Loading...
HomeMy WebLinkAboutWPO202100070 Plan - Submittal (First) Road Plan and Comps. 2021-10-20SHEET INDEX (WPO PLAN SET) Sheet Number Sheet Title CO.00 COVER SHEET C1.00 GENERAL NOTES AND DETAILS C2.00 OVERALL LAYOUT — KEY PLAN C3.00 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS C3.01 —C3.03 EXISTING CONDITIONS C4.00—C4.02 EROSION AND SEDIMENT CONTROL PLAN — PHASE I C4.03—C4.05 EROSION AND SEDIMENT CONTROL PLAN — PHASE II C5.00—05.02 DEMOLITION PLAN C6.00—C6.02 LAYOUT PLAN C7.00—C7.02 GRADING, DRAINAGE AND UTILITY PLAN C8.00—C8.01 ALIGNMENT PROFILES C9.00 STORMSEWER PROFILES C11.00 PRE AND POST LAND COVER MAPS C11.01 PRE AND POST DRAINAGE AREAS C11.02 STORMWATER COMPLIANCE C11.03 STORMWATER CONVEYANCE CALCULATIONS C11.04—C11.05 STORMWATER QUANTITY CALCULATIONS C12.00—C12.02 MAINTENANCE OF TRAFFIC PLAN C13.00 VDOT DETAILS SURVEY NOTES: THIS TOPOGRAPHIC MAP WAS PREPARED FOR: WORRELL LAND AND DEVELOPMENT COMPANY LLC THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. SOME EASEMENTS OTHER THAN THOSE SHOWN HEREON MAY EXIST. TMP 78-2OC6 IS ZONED: PLANNED DEVELOPMENT MIXED COMMERCIAL THIS PROPERTY LIES IN AN AREA DESIGNATED AS ZONE X (UNSHADED) (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON MAPS BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. MAP 51003CO289D DATED: FEBRUARY 4, 2005 THIS TOPOGRAPHIC SURVEY OF A PORTION OF TAX MAP 78 PARCELS 20136 AND 2005, LOCATED ON WORRELL DRIVE ALBEMARLE COUNTY, VIRGINIA WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF CHRISTOPHER B. KEAN FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON OCTOBER 24, 2019; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. I HEREBY CERTIFY THAT THIS TOPOGRAPHIC SURVEY, TO THE BEST OF MY PROFESSIONAL KNOWLEDGE AND BELIEF, IS CORRECT AND COMPLIES WITH THE MINIMUM PROCEDURES AND STANDARDS ESTABLISHED BY THE VIRGINIA STATE BOARD OF ARCHITECTS, PROFESSIONAL ENGINEERS, LAND SURVEYORS, CERTIFIED LANDSCAPE ARCHITECTS AND INTERIOR DESIGNERS. I ALSO CERTIFY THAT THE BOUNDARY SHOWN HEREON IS BASED ON A CURRENT FIELD SURVEY. NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. UTILITIES ARE LOCATED USING UTILITY COMPANY LOCATIONS, CITY/COUNTY UTILITY MAPS, AND FIELD VERIFICATION.THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THEY AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. MISS UTILITY TICKET FOR THIS PROJECT: A928302357-OOA A928302384-OOA A928302410-OOA LILAC LN SURVEYING Innovation. Integrity. vision. 632 BERKMAR CIRCLE CHARLOTTESVILLE, VIRGINIA 22901 OFFICE: 434-974-1417 FAX. 434-974-1776 www.lincolnsurveying.com LEGEND PROPOSED OVERLAY EXISTING PAVEMENT ASPHALT PAVEMENT m CULVERT OR STORM SEWER PIPE 22 DRAINAGE STRUCTURE NUMBER SANITARY SEWER LINE WATER LINE 174-.l PROPOSED FINISHED GRADE CONTOUR ELEVATION E/P DENOTES EDGE OF PAVEMENT TIC DENOTES TOP OF CURB /-/C DENOTES FACE OF CURB (MEASURED TO BACK OF ANY ROLL FACE CURB) B/C DENOTES BACK OF CURB EXISTING WORRELL DRIVE IMPROVEMENTS WITH WATER SERVICE EXTENSION FOR 355 WORRELL DRIVE ROAD PLAN (WPO PLAN SET) ALBEMARLE COUNTY, VIRGINIA MAGISTERIAL DISTRICT RIVANNA CJ ao C� 0 20 P 0 0 a 250 d a 0 (I 0 o Il SITE P P HANSENS O NTA N RD O • EFF�Rs�� 0" 64 250 0 0 VICINITY MAP Scale: 1" = 2000' FILE DISCLAIMER: IF THESE FILES ARE MODIFIED AFTER RECEIVED, THE RECEIVER AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS, OUR FIRM "RK&K", FROM AND AGAINST ANY AND ALL CLAIMS, SUITS, LOSSES, DAMAGES OR COSTS FROM THE USE OF OUTDATED DESIGN FILES. THE OFFICIAL DOCUMENTS OF RECORD ARE THE PAPER, MYLAR, OR VELLUM DOCUMENTS WHICH BEAR THE COMPANY SEAL AND SIGNATURES. IF DIGITAL FILES HAVE BEEN PROVIDED TO THE CLIENT AND/OR CONTRACTOR, THOSE FILES ARE FOR CONVENIENCE ONLY AND DO NOT SUPERCEDE THE SIGNED PLAN SET. BP = BRADFORD PEAR TREE BPP = BLACK PLASTIC PIPE BIR = BIRCH TREE CO = CLEAN OUT CED = CEDAR TREE COMM = COMMUNICATION CM = CREPE MYRTLE TREE CMP = CORRUGATED METAL PIPE DIP = DUCTILE IRON PIPE FH = FIRE HYDRANT GV = GAS VALVE GNDL = GROUND LIGH GINKGO = GINKGO TREE GUM = GUM TREE HH = HANDHOLD HEM = HEMLOCK TREE HOL = HOLLY TREE ICV = IRRIGATION CONTROL VALVE IS = IRON SET IF = IRON FOUND JM = JAPANESE MAPLE TREE LP = LIGHT POLE LOC = LOCUST TREE MAP = MAPLE TREE OHC = OVERHEAD COMMUNICATION OHE = OVERHEAD ELECTRIC PVC = POLYVINYL CHLORIDE RCP = REINFORCED CONCRETE PIPE SP = SIGNAL POLE SYC = SYCAMORE TREE S = SIGN SSMH = SANITARY MANHOLE SDMH = STORM DRAIN MANHOLE TP = TELEPHONE PEDESTAL TVP = TELEVISION PEDESTAL TW = TOP OF WALL TREE = UNKNOWN SPECIES WILD = WILLOW TREE WM = WATER METER WV = WATER VALVE 12TREE25 = 12" TREE 25' CROWN SPREAD +480.50 = SPOT ELEVATION 6 = GAS LINE E = ELECTRIC LINE 6 = SEWER LINE D = STORM DRAINAGE LINE = OVERHEAD UTILITY w = WATERLINE = COMMUNICATION LINE = TELEPHONE LINE ;b — = FIBER OPTIC LINE BEFORE YOU DIG CALL "811" PROTECT YOURSELF, GIVE THREE WORKING DAYS NOTICE N O N J z z Li OWNER WORRELL LAND AND DEVELOPMENT COMPANY LC 0 POST OFFICE BOX 5386 CHARLOTTESVILLE, VIRGINIA 22905 z ATTN: MR. ANDREW J. DRACOPOLI z c0i PHONE: 434-977-6803 O oc E—MAIL: worrell®cstone.net > a ENGINEER LU z N RK&K, LLP i a 2100 E. CARY STREET, SUITE 309 RICHMOND, VIRGINIA 23223 ATTN: MALACHI MILLS, P.E. PHONE: 804-782-1903 w o w FAX: 804-782-2142 W Q I- E-MAIL: MMills@rkk.com = U U z W U) PARCEL ID# 07800-00-00-02OC6 ADDRESS 384 WORRELL DRIVE CHARLOTTESVILLE, VIRGINIA 22911 ZONING: PLANNED DEVELOPMENT MIXED COMMERCIAL (PROPERTIES ARE SUBJECT TO PROFFERS PER CASE ZMA-1996-0003, ZMA-2001-00015) PROPERTY AREA: 25.243 AC TOTAL LOD AREA: 2.07 AC UTILITIES YES NO COUNTY WATER ® ❑ COUNTY SEWER ® ❑ (ACSA) SPECIAL FLOOD HAZARD AREA INFORMATION SPECIAL FLOOD HAZARD AREA (FLOODPLAIN) YES NO ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA) 168 SPOTNAP ROAD CHARLOTTESVILLE, VIRGINIA 22911 CONTACT: JEREMY M. LYNN P.E. 434-977-4511 APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT z U-1 2 \UJ OZ a J �O C) Qf W O I Si N C:) N rn C:) CD C:) W Q 0 W W Z_ 0 Z W El FA U) m Q 0 W Y U W 2 U w VJ LLJ O U N LO eM rn *k m O GENERAL CONSTRUCTION NOTES: 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). GENERAL CONSTRUCTION NOTES FOR STREETS (THIS LIST IS IN ADDITION TO THE GENERAL CONSTRUCTION NOTES): 1. CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTIFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296- 5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG-9(A, B OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE-1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11.THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD-1 OR CD-2 CROSS -DRAINS UNDER TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13.A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. B. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11.ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13.ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14.BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15.BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 16.THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17.TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19.MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS_ 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. ACSA GENERAL WATER & SEWER CONDITIONS: 1. WORK SHALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA) INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER ACSA OFFICALS AT THE START OF THE WORK. 2. THE LOCATION OF EXISTING UTILITIES ACROSS THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL, ON HIS OWN INITIATIVE, LOCATE ALL UNDERGROUND LINES AND STRUCTURES, AS NECESSARY. 3. ALL MATERIALS ARE CONSTRUCTION SHALL COMPLY WITH THE CURRENT EDITION OF THE GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS, AS ADAPTED BY THE ACSA. 4. DATUM FOR THE ELEVATIONS SHOWN IN NATIONAL GEODETIC SURVEY. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING MISS UTILITY (1-800-552-7001). 6. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF THREE AND A HALF (3.5) FEET OF COVER MEASURED FROM THE TOP OF PIPE, OVER THE CENTERLINE OF THE PIPE. THIS INCLUDES ALL FIRE HYDRANT LINES, SERVICE LATERALS AND WATER LINES, ETC. 7. ALL WATER AND SEWER APPURTENANCES ARE TO BE LOCATED OUTSIDE OF ROADSIDE DITCHES. 8. VALVES ON DEADEND LINES SHALL BE RODDED TO PROVIDE ADEQUATE RESTRAINT FOR THE VALVE DURING A FUTURE EXTENSION OF THE LINE. 9. TREES ARE NOT PERMITTED IN THE ACSA EASEMENT. 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE NO -LEAD REGULLTION REGARDING BRASS FITTINGS EFFECTIVE JANUARY 4, 2014 (SENATE BILL 3874 WHICH AMENDS THE SAFE DRINKING WATER ACT). GOOD FOUNDATION MATERIAL ROCKY FOUNDATION MATERIAL u INITIAL BACKFILL za w 9"R.. MIN. MIN. 6" BEDDING ., / #68 STONE * STABLE SOIL ROCK * SCRAPE THE BOTTOM OF THE TRENCH. REMOVE ALL STONES TO INSURE THE PIPE DOESN'T REST ON ROCK AND THEN COMPACT THE SOIL OR PROVIDE A 4" BEDDING OF #68 STONE. FOUNDATION IN POOR SOIL UNDER -CUT CONDITION 1 Ij ij 4 I INITIAL BACKFILL 4 UNSTABLE a" 8" a" e" SOIL 1 • MIN. �\ � MIN MIN #68 STONE °i� ;:.: GRANULAR FILL AS ' APPROVED BY ACSA ST CI Z STABLE SOIL OR ROC\ NOTE : 1. NO ROCKS SHALL BE ALLOWED WITHIN 24" OF THE WATER LINES. 2. NO ROCKS LARGER THAN 6" IN ANY DIMENSION SHALL BE ALLOWED ABOVE THE INITIAL BACKFILL. 3.THE INITIAL BACKFILL SHALL BE PLACED AND COMPACTED IN 6" LIFTS. 4. NO ORGANIC OR FROZEN MATERIAL OR DEBRIS SHALL BE ALLOWED IN THE TRENCH. 5. BELL HOLES SHALL BE DUG OUT IN ALL CASES. DUCTILE IRON WATER PIPE INSTALLATION & BEDDING NTS FIG. W-2 TD-2 COVER LIFT NOTCH 12 3/8" WA CAST IRON LID NOTES: D (1) A 1-3/4" DIAMETER HOLE IS REQUIRED IN THE LID FOR TOUCH READ METERS. TYPICAL METER BOXES (5/8"-1" METERS) NTS FIG. W-7 TD-13 PLACE 5 GALVANIZED " WITNESS " POST WITH CAPPED ENDS PAINTED BLUE IN REMOTE AREAS o AS DIRECTED. MARKER LOCATION MAY BE SUBJECT a TO HIGHWAY DEPARTMENT APPROVAL. FINISHED GRADE .III. O II %- II 1 WATER 2500 P.S.I. CONCRETE THRUST BLOCK ADJUSTABLE TRAFFIC RATED VALVE BOX W/ LID M.J. GATE VALVE LINE 2' BEARING AREA. NOTE : IN REMOTE AREAS, VALVE BOXES SHALL EXTEND SIX (6) INCHES ABOVE GRADE. TYPICAL GATE VALVE NTS FIG. W-5 TD-9 FINISHED GRADE AIR RELEASE VALVE BRASS OR BRONZE PIPE BRONZE GATE VALVE DRAIN TO GRADE - IF POSSIBLE I BRICK SUPPORTS OR - SOLID CEMENT BLOCKS CRUSHED STONE TYPE "K" SOFT COPPER CORPORATION STOP NOTES: 1) A PRECAST MANHOLE CONE AND COVER WITH WATER CAST ON LID FOR TRAFFIC AREAS, OR A METER BOX ASSEMBLY IN NON -TRAFFIC AREAS, OR APPROVED EQUAL, SHALL BE USED. 2) FOR WATERLINES SMALLER THAN 12" USE A 1" A.R.V. AND FITTINGS. FOR WATER LINES 12" AND LARGER USE 2 A.R.V. AND FITTINGS. 3) IN SITUATIONS WHERE THE A.R.V. ASSEMBLY CANNOT BE OFFSET FROM THE MAIN AN ADEQUATE FOUNDATION SHALL BE INSTALLED SO THE WATER LINE DOES NOT SUPPORT THE MANHOLE CONE. AIR RELEASE VALVE (ARV) NTS FIG. W-9 TD-20 2016 ROAD & BRIDGE STANDARDS NOTES( I. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. CURB HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) WILL BE PAID FOR AS RADIAL CURB. - 4, THE DEPTH OF CURB MAY BE REDUCED AS MUCH AS 3" 05" DEPTH) OR INCREASED AS MUCH AS 3" (21" DEPTH) IN ORDER THAT THE BOTTOM OF CURB WILL COINCIDE WITH THE TOP OF A COURSE OF THE PAVEMENT SUBSTRUCTURE. OTHERWISE THE DEPTH IS TO BE 18" AS SHOWN. a NO ADJUSTMENT IN THE PRICE BID IS TO BE MADE FOR A DECREASE OR AN INCREASE N DEPTH. i 5. CG-2 IS TO BE USED ON ROADWAYS MEETING THE REOUREMENTS FOR CG-6 AS SHOWN IN APPENDIX A OF THE VDOT ROAD DESIGN MANUAL, vA N THE SECTION ON GS URBAN STANDARDS. ACCEPTABLE ALTERNATIVE IF CURB IS EXTRUDED V. D T D A,' D' D'TD o. A A. A. D,�' D•� T D D 'A D•' T D•' � D 6•• R BASE SUBBASE CG-2 REFERENCE STANDARD 6" CURB ROAD AND BRIDGE STANDARDS 105 REVISION DATE SHEET 1 OF 1 502 VIRGINIA DEPARTMENT OF TRANSPORTATION 201.01 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS CG-e NOTES: 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST N PLACE, 4D00 PSI IF PRECAST. 3. COMBINATION CURB & GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CUPS) SHALL BE PAID FOR AS RADIAL COMBINATION CURB & GUTTER. 4. FOR USE WITH STABLIZED OPEN -GRADED DRAINAGE LAYER, THE BOTTOM OF THE CURB & GUTTER SHAII BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES AND TO THE DEPTH OF THE PAVEMENT. 5. ALLOWABLE CRITERIA FOR THE USE OF CG-6 IS BASED ON ROADWAY CLASSIFICATION AND DESIGN SPEED AS SHOWN N APPENDIX A OF R THE ROAD DESIGN MANUAL IN THE SECTION ON GS URBAN STANDARDS. ,.D e 1, V • D " " D e- D '. D e D BE CONCRETE OF THE CONTRACTOR MINIMUM DEPTI IS MAINTAINED. A SPECIFICATION I 1 `VDOT REFERENCE COMBINATION 6" CURB AND GUTTER ROAD AND BRIDGE STANDARDS 105 REVISION DATE SHEET 1 OF 1 502 VIRGINIA DEPARTMENT OF TRANSPORTATION 201.03 2016 ROAD & BRIDGE STANDARDS 1' COMPRESSION x 3/9 MALE PIPE COUPLING OR APPROVED EQUAL TEE NOTE NO SWEATED FlTRNGS F] DUAL SERVICE SINGLE SERVICE NOTE: 1) SADDLES SHALL BE USED ON PVC PIPE. ���((( W MIN. 1/8 BEND COUPLING- /A, / As n U FOR USE ON ATTACHED SINGLE FAMILY RESIDENTIAL SERVICES OR DUAL RESIDENTIAL 1(� AND IRRIGATION SERVICES. I�- 2• R " "'IMPRESSION x 3/4' MALE PEE COUPLING PPROVED EQUAL IRON UD MR USE ON DETACHED SINGLE FAMILY RESIDENTIAL SERVICE MOE AN IRRIGATION AETER IS NOT PROVIDED. GRADE �-CORPNRATION STOP-ti4',i$��+ -Dn:u, ,u '^L`i`1.^a NECESSARY SAND OR COST UNDER }S+i wRk�. !yam 'y.F!. 4' NAMEREN MM PIPE, 12' BOX AND SETTER (2-NCH i�y,�< R'Y'"".a.'. 4� : A0 LONG STONE POCXET, WX)T MINIMUM TI1ICXNE53) y1!!,.{?y•,'.,LS n'?r.�.Ki:�RK� 4a SPEC. 2N, NO. 57 AGGREGATE TYPICAL SERVICE LATERAL INSTALLATION (5/8" & 1" METERS) NITS FIG. W-6A TD-10 N O N J 0 N z Z W 0 U z Z (n 0 Z U O U) W a Lu z Q N d o ~ CD W CD W _ = U W Q � U Z U) � U) J Z Q LSL] Q LLJ 0 \` / �_ N� Z > z /0L Q 5LL L 0- Z �/� v! ❑ > Q W 0 I L �Q Z J G m J LL.I J NQN L f_ LLJ rrznn V CN CD CO CV CO � Q CD N co Lo CD W ❑ rn W W Y Z 00 Q Z 2 Q ❑ W U U r r 0� IEl N J � J � � S U_ �'yt'00 J O a d m 0 N 0 U Z CL I I s 14 I 1 1 I C3.01 -- -- I - C3.04 I C4.00 I C4.03 ' C5.00 I C6.00 C7.00 \ \MAC A �NE W W 0000000 - U U U U U U U MATCH LINE STATE FARM BLVD I \I i r"r C3.02 C3.05 C4.01 C4.04 C5.01 C6.01 C7.01 Y i#74 LEGEND II SHEET 60 0 60 HORIZONTAL SCALE 120 N O N J 7 zZ w 0 U z cn 0 z 0 O U) w > a W 0' N z \ Q N J \ d O O p W Q CD = N U U C/) � z Z a LU J a_ Q W z > 0 LLI Y Z > a J Lu O o >a w Q o� Q J w J J LLI m a 0� Q LU O > � O N U) N_ m C Q N w 0 0 rn W W Y O z z = m Q Q W U U or No J W J J r� 0 O :iU o N M (/) (N CL Lu 0 Cho CL wQ)� w NN N c w J W c a d m c m c N C U d W GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10.ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11.ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12.BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13.ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14.BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15.BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 16.THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17.TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18.PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19.MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 4VAC50-30 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLANT THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. EROSION CONTROL NARRATIVE PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF THE WIDENING OF WORRELL DRIVE, RECONSTRUCTION OF PRIVATE ACCESS ROADWAYS, ADDITION OF SIDEWALK PATHWAYS, CONSTRUCTION OF A STORMSEWER SYSTEM, AND DOMESTIC WATERLINE INSTALLATION. EXISTING SITE CONDITIONS: THE EXISTING SITE IS MOSTLY OPEN SPACE / MANAGED TURF WITH THE EXCEPTION OF THE EXISTING WORRELL DRIVE AND PERIMETER TREES. ADJACENT AREAS: STATE FARM BOULEVARD BORDERS THE PROPERTY TO THE NORTH, U.S. ROUTE 250 (RICHMOND ROAD) BORDERS THE PROPERTY TO THE EAST, PETER JEFFERSON PARKWAY BORDERS THE PROPERTY TO THE SOUTH, AND MARTHA JEFFERSON DRIVE / MARTHA JEFFERSON HOSPITAL BORDERS THE PROPERTY TO THE WEST. OFF -SITE AREAS: N/A DOWNSTREAM DRAINAGE: THE RECEIVING DRAINAGE SYSTEM FOR THIS SITE CONSISTS OF SEVERAL ON -SITE PONDS. THE ON -SITE PONDS DRAIN THE PROJECT AREA TO THE HICKMANS BRANCH TRIBUTARY WHICH ULTIMATELY DRAINS INTO THE RIVANNA RIVER. SOILS: THE PREDOMINANT SOILS ONSITE ARE RABUN CLAY LOAM (71C & 71D). TYPE % SLOPE PERMEABILITY EROSION HAZARDS K FACTOR HYDROLOGIC SOIL GROUP 238 YADKIN CLAY LOAM 2 TO 7 0.00-0.06 IN/HR MODERATE 0.28 B 26B3 DYKE CLAY LOAM 2 TO 7 0.00-0.06 IN/HR MODERATE 0.37 B 71C RABUN CLAY LOAM 7 TO 15 0.00-0.06 IN/HR MODERATE 0.24 B 71D RABUN CLAY LOAM 15 TO 25 0.57-1.98 IN/HR SEVERE 0.24 B CRITICAL EROSION AREAS: VEGETATION PRESERVED: NO VEGETATION IS PROPOSED TO BE PRESERVED WITHIN THE PROPOSED RIGHT OF WAY. EXISTING VEGETATION ADJACENT TO THE PROJECT RIGHT OF WAY ARE TO BE PRESERVED. THESE TREE SAVE AREAS, ALL WETLANDS AND BUFFERS ARE TO HAVE TREE FLAGGING INSTALLED AS SHOWN ON PLANS PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITIES. FINAL STABILIZATION: FINAL SITE STABILIZATION TO BE PROVIDED ONCE FINISHED GRADING IS COMPLETE, SEE MIXTURE RATES PROVIDED ON THIS SHEET. DUST PROTECTION: IF DUST BECOMES A PROBLEM DURING CONSTRUCTION, A WATER TRUCK WILL BE REQUIRED ON -SITE AT ALL TIMES, AND DUST MUST BE CONTROLLED IN ACCORDANCE WITH STD. & SPEC. DUST CONTROL, IN THE LATEST VERSION OF THE VA EROSION AND SEDIMENT CONTROL HANDBOOK. NOTE: 1. E&S CONTROLS MAY BE REMOVED ONLY UPON THE APPROVAL OF THE COUNTY ENVIRONMENTAL INSPECTOR. 2. CONSTRUCTION SITE OPERATORS ARE REQUIRED TO CONTROL WASTE SUCH AS CONCRETE TRUCK WASH OUT, CHEMICALS, AND LITTER AT THE CONSTRUCTION SITE THAT MAY CAUSE ADVERSE IMPACT ON WATER QUALITY. CONTRACTOR TO PROVIDE SWPPP AND MAINTAIN PLAN ON -SITE DURING CONSTRUCTION OPERATIONS. Soil Map -Albemarle County, Virginia 3 38' :'52 N M' 1' T N 7m1ao nlao naam na400 n4sn n4sm n47 Homo n4an a Map Se31e: 1:6AW If prFlmi WA porhad (8.5" x 11") shot IN 0 10D 270 4m �D ,\ 0 3M am 121D 18Te Map proiemon: Web MamltX CWrermadlnates:WCS84 Edgetks:UTM7me17NWC584 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Map Unit Legend 12/17/2019 Page 1 of 3 Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 23B Yadkin clay loam, 2 to 7 percent slopes 10.2 20.6% 26133 Dyke clay loam, 2 to 7 percent slopes, severely eroded 2.1 4.3% 71 C Rabun clay loam, 7 to 15 percent slopes 13.0 26.1 % 71 D Rabun clay loam, 15 to 25 percent slopes 22.1 2 X 4' WOOD FRAME DROP INLET 3' MIN. 7 AT CORNERS PERSPECTIVE VIEWS ELEVATION OF STAKE AND FABRIC ORIENTATION SPECIFIC APPLICATION I I 1' MIN. IIIII DETAIL A THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA SLOPE NO GREATER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. SILT FENCE DROP INLET PROTECTION STD. & SPEC. 3.07 - VA. EROSION AND SEDIMENT CONTROL HANDBOOK (1992) GRIP LINE PROTECTIVE DEVICE MAXIMUM LIMITS OF CLEARING AND GRADING PROPOSED GRADING / �YIw Irr r r w r MIN. 5' f r -isfin, WHERE DRIPUNE IS LESS THAN 5' **M CONSTRUCTION OPERATIONS RELATIVE TO THE LOCATION OF PROTECTED TREES TREE PROTECTION STD. & SPEC. 3.38 - VA. EROSION AND SEDIMENT CONTROL HANDBOOK (1992) NO WIRE BACKING 6' MAX 1\ 16" - 3 F�o'w -� -�41P PROVIDE I" TUCK OR SUITABLY REINFORCED TOP END SECTION F�owr 4 EMBED 8' OF FILTER CLOTH IN TRENCH TO ANCHOR BOTTOM OF CLOTH. COMPACT THOROUGHLY WITH WIRE BACKING IS11F !I t WIRE MESH V4, PROVIDE I' TUCK OR SUITABLY REINFORCED TOP END SECTION �`�4n EMBED 8' OF FILTER CLOTH IN TRENCH TO ANCHOR BOTTOM OF CI OTH. COMPACT THOROIIGHI Y MESH SHALL BE A MINIMUM OF 14 GUAGE AND SHALL HAVE A MAXIMUM MESH SPACING OF 6'. SILT FENCE STD. & SPEC. 3.05 - VA. EROSION AND SEDIMENT CONTROL HANDBOOK (1992) == ►�_ul�_ aulllllu IIIII THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE ISTONE L_Y CONSTRUCTION EA CCESS STONE CONSTRUCIION ACCESS 70' _ I 0" �i0"��Ij�i.I�F`i1� ASPHALT PAVED WASHRACK 2% 2% t2% '2' M.N.* -POSITIVE DRAINAGE *MUST EXTEND FULL WIDTH L o TO SEDIMENTL OF INGRESS AND EGRESS OPERATION TRAPPING DEVICE; - , A nlit1u11tun water tap of 1 inch must be installed with a n»uunum l kWh ballcock shutoff valve sllpp! ing a wash hose with T diameter of 1.5 arches for-a&Tiate constant pressure. Wash water must be carried away from the entrance to an approved settlkle area to reiuoVe sedunetit. AU sedunettt shall be prey ted o euteinig storm drains, ditches or watercotuses. RAVED J,W I SH RACK N O C4 r J z W 0 U z � Z O Z U O_ J) a w Q�� z a D- O LLj Lj CD J U) _ U z In U In O U) I- z LLJ z Q O W z L) J > (3 I- Q [)� Z > LLI LI J Q Z (� a D Q 0 _ >a0Wz L11 Co Q GE Q W Q Q J m O W Q O z 0Y O> O Of LLl CD M N Q O N ❑ LO CD L W 0')W Y O Z m Q z = Q ❑ LU U U Uj N c Ti N U �n PLAN SHEET KEY Scale: 1" = 500' THIS PROPERTY LIES IN AN AREA DESIGNATED AS ZONE X (UNSHADED) (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON MAPS BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. MAP 51003CO289D DATED: FEBRUARY 4, 2005 THIS TOPOGRAPHIC SURVEY OF A PORTION OF TAX MAP 78 PARCELS 2006 AND 2005, LOCATED ON WORRELL DRIVE ALBEMARLE COUNTY, VIRGINIA WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF CHRISTOPHER B. KEAN FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON OCTOBER 24, 2019; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. I HEREBY CERTIFY THAT THIS TOPOGRAPHIC SURVEY, TO THE BEST OF MY PROFESSIONAL KNOWLEDGE AND BELIEF, IS CORRECT AND COMPLIES WITH THE MINIMUM PROCEDURES AND STANDARDS ESTABLISHED BY THE VIRGINIA STATE BOARD OF ARCHITECTS, PROFESSIONAL ENGINEERS, LAND SURVEYORS, CERTIFIED LANDSCAPE ARCHITECTS AND INTERIOR DESIGNERS. I ALSO CERTIFY THAT THE BOUNDARY SHOWN HEREON IS BASED ON A CURRENT FIELD SURVEY. NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. UTILITIES ARE LOCATED USING UTILITY COMPANY LOCATIONS, CITY/COUNTY UTILITY MAPS, AND FIELD VERIFICATION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THEY AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. MISS UTILITY TICKET FOR THIS PROJECT: A928302357-OOA A928302384-OOA A928302410-OOA I / CD I a1 w O N N W a I ONN °' / OON� O - I ' N �W .I LEGEND: / Y BP = BRADFORD PEAR TREE PVC = POLYVINYL CHLORIDE BPP = BLACK PLASTIC PIPE RCP = REINFORCED CONCRETE PIPE BIR = BIRCH TREE SP = SIGNAL POLE CO = CLEAN OUT SYC = SYCAMORE TREE CED = CEDAR TREE S = SIGN COMM = COMMUNICATION SSMH = SANITARY MANHOLE CM = CREPE MYRTLE TREE SDMH = STORM DRAIN MANHOLE CMP = CORRUGATED METAL PIPE TP = TELEPHONE PEDESTAL DIP = DUCTILE IRON PIPE TVP = TELEVISION PEDESTAL FH = FIRE HYDRANT TW = TOP OF WALL GV = GAS VALVE TREE = UNKNOWN SPECIES GNDL = GROUND LIGH WLO = WILLOW TREE GINKGO = GINKGO TREE WM = WATER METER GUM = GUM TREE WV = WATER VALVE HH = HANDHOLD 12TREE25 = 12" TREE 25' CROWN SPREAD HEM = HEMLOCK TREE +480.50 = SPOT ELEVATION HOL = HOLLY TREE GAS LINE ICV = IRRIGATION CONTROL VALVE ELECTRIC LINE IS =IRON SET = SEWER LINE IF = IRON FOUND D = STORM DRAINAGE LINE JM = JAPANESE MAPLE TREE -oA- = OVERHEAD UTILITY LP = LIGHT POLE w = WATERLINE LOC = LOCUST TREE a = COMMUNICATION LINE MAP = MAPLE TREE T. = TELEPHONE LINE OHC = OVERHEAD COMMUNICATION a - = FIBER OPTIC LINE OHE = OVERHEAD ELECTRIC J SURVEY CONTROL T-18318OO1 3896684.28600 11499899.30400 529.59 T-18318335 3897031.47800 11500126.57700 483.06 T-18318336 3896788.28800 11500218.44700 485.83 T-18318365 3896996.42800 11500314.37000 470.05 T-18318366 3896907.82000 11500207.34300 486.34 T-18318534 3897257.21900 11500299.08400 495.66 T-18337063 3897142.01300 11500418.98300 494.51 T-18337064 3897378.74900 115OO446.iBBOO 505.92 T-18337291 3897308.91500 11500478.27700 502.11 T-18348011 3896853.75300 11499727.73700 530.14 T-19282227 3896931.20600 11499825.13400 519.22 T-19282286 3896829.92600 115000B8.i55OO 502.16 T-19282692 3896950.01B00 11499620.27700 533.47 T-19284075 3897427.78100 11499790.60700 529.60 T-19284076 3897122.67000 11499688.36700 535.14 T-1928428i 3897032.70600 11499584.52700 538.64 T-19285218 3897171.28200 11500209.76200 478.13 SURVEY DATE: OCTOBER 31,2019 T-19287285 3897578.77400 11499497.20700 527.27 NAVD '88 VERTICAL DATUM T-19287405 3B97323.76600 11499574.92900 536.53 20 i i i LINC LN SURVEYING Innovation. Intearitv. Vision. 632 BERKMAR CIRCLE CHARLOTTESVILLE, VIRGINIA 22901 OFFICE: 434-974-1417 FAX: 434-974-1776 www.lincoinsurveying.com 0 20 HORIZONTAL SCALE 40 N O N r In z z w O U H Z O Z U O w U) w > a w D N Z \ Q N J \ D- O WCDQ rn U LL.I N U U) z W U) :�E g z Lu z O O Q�z > o �a z z -a z O 0 U >Q w (� � Q z J J � m ~ U) W Q W >O o O7 Q CD CO CDLU ❑ LO � W Z w Y O m Q ❑ Z w = U Q U O O N cod, co (3 �MoNp N I� �n / I / / WOR ELL LAND AND DEV LOP / /CoYLCTMP M7�C6 ° / 25.24 ACRES / oGr oy° I1 \ I J i \ / � °L _ODcp Cp S. 00 / ♦ ♦ \♦ % 4y ♦ /\\ 1 \o0 \ \ I p Y �_ o ♦ ♦ I 1 \ s�ossal- / Q ♦ ♦ //� r %^y =�, \ %:. :' ..'.'/ ♦ I\I 1 \ \ \ F°y r r� s ate, I : /♦ ,2 /,.. �qo . _.a \.:� j:;:: ;. ;.::' ;.. 1 \ \20pF-1-O 4s,�� ♦ / , / yes •';//ram/-�% N \ \Y°�l •�\Q �. .ate /I \ \ \ \ \ s'�os'�`o 0\ '� / ,•'• Gas\\ :�:: :. : ; :: . .I: / / // i �,rs // / r / /��,p-\ \ \ \ � \ � I � r '+, ( \ \ \ Gar `,o/ I 1 / / i l p� - / � y e ss \ \ � • ,.2 �y / O I \ � I / / i L ''': .'.';.'.; :.1.". :::.. I / / / ,� / / 9 •o / � 'TIsA G\ \ .\ \ \ \ \\\'" I I .; Q .' i /\ / I \ \ \ \ \ \ Q I l Io \ \ \ c o•, os9o'9sFrF 1 \ o 1 I / / / / / \ \ I I 19 \ zb\ \ �l �, / p c 1_/ I 1 \ \ \ 19 \ e Fs /y sr p92 so \ \ \ �p\�\ \ \ \ gG / :: ��s 1 \ \ �` \ r LL l a'Qscc9 tir 9F '9 ( �--, I \ p p \` .,I � / �'^' \ I l I 2A9S iP FT \ ( / \ •, \ � °'rsr ! • I 1 / / / / / / � � \ I l r 'Y \\ \ \ X(\O`s�o r\ \ . (;b / O I I 6� I I \ I I 1 \ \ X.\ _C_Z7 '^:c 4I fy2 -s�,T 1/'�../� /q l 9c�� �/T! F__ ,,/'s� / 1( 1 l sT2�a,(/sI ' IiI o� 1\�•- \I" ,r',2 c \ 1 1 1 `IG\4i2; \ o �s9\ \\ \ \\ \\ \ I \ \ikt'"; "I I1I /__:' I: II s II I I 't'III II / Il I 1 I A QI ��\J \ �\ \ti\p7ss1�.\s.. � ° I\ / 1' 11 '\�\\\ 1\1 \\\\ 1 \ \ \\\/ \\ \\\\\\\ \\ \\\ \ \�\' \1 r�\,•y`\ ' ; s ( I / / �/ / / // / �' /sod \� ° \� \ °° O °°o °0 cP \ / kT 61 \ \ I 0/ O \ 1` l\ U #355 WORRELL I I 7i� \ 1 I Ic p9 496- Op r l 1 q I :: ; ::s DRIVE _ �p :;:1: :. I..:::.. �G ITl /� T / d T / TLq '•.�, / l l e6`�d, l 1 I o 1 ' / T T ( l / p S� J 1 I '40 ; / ��"� , l / // •� / l `\RCEL "VV o, °s rs % r • / `/rs / / / ' �� I 4 0 0 � m m o I (O I Iti.:: C� 2 / r �/ ACRES O VP W • _ - - - ry�- ��� / / / ss I / / wmv I 1.w4/° r � I s7A�B r o / / -� / - / y'S /. - l TM 78-2005 S \ _� > N I )b/moo+ I \ ?000\0/ •' I r?2Su� / _ r // - - / � / / INS ION PROPERTI S FOUR/ v �r w SO`lq L 2�l 8r 2. \ / / .. , / D. 20200000166 LLC I �L 7 PA ty / / /( 1'�a%° �� („S l 0043 � \ / 94 � � I p3'p I-/i1�,q.5' 9cOq I I ro\ °iy 2 s+O F 9pg99°�i / J J !°2 ` r ° s p9/ S�F I LEGEND: / / SURVEY CONTROL PLAN SHEET KEY BP = BRADFORD PEAR TREE PVC = POLYVINYL CHLORIDE BPP - BLACK PLASTIC PIPE NAME NORTH EAST ELEVATION RCP =REINFORCED CONCRETE PIPE BIR = BIRCH TREE SP = SIGNAL POLE CO = CLEAN OUT SYC = SYCAMORE TREE T-1B318OO1 3896684.28600 11499899.30400 529.59 20 0 20 40 ������������ E TELEPHONE LINE T-19287285 3897578.77400 11499497.20700 527.27 MAP = MAPLE TREE 11 _ OHC = OVERHEAD COMMUNICATION FIBER OPTIC LINE T-19287405 3897323.76600 11499574.92900 536.53 HORIZONTAL SCALE Scale: 1 - 500I OHE = OVERHEAD ELECTRIC CED OC OC S = CEDAR TREE S = SIGN T-18318335 3897031.47800 11500126.57700 483.06 COMM = COMMUNICATION SSMH = SANITARY MANHOLE T-18318336 3896788.28800 11500218.44700 485.83 CM = CREPE MYRTLE TREE =CORRUGATED METAL PIPE SDMH = STORM DRAIN MANHOLE TP TELEPHONE PEDESTAL T-18318365 3896998.42800 11500314.37000 470.05 DIP DIP =DUCTILE IRON PIPE = TVP TELEVISION PEDESTAL T-18318366 3896907.82000 11500207.34300 486.34 FH = FIRE HYDRANT TW = TOP OF WALL T-18318534 3897257.21900 115OO299.08400 495.66 GV = GAS VALVE TREE =UNKNOWN SPECIES T-18337063 3897142.01300 11500418.98300 494.51 GNDL= GROUND LIGH WLO = WILLOW TREE T-18337064 3897378.74900 11500446.18800 505.92 GINKGO = GINKGO TREE WM = WATER METER T-18337291 3897308.91500 115OO478.27700 502.11 GUM = GUM TREE WV = WATER VALVE T-18348011 3896853.75300 11499727.73700 530.14 HH = HANDHOLD 12TREE25=12" TREE 25' CROWN SPREAD T-19282227 3896931.20600 11499825.13400 519.22 HEM = HEMLOCK TREE +480.50 = SPOT ELEVATION T-19282286 3896829.92600 11500088.15500 502.16 ICV ICV = IRRIGATION CONTROL VALVE HOLLY TREE =GAS LINE T-19282692 3896950.01800 11499620.27700 533.47 IS = IRON SET �, ELECTRIC LINE T-19284075 3897427.78100 11499790.60700 529.60 =IRON FOUND = SEWER LINE 9IF 0 = STORM DRAINAGE LINE T-19284076 3897122.67000 11499688.36700 535.14 JM = JAPANESE MAPLE TREE �n�y�= OVERHEAD UTILITY T-19284281 3897032.70600 11499584.52700 538.64 LP = LIGHT POLE W = WATERLINE T-19285218 3897171.28200 11500209.76200 478.13 - COMMUNICATION LINE N O N r In z z w 0 U z ,Z �_ Z U O W (/) a w z a N o _ 0 ~ (V w O w C6 = U U LLj :�E Q LLJ z i Z > ^a^ Z w� LL D / Q LLI O JLLI J m W O E N � O U7 O) Q 0 CO w U Co rn w Y O Z m Q Z = Q 0 t] w U U o N Cod, Co N I �Mo,Np W ? OO Cr LC o - > ZQ I\ WV� o N CL J w CL CL W N a t `o U \ z-� I II I - --� ----� C 0 0l �, % 51 4 / ) /I V �= e O/ / / o \ / / \ I // \ --/ / I _ � 1 I \ -` �� \ / j ,--"', I , \ \ / \ 0 \ 1 , � k . . . / 0 N , � ,0 � \ _ . :: ( \ /,, �,� f" ......... .. \ \ \\ / / \ \\ 40� r - `36 ` \ \ / - v:.: 5\ / ia; Y P 1 ` S \ // ��... � -� �. �. ...� . � � / � 1 41.f x N / �_ 1 / • L11.-' v m \ /� . y- 6 i Ut \� 1 x ,.a.- w m 4 . . :: i ' / / N P' / n v i:.-.-.:.. / 1.. ::::: w, } j O ;. 1:,- w 71 ' W' w C / J" cS s ' ' N -1 A a .Nl'' J J lfl W N C ] m D \ � � �� �� � � � � 1 / / q / -0 I m w w ... .. J.... rnm : ':'. I C / o N 4 - L W / P - :. I y / /. . / n 'l o 1 y., // - 'O / N O \ • ::� . / I _ W J \ F _ -1 • l I o y I h` '. I / m l w W h 11 A � I b m _ ` nt 13'\ I fD- . �i0 -ID' I W j �J \ F Y F� !KG ti \ T . c� 1 N 0 F I i m >' �.. �. ... -. � . . � . . � -� 4, � / '� 1 \ J 1 b u i/. m / 3 w �- / / �- -- - J - ..fir f! _ ''I+T � 'Tye • �' S G lJ Y - I CO. \ 'L P / N /L 3 N p - _ 1 L>, T - / A m o - - c W :" � m_ L N _ L - _ - - - _ --0 __-t55 LCL.1 / _ jI� - \ _ _ -7 _^/ I - - 53 - _ - ti - _ / - - -Or ` v _ _ _ - - _ / O G 1 - _ 2 _ 08' - O A / yL 7]� N `,'�1,` \ \------_-- - IL111? _ '/� N r.J3 jJ \/ /l ..`-. I w `./m 7� / -'AJ10 _-- ---- ---��m -, - - _-N11?�122 €� / / / i� • / / N / _ _ - _ _ - - \ w _ _ xr _ _ 54 / 4 _ _ /a - - V - - - / / ' N O -`� _ - _U` _ �- G _ _ _ - - �• o Z L _ _ _ m _ _ _ _ - _ - _ _ _ i t 1 G � • W T \ / - 5 _ _ _ - /' J _ _ 3 - - - - i / �; ' - _ _ / 11 Ill"/ G1 ' a --�J \- '�� _ - .--:r-. TI- A �' �. - - - - • m / _ x w / • m / - w 2 _ J J - - - _ V _ . -..... -. / // - �N �r: - 2 / T pr \ / / _/ _ - t-/ <n / / N W --- 03 VyA-F-E \- 0 / \_ .� N .J' . 00'.t. �` \•' A �' • /~ - / t9 i /�/- / / / D.B. 14 uo- P. 61 w _ - - _ ` - \ \ \ \ _ - � -� W - \ \ •`<--: \ ' ''..,'Cy'. / /, / /� A _ N _ J / _ / // w \ w� / -- --- W ___ Nr _ � _�52_ - / / / / r :::p: ;*!% / k-/ N // - --- / ' �a / / . ��.r .. � Ill wOR BAN /TO / .;..Aii. `q:� / / \ �.D AND DEVELOP \ � g�3 // 4 2 / : r/ / / \ - / rMP 7g MENT COMPANY LC �_ / NIA / r / A,.! / . • / / _ _ 2006 / 25.243 / / N / ACRE / - \ / 20 0 20 40 \ _ - - \ _ / / / / � _ � � HORIZONTAL SCALE // r �.::.::. �/ / j/ r/ // - - /�/l //�; // // /// / - - - �2o-- - / �- E� am9 1' _ °ist /� -..m .. 133 / A%/ / W I \ \ i I '% La / / Q l� i'l MATCL, / // / // NN / \Jy�// / J / / \\ \� \� • I I Y �Li, :� A /` . '`l / / �/ / /, ff Syf� / i � ,�N - I ` / ° p,25000 NEED I S $ ../ • / / / / 0 / / I / I I 0., 90q A.19 J9' \• I p0 - � a J 5 ]T D /I / / / / / / / / \ CB•N5,'402;r- C•1A3 I �a / ;-:-.'........ C7 �.. I �.. 1. � Q". :_:'// / iI • / /, / / / Ill / I �TA=33'2A',0' - - CB.N39•9 SS•W b DELTA. 9 /'32' I 7 E.M �/j / / / / RA5.35'� Ay SNAM AVE�E85 //IIT_ _ _ _ _D /'' / / 115.09t%1,� / .' VAxIABLE W51TX / / I _ / J m J �\ NOW.%L'WSWE q�e I T ::.F /� // //A // // / / / / / ' \ T CB2&P` -,t- / I pAg=e .SE, '%ry; ri, ]! S fr. �i 3 AT .. _ _ :/ to / / / / / (SHAM AVE 'gb'} /I.. . 4xE r'-�'__ / \F C SAW O ' . / ) \ / / \ SEMENi D.B. L+ G �-:'.:.:'.:.,' :'.:' .',' : �,' .',' : �,.......... .',' : �,' .',' :',' .',' :" :':': %I / / _ - `, k ; I / / / r / \ I i� -ikli%g0'� \ °tiPf ; I .'..-.•.. CB.SA 3 2t< ^^ ,, r 9R V yy C ' J O D - <S ELTA- �i9 \ _ P S10 8 O / I �w r I (T d 0 I • 6d ll, 22. 3 / / I �, a�ymu / / 9 r 0 Og / 9 .. r 40 U. L. •a U 3 I C 0 ,• ( C S, 1/ O. S 1 55 ,�f�\ N 9 T - 2 .9 /�"f�y�'1r •/ i O 'E T 2. yG 3 LP jj >' s a} D . s 1 .,/ a 3•. g1< P 3 I / ' O / r� z LEGEND: suRVEv CONTROL w ICIF`� d ° "4,:: PLAN SHEET KEY BP = BRADFORD PEAR TREE PVC = POLYVINYL CHLORIDE fro ,p roe:. g BPP = BLACK PLASTIC PIPE RCP = REINFORCED CONCRETE PIPE NAME NORTH EAST ELEVATION *.. ` �I I od. .'................. BIR =BIRCH TREE SP =SIGNAL POLE n.......... CO = CLEAN OUT SYC = SYCAMORE TREE T-18318001 3896684.28600 11499899.30400 529.59 } . 15�s .d I A' CED = CEDAR TREE S = SIGN T-18318335 3897031. 47800 11500126. 57700 483. 06 . ` 11 . v`a I • COMM = COMMUNICATION SSMH = SANITARY MANHOLE '°° / I CM = CREPE MYRTLE TREE SDMH = STORM DRAIN MANHOLE T-18318336 3896788.28800 11500218.44700 485.83 i^ . CMP = CORRUGATED METAL PIPE TP= TELEPHONE PEDESTAL T-18318365 3896998.42800 11500314.37000 470.05 , DIP = DUCTILE IRON PIPE TVP = TELEVISION PEDESTAL T-18318366 3896907.82000 11500207.34300 486.34 INSET A tiyo FH = FIRE HYDRANT TW = TOP OF WALL T-18318534 3897257.21900 11500299.08400 495.66 SCALE = VAO' GV = GAS VALVE TREE= UNKNOWN SPECIES T-18337063 3897142.01300 11500418.98300 494.51 - '`� GNDL = GROUND LIGH WLO = WILLOW TREE �' n'� n' T-18337064 3897378.74900 11500446. 18800 505.92 a. GINKGO = GINKGO TREE WM = WATER METER , �I , �I T-18337291 3897308.91500 11500478.27700 502. 11 GUM = GUM TREE WV = WATER VALVE T-18348011 3896853.75300 11499727.73700 530.14 HH = HANDHOLD 12TREE25 = 12" TREE 25' CROWN SPREAD S u R v E v i N G T-19282227 3896931.20600 11499825. 13400 519. 22 i HEM = HEMLOCK TREE +480.50 = SPOT ELEVATION T-19282286 3896829.92600 11500088.15500 502.16 ICV = HOLLY TREE _GAS LINE T-19282692 3896950.01800 11499620.27700 533.47 ., I,•'�' ICV = IRRIGATION CONTROL VALVE E - r IS = IRON SET f = ELECTRIC LINE Innovation. Integrity. Vision. T-19284075 3897427.78100 11499790.60700 529.60 •t' �� = SEWER LINE IF =IRON FOUND �= STORM DRAINAGE LINE 632 BERKMAR CIRCLE T-19284076 3897122.67000 11499688.36700 535. 14 JM = JAPANESE MAPLE TREE --� = OVERHEAD UTILITY T-19284281 3897032.70600 11499584.52700 538.64 CHARLOFFICE. 434 74-1417 22901 a LP =LIGHT POLE �+J= WATERLINE T-19285218 3897171.28200 11500209.76200 478. 13 LOC = LOCUST TREE C = COMMUNICATION LINE OFFICE: 434-974-1417 T-192B72B5 3897578.77400 11499497.20700 527.27 40 0 40 MAP = MAPLE TREE T. = TELEPHONE LINE FAX: 434-974-1776 T-192B7405 3897323.76600 11499574.92900 536.53 Scale: 1 n = 5001� L OHC = OVERHEAD COMMUNICATION � - = FIBER OPTIC LINE www.lincolnsurveying.com HORIZONTAL SCALE OHE = OVERHEAD ELECTRIC N O N J In z W m m O U Z �0 Z U O w (/) a LU N z O -i N J D- O w m W J C) =c) U Cf)U U CV O N O O w Q 0 2 w w Z Z w (3 LL H Z O w J 0' w m J Q W m b w Y U w U .. O N J =O\ _I O :2 . :mO Ifo0 0) O N cod Z) NO (/)NI� uj O LLI Z 00 M �� - 1Z Zr >.- , o�/'� w J t� UON I, Z I\ WVco O z O N N d 2 D- N m 2 0 N U 0 0 C W I 1 0 O Z X Lu (N Ln co O) *k m O CL J N W z z r N O N } J 7 N H Ld W O U } H Z C� O Z U O o:: cn W > a Lu 0' N Z J N d O H p W p W v 7- U U) b uv y - di F 2 s �p /..�:::::(.':.. .. O V9.5r SF INSTALL 282 LF—� � TP )L—L—QmI�—��4 • F �:. 919 I� k� �':. S4 — — — — _ OF SILT FEN \ / -I _ _ / / so 00 Sa / f C: :' \ l I N I s S 6 00'50"W - — —5,41' \Tp — TP : "�y. f�.�:'/ O O — — I s 'sue T i.::.�di S46°00'S0„W _ _ — OOl I CO r 1 N �y \ / 00?� O O 0 / L � 0 O TMP 78-311 MARTHA JEFFE s�. ^ ' ���' \ O X �Fo� \ > p C� \�° I oo> ° D w Asp D.B. 3799 P. 734SON HOSPITAL v I N �� s2 TP .�. = W s �y2 . 7D = LLI D.B. 27092 P 201 PLAT s 9v9 \ S n Z I r26s9 D.B. 2126 P. 393 LAT I s�� 007 ./,� _ TOE PLAT `LOD r _ Q❑ W titio_ y�00 EROSION AND SEDIMENT CONTROL NARRATIVE: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE —CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK / PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL SD::: REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. / 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE O SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF —SITE BORROW OR WASTE AREAS), THE CONTRACTOR / SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL / MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ONLY CONSTRUCTION ACTIVITIES ASSOCIATED WITHIN THE PRELIMINARY LIMITS OF DISTURBANCE ARE ALLOWED. UNDER NO CONDITIONS ARE ANY CONSTRUCTION ACTIVITIES TO OCCUR OUTSIDE OF THE OF THE TEMPORARY / B. STABILI AITONUSHALL BETHERON T TEMPORARY EEDINGIRONMENTAL AND MULCHING.PSEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL PLAN SHEET KEY RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 9. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 10. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. Scale: 1" = 500' FOR CONSTRUCTION DETAILS AND SPECIFICATIONS REFER TO THE "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" THIRD EDITION, 1992. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED DURING CONSTRUCTION AT THE DIRECTION OF THE COUNTY CIVIL INSPECTOR TREE COUNT REMOVAL: ALONG WORRELL DR: 2 ALONG WORRELL OFFICE DRIVEWAY: 16 TOTAL TREES TO BE REMOVED: 18 Z W 0 J = U N C/) N Q Z w Z_ C Q w U) Z � 0 Q OU z LLJ z J w-Of m U) P- a of0 w0 Z m 4�tT1TAr� TP / di SF INSTALL 557 LF TP ��*7 x o d� / j F SILT FENCE _ v O m F N ./.. O// P / �l' C e / os m - %:.:.. GI'1Y00 o N / M to IW-MN / Q I U C) Il¢LIVco 20 0 20 40 Q) Q HORIZONTAL SCALE N / / I / I P / WOR ELL LAND AND / DEV LOPMENT COMPAt�C / l�I 1 TMP zocs oti / o 0 ACRES oLr off° I � JI Do ICP I / Sa 1 �� � \ Imo,, � ! / �ssr I \� • � \ l z� 11-0 3377..tv*00 '0 so / LIMITS 0 / I ♦ • • ion - ego �\ / \ \ 1 \ 1 I I I / DISTURBANCE (TY).$ Ip ) a s.. _ S. �7:_. !o o /.. ea / ` o .... ♦ / -ate \ \ f\ I ` 1 \ \ \ zb\ / � TP �I -- {.': ': J �:::: !s P' // � 4 sue- _-�% � � •, > to �y \ I \ \ I I I \ ::.:r.:.. •6% / / / / / `�o\ / /sic, / � � \ \ \ ,/ SF ItpSTALL 1,602 LF 1 ox' ' I I / / �� / / / / i l 4 �c 2' o� \ I O II OF SILT FENCE / I ` L o0 oa r I / [k / / �29�q // \\ \ \ \ \\' I: j / OS / / / / \ ICf 9 ' (° 4 -9 GQ o- sl TF I I o pa ✓ / °LO a Oo 642�?•QQ'TT,9�. `'.,.:.:::."( \ � � ;'�•.I / / / / / / / / / �\/ I \I 1 :.�p LT \\ \ \\\�\\\' .. .,...._ � I A9s s �T 1 1 • 2�2i 1 \\ � \I1 : TlP ALL/3 \ SILT F.. \3INo SF PROTECT EXISTING TREES ALONG WORRELL DRIVEIAT I/ALL 11MES YYP \ o I , l/no /2s l TP \ ,� 1 1 e,o poQ94 ^`Q �O. \ I I INSTALL 78 LF SF ) I A r �� �� I � 2� \ oo.. . \ k'--- s l I I OF ILT FENCE I O Z2 J —S �O. a �22e / : STALL 557 LF 400LOD \\ S OF SILT FENCE I 4 ' \ \ Cn yb9: rr T m 00 0 00 { ) / N355 WORRELL l r N l -� LOD OD I'SCL�° DRIVE 1 \ \MAI T//IN A�CSS�T0ss� = d / / i •� ) I 4ss'�o l I I COICoo SQV�R IRO'AD T \ °s� Cy m 7L T / T —� T �A / l / `?4'e� I C5� I AFL \TIM S is x�k / TP / / ss l AAA \ I l �•�J • l ',/p 1�/� / /lr / C7 RCEL W O 400 ACRES I / / Wm�o Cfl I \ a.. /° TM 78-2005 PA ION PROPERTI /qsp�\ 001 . — /: INS 202S FOUR' LLC / : i 000 . r. 0043 00 IC, ?19, �O PLAN SHEET KEY 20 0 20 40 HORIZONTAL SCALE Scale: 1" = 500' _L N O N J V) z z W 0 U z ,Z U o Z U O w U a W Z Q N d o LU W p w = U U ~ L1J z L LJ Q W ILI) o �0a- Z vJ Z z Lu 0 Ov Z o z 0 0 < o 0 J pwOLu co � -1 Q Of o Lu U >o N � O U p Q CD o w O Co Luz Y 0 a' Z = Q Q 0 � Q W ? °p >- o �o� WVco o N CL J w CL CL W N N C n J W a O� / I I N as V eZ _ � M a Y q N / - - T dm z m C ) ti I 1 r w f N O x .3 O Z N Ur-F 3 w O .'. w' 0 f 0 J A J N to C m I v / n y _ c .W.. .. _ m 5 � / o I \ -__-•J'N /. . % O rn / I O w , V i I / I m l �. I 3yl- o y I � w h 11. P \ O rt)0 v / C� O c ti N i 1 i m > W � W 1 C` w :. m J 7i W / P N • — 1 /f Y V 2 (T ~N i3 _ N (T — D ' J / 1 A m L n / \ I L E \ DC - / — o L — / rJ — — I _ T' - 3 _ o ti.T.� .08'! -c G N �� m . 10 L / Aw �' � : `` _Try--- -• t I / i ,(J�_ — —I- °_ \ ,-\. o _ '/, ES_ sJ 3 - _---:' '_€07�PROTECT4DMAINTAIN190'N171'22 ACCESS-TD GIBE 5400" HiDRA�T i .i.aON INSTALL 60 LF' - AT ALL YI OF SILT FENC �•1 , a r N m — / d• I o _ • --- —_ — / 00 w LODLOD A A'-' ---- / LOD INSTALL Y48 LF o \N N ;' _----LS�Du�OD� ter' :p- -� 'J3------ f// .// .cn LOD �aL Rr o '�� \ — — — — — VO //�O:. O — • / / _ O OF SILT FE CE / A / - _ � rn w LOD--rr�� � \ a - m �" _ �- w / t T 2 — _ _ / c - LOD _ T W W F` (10T—�� = 70� DC / /---------'---_I STALL 38 SF i /-- N -- W�o�_ - -' _ — — — ��- oQ-_z g \ o p� SILT FENCE J �2 / "tp I , '•r / .o '' / /'' < D.B. 14 C16 p. 61—NJ`�—QOl \ -• \ / /l m /� ROTECT EXISTING TREES W AT ALL TIMES (TYP)---- -� _-----_-_---_-- �2 ------ -52' 7INSTALL 1,602 LF -FENCE- OF SILT 26 � 25- € 23- 5 m ,� — / TP / 523---522 - - -- - _ ------ - _ - / a:. - / / wCRRELL LA D AND EVEL \ — / D Ng3 LIMITS OF DISTURBANCE _ / �.y/. // MIRY— TMp �6 OCENT COMPANY LC 25.243 ACRES / 20 0 20 40 HORIZONTAL SCALE IRA- I /N' 2o-- / / N / N _ CS o� o6 • - // PLAN SHEET KEY INSET W SCALE = 1 ":40' Scale: 1" = 500' 40 ti 0 40 HORIZONTAL SCALE LEI N O N J 1n z z W 0 U z Z O Z U O w U) a w tY N Z 0 Q N J 0_ O w CD w U ~ L1J z L LJ LJJ CQ Lu z Q i U` _ D_ � ^ L.L �/ L L 7 z > L/JJ�J 1 a V z zz Lu 0 O J U a/ 0� O 0 2 Oz 0� J pw0 co� 0�O 0 uJ U ONO N � O C() 0 Q 0 Co w O Co w Y 0 a' z Q z = Q 0 � a 53 a Z ZZ \SO 15 RC" � �C7 •0 SEE SNEE 1 3-1 / 10 hryh h Ch Ny I I •� I I I I 25 �75 PSI II \u Ts I 1\ 1 cy C i I �\ N 1 I � q/ I I I I/ i I I I I 'I I I I I I j OR4';ELLI LAN AND DEVFLOPME I I I CO PANYI LC VPA I TM 78-2C65.2 3 AdREJ I IRCEL B / 3.9t ACRES I S O / N \ s2 I \FL529.62 x� FL529.87 TC52 . s I l\ I I �hq� T a I FL523.44 s2s I �ti1// I ss I / \ / SF a 0Lr t% PS v rP MU TS \� \ 1 I r VXj 5391/5 FL529.82 / I I / / l 9°Asp / O \ Fiszs. I I I Ilya^ I j 1� I / .6d Ps 9 I 1 MU L vs SF\ 4 d1� / TC528.85 \ - - - - 119.51' _ - \ TP • 1 FLS27 6 "PL529. 4 �� - - s FL528.35 • / I y/y�� / ry / /; i ss S S46°00'50"W - �_ - 105,41' OI l —r y / OI I 1 o ,G s�LS S46°00'50"W - i 0-i oL T''s.9flAq u/ .. . 4s I I I NI NIDS 294 p p0 s:eTMP 311MARTHgJEFFERSO 009*52i.5 o sDB3799 P. 734HOSPITAL CG-12 (TYP) A PPLAT ) I s, ?ss2 ,9 D.,B.2792 P. 204DB2126 PPLAT/ C� I 9 (/ ) T 5 IPP9,393 PLAT 9�5 / OOj N / SgTy / ?o l / / T l 'd SF \ J / MU 20 0 20 HORIZONTAL SCALE PLAN SHEET KEY Scale: 1" = 500' e EROSION AND SEDIMENT CONTROL NARRATIVE: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ONLY CONSTRUCTION ACTIVITIES ASSOCIATED WITHIN THE PRELIMINARY LIMITS OF DISTURBANCE ARE ALLOWED. UNDER NO CONDITIONS ARE ANY CONSTRUCTION ACTIVITIES TO OCCUR OUTSIDE OF THE PRELIMINARY LIMITS WITHOUT THE PERMISSION OF THE ENVIRONMENTAL INSPECTOR. 8. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 9. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 10. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. I � / X11N O A � 0)/ O N N O G / OON(� AC1 Ov N �W cal i I / I / I / FOR CONSTRUCTION DETAILS AND SPECIFICATIONS REFER TO THE "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" THIRD EDITION, 1992. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED DURING CONSTRUCTION AT THE DIRECTION OF THE COUNTY CIVIL INSPECTOR N N N J N z z W 0 U H � Z <n o Z U O_ U) d 0_ C4 Z Q N a o H C'') LL1 O LU 4 = U V1 Lu -0Q .I Z Lu Z w Lu z 2i Q O Z O� j p Lu Q Z ' V 1 Z — z Lu 0i O Q o LLI 0� Z J <00 J m L Q 0 � O Lr_ O W U N � O U) 0.) Q CD M O Lu w LU OLj Z m Q Z = Q 0 0 W U U ~ � O Lu ? Co >- o UO(v WU Co o N II � o , D / n / r � Z ,m I (A _m m ac N rm = m ,V. O ��ASpyp I / I PLAN SHEET KEY Scale: 1" = 500' I I so. F�2 P o' 9s6 TF Q2s��9�tirT9 (L=1U-, W=d , U=U.a ) w/RIP-RAP EC-1 TYPE Al 2 CYD OVER FILTER FABRIC BASE LAYER -PARCEL B - 3.9f ACRES LAND AND DEV LOP MENT COMPq /YLC TMP 7 2006 2- ACRES 20 0 20 HORIZONTAL SCALE I I I I / I tl / i CG-12 (TYP) I I Cp o \�b M -PARCEL A - 2.0± ACRES \\ \\ \\ x \ C SF N O N J N H Z W O U H Z O Z U O w Cn Wa Z Q N a o I- 1�4_ W O W 4 = U U) LU o Q N I U) Z LU z �LI/J� VJ LUz \ / � Cw G T Q } L J Z co z .z) M Q LU 0 O 0 >a Q �on o LLI � Z J J < 00 — C r J LLI mLU (n Q Z O ° �11 L- 0 w U � � o O Q CDN Ln CD LU 0 Co w Y 0 a' z z = m Q Q 0 LU U 0 Cn o N M 11, �MoNO N r� W CL CL W N C co v/ w� / o� w o � ell,CD PS w r --- O Ts - ITC LOD \ 11 'LOD L535. � DD < +W // \ pWC, 13 / N, �01 fT� o F _+ 536.6 / / / ./ \+ I I / A X .79 C53C6.1,1 _ \ _ F 3�.E,Fcd� v'� �_----'� z� o v Cb 21, =--- N11?4-T='E--= - 3 _ _ / 3� ------ - w� - _ �190.00�-- \1� • ==_��_ �_N11?41-22 €J / /// > • 531 \ t _ - ov - -- �_ __ 54.00'- FL5�3J'a{//{�1 MUSTS \\� '� -�34 i-�- j " �.----------- — �3� TC5 --- L- 3 0- \ �i _y , �• i� -_ 1529.a2 LOD LOD LOD - _- _• - • n /- LOD LODE LODE on \�� �,��-------� �� r1 / P527.8^" OOT� ��QOT �_ 4� v -527- LOD T6p �� �` _� - - _� / >\ // 0 o\ ----t / -- �uQ ---N \� —�j�1 — X / \ / J/T 1. / O N .o // C --"— D.B. 7408 P. 67 W __ ---\� _ \ 7� —�\ •�� `\ SF 17— lop ------ _ -527 TC525.63� - \ \ _ _ _ 2J- _ — — — -5 2 3- / TP / / 525 TC525.63 / � FL525.13 ------ — / / / -514 _ ' �mc) 7 / / / p � � \ \ WORRELL LAND AND '83 / / � DEVELOPMENT NAD I �° / 7. 3-3 i 2 / // d / / • IP ' gj �2o IP QN OP 3-2 - LEVEL SPREADER TTC53 .91� o =% SF J/ o / / F / / o� X / N (L=10', W=8', D=0.5') SFF W/RIP-RAP EC-1 TYPE / S res2a. Al 3.0 CYD OVER / y> F / ytiofFT C, 3_1 -- FILTER FABRIC BASE /j �� / � LAYER PLAN SHEET KEY Scale: 1" = 500' PARCEL 0 3.9f ACRE" TMP 78-2OC6 COMPANY LC 25.243 AC ES M.96 d5� � E65/EGRE56 TF T=50.81'� EASEyENi ^1 c:9zsa''�-_ E. tmx=. aFT 3/\tl VWHSI smmmm��ViV c a _ ISHAM AVE m — L - - IY\ AG6A WATERLINE O � EABEMFNT D9. - '� A=18 U 11 / catT31' m0)a CB.S<3'zTa9'E \ i T� DELTA= 42 a7?5106" nymu A 1g6 0. il1°'r'Y yOD INSET W SCALE = 1 ":40' 20 0 go 40 HORIZONTAL SALE I La Cn _ _ \ C.)�Nce 4DAb � w / I/ / OD J L <p� DD. 39' \' � 160 ' 35 W 32 N 55 43 0 'S,'0"4{A I 'J I� I I I mz lD�nSJ, I AA!!ffffffP I N I I I .zi .cs y'3 ers I Dim SI \ m I 9�e I to I I 1 II I I I I Elf pia ti A 0 40 HORIZONTAL SCALE Nfir, N O N J rn z z W 0 U r z Z �o z U O W a W z Q N d o W O LU = U z W Z LU LU W z Q — T— o z;o� J Z � I z z — O Q IZ 0� W p0 J m W Q � O O wU N � rn m Q O N U' M O LLL.I w °' W Y O Z z = m Q 0 W U U � r O� N fN 0 J a C%j � � o � ���yY00 a C N L O U Ir QL CL 00 51'_ S46°00'S0"W - - - �'o _ _ 105.41' s - _ 9? 'ti so�yi S4_6 00'50"W oe'o REMOVE AND RELOCATE 's9co s SPEED LIMIT SIGN 9ogs2 s� / r2e �9 s rod / do 9 �s'TT'S I I I / PLAN SHEET KEY TREE COUNT REMOVAL: ALONG WORRELL DR: 2 ALONG WORRELL OFFICE DRIVEWAY: 16 i^ TOTAL TREES TO BE REMOVED: 18 n a Q Scale: 1" = 500' �i 4ss N N IC I_ SAW CUT AND DEMO ASPHALT PAVEMENT i I I RCN 000 I 1 t I I I I 1 ✓ 1 ; I I 1 1 I \°A'tiF c�, 1 11 II II I I 111 111 I I I f \ poCP A 1 OF ED NG I, 1 ` 1 1 \ \ I ckI 1 ,s o I I � - •III / , , , I I y_"( DEMO EXISTING TREE I I I I I (TYP) I I I I I I II � PROTECT EXISTING I I I I TREES AT ALL TIMES (TYP) I I I I I I l I � •,I'er I I I I � � I I I y / �70 / I I I I I I 1 � �,_'• / / I I I � I I ' I 11,•,/ �/ I I I I � I I ' I I c6/ \I I I I I I l \ I I I PROTECT EXISTING TREES I ALONG WORRELL DRIVE AT ' ALL TIMES (TYP) / dj REMOVE AND RELOCATE SPEED LIMIT SIGN z GENERAL NOTE: 1. SEE SHEETS C12.00 THROUGH C12.02 FOR MAINTENANCE OF TRAFFIC AND CONSTRUCTION SEQUENCING TO MAINTAIN ACCESS ALONG WORRELL DRIVE. f �'' Ts�• : ' : I C7 zk z L�2S T �/ y • F / ,�L r vy10 / r'S 2 '0s / m m 0 p cn h / h0� I I 20 0 20 40 HORIZONTAL SCALE N O N J V) z z W O U zZ �o z U O w U) a w z j Q N J d O CD w CD w = U U LJJ :�E Q L1J z > Qi Z Q Z — a z Lu 0 Ov LLI LLI 0 � J J EDD L1J O E z w 3:: J o < = U N U N Q Q 0 J 2 Lu N � CD U 0 Q CD Co w O L0 CD Co 0') w Y 0 z = Q z Q 0 � CL J V W / / I CD o / �P / / r I C. \ REMOVE, PROTECT AND / RELOCATE EXISTING A— / BOLLARDS (TYP OF 18) CR \ ` ` ��— / �/ %r \e 1 rsCG \I \ \ CP \ \ \ I / DEMO EXISTING INLET AND �o ♦ b ''.. ♦_ I 1 \ \ I PROTECT SANITARY / / ♦ ♦ \ \ \ ABANDON IN PLACE 12" CM P SEWER MANHOLE o° �_ ♦o° ♦ ': �. . ' a° \ 1 \ \ \ \ I / WITH FLOWABLE FILL *— = ♦� �\ \ \ \ \ \ \ C'1� `• y2o / l'...Q�o ;1; / • I i'r yam_ —{9_ \=" 00 •\\q \ 8ss \ \ \ \ \ •, 2s':' /:::..:: �/ IL os REMOVE, PROTECT AND / / i2y yA / — L\ RELOCATE EXISTING � „ I 1 z?D c9 9, l I i l:: ' ✓. �G� BOLLARDS (TYP OF 19) s, ;Lo \ 1 F L a �9 ° 9sF TF I I /,V \ o • �..' ::.:. , 1 I % / ° / / / / a \ \ I ,2 / .... 4 0� — / I \ \ \ \ \ 1q \ I e Fs �ti s 49�'.jcti 1 I 4( \ I I 1 '4�r' s DEMO EXISTING \ ,god ..':�. \ T ?/ a GUARDRAIL 72 LF 1 2 s PROTECT EXISTING TREES ALONG WORRELL DRIVE AT I \ I \ � :. �::; :; �: I I I I / A ALL TIMES TYP I I �� (TYP) I \. I �I I I \..:.:.::': I I I I I I I DEMO EXISTING w d� l INLET AND 12" ,1• i 1 ' Q' . 1 ( I I / ( \ \ \ \� \\ \ \� \ \ \ r� / „ / CMP PIPING (L: ' .' I •+ __ � !201 1 I �2p 44��....'' ' I DEMO GRAVEL °o::'�::': ' \ I PAVEMENT 0 \ \ \ \ " 1• sl. /':: 0 1g( (.. r— o�� y� g 1. 2 I I \ \ ,� \ ..; .. ......... ' .; . . l °d9T\ 'YJ /'i� _ \o l AND REPLACE e.. \ :1: -a�F� IN KIND / \ \.: �. ��. m 1 � I � 1 � I 60 s� 90 \ \ \ \ \ \\ \ '•, / I N355 WORRELL F 4y dM: frl SAW CUT AND DEMO DRIVE X '� { I : (/) / � �oyo /�� •, r I '�:. / / ASPHALT PAVEMENT � MAINTAIN ACCESS TO 2 T/ s / / •/� ) / I CROSSOVER ROAD AT 3: frl ALL TIMES �. I / • /i / �' %' l l om _.:a�. OMB �T s l7 iPmo p _ _ 2�, _' O 4y U1 ) ao — SAW CUT AND DEMO ss/ I w my I I c / ° >. s2. _; :':' :: s, O / ia✓ - — a ASPHALT PAVEMENT r s 1/�� I j...... Qa�o • 2 19 19 190 10 V. 1\0 0,9 L 2 I SAW CUT AND DEMO 40, F� ASPHALT PAVEMENT / \ v 9r9 II 4 °L�Ys2 PLAN SHEET KEY 20 0 20 HORIZONTAL SCALE 40 N O N J 7 z z W O U z ,Z �o Z U O a �; Z J N CZ O H Lu p U-I Li = U U) W 2 Q W z > Z > J z \ o / O Lu Lu C < J J m NW Q LL O U ^O N O U) N_ m Cn Q N 0 U) Lu Lu 0) Lu Y O z 2 m Q Z Q O 0 Lu U U oLL N M co N k Q o W? °p >- Co O UO�v w�co o N CL J 2 LLJ CL Lu N N c w J uj a tCr �n / W � N � ��pl ''. ;1 ..,''':'..O CO'L��J '✓',. / vF � f/' 1".. / w T • 'N m w I _ I I N P' LIMITS ti. �o x G PLANTIN BED \ \ f p G / / ARIN �— � CLE �'� • — / — — P • Y V / l w\ — 2 ~N /' _ _ 3 (T ( — _ N N11?41'22"E21. ---rj GJ I 3G c Or— — _ N 1 - - - - 0 8' — — — A \ _ N1 •m I t PROTECT AND MAINTAIN - - — _190.00 - - - _ N11 71 22 1 / / m _ ACCESS TO FIRE �� ---__ _ - �__ 54.00' - ` - _ - -' w _ - � HYDRANT AT ALL TIMES `•/ I 0 — — - - -- - — --- r / W ----- /+ o m — — • / / o - — • cn v \ a _ cn m g" _ - 2 — — N — c - - --t-// N ---/ w --- ACSA V1�q-FERNN€--'\`__ ,/off D.B. I468N 61 IN -----\— � � � � � \_-7/ -\ •I1 \ w -EPROTECT EXISTING TREES �2�- // � / -------------- � — � — 2�_\ J 'I_ _ W --- _= + AT ALL TIMES (TYP) ///// / i �— \\_\— \\ / 0�--52E -527 50 _--_DEMO ASPHALT - - \\\ \ �26 - ---- ' �25�- PAVEMENT / /// ----- \\ --- - �2 4-- •/ --- / 2�---------- __ f v // // - - 20 0 20 40 HORIZONTAL SCALE �2�- — Y' / tijq TCly� / SFF SyfF� - / 5.00 o I �! V o PLAN SHEET KEY Scale: 1" = 500' Q INSET'A' SCALE = 1 ":40' 40 0 40 HORIZONTAL SCALE N O N r N z Z w O U H Z � O Z U O w cn w a w Q' N Z \ Q N J \ d O ~ CV w Q w U U I_LI LLJ z 0 Q�Z > a �a z W 0 0 LLI 0 Q J G J m W -.1 0 Z w TO Q 2 U U W Q CD 0 Q CD N Co ❑ L0 CD w Co w W Y O Z it Q Z = Q ❑ w U U �m o N Cod, Co �MoNp N I� CL J o� W CL CL W N N C n J W a c .2 G� QJ J Q P a \ MAINTAIN ACCESS TO MARTHA JEFFERSON , DR AND WORRELL \ DRIVE AT ALL TIMES r Io T:':.. ,..,.. . 0 2�6 0 u V' -0O n�6 oo�udrd row C� • BP: 0+00.00 19 O 0 0 L-32.31' .. 9g 01 t?6 }IixS � n 0+32.31 r I • MILL AND OVERLAY J EXISTING ASPHALT PAVEMENT (TYP) S46°00'50"- W - - - - -311 MARTH D.B.J79J9PF734SON HOSPITAL D,B. 4077 P. 311 PLAT D,B, 2792 P, 204 PLAT D.B. 2126 P. 393 PLAT COMPACTED SUBGRADE- HEAVY PAVEMENT ACCESS PLAN SHEET KEY (MAIN NO SCALEDRIVES) Scale: 1 " = 500' •12 1 14-ill -it"] U-1-1 • ■ Zxvi 4 u 131 l • • \ CONNECT TO EXISTING ASPHALT PAVEMENT 2" SM-9.5A ASPHALT 2" IM-19.OA ASPHALT 8" 21 -B STONE \ \CONNECT TO EXISTING ASPHALT PAVEMENT U° \ ws `Dv 4 0�2 \ 4'> \ s o ti PC: 30+26.61 MAINTAIN ACCESS TO \ PRIVATE DRIVEWAY AT ALL TIMES PT: 1 +26.66 \ @" \ END CURB WITH 45- BEVEL N 22+03 UNIVERS TY OF O S\OF�`�yQl VIRGINIA FOUNDATION QpJ� D.B. 2712 P. 325 \ D.B. 1674 P. 482 PLAT PT: 21 +98.82 \ PC: 11+ MAINTAIN ACCESS TO \ PRIVATE DRIVEWAY AT ALL TIMES �Iy�OF PC: 21+31.54 y R10' \ 30+00 l,2ss, 0 p / � d PT: 21 +01.31 °A � i S/Q PC: 20+56.32 PC: 10+54. i20' WIDE --- END CURB WITH • �� I ' • I I • Z:� ' SHEEN C6 wrowo SEE Ma��H 1 h• Q- FUTURE ENTRANCE V (BY OTHERS) 00 �O i 1 45° BEVEL I STOP BAR AND / STOP SIGN (TYP) REVISED 50' PRIVATE I STREET EASEMENT N M _ a PC: 2+84.78 c�'6 !°28ss. �ti5 Pis- I CG-6 N 20+00 PI: 2+43.59 p 3+0 1 (c80.26' l ---- R=155' 2+00 L=7.72 L-41.19' v PC: 1+55.61 SPEED LIMIT SIGN (25 MPH) PT: 2+35.88- _ _ 105.41' ------ ASPHALT PAVEMENT - S46° - - 00'5o"w I o CG-12 (TYP) GENERAL NOTE: 1. DESIGN SPEED USED FOR PROPOSED ROAD = 25 MPH. 6' ASPHALT PAVED SIDEWALK MAINTAIN ACCESS TO ASPHALT PATHS AT ALL TIMES (TYP) Note: Sign material must be encapsulated lens, Installed on the right side of the road. WORRELL LAND AND DEVELOPMENT COMPANY LC TMP 78-2oc6 25.24= 1 PARCEL B 3.9t ACRES ----+- - o 23. �L=R\ R=2381 / Q R226' R a Oo RI-I Stop Sign po' 7' T m�,inen um arban, G rural areas 1U-1 STOP SIGN DETAIL Curb Line PROTECT EXISTING TREES ALONG WORRELL DRIVE AT -%7� ALL TIMES (TYP) SPEED LIMIT SIGN (25 MPH) MILL AND OVERLAY 7' FROM CENTERLINE ALONG EXISTING ASPHALT PAVEMENT (TYP) SIGN IS 30" X 30" Jr STANDARD 4" X 4" PRESSURE TREATED PI IF 6" X 6" IS USED, IT MUST BE BREAK-AW GROUND 4+08.38 1.94 20 0 20 HORIZONTAL SCALE I D� R328, 0 2- +0 ( z 40 2 M R352' I 1 M Im N 2 Im frl 0 rn Io I I I 40 J Y ct W a CL N O N J H Z w 0 U z z 0 Z U O 0- LU a a o H o W p W CD = U Co LLI W z � Z > J Z O U i O W o LL Q J w J m W J 0� Q W p Q N U ^II U) a a J N o U) CD Q 0 Q W M W 0') W Y O Z m Q Z 2 Q LLI U U o N M d, �MoNp I-Qo ao (j) M 15z U O N �_� �U00 o o �. N N U �n ss" A9i d FC vo F9S yJ PROTECT EXISTING TREES ALONG WORRELL DRIVE AT ALL TIMES (TYP) I I I I PLAN SHEET KEY i Scale: 1" = 500' i WORRELL LAND AND DEVELOPMENT COMPANY LC TMP 78-2006 25,24- -PARCEL B - 3.9f ACRES PRC: 7+11 MILL AND OVERLAY 7' FROM CENTERLINE ALONG EXISTING ASPHALT PAVEMENT (TYP) PCC: 6+57 PCC: 7+57 ASPHALT PAVEMENT SHALL BE FLUSH WITH SANITARY SEWER RIM MAINTAIN ACCESS TO DRIVEWAY AT ALL TIMES AND REPAIR GRAVEL DRIVEWAY DUE TO r�5 FOUR LLC 00431 / / / / / NEW PARCEL LIMITS (TYP) / / PCC: /8+87.32 EXISTING PARCEL LIMITS (TYP) 046 oa �T 410 00, qs C' Fq oA CG-12 (TYP) CONNECT TO EXISTING ASPHALT PAVEMENT -PARCEL A 2.0t ACRE<, WIDEN EXISTING ASPHALT PAVEMENT AS NECESSARY TO OBTAIN 24' WIDTH ALONG WORRELL DRIVE PROTECT EXISTING SPEED LIMIT SIGN FUTURE ENTRANCE IA,,o n, (BY OTHERS) MAINTAIN ACCESS TO CROSSOVER ROAD AND WORRELL DRIVE AT ALL TIMES 952. Oe �4A9s�Ls S90 F` c T I I 20 0 20 HORIZONTAL SCALE 40 N O N J 7 H Z W O 0 H Z C� 0 Z U O a W 0' N Z J N a- a H W p W C6 = U 07 LLI 2 Q \W z Z > ^J Z P1 O U O W C < J J m LLI J Q 0 i W p Q cV Q D 0 Q N o 07 N_ m rn Q CV 0 U u) W rn W W Y Z m Q Z 2 Q O 0 W U U � O N M d, �MoNO W ? Co -� cv) �zrn WVCO o 0 N CL J N c w J uj a N U i I CG-12 (TYP) PC: 13+75.40 / 6' ASPHALT PAVED SIDEWALK (TYP) / PC: 11 1: / C6.00 PLAN SHEET KEY Scale: 1" = 500' MAINTAIN ACCESS TO WORRELL OFFICE BUILDING AT ALL TIMES CONNECT TO EXISTING ASPHALT PAVEMENT 6' ASPHALT PATH (TYP) -PARCEL B - 3.9t ACRES I �QW / 1 -.....{.ice"�=-jji�3f �:��j}�•p•260Aq T 2068 '2146411 C=1A21' 9 DELL SO A: 4]?5T06" v �m ,`• ELTq Gy4'y��yv4dd CB: / D INSET 'A' SCALE = 1":40' HORIZONTAL SALE 531) I � I I I I _ I II I R:96.00' A-13,39, I yD R13 3 C6.N39' 0835"W .'.."..'.."..'..". _. _.._ ... ..... ..... ... DELiA, 8'Od'32" .... Ne3'D " y . I m L IX` , iON6 m 6 J qIUS S6C t T: 6 C.4 1a myi 2S � �23 SI � Im�F A all ti 0 40 HORIZONTAL SCALE W Q U O Co Z WUao N Z W 0 J = U N Q z J n O Q J O 0 U dJb�� o \ YCfo 320 2 boo Or d�O d o o o f�NZ� �qo 00 s °6 Ya6'Q 6 : �N S s�Nrod��Z �pN22 \\ So \ l 20 0 20 HORIZONTAL SCALE PLAN SHEET KEY Scale: 1 " = 500' STORM SEWER STRUCTURE TABLE STRUCTURE DETAILS PIPES IN PIPES OUT 1-1 RIM = 517.45 12" INV OUT=513.62 (NW) DI-3B, L=8' H = 3.82 1-2 DI-3B, L=8' RIM = 517.38 H = 4.97 121, INV IN=512.51 (SE) 15" INV OUT=512.41 (W) 2-1 ES-1 (12") RIM = 526.59 H = 2.01 12" INV IN=524.57 (NE) 2-2 RIM = 528.00 12" INV OUT=524.84 (SW) DI-1 H = 3.16 3-1 RIM = 520.98 15" INV IN=519.05 (SW) ES-1 (15") H = 1.94 3-2 RIM = 523.28 15" INV IN=519.33 (SW) 15" INV OUT=519.23 (NE) 3-3 DI-3C, RIM = 523.31 15" INV OUT=519.68 (NE) L=10' H = 3.63 4-1 ES-1 (15") RIM = 497.46 H = 1.94 15" INV IN=495.52 (NW) 4-2 DI-31B, L=6' RIM = 503.56 H = 7.45 15" INV IN=499.26 (NW) 15" INV OUT=496.11 (SE) 4-3 RIM = 504.20 15" INV OUT=499.95 (SE) DI-313, L=6' H = 4.25 5-1 RIM = 483.86 12" INV IN=482.00 (SW) ES-1 (12") H = 1.86 5-2 RIM = 489.38 12" INV OUT=482.98 (NE) DI-313, L=8' H = 6.40 6-1 ES-1 (18") RIM = 476121 H = 2.2 18" INV IN=474.00 (SE) 6-2 DI-3C, RIM = 478.23 15" INV IN=474.18 (SE) 18" INV OUT=474.08 (NW) L=14' H = 4.15 6-3 RIM = 478.26 15" INV OUT=474.47 (NW) DI-3C, L=6' H = 3.79 PIPE TABLE FROM STRUCTURE TO STRUCTURE SIZE LENGTH SLOPE MATERIAL 1-1 1-2 12" 27.82' 4.0% RCP CLIII 2-2 2-1 12" 44.23' 0.6% RCP CLIII 3-1 3-2 15" 15.84' 1.1% RCP CLIII 3-2 3-3 15" 28.00' 1.2% RCP CLIII 4-1 4-2 15" 40.58' 1.5% RCP CLIII 4-3 4-2 15" 33.52' 2.1% RCP CLIII 5-1 5-2 12" 48.04' 2.0% RCP CLIII 6-2 6-1 18" 12.80' 0.6% RCP CLIII 6-3 6-2 15" 32.71' 0.9% RCP CLIII EX -DI 1-2 15" 38.12' 1.2% RCP CLIII - COMPACTED SUBGRADE HEAVY PAVEMENT (MAIN ACCESS DRIVES) NOT TO SCALE 2" SM-9.5A ASPHALT 2" IM-19.OA ASPHALT 8" 21-B STONE GENERAL NOTE: TO BE INSTALLED IN TS ACCORDANCE WITH THE VA. EROSION AND pS SEDIMENT CONTROL HANDBOOK (TYP.) TO TO BE INSTALLED IN TS ACCORDANCE WITH /�//�,//� / THE VA. EROSION AND p5 SEDIMENT (TYP.) HANDBOOKK TYP.P.TO TIE TO EXISTING) GROUND 1. DESIGN SPEED USED FOR PROPOSED ROAD = 25 MPH. TIE TOJ EXISTING GROUND VDOT STD CG-6 2% MAX 12' LANE \gip, It TC526.52 /FL526.02 • I /I I I _ I I It l i� •'�, \ � I ' I I I I I I I I / / t• j_ I j I I WOR4ELLI LAND AND DEVIELOPM IfI I I I I I I CoMPANv LC rM 78_2pC6 I 5.2 3 A�JREJ/ r t9 \'• J I I I I 9 L_ I 7�. PARCEL B 3.9t ACRES \ TC526.00 FL525.50 12' LANE 2.0% 2.0% • ,. w,� ,.C. v. �vu• u � w .: Y L M:♦• •' i •.w••••a�i t u I_. I- N W VDOT STD CG-6 HEAVY PAVEMENT (SEE o a DETAIL, THIS SHEET) m TYPICAL CROSS SECTION ALONG WORRELL DRIVE NOT TO SCALE 2 4.0' 0.5'� ► 10' LANE 2.0' 10' LANE s' Y.•!. ..• I- I - Z W VDOT STD CG-6 J HEAVY PAVEMENT (SEE o a VDOT STD CG-6 DETAIL, THIS SHEET) m TYPICAL CROSS SECTION ALONG PRIVATE DRIVEWAYS (REFER TO SHEETS C6.00 TO C6.02 FOR DIMENSIONS ALONG DRIVEWAYS AND CG-6 LOCATIONS) NOT TO SCALE 0 )TIE TO EXISTING GROUND i R 340'� TS TO BE INSTALLED IN ACCORDANCE WITH pg THE VA. EROSION AND SEDIMENT CONTROL TO HANDBOOK (TYP.) -TIE TO EXISTING GROUND TO BE INSTALLED IN ACCORDANCE WITH THE VA. EROSION AND SEDIMENT CONTROL HANDBOOK (TYP.) ICL J 2 W ICL N 04 N J z z W O U F � Z CO Z U O_ o: (n W > a Ld 0L N Z Q a o O W p W I": = 0 U) W p J (V U ^II (n ^ I- w UJ / Q 0 Z J 10I Z > G a Z o w o 0 J > a w (D O � Z Z) p LJ� < Q Q J ui J [] Q Iry Q V O i O N_ C7) Q O CD M W W 00 0)LU W Y Z Z Q 2 Q 0 0 W U U 7) LLl Z O � � M O V 0 �Uoo O aO � (N 0 U I I mI D 4-3 • C7 �r--- `Z • _m I m m N m / /• ✓ -4 O / /_ ASp WL17_ P _ ' 4-1 I I I I PLAN SHEET KEY Scale: 1 " = 500' WORRELL LAND AND DEVELOPMENT COMPANY LC TMP 78-2006 25,2=RES PARCEL B 3.9t ACRE<, PRC: 7+11 /fC487.17 / FL486.67 / pp / ,\x/ PCC: 6+57.78 TC494.14 FL494.14i TC503.19 / FL502.69- TC24.5 / �15 FL 7 � +65.51 s+oo F 9611 i / TC503.25 / • , j /��/ FL502.75 1z I 1J / � � Vol sy CO LEVEL SPREADER (L=10', W=8', D=0.5') w/RIP-RAP EC-1 TYPE Al 2 CYD OVER FILTER FABRIC BASE LAYER PCC: 7+57.: 's TC484. FL484. CORE DRILL 6" PVC SANITARY SEWER �TERAL AND INSTALL FLEXIBLE BOOT TO EXISTING MANHOLE NFIRM 8" SANITARY LATERAL LOCATION. TEND WITH 8" PVC AND CLEANOUT. i � I / / / t/ / / A RIP -RAP EC-1 TYPE Al °° � 3.0 CYD OVER FILTER r tiq FABRIC BASE LAYER 06, 9's 9, �c PCC: /8+87.32 9ApYp99 6-1 ` a9�,?F 6-2 TC478.54 / �\ FL478.04 PCC: 8+69.99 • BOLLARDS TO NOT BE 1 IN CONFLICT WITH PROPOSED WATERLINE l I r �y4 \ CG-12 (TYP) TC478.76 TC478.83 0 \ FL478.26 FL478.83 - / ) \\ P \ 1" DOMESTIC ° \ WATERLINE /Y \ (POLYETHYLENE) :7 / L_f1.3�_ \ PARCEL A 2.0t ACRE i� • \ TC478.20 �,• r, \ 111g5 • FL477.70 �- TC478.90 \ TC478.50 _ 6-3 FL478.90 FL478.00 s, /o PT: 10+11.54 30.78 LF OF 6" PVC SANITARY SEWER LATERAL FL483.67 AND CAP (S=0.45%) y / _ 1Gsbs� \ \ \ \ \ INV. IN= 473.89 °, / \ `\ 0-) Iq`� c\ \ \oEP:\ \10 \+48.04 INV. OUT= 473.75 T� I p\ so 1" COPPER( #, ) , I WATER LINE TC484.32 1 ? IT°\ �1" GATE VALVE ANDF2 \ 0� TC488 o FL487..59 AIR RELEASE VALVE Tca8s.2 EX487.g4 \ ONNECT TO EXISTING FLass CONNECT TO EXISTING \ \ \� \ \\\ \ rc488.39 \ WATER SERVICE LINE \ \ \ \ \ \ \\ \ FL487.89 I / \ WATER SERVICE LINE \ / \ / WITH 5/8" WATER Y 3 66.01 I / o \ \ \\\\\\\ \\\ cP\\\ \ \ ) \ \ METER AND YOKE o \ V AV A \ (b �� v ss LEVEL SPREADER \ \ \ \ \ \\ \ \\ \ \ A 8" GATE VALVE AND BLOW OFF VALVE REMOVE CAP, EXTEND 8" MAIN AND INSTALL 1" CORPORATION STOP _ (SEE NOTE #1, THIS SHEET) \ / I I 4 00 \\ \ \ \\ 10, I w w/RIP-RAP EC-1 TYPE \ \ Al 2 CYD OVER FILTER 6 \ \\1 \\\\ \�\\\ \\\ 1 / \ /I \ ^� FABRIC BASE LAYER ,O �( ) I o cP \ 411 41 / Z s� 9° x \ \ \ \ \ \ \ \ \ I \ o ��' b�� � q� I T v9p, 6- 1 / I I OD / aQ '9GO L'66' C3 / PARCEL 9gss/ 0 4 0= S I \ o TMP 78_2005 / / PAVILION PROPERTIES FOUR/ >• INSL 00 2020001661 LLC C D B 05276� P. 0427_ e 00q 431 i I UTILITY SERVICE NOTES: 1. 8" WATER MAIN SHALL BE PRESSURE TESTED AND DISINFECTED BEFORE ANY CONNECTION IS MADE. 2. 6" SANITARY SEWER LATERAL TO BE INSTALLED WITH CAP FOR FUTURE CONNECTION IF EXISTING SEPTIC TANK THAT SERVES RESIDENTIAL STRUCTURE IN PARCEL 'W' REACHES FAILURE. #355 WORRELL DR STRUCTURE NOTES: 1. STRUCTURE USE: RESIDENTIAL 2. FIXTURE COUNT; • 3 SINKS • 2 TOILETS 3. #355 WORRELL DRIVE STRUCTURE IS CURRENTLY CONNECTED TO A PRIVATE SEPTIC SYSTEM. 20 0 20 HORIZONTAL SCALE STORM SEWER STRUCTURE TABLE STRUCTURE DETAILS PIPES IN PIPES OUT 1-1 RIM = 517.45 12" INV OUT=513.62 (NW) DI-3B, L=8' H = 3.82 1-2 DI-3B, L=8' RIM H = 517.38 = 4.97 12" INV IN =512.51 (SE) 15" INV OUT=512.41 (W) 2-1 ES-1 (12") RIM H = 526.59 = 2.01 12" INV IN =524.57 (NE) 2-2 RIM = 528.00 12" INV OUT=524.84 (SW) DI-1 H = 3.16 3-1 ES-1 (15") RIM H = 520.98 = 1.94 15" INV IN =519.05 (SW) 3-2 RIM = 523.28 15" INV IN =519.33 (SW) 15" INV OUT=519.23 (NE) DI-3C, L=6' H = 4.05 3-3 DI-3C, RIM = 523.31 15" INV OUT=519.68 (NE) L=10' H = 3.63 4-1 ES-1 (15") RIM H = 497.46 = 1.94 15" INV IN =495.52 (NW) 4-2 RIM = 503.56 15" INV IN =499.26 (NW) 15" INV OUT=496.11 (SE) 4-3 RIM = 504.20 15" INV OUT=499.95 (SE) DI-3B, L=6' H = 4.25 5-1 ES-1 (12") RIM H = 483.86 = 1.86 12" INV IN =482.00 (SW) 5-2 RIM = 489.38 12" INV OUT=482.98 (NE) DI-3B, L=8' H = 6.40 6-1 RIM = 476.21 18" INV IN =474.00 (SE) ES-1 (18") H = 2.21 6 2 DI-3C, RIM = 478.23 15" INV IN =474.18 (SE) 18" INV OUT=474.08 (NW) L=14' H = 4.15 6-3 RIM = 478.26 15" INV OUT=474.47 (NW) DI-3C, L=6' H = 3.79 PIPE TABLE FROM STRUCTURE TO STRUCTURE SIZE LENGTH SLOPE MATERIAL 1-1 1-2 12" 27.82' 4.0% RCP CLIII 2-2 2-1 12" 44.23' 0.6% RCP CLIII 3-1 3-2 15" 15.84' 1.1% RCP CLIII 3-2 3-3 15" 28.00' 1.2% RCP CLIII 4-1 4-2 15" 40.58' 1.5% RCP CLIII 4-3 4-2 15" 33.52' 2.1 % RCP CLIII 5-1 5-2 12' 48.04' 2.0% RCP CLIII 6-2 6-1 18" 12.80' 0.6% RCP CLIII 6-3 6-2 15" 32.71' 0.9% RCP CLIII EX -DI 1-2 15" 38.12' 1.2% RCP CLIII N O N r J 7 VI F Z W O U z z C� o Z U O a: U) a u1 0Z N Z Q N a o J O LU O N U U U) ^II w W Z U Z Q O Z LU o 0 J > a w (D �O�ZZ) < 0 0 J ui m J Q Q O i N U) Q O CV CD L0 LLl W rn LLI Y Z Z Ui Co Q 2 Q 0 LLl U U N J \ J lt'00 FL535.60 15+00 �� .{- w /' p L=35.43' -' Owp / \ / / / ` N s N ll' 10 m C 15+06 EX536.68 •1 29.79 / I \ TC536.11 - \ FL735.6J PT: 14+70.52 I w a I J I ^�4D + 3 \ ; 1 `QP^hcb / w oo z I ' 1/ ' O, 1' X--12-12 (TYP ) IF L530.41 PC: 13+75.40 %- - o/v / 6' ASPHALT ' / /o / PAVED SIDEWALK / w' o DD w / o / / D / / TC525.63 FL525.13 / / �Z�3'i � N' o / v f x 2� / 27.20 3-3 SQ • �rti3 PC: 11 1. 41' co 3p-, __L�n �� - ------------ w� __=190.00�=- \==�`` N11?4122 €J i \ - / / y�� • 531 T t - _ - o v _ - ` _ - 5 4.0 0' - -r-\/ / / TC530.91 �• i ��\ - -�,�v �� -_�---------- -`--0 / FL530.41 I \h •/--_�34--�3sl� ---_ -./ //J /'/ /�// ��/ / •s �' TC529.42 • _ / 530 FL529.42 _ i 3 0- J• ; \- �' ' : �/ / / / / / / = / / 00 527 x P527.80 - - - _ P528.54 ' 528 iN ACS' /\/0-526 N ' E(vl�]N •J 14 [7 2 / rl \ 527 / 6' ASPHALT PATH - I 526 PT: 12+99.37 -- �� \ -----' i ---552 - -52a- 525 TC525.63 IF / 25.13 i-�J2�------'-'-� `�2�-- ----- ` _ - - 524 WORRELL Lq / �O ANDTmp V8L OC6 NT COMPANY LC \ \� NAD '83 25.243 ACRES I - i 20 0 0 4� PARCEL B HORIZONTAL SALE 3.9t ACRES Lai Mq Tc z N �/ I / 6 ASPHALT PATH \) \ e / 7*%�.N 3-2 _ LEVEL SPREADER (L=10', W=8', D=0.5') w/RIP-RAP EC-1 TYPE ., Al 3.0 CYD OVER 3-1 FILTER FABRIC BASE Q0 ` LAYER PLAN SHEET KEY Scale: 1" = 500' PIPE TABLE FROM STRUCTURE TO STRUCTURE SIZE LENGTH SLOPE MATERIAL 1-1 1-2 12" 27.82' 4.0% RCP CLIII 2-2 2-1 12" 44.23' 0.6% RCP CLIII 3-1 3-2 15" 15.84' 1.1% RCP CLIII 3-2 3-3 15" 28.00' 1.2% RCP CLIII 4-1 4-2 15" 40.58' 1.5% RCP CLIII 4-3 4-2 15" 33.52' 2.1 % RCP CLIII 5-1 5-2 12" 48.04' 2.0% RCP CLIII 6-2 6-1 18" 12.80' 0.6% RCP CLIII 6-3 6-2 15" 32.71' 0.9% RCP CLIII EX -DI 1-2 15" 38.12' 1.2% RCP CLIII STORM SEWER STRUCTURE TABLE STRUCTURE DETAILS PIPES IN PIPES OUT 1-1 RIM = 517.45 12" INV OUT=513.62 (NW) DI-313, L=8' H = 3.82 1-2 RIM = 5.9. 12^ INV IN=512.51 (SE) 15" INV OUT=512.41 (W) 2-1 RIM = 526.59 12" INV IN=524.57 (NE) ES-1 (12") H = 2.01 2-2 RIM = 528.00 12" INV OUT=524.84 (SW) DI-1 H = 3.16 3-1 ES-1 (15") RIM = 520.98 = H 1.94 15" INV IN=519.05 (SW) 3-2 RIM = 523.28 15" INV IN=519.33 (SW) 15" INV OUT=519.23 (NE) DI-3C, L=6' H = 4.05 3-3 DI-3C, RIM = 523.31 15" INV OUT=519.68 (NE) L=10' H = 3.63 4-1 RIM = 497.46 15" INV IN=495.52 (NW) ES-1 (15") H = 1.94 4-2 DI-31B, L=6' RIM = 503.56 H = 7.45 15" INV IN=499.26 (NW) 15" INV OUT=496.11 (SE) 4-3 RIM = 504.20 15" INV OUT=499.95 (SE) DI-3B, L=6' H = 4.25 5-1 ES-1 (12") RIM = 483.86 H = 1.86 12" INV IN=482.00 (SW) 5-2 RIM = 489.38 12" INV OUT=482.98 (NE) DI-31B, L=8' H = 6.40 6-1 ES-1 (18") RIM = 476.21 H = 2.21 18" INV IN=474.00 (SE) 6-2 DI-3C, RIM = 478.23 15" INV IN=474.18 (SE) 18" INV OUT=474.08 (NW) L=14' H = 4.15 6-3 RIM = 478.26 15" INV OUT=474.47 (NW) DI-3C, L=6' H = 3.79 Q W I e W - :95L / 1 1 I Aa515B' .00' A�p a p.ta9 aa' T=6.71' I. CB=N51'40'N;W, C9-0 1 i DELTA= 33°2a t0 CB:N39.0 35"W - - - DELTA:8 4'32" j 65 ,' I 18NAM --g F:115.O9.f°1,� E%GVAPIABLE WIDTH J 'iA=95 T,35'� • HOH-LUSIVE / 1 y. :5G.61'. EABEMENi D"E58 o N 0:9264'- c A= w° _- J a I SHAM AVE y� RDBA WATERLINE T2- p= EABEMFnT De. I IIIITIT" uoe v. 61 - - A=120.88' T:6<.11' C' cT43'21' DELTA- 47?5106 " mm Tv to I I sB( I -zi .9s y'3 ers I Ds" SI \ m I "tee I m I I 1 II I I I I I I I \ nymu A 13. 0. i11"5'r'Y 9`�!y °N; DELTA 323. 35` INSET 'A' SCALE = 1 ":40' �� Elie, 9 0 40 HORIZONTAL SCALE M N O N J 0 z z W 0 U zI Z �0 z U O x U) a of C,4 Lu I J N [t 0 ~ N LLI p LLI = U z Q = U w U) V) Q Z Lu 2i Q LLJ O W Z J Z > z LLI 0 O J �OwZZ) J Q n/ LL Q Q Q J m �n Q Q rr V O i N N U) m � � Q O N Lo p LLI M °' Lu Y O z m Q z = Q O o Lu U U O O N Co M (f) N K C N U N O N J In WORRELL DRuj Z z 545 545 z M <n e z U O w cn W 5: IL VI STA: 2+60:89 PVI STA: 3+37.77 � z . Q O J a o ,n 0!rn N L1J PYI • 522.0 � N•) u + Nn L + U-) m O LVC• 64.84 W W 4i LU Lij w MN co<O U> > U > Q �N m m L U 2 00 U C6 o Ki U + in + Ln 1.04% 530 = cf) v7 U m U W V! m W � \ 4. INTERSECT ON POINT ~ 525 o PROPOSED STATIO =2+43.61 STATION_ +o = Li GRADE Lij LH EXISTING L U Q LJJ Iti GRADE ; J J LL 0 0' O C) z > 5i5 515Q �a z a - IV INV: 513.08 O L1J 0 LU LU 2i OLo M M O^ N^ � Ln (o O^ r 0000 00 0 Lo It N O 0) n 00 M 00 00) O 00 00 z C606 0)C3; N N N N N N MM N N It't N N Ln N uj N cD N ^ N coT N N O�� N N ocI M N O � M O � p) N N W N LnN N N M N N N O J LL.I J MM rn V Ln Ln Lo Ln N Ln � Ln L0 M N M Lo M W) Ln L � Lo Ln � M Ln LP � LP Ln Ln N M � M � Ln � J J 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+25 � Q Q WORRELL DR WORRELL DR 530 530 500 500 N Lo �� D CD U) --I+ Lo Q `) I I 525 4950 \ Q CM O LLI LLI NW Y 0 z w z � cD o m m o w U° I U T im / O N J W J VJ \ Uj \ EXISTING / �jr U _ \ GRADE �IyyY00 J m m PROPOSED 1" DOMESTIC WATERLI E M N D co GRADE 37 15" RCP C III STORM SEWER W M O \ STA: 8+99 36 N n m \ Arl EX " PVG SANITARY SEWER J — Lij 0 INV: 473.19 (� X AR TJ 15" RCP CLIII STORM SEWE \ cf) M STA: 5+57.3 i O oj�495 495 I V: 468.96 U 0 co t O Ln t N co O O� O) Ln OJ N h N O N LnO M of m C6 M O 4 O N O O O h Ln m C6 cD � 4 co M � co O m co CKD co O 00 M 00 Ln 00 v J tV' Lu M Ln Ln co QU_o 4+25 4+50 4+75 5+00 5+25 5+50 5+75 6+00 6+25 6+50 6+75 7+00 7+25 7+50 7+75 8+00 8+25 8+50 8+75 9+00 9+25 9+50 9+75 10+00 10+25 10+50 00CL LU NN N C n U J LU c a d 20 0 20 40 2 o U HORIZONTAL SCALE H 5 0 5 10 0 d VERTICAL SCALE W WORRELL OFFICE DRIVEWAY a! LL 545 PVI STA:14+35.14 +Ke M 15.44> .81 H N J LU 540 N O 0054 Of n M 0 PVI ELEV:528.61 M o K:15.07 PVI ELF(w519.81 + co LVC: 9.14 Ppnpnqpn> U U > `" ao `� ° GRADE _ II �06clJ ui- n mgm -Cc F J +Ln + Ln N in N + W U W L.Lj _ U M U W ' > (N 530 OO W > 530 INTERSECTION POINT EXISTING STATION=10 00.00 GRADE 525 TLEV-=3ZM525 15" RCP CLIII STORM EWER STA: 12 15.99 O co N Ln co 19 06 co N N Ln Ln (0 Ln 06 C6 N N u) Ln n c0 00 C6 N N u) Ln co O 00 c N N u) Ln ^ 0) Ln ^ co N N Ln Ln 0) c0 (C N N Ln Ln N Lp c0 N N N Ln Ln M Lp Ln N N N N Ln 0) Ln N N Ln Ln O O N N N N Ln O p r7 N N7 N N � n Lo N M Ln N N Ln n N c u) r N N N Ln 00 p 0� ^ 00 N N LA Ln T 00 O 00 N n N Ln O p (D N M V) u) Ln cn 0 N M n 110 Ln N Q cD a Ln M r) LA Ln Lp N Ln C6 M � Lr) Ln Lo (D cD CD M r) LA Ln to c0 M u) 9+75 10+00 10+25 10+50 10+75 545 11+00 11+25 11+50 11+75 12+00 12+25 DRIVEWAY J1 12+50 12+75 13+00 13+25 13+50 13+75 14+00 14+25 SMALL DRIVE J1 545 545 v M 00 Z)41UI PVI ELE : 528.40 N Lo 0o K: 12.08 v o II O 11;1 M O N > O LN Cc Lo LOW PT. ST : 20+60.25 tO w + Ln W. + Ln N LJ.a I I Lf NLUW VI OO N N W N W > (n > N W LN uj U <••) p>. W - .00 m�) W ELEV=528.99 a Y SMALL DRIVE J1 INTERSECTIO POINT 12" RCP LIII STORM SEWE STA: 20+61.0 N m N n N LT00)j �; Loco N N Lo Lo Oc0 co00 N N Lo Ln LnLN coo6 N N LA Ln N m N N Lo Ln 0a)) 0c; O) r) Ln cn 00 oo N r7 Lo Ln r- r�N pry r7 Lo Ln r M r7 Lo n M 19+75 20+00 20+25 20+50 20+75 21+00 21+25 21+50 21+75 22+00 22+25 14+50 14+75 545 45.90 PVI STA: 30 o Lo OKs 0] 16. 3 o Q O M Ln + N II II nLOW W+6015 M M II Q LaJ N N Il N N W O M O M ' F J U U > > 2.32% 525 DRIVEWAY J1 525 N m Ln cD 0; 00 Lo Ln Lo co CO Ln Ln N N u) Ln M N Ln 29+75 30+00 30+25 30+50 30+75 31+00 15+00 15+25 20 0 20 40 HORIZONTAL SCALE 5 0 5 10 VERTICAL SCALE N O N J N Z z W O U zZ O z O U)ui U w w z \ Q J a N \ o LU w O 0 w C4 II Q ^II 2 00 cf) U U c 2 � VJ z LU /n 2 Q w W z J > - J � Z a- - LU 0 Z O z W 0 � Q J m z LU J J ry O r_ o 0 Q CD CD M o LU LJ W Y 0 Z Q Z = Q 0 0 W U U x O04 J _ h � U �0 ,vo0 J a7 o M N 11• LL M 1= Ui Q d• 0 J Lli I— cj� �- cf) M Q O � QUo CC C � Lu W Co CL o � CL NN N C U n J LU c a d m iAmmh�d 0 N 0 0 U 0 d LL STORM SEWER EX DI TO 1-2 535 535 COVER 2' MIN (TYPj -■■ 12" MIN. ■■ —�_i 11 11 „ ■ 0+00 0+25 0+50 0+75 STORM SEWER 2-1 TO 2-2 545 545 a 540 N I I N � II ... 535 Z x r. ^ON CAS —N4 N w � I i CL IL %-. z HGL (TYP) -530 N F 520 520 co-525 N Ln 000 C6 N LnLo (D ^ 00 N N Ln 0+00 0+25 0+50 STORM SEWER 5-1 TO 5-2 505 505 STORM SEWER 3-1 TO 3-3 540 540 LEVEL — SPREADER1L�7�■-■- 1 1 �.■�■ ■■F���`WOMAN, ■0 lffl- -waRES,4EN,r4mm■� ■■■ mw--MA ■ SPRUAIER _����1■ ■ SEPARATION -0+25 0+00 0+25 0+50 0+75 0+00 0+25 0+50 STORM SEWER 6-1 TO 6-3 495 495 12 MIN. SEPARATION 0+00 0+25 0+50 ►-��0 RISEN STORM SEWER 4-1 TO 4-3 520 520 co 515 N c0 515 01 II � ip O J m U � M N 510 to o O cl I N d 4 � Z Z 505 505 co I w�l LEVEL 500 SPREADER D=0.5 -''-- 34 L.F. OF RC 495 reuR 4�10 41 N m ' n � nj rri 0) � N 0) O It Lo n h spry p o Lo n to O Lo -0+20 0+00 0+25 0+50 0+75 1+00 PROPOSED GRADE EXISTING GRADE HGL FILL SECTIONS 20 0 20 40 HORIZONTAL SCALE 5 0 5 10 VERTICAL SCALE N O N J N z Z W O U z Z M O z U O w U) uj w z Q a o H O W p LI.1 Cr = U U) Z LU 2 Q W z > O Z Q Z Z Q LLJ �O 0 � Q LLI J � J m m LU Q O 0 W N w LL O LU LU vJ 2 Of O 07 o 0 Q 0 oCD w w Y O z z = m Q Q 0 LI.1 U U J W CL W n J W ct / r I W I / VANVA X wD—z—au \�i`-F �o� +J� � r r I II l I I I I �� � �✓�T / ` I ` \ \\\ �'\\ �v r'_"�% t —Lon W W / � ao, w � v I D JZ. L. � LOO �— lnD LOD I SCALE 1"=100' 0 100, 200' PRE LAND COVER AREAS IMPERVIOUS COVER: 0.62 AC (29%) MANAGED TURF: 1.52 AC (71 %) TOTAL: 2.14 AC LEGEND: IMPERVIOUS COVER W W W W W W W MANAGED TURF AREA W W W ` _ ------__ ---- \—/ \jX/// �\ \ IMPERVIOUS COVER: MANAGED TURF: TOTAL: IMPERVIOUS % INCREASE: +96% 1.07 AC (50%) 1.07 AC (50%) 2.14 AC 11 N O N r In z z w O U H r Z � O Z U o U) a w j z Q N d o W o w cn U w :�E Q w Z � Z > Q Z -a D Q LLI w/ 0 J J J m 'wr' Q I..L 0 N � O C() 0 Q 0 p W ❑ co w Y O a' z Lu Z m Q = Q ❑ w U U � o N cod, co �MNp N oI� \ FF- ITE AND DEVELOPED AREA \ DRAINAGE TO POND 1 AS SHOWN. SEE MASTER PLAN DRAINAGE MAP ON SHEET C11.02 FOR MORE INFO. 000 100, C / `�•/�Y�G//� 0. 31 Ac -IN4 / A I 381 Ac / 1 I II 1 1 1 1 1 1 1 1 1 1 / 1 1 1 1 1 I) III I_ /0.3 c /v POND, / AV 08.79A1' or PONQ2 -Ixn t �\ _, ` ,b• .� I I VIA, .3.522 Ac g/ OIX-9IN7� Ip so"4i}� \4 \1 1-IIII )1, ♦ I , "��K22��`✓ /�\\��. \ _� / i� 'Jill 0.15 1;1 {R` a, I l 3 -AI/ 0.04 Y0.,♦ �f �-0.5 D3 =0.90 � _ s i l l l - I _ / I� I D(-IN9 c-os I �,�.�.w. an � � � � _ _� � ICI d /,Y � •� I o.n Ac 1 =0.9 POND 4 -IN 0.24 Ac 04 POO� 4 I / lip/ I SCALE 1"=100' 0 100, 200' PRE -DEVELOPMENT Drainage Area TurF Area (ac) , Impervious Area (ac) • Total Area (ac) • C Value* EX-IN3 1.41 0.20 1.61 0.46 EX-IN4 0.19 0.20 0.39 0.66 EX-IN5 0.10 0.21 0.31 0.74 EX-IN6 0.43 0.37 0.80 0.63 EX-IN7 0.07 0.12 0.19 0.72 EX-IN8 0.40 0.28 0.68 0.61 EX-IN8A 0.45 0.06 0.51 0.46 EX-IN8B 0.00 0.04 0.04 0.90 EX-IN9 0.00 0.17 0.17 0.90 EX-IN10 0.05 0.10 0.15 0.73 EX-IN11 3.21 0.31 3.52 0.44 POND 1 3.81 0.00 3.81 0.40 POND 2 8.73 0.06 8.79 0.40 POND3 0.18 0.10 0.28 0.58 POND4 0.041 0.20 0.241 0.82 'A IX-IN8 1-1 1 0.68 Ac 0.10 Ac 0.77 / 0.90 1■�����"Waws �I I I Lem 0 1G= I ►3e] N I WIN wil 0 u_* IRV 5-2 OND 015 Ac 0.47 1p P{ POST -DEVELOPMENT Drainage Area Turf Area (ac) • Impervious Area (ac) • Total Area (ac) • C Value* EX- I N 3 1.41 0.20 1.61 0.46 EX-IN4 0.19 0.20 0.39 0.66 EX-IN5 0.10 1.37 1.47 0.87 EX-IN6 0.27 0.40 0.67 0.70 EX-IN8 0.18 0.50 0.68 0.77 EX-IN9 0.00 0.17 0.17 0.90 1-1 0.00 0.10 0.10 0.90 1-2 0.02 0.08 0.10 0.90 2-2 0.19 0.03 0.22 0.47 3-2 0.00 0.13 0.13 0.90 3-3 1.14 0.39 1.53 0.53 4-2 0.00 0.09 0.09 0.90 4-3 0.00 0.08 0.08 0.90 5-2 0.00 0.05 0.05 0.90 6-2 0.13 0.14 0.27 0.66 6-3 0.00 0.15 0.15 0.90 POND 1 3.81 0.00 3.81 0.40 POND 2 0.30 6.54 6.84 0.88 POND 3 0.09 0.01 0.10 0.45 POND4 0.13 0.02 0.15 0.47 N O N r In z z w O U zZ � O Z U O � C/) a w z j Q N d o w CD w cf) U V ) LU LL_ w Q 0 VJ a_ Z w N � CD C() 0 Q CD w o CD co w Y O a' z Q z = Q m w U U DAK 41GE AREA XQ ZQ 10700 AC 71.45 AC. 53.50 AC � momAwn ACE Am A AM. J2UVA29EA2ABEAA IiP't Ac lAal (AC) Uc.} (ACJ -P/0 D O 9.69 587 60 X P/0 8/0 O 25.82 T7,JO 67 X P/O B/O O 1.8J 1.2J 67 X E O 9.72 6.80 70 X P/0 / O 6.20 J /0 50 x P/O ! O 12.20 6.1 50 X N O 20. 63 11.56 56 X K O 326 45 X P/O WORRELL (EXEMPT)0 --_ -_- -__ P/0 O O 7.45 485 60 X 1.45 P/O D O 7.45 0.85 60 X PJP / 01EMPT) O ___ ___ -__ / ___ O (E RRE O P WoLI (EXEMPT)0 �._ O (EXEMPT)a P/O Pip !I (E _.._ ___ P/O RIP /l (EXEMPT) O ___ ___ --- P/0 PJP ///(EXFAIPT) O ___ _ _ ___ P/0 PJP /// (EXEMPT) O ___ --_ __- PJP /V O 1.97 1.24 63 X ' : P✓P V O Z45 J 12 42 X U. ✓A C.0 O 1.25 0.75 60 X P/O ACC. / MJ-H. O 5.02 4.15 69 X P/O ACC / MJ..H. O J.00 2.07 69 X P/O AC.C. / M.✓.H. O 4.97 297 60 X q SPACE O J9.J3 i 0 0 X OPEN SPACE O 28.6J O 0 X PUMP STA. (E(EMPT) O _- ___ ___ ROADWAYS O 6.67 5J4 80 X ROADWAYS O 2.58 2.05 BOX AWNT BLDG. O 02J 0.22 95 X au. (EXEMPT) O --- -- --- B.U. OPEN SPACE O J5. 12 0 O X W ROWA Y5(EXQ1P7) O -. ___ ___ d7.50 ZR35 Jd x 1t7)bLL AtSID 74 47 x MZIv T7.04 ze x AqM x -DEVELOPMENT AREA D, E, P/O ACC/MOH, P/0 WORR£LL ARE SERVED BY &-A75MG WET POVD SYSTEM EACH DEVELOPMENT WILL MIF SEPARATE EROSION CONTROL TRIPS PROVIDED DURING LAND DISTURBANCE AC7MT7ES -OEIELOPQEff AREA N WILL RC SERVED BY PROPOSED BYO-R17ERS CONVERTED FROM SLLT TRAP/B4.SWS ONCE LAND 967UP64NCE AcRwT7E5 ARE F7NLSH6D• ANA Y` -DEVELOPMENT AREA P/O ACC/MOH, P/O WORREL4 H. O WILL BE SERVED BY POND p.. DEVELOPMENT OF B, O WILL REOU/RE POND 12 TO HE INSTALLED FOR SED/A1ENr CONTROL /N/774a Y. POND 12 SAALL BE C00ER7M TO ELNAL BVP POND WITH COMPLETION OF SITE DEVELOPMENT TFHT EXCEEDS 15 AC OF IURERWOVS SURFACE W/77#,V CON7ROOLMNG DRAINAGE AREA 70 POND 12 -DEVELOPMENT AREA P/O I WILL BE SERVED BY PROPOSED 6YO-FILTERS CONVERTED FRYMI SILT TRAP16ASINS ONCE LAND DISTURBANCE ACnWMS ARE f NISHCO ARFA 4 -DEVELOPMENT AREA P/O ACC/M7H, K P/O I WILL BE SERVED BY PROPOSED POND p,, 14 AND/LIR B70-FILTER 17 CONVERTED FROM S2r RWI94SWS OVCA LAND D/S7UA9WCE ACThJDES ARE FINISHED INDIVIDuc DEVELOPMENTS WITHIN DRAINAGE AREAS - „aVa5 26c j` DETERMINED ABOVE MAY INSTALL INTFRYM SEDIMENT CONTROL MEASURES AND B.MP MEASURES TO MF£T TIE" INOMDUAL DEVELOPMENT REQUIREMENTS FOR E B 5 AND W.P.O. CRaER64 PRIOR TO IRE INSTALLATION OF THE FINAL SEDIMENT CONTROL MEASURES ANO B.M.P. MEASURES SHOWN ON TM5 PLAN POA (L0O Pa B) 6fIR° D /? DR cwlawL i -AM EXEMPT AREAS /NLYCATE EXWW / UNDER CONSTRUC770N / -P(PV PEPEO POR TO WAREA REmmRrrs 7mr DRAWS TD D/FFDRrff DRAINAGE AREAS (X, Y, -7). -Sg 0 OFF-S"E AR A I CDAIMi~ IV AREA X 11.7 AC PROJECT LIMITS ---:;C 7 RIVER -Apg. THE STORMWATER MANAGEMENT AND 8MP. MEASURES SHOWN ARE CONCEP7UAL, AND SUBJECT \ TO MODIFICAHLW AS APPROVED BY THE ETVG/NEER/NC DEPARTMENT. A FINAL S7O%%A7ER / 9 M PPLAN . OE/LWATER PROlEC7/ONMTORDI EL�HAPIER 17SOnE CODE OF ACRE J. E M9TH ARTICLE X OVERALL W.P.O/ B,M.P COMPLIANCE PLAN, DATED 7/24/06 (NOT TO SCALE) SITE STORMWATER COMPLIANCE NOTES: 1Y-Q/ &UP. 0"UtA_Ax / 71 A171�OVT 1 1 1 i �I I ti 1 1 1 I 1 1 1 1 I / AM 21 A - Am Q FOLL IDW Lam PRE-OEYELOP.= POI4&7ANT LOAM PRE -DEVELOP.- peamAMT Lam PRE-DEIELOP.- - 1.41 (83.6): 17Z9 7bs/yr - L 41 (65.49)- 92.J /bs/yr - T 41 (6293)- 88.7 Ibs/yr POST -DEVELOP.- - 6.14[0.05+((0.009)J5))B36- POST. -DEVELOP.= + 6. 14[0.05+((000Y)47)j65. 49- POS7-oEmop,= - 6. 14[0.05+((0009)29)j6293- - 78Z4 /bs/yr AIMOWIL AIE7LIIQIi a 1902 /6r/yr - 120.2 /bslw OW. RR= 69.5 /bs/yr AEVO1/1L A EVARBEM' RR= 97.9 /bs/yr REWO NL AEioANSfOW. RR= 37.5 /Ar/yr RRT= J7 X RRX-'51 X RRX= 26 X PAa9lfiU A#- AVUR S/TE3' OFF-SIYF AREA 7616 AC PRE-EX/S7/NG S/TES 49.1 AC �O/dl/NS PRED-EXYS'>JNG 9'lES 3J.B5 AC >(DWAIS PROPOSED 517E5 (DRAINS 7D B1/P PROPOSED SOES 70 BNPJ P�Po TO SMP) 6. 14[0.05+((0.009)J5)j76.16= 170.7 /bs/yr 6.14[0.054((0.009)47)j49.2= 142.9 /bs/yr 6.14[0.05+((0.009)29)jJ1.85= 60.8 lbs/)r POND / FOREEi1Y 5157EM FUTURE FUTURE FILTERS F0NOS/90-a7ER ANSI J2A, j2B PONDS/8A0-FILTER AREAS ^ /J, 14 O 65X /5OX £FF7C/E7VCY PROPOSED O SOX EFFICIENCY PROPOSED O 50X EFFICIENCY 170.7 (0.60)= 102.4 /bs/yr REMOVAL 142.9 (0.50)P 71.4 Ibs/yr REMOVAL 60.8 (0.50)- 30.4 /bs/yr REMOVAL ONDOU1 kRdECr ASWOW REOUROOVE RR= X+Y+Z= 69.5 + 9Z9 + 3f.5 = 199..9 /bs/}r R= X+Y+Z- 102.4 + 71.4 + JD4 - 204.2 /bs/yr LOAD REMOVED - 204.2 > REMOVAL REQU/REMENT - 198.9 THERUPRE CLMIPLANT o�a N O N r N z z w O U H z O Z U O W (/) a W Z � Z Q N d O of o W O U) w WN W Q N a u = U z i �= r� U U O x 017EAMU / OFF -SITE DRAINAGE MAP SCALE 1 1000' ot �' X�4�1 �A/P S7RA70=4LLY PLACED TO IREAT AWX/MUM �1 AMOUNT OF AU IMPERVIOUS AREAS DRAINING FROM EACH O&SLOPMENT. / Q S.J LBS OF 7REATAIENT CREPT IS AVAILABLE FOR .� DE MOPMENT W UP 57RE44 OFF-5I7E AREAS. n 68.45 AC. 66.50 AC. -" AM 'AMC.ARE x ZE AVA' AW MHO AREA OV. AAlcil X Mp3P. AC.) AC (AC) _ (AC) (AC.) (AC) O 9. 581 60 X P/O B/O P/O / O O 25.82 6.20 17,JO J 10 67 X 50 X P/O B/O P/O / O O 1.83 12.20 1.2J 6.10 67 X 50 X E 72 N P/0 NORRELL O J.19 0.95 30 X P/O 0 - '60 K O Z24 J.26 45 X Pip / O 8.25 4.28 52 X O 1.45 0.85 X P/O D O 1.45 0.85 60 x P/O PUP 7I O 523 2.50 48 % P/O WDRRELL - O - 1.8-7 0.56 Jl X P/0 Pip 67 O 2.82 1.24 44 X P/0 PUP N O 0.59 0.51 87 % Pip N O L97 1.24 61 X P/0 Pip 8/ O 2.98 1.67 56 X U VA. C.U. O 1.25 a75 60 X Pip V O 7.45 J.12 41 X P/O ACC. / M.J.H. O 4.97 2.97 60 X P/O AC.C. / MJ.H. O 6.02 4.15 69 X P/O ACC. / M.J.H. O 300 2.07 69 X PUMP STA O 0.093 0.088 95 X OPEN SPACE O 79.3J 0 0 x OPEN SPACE O 18.63 0 0 X MAWT. BLOC. O 0.2J 0.22 95 x R04DIYAYS O A.67 5.J4 80 X ROWWAYS -O 2.58 2.06 80 X OPEN SPACE O J5.12 0 ON B.U. O - 1.19 055 46 X RaWNAYS ' O 384 3.07 ED X - .Bold-%. IOZW 4L5 .�X .IDfdL�. 8d46 J7.88 47X AIATO VQAI 13 .T 1. THIS PROJECT WAS GRANDFATHERED UNDER THE PREVIOUS STORM REGULATION PER ATTACHED PLAN SHOWN ON THIS SHEET. 2. THIS PROJECT CONSISTS OF PRE IMPERVIOUS COVER OF 0.62 AC, 29% OF WITHIN THE LIMITS OF DISTURBANCE AND POST IMPERVIOUS COVER OF 1.07 AC, 50% WITHIN THE LIMITS OF DISTURBANCE. 3. PROJECT LIMITS CAN BE FOUND WITHIN DRAINAGE AREA Y IN THE MAP SHOWN ABOVE, THIS SHEET. 4. AREA Y NOW CONSISTS OF 29.80 AC, PREVIOUSLY SHOWN AS 29.35 AC (SHOWN IN THE 'DEVELOPMENT COMPLIANCE REQUIREMENTS' TABLE ABOVE). 5. THIS INCREASE OF 0.45 AC IS BELOW THE THRESHOLD OF 41.5 AC THAT IS TAKEN INTO ACCOUNT ON THE 'OVERALL DEVELOPMENT TABLE' SHOWN ABOVE, SHOWING THAT THE INCREMENT OF IMPERVIOUS AREA IS IN COMPLIANCE WITH THE STORMWATER REQUIREMENTS ON SITE THAT WAS PREVIOUSLY MASTER PLANNED. w W U a W Q z Oa- = a i O CL Q o Q Fwo sA � YMs/LLI U W W 2 0 w UA m ` a 3 a. LLI p� J 1-0 W J O 0 o I � � I m O W Z w � aJ U I O 0 MOM SZ) � Zoo(.-O$o d. J N j o J O N O N Q N N r- �Y cn N W F Q 00 W Z �. W K Z5 d' 0. N i M W Z d O I 2 00 J to U 1` W00 O 00 a A� v,l W w O Z a- Q I L f �0 I� LLJ I L ry 0 N O N O O_ CD O W Q ❑ (Y W W Zn (D Z W 0 m Q W Y U W U C] o N cod, L co �MoNO N I� O Q U N LO co _O *k m O P:804.782.1903 2100 East Cary Street, Suite 309 Richmond, VA 23223 Engineers I Construction Managers I Planners I Scientists www.rkk.com Project Name: Drive and Waterline Ex Date: 10/21l21 Responsive People I Creative Solutions Location: Albemarle County Computed by. OJG Pull down for City Proj. No: 19352.00 Checked by. ABS Pull down for Yr. Stm Sheet 1 of Albemarle AREA RUN- OFF COEF. CA INLET TIME RAIN FALL RUN-OFF INVERT ELEVATIONS PIPE LNGTH SLOPE DIA CAPA- CITY VEL. FLOW TIME INLET /RIM ELEV Structure Type .5forC6 OforDl THROAT LENGTH REMARKS Return Yr: 2 INCRE- MENT ACCUM- ULATED INCRE- MENT ACCUM- ULATED INCRE- MENT ACCUM- ULATED B 46.43 D 10.50 ACRES C INCRE- MENT ACCUM- ULATED MIN- UTES MIN- UTES IN.\HR IN.\HR CFS CFS UPPER LOWER END END FT. FT./FT. IN. C.F.S. F.P.S. MIN. or YI E 0.81 From Point To Point 1-1 1-2 0.10 0.90 0.09 0.09 5.00 5.00 5.04 5.04 0.45 5.13 513.62 512.51 28 0.0399 12 7.11 9.79 0.05 517.45 DI-3B 0.00 L=8' 1-2 E)FSDMH(#3) 0.10 0.80 0.08 0.17 5.00 5.05 5.04 10.08 0.40 5.54 512.41 511.93 38 0.0126 15 7.26 6.51 0.10 517.38 DI-36 0.00 L=4' >FSDMH(#3) EX-SDMH(#4) 0.04 0.90 0.04 0.86 5.00 5.29 5.04 2521 0.18 8.99 511.83 510.26 44 0.0357 15 12.20 10.83 0.07 515.93 DI-3B 0.00 L=4' 2-2 2-1 0.22 0.47 0.10 0.10 5.00 5.00 5.04 5.04 0.52 0.52 524.84 524.57 44 0.0061 12 2.79 2.69 0.27 528.00 DI-1 0.00 3-3 3-2 1.53 0.53 0.81 0.81 5.00 5.00 5.04 5.04 4.09 4.09 519.68 519.33 28 0.0125 15 7.22 6.00 0.08 524.86 DI-3C 0.00 L=10' 3-2 3-1 0.13 0.90 0.12 0.93 5.00 5.08 5.04 10.08 0.59 4.68 519.23 519.05 15 0.0120 15 7.07 6.17 0.04 524.83 DI-3C 0.00 L=6' 43 42 0.08 0.90 0.07 0.07 5.00 5.00 5.04 5.04 0.36 0.36 499.95 499.26 34 0.0203 15 9.20 3.22 0.18 504.20 DI-36 0.00 L=6' 42 41 0.09 0.90 0.08 0.15 5.00 5.18 5.04 10.08 0.41 0.77 496.11 495.52 41 0.0144 15 7.75 4.04 0.17 503.68 DI-3B 0.00 L=6' 5-2 5-1 0.05 0.90 0.05 0.05 5.00 5.00 5.04 5.04 0.23 0.23 482.98 482.00 49 o.ozoo 12 5.04 3.14 0.26 489.48 DI-36 0.00 L=6' 6-3 6-2 0.15 0.90 0.14 0.14 5.00 5.00 5.04 5.04 0.68 0.68 474.47 474.18 33 0.0088 15 6.05 3.22 0.17 478.33 DI-3C 0.00 L=6' 6-2 6-1 0.27 0.66 0.18 0.31 5.00 5.17 5.04 10.08 0.90 1.58 474.08 474.00 13 0.0062 18 8.24 3.55 0.06 478.23 DI-3C 0.00 L=6' DI(#1) E�SDMH(#2) 0.68 0.61 0.41 0.41 5.00 5.00 5.04 5.04 2.09 2.09 513.46 512.75 13 0.0546 15 15.09 8.36 0.03 516.16 DI-5 0.00 - )FSDMH(#2) E)FSDMH(#3) 0.51 0.46 0.23 0.65 5.00 5.03 5.04 10.08 1.18 3.27 512.65 512.13 73 0.0071 15 5.45 4.62 0.26 516.78 DI-36 0.00 L=4' N O N J to z w O U z O Z U O_ of a w D_' N Z a N J d O w CD Q (n W U (n U (n Z W z U Q Q W z >_ O 0Y > Z �z?Z0 a Q a U Q W 0 O � J QJ � Q J DD U W Q O vJ O O Q O N CO O W W O � ROUTE PROJECT Worrell Dria DESIGNER: OJG LU Y CHECKED: W Z U Q Z = Q m ❑ LU U U GZ�TA� o off"' yYO� O O N M d 1= Q J Uj O � J 1-z Z _ c� Qz� � �NN �L O I� NN N E n J II' d W c m a d * INLET 3-3 IS RECEIVING FLOW FROM THE HILLSIDE OVER THE CURB. DUE TO THE NATURE OF THE OFFICE BUILDING, ONLY ONE LANE NEEDS TO REMAIN PASSABLE, WHICH IS MET WITH THE COMBINATION OF INLETS 3-3 AND 3-2. o N O U d d c c W rLU it y ��� P:804.782.1903 2100 East Ca Street, Suite 309 Richmond, VA 23223 Engineers I Construction Managers I Planners I Scientists www.rkk.com Project Name: Drive and Waterline Ex Date: 10/21121 Responsive People I Creative solutions Location: Albemarle County Computed by. OJG Pull down for City Proj. No: 19352.00 Checked by. ABS Pull down for Yr. Stm Sheet 1 of Albemarle RUN- INLET TIME RAIN FALL RUN-OFF INLET THROAT Return Yr: 10 OFF INCRE- ACCUM- INCRE- ACCUM- INCRE- ACCUM- INVERT PIPE CAPA- FLOW /RIM Structure .5forC6 LENGTH REMARKS B 49.49 AREA COEF. CA MENT ULATED MENT ULATED MENT ULATED ELEVATIONS LNGTH SLOPE DIA CITY VEL. TIME ELEV Type OforDl D 9.85 or YI E 0.75 INCRE- ACCUM- MIN- MIN- UPPER LOWER From Point To Point ACRES C MENT ULATED UTES UTES IN.\HR IN.\HR CFS CFS END END FT. FT./FT. IN. C.F.S. F.P.S. MIN. 1-1 1-2 0.10 0.90 0.09 0.09 5.00 5.00 6.54 6.54 0.59 6.63 513.62 512.51 28 0.0399 12 7.11 10.24 0.05 517.45 DI-3B D.00 L=8' 1-2 E)FSDMH(#3) 0.10 0.80 0.08 0.17 5.00 5.05 6.54 13.08 0.52 7.16 512.41 511.93 38 0.0126 15 7.26 6.74 0.09 517.38 DI-3B 0.00 L=4' EXSDMH(#3) E)FSDMH(#4) 0.04 0.90 0.04 0.86 5.00 5.27 6.54 32.71 0.24 11.64 511.83 510.26 44 0.0357 15 12.20 11.33 0.06 515.93 DI-3B 0.00 L=4' 2-2 2-1 0.22 0.47 0.10 0.10 5.00 5.00 6.54 6.54 0.68 0.68 524.84 524.57 44 0.0061 12 2.79 2.92 0.25 528.00 DI-1 0.00 3-3 3-2 1.53 0.53 0.81 0.81 5.00 5.00 6.54 6.54 5.31 5.31 519.68 519.33 28 0.0125 15 7.22 6.41 0.07 524.88 DI-3C O.OD L=10' 3-2 3-1 0.13 0.90 0.12 0.93 5.00 5.07 6.54 13.08 0.77 6.07 519.23 519.05 15 0.0120 15 7.07 6.46 0.04 524.83 DI-3C 0.00 L=6' 43 42 0.08 0.90 0.07 0.07 5.00 5.00 6.54 6.54 0.47 0.47 499.95 499.26 34 0.0203 15 9.20 3.67 0.15 504.20 DI-3B 0.00 L=6' 42 41 0.09 0.90 0.08 0.15 5.00 5.15 6.54 13.08 0.53 1.00 496.11 495.52 41 0.0144 15 7.75 4.22 0.16 503.66 DI-3B 0.00 L=6' 5-2 5-1 0.05 0.90 0.05 0.05 5.00 5.00 6.54 6.54 0.29 0.29 482.98 482.00 49 0.0200 12 5.04 3.14 0.26 489.48 DI-3B D.00 L=6' 6-3 6-2 0.15 0.90 0.14 0.14 5.00 5.00 6.54 6.54 0.88 0.88 474.47 474.18 33 0.0088 15 6.05 3.48 0.16 478.33 DI-3C 0.00 L=6' 6-2 6-1 0.27 0.66 0.18 0.31 5.00 5.16 6.54 13.08 1.17 2.05 474.08 474.00 13 0.0062 18 8.24 3.86 0.06 478.23 DI-3C 0.00 L=6' DI(#1) E)FSDMH(#2) 0.68 0.61 0.41 0.41 5.00 5.00 6.54 6.54 2.71 2.71 513.46 512.75 13 0.0546 15 15.09 8.98 0.02 516.16 DI-5 0.00 EXSDMH(#2) EXSDMH(#3) 0.51 0.46 0.23 0.65 5.00 5.02 6.54 13.08 1.53 4.25 512.65 512.13 73 0.0071 15 5.45 4.89 0.25 516.76 DI-38 0.00 L=4' P:804.782.1903 2100 East Cary Street, Suite 309 Richmond, VA 23223 Project Name: Drive and Waterline Ex Date 10/21/2021 Engineers I Construction Managers I Planners I Scientists Location: Albemarle County Computed by OJG www.rkk.com Proj. No: 19352 Checked by ABS Responsive People I Creative Solutions Sheet 2 of 2 P:804.782.1903 2100 East Cary Street, Suite 309 Richmond, VA 23223 Project Name: Drive and Waterline Ex Date 10/21/2021 Engineers I Construction Managers I Planners I Scientists Location: Albemarle County Computed by OJG www.rkk.com Proj. No: 19352 Checked by ABS Responsive People I Creative Solutions Sheet 2 of 2 INLET OUTLEr WATER JUNCTION LOSS Ho+Hi+ Inlet Shaping Final INLET WATER BASIN SURFACE Do Co PIPE Sfo Hf Vo Ho Hi BEND PIPE O in BEND Bend Loss " Ht Shaping LOSS .8D SURFACE RIM RIM TO MANN. NO ELEVATION Pipe Dia CFS LENGTH VEL-IN ANGLE IN CFS LOSS Ht x 1. or 1.3 .5 or 1 SUM H Down Inv Down Pipe ELEVATION F-LINE HGL n 6-2 475.20 18 2.05 13 0.0004 3.86 474.00 475.20 0.013 0.00 0.06 0.07 0 15 0.88 0.00 0.12 0.16 0.16 0.17 475.37 478.23 2.86 6-3 475.37 15 0.88 33 0.0002 3.48 474.18 475.18 0.013 0.01 0.05 0.00 0 0 0.00 0.00 0.05 0.05 0.05 0.05 475.42 478.33 2.91 5-2 482.80 12 0.29 49 0.0001 3.14 482.00 482.80 0.013 0.00 0.04 0.00 0 0 0.00 0.00 0.04 0.05 0.05 0.05 482.85 489.48 6.63 4-2 496.52 15 1.00 41 0.0002 4.22 495.52 496.52 0.013 _ 0.01 _ � _ 0.07 0.07 0 15 1.00 0.00 0.14 0.19 0.19 0.20 496.72 503.66 6.94 43 500.26 15 0.47 34 0.0001 3.67 499.26 500.26 0.013 0.00 0.05 0.00 0 0 0.47 0.00 0.05 0.05 0.05 0.05 500.31 504.20 3.89 3-2 520.05 15 6.07 15 0.0088 6.46 519.05 520.05 0.013 0.13 0.16 0.22 0 15 6.07 0.00 0.39 0.50 0.50 0.63 520.68 524.83 4.15 3-3 520.68 15 5.31 28 0.0068 6.41 519.33 520.33 0.013 0.19 0.16 0.00 0 0 5.31 0.00 0.16 0.16 0.16 0.35 521.03 524.86 3.83 2-2 525.37 12 0.68 44 0.0004 2.92 524.57 525.37 0.013 0.02 0.03 0.00 0 0 0.68 0.00 0.03 0.04 0.04 0.06 525.43 528.00 2.57 1-2 512.93 15 7.16 38 0.0123 6.74 511.93 512.93 0.013 0.47 0.18 0.57 0 12 7.16 0.00 0.75 0.97 0.97 1.44 514.37 517.38 3.01 1-1 514.37 12 6.63 28 0.0347 10.24 512.51 513.31 0.013 0.96 0.41 0.00 0 0 6.63 0.00 0.41 0.41 0.41 1.37 515.74 517.45 1.71 STORM SEWER STRUCTURE TABLE STRUCTURE DETAILS PIPES IN PIPES OUT 1-1 RIM = 517.45 12" INV OUT=513.62 (NW) 1-2 RIM = 517.38 12" INV IN=512.51 (SE) 15" INV OUT=512.41 (W) 2-t RIM = 526.59 12" INV IN=524.57 (NE) 2-2 RIM = 528.00 12" INV OUT=524.84 (SW) DI-1 H = 3.16 3-1 RIM = 520.98 15" INV IN=519.05 (SW) 3-2 RIM = 523.28 15" INV IN=519.33 (SW) 15" INV OUT=519.23 (NE) 3-3 DI-3C, RIM = 523.31 15" INV OUT=519.68 (NE) L=10' H = 3.63 4-t RIM = 497.46 15" INV IN=495.52 (NW) 4-2 RIM = 503.56 15" INV IN=499.26 (NW) 15" INV OUT=496.11 (SE) 4-3 RIM = 504.20 15" INV OUT=499.95 (SE) 5-1 RIM = 483.86 12" INV IN=482.00 (SW) 5-2 RIM = 489.38 12" INV OUT=482.98 (NE) 6-1 RIM = 476.21 18" INV IN=474.00 (SE) 6-2 DI-3C, RIM = 478.23 15" INV IN=474.18 (SE) 18" INV OUT=474.08 (NW) L=14' H = 4.15 6-3 RIM = 478.26 15" INV OUT=474.47 (NW) PIPE TABLE FROM STRUCTURE TO STRUCTURE SIZE LENGTH SLOPE MATERIAL 1-1 1-2 12" 27.82' 4.0% RCP CLIII 2-2 2-1 12" 44.23' 0.6% RCP CLIII 3-1 3-2 15" 15.84' 1.1% RCP CLIII 3-2 3-3 15" 28.00' 1.2% RCP CLIII 4-1 4-2 15" 40.58' 1.5% RCP CLIII 4-3 4-2 15" 33.52' 2.1% RCP CLIII 5-1 5-2 12" 48.04' 2.0% RCP CLIII 6-2 6-1 18" 12.80' 0.6% RCP CLIII 6-3 6-2 15" 32.71' 0.9% RCP CLIII EX -DI 1-2 15" 38.12' 1.2% RCP CLIII 1NLt C m e 2 � � U ci o o� } J L' J ti a� y�'m,//�� U � � l[l -r aVa, �• �� _ •�" < � tiF '? � Bq " H CCC -J � � �O N � 0.6 o m �' Vl I; p T oS •_E` J +. z J b � `. J N o�f�+. � V V F z j z l-1 DI-3B 6.OW 0.100 O.W O.W O.OW'RI($iT 0.09 4 0.36 0 0.360 0.0490 0.020R 1.3R7 2.OW 1.44196 0.0833 4.00481 I.OW 3.50 0.145R 0.1666 6.272 fi0W 0.957 0.996 0.359 QWI 1.3R7 1-2 DI-3B 6. W0 0.080 O. W 0.072 alucarr o.ozo o.ao o.Wa 0.08 4 0.32 0 0.320 0.0490 0.0208 1.327 2.W0 1.5071G 0.0833 4.00481 LWO 3.50 O.1458 D1666 5.970 6.OW L005 LWO 0.320 O.OW 1.327 2-2 DI-1 2.OW 0.030 0.90 0.027 O'RIGHT O.IW 0.40 0.076 O.103 A 0.412 0 0.412 0.0050 0.020R 2.926 2.W0 0.68353 0.0833 4.00481 0.991 3.50 0.1458 0.1653 3.364 2.OW 0.595 0.992 0.409 O.W3 2.2W 3-2 DI-3C 6 WO 0.130 0.90 0.117 O.OW'RIGHT O.117 4 0.468 0 0.468 0.02W 0.0208 1.910 2.OW 1.04712 0.0833 4.00481 1.OW 3.50 0.1458 0.1666 4.912 6.OW 1.221 1.OW 0.46R O.OW 1.W9 3-3 DI-3C 1D.OW 0.390 O.W 0.351 O.00aRICili 1.140 0.30 0.342 0.693 4 2.772 0 2.772 0.0150 0.0208 8.139 2.OW 0.24573 0.0833 4.00481 0.674 3.50 0.1458 0.1191 11.632 IO.OW O.RW 0.971 2.691 O.ORI 3.531 42 DI-3B 6.W0 O.G90 0.90 0.081 MIGHT 0.081 4 0.324 0 0.324 O.11W 0.0208 1.129 2.W0 1.77148 0.0833 4.00481 LOW 3.50 0.1458 0.1666 7.831 6.W0 0.766 0.927 0.3W 0.024 L129 43 DI-3B 6.OW 0.080 O.W 0.072 aRICdiT 0.072 4 0.288 0 0.288 0.1190 0.0208 1.081 2.W0 L8W14 0.0833 4.00481 1.W0 3.50 0.1458 0.1666 7.453 6.W0 0.805 0.947 0273 O.OIS L080 3-2 DI-3B 6.W0 0.050 O.W 0.045 FRIGHT 0.045 4 0.18 0.024 0.204 QI1W Q0208 0.950 2.OW 2.10526 D0833 4.00481 LWO 3.50 O.1458 O.1666 6.448 6.W0 0.931 0.992 0.202 O.W2 0.949 6-2 DI-3B 6.OW 0.140 0.90 0.126 aRICiliT 0.130 0.40 0.052 O.178 4 0.712 0.015 0.727 O.O1W 0.0208 3.631 2.W0 0.55081 0.0833 4.00481 0.966 3.50 O.1458 O.1617 5.326 G.OW L127 LOW 0.727 O.OW 2.406 6-3 DI-3B 6.000 0.150 0 90 0.135 O'RIGHT 0.135 4 0.54 O.W2 0.542 O.O1W 0.020R 2.6y9 2.OW 074102 0.0833 4AO481 0.9y5 3.50 0.1458 0.1659 4.635 6.W0 1.2y4 1.W0 0.542 O.OW 2.174 1-YEAR CALCULATIONS WorrellQuantity NOAA 24-hrD 1-YearRainfa11=3.40" Prepared by {enter your company name here) Printed 10/19/2021 HydroCAD® 10.00-21 s/n 10322 02018 HydroCAD Software Solutions LLC Pace 1 Summary for Subcatchment 1S: A Pre Runoff = 239.06 cfs @ 12.12 hrs, Volume= 718,292 cf, Depth> 1.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hrD 1-Year Rainfall=3.40" Area (ac) CN Description 77.650 79 <50% Grass cover, Poor, HSG B 107.000 84 Weighted Average 77.650 72.57% Pervious Area 29.350 27.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (IM (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: A Pre 26 240 22 ---------I-- 20 --1------`-=-----=--=--=--=-- ,e 1 1 1 1 1 1 1 1 1 _L_J_______ _ 18 I I 1 .. 14 -- -- -- -- -- ----------- ,e 9" ------------- I I I I I I I I I I 1 ■ RunoR I!X4ar;P4infa] 40!- ;ttpAr1p74u0lqc RunpfV IUM0=11&,1%2-0IF- r-1--i--Runoff DeptW185" Tim (hnsm) WorrellQuantity NOAA 24-hrD 1-YearRainfa11=3.40" Prepared by {enter your company name here} Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 2 Summary for Subcatchment 2S: A Post Runoff = 258.14 ds @ 12.12 hrs, Volume= 780,002 d, Depth> 2.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hrD 1-Year Rainfall=3.40" Area (ac) CN Description 66.650 79 <50% Grass cover, Poor, HSG B 107.000 86 Weighted Average 66.650 62.29% Pervious Area 40.350 37.71 % Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (If/ft) (fl/sec) (ds) 5.0 Direct Entry, Subcatchment 2S: A Post 28 1 1 1 1 1 1 1 1 1 1 I I I I I I I I --r--r--r--r--r--r--r--r--r� 20CI I _J _J. 24 I I I 1 I I I I I I I I I I zz ' 20 18 L 1 �1 18 l I I I I I I I I I I 14 1 12 I I I I I I I I 10 ° ------I fi ' I I r I I I I I I I I I I 1 I I I I I I I I II -'--Y--Y--'--Y--f--'--f-- I f--'-- 1 1 1 1 I I ■ RunoR 1_ - INOM-94-kW 0 1�ar;Rin�all=i� e __ __,__�tunoff�epth>2r011'r To--5.01min I I 111111111 ' -Y -Y -Y -Y -f -f -f -♦ -fi Y Y- 1I I I I I I I I I 8 9 10 11 12 13 Time (houm) WorrellQuantity NOAA 24-hrD 1-YearRainfa11=3.40" Prepared by (enter your company name here) Printed 10/19/2021 HydroCAD® 10.00-21 s/n 10322 02018 HydroCAD Software Solutions LLC Pace 3 Summary for Pond 11 P: Upper Pond Inflow Area = 4,660,920 sf, 37.71 % Impervious, Inflow Depth > 2.01" for 1-Year event Inflow = 258.14 ds @ 12.12 hrs, Volume= 780,002 ef Outflow = 258.14 ds @ 12.12 hrs, Volume= 780,001 cf, Atten= 0%, Lag= 0.0 min Primary = 258.14 cis @ 12.12 hire, Volume= 780,001 cf Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.01' @ 12.12 hire Surf.Area= 944 sf Storage= 12 Of Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min (827.3 - 827.3 ) Volume Invert Avail.Storage Storacle Description #1 484.00' 9,352 of Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sI (cubic -feet) (cubic -feet) 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 Device Routing Invert Outlet Devices #1 Primary 474.32' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Primary 469.87' 36.0" Vert. Orifice/Grate C= 0.600 nmary OutFlow, Max=922.55 cis @ 12.12 hire HW=484.01' (Free Discharge) 1=Broad -Crested Rectangular Weir(Weir Controls 801.53 cfs @ 10.34 fps) 2=0rifice/Grate Orifice Controls 121.02 ds 17.12 s ( Uo3 fps) Pond 11P: Upper Pond 28 _J__J__J__y__� __� __� _J,am _ ■ Pnmary m,.m A rlea�a�, 28 24 I Pe0kjE(ev-484,.0j' 22 $ airageF:4 -_ f- 20 -T--i-----i--i -T--i --- -i--i --i --i --i--, _� --I - - 18 18 ,IIIIIIIII 14 I I I I I I I I I l l l I I I I _ ,L 12 , _L _I _J _J _! _L _L _L_J _♦ _L _L _L _I _J _! _L _L _L _L lae. I I I I I I I I I I I I I I I I I I I I 8 8 , r,y__'__'__r__r__r_y_ 4 I _L__L_ -__J__J__1__L__L__I__ -__ z Tlms WorrellQuantity NOAA 24-hrD 1-YearRainfa11=3.40" Prepared by (enter your company name here) Printed 10/19/2021 HydroCAD® 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 5 Summary for Pond 18P: Upper Pond Inflow Area = 4,660,920 sf, 27.43% Impervious, Inflow Depth > 1.85" for 1-Year event Inflow = 239.06 ds @ 12.12 hrs, Volume= 718,292 ef Outflow = 239.06 ds @ 12.12 hrs, Volume= 718,291 cf, Atten= 0%, Lag= 0.0 min Primary = 239.06 cis @ 12.12 hrs, Volume= 718,291 cf Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.01' @ 12.12 hire Surf.Area= 944 sf Storage= 12 Of Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min ( 834.8 - 834.8 ) Volume Invert Invert Avail.Storege Storage Description Description #1 484.00' 9 352 ef Custom Stage Data (Prismatic)Listed below Recalc Elevation Surf.Area Inc.Store Cum.Store (feet) (sg-fl) (cubio-feet) (cubic-feet 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 Device Routing Invert Outlet Devices #1 Primary 474.32' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Cost (English) 2.80 2.92 3.08 3.30 3.32 #2 Primary 469.87' 36.0" Vert. Orifice/Grate C= 0.600 nmary OutFlow Max=922.43 cfs @ 12.12 hire HW=484.01' (Free Discharge) 1=Broad -Crested Rectangular Weir(Weir Controls 801.41 cis @ 10.34 fps) 2=0rifice/Grate (Orifice Controls 121.01 cis @ 17.12 fps) Pond 18P: Upper Pond 2e --�----;--;--;-------;- I I I I I I I I a 24 r 22 , I J --; --; -----;--; --; --; - ;- 1 18 ----;----;--T------�-;- ,4 12 r r _L -J ,o ' ' _I I I I I I I I I I r 60, 4 1 1 1 1 1 1 1 1 1 T--r--r--r-r-T--T--r--r_ toirage='1,- _1__L__L__I___I__J__1__L__L__L_ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hours) ■ Inflow ■ Pnmary 2-YEAR CALCULATIONS WorrellQuantity NOAA 24-hrD 2-YearRainfa11=4.10" Prepared by {enter your company name here} Printed 10/19/2021 HydroCADO 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 7 Summary for Subcatchment 1S: A Pre Runoff = 315.42 cis @ 12.12 hrs, Volume= 954,374 cf, Depth> 2.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hr D 2-Year Rainfall=4.10" Area (ac) CN Description 77.650 79 <50% Grass cover, Poor, HSG B * 7. I.n n. 107.000 84 Weighted Average 77.650 72.57% Pervious Area 29.350 27.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) Mflt) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: A Pre __I __L__L__li __L__11___1___I___I__J_ 340 _L i16 300 I I I I I I I I I I --`-- -- -J----------J-- - 240 --i--f--f-----L---l--l---i -'- 22 __r__r 20 1 --1,--_-_',-_--_-_--- _ _ -- - -- ------------------ I I -I I_ I I� I I I ---2•YearlRa Time (houm) ICN=i p Runoff WorrellQuantity NOAA 24-hrD 2-Year RainfaIII 10" Prepared by (enter your company name here) Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 8 Summary for Subcatchment 2S: A Post Runoff = 335.46 cfs @ 12.12 hrs, Volume= 1,023,346 cf, Depth> 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hr D 2-Year Rainfall=4.10" Area (ac) CN Description 66.650 79 <50% Grass cover, Poor, HSG B 107.000 86 Weighted Average 66.650 62.29% Pervious Area 40.350 37.71 % Impervious Area Tc Length Slope Velocity Capacity Description (mini /feet\ (M) (fusRin) (471s1 Direct Entry, Subcatchment 2S: A Post J--- L--J - 3130 _L C 300 ----- ---22D-,- --r--r--r- ,^, -- -- -- --I-----I----------- - r 1 _L _L _L 1------- i4o11 11 J J 12D lea se 40 J r r 11 I I I 4 5 6 7 ---- t I I� -, -T .-T T 22� =Yea _ _-;--RurlroffA ei-r07,000 i RimM Vol urt?te:Ir346_ - ---;R1lnoffDeI u 5.0rm , -J--1 --J--J--J--1--L--1--1-- I I LI III L Time (Imes) t ■ RunoR WorrellQuantity NOAA 24-hrD 2-Year RainfaIII 10" Prepared by {enter your company name here} Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 9 Summary for Pond 11 P: Upper Pond Inflow Area = 4,660,920 sf, 37.71 °h Impervious, Inflow Depth> 2.63" for 2-Year event Inflow = 335.46 cfs @ 12.12 hrs, Volume= 1,023,346 cf Outflow = 335.46 ds @ 12.12 hrs, Volume= 1,023,345 d, Atten= 0%, Lag= 0.0 min Primary = 335.46 cfs @ 12.12 hrs, Volume= 1,023,345 cf Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.02' @ 12.12 hrs Surf.Area= 946 sf Storage= 16 d Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min ( 818.7 - 818.7 ) Volume Invert Avail.Storege Storage Description #1 484.00' 9,352 d Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 Device Routing Invert Outlet Devices #1 Primary 474.32' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Ccef. (English) 2.80 2.92 3.08 3.30 3.32 ( 9 ) #2 Primary 469.87' 36.0" Vert Orifice/Grate C= 0.600 nmary OutFlow Max=923.05 ds @ 12.12 hrs HW=484.02' (Free Discharge) =Broad -Crested Rectangular Weir(Weir Controls 802.01 cfs @ 10.34 fps) 2=Oriflce/Grate (Orifice Controls 121.04 cfs @ 17.12 fps) Pond 11 P: Upper Pond I I I I I 1 ■ InBow ■Pnmary 38 _L _J _J _1 _L _L _L 1 34 32 __,_ J J! L L L J . I--,' Pe*,Ejev=484 30 I•`04r- 28 28 24 220 _~ 20 , _L _ 18 I I I I 1 I --`---- ----;--;--;--`-�- -;--;--;-- ---- --;--;--;--;--;-- E, 18 , 14 1 _!__L__L__L__I__J__!__L__L__L__I__ I I I I I 1e 1 1 1 1 1 1 1 1 1 I I I I I I I I I I I 8 1 12 13 14 15 16 Time (hours) WorrellQuantity NOAA 24-hr D 2-Year RainfaIII 10" Prepared by {enter your company name here} Printed 10/19/2021 HydroCAD® 10.00-21 s/n 10322 0 2018 HydroCAD Software Solutions LLC Pace 11 Summary for Pond 18P: Upper Pond Inflow Area = 4,660,920 sf, 27.43% Impervious, Inflow Depth > 2.46" for 2-Year event Inflow = 315.42 ds @ 12.12 hrs, Volume= 954,374 d Outflow = 315.42 ds @ 12.12 hrs, Volume= 954,374 d, Atten= 0%, Lag= 0.0 min Primary = 315.42 ds @ 12.12 hrs, Volume= 954,374 d Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.02' @ 12.12 hire Surf.Area= 946 sf Storage= 15 d Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min 825.8 - 825.8 Volume Invert Avail.Storage Storage Description #1 484.00' 9,352 ef Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sI (cubic -feet) (cubic -feet) 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 Device Routing Invert Outlet Devices #1 Primary 474.32' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Ccef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Primary 469.87' 36.0" Vert. Orifice/Grate C= 0.600 nmary OutFlow Max=922.92 ds @ 12.12 hrs HW=484.02' (Free Discharge) 1=Broad -Crested Rectangular Weir(Weir Controls 801.89 cis @ 10.34 fps) 2=0rifice/Grate (Orifice Controls 121.03 cis @ 17.12 fps) Pond 18P: Upper Pond ■Inflow Pnmary 34 32 qy� I I 300 ---I--I--P�E02e- ,N484 28 I 2fi --r----------------�-;-- -T-T--r--�_--ttolrage="t- 2a 22 ,f 20 I I I I I I I I I I 1g I I I I I I I I I I I I I I I I I I I I 18 _ ,L 14 12 10 8 I I I I I I I I I I I I I I I I I I I I 8 ,' -T--'--�--Y--T--r-T-T-�- I I I I I I I I I --T--r-T--'--�--T--T--r-T--'-- I I I I I I I I I I 2 Time N O N r J N z z w 0 U r z Z �e Z U O � cn w EL W [L' N Z 0 Q a- 0 W LU CD LLJ Q U () H Un U Un Z U) z w LU 0z a Q J a / Q 0 W 0 ii CD N � U) CD � < CO CD LULLJ tJ LU LLJ Z Q Z = LU U Q O W ? DO >- o t- Q � WV� O O N 10-YEAR CALCULATIONS WorrellQuantity NOAA 24-hrD 10-Year Rainfall=6.20" Prepared by {enter your company name here) Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 02018 HydroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 1S: A Pre Runoff = 548.59 cis @ 12.12 hrs, Volume= 1,701,369 cf, Depth> 4.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hr D 10-Year Rainfall=6.20" Area (ac) CN Descriotion 77.650 79 <50% Grass cover, Poor, HSG B • nn 0.A no 107.000 84 Weighted Average 77.650 72.57% Pervious Area 29.350 27.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (ds) 5.0 Direct Entry, Subcatchment 1S. A Pre 60 50 1 40 35 I I I I r r r • 30 -r-1 -, -r 25 20 1 16 10 5 ■ RunoR 110,1!IiA► 4 hr`+p= 10-Yealj_Rpinifal�=6.2�'r It_un_oflF Ar_ea=107M'O ac R4ndr f Volurdei1,701'I ,3890 j Rbn6fflDe0tH>4.38" ,CN= 814 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Tim (hour) WorrellQuantity NOAA 24-hrD 10-Year Rainfall=6.20" Prepared by {enter your company name here) Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 02018 HydroCAD Software Solutions LLC Paae 15 Summary for Pond 11 P: Upper Pond Inflow Area = 4,660,920 sf, 37.71 % Impervious, Inflow Depth > 4.60" for 10-Year event Inflow = 569.08 cis @ 12.12 hrs, Volume= 1,785,140 cf Outflow = 569.08 afs @ 12.12 hrs, Volume= 1,785,139 d, Atten= 0%, Lag= 0.0 min Primary = 569.08 cis @ 12.12 hrs, Volume= 1,785,139 cf Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.03' @ 12.12 hrs Surf.Area= 952 sf Storage= 28 d Plug -Flow detention time= (not calculated: outflow precedes inflow) Center-d-Mass det. time= 0.0 min ( 801.3 - 801.3 ) Volume Invert Avail.Stomge Storage Description #1 484.00' 9,352 d Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 Device Routing Invert Outlet Devices #1 Primary 474.32' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Cost (English) 2.80 2.92 3.08 3.30 3.32 #2 Primary 469.87' 36.0" Vert Orifice/Grate C= 0.600 rimary OutFlow Max=924.56 afs @ 12.12 hrs HW=484.03' (Free Discharge) 1=Broad -Crested Rectangular Weir(Weir Controls 803.47 CIS @ 10.34 fps) mOrifice/Grate (Orifice Controls 121.09 cis @ 17.13 fps) NOAA 24-hrD 10-Year Rainfall=6.20" your company name here) Printed 10/19/2021 s/n 10322 ® 2018 HvdroCAD Software Solutions LLC Peas 14 " Summary for Subcatchment 2S: A Post Runoff = 569.08 cis @ 12.12 hrs, Volume= 1,785,140 d, Depth> 4.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs NOAA 24-hr D 10-Year Rainfall=6.20" Area (ac) CN Description 66.650 79 <50% Grass cover, Poor, HSG B 40.350 98 wr.ouo oo vveiyi ILeu nveiaye 66.650 62.29% Pervious Area 40.350 37.71 % Impervious Area Tc Length Slope Velocity Capacity Description (min) MAP.t) !ff/ffl (ft/secl (nfsl Direct Entry, Subcatchment 2S: A Post 1 1 1 1 I I I I 4fi IL 11 40CI I I I I I I I I I I 95 i I I I I I I I I I i 30 I I I I I 1 I I I I I I I I I I LL _L _L _L _L _L _J _J _J _J _JI 26 1 20 I 15 I I I I 10 I I I I I . --r--r--r 3 4 - ;- ;--'--'- !-Nn71A�4-*b- 11CYea1'ltplit'fal�=B ----�tuitofifiCre�='C07�OOb�c R"#ff VO1urt1V:i1;?85,1-40-4f - I I I RtfrilP">-Ur- I1� ` I--J--J--J--1--J-- -1=�1.01t1n- I I I I I 1 1 1 1 1 1 1 1 1 11 1 8C _CN= 1 I I I I I I I I oV Tim (hours) 6 7 8 9 Pond 11P: Upper Pond __r__r__I___I__y__+__r__r__r__I__ ■Inflow aaem I i I I I I I ■Pnmary tgra a=2 of _r__r__r__r __r _1__7__ _r__r I I I I I I I I I I I I I --------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 12 13 14 Time (hours) WorrellQuantity NOAA 24-hrD 10-Year Rainfall=6.20" Prepared by {enter your company name here) Printed 10/19/2021 HydroCADS 10.00-21 s/n 10322 02018 HydroCAD Software Solutions LLC Peas 17 Summary for Pond 18P: Upper Pond Inflow Area = 4,660,920 sf, 27.43% Impervious, Inflow Depth > 4.38" for 10-Year event Inflow = 548.59 ds @ 12.12 hrs, Volume= 1,701,369 d Outflow = 548.59 ds @ 12.12 hrs, Volume= 1,701,368 d, Atten= 0%, Lag= 0.0 min Primary = 548.59 cis @ 12.12 hrs, Volume= 1,701,368 d Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.04 hrs Peak Elev= 484.03' @ 12.12 hrs Surf.Area= 951 sf Storage= 27 d Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min ( 807.6 - 807.6 ) Volume Invert Avail.Storage Storage Description #1 484.00' 9,352 d Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 484.00 938 0 0 485.00 1,418 1,178 1,178 486.00 1,830 1,624 2,802 487.00 2,316 2,073 4,875 488.75 2,800 4,477 9,352 8l t-rimary 4/4.JZ' a.u- iong x u.7 Dreaarn lsroaa-tireslea Kai Head (feet) 0.20 0.40 0.60 0.80 1.00 Cost (English) 2.80 2.92 3.08 3.30 3.32 #2 Primary 469.87' 36.0" Vert. Orifice/Grate C= 0.600 �mary OutFlow Max=924.43 cfs @ 12.12 hrs HW=484.03' (Free Discharge) 1=Broad-Crested Rectangular Weir(Weir Controls 803.35 cis @ 10.34 fps) 2=Orifice/Grate (Orifice Controls 121.09 cis @ 17.13 fps) Pond 18P: Upper Pond 60 i 55 -------------- I 5001 50 I I I I I I I 46 40 •' " 35 I I I I I I I I 30 I I I I I I I I 25 i I I I I I 20 I I I I m ' I I 9 10 11 12 13 14 15 16 17 18 19 20 21 Time (hours) ■ Inflow ■ Primary N O N r J V) z z w 0 U r z Z 0 Z U O W cn w EL w 0L N Z \ Q N J \ d 0 WLin CD Q U U)LU U) U (n Z .! ii Z D O W J W M J Q CD N � cir) CD Q CD W ❑ W LLJ LU Z Q Z = ❑ w U O N cod, U co �MoNp CN I� O LUJ ? CO >- o Cr Q t- co O O �. N Z (n Q Z ZZD V 0 w Q Q U 5: _J L U 0 Y) (N LO co O 0') ❑ m Q U Page 6F-62 September 2019 September 2019 Page 6H-5 Page 6H-114 Typical Traffic Control Signing for Project Limits (Figure Ti NOTES September 2019 Support: 1. This layout depicts signing requirements for notifying motorist when they are entering and exiting a potential construction/maintenance area with a duration equal to or greater than 60 days. Standard: 2. The ROAD WORK AHEAD (W20-1) sign or the ROAD WORK NEXT XX MILES (G20-1 (V)) sign shall be placed far enough in advance of the project limits so that other warning signs in a series may be adequately placed prior to the condition they are warning about. 3. The ROAD WORK NEXT XX MILES sign shall be used for projects with activity areas greater than 2 miles in length, or when multiple work activities (such as pavement patching, guardrail installations, shoulder restoration, etc.) occur along a highway. 4. The distance displayed on the ROAD WORK NEXT XX MILES sign shall be stated to the nearest whole mile from the point of installation to the END ROAD WORK (G20-2 (V)) sign. 5. On divided highways having a median wider than 81, right and left sign assemblies shall be required. Guidance: 6. For projects with activity areas 2 miles or less in length, the ROAD WORK AHEAD sign should be the first sign motorist encounter. 7. Sign spacing should be 130W-1500' for Limited Access highways. For all other roadways, the sign spacing should be 500'--800' where the posted speed limit is greater than 45 mph, and 35W-500' where the posted speed limit is 45 mph or less. 8. All connections within the project limits should be idenu; fled with signs indicating to motorist they are entering or exiting a potential construcdon/maintenance area. September 2019 Signing for Project Limits (Figure TTC-53.0) Page 115 2) 1 (V) NEXT XX MILES ocza (NOTES 3 & 4 Figure 6F-8, Channelizing Devicesl GROUP 1 TUBULAR MARKER & CONE - 2 Inches ches 36" 2 to 6 Inches MIN -3 Inches T 36" - -6 Inches 1: Revision 1 - 4/1/2015 5 _ 31n 4 Inches 6 Inches _ 'Inches 4 Inches I 36" hi It it 42" I GROUP2 DRUM. VERTICAL PANEL, DIRECTIONAL INDICATOR BARRICADE & LONGITUDINAL CHANNELIZING DEVICE 1�1 MIN ° rc i 12" MAX TYPE 3 BARRICADES r L 6 -h°s AS° TRAFFIC FLOW TRAFFIC FLOW LEFT OF BARRICADE' RIGHT OF BARRICADE' TRAFFIC FLOW ROAD CLOSED EITHER SIDE OF BARRICADE' THE SICES OF SMRICAOES FACING TRAFFIC SHALL BE 5INCH ORANGE & WHITE FLUORESCENT PRISMATIC(HIGH OBSERVATION ANGLE) LENS STRIPES REQUIRED T 36" MIN Table 6H-2, Taper Length Criteria and Taper Length Chart Type of Taper Taper Length (L) Merging L= Minimum Shifting See table below2 Shoulder 1/3 L Minimum Two -Way Traffic 50 Feet Minimum,100 Feet Maximum Downstream 50 Feet Minimum,100 Feet Maximum L= Taper Length, W= Width of Offset, S= Posted Speed Limit Posted Speed Limit(mph)Remarks Width of Offset (Feet) 9 10 11 12 < 25 95 105 115 125 L= S�1tV/60 30 135 150 165 180 " 35 185 205 225 245 " 40 240 270 295 320 " 45 405 450 495 540 L=SW 50 450 500 550 600 " 55 495 550 605 660 " 60 540 600 660 720 " 65 585 650 715 780 " 70 630 700 770 840 " --Limited Access highways shall use a 1000' merging taper regardless of the posted speed. Shifting Tapers - full lane width shifts on Limited Access Highways shall use a 750' shifting taper for posted speeds less than 65 mph and a 1 000'shifting taper for posted speeds equal to or greater than 65 mph. For all other roadways 3/4 L should be used. Table 6H-3, Length of the Longitudinal Buffer Space' Posted Speed Limit (mph) Distance (Feet) < 20 115 - 120 25 155 -1651 30 200 - 210 35 250 - 260 40 305 - 3251 45 360 - 380 50 425 - 445 55 500 - 5301 60 570 - 6001 65 645 - 675 70 730 - 760 1: Revision 1 - 4/1/20152: Revision 2 - 9/1/2019 Page 6H-6 Table 6H-4, Channelizing Device Spacing September 2019 Location Posted Speed Limit (mph) 0-35 36+ Transition Spacing 20' 40' Travelway Spacing 40' 80' Spot Construction Access ` 80' 120' * For easier access by construction vehicles into the work area, spacing of devices may be increased to this distance, but shall not exceed one access per 0.25 mile unless approved by the engineer and documented. Table 6H-5, Recommended Spacing of Advance Warning Signs' Road Type Spacing (Feet) Urban street with 25 mph or less posted speed 100 - 200 Urban street with 30 to 40 mph posted speed 250 - 350 * All Other Roadways with 45 mph or less posted speed 350 -500 All Other Roadways with greater than 45 mph posted speed 500 - 800 Limited Access highways 1300 -1500 * Urban streets with greater than 40 mph posted speed limits fall into this category. Note: For urban conditions, it is generally better to place all advanced warning signs within a one block area versus spreading out the signs over several blocks, however, motorist must have time to recognize and react to each warning sign - see Section 6G.11. Table 6H-6, Barrier Flare Rate Speed Limit (mph Flare Rate Speed Limit (mph) Flare Rate Speed Limit mph Flare Rate 70 22:1 55 17:1 40 13.1 65 20:1 50 16:1 35 11:1 60 19:1 45 14:1 530 10:1 Table 6H-7, Spacing of Portable Temporary Rumble Stripe Posted/Statutory Speed Limit < 40 mph 41 - 55 mph 55 mph PTRS Spacing (Center to Center) 10 Feet 15 Feet 20 Feet Table 6H-8, Spacing of Long-term Transverse Temporary Rumble Strip' Set 1 Spacing Set 2 Spacing Between Set Spacing PTRS Spacing (Center to Center) 5 strips at 90 Feet 5 strips at 6 Feet 4,-„ 1: Revision 1 - 4/1/2015 2: Revision 2 - 9/1/2019 SEQUENCE OF CONSTRUCTION PHASE 1- SEE SHEET C12.01 1. CLOSE TO TRAFFIC THE SECTION OF WORRELL DRIVE FROM WORRELL DRIVE / CROSSOVER INTERSECTION TO THE DRIVEWAY OF 355 WORRELL DRIVE AS SHOWN. *WORRELL DRIVE ACCESS: WORRELL DRIVE AND ALL PROPERTY DRIVEWAYS (UNLESS OTHERWISE NOTED) WILL REMAIN OPEN TO TRAFFIC FROM THE INTERSECTION WITH MARTHA JEFFERSON DRIVE TO THE ROAD CLOSURE AS SHOWN. 2. KEEP A 12' MINIMUM ACCESS OPEN TO THE DRIVEWAY OF 355 WORREL DRIVE WHEN ABLE. IF DRIVEWAY MUST BE FULLY CLOSED, CONTRACTOR TO NOTIFY PROPERTY OWNER AT LEAST 48 HOURS IN ADVANCE. *PARKING OPTION: PROPERTY OCCUPANTS CAN PARK ALONG WORRELL DRIVE WEST OF THE WORK ZONE. 3. WITH CLOSURE IN PLACE, COMPLETE ALL ROAD, SIDEWALK, AND UTILITY CONSTRUCTION WITHIN THIS SECTION. 4. ONCE CONSTRUCTION FOR THIS SECTION OF WORRELL DRIVE IS COMPLETE, REMOVE PHASE 1 ROAD CLOSURE AND SET UP ROAD CLOSURE FOR PHASE 2. PHASE 2 - SEE SHEET C12.01 1. CLOSE TO TRAFFIC THE SECTION OF WORRELL DRIVE FROM THE MARTHA JEFFERSON DRIVE INTERSECTION TO JUST EAST OF THE FIRST DRIVEWAY OF 400 WORRELL DRIVE AS SHOWN. *WORRELL DRIVE ACCESS: WORRELL DRIVE AND ALL PROPERTY DRIVEWAYS (UNLESS OTHERWISE NOTED) WILL REMAIN OPEN TO TRAFFIC FROM THE INTERSECTION WITH WORRELL DRIVE / CROSSOVER TO THE ROAD CLOSURE AS SHOWN. 2. PHASE 2A: COMPLETE CONSTRUCTION OF THE FIRST DRIVEWAY OF 400 WORRELL DRIVE AND ITS INTERSECTION WITH WORRELL DRIVE AS SHOWN. ALSO, COMPLETE ANY UTILITY CONSTRUCTION WITHIN THIS AREA. DURING THIS CONSTRUCTION, KEEP THE SECOND DRIVEWAY OF 400 WORRELL DRIVE ACCESSIBLE AT ALL TIMES. *NOTE: AT THE COMPLETION OF PHASE 2A, TEMPORARY PAVEMENT ADJUSTMENTS / GRAVEL OR AGGREGATE MAY BE NEEDED FOR GRADING DIFFERENCES BETWEEN EXISTING AND PROPOSED SO THE ROAD IS TRAVERSABLE FOR PHASES 2B, 2C, AND 3. ALSO, CHANNELIZING DEVICES MAY BE NEEDED TO TRANSITION FROM THE NEW EDGE OF PAVEMENT TO EXISTING EDGE OF PAVEMENT FOR THESE PHASES AS WELL. 3. PHASE 2B: AFTER COMPLETION OF PHASE 2A, OPEN THE NEWLY CONSTRUCTED DRIVEWAY AND INTERSECTION TO TRAFFIC WHILE CLOSING SECOND DRIVEWAY OF WORRELL DRIVE FOR REMAINING CONSTRUCTION OF PROPOSED DRIVEWAY AS SHOWN. 4. PHASE 2C: AFTER COMPLETION OF PHASE 2B, COMPLETE CONSTRUCTION FOR THE REMAINING SECTION OF WORRELL DRIVE FOR PHASE 2 AND ANY REMAINING UTILITY WORK WITHIN THIS AREA. *NOTE: WORRELL DRIVE TO REMAIN CLOSED TO TRAFFIC FROM MARTHA JEFFERSON DRIVE DURING PHASE 2A, 28, AND 2C. 5. ONCE ALL CONSTRUCTION FOR THIS SECTION OF WORRELL DRIVE IS COMPLETE, REMOVE PHASE 2 ROAD CLOSURE AND SET UP ROAD CLOSURE FOR PHASE 3. PHASE 3 - SEE SHEET C12.02 1. CLOSE TO TRAFFIC THE MIDDLE SECTION OF WORRELL DRIVE AS SHOWN. *WORRELL DRIVE ACCESS: WORRELL DRIVE AND ALL PROPERTY DRIVEWAYS (UNLESS OTHERWISE NOTED) WILL REMAIN OPEN TO TRAFFIC FROM THE INTERSECTION WITH WORRELL DRIVE / CROSSOVER TO THE ROAD CLOSURE AND FROM THE INTERSECTION WITH MARTHA JEFFERSON DRIVE TO THE ROAD CLOSURE AS SHOWN. 2. KEEP A 12' MINIMUM ACCESS OPEN TO THE DRIVEWAY OF 355 WORREL DRIVE WHEN ABLE. IF DRIVEWAY MUST BE FULLY CLOSED, CONTRACTOR TO NOTIFY PROPERTY OWNER AT LEAST 48 HOURS IN ADVANCE. *PARKING OPTION: PROPERTY OCCUPANTS CAN PARK ALONG WORRELL DRIVE EAST OF THE WORK ZONE. 3. WITH CLOSURE IN PLACE, COMPLETE ALL ROAD, SIDEWALK, AND UTILITY CONSTRUCTION WITHIN THIS SECTION. 4. ONCE CONSTRUCTION FOR THIS SECTION OF WORRELL DRIVE IS COMPLETE, REMOVE PHASE 3 ROAD CLOSURE AND SET UP ROAD CLOSURE FOR PHASE 4. PHASE 4 - SEE SHEET C12.02 1. CLOSE TO TRAFFIC THE REMAINING MIDDLE SECTION OF WORRELL DRIVE AS SHOWN. *WORRELL DRIVE ACCESS: WORRELL DRIVE AND ALL PROPERTY DRIVEWAYS (UNLESS OTHERWISE NOTED) WILL REMAIN OPEN TO TRAFFIC FROM THE INTERSECTION WITH WORRELL DRIVE / CROSSOVER TO THE ROAD CLOSURE AND FROM THE INTERSECTION WITH MARTHA JEFFERSON DRIVE TO THE ROAD CLOSURE AS SHOWN. 2. WITH CLOSURE IN PLACE, COMPLETE ALL ROAD, SIDEWALK, AND UTILITY CONSTRUCTION WITHIN THIS SECTION. *NOTE: WHEN NOT POSSIBLE TO MAINTAIN ACCESS TO 384 WORRELL DRIVE DURING CONSTRUCTION FOR THIS PHASE, CONTRACTOR TO NOTIFY PROPERTY OWNER AT LEAST 48 HOURS IN ADVANCE OF ACCESS CLOSURE. TEMPORARY PARKING OPTIONS FOR 384 WORRELL DRIVE OCCUPANTS (ONCE DISCUSSED WITH PROPERTY OWNER) COULD CONSIST OF PARKING ALONG [SHAM AVENUE OR IN ADJACENT PARKING LOT AS SHOWN. ANOTHER OPTION TO EXPLORE FOR REDUCING IMPACTS TO 384 WORRELL DRIVE ACCESSIBILITY WOULD BE TO COMPLETE CONSTRUCTION FOR THIS PHASE DURING WEEKEND. 3. ONCE CONSTRUCTION FOR THIS SECTION OF WORRELL DRIVE IS COMPLETE, REMOVE PHASE 4 ROAD CLOSURE AND OPEN ALL OF WORRELL DRIVE AND PROPERTY DRIVEWAYS TO TRAFFIC. MAINTENANCE OF TRAFFIC NOTES 1. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE 2011 VWAPM, AS APPLICABLE. 2. THE FOLLOWING TTCS APPLY TO THIS PROJECT: -TTC-53.0 SIGNING FOR PROJECT LIMITS 3. SIGN SPACING SHALL BE PER TABLE 6H-5 IN THE LATEST REVISION OF THE 2011 VWAPM AND THE APPLICABLE TTC. 4. ONLY GROUP 1 (36" CONES) OR GROUP 2 (36" DRUMS) CHANNELIZING DEVICES SHALL BE USED. SPACING SHALL BE CONSISTENT WITH OR MORE CONSERVATIVE THAN THE REQUIREMENTS LISTED IN THE APPROPRIATE TTC AND/OR TABLE 6H-4 IN THE LATEST REVISION OF THE 2011 VWAPM. 5. WHEN ROAD CLOSURES ARE IMPLEMENTED, ROAD SHALL BE CLOSED USING CHANNELIZING DEVICES AND/OR TYPE 3 BARRICADES WITH ROAD CLOSED SIGN (R11-2, 48"X30") IN ACCORDANCE WITH THE LATEST REVISION OF THE 2011 VWAPM. N 0 N J Z z w O 0 Z Z cn 0 Z 0 O w CO w > n- Lu D_' N Z 0 JN 0 0 LLJ W No U U) U U7 Z LLJ 2E LU Z a- Q a - >a J LJJ ry O i N 0 N C) 0 CO 0 W Q IY W Ltl Z_ CD Z W P. 0 QY i I- Z D O W J Q 2 W m J Q Z Q I..L LL LL LL O Lii Z Z W Z CQ G to co M jt 0c O J J MW PHASE 1 PHASE 2 e C° \ KEEP 12' MIN. ACCESS OPEN DURING CONSTRUCTION \ !1 WHEN ABLE 1 r 355 WORRELL DRIVE / I / I / I I I 1 I I 1 I I I I I I I I 1 1 I 1 1 I I I I I 1 A I I 0 I x I O z I ' v I � ' ' I v I I I I \ I O WORK ZONE: ROAD CLOSED FOR; c CONSTRUCTION IN rrri THIS SEGMENT N C) 1 I I 0 I I I I I r'r I I > 0 PARKING OPTION: PARK ALONG SECTION I 1' NO OPEN TO TRAFFIC ALONG WORRELL DR IF U� I ACCESS MUST BE CLOSED FOR CONSTRUCTION I % ,I \ � I \ 400 WORRELL DRIVE " o Q, v \ �O \Z O'A \ b WORK ZONE: ROAD CLOSED FOR CONSTRUCTION IN \ THIS SEGMENT UNLESS OTHERWISE NOTED IN SOC \ PHASE 2C: COMPLETE CONSTRUCTION OF THIS PORTION OF WORRELL DRIVE AFTER PHASE 2A AND 2B ARE COMPLETE. THIS SECTION OF WORRELL DRIVE TO REMAIN CLOSED DURING ALL OF PHASE 2 (2A, 2B, AND 2C) , o y0 POSSIBLY NEED TEMPORARY PAVEMENT ADJUSTMENTS GRAVEL OR AGGREGATE FOR GRADING DIFFERENCES BETWEEN EXISTINGI AND PROPOSED FORI PHASES 2B, 2C, AND 3 /PHASE 2B: COMPLETE CONSTRUCTION OF THIS PORTION OF DRIVEWAY AFTER PHASE 2A IS COMPLETE AND NEW DRIVEWAY IS ACCESSIBLE. PHASE 2A: COMPLETE CONSTRUCTION OF THIS OF DRIVEWAY \� �EXISTINGRTION ADJACENT ACCESS OPENING IV IRArrll. CHANNELIZING DEVICES NEEDED TO TRANSITION FROM NEW EDGE OF PAVEMENT TO EXISTING EDGE OF PAVEMENT � p1 \ D CHANNELIZING DEVICES MAY BE NEEDED TO TRANSITION FROM NEW EDGE OF PAVEMENT TO EXISTING EDGE OF PAVEMENT FOR PHASES 2B, 2C, AND 3 / OI II�NI 1 I/ 12 19 N LEGEND 'O-m ALLOWED TRAFFIC MOVEMENTS L_ CLOSED TO TRAFFIC NOTE REFER TO DEMOLITION, GRADING, AND LAYOUT PLANS FOR DESIGN INFO. 80 0 80 160 SCALE IN FEET LEGEND 4-- ALLOWED TRAFFIC MOVEMENTS L_ CLOSED TO TRAFFIC NOTE REFER TO DEMOLITION, GRADING, AND LAYOUT PLANS FOR DESIGN INFO. 80 0 80 SCALE IN FEET 160 N 0 N J z z W 0 U F Z � 0 Z U O a w Z JN d O Lu 00 W o Q U cq U ^II c/) z U) Q J z a- LLl 2E Q U LLI zLL O Q 0�z IZ Q LL Lu o o 0 Q Lu LLl Q z J m LLl z z Q LLJ o Q C N � C C() 0 Q CDN co ❑ L0 O LLI co w Y O a' z z = m QLLJ Q ❑ w U U r� \ J W r, O J J 1Y00 O c') Nt �MoNp uj J kz _ M Q 'NO, W�ca CL O CL Lu NN Lo N c w IIW''11 c R a d 0 0 U N C U w PHASE 3 PHASE 4 e D ` v� \ O O �� \ Fps oy O� e POSSIBLY NEED TEMPORARY-j PAVEMENT ADJUSTMENTS / 1 GRAVEL OR AGGREGATE FOR GRADING DIFFERENCES BETWEEN EXISTING AND PROPOSED FOR PHASES 2B, 2C, AND 3 \ PARKING OPTION: PARK ALONG SECTION \ OPEN TO TRAFFIC ALONG WORRELL DR IF �- ACCESS MUST BE CLOSED FOR CONSTRUCTION � p1 i r ROAD CLOSED FOR CONSTRUCTION IN r/.- THIS SEGMENT CHANNELIZING DEVICES MAY BE NEE-DED--ZZ: TO TRANSITION FROM NEW EDGE OF PAVEMENT TO EXISTING EDGE OF PAVEMENT FOR PHASES 2B, 2C, AND 3 I 14. % , I / 1)t 384 WORRELL DRIVE ROAD CLOSED FOR CONSTRUCTION IN 1 THIS SEGMENT - -- I I / I I I 1 1 1 1 1 I I I I I I I 1 1 1 1 1 I I I I 1 1 I I = I 0 Z I I v I I I p I ' I \ I ' I z o I c I rri Ln N I p I 1 I I I 1 I KEEP 12' MIN. ACCESS OPEN DURING CONSTRUI WHEN ABE WORRELL DRIVE 1 I —PARKING OPTION: PARK IN, THIS AREA OF ISHAM AVE OR ADJACENT PARKING LOT. SL I 1 I I I I I 1 I I I 1 1 1 1 I I I I I I I � I I I I I i I I I I I I I 1 I I I I I I I I 1 I I 11 I I I I f• 0 c N CA 0 LEGEND ALLOWED TRAFFIC MOVEMENTS O CLOSED TO TRAFFIC NOTE REFER TO DEMOLITION, GRADING, AND LAYOUT PLANS FOR DESIGN INFO. 80 0 80 SCALE IN FEET LEGEND ALLOWED TRAFFIC MOVEMENTS O CLOSED TO TRAFFIC NOTE REFER TO DEMOLITION, GRADING, AND LAYOUT PLANS FOR DESIGN INFO. 80 0 80 SCALE IN FEET 1F-061 160 N 0 N J z W O U F Z � � O Z U O a Lu Z Q a o H N W O 00 Lu N Q _ � U co U ^II U Z J Z LLJ Q U Lu zLL LL O Q a ? LL Lu 0 Ov O Q w W o Z J m Q W Q W O Z Q N o U) rn Q O CV CD (� L0 O LLI rn Lu Lu Y O Z m Q Z 2 Q Lu U U O N J rrrr��i,, O J J 4PY00 J �' O M N d, �MoNp N I, CL J O QD J Lu W00CL o � � NN N C n m c N a d N 2 0 U 7 N 0 U N C w W 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS ' 01-3A, 3B, 3C EXPANSION KEYED @ DI -SA 38, x DI-1 1/2 SECTION CAST RON �� 1/X SECTION STEEL IC-2 N FOR DETAILS OF INLET JOINT CONST. FRS _ TABLE OF QUANTITIES NOTES N EXPANSION JOINT 3'-f0" FRAME i COVER BACK OF SIDEWALK r JOINT 11 (APPROACH T-77" SEE STANDARD IC-2. / OUTTER¢ LUGS TO BE I- '1_31/ 11 -I L 1/z• z 2411 z LONG 7- DEPTH OF INLET lH) TO BE SHOWN 0' i'i" RASED LETTERING PLANS. FOR DEPTH GREATER THAN USE BARS G 4•• 2" w „ m� BAR G- . '(KA1APrE& TYPE L AREA OF Cu. YIN. No. BARS F!. No. BARS B t. a REINORBARCuNGe STEEL D F No. Lin. Ft. III No- N. Fee No. Un FtAi LIAR m A MILAN A to,_4^ Loxc z iEiNDHAnos AaNSPEQ°Fm oN� 7 EIPLANs / / / \ \ \ JMQ 0 SLOT r STANDARD DI -IA • BARS C 6...� .� o - BAR I SUBRASE FL - - A m ARS F rc "' 2" HARDWARE 01-3A T-8• 1.15 2.28 1 5'-7" 3 3,-2" e jam` BARS B a ♦ CLOTH WILL BE MEASURED FROM THE INVERT OF LETTERING OPTIONAL MS F WEEP HOLE. 4' 1.83 2.50 5 1'-8" 2 = e'- 3 5'-7" 3 3'-2" 4 1'-8" 3 1'-e" 4 - L N F _ CAST GILV. ONE WELDED TYE OUTFN.L PIPE TO 71E TOP OF 7YE \ ❑ ❑ ❑ SLOT y SEE NOTE 8 8' 2.75 3.02 5 3'-8" 6 '- " '- " 3 5'-7" 3 3'-2" 4 Y-6" 3 '1 4 - 11 F IRA STEEL JOINT STRUCTURE. PI -AR "H" DIM7NSgNS AE a of B' 3.67 3.46 5 5'-8" 10 " 3 5'-7" 3 3'-2" 4 5'-6'• 3 1'-e" 4 e a w APPRO%MATE OILY FOR ESTIHMTNG H "' gg ± WELD &L PURPOSES AD THE ACTUAL DIMENSIONS / \ ❑ ❑ ❑ ❑ W DI-38 O' 4.68 3.90 5 7'-8" 14 8'-7" to 8'-O" 3 5'-7" 3 3'-2" 4 7'-6" 3 1'-e" 4 - 04 OPTIONAL 43.6 LBS CzCTORS SHALL SE DETERMINED BY THE ...;.. - IT SM 4.34 5 9'-8" 18 '-7" 3 Ili 3 3'-2" 4 9'-6" 3 Il L - 251 _ _ BRACE RIBS 3 LBS TO COLLAR CONTRACTOR FROM FIELD CONDITIONS. B / 1 B A A 2 1 . 6.42 4.78 5 n-0" 22 - " - 3 Ili 3 3'-2" 4 111 3 11 L - 98 INCLIDING INCLIDING 3. WMEN SPEgFGD N THE PLANS THE ❑ ❑ ❑ ❑ ❑ ❑ 0 11 II AR F BAR A •NOTEaSSE to- 7.33 5.22 5 Ill 26 '-7" 3 Ili 3 3'-2" 4 13'-6" 3 11 L - 345 m LUGS CONNECTORS AVERT Is TO BE SHAPED N ACCORDANCE �W O ry I p ARS D FACE OF CURB 18' 8.25 5.88 5 15'-8" 30 '- " 3 5'-7" 3 3'-2" 4 15'-6" 3 1'-8" L = 391 WITH STANDARD IAM IS -AC ING COST MATERIALS ®• ®• Y . 35 GUTTER B' 3.8] 3.45 10 2'-9" B " " 5 5_7„ 3 3,_2 B 2, 9„ 8 1� 8" 2 9%" 9%" FURBISHING I NH PLACING AL FOR I I V CR K CONTROL JOINT CRAG( CONTROL JOINT '_ .. 2,_p, LUGS STUD NCIDENT& TO THE SHAPING IS TO BE ' ❑ ❑ 10'NAX. _1 to 5.� 4.33 0 14 =9''' 78 8_7 to 6'_IO„ 5 IllIll 3 b-T' a 14-L" 6 7.8 2 ,_ „ 41 GO INCLUDED IN THE BID PRICE FOR THE 1 6' MN. PLAN 8 (GRATE REMOVED) /Y z }/E" x 4" STUD SHEAR STRUCTURE. z SECTION A -A 4'-2• 4 MAX. PLAN 2' 9/z' HEAP 4. N THE EVENT THE INVERT OF THE ❑ ❑ ❑ ❑ Z A L-VARIABLE - MAX, 20' r KEYED COAST. JOINT DI-3C 14' 8.42 L.T/ 10 5'-9" 20 8'-7" to 6'-IO" 5 5'-7" 3 3'-2" a 5'-9" 8 1'-8" 2 g f- , CONNECTORS BOTTOM OF HSTRUCTURTNE R THAN THE 1 WARPED SEE DETAIL A OF THE STRUCTURE SHALL BE SHAPED \ (n O may{ GUTTER 16' ].33 5.21 10 Ill 24 '- „ 5 5'-7" ; 3'-2" a e'-9" 8 1'-0" 2 W, WTTH CEMENT MORTAR TO PREVENT ❑ ❑ ❑ 5 2'-0" 8' 2'-6" 8" J'-0" 2" III �IF \ /y Z U �� I B z I I BARS A APPROACH 1B' 8.25 5.85 10 7'-9" 28 8'-7" to 6'-IO" 5 5'-7" 3 3'-2" 8 ]'-9" 8 1'-8" 2 '- " _ N 0 WATER IN THE / i'i' x 1/x" SLOT �q/ y w -- Zi GUTTER 20' B.1] 6.09 10 8'-9" 32 ,_ " „ 5 5'-7" 3 3'-2" a e'-9" 8 1'-0" 2 ,_ „ COLLAR DETAIL STRUCTUE.THE T OFFNCIDHN& \ ••J r0 WATEP SECTION B B + N - L yZ' MIN 0 � PLACE' L MATERIALS ENT ^'� - LE G TO INLET SHAPING IS TO BE INCLUDED (n {J _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - NOTES 21 N THE BD PRDE FOR T E STRUCTURE. / a •. �• - i APPROXIMATE WEIGHT �j • RASED LETTERING TTERIN B S G I H .0 5. STEPS ARE TO BE PROVIDED WHEN H IS CAST IRON 1 DIMENSIONS FOR DUMP NO WASTE DRAINS TO WATERWAYS 4'-0" OR GREATER. FOR DETAILS SEE O f 04 L 1. DEPTH OF INLET (H) TO BE SHOWN ON PLANS. ]- #4 X 8" SMCTH DOWELS AT APPROXIMATELY 16. THS AREA MAV BE EARTHEN, IN WITCH CAE CAST IRON ONLY STANDARD STA FRAME 56 + 4 LBS.IBARS F BARS E LAB n o 12" C-C TO BE PLACED N ALL AREAS ADJACENT THE EXPANSIN JOINTS WILL APPLY ONLY TO COVER 83 � 4 Les. COVERN*3" DIAMETER BAPS E 2. THE "H" DIMENSION SHOWN ON THE STANDARDS TO ABUTTNG CONCRETE TO PREVENT CURB AND GUTTER. DETAIL B 8. THIS ITEM MAY SE PRECAST OR CAST - WEEP HOLE BARS B AD SPECIFIED ON TIE PLANS WLL BE ETTLELENT. THIS IT E. FRAME Z FRONT ELEVATION 1'-8" 8" MEASURED FROM TE NVERT OF TIE OUTFALL B. CONCRETE QUANTITIES SHOWN ARE FOR DEPTH - I BARS F PIPE TO THE TOP OF THE STRUCTURE. a, 3" DIAMETER WEEP HOLE TO BE LOCATED TO GO OF 5'-2" WITHOUT PIPES. THE AMOUNT DETAIL A 2,-6„ `D l Q LN - (GUTTER REMOVEDI 3'-0" ]. #4 X IM SILLY 12 DOWELS AT ' FOR STI DIMENSIONS ME MING PURPOSES ND THE ACTUAL ONLY DRAIN SUBBASE MATERIAL. WEEP HO WITH OBTAIN TR BY PIPES MUST BE INLETS OF TO 4'-2" CIADWAE 1,_J„ SEE DETAIL B pppRO%IMATELY 12" C-C TO BE J La 5M/i' BENT PLATE - SECTION B-B DMENSIONS S1HALL BE DETERMINEDHBYTHEOR GAVANAISZED STEELWWIRE YOTH xWRE11 E DOUFFERENTUDEPPTQUANTITIES. I STADD ORpSUBTRACT 0.32 OF CLOTH T-4" DIA. 1'-9,Y'j' CIA. 2'T' J I PLACED IN ALL AREAS ADJACENT G g�• CONTRACTOR FROM FELD CONDITIONS. DIAMETER 0.03"•NUMBER 4 MESH HARDWARE CUBIC YARDS OF CONCRETE FOR EACH FOOT I 4" DEPTH AACR - TO ABUTTING CONCRETE TO PREVENT 1%i _.:,.; ... \ i88, i78 SETTLEMENT. NOTCH RAU DOWELS 3" 1'-10" DI0. T. N CLOTH ANCHORED FIRMLY TO THE OUTSIDE OF DEPTH. �" 1'•• 3. WHEN SPECIFIED ON THE PLANS TIE AVERT 6 W THE STRUCTURE. RIIPP IMIMI •' FINISHED 1/T •:' . I .::.. ::.. TO E SHAPED N ACCORDANCE WITH STANDARD n, LENGTH OF ANGLE ROOM AS SHOWN ON SHEET 1 SS OS " > 38 DW.ETERTM N SEE STANDARD ALTERNATE OESIGN.Y3,4 FOR �• - X„ MACHINE MACHINE 3i" DIMENSIONS -« /� R ., •., 1 IS-1. THE COST OF FURNISHING NO PLACING ALL 9. ALL REINFORCING STEEL SHALL HAVE A LAN. OF 2 IS TO BE L+B'• AT 4.10 LBS./FT.. TYPE A NOSE DETAIL SHALL BE USED WITH CO-3 0 CG-] STANDARDS. ... L2/"X2%"X'/." IT 11 MATEIALS INCIDENTAL TO THE SHARING IS TO BE COVER OF 2". x =_ - z D. COLLAR WEEP HOLE _ /, \ - - MACHINE �INEITYPE B NOSE DETAIL SHALL BE USED WITH C-2 I! C-6 STANDARDS. TYPE A LARIZ�DINCLUDED IN TIE BD PRICE FOR THE STRUCTUE. 18. a DENOTES LENGTH OF ONE (0 BAR. �B 9qEE NOTE 8 iO a. f DIAAMSTIC ERRDWEEPWARE LOTH ITH' MEs2YPE B Y2 X 4• STUD SHEAR CNNECTOR WELDED 10. ILL REINFORCING STEEL TO BE CUT CLEAR OF » � n /••" O Ljj GALVANIZED PLATE FOR TYPE A TO BE BENT N AN ANGLE OF 68.30' TO ANGLE RON AT VC-C. IN THE EVENT THE INVERT OF THE OUTFALL ALL OPENINGS BY 2". 19. ALL REINFORCING BARS TO GEMS. 12" "" OR GALVANIZED STEEL WIRE, MINIMUM I 4. PIPE IS HIGHER THIN THE BOTTOM OF THE • - - _ 12"-16"-B" OR 24" WIRE DIAMETER 0.03", NUMBER 4 MESH J CONNECTORS END IS T A ANCHORED WITH /i' X 4" STUD SHEAR NTo - n HARDWARE CLOTH ANCHORED FIRMLY .. NOSE DETAILS STRUCTURE, THE AVERT OF THE STRUCTURE H. CAST -IN PLACE CONCRETE R TO BE CLASS AT 20. WHEN INLET IS USED N 4O CONFORM BICN OF 4 4, _ :♦` WELDED TO BENT PLATE AT 2'C-C. � TO THE OUTSIDE DR THE STRUCTURE. LLI Q 2" SHALL BE SNIPED WITH CEMENT OF TARFAT TO (3000 PSU. PRECAST CONCRETE 6 TO BE INLET IS TO BE SHAPED TO CONFCAI TO aN nq s 1 SECTION A -A (� fn Z R. PAVEMENT PREVENT STANDING OR PMST OF WATER 4000 PSI. PROPOSED CURB. • �� > G, m 9. CAST IN PLACE CONCRETE IS TO BE 1if' 11 IN THE PLACING ALE. THE COST OF NT& TONG m A s CLASS A3 (3000 PSI). PRECAST I DI-3A L 01-38 L DI-3C L 'T�; WARPED PAVEMENT AND SLICING ALL MATERIALS INCIDENT& BID @. LENGTH OF SLOT fU WILL, IN EVERY CASE. BE r•�,����•, CONCRETE IS TO BE 4000 PSI. 1'-10" DIAL 1 . PRIDE SHAPING E TO C INCLUDED IN THE BD SHOWN N PLANS. PRICE FOR THE STRUCTURE. Me 1" 11 - „ 10. ANY ALTERNATE METHODS OF AOd10RAGE 13. F INLET IS AL CURB. IN IS TO CURB DR SECTION A -A '�' 31�' ^ MEETING THE APPROVAL OF THE ENGINEER SECTION B-B - - - - LOW - - a, OREPS ARE TO BE GREATER. FOR DETAILS SEE HEN H IS STANDARD SO_A OMITTED (SEE DETAIL). GUTTER IS TO BE CONCRETE QUANTITIES FOR MIN. DEPTH SEE DErPl B x x x LUGSBASSSN)TWN�HEREOFNDR. THE CAST IRA NOTES I . FLOW 1 f.LQW 1 0 B. THIS ITEM MAY BE PRECAST OR CAST -IN -PLACE. 14. STANDARD INLETS MAY BE CONSTRUCTED WITH 12" TE PPE - 1.440 CU. YD. CONCRETE APPROXIMATE WEIGHT 1, THE LETTERS V.D.O.i. ARE OPTIMA, IF USED THE LETTERS ARE TO BE f /� CONCRETE BLOCKS IN ACCORDANCE WITH THE M" �TE PPE - 1.528 CU, YD. CONCRETE 4/." I �j' CAST IRON 1. DUMP NO WASTE DRAINS TO WATERWAY 1 1 1`L I DETAIL WHEN USED DETAILS SHOWN ON STANDARD DRAWING DI-MB. N t y GRATE 383 ± 1B LBS LETTERING LOCATONUIOFDLETTALL ERNG IMAY CAST j HIGH AS SHOWN. IN TOP OF THE COVER 1" WIDE PAID REED B" TE PPE - 1.820 CU. YD. CO CRETE 24" CONCRETE PIPE - 1,817 CU. YD, CONCRETE SECTION C-C SECTION D-D VARY BY MANUFACTURER. FOR USE N GRADES ADJACENT TO CURB ADD 0.489 CU. YD.PER 2 ONE ALL MIC-2 COP NO VERS. TE DRAMS CATION OFLETTERINGINGAYS L MAY aVARY NG SBYE MUANUFACTURER. FOR USE IN SAGS WITHOUT GUTTER ADOil FOOT OF DEPTH. GRATE DETAIL BOTH SIDES TO BE SYMMETRICAL VDOT SPECIFICATION SPECIFICATION VDOT vmT SPECIFICATION SPECIFICATION STANDARD CURB DROP INLET REFERENCE REFERENCE STANDARD CURB DROP INLET STANDARD DROP INLET REFERENCE REFERENCE STANDARD INLET AND FRAME COVER �VDC]T ROAD AND BRIDGE STANDARDS ROAD AR0 PoRDGE STAROADS ROAD PMD BRIDE STADAR05 ROM AND BRIDGE STANDARDS s1EET 1 a z REVISIN DATE 12" - 30" PIPE( MAXIMUM DEPTH (H) - 8' z33 z33 12" - 30" PIPE: MAXIMUM DEPTH (H) - 8' REVISION GATE sHGEr z DR z SHEET 1 of A REVISION DATE 12 - 24 PIPES MAXIMUM DEPTH (H) - 10 233 z2a REVISION DATE SHEET 1 of 1 104.09 OB/10 VRGNIA DEPARTMENT OF TRANSPORTATION 302 302 VIRGINIA DEPARTMENT OF TRPNSPORTATION 104.q 104.01 VIRGINIA DEPARTMENT OF TRANSPORTATION 302 302 VIRGINIA DEPARTMENT OF TRANSPORTATION 04/20 105.01 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS W 2 Q L\L1 Z 0 E LL_ Z > 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS G J Z W PB-1 PB-1 EC-1 GENERAL NO PROJECTION OF PIPE ABOVE GROUND LINE DETAIL 1 DETAIL 2 B END -SECTION 12" - 60" PIPE ALTERNATE END -SECTION 12" - 60" PIPE ES 1 W Q O Q 1. METHOD "A" PIPE BEDDING SHALL BE USED FOR ALL TYPES OF PIPE CULVERTS WITHIN THE HUB END N OUTLET END -SECTIONS 4A- RA SPIGOT END N INLET END -SECTION HUB END N OUTLET END -SECTIONS U APPLICABLE HEIGHT OF COVER RANGE NOTED IN THE STANDARD PC-1TABLES UNLESS TOP OF FILL TOP OF FILL TOP OF FILL �B DESPIGOT ENO ON INLET END -SECTION OTHERWISE NOTED N THE PLANS. 2. H - HEIGHT OF COVER MEASURED FROM TOP OF CULVERT TO FLASHED GRADE. _ _ A '^ X _ _ X X _ X O J O GROUND LINE x GROUND LINE x GROUND LINE x - - 3. b - EXCAVATION DEPTH AS SHOWN ON PLANS OR TO FIRM BEARING SOIL. _ A A 1 1 r 1 I„I� UI yp 1 - - - - - - - - CONCRETE TO BE - - ■ CONCRETE TO BE LLL JJ 4000 P81 MINIMUM ���LLL 1_ - _ - _ - _ - _ J' 4000 P31 MNM1M � Q ' `R - /irir rrrr - - /iirr r/Jr I I I� I1=11r _ - rrrrrr rrJ - - j m I A CIRCULAR PIPE -rrr rrr 11�- -'I rrr rr Ilr' -'iEll r// rrril III "' ? 1N -- w -- rr ri ri rr 1 11�'�N 1_ - C L D •OUTSIDE DIAMETER OF APE. -II r p r EARTH t .II p ROCK DI . p EARTH \ Z _ _ 2. O - INSDE DIAMETER OF PPE. SOILBEDDIELDING x M NG 3. X - WDTH OF CLASS I BACKFILL MATERIAL BEYOND THE EXTREMITY OF THE PPE. MATTEIIA `" '^ PLAN PLAN JX.18" WHERE EIS LESS THIN 38". B B C B ET WQ X . 18" WHERE E IS 38"AND GREATER. MIN. MMIN. 1/10 D NMIN. 1/10 D 1/10 D - F PL.L 4. NWHEREORMAL DRECTED BY THE ENGINEER. BEDDING MATERIAL MAY BE ELIMINATED FOR X D % BECDNG x D X BEDDING L C B L0LNORMAL EARTH FOUNDATIONS UNDER ROUTINE ENTRANCE PIPE (EXCEPT PLASTIC PPE) MATERIAL MATERIAL X 0 % 30" NO LESS IN DIAMETER WITH HEIGHT OF COVER 15-OR LESS. '/>" PER TOF H B '`OPRp E i11N. 8", MO. 24" FOUNDATION SOFT, YIELDING, OR x � 'A ok J'15Lpp 5. REGULAR BACKFILL MATERIAL MAY BE USED IN LIEU OF CLASS I BACKFILL MATERIAL FOR NORMAL EARTH FOUNDATION OTHERWISE UNSUITABLE MATERIAL FNRD I STEEL FABRIC REINFORCEMENT 11 ALL FOUNDATION TYPES FOR ROUTINE ENTRANCE PIPE (EXCEPT PLASTIC PPE) 30" AD ROCK FOUNDATION RD(EpNGE1DIc J _ - - - - - - - - - - - - LESS IN DIAMETER WITH HEIGHT OF COVER 15' OR LESS. 1 a 1 8. BEDDING MATERIAL AND CLASS I BACKER.]. MATERIAL MAY BE ELIMINATED FOR SHOULDER PIPE PROJECTION ABOVE GROUND LINE SLOT INLET (DI-13) OUTLET PIPES INSTALLATIONS. x / I PAY p GEOTE%TILE - ELLIPTICAL PIPE MIN. 1.5 x D MIN. 1.5 x 0 MIN. 1.5 x C MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D FABRIC _ A 1. SA -OUTSIDE SPAN DIMENSION OF PIPE. TOP OF FILL iDR DR FILL TOP OF FILL m FABRIC FPI3RICXTILE - SECTION X-X END EVEEW SECTIONNX-X END VIEW 2. S2 - INSIDE SPAN DIMENSION OF PIPE. x x x _ SECTION A -A SECTION A -A SECTION A -A w END SECTION DIMENSIONS END SECTION DIMENSIONS 3. R - OUTSIDE RISE DIMENSION OF PPE. - - PIPE DIAMETER A B C D E PIPE DIAMETER A B C D E JJr// rrrrr .% - Jr/JJ JJ/r ::::::::• - rrrrrrr///r// rrrXr/rrr/N- 12" 4" _ 2'_p" 4' 0" 2•_ " 12" 4" 4'_7• ,_1„ 2•-p" 4. X •WIDTH OF CLASS BACKFILL MATERIAL BEYOND THE EXTREMITY OF THE PIPE. = rrr rrr 'x: :::•• rrrr rrr «iiiiii - - ///iiir/rir Ur/Jr//rrr = MIN. 35 X - 12" WHERE S IS LESS THAN 36", ry /J rp 'yyyyyyy .. 15" 8" - 1'-9" 4'-0" 15" e" 3'-O" '-1" 2'-6" 2 :• rr' rJ .:::::••.-:ti':titi' ::'rrr rr :::::::• _ /rJNrrr// U/N/Urr= W iT-Y_ X - 18" WHERE 52 IS 36" AND GREATER c -r• w• •:• r d Ir iiti11: uNEUNO o r rr: };:::: LINLUND . = r/r/JJrrr p rrr/rrrJr _GROUND 21" 9g" ,-1 • 2'-01" '- " f, 21" 9" '- " 1A" 8-1" 3'-8" N 5. WHERE DIRECTED U THE ENGINEER, BEDDING MATERIAL MAY BE ERE STIED FOR ••., ,,,;;,,, o -LINE NOTES NORMAL EARTH FOUNDATIONS UNDER ROUTINE ENTRANCE PPE WHERE 52 IS 38" DR -}.. :: • v::•:::. _ - • - w p LESS AND HEIGHT OF COVER 15-OR LESS. - :: vv.•.•.•.•. _ •• - _ - q i--. 24" Ill '_7" 2'-6" - 24" 10" '-p' 2,-8• 6'y" V-0„ Q o = o o - - 2T' 10 2�_T� ,_ ,� �, v„ 10 4,- „ 2M_ e,_p „ 4M_8. cQ S. REGULAR FOUNDATION T MATERIAL MAY IN USED IN LEU OF CLASS I BACKFILL MATERIAL AND -- 1. FOR MULTIPLE LIE NSTNLATgNS. DNDNSION S IS TO GOVERN THE PROTECTION N G ALL FOUNDATION TYPES FOR ROUTINE ENTRANCE PPE WHERE 52 IS 38" DR LESS AND o y EARTH I -� ROCK OR ' � OUTSIDE THE CHANNEL WIDTH (YIN. 30" 1'-0" '- " 1'-] 8'-1 '- " 30" 1'-0" 4'-8" 1'-7 e'-1 6'-0• HEIGHT OF COVER 15'OR LESS. MIN. 1/10 D UNYIELDING r / 2. N ANY INSTILLATION REQUIRING CULVERT OUTLET PROTECTION WHERE NO ENDW&L 33" 1'-1 " " T-31 7'-1 '- " 33" 1'-7 4'-D1 " 3'- " al a'-6" G < MIN. 1/10 BEDDING /z• Sag �I. II _ I _ II-, SOIL - - ^ - - - N EMOSECTION IS SPECIFIED M THE PLANS, CONSTRUCTION E TO BE N ACCORDANCE 36" 1'-3" 5'-3" 2'-10 " al 6.-0.. 38" 1'-3M' 5'-3" T-10 " a'-1 " 6'-0" O N MATERIAL 1" OF H % D % MIN. 1/10 D n BEDDING EARTH 4L, WITH OETAL 2 SHOWN ABOVE. 42" 1'-9" 5'-3" T-11" all 8'-8" 42" 1'-g" 5'-3" T-11" 8'-T' 8'-8" (D �/ L0 PIPE ARCH MAX.N. a", BEDDING MATERIAL 48" 2'-0" 8'-0" 2'-2" 8'-2" 7'-0" 48" 2'-0" 8'-0" 2'-2• 8'-2" 7'-0- '� FTY M24" MATERIAL 3. GEOTEXTLE FABRIC TO BE INSTALLED UNDER CLASS N,Z, AND I MATERIALS N Q LL V i1') L S - SPAN DIMENSION OF PIPE. NORMAL EARTH FOUNDATION FOUNDATION SOFT, YIELDING, OR ACCORDANCE WIT1 THE SPECIFICATIONS. 54" T-3" S'-5" 2'-91 " 8'-21 " 7'-6" 54" T-3" 5'-5" 2'-T" a'-4" 7'-8" Lu � � ROCK FOUNDATION OTHERWISE UNSUITABLE MATERIAL GEOTEXTILE 4. 3 • DIAMETER OF CIRCULAR CULVERT OR SPAN FOR BOX, ELLIPTICAL OR ARCH CULVERT, 80" 2'-11" 5'-0" 3'-3" 8'-3" a'-0" 80" 2'-8" 5'-0" 3'-3' 8'J" B'-0" W Y O 2. R •RISE DIMENSION OF PIPE. FABRIC H - DM)IETER OF CIRCULAR CULVERT OR RISE/HEIGHT FOR BOX, ELLIPTICAL OR ARCH LENGTH OF PIPE Z 3. B - SEE PC-1 rAHLE FOR APPLICABLE PIPE MATERIAL BEDDING MATERIAL IN ACCORDANCE WITH EMBANKMENT CULVQtfM PAY LIE ® SECTION 302 OF THE ROAD LAND BRIDGE ® NOTES: SECTION B-B i USE TYPICAL SECTION SHOWN ON PLUS FOR SIDE SLOPE, BOTTOM WIDTH IUD DEPTH SHOULDER C B �J W Q 4. x - WIDTH OF CLASS IBACKFILL MATERIAL BEYOND THE EXTREMITY OF THE PIPE. SPECIFICATIONS. NOTES( Z = D] z • 12" WHERE 52 IS LESS THAN >8". FOR GENERA NOTES ON PIPE BEDDING, MAXMUM CUTLET OF CHANNEL OR MATCH EXISTING DITCH OR NATURAL GROUND. x - B" WHERE 52 IS JB" AND GREATER ANS ARE 0 WITH SSECTIONK31LL 02 OFERIA- IN ACCORDANCE SEE THE ROAD MD BRIDGE AND INSTALLATION SEWERSFGEIPE CULVERTS NERAL NOTES TYPE DR OUTLET PROTECTION MATERIAL VELOCITY MINIMUM „I,� BASEDEON E�aND a3EC SECTION DEON SIGN SHOWN 5. WHERE DIRECTED BY THE ENGINEER. BEDDING MATERIAL MAY BE ELIMINATED FOR SPECIFICATIONS. ON SHEET 107.00. (FOR DESIGN STORM) (INCHES) W U U OUTLET PROTECTION MINIMUM LENGTH fU N THE LEFT. F THE CONTRACTOR ELECTS NORMAL EARTH FOUNDATIONS UNDER ROUTINE ENTRANCE PPE WHERE S IS 35" N REGULAR SECTION LL MATERIAL O ACCORDANCE TO USE THE ALTERNATE DESIGN SHOWN ON 2 ''!!��++��!!�R FOR PLASTIC PIPE CLASS I BACKFILL MATERIAL WITH SECTION 302 DR THE ROAD ARID BRIDGE CRUSHED GLASS CONFORMING TO THE CLASS Al CLASS Al DRY RIPRIP a THE RDHT LENGTHS WILL BE REDUCED BY LESS AND HEIGHT OF COVER 151OR LESS. L..::.] IN ACCORDANCE WITH SECTION 302 OF THE ROAD SPECIFICATIONS. Po° 1B _ _ Gj111A SIZE REQUIREMENTS FOR CRUSHER RUN TYPE A INSTALLATION 311 CULVERT THE DFFEI2ENDE IN DIMENSION "D". S. REGULAR FOUNDATION T MATERIAL MAY IN USED IN LIEU OF CLASS I S 35" O MATERIAL FOR MO BRIDGE SPECIFICATIONS. AGGREGATE SIZE 25 AND 26 MAY BE CLASS I CLASS I CRY PoPRAP 14 fin; 24 ALL FOUNDATION TYPES FOR ROUTINE ENTRANCE PPE WHERE S IS 35" N LESS ARID USED IN PLACE OF CLASS I BACKFILL. TYPE B INSTALLATION SX 1 HEIGHT OF COVER 15'OR LESS. I W ACCORDANCE WITH SECTION 302 OF THE ROAD CLASS I CLASS DRY PoPRAP 19 fpe 38 AND BRIDGE SPECIFICATIONS. SLOPE DETAIL �L L SPECIFICATION vDOT VDOT SPECIFICATION SPEgFDATON vDOT SPECIFICATION v=r IO~ ^ (/) t9y REFERENCE INSTALLATION OF PIPE CULVERTS & STORM SEWERS INSTALL. OF PIPE CULVERTS AND STORM SEWERS REFERENCE REFERENCE ` REFERENCE FLARED END SECTION t `�' J W ROAD AND BRIDGE STANDARDS ROAD PAID BRIDGE STANDARDS CULVERT OUTLET PROTECTION ROAD AND BRIDGE STANDARDS ROAD AD BRIDGE STNIOM05 �.R 302 GENERAL NOTES REVISION DATE SHEET 1 OF 1 SHEET 1 OF 4 REVISION DATE CIRC. PIPE BEDDING AND BACKFILL -METHOD "A" 302 204 REVISION DATE SHEET 1 DR 1 12" - 6D" CONCRETE PIPE CULVERTS REVISION DATE SHEET 1 OF 1 x J Q 303 303 303 VIRGINIA DEPARTMENT N TRARSEORTATION 302 E-'R 04 Z VIRGINIA DEPARTMENT OF TRANSPORTATION 107.00 10].01 07/12 VIRGINIA DEPARTMENT OF TRANSPORTATION {N T301 VIRGINIA DEPARTMENT OF TRANSPORTATION '02.01 _Q 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS by �0 J ITOD 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS Is-t ST-1 A CG-12 EC-1 DETAIL 1 DETAIL 2 O) PERMISSIBLE B O X4, GRADE 60, REINFORCING ROD ENCASED N CONSTRUCTION x5 DOWEL, 8" LONG p 12" C-C 1�B �. DETAIL 3 B M A CORROSION RESISTANT B RIBBER M OTHER JOINT 5' • NO. 6 GALVANIZED STEEL STEP MATERIAL APPROVED BY THE ENGINEER. MIN. RADA DIMENSION MAY VARY WITH MANUFACTURERS m 4. A III • DESIGN) W MATERIAIALN RESISTANT x e, A 1 n N 1 �f A R )L I I A M N I SHAPE TO ELEVATION 0'1 � � 10:1 ✓' 3 OF MID POINT OF '(� z LARGEST PIPE. <� B MA% B I s I n 5 # 4 REINFORCING ROD ut • �.r d511` - TYPICAL DESIGN SHAPE TO 1 TYPICAL SECTION ! "3 •' OF PIPE I TO 204 THROUGH GUTTER PAN SLOPE I• �_ J TO 20�1 THROUGH RAMP LENGTH B B y 1 O 1 V' TRANSITION GUTTER PAW SLOPE A GUTTER PAN MAXIMUM SLOPE 20:1 L �1 Z (••� •• • 1 1 TO 201 THROUGH RAMP LENGTH `•V I D 4' L B'-0" Min, 4�_p.� Mn. 4' x �. A ' "•D ��ll W 12:1 MAX. a8:1 MA%. •- r /N BACK 0: CURB v J & TYPE A I T SLOPE TO DRAIN TO INVERT FABRIC O vJ OF OUTLET PPE �� NOTES' 20 2'MIN. - WITH BUFFER STRIP GEOTE%TILE a DEOTE)('fILE• / O I :T STEPS WILL BE REQUIRED IN Nl STRUCTURES WITH A DEPTH OF I~.'I SECTION A A FABRIC 7 CIO ' SECTION A -A I . 4'-0" OR GREATER UNLESS OTHERWISE NOTED N THE PLANS. FEIHRIZRISE ` I O� •'':' 4/ x� ALL STEPS SHALL PROTRUDE 41/r' FROM INSIDE FACE OF SECTION A -A SECTION A -A SECTION A -A m U O KyN� TRANSITION BETWEEN : }w. R 3 STRUCTURE WALL. PERMISSIBLE PPE DIAMETERS WHEN METHOD OF TREATMENT IN DROP INLETS /. MAXIMUM STEP SPACING TO BE 18" C-C. CONSTRUCTION OFFDRENT SIZES OF //. JOINT PIPES ARE ENCOUNTERED. �e x STEPS SHALT WITHSTAND A MINIMUM FORCE OF 3C POUNDS WHEN MINT X W. R EXTENDED 4/x FROM THE FACE OF THE SUPPORT. _S Mil STEPS ARE TO BE VERTICALLY ALIGNED AND UNIFORMALY SPACED NOTES: Q U O FOR THE ENTIRE DEPTH OF ANY STRUCTURE. SECTION B-B M ii'' 11 TYPICAL SECTION EXAMPLE INSTALLATION METHODS - 1. FOR MULTIPLE LINE INSTALLATIONS, DIMENSION S E TO GOVERN THE PROTECTION W � N PRECAST UNITS STEPS MAY FA CAST IN PLACE, MORTARED SEE PLANS FOR LAYOUT CL NOTES' (DIMENSIONSUFACMAY VARY WITH INTO HOLES PROVIDED BY THE FARRICATOR, OR DRIVEN. NOTES( OUTSIDE THE CHARNEL REQUIRING M. O SHAPING WI MANHOLE AND MET INVERTS R ACCORDANCE WITH YARUFACTURER'S DESIGN 2. ON ANY INSTALLATION SPECIFIED ON CULVERT OUTLET PROTECTOR WHERE NO ACCORDANCE O THIS DRAWING S TO APPLY TO THOSE STRUCTURES SPECIFIED SLOPE TO ORNN a MINMN OF 3• EMBEDMENT STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS 1. FOR GENERAL NOTES ON THE DETECTABLE WARNING SURFACE, SEE SHEET 1 ID 5. OR ENOSECTION IS SPECIFIED ON THE PLANS, CONSTRUCTION E TO BE N A'CCOPoIARDE ST PLUS M WHERE INVERT OF PIPE IS ABOVE INVERT OF TO INVERT OF FROM THOSE SHOWN MAY &50 BE USED PROVIDED THEY MEET 2. THIS DESIGN TO BE USED FOR CONSTRUCTION THAT INCORPORATES WIDER SIDEWALK. LANDING WITH DETAIL 2 SHOWN ABOVE. W STRUCTURE. �j OUTLET PPE THE MINIMUMCONTRACTOR REQUIREMENTS SHOWN HEREON AND THE CONSTRUCTION. TRUCTONREO AT TOP OF CURB RAMP. MINIMUM CURB RAMP LENGTH a FEET FOR NEW A' ^ 1 CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS AND CONSTRUCTION. y 3. GE TEXTILEACCORDANCE FABRIC TO SE INSTALLED UNDER CLASS A,I, AND I MATERIALS N ` V IN MANHOLE A DROP INLET IS TO BE FORMED AND CONSTRUCTED RECEIVED TEST REPORTS AL THE PROPOSED SUBSTITUTE AND H/5 y =JJ ACCDROINCE WITH THE SPECIFICATIONS. _ 1 IN INVERT SHAPING WITH APPLICABLE STANDARD I OR SPECIAL DRAWING. RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE 3. CUTTER PIN SHALL BE A MAXIMUM SLOPE OF 20'1 AT THE RAMP OPENING. Q �I THE INVERT SHAPING AS DETAILED HEREON IS TO CONSIST DR A / n OF SUCH STEPS. �� GEOTIXTLE PORTLAND CEMENT CONCRETE MIX CONFORMING TO CLASS AS OR / v 4. OIAGON& PLACEMENT IS NOT PERMITTED, (n FARRIC 4. S - DIAMETER N CIRCULAR CULVERT N SPAN FOR BOX ELLIPTICAL OR ARCH CULVERT. �+ H -DIAMETER OF CIRCULAR CULVERT OR RISE/HEIGHT FOR BOX, ELUl OR ARCH CLASS C1M EXCEPT THAT 25X OF COARSE AGGREGATE MAY BE / ALL STEPS INSTALLED SHALL BE PROVIDED WITH SLIP-RESSTMNT N N CULVERT. w UP TO 4 N DIAMETER AND CONSIST OF STONE. BROKEN BRICK, _ A(+ SURFACES SUCH AS BUT NOT LIMITED TO. CORRUGATED KNURLED. 0 �O SECTION B-B y BROKEN CONCRETE OR BROKEN CONCRETE BLOCK. THE SURFACE I I ..:; OR DIMPLED SURFACES. O 0: Al USE TYPICAL SECTION SHOWN N PLANS FOR SIDE SLOPE,BOTTOM WIDTH AND DEPTH SHALL BE LEFT SMOOTH BY REINS OF HAND TROWELLING. NONE I - !%�,' �� U b OF CHANNEL N MATCH EXISTING DITCH OR NATURAL GROUND. OF THE COARSE AGGREGATE SHILL REMAIN EXPOSED. . 4 .'" ALUMNA STEPS SHALL BE FABRICATED IN ACCORDANCE WITH U MAXIMUM OUTLET ro a TYPE OF OUTLET PROTECTION MATERIN- VELOCITY MINIMUM "T" 'u J DETAILS OF INVERT SHAPING AS SHOWN HEREON ARE FOR EXAMPLE _- .' °' THAT B221, ALLOY HE STEP CROSSW K INCHES) (G PURPOSES ONLY. EACH MANHOLE N DROP INLET IS TO BE SHAPED _ THAT PORTION COATED THE STEP ENCASED IN MASONRY SHALL BE (FOR DESIGN STORM) INDIVIDUALLY TO BEST FIT THE PARTICULAR INLET AND OUTLET' `Np UNIFORMLY COATED WITH A BfTIAWMDIS, SOLVENT TYPE, ASBESTOS CROSSWALK N CARET PROTECTION MINUMUM LENGTH (Uuj CONFIGURATION AND FLOW LINES. i " 'A" q'(Fp FILLED ALUMNIM PIGMENTED COATING CONFORMING TO FEDERAL M TYPICAL PLACEMENT CLASS Al CLASS Al DRY RPRAP a fpa 18 m SECTION B-B SPECIFICATION TC-C-00498A TYPE A INSTALLATION 3x c PLAN wk cA TYPICAL PLACEMENT AT INTERSECTION CLASS I CLASS DRY RPRAP 14 1pe 24 `m ALUMINUM STEP AT INTERSECTION WITHIN CROSSWALK TYPE B INSTALLATION sx a METHOD OF TREATMENT IN MANHOLES WITHIN CROSSWALK (WITH BUFFER STRIP) CLASS I CLAW DRY WRAP 19 fpe 36 � `vDOT soactiCATIDEON SPEC 7qN VD= SPECIFICATION A COPY OF THE ORIGIN& SEALED MD SIGNED DRAWING IS ON FILE IN THE CENTRAL OFFICE. `VDOT SPECIFICATION VDDT CI STANDARD METHOD OF SHAPING REFERENCE CG-12 DETECTABLE WARNING SURFACE REFERENCE ` NON) AND BRIDGE STANDARDS STANDARD STEP ROAD AND BRIDGE STANDARDS ROAD AND BRIDGE STANDARDS 204 CULVERT OUTLET PROTECTION ROAD ANC BRIDGE STANDARDS SHEET 1 DR 1 REVISION GATE MANHOLE & INLET INVERTS REVISION PATE SHEET 1 OF 1 105 TYPE A (PERPENDICULAR) APPLICATION REVISION DATE SHEET 2 OF 5 245 REVISION DATE SHEET 1 OF 1 c 302 VIRGMA DEPARTMENT OF TRANSPORTATION 502 303 VIRGINIA DEPARTMENT OF TRANSPORTATION 0 D8.08 VIRGINIA DEPARTMENT OF TRANSPORTATION 106.09 504 VIRGINIA DEPARTMENT OF TRANSPORTATION 04/19 204.02 414 113 Ot t 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS w 0 U N g1 N C C W