HomeMy WebLinkAboutSUB201900156 Bond Estimates 2020-08-03Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2018-31, Block F, G, H, I, & J, SUB2019-00156 Plan #: SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost %complete cost remaining Road Name: Lary Branch Lane Begin station 19+80.00 End station 35+50.00 road length 1570.0 ft aggregate base 6.0 in it 1570.0 ft L 32.0 It W 1768.4 ton $35.00 $61,644.00 0% $61,644.00 blotted or prime&double seal 1570.0 ft L 0.0 It W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 2.5 in it 1570.0 ft L 27.0 ft W 649.1 tons $100.00 $64,909.69 0% $64,909.69 asphalt surface k1.5 in it1570.0 ft L 27.0 It W 389.5 tons $120.00 $46,734.98 0% $46,734.98 curb CG-2 0.0 ft $13.00 $0.00 0% $0.00 curb CG-6(Lx2-(200')[Steamer-Village pv.I width[60'total]+redu M., 35'x4]) 2940.0ft $15oo $44,100.00 0% $41,100.00 sidewalk, concrete(5)(Lx 2-115'[Steamer-Village Rw width]) 3025.0ft $1700 $51,425.00 0% $61,425.00 ramp CG-12 beach $350o0 $2,100.00 0% $2,100.00 street name sign 0 each $200.00 $0.00 0% $0.00 traffic control sign:2 speed, 17 NP 19 each $200.00 $3,800.00 0% $3,800.00 Street Landscape won planting strip Each 75 each $150.00 $11,250.00 0% $11,250.00 guardrail 0 ES ® 3000 r 0.0 It $17.00 $0.00 0% $0.00 drop inlet or grate 20 each $3,500.00 $70,000.00 0% $70,000.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0% $0.00 manhole structure (per ft. rise) 88 ft $450.00 $39,375.00 0% $39,375.00 pipe, mp, crop (15 to 48') 15.0 in it 8ES-1,2 5ECA 963.0ft $35.00 $40,205oO 0% $40,205.00 pipe, mp, crop (15 to 48') 18.0 in it 0 ES-1,2 0 ECA 0.0 ft $40.00 $0.00 0% $0.00 pipe, mp, coup (15 to 48') 24.0 in it 0 ES-1,2 0 ECA 0.0 ft $50.00 $0.00 0% $0.00 pipe, mp, coup (15 to 48') 36.0 in it 1 ES-1,2 1 ECA 129.0ft $70.00 $10,030.00 0% $10,030.00 pipe, mp, coup (60 to 108) 96.0 in it 0 ES-1,2 0 ECA b6 0.0 ft $320.00 $0.00 0% $0.00 rip -rap, placed _ft d 0 1 L ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC-2 or 3 ftL ft w 0.0 sy $2.00 $0.00 0% $cD0 clear and grub(forwooded sites)-0 A0.; Putorn ftL ftw 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading: (7T x 160'x 8')+(64'x 60'x4) cY $6.00 $23,892.00 0% $23,892.00 fill grading - (56' x 200x 2i)+2"(69' x 2W x 4)+2"(66 x 20V x 25) cy $12.00 $80,652.00 0% $80,652.00 as -built drawngs(1 k+ price per 0.1 mi.) 1570.0 ftL 0.2973 mi. 31sum $2,000.00 $7,000.00 0% $7,000.00 survey and layout (price per 0.1 mi.) 1570.0 ft L 0.2973 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 mobilization -Isum $5,000.00 $5,000.00 0% $5,000.00 materials testing 1570.0 ftL 3.14 inc of 600' 4each $200.00 $840.00 0% $840.00 compaction testing 1570.0 ft L 3.14 inc of 600' 4 each $200.00 $840.00 0% $840.00 CBR tests (1 every 0.1 mi. per road) 1570.0 ft L 3.14 inc of 600' 4 each $200.00 $840.00 0% $840.00 stone depth inspections 1570.0 ft L 3.14 inc of 600' 4 each $200.00 $840.00 0% $840.00 pavement inspections 1570.0 ft L 3.14 inc of 600' 4 each $200.00 $840.00 0% $840.00 pipe and drainage video inspections ($500 min) 1092 ft $3.00 $3,276.00 0% $3,276.00 VDOT surety (1 lane) 1570.0 ft L 0.2973 mi. 2 Lanes $2,000.00 $11,893.94 0% $11,893.94 VDOT maintenance fee (1 In M, 1 yr) 1570.0 ft L 0.2973 mi. 2 Lanes $150.00 $892.06 0% $892.05 VDOT admin. Cost recovery fee(11ane) 1570.0 ftL 0.2973 mi. 2Lanes $100.00 $644.70 0% $844.70 6'x 4' Box Culvert - La Branch, Sta 26+4o (A Fraddin emad, July 2, 202o 9:44 AM) 66204 Isom $66,203.74 $66,203.74 MI.4'x 2' Box Culvert- Lary Branch, Sta 31+6o(A Franklin emad,July 2, 2020 9:44AM) 61960 Isom I $61,960.22 $61,960.22 Phase mtainingwallsl K L M(A.FrenklineoodLJuly2,20209:44AM) 89901 Isum $89,900.93 $89,900.93 D:\work\I-drive offload 102519 -TO DO to doudWnderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08M20121121 Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2O18-31, Block F, G, H, I, & J, SUB2019-00156 Plan #: SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost %complete cost remaining Road Name: Lary Branch Lane Note- Wall eslimate pra-rated-=4/15 x $337,12848 cost sum $808,189.23 $808,189.23 contingency $80,818.92 $80,818.92 SUB201900156 Rivanna Village Phase 2 ph=s hale 2A_080320 ,080320 Total $889,010 $889,010 D:\work\I-drive offload 102519 -TO DO to doudWnderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08M20121121 Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2018-31, Block F, G, H, I, & J, SUB2019-00156 Plan #: SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost %complete cost remaining Road Name: Village Park Ave Begin station 22+53.00 End station 24+31.33 road length 178.3 ft aggregate base 8.0 in d 178.3 ft L 31.0 ft W 268.0 ton $35.00 $9,029.44 0% $9,029.44 blotted or prime&double seal 178.3 ft L 0.0 It W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 4.0 in d 178.3 ft L 27.0 It W 118.0 tons $100.00 $11,796.53 0% $11,796.53 asphalt surface 1.5 in d 178.3 ft L 27.0 It W 44.2 tons $120.00 $5,308.44 0% $5,308.44 curb CG-2 ft $13.00 $0.00 0% $0.00 curb CGE 3R1.0ft $15oo $4,660.00 0% $4,650.00 sidewalk, concrete (5) 280.0 ft $17A0 $4,760.00 0% $4,760.00 ramp CG-12 2 each $350o0 $700.00 0% $700.00 street name sign 1 each $200.00 $200.00 0% $200.00 traffic control sign 3 each $200.00 $600.00 0% $600.00 Street Landscape Each 5 each $150.00 $750.00 0% $750.00 guardrail 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate teach 1 $3,500.00 $7,000.00 0% $7,000.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0% $0.00 manhole sbucture (per ft. rise) 21 ft $450.00 $9,460.00 0% $9,450.00 pipe, mp, mp (15 to 48') 15.0 in it 0 ES-1,2 0 ECA 79.0 ft $35.00 $2,765.00 0% $2,765.00 pipe, mp, crop (15 to 48') 18.0 in it 0 ES-1,2 0 ECA 0.0 ft $40.00 $0.00 0% $0.00 pipe, mp, chop (15 to 48') 24.0 in it 0 ES-1,2 0 ECA 0.0 ft $50.00 $0.00 0% $0.00 pipe, mp, coup (15 to 48') 36.0 in it 0 ES-1,2 0 ECA 0.0 ft $70.00 $0oo, 0% $0.00 pipe, mp, chop (60 to 108") 96.0 in it 0 ES-1,2 0 EC -1 L 0.0 ft $320.00 $0.00 0% $0.00 rip -rap, placed _ft d .0 1 L ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC-2 or 3 .0 ft L ft w 0.0 sy $2.00 $cD0 0% $0.00 clear and grub (for wooded sites) -O so Pictons .OftL ftw 0.0 acre $24,000.00 $cD0 0% $0.00 on grading: -bT"9P*15' q $600 $1,920.00 0% $1,920.00 fill grading :-bT"9P*15' cy $12.00 $3,840.00 0% $3,840.00 as -built drawngs(Ik+price per 0.1 mi.) 178.3 ftL 0.0338 mi. 11sum $2,000.00 $3,000.00 0% $3,D00.00 survey and layout (price per 0.1 mi.) 178.3 ft L 0.0338 mi. 1 Isum $2,000.00 $3,000.00 0% $3,D00.00 mobilization -Isum K000.00 $0.00 0% $0.00 materials testing 178.3 ftL 0.3667 inc of 600' leach $200.00 $280.00 0% $280.00 compaction testing 178.3 ftL 0.3667 inc of 600' leach $200.00 $280.00 0% $280.00 CBR tests (1 every 0.1 mi. per road) 178.3 ft L 0.3667 inc of 600' 1 each $200.00 $280.00 0% $280.00 stone depth inspections 178.3 ft L 0.3667 inc of 600' 1 each $200.00 $280.00 0% $280.00 pavement inspections 178.3 ft L 0.3667 inc of 600' 1 each $200.00 $280.00 0% $280.00 pipe and drainage video inspections ($500 min) 79 ft $3.D0 $600.00 0% $500.00 VDOT surety (1 lane) 178.3 ft L 0.0338 mi. 2 Lanes $2,000.00 $1,350.98 0% $1,350.98 VDOT maintenance fee (1 In on, 1 yr) 178.3 ft L 0.0338 mi. 2 Lanes $150.00 $101.32 0% $101.32 VDOT admin. Cost recovery fee(11ane) 178.3 ftL 0.0338 mi. Lanes $100.00 $317.55 0% $317.55 cost sum $72,439.27 $727439.27 Contingency $7,243.93 $7,243.93 SI7B20190p156 Rivanna Village Phase 2 phaseytusse 2A D:\work\I-drive offload 102519 -TO DO to cloud\anderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08M20121121 Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2O18-31, Block F, G, H, I, & J, SUB2019-00156 Plan M SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost %complete cost remaining Road Name: Village Park Ave ia012420 Total $79,690 $79,690 D:\work\I-drive offload 102519 -TO DO to doudWnderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08M20121121 Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2018-31, Block F, G, H, I, & J, SUB2019-00156 Plan #: SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost %complete cost remaining Road Name: Steamer Drive Begin station 24+50.00 End station 25+74.92 road length 124.9 ft aggregate base 6.0 in it 124.9 ft L 29.0 It W 126.8 ton $35.00 $4,437.78 0% $4,437.78 blotted or prime&double seal 124.9 ft L 0.0 It W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 3.0 in it 124.9 ft L 25.0 It W 57.4 tons $100.00 $5,738.61 0% $5,738.61 asphalt surface 1.5 in it 124.9 ft L 25.0 It W 28.7 tons $120.00 $3,443.11 0% $3,443.11 curb CG-2 0.0 ft $13.00 $0.D0 0% $0.00 curb CG-6 210.0ft $15oo $3,150.00 0% $3,150.00 sidewalk, concrete (5) 180.0 ft $17A0 $3,060.00 0% $3,060.00 ramp CG-12 2 each $350o0 $700.00 0% $700.00 street name sign 1 each $200.00 $200.00 0% $200.00 traffic control sign 2 each $200.00 $400.00 0% $400.00 Street Landscape IF 7 Each 7 each $150.00 $1,050.00 0% $1,050.00 guardrail 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate teach 1 $3,500.D0 $7,000.D0 0% $7,000.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0% $0.00 manhole sbucture (per ft. rise) 0 ft $450.00 $0.D0 0% $0.00 pipe, mp, mp (15 to 48') 15.0 in it 0 ES-1,2 0 ECA 0.0 ft $35.00 $0.00 0% $0.00 pipe, mp, crop (15 to 48') 18.0 in it 0 ES-1,2 0 ECA 0.0 ft $40.00 $0.00 0% $0.00 pipe, mp, chop (15 to 48') 24.0 in it 0 ES-1,2 0 ECA 0.0 ft $50.00 $0.00 0% $0.00 pipe, mp, chop (15 to 48') 36.0 in it 0 ES-1,2 0 ECA 0.0 ft $70.00 $0oo, 0% $0A0 pipe, mp, chop (60 to 108") 96.0 in it 0 ES-1,2 0 ECA b6 0.0 ft $320.00 $0.00 0% $0.00 rip -rap, placed _ft d .0 1 L ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC-2 or 3 .0 ft L ft w 0.0 sy $2.00 $0.00 0% $0.00 clear and grub (for wooded sites) -OAc.; Pictons .OftL ftw 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading: -74'•125'"5' ry $6.00 $8,886.D0 0% $8,886.00 fill grading -None cy $12.00 $cD0 0% $0.00 as -built drawngs(1k+ price per 0.1 mi.) 124.9 ftL 0.0237 mi. 11sum $2,000.00 $3,000.00 0% $3,000.00 survey and layout (price per 0.1 mi.) 124.9 ft L 0.0237 mi. 1 Isum $2,000.00 $3,000.00 0% $3,D00.00 mobilization -Isum KOOO.00 $0.00 0% $0.00 materials testing 124.9 ftL 0.2498 inc of 600' leach $200.00 $260.00 0% $260.00 compaction testing 124.9 ftL 0.2498 inc of 600' leach $200.00 $260.00 0% $260.00 CBR tests (1 every0.1 mi. permit) 124.9 ft L 0.2498 inc of 600' 1 each $200.00 $260.00 0% $260.00 stone depth inspections 124.9 ft L 0.2498 inc of 600' 1 each $200.00 $260.00 0% $260.00 pavement inspections 124.9 ft L 0.2498 inc of 600' 1 each $200.00 $260.00 0% $260.00 pipe and drainage video inspections ($500 min) 0 ft $3.D0 $0.00 0% $0.00 VDOT surety (1 lane) 124.9 ft L 0.0237 mi. 2 Lanes $2,000.00 $946.36 0% $946.36 VDOT maintenance fee (1 In on, 1 yr) 124.9 ft L 0.0237 mi. 2 Lanes $150.00 $70.98 0% $70.98 VDOT admin. Cost recovery fee(11ane) 124.9 ftL 0.0237 mi. Lanes $100.00 $297.32 0% $297.32 cost sum $46,680.06 $467680.06 contingency $4,668.01 $4,688.01 SI7B201900156 Rivarma Village Phase 2 phaseyhase 2A D:\work\I-drive offload 102519 -TO DO to cloud\anderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08t1B20121121 Project Name: Phase 2 Rivanna Village Road Plans Associated with SDP2O18-31, Block F, G, H, I, & J, SUB2019-00156 Plan M SUB201900156 TM P(s): 093A 1-00-00-004 R 1 Date Estimate Completed: 7124120 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Phase 2A, Only Item No. Unit Unit Cost Cost Road Name: Steamer Drive ia012420 1 Total $51,350 %complete cost remaining $51,350 D:\work\I-drive Offload 102519 -TO DO to doudWnderson\040918_bonds\estimates\SUB201900156_Rivanna Village ph 2 ROAD Plan\SUB201900156 Rivanna Village Phase 2 phase phase 2A_08M2012a21