Loading...
HomeMy WebLinkAboutSP202100016 Checklist 2021-10-18SPECIAL USE PERMIT CHECKLIST for ALB�v CVEC Cash's Corner Substation / TMP 05000-00-00-045C0�1:�-._ rIRGtN��� After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.33 that must be submitted with the official application smc Required for Provided with application? application (County Staff) (Applicant) SECTION 33.33 X X NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print or some other method that can be distinguished when copied with a black and white YES NO copier/printer. X A narrative of the project proposal, including its public need or benefit; X A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; X A narrative of the proposed project's impacts on public facilities and public infrastructure. X A narrative of the proposed project's impacts on environmental features. X A narrative of the proffers proposed to address impacts from the proposed project. X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; X A conceptual plan showing: X 1) entrance, driveways, and parking the ..•Feet ..,........1 :_^I••diAg GiRulation ...:thin the of the i X 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/circulation; X 3) the general location of pedestrian and bicycle facilities; X 4) building envelopes, including existing and new substation equipment X 5) parking envelopes; SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 X 6) public spaces and amenities; 7) areas to be designated as conservation and/or preservation areas; 8) conceptual stormwater detention facility locations; X X X 9) conceptual grading; X Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. • The conceptual plan should show all areas to be changed or upgraded, including the expanded pad, the altered fence line, and all existing and new equipment. If available, please include either elevations or vertical dimensions of the new equipment. • Please include ground -level images of the existing screening vegetation on the neighboring parcel. • Please include images of the existing substation from the public road, and include a map showing the distance from the substation to the public road in the conceptual plan. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. Signature of person completing this check t f5 Date 91 i- -770 Print Name Phone SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2