Loading...
HomeMy WebLinkAboutWPO202100043 Calculations 2021-10-22Crozet Animal Wellness Stormtech MC-740 Buoyancy Calculation Buovant Force in (1) Stormtech MC-740 Section W= 51 in. H= 30 in. L= 85.4 in. Volume per Section 45.9 cubic feet Buoyant Force = p*V = 62.4lb/cf *61.1 cf Buoyant Force = 2,864.16 Ibs 1.25x BF = 3,580.20 Ibs (factor of safety) Volume of Asphalt Above (1) Stormtech Section Asphalt Volume = 5.04 cf Asphalt Weight = p*V Volume of Stone Above (1) Stormtech Section Stone Weight = p*V = 140 lb/cf * 5.04 Stone Volume = 110.45 cf = 100 lb/cf * 110.45 Weight on Stormtech Section = 11,750.80 Ibs Stone/Asphalt Weight> 1.25*Bouyant Force? Yes