Date Estimate Completed: 10/21/2021 ; checked 102221Ja
Erosion and Sediment Control Bond Estimate
Item
Item
No. Unit
Unit Cost
Cost
Number
installed
1
stablization (PS, TS)
0.5 acres
$5,000.00
$2,500.00
2
silt fence (SF)
195.0 ft
$5.00
$975.00
3
super silt fence (SSF)
380.0 ft
$5.00
$1,900.00
4
safety fence (SAF)
1780.0 ft
$5.00
$8,900.00
5
tree protection (TP)
1600.0 ft
$5.00
$8,000.00
6
diversion (DD, FD, RWD)
300 ft
$13.00
$3,900.00
7
temporary slope drain (TSD)
pipe length
0 ft
pipe diameter
L 0 in
$0.00
$0.00
8
earthwork for trap/basin
9
height of dam at toe
0 ft
cut at high side
0 ft
10
height of fill at face
0 ft
cut at face
0 ft
h
11
length of dam
0 ft
length of cut
0 ft
12
top width
0 ft
width of cut
0 ft
13
(area above transition
0 sf
(area below transiti(
0 sf
14
(total width of dam)
0 ft
(total width of cut)
0 ft
15
(height below lransitio
0 ft
(depth below transit
0 ft
16
(area below transition;
0 sf
(area above lransilii
0 sf
17
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
18
length of spillway
0 ft
(TOAL CY estimate,
0 cy
$13.00
$0.00
19
width c spillway
0 ft
(spillway stone tons
0 tons
$50.00
$0.00
20
structures for basin
21
riser height
0 ft
22
riser diameter
0 in
(riser unit price)
$0.00
$0.00
23
barrel length
0 ft
base plate or fdn
$200.00
$0
24
barrel diameter
0 in
(barrel unit price)
$0.00
$0.00
25
barrel collars
$200.00
$0
26
baffle length
Mft
$50.00
$0
27
28
silt fence inlet protection (IP)
3
$100.00
$300.00
29
stone inlet protection (IP) [trench
drain]
35
$200.00
$7,000.00
30
outlet protection (OP)
length
0 ft
width
0 ft
0
$0.00
$0.00
31
channel (SCC, matted)
length
0 ft
width
0 ft
$0.00
32
check dam
depth in channel
0 ft
channel width
0 ft
$0.00
$0.00
33
construction entrance (CE)
.
$2,500.00
$0.00
34
wash rack
$2,000.00
$0.00
35
paved construction entrance
$3,500.00
$3,500.00
10/22/2021
Monticello Burial Ground for Enslaved People, WPO Submission - WP0202000054
WPO file number: WP0202000054
TMP(s): 7800-00-00-02300, 7800-00-00-02200
Date Estimate Completed: 10/21/2021 ; checked 102221Ja
Erosion and Sediment Control Bond Estimate
Item
Item
No. Unit Unit Cost
Cost
Number
installed
36
rip -rap, placed depth 0 ft length 0.0 ft
37
width 0.0 (tons) 0 tons
$60.00
$0.00
38
39
survey and layout (price per 0.1 mi.) acres 0.76 traps and basins
$380.00
40
mobilization
$2,500.00
41
stream crossing (computed independently)
$0.00
Copy of WPO202000054_E8C_SWM_bond_M 2021_chk102221-mchg_bochocki_tgAn
cost sum
$39,855.00
contingency
$3,985.50
Total
$43,850