6 30 6:45 10 128, 377 7 1 2 525 2,562
6:45 7:00 11 173 365 23 2 2 576 2,950
7:00 7:15 18 141 433 28 3 1 624 3,272
7:15 7:30 29 197 572 24 9 6 837 3,453
7:30 7:45 40 212 599 53 6 3 913 3,335
7:45 8:00 80 251 480 74 5 8 898 3,106
8.00 8:15 73 210 467 42 9 4 805 2,865
8.15 8:30 55 209 399 41 9 6 719 2,060
8.30 8:45 33 202 404 33 4 8 684 1,341
8 45 9:00 47 194 372 31 10 3 657 657
PK HR TOTALS 222, 870 2,118 193 29 21 3,453 12,759
PK HR FACTOR 0.82 0.82 0.89 0 89 0.83 0.83
TOTAL 375 1,616 3,726 326 55 39 6,137
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 NORTH FORK RES. PARK PEAK
FROM TO L T T R L R TOTAL TOTAL
16:00 16:15 3 255 162 r 7 7 11 445 2,281
16:15 16:30 6 292 178 5 15 20 516 2,700
16.30 16-45 1 314 191 6 28 32 572 2,974
16.45 17:00 3 387 237 4 52 65 748 3,254.
17.00 17:15 4 412 251 11 98 88 864 3,183
17:15 17:30 16 411 249 9 52 53 790 2,319
17:30 17:45 3 482 273 9 50 35 852 1,529
17:45 18:00 2 389 241 10 9 26 677 677
18:00 18:15 1 377 237 12 10 12 649 2,224
18:15 18:30 3 313 235 6 10 5 572 1,575
18:30 18:45 1 348 194 4 11 6 564 1,003
18:45 19:00 2 249 164 6 10 8 439 439
PK HR TOTALS 26 1,692 1,010 33 252 241 3,254 10,285
PK HR FACTOR 0 89 0.89, 0.92 0 92 0.66 0 66
TOTAL 38 2,942 1,782 61 311 330 5,464
TURNING MOVEMENT COUNT FORM Show INTERSECTION
North DIAGRAM
COUNTY. Albemarle LOCATION.Proffit Rd&Worth Crossing
DATE: 12/5/00 DAY OF WEEK Tuesday
COUNTED BY:M.H. INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON WESTBOUND ON
TIME PERIOD WORTH CROSSING WORTH CROSSING PROFFIT RD FROFFIT RD PEAK
IFROM TO L T R L T R L T R L T R TOTAL TOTAL
6:00 6.15 0 0 2 0 0 0 0 19 3 5 24 1 54 328
6:15 6:30 1 0 3 0, 0 0 2 24 1 4 17 0 52 441
6:30 6:45 1 1 5 0 0 0 4 46 3 7 45 1 113 585
I6:45 7:00 7 0 7 1 0 1 2 27 7 5 50 2 109 678
7:00 7:15 9 0 8 2 0 3 2 53 9 15 66 0 167 740
7:15 7:30 13 1 16 0 0 1 1, 73 17 12 61 1 196 738
7.30 7:45 17 0 13 1 0 0 2 41 15 17 98 2 206 710
I7:45 8:00 9 0 13 0 0 0 5 46 13 11 74 0 171 633
8.00 8:15 13 0 17 0 0 2 2 41 15 13 61 1 165 538
8:15 8.30 5 0 16 3 1 5 5 46 8 10 68 1 168 373
8:30 8:45 6 1 4 0 0 0 4 31 13 7 63 0 129 205
i8.45 9:00 4 0 5 0 0 0 2 15 10 3 37 0 76 76
PK HR TOTALS 48 1 50 3 0 4 10 213 54 55 299 3 740 2,821
PK HR FACTOR 0.83 0 83 0.83 0.35 0.35 0.35 0.76 0 76 0.76 0 76 0 76 0.76
TOTAL 76 2 92 6 1 11 23 346 100 88 528 5 1,278
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON WESTBOUND ON
TIME PERIOD WORTH CROSSING WORTH CROSSING PROFFIT RD FROFFIT RD PEAK
FROM TO L T R L T R L T R L T R TOTAL TOTAL
16:00 16:15 5 1 10 1 1 3 0 47 8- 6 42 1 125 679
16:15 16:30 9 3 20 0 2 0 2 55 14 8 35 0 148 750
16:30 16:45 19 3 26 3 1 3 5 50 15 19 61 1 206 811
16:45 17.00 11 1 20 1 1 5 2 70 14 13 60 2 200 835
17:00 17:15 22 1 20 4 0 1 0 68 11 8 61 0 196 823
17:15 17:30 18 0 17 0 0 2 1 71 20 17 63 0 209 627
�
17:30 17:45 18 0 23 2 0 1 2 69 28 12 74 1 230 418
17:45 18:00 17 0 22 0 0 2 3 60 15 14 55 0 188 188
18:00 18:15 10 1 25 2 2 1 0 53 13 13 50 0 170 560
18:15 18:30 3 0 12 1 0 2 0 55 9 4 55 0 141 390
18:30 18:45 6 0 12 0 0 0 0 57 7 10 37 1 130 249
18:45 19:00 3 0 32 0 0 0 0 36 6 10 32, 0 119 119
PK HR TOTALS 69 2 80 7 1 9 5 278 73 50 258 3 835 2,703
" PK HR FACTOR 0.88 0.88 0.88 0 61 0.61 0 61 0.90 0 90 0 90 0 89 0 89 0.89
-
TOTAL 119 9 158 11 5 17 15 490 125 97 451 5 1,502
TURNING MOVEMENT COUNT FORM
COUNTY Albemarle LOCATION Rt 29&Airport Acres North
DATE. 12/6/00 DAY OF WEEK Wednesday
COUNTED BY S T INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT ACRES PEAK
FROM TO L T T R L R TOTAL TOTAL
6:00 6.15 8 88 197 12 0 0 305 1,939
6:15 6:30 11 128 428 7 0 0 574 2,356
6:30 6:45 9 197 367 5 1 2 581 2,380
6:45 7.00 9 149 320 1 0 0 479 2,394
7:00 7:15 2 107 609 1 0 3 722 2,606
7:15 7.30 4 92 495 5 0 2 598 2,422
7:30 7:45 3 167 423 1 0 1 595 2,353
7:45 8.00 9 255 414 9 0 4 691 2,311
8:00 8:15 10 140 380 8 0 0 538 1,698
8:15 8:30 6 161 351 8 1 2 529 1,160
8.30 8:45 10 161 369 12 1 0 553 631
8:45 9:00 2 39 37 0 0 0 78 78
PK HR TOTALS 18 621 1,941 16 0 10 2,606 9,692
PK HR FACTOR 0.61 0 61 0 80 0 80 0 63 0 63
TOTAL 46 1,122 3,078 44 2 12 4,304
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT ACRES PEAK
FROM TO L T T R L R TOTAL TOTAL
16:00 16:15 7 359 235 3 1 2 607 3,498
16:15 16:30 7 531 326 4 0 1 869 3,909
16:30 16:45 5 569 413 6 0 0 993 3,866
16:45 17:00 5 600 413 10 0 1 1,029 3,751
17:00 17:15 5 542 457 10 2 2 1,018 3,709
17:15 17.30 4 445 369 8 0 0 826 2,691
17:30 17:45 3 497 368 8 1 1 878 1,865
17:45 18:00 8 412 561 6 0 0 987 987
18:00 18:15 2 264 261 2 0 0 529 1,972
18:15 18:30 5 287 199 3 1 3 498 1,443
18:30 18:45 3 266 270 2 0 2 543 945
18:45 19:00 1 209 176 10 2 4 402 402
PK HR TOTALS 22 2,242 1,609 30 2 4 3,909 15,235
PK HR FACTOR 0.94 0.94 0.88 0.88 0.38 0 38
TOTAL 44 3,955 3,142 55 4 7 7,207
TURNING MOVEMENT COUNT FORM
COUNTY Albemarle LOCATION Rt 29&Airport Acres South
DATE: 12/6/00 DAY OF WEEK.Wednesday
COUNTED BY: M H INTERSECTION NUMBER
COMMENTS
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT ACRES PEAK
FROM TO L T T R L R TOTAL TOTAL
6:00 6:15 1 92 180 0 0 2 275 1,404
6:15 6:30 0 100 217 0 0 0 317 1,652
6:30 6:45 1 138 298 0 0 0 437 1,847
6:45 7:00 0 162 213 0 0 0 375 1,970
7:00 7:15 2 142 377 0 1 1 523 2,162
7:15 7:30 0 172 340 0 0 0 512 2,250
7.30 7:45 2 188 367 0 0 3 560 2,253
7.45 8.00 1 218 344 0 0 4 567 2,325
8.00 8:15 1 242 364 0 2 2 611 2,307
8.15 8 30 0 184 329 1 0 1 515 1,696
8 30 8:45 5 195 427 0 4 1 632 1,181
8.45 9.00 5 178 363 0 3 0 549 549
PK HR TOTALS 7 839 1,464 1 6 8 2,325 7,509
PK HR FACTOR 0.87 0 87 0 86 0.86 0.70 0 70
TOTAL 16 1,519 2,911 1 10 12 4,469
NORTHBOUND ON SOUTHBOUND ON EASTBOUND ON
TIME PERIOD RT 29 RT 29 AIRPORT ACRES PEAK
FROM TO L T T R L R TOTAL TOTAL
16.00 16:15 2 70 80 0 0 1 153 2,526
16:15 16:30 6 475 310 0 0 0 791 3,208
16:30 16:45 5 400 310 0 0 0 715 3,290
16:45 17:00 2 540 325 0 0 0 867 3,457
17:00 17:15 4 460 370 1 0 0 835 3,397
17:15 17:30 6 500 365 1 0 1 873 2,562
17:30 17:45 2 530 350 0 0 0 882 1,689
17:45 18:00 2 485 320 0 0 0 807 807
18 00 18:15 1 435 435 0 0 3 874 3,066
18:15 18:30 1 470 470 0 1 1 943 2,192
18:30 18:45 2 350 350 0 2 1 705 1,249
18:45 19.00 3 270 270 0 1 0 544 544
PK HR TOTALS 14 2,030 1,410 2 0 1 3,457 11,105
PK HR FACTOR 0.94 0.94 0.95 0.95 0.25, 0.25
TOTAL 29 3,460 2,430 2 0 2 5,923
APPENDIX B
HIGHWAY CAPACITY ANALYSIS
HCS ANALYSIS:
EXISTING TRAFFIC
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter.: Rout 29 and Airport/Proff it
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: AM Peak 2000 Year .
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 1 0 1 1 0 1 2 1 1 2 1
LGConfig L TR L TR L T R L T R
Volume 72 48 94 159 83 97 144 774 54 139 1394 69
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 15.0 17.0 18.0 50.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 226 1805 0.34 0.13 48.8 D
TR 243 1712 0.62 0.14 53.1 D 51.7 D
Westbound
L 226 1805 0.74 0.13 62.7 E
TR 247 1746 0.77 0.14 62.9 E 62.8 E
Northbound
L 271 1805 0.56 0.15 50.0 D
T 1504 3610 0.54 0.42 26.8 C 29.9 C
R 673 1615 0.08 0.42 21.2 C
Southbound
L 271 1805 0.54 0.15 49.3 D
T 1504 3610 0.98 0.42 52.0 D 50.5 D
R 673 1615 0.11 0.42 21.5 C
Intersection Delay = 45.5 (sec/veh) Intersection LOS = D
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter.: Rout 29 and Airport/Proffit
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: PM Peak 2000 Year .
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 1 0 1 1 0 1 2 1 1 2 1
LGConfig L TR L TR L T R L T R
Volume 189 128 157 93 77 182 203 1636 126 191 1288 91
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 13.0 15.0 15.0 57.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 196 1805 1.02 0.11 121.8 F
TR 218 1743 1.38 0.13 247.9 F 197.6 F
Westbound
L 196 1805 0.50 0.11 52.4 D
TR 213 1700 1.28 0.13 210.2 F 168.5 F
Northbound
L 226 1805 0.95 0.13 97.2 F
T 1715 3610 1.00 0.47 54.2 D 56.3 E
R 767 1615 0.17 0.47 18.1 B
Southbound
L 226 1805 0.89 0.13 83.9 F
T 1715 3610 0.79 0.47 29.1 C 35.1 D
R 767 1615 0.13 0.47 17.7 B
Intersection Delay = 73.1 (sec/veh) Intersection LOS = E
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2000
Intersection: Prof fit Rd and Worth Crossing
Jurisdiction:
Analysis Year: AM Peak 2000
Project ID: North Point
East/West Street: Prof fit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 10 213 54 55 299 3
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 10 224 56 57 314 3
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 48 1 50 3 0 4
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 50 1 52 3 0 4
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT LT I L TR I L TR
v (vph) 10 57 50 53 3 4
C(m) (vph) 1247 1349 769 282 866
v/c 0.01 0.04 0.07 0.01 0.00
95% queue length 0.02 0.13 0.22 0.03 0.01
Control Delay 7.9 7.8 10.0+ 17.9 9.2
LOS A A B C A
Approach Delay 12.9
Approach LOS B
HCS2000• Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2000
Intersection: Proffit Rd and Worth Crossing
Jurisdiction:
Analysis Year: PM Peak 2000
Project ID: North Point
East/West Street: Proffit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R 1 L T R
Volume 5 278 73 50 258 3
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 5 292 76 52 271 3
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 69 2 80 7 10 9
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 72 2 84 7 10 9
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level of Service
Approach EB WE Northbound Southbound
Movement 1 4 1 7 8 9 ( 10 11 12
Lane Config LT LT ( L TR 1 L TR
v (vph) 5 52 72 86 7 19
C(m) (vph) 1293 1274 694 253 502
v/c 0.00 0.04 0.12 0.03 0.04
95% queue length 0.01 0.13 0.42 0.09 0.12
Control Delay 7.8 7.9 10.9 19.6 12.5
LOS A A B C B
Approach Delay 14.4
Approach LOS B
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2000
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year: AM Peak 2000
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R 1 L T R
Volume 7 839 1464 1
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 7 884 1541 1
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 6 8
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 6 8
Percent Heavy Vehicles 0 0 0
Percent Grade M 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L 1 1 LTR
v (vph) 7 14
C(m) (vph) 436
v/c 0.02
95% queue length 0.05
Control Delay 13.4
LOS B
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2000
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year:
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 14 2030 1410 2
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 14 2135 1484 2
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 1
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 0 1
Percent Heavy Vehicles 0 0 0
Percent Grade (t) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 14 1
C(m) (vph) 458
v/c 0.03
95t queue length 0.09
Control Delay 13.1
LOS B
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2000
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: AM Peak 2000
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 18 621 1941 16
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 18 652 2043 16
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 0 10
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 0 10
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L 1 1 LTR
v (vph) 18 10
C(m) (vph) 276
v/c 0.07
95% queue length 0.21
Control Delay 19.0
LOS C
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2000
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: PM Peak 2000
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 22 2242 1609 30
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 23 2360 1693 31
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 2 4
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 2 4
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I l0 11 12
Lane Config L I I LTR
v (vph) 23 6
C(m) (vph) 372
v/c 0.06
95t queue length 0.20
Control Delay 15.3
LOS C
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2000
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: AM Peak 2000
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 9 933 2018 3
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 9 984 2124 3
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 3 20
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 3 21
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config L 1 I LTR
v (vph) 9 24
C(m) (vph) 259
v/c 0.03
95% queue length 0.11
Control Delay 19.4
LOS C
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2000
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: PM Peak 2000
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 13 1951 1308 3
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 13 2063 1376 3
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 10 7
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 10 7
Percent Heavy Vehicles 0 0 0
Percent Grade (t) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 13 17
C(m) (vph) 504
v/c 0.03
95t queue length 0.08
Control Delay 12.3
LOS B
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2000
Intersection: Route 29 and Lewis & Clark
Jurisdiction:
Analysis Year: AM Peak 2000
Project ID: North Point
East/West Street: Lewis & Clark
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 222 870 2118 193
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 233 915 2229 203
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 29 21
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 30 22
Percent Heavy Vehicles 0 0
Percent Grade (U) 0 0
Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I L R
v (vph) 233 30 22
C(m) (vph) 197 206
v/c 1.18 0.11
95% queue length 11.86 0.35
Control Delay 171.2 24.6
LOS F C
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2000
Intersection: Route 29 and Lewis & Clark
Jurisdiction:
Analysis Year: PM Peak 2000
Project ID: North Point
East/West Street: Lewis & Clark
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 26 21 1010 33
Peak-Hour Factor, PHF 0.95 0.25 0.95 0.95
Hourly Flow Rate, HFR 27 84 1063 34
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 252 241
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 265 253
Percent Heavy Vehicles 0 0
Percent Grade (t) 0 0
Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L I 1 L R
v (vph) 27 265 253
C(m) (vph) 644 257 497
v/c 0.04 1.03 0.51
95t queue length 0.13 10.48 2.85
Control Delay 10.8 106.9 19.5
LOS B F C
Approach Delay 64.2
Approach LOS F
HCS ANALYSIS :
FUTURE BACKGROUND
HCS2000: Signalized Intersections Release 4.1
Analyst: Inter. : Rout 29 and Airport/Proffit
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: AM Peak 2010 Year : 2010
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 1 1 1 1 1 3 1 1 2 1
LGConfig L T R L T R L T R L T R
Volume 199 75 190 235 141 197 456 1869 80 215 2251 190
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right A EB Right A
SB Right A WB Right A
Green 12.0 14.0 24.0 50.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 181 1805 1.15 0.10 168.7 F
T 421 3610 0.19 0.12 48.1 D 91.7 F
R 579 1615 0.35 0.36 28.6 C
Westbound
L 181 1805 1.36 0.10 249.3 F
T 222 1900 0.67 0.12 58.2 E 126.5 F
R 579 1615 0.36 0.36 28.7 C
Northbound
L 361 1805 1.33 0.20 214.3 F
T 2161 5187 0.91 0.42 39.2 D 71.5 E
R 902 1615 0.09 0.56 12.4 B
Southbound
L 361 1805 0.63 0.20 47.3 D
T 1504 3610 1.58 0.42 297.0 F 256.6 F
R 902 1615 0.22 0.56 13.5 B
Intersection Delay = 158.8 (sec/veh) Intersection LOS = F
HCS2000: Signalized Intersections Release 4.1
Analyst: Inter. : Rout 29 and Airport/Proffit
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: PM Peak 2010 Year : 2010
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 1 1 1 1 1 3 1 1 2 1
LGConfig L T R L T R L T R L T R
Volume 401 210 514 138 123 293 425 2738 186 341 2676 255
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right A EB Right A
SB Right A WB Right A
Green 15.0 17.0 18.0 50.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate _
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 226 1805 1.87 0.13 459.2 F
T 511 3610 0.43 0.14 47.7 D 209.2 F
R 538 1615 1.01 0.33 80.2 F
Westbound
L 226 1805 0.64 0.13 56.0 E
T 269 1900 0.48 0.14 48.8 D 43.0 D
R 538 1615 0.57 0.33 34.4 C
Northbound
L 271 1805 1.65 0.15 359.2 F
T 2161 5187 1.33 0.42 188.4 F 200.3 F
R 942 1615 0.21 0.58 12.0 B
Southbound
L 271 1805 1.32 0.15 220.5 F
T 1504 3610 1.87 0.42 430.4 F 376.0 F
R 942 1615 0.28 0.58 12.7 B
Intersection Delay = 260.3 (sec/veh) Intersection LOS = F
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Proffit Rd and Worth Crossing
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Proffit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 15 328 80 81 515 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 15 345 84 85 542 4
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 71 1 74 4 0 6
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 74 1 77 4 0 6
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (t) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level ofService
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT LT I L TR I L TR
v (vph) 15 85 74 78 4 6
C(m) (vph) 1026 1218 638 123 731
v/c 0.01 0.07 0.12 0.03 0.01
95t queue length 0.04 0.22 0.42 0.10 0.02
Control Delay 8.6 8.2 11.4 35.2 10.0-
LOS A A B E A
Approach Delay 20.1
Approach LOS C
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Prof fit Rd and Worth Crossing
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Proffit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 7 490 108 74 415 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 7 515 113 77 436 4
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 102 3 118 10 15 13
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 107 3 124 10 15 13
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (t) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config LT LT 1 L TR 1 L TR
v (vph) 7 77 107 127 10 28
C(m) (vph) 1123 1054 490 93 295
v/c 0.01 0.07 0.26 0.11 0.09
95% queue length 0.02 0.24 1.03 0.35 0.31
Control Delay 8.2 8.7 14.9 48.3 18.5
LOS A A B E C
Approach Delay 26.3
Approach LOS D
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 10 2094 2306 1
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 10 2206 2427 1
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 9 8
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 9 8
Percent Heavy Vehicles 0 0 0
Percent Grade (t) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 10 17
C(m) (vph) 198
v/c 0.05
95% queue length 0.16
Control Delay 24.1
LOS C
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 21 3378 3003
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 22 3554 3161 3
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 1
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 0 1
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 22 1
C(m) (vph) 101
v/c 0.22
95% queue length 0.77
Control Delay 50.3
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 27 1771 3012 24
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 28 1859 3170 25
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 15
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 0 15
Percent Heavy Vehicles 0 0 0
Percent Grade (U) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 28 15
C(m) (vph) 98
v/c 0.29
95% queue length 1.07
Control Delay 55.8
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 33 3692 3297 44
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 34 3886 3470 46
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 3 6
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 3 6
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L 1 1 LTR
v (vph) 34 9
C(m) (vph) 73
v/c 0.47
95% queue length 1.89
Control Delay 91.5
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 13 2233 3126 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 13 2355 3290 4
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb .
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 4 30
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 4 31
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 13 35
C(m) (vph) 89
v/c 0.15
95% queue length 0.49
Control Delay 52.2
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R 1 L T R
Volume 19 3261 2852 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 20 3449 3002 4
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 15 10
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 15 10
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L 1 I LTR
v (vph) 20 25
C(m) (vph) 117
v/c 0.17
95% queue length 0.59
II Control Delay 42.0
LOS E
Approach Delay
Approach LOS
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rout 29 and Lewis & Clark
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: AM Peak 2010 Year .
Project ID: North Point
E/W St: Lewis & Clark N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 2 0 2 0 0 0 2 2 0 0 2 1
LGConfig L R L T T R
Volume 103 95 1127 1288 3134 580
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru Thru A A
Right A Right
Peds Peds
WB Left SB Left
Thru Thru A
Right Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 10.0 27.0 68.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 292 3502 0.37 0.08 52.8 D
53.1 D
R 237 2842 0.42 0.08 53.5 D
Westbound
Northbound
L 788 3502 1.51 0.22 280.4 F
T 3008 3610 0.45 0.83 2.8 A 132.3 F
Southbound
T 2046 3610 1.61 0.57 303.9 F 259.5 F
R 915 1615 0.67 0.57 20.0+ C
Intersection Delay = 204.5 (sec/veh) Intersection LOS = F
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rout 29 and Lewis & Clark
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: PM Peak 2010 Year .
Project ID: North Point
E/W St: Lewis & Clark N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 2 0 2 0 0 0 2 2 0 0 2 1
LGConfig L R L T T R
Volume 1672 1169 405 2504 1495 184
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru Thru A A
Right A Right
Peds Peds
WB Left SB Left
Thru Thru A
Right Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 40.0 25.0 40.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 1167 3502 1.51 0.33 273.2 F
235.9 F
R 947 2842 1.30 0.33 182.7 F
Westbound
Northbound
L 730 3502 0.58 0.21 44.0 D
T 2106 3610 1.25 0.58 142.4 F 128.7 F
Southbound
T 1203 3610 1.31 0.33 184.9 F 167.9 F
R 538 1615 0.36 0.33 30.7 C
Intersection Delay = 178.6 (sec/veh) Intersection LOS = F
HCS ANALYSIS :
INTERNAL INTERSECTIONS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.:
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road B
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road B
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 12 9 22 7 15 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 12 9 23 7 15 4
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 72 18 9 36
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 75 18 9 37
Percent Heavy Vehicles 0 0 0 0
Percent Grade (U) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR 1 LR
v (vph) 12 7 93 46
C(m) (vph) 1611 1593 932 1042
v/c 0.01 0.00 0.10 0.04
95% queue length 0.02 0.01 0.33 0.14
Control Delay 7.3 7.3 9.3 8.6
LOS A A A A
Approach Delay 9.3 8.6
Approach LOS A A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Road A and Road B
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road B
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 38 18 74 25 14 13
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 40 18 77 26 14 13
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 45 11 6 22
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 47 11 6 23
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR I LR
v (vph) 40 26 58 29
C(m) (vph) 1600 1512 803 996
v/c 0.03 0.02 0.07 0.03
95% queue length 0.08 0.05 0.23 0.09
Control Delay 7.3 7.4 9.8 8.7
LOS A A A A
Approach Delay 9.8 8.7
Approach LOS A A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road C
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road C
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 3 51 1 5 140 14
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 3 53 1 5 147 14
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 1 6 73 18
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 1 6 76 18
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR I LR
v (vph) 3 5 7 94
C(m) (vph) 1430 1564 1005 787
v/c 0.00 0.00 0.01 0.12
95% queue length 0.01 0.01 0.02 0.41
Control Delay 7.5 7.3 8.6 10.2
LOS A A A B
Approach Delay 8.6 10.2
Approach LOS A B
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road C
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road C
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 18 165 2 8 93 70
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 18 173 2 8 97 73
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 2 7 34 9
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 2 7 35 9
Percent Heavy Vehicles 0 0 0 0
Percent Grade (V) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR I LR
v (vph) 18 8 9 44
C(m) (vph) 1420 1414 868 739
v/c 0.01 0.01 0.01 0.06
95% queue length 0.04 0.02 0.03 0.19
Control Delay 7.6 7.6 9.2 10.2
LOS A A A B
Approach Delay 9.2 10.2
Approach LOS A B
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Condo
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Condo
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 4 38 122 1
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 4 40 128 1
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 5 19
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 5 20
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 ( 7 8 9 ( 10 11 12
Lane Config L I 1 LR
v (vph) 4 25
C(m) (vph) 1469 955
v/c 0.00 0.03
95% queue length 0.01 0.08
Control Delay 7.5 8.9
LOS A A
Approach Delay 8.9
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Road A and Condo
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Condo
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 17 127 75 6
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 17 133 78 6
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 2 9
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 2 9
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config L 1 i LR
v (vph) 17 11
C(m) (vph) 1526 977
v/c 0.01 0.01
95% queue length 0.03 0.03
Control Delay 7.4 8.7
LOS A A
Approach Delay 8.7
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road D
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road D
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 34 2 7 38
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 35 2 7 40
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 1 1 1 0
Configuration L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 13 20
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 13 21
Percent Heavy Vehicles 0 0
Percent Grade (t) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L ( I L R
v (vph) 35 13 21
C(m) (vph) 1573 885 1054
v/c 0.02 0.01 0.02
95t queue length 0.07 0.04 0.06
Control Delay 7.3 9.1 8.5
LOS A A A
Approach Delay 8.7
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road D
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road D
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 27 8 4 24
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 28 8 4 25
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 1 1 1 0
Configuration L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 43 47
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 45 49
Percent Heavy Vehicles 0 0
Percent Grade (t) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SE Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I L R
v (vph) 28 45 49
C(m) (vph) 1597 911 1069
v/c 0.02 0.05 0.05
95t queue length 0.05 0.16 0.14
Control Delay 7.3 9.2 8.5
LOS A A A
Approach Delay 8.8
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road El
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road El
North/South Street: Road A
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 133 83 35 10
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 140 87 36 10
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 1 1 1 0
Configuration L T TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 24 109
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 25 114
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach ER WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I L R
v (vph) 140 25 114
C(m) (vph) 1575 549 1036
v/c 0.09 0.05 0.11
95% queue length 0.29 0.14 0.37
Control Delay 7.5 11.9 8.9
LOS A B A
Approach Delay 9.4
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Road A and Road El
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road El
North/South Street: Road A
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 317 163 202 10
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 333 171 212 10
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 1 1 1 0
Configuration L T TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 65 319
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 68 335
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L 1 1 L R
v (vph) 333 68 335
C(m) (vph) 1359 190 828
v/c 0.25 0.36 0.40
95% queue length 0.97 1.52 1.98
Control Delay 8.5 34.1 12.3
LOS A D B
Approach Delay 16.0
Approach LOS C
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road E2
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road E2
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 62 38 43 6 69 84
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 65 40 45 6 72 88
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 21 4 13 19
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 22 4 13 20
Percent Heavy Vehicles 0 0 0 0
Percent Grade (t) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR I LR
v (vph) 65 6 26 33
C(m) (vph) 1432 1524 723 857
v/c 0.05 0.00 0.04 0.04
95t queue length 0.14 0.01 0.11 0.12
Control Delay 7.6 7.4 10.2 9.4
LOS A A B A
Approach Delay 10.2 9.4
Approach LOS B A •
IIHCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road E2
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road E2
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 75 86 123 20 66 17
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 78 90 129 21 69 17
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized? No No
Lanes 1 2 1 1 2 1
Configuration L T R L T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R 1 L T R
Volume 122 22 77 110
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 128 23 81 115
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR I LR
v (vph) 78 21 151 196
C(m) (vph) 1523 1362 559 781
v/c 0.05 0.02 0.27 0.25
95% queue length 0.16 0.05 1.09 0.99
Control Delay 7.5 7.7 13.8 11.1
LOS A A B B
Approach Delay 13.8 11.1
Approach LOS B B
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.:
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road A and Road E3
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: E3
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 116 13 43 98
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 122 13 45 103
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized? No
_ Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 29 115
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 30 121
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L I I L R
v (vph) 122 30 121
C(m) (vph) 1446 621 1056
v/c 0.08 0.05 0.11
95% queue length 0.28 0.15 0.39
Control Delay 7.7 11.1 8.8
LOS A B A
Approach Delay 9.3
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
I Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Road A and Road E3
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: E3
North/South Street: Road A
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 161 46 24 60
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 169 48 25 63
Percent Heavy Vehicles 0 -- -- -- --
Median Type Undivided
RT Channelized? No
Lanes 1 2 2 1
i Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 ( 10 11 12
L T R I L T R
Volume 99 147
1 Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 104 154
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1 1
Configuration L R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L 1 I L R
v (vph) 169 104 154
C(m) (vph) 1520 528 1072
v/c 0.11 0.20 0.14
95% queue length 0.37 0.73 0.50
Control Delay 7.7 13.5 8.9
LOS A B A
Approach Delay 10.8
Approach LOS B
I
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.:
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Road E2 and Office/Shop
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Road E2
North/South Street: Office/Shop
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
i
Volume 42 4 20 20 28 98
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 44 4 21 21 29 103
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized?
Lanes 0 2 0 0 2 0
Configuration LT TR LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 13 13 15 7
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 13 13 15 7
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT LT I LR I LR
v (vph) 44 21 26 22
C(m) (vph) 1466 1603 894 772
v/c 0.03 0.01 0.03 0.03
95% queue length 0.09 0.04 0.09 0.09
Il Control Delay 7.5 7.3 9.1 9.8
LOS A A A A
Approach Delay 9.1 9.8
Approach LOS A A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Road E2 and Office/Shop
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
i East/West Street: Road E2
North/South Street: Office/Shop
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R L T R
Volume 8 26 67 67 6 20
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 8 27 70 70 6 21
I/ Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Undivided
RT Channelized?
Lanes 0 2 0 0 2 0
Configuration LT TR LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 72 72 90 38
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 75 75 94 40
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
_ Lanes 0 0 0 0
Configuration LR LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config LT LT 1 LR 1 LR
v (vph) 8 70 150 134
C(m) (vph) 1600 1509 806 763
v/c 0.00 0.05 0.19 0.18
95% queue length 0.02 0.15 0.68 0.63
Control Delay 7.3 7.5 10.5 10.7
LOS A A B B
Approach Delay 10.5 10.7
Approach LOS B B
II
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Office and Road E3
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: E3
North/South Street: Road A
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 132 119 24 190
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 138 125 25 200
Percent Heavy Vehicles -- -- 0 -- --
Median Type Undivided
RT Channelized? No
Lanes 2 1 1 2
Configuration T R L T
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 61 12
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 64 1'2
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I LR
v (vph) 25 76
C(m) (vph) 1313 707
v/c 0.02 0.11
95% queue length 0.06 0.36
Control Delay 7.8 10.7
LOS A B
Approach Delay 10.7
Approach LOS B
I
IHCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: PM Peak
II Intersection: Office and Road E3
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: E3
North/South Street: Road A
Intersection Orientation: EW Study period (hrs) : 0.25
' Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
II
L T R I L T R
Volume 209 138 28 193
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 220 145 29 203
Percent Heavy Vehicles -- -- 0 -- --
Median Type Undivided
RT Channelized? No
Lanes 2 1 1 2
Configuration T R L T
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 182 37
Peak Hour Factor, PHF 0.95 0.95
II Hourly Flow Rate, HFR 191 38
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 0
IConfiguration LR
Delay, Queue Length, and Level of Service
Approach ER WB Northbound Southbound
Movement 1 4 ( 7 8 9 I 10 11 12
Lane Config L I LR
v (vph) 29 229
C(m) (vph) 1205 625
v/c 0.02 0.37
95% queue length 0.07 1.68
Control Delay 8.1 14.1
LOS A B
Approach Delay 14.1
Approach LOS B
HCS2000: Unsignalized Intersections Release 4 1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. :
Date Performed: 3/30/01
Analysis Time Period: AM Peak
Intersection: Shop and Southern Entrance
Jurisdiction:
Analysis Year:
Project ID: Norh Point
East/West Street: Shop
North/South Street: Southern Entr
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 ( 4 5 6
II
L T R I L T R
Volume 180 32 158 31
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 189 33 166 32
Percent Heavy Vehicles -- -- --
Median Type Undivided
RT Channelized? No
Lanes 1 0 2 1
Configuration TR T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 15 15
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 15 15
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No No
Lanes 1 1
Configuration R R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config 1 R 1 R
v (vph) 15 15
C(m) (vph) 807 966
v/c 0.02 0.02
95% queue length 0.06 0.05
Control Delay 9.5 8.8
LOS A A
Approach Delay 9.5 8.8
Approach LOS A A
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.:
Date Performed: 3/30/01
Analysis Time Period: PM Peak
Intersection: Shop and Southern Entrance
Jurisdiction:
Analysis Year: 2010
Project ID: Norh Point
East/West Street: Shop
North/South Street: Southern Entr
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
II
L T R I L T R
Volume 339 80 433 105
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 356 84 455 110
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 1 0 2 0
Configuration TR T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 87 86
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 91 90
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No No
Lanes 1 1
Configuration R R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config I R I R
v (vph) 91 90
C(m) (vph) 607 721
v/c 0.15 0.12
95% queue length 0.52 0.43
Control Delay 12.0 10.7
LOS B B
Approach Delay 12.0 10.7
Approach LOS B B
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rd El and Outparcels
Agency: Albemarle County Area Type: All other areas
Date: 3/30/01 Jurisd:
Period: AM Peak Year .
Project ID:
E/W St: Rd El N/S St: Out Parcels
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 0 0 2 1 0 0 0 1 0 1
LGConfig L T T R L R
Volume 205 159 63 60 38 132
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A A NB Left
Thru A Thru
Right Right
Peds Peds
WB Left SB Left A
Thru A Thru
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 12.0 26.0 32.0
Yellow 0.0 3.0 3.0
All Red 0.0 2.0 2.0
Cycle Length: 80.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 637 1805 0.36 0.48 13.2 B
T 1173 3610 0.14 0.32 19.2 B 15.7 B
Westbound
T 1173 3610 0.06 0.32 18.6 B 18.8 B
R 525 1615 0.12 0.32 19.1 B
Northbound
Southbound
L 722 1805 0.06 0.40 14.8 B
15.7 B
R 646 1615 0.22 0.40 15.9 B
Intersection Delay = 16.3 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. . Rd El and Outparcels
Agency: Albemarle County Area Type: All other areas
Date: 3/30/01 Jurisd:
Period: PM Peak Year .
Project ID:
E/W St: Rd El N/S St. Out Parcels
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 0 0 2 1 0 0 0 1 0 1
LGConfig L T T R L R
Volume 334 484 365 126 127 383
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A A NB Left
Thru A Thru
Right Right
Peds Peds
WB Left SB Left A
Thru A Thru
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 10.0 28.0 32.0
Yellow 0.0 3.0 3.0
All Red 0.0 2.0 2.0
Cycle Length: 80.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 513 1805 0.72 0.47 19.3 B
T 1263 3610 0.40 0.35 19.9 B 19.6 B
Westbound
T 1263 3610 0.30 0.35 19.0 B 18.9 B
R 565 1615 0.24 0.35 18.6 B
Northbound
Southbound
L 722 1805 0.19 0.40 15.7 B
19.7 B
R 646 1615 0.62 0.40 21.1 C
Intersection Delay = 19.5 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. Rd El and Southern Entrance
Agency: Albemarle County Area Type- All other areas
Date: 3/30/01 Jurisd:
Period: AM Peak Year .
Project ID:
E/W St: Rd El N/S St: Southern Entrance
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 2 1 1 2 0 1 0 1 0 0 0
LGConfig T R L T L R
Volume 96 93 96 48 75 120
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left NB Left A
Thru A Thru
Right A Right A
Peds Peds
WB Left A SB Left
Thru A Thru
Right Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 15.0 15.0 15.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 60.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
T 903 3610 0.11 0.25 17.4 B 17.8 B
R 404 1615 0.24 0.25 18.3 B
Westbound
L 451 1805 0.22 0.25 18.1 B
T 903 3610 0.06 0.25 17.1 B 17 8 B
Northbound
L 451 1805 0.18 0.25 17.8 B
18.4 B
R 404 1615 0.31 0.25 18.7 B
Southbound
Intersection Delay = 18.0 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. - Rd El and Southern Entrance
Agency: Albemarle County Area Type: All other areas
Date: 3/30/01 Jurisd:
Period: PM Peak Year
Project ID:
E/W St: Rd El N/S St: Southern Entrance
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 2 1 1 2 0 1 0 1 0 0 0
LGConfig T R L T L R
Volume 268 315 223 278 213 212
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left NB Left A
Thru A Thru
Right A Right A
Peds Peds
WB Left A A SB Left
Thru A Thru
Right Right
Peds Peds
NB Right EB Right
SB Right WE Right
Green 12.0 27.0 31.0
Yellow 0.0 3.0 3.0
All Red 0.0 2.0 2.0
Cycle Length: 80.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
T 1218 3610 0.23 0.34 19.1 B 21.8 C
R 545 1615 0.61 0.34 24.1 C
Westbound
L 591 1805 0.40 0.49 12.7 B
T 1218 3610 0.24 0.34 19.2 B 16.3 B
Northbound
L 699 1805 0.32 0.39 17.4 B
17.6 B
R 626 1615 0.36 0.39 17.8 B
Southbound
Intersection Delay = 18.8 (sec/veh) Intersection LOS = B
HCS ANALYSIS :
FUTURE TOTAL
(BACKGROUND + SITE)
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter : Rout 29 and Airport/Proff it
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: AM Peak 2010 Year : 2010
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 1 1 1 1 1 3 1 1 2 1
LGConfig L T R L T R L T R L T R
Volume 252 99 190 267 177 215 456 2234 132 242 2704 234
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right A EB Right A
SB Right A WB Right A
Green 12.0 14.0 24.0 50.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (a) v/c g/C Delay LOS Delay LOS
Eastbound
L 181 1805 1.46 0.10 290.5 F
T 421 3610 0.25 0.12 48.5 D 154.2 F
R 579 1615 0.35 0.36 28.6 C
Westbound
L 181 1805 1.55 0.10 328.0 F
T 222 1900 0.84 0.12 75.5 E 162.8 F
R 579 1615 0.39 0.36 29.2 C
Northbound
L 361 1805 1.33 0.20 214.3 F
T 2161 5187 1.09 0.42 83.2 F 101.1 F
R 902 1615 0.15 0.56 12.9 B
Southbound
L 361 1805 0.71 0.20 50.9 D
T 1504 3610 1.89 0.42 439.1 F 378.2 F
R 902 1615 0.27 0.56 14.0 B
Intersection Delay = 233.1 (sec/veh) Intersection LOS = F
I
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rout 29 and Airport/Proff it
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd
Period: PM Peak 2010 Year : 2010
Project ID: North Point
E/W St: Airport/Proffit N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 1 1 1 1 1 3 1 1 2 1
LGConfig L T R L T R L T R L T R
Volume 491 259 514 300 185 303 425 3353 353 402 2756 353
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right A EB Right A
SB Right A WB Right A
Green 15.0 17.0 18.0 50.0
Yellow 3.0 3.0 3.0 3.0
All Red 2.0 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 226 1805 2.29 0.13 645.7 F
T 511 3610 0.53 0.14 48.9 D 293.5 F
R 538 1615 1.01 0.33 80.2 F
Westbound
L 226 1805 1.40 0.13 256.3 F
T 269 1900 0.72 0.14 58.6 E 124.8 F
R 538 1615 0.59 0.33 35.0- C
Northbound
L 271 1805 1.65 0.15 359.2 F
T 2161 5187 1.63 0.42 322.0 F 299.5 F
R 942 1615 0.39 0.58 13.8 B
Southbound
L 271 1805 1.56 0.15 320.7 F
T 1504 3610 1.93 0.42 455.5 F 395.6 F
R 942 1615 0.39 0.58 13.8 B
Intersection Delay = 319.3 (sec/veh) Intersection LOS = F
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co.: Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Proffit Rd and Worth Crossing
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Proffit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 91 333 80 81 533 80
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 95 350 84 85 561 84
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 71 41 74 57 34 74
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 74 43 77 60 35 77
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 ( 7 8 9 I 10 11 12
Lane Config LT LT ( L TR I L TR
v (vph) 95 85 74 120 60 112
C(m) (vph) 943 1213 257 55 293
v/c 0.10 0.07 0.47 1.09 0.38
95% queue length 0.34 0.23 2.31 5.07 1.72
Control Delay 9.2 8.2 30.7 271.3 24.7
LOS A A D F C
Approach Delay 110.7
Approach LOS F
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Proffit Rd and Worth Crossing
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Proffit Rd
North/South Street: Worth Crossing
Intersection Orientation: EW Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 214 511 108 74 425 134
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 225 537 113 77 447 141
Percent Heavy Vehicles 1 -- -- 1 -- --
Median Type Undivided
RT Channelized? Yes
Lanes 0 1 1 0 2 0
Configuration LT R LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 102 71 118 158 68 207
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 107 74 124 166 71 217
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay, Queue Length, and Level of Service
Approach EB NB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT LT I L TR I L TR
v (vph) 225 77 107 198 166 288
C(m) (vph) 990 1034 124 0 196
v/c 0.23 0.07 1.60 1.47
95% queue length 0.87 0.24 14.40 17.63
Control Delay 9.7 8.8 365.5 281.6
LOS A A F F F
Approach Delay
Approach LOS
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter : Proffit and Worth Crossing
Agency: Albemarle County Area Type- All other areas
Date: 3/30/01 Jurisd:
Period: AM Peak Year .
Project ID:
E/W St: Proffit Rd N/S St: Worth Crossing
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 1 1 1 1 1 1 1 0 0 1 1
LGConfig L T R L T R L TR LT R
Volume 91 333 80 81 533 80 71 41 74 56 31 71
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
. RTOR Vol 0 0 15 15
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 17.0 36.0 17.0 19.0
Yellow 3.0 3.0 3.0 3.0
All Red 3.0 2.0 2.0 2.0
Cycle Length: 110.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 279 1805 0.34 0.15 42.3 D
T 622 1900 0.56 0.33 31.7 C 32.8 C
R 529 1615 0.16 0.33 26.4 C
Westbound
L 279 1805 0.30 0.15 41.9 D
T 622 1900 0.90 0.33 51.7 D 47.7 D
R 529 1615 0.16 0.33 26.4 C
Northbound
L 279 1805 0.27 0.15 41.5 D
TR 268 1732 0.39 0.15 42.8 D 42.3 D
Southbound
LT 318 1841 0.29 0.17 40.1 D 39.9 D
R 279 1615 0.21 0.17 39.4 D
Intersection Delay = 41.4 (sec/veh) Intersection LOS = D
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Proffit and Worth Crossing
Agency: Albemarle County Area Type: All other areas
Date: 3/30/01 Jurisd:
Period: PM Peak Year •
Project ID:
E/W St: Proffit Rd N/S St: Worth Crossing
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 1 1 1 1 1 1 1 0 0 1 1
LGConfig L T R L T R L TR LT R
Volume 214 511 108 74 425 134 102 71 118 158 68 207
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 1 .0 12.0 12.0 12.0
RTOR Vol 0 0 15 15
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 19.0 35.0 16.0 19.0
Yellow 3.0 3.0 3.0 3.0
All Red 3.0 2.0 2.0 2.0
Cycle Length: 110.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 312 1805 0.72 0.17 50.9 D
T 605 1900 0.89 0.32 50.8 D 47.8 D
R 514 1615 0.22 0.32 27.7 C
Westbound
L 312 1805 0.25 0.17 39.8 D
T 605 1900 0.74 0.32 38.2 D 36.3 D
R 514 1615 0.27 0.32 28.3 C
Northbound
L 263 1805 0.41 0.15 43.7 D
TR 252 1732 0.73 0.15 54.9 D 50.8 D
Southbound
LT 317 1836 0.75 0.17 52.9 D 52.5 D
R 279 1615 0.72 0.17 52.0 D
Intersection Delay = 45.7 (sec/veh) Intersection LOS = D
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 10 2624 2672 1
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 10 2762 2812 1
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 9 8
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 9 8
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 10 17
C(m) (vph) 139
v/c 0.07
95% queue length 0.23
Control Delay 32.9
LOS D
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Airport Acres (S)
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R 1 L T R
Volume 21 4274 3785 3
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 22 4498 3984 3
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized?
Lanes 1 2 2 0
Configuration L T T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 0 1
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 0 1
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L 1 I LTR
v (vph) 22 1
C(m) (vph) 47
v/c 0.47
95% queue length 1.71
Control Delay 136.4
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R 1 L T R
Volume 27 1977 260 104 3255 24
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 28 2081 273 109 3426 25
Percent Heavy Vehicles 0 -- -- 0 -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 1 1 2 0
Configuration L T R L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 123 69 0 15
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 129 72 0 15
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No No
Storage
RT Channelized?
Lanes 0 0 0 1 0
Configuration LR LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LR 1 LTR
v (vph) 28 109 201 15
C(m) (vph) 77 211
v/c 0.36 0.52
95% queue length 1.40 2.65
Control Delay 76.4 39.0
LOS F E
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Airport Acres (N)
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Airport Acres
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 33 4013 492 326 3605 44
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 34 4224 517 343 3794 46
Percent Heavy Vehicles 0 -- -- 0 --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 1 1 2 0
Configuration L T R L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
Volume 445 303 3 6
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 468 318 3 6
Percent Heavy Vehicles 0 0 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized? No
Lanes 1 1 0 1 0
Configuration L R LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I L R 1 LTR
v (vph) 34 343 468 318 9
C(m) (vph) 54 23 43
v/c 0.63 14.91 7.40
95% queue length 2.53 42.99 37.55
Control Delay 149.1
LOS F F F
Approach Delay
Approach LOS
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Route 29 and Lower
Agency: WSA Area Type: All other areas
Date: 5/23/01 Jurisd:
Period: AM Peak Year : 2010
Project T^: ^7r,-thDoint
E/W St: - N/S St: Rotue 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 1 0 1 1 0 1 2 1 1 2 1
LGConfig LTR L TR L T R L T R
Volume 0 5 15 123 5 77 27 1977 229 104 3255 24
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 15.0 20.0 60.0
Yellow 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 110.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
LTR 233 1705 0.09 0.14 41.7 D 41.7 D
Westbound
L 328 1805 0.39 0.18 40.4 D
TR 297 1632 0.29 0.18 39.4 D 40.0 D
Northbound
L 0.55
T 1969 3610 1.06 0.55 62.3 E
R 881 1615 0.27 0.55 13.5 B
Southbound
L 69 127 1.58 0.55 344.0 F
T 1969 3610 1.74 0.55 360.1 F 357.2 F
R 881 1615 0.03 0.55 11.6 B
Intersection Delay = (sec/veh) Intersection LOS =
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter.: Route 29 and Lower
Agency: WSA Area Type: All other areas
Date: 5/23/01 Jurisd:
Period: PM Peak Year : 2010
Project ID: Northpoirt
E/W St: . __ _• N/S St: Rotue 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 1 0 1 1 0 1 2 1 1 2 1
LGConfig LTR L TR L T R L T R
Volume 3 3 6 474 5 303 33 4013 394 286 3605 44
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 14.0 48.0 53.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 130.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
LTR 188 1750 0.06 0.11 52.3 D 52.3 D
Westbound
L 666 1805 0.75 0.37 40.5 D
TR 598 1619 0.54 0.37 33.3 C 37.7 D
Northbound
L 0.41
T 1472 3610 2.87 0.41 881.7 F
R 658 1615 0.63 0.41 32.7 C
Southbound
L 0.41
T 1472 3610 2.58 0.41 750.6 F
R 658 1615 0.07 0.41 23.5 C
Intersection Delay = (sec/veh) Intersection LOS =
HCS2000: Signalized Intersections Release 4 1
Analyst: WSA Inter. . Rout 29 and Business Entrance
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: AM Peak 2010 Year .
Project ID: North Point
E/W St: Business Entrance N/S St- Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 0 0 1 1 1 0 2 1 1 2 0
LGConfig L T R T R L T
Volume 206 10 45 2388 216 59 3297
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru A
Right Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 14.0 76.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
Westbound
L 253 1805 0.86 0.14 66.2 E
T 266 1900 0.04 0.14 37.3 D 60.3 E
R 226 1615 0.21 0.14 38.5 D
Northbound
T 2744 3610 0.92 0.76 14.9 B 14.0 B
R 1227 1615 0.19 0.76 3.4 A
Southbound
L 76 100 0.82 0.76 55.1 E
T 2744 3610 1.26 0.76 134.3 F 132.9 F
Intersection Delay = 80.1 (sec/veh) Intersection LOS = F
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter.: Rout 29 and Business Entrance
Agency. Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: PM Peak 2010 Year
Project ID: North Point
E/W St: Business Entrance N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 0 0 0 1 1 1 0 2 1 1 2 0
LGConfig L T R T R L T
Volume 285 10 90 3633 312 105 3171
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru A
Right Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 14.0 76.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
Westbound
L 253 1805 1.19 0.14 159.3 F
T 266 1900 0.04 0.14 37.3 D 128.2 F
R 226 1615 0.42 0.14 40.6 D
Northbound
T 2744 3610 1.39 0.76 191.4 F 176.6 F
R 1227 1615 0.27 0.76 3.7 A
Southbound
L 0.76
T 2744 3610 1.22 0.76 113.0 F
Intersection Delay = (sec/veh) Intersection LOS =
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: AM Peak 2010
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: AM Peak 2010
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 13 2370 3313 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 13 2494 3487 4
Percent Heavy Vehicles 0 -- -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 4 30
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 4 31
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L I I LTR
v (vph) 13 35
C(m) (vph) 74
v/c 0.18
95% queue length 0.59
Control Delay 63.7
LOS F
Approach Delay
Approach LOS
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: WSA
Agency/Co. : Albemarle Co, VA
Date Performed: 1/4/01
Analysis Time Period: PM Peak 2010
Intersection: Route 29 and Cypress
Jurisdiction:
Analysis Year: PM Peak 2010
Project ID: North Point
East/West Street: Cypress
North/South Street: Route 29
Intersection Orientation: NS Study period (hrs) : 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R 1 L T R
Volume 19 3702 3200 4
Peak-Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 20 3916 3368 4
Percent Heavy Vehicles 0 -- -- --
Median Type Raised curb
RT Channelized? No
Lanes 1 2 2 1
Configuration L T T R
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R 1 L T R
Volume 15 10
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 15 10
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage 1
Flared Approach: Exists? No
Storage
RT Channelized?
Lanes 0 1 0
Configuration LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config L 1 1 LTR
v (vph) 20 25
C(m) (vph) 83
v/c 0.24
95% queue length 0.86
Control Delay 61.6
LOS F
Approach Delay
Approach LOS
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rout 29 and Lewis & Clark
Agency: Albemarle Co, VA Area Type: All other areas
_ Date: 1/4/01 Jurisd:
Period: AM Peak 2010 Year .
Project ID: North Point
E/W St: Lewis & Clark N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 2 0 2 1 0 1 2 2 1 1 2 1
LGConfig L R L R L T R L T R
Volume 103 209 37 35 1142 1396 19 14 3284 580
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru Thru A A
Right A Right
Peds Peds
WB Left SB Left
Thru Thru A
Right Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 10.0 35.0 60.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 292 3502 0.37 0.08 52.8 D
80.4 F
R 237 2842 0.93 0.08 94.0 F
Westbound
L 0.00
R 0 1615 0.00
Northbound
L 1021 3502 1.18 0.29 132.6 F
T 3008 3610 0.49 0.83 2.9 A
R 0 1615 0.00
Southbound
L 0.00
T 1805 3610 1.92 0.50 443.9 F
R 808 1615 0.76 0.50 28.2 C
Intersection Delay = (sec/veh) Intersection LOS =
HCS2000: Signalized Intersections Release 4.1
Analyst: WSA Inter. : Rout 29 and Lewis & Clark
Agency: Albemarle Co, VA Area Type: All other areas
Date: 1/4/01 Jurisd:
Period: PM Peak 2010 Year .
Project ID: North Point
E/W St: Lewis & Clark N/S St: Route 29
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 2 0 2 1 0 1 2 2 1 1 2 1
LGConfig L R L R L T R L T R
Volume 1672 1205 23 28 440 2862 51 29 1820 184
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vol 0 0 0 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru Thru A A
Right A Right
Peds Peds
WB Left SB Left
Thru Thru A
Right Right A
Peds Peds
NB Right EB Right
SB Right WB Right
Green 40.0 25.0 40.0
Yellow 3.0 3.0 3.0
All Red 2.0 2.0 2.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 1167 3502 1.51 0.33 273.2 F
242.4 F
R 947 2842 1.34 0.33 199.7 F
Westbound
L 0.00
R 0 1615 0.00
Northbound
L 730 3502 0.63 0.21 45.1 D
T 2106 3610 1.43 0.58 221.6 F
R 0 1615 0.00
Southbound
L 0.00
T 1203 3610 1.59 0.33 310.7 F
R 538 1615 0.36 0.33 30.7 C
Intersection Delay = (sec/veh) Intersection LOS =
GREAT EASTERN MANAGEMENT COMPANY
. DEVELOPMENT • CONSTRUCTION III FINANCE II MANAGEMENT
Hand Delivery
September 21, 2001
Mrs. Elaine Echols
Albemarle County Planning Department
County Office Building
401 McIntire Road
Charlottesville,VA 22902
Re: Traffic Impact Study
North Pointe Development
Dear Elaine:
I am pleased to enclose herewith five (5) copies of the Traffic Impact Study for our North Pointe
development. I trust that you will forward appropriate copies to VDOT.
As I believe Chuck discussed with you recently,the next step from our perspective is to allow appropriate
time (which we hope will be relatively short!) for VDOT to review and digest the detail and
recommendations contained in the Study and then schedule a meeting for VDOT to communicate back to
us and to the County the results of its review.
With North Pointe,we need to first agree with VDOT and the County on the requested improvements to the
existing road network (which we would expect to include as proffers to our application) and then to also
agree on the general location for the internal road network. Once these issues are behind us,we can address
with the County other known issues such as critical slopes,piping and filling the stream area, construction
of our proposed lake amenity, community infrastructure needs (some of which we would also expect to
proffer) and, perhaps, densities. From that point, we will then be in a position to work on details of land
planning and the other important information which will be needed during the public hearing process. As
I believe we may have already told you, we have contracted with Integra/Rountrey & Associates (Cecil
Sears)to prepare an economic impact study.
We are looking forward to working with you and the County on this development and please feel free to call
me any time you have any questions.
Yours Truly,
)47+17)/%tt,
Donald J. Wagner `\'
DW/dj a_
Enclosures
0
cc: V. Wayne Cilimberg, Director of Planning(w/o enclosure)
Joseph T. Wallace(w/o enclosure)
Robert W. Tucker,Jr.,County Executive(w/o enclosures and for information only) I j► o
G\DOCS\WP\TOWERSLT\Rezoning\CountyStaft\EcholsTrafficStudySub wpd
September 21,2001(11 37am)
PO Box 5526 III CHARLOTTESVILLE,VIRGINIA 22905-5526
• GENERAL OFFICE (434) 296-4141 II PROPERTY MANAGEMENT (434) 296-4109 ■ FACSIMILE (434) 293-5197 II
s
nal SEP 2 fi 1kH 9: 08
ENG Ey P W