Loading...
HomeMy WebLinkAboutSDP202000049 Application 2020-06-08 (2)}_ Albemarle Caun" Planning Application Community 401 V •tire Roao Ghat .e : i 434 i 2?E-5 Fay..:(435) Application #I SDP202000049 CREEK INDUSTRIAL DEVELOPMENT LLC PROPERTY INFORMATION Legal Description [;EL CREEK INDUSTRSAL PARK PARCEL 1 Magisterial Dist, Scottsville Land Use Primary Forest 'v Current AFD !i'Not in A/F District Current --oning Primary Planned Unit Development v APPLICATION INFORMATION Street Address Entered B•; Application Type Site Development Plans Jennifer lont6 v Cf IWO 2620 Project Mill Creek Industrial Lot 11 - Final - Digital Received Date F O6/OB/2O Received Date Final Submittal Data O6/OB/2O Total Fees Closing File Date �-�_-_`, Submittal Date Final` _ Total Paid Revision Number Comments Legal Ad SUB APPLICATION(s) __[Sob P li;atIOLL_ _—._—_ _.__Comtrert 'Final Site Development Plan i 06/08/20 APPLICANT / CONTACT INFORMATION CentactT� Nacre ;+�^reams FALL PzEaRODOSTL QE E LDs iE r' 1155 RFTH ST FEET -AcTE L a -• ;SCOTT CO LLINS .. G-.RRETT ST STE K CihState _yipPhone FfsoneC.ell CH �.F.LGTT EStILL CH:RLOTTES TILL ._90_ 434_933. 14 i Signature of Contractoror Authorized Agent Date 5�S51 Application for Initial Site Plan or Final Site Plan or Site Plan Exception Project Name: Mill Creek Industrial Lot 11 - Final Site plan Tax map and parcel(,): 76M1-00-00-01100 Zoning: PLID Contact (who should we contact about this project) Collins Engineering Street Address 200 Garrett Street, Suite K City Charlottesville StateVA zip Code22902 Phone Number Email Owner Of Record Mill Creek Industrial Development LLC Street Address 1155 Fifth Street, SW, Suite C City Charlottesville State VA Zip Code 22902 Phone Number Email Applicant Collins Engineering Street Address 200 Garrett Street, Suite k CityCharlottesville State VA Zip Code22902 Phone Number Email Residential 1 m Non-residential Type of unit(s): # of building(s): Sq. ft. of building(s): # of units per building: Total # of units: Resulting density: Acreage of site: Acreage in open space: Acreage in roads: Average gallons of water used per day: m Commercial ❑ Industrial ❑ Quasi -Public Sq. ft of building(s): 10,000 SF building Acreage of site: 1.35 Acreage in open space: Acreage in roads: Average gallons of water used per day: FOR OFFICE USE ONLY 1' ,/�/,SDP Fee Amount $' �Date Paid/(J� By who? eceipt # z '- r / �Ck#�%By:_ �� County o Alb arle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 REVISED 4/052019 Page 1 of Comments/Attachments: FEES SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION Initial Site Plan Final Site Plan Exception to drawing of site Plan under section 32.3. s Approved No Preapp,lication plan Preapplication plan ® $1,613 ❑ $1,613 ❑ $752 plus $16/dwelling ❑ $1,290 plus $16/dwelling unit and/or $0.016 per square foot of unit and/or $0.016 per square foot of +Fire Rescue Fee of $100 +Fire Rescue Fee of u nonresidential structure nonresidential structure $1 00 $ +Fire �.+Fire J, 7/3 Rescue Fee of $100 Rescue Fee of $100 16 folded copies of the plan # of copies requiredfor submittal will be noted with 8 fohled copies of the plan plus an additional copies if within an Entrance Corridor your initial approval leaer. Copies of the phm should be folded and in blue or black ink Also provide 1 reduced com, of the plan no larger than 11 by 17 in. ❑ The initial site plan has a parking structure. ❑ The final site plan has a parking ❑ Included are architectural elevations, drawings, Structure. photographs or other visual materials showing any ❑ Included are revised architectural elevations, parking structure proposed on the site and surrounding drawings, photographs or other visual structures and land uses. materials submitted with the initial site plan. The elevations shall be part of the approved final site Dian. GROUNDWATER ASSESSMENT (Required for all non-residential site plans not serviced by public water) ❑ If the plans show a use using less than 2,000 gallons/day (average) Tier 3 Groundwater Review = $548 ❑ If the plans show a use using greater than 2,000 gallons/day (average) Tier 4 Groundwater Review = $1,183 ❑ Special Exception = $457 This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be required by the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal. Notices required by Section 32.4.2.1 (f) Initial notice fee to be provided in conjunction with an application, for preparing and mailing notices and published notice = $435.00 Owner/Applicant Must Read and Sign This site plan as submitted contains all of the information required by Section 32.5 (Initial Site Plan) or Section 32.6 (Final Site Plan) of Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 of Chapter 18 of the Code as the case may be. By signing this application I am consenting to written comments, letters and or notifications regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such written communication from also being sent via first class mail. 6-8-20 of Owner, Contract Purchaser, Agent Date Scott Collins Print Name 434-293-3719 Daytime phone number of Signatory Site Plan Application REVISED 4/05/2019 Page 2 of 2