Loading...
HomeMy WebLinkAboutSDP202100081 Application 2021-10-25it Application forInitial Site Plan or Final Site Plan or Site Plan Exception Project Name: Crozet Self Storage Tax map and parcel(s): 05600-00-00-03200 & 05600-00-00-032AO zoning: Highway Commercial Contact (who should we contact about this project) Andrew Lewis - Merchants Retail Partners, LLC Street Address 2801 Highway 208 South, Suite 345 city Birmingham State AL zip Code 35223 Phone Number 205-329-3934 Email alewis@merchantsretail.com Owner of Recordyousef LC Street Address 5717 Brownsville Road City Charlottesville State VA Phone Number Applicant Same as contact Street Address City State_ Phone Number Email Residential Type of unit(s): # of building(s): Sq. ft. of building(s): # of units per building: Total # of units: Resulting density: Acreage of site: Acreage in open space: Acreage in roads: Average gallons of water used per day: 22903 Non-residential ❑ Commercial ® Industrial ❑ Quasi -Public Sq. ft. of building(s): 90,000 Acreage of site: 2.05 (Disturbed Area) Acreage in open space: 1_02 Acreage in roads: 0.26 (Driveway/Parking) Average gallons of water used per day: 348 FOR OFFICE USE ONLY SDP # Fee Amount $ Date Paid By who? Receipt # Cldi By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 REVISED 7/1/2021 (Fee Update) 1 of Intended use or justification for request: Comments/Attachments: FEES SITE DEVELOPMENT PLAN ❑ $861.12 Fee $828 + Technology Surcharge $33.12 Plus # of dwellings _ X $16 = $ X .04 = $ Plus Nonresidential square feet X .016 = $ X.04= TOTAL No ® $1,476.80 Fee $1,420 + Technology Surcharge $58.80 Plus # of dwellings _ X $16 = $ X .04 = S Plus Nonresidential square feet 90,000 X 0.016 = s 1.440 X .04 = TOTAL $1,497.60 plus an additional 6 copies if within an Entrance Corridor ❑ $1,846 Fee $1,775 + Technology Surcharge $71.00 + Fire Rescue Fee of S100 submittal will be noted with your initial approval SITE PLAN Exception to drav of site plan under ❑ $1,846 Fee $1,775 + Technology Surcharge $71.00 + Fire Rescue Fee of $100 plan ❑ Site plan has a parking structure. Included are revised architectural elevations, drawings, photographs or other visual materials submitted with the initial site nlan. The elevations shall be oart of the anoroved final site also. Notices required by Section 32.4.2.1 (f) Initial notice fee to be provided in conjunction with an application, for preparing and mailing notices and published notice = $448 GROUNDWATER ASSESSMENT (Required for all non-residential site plans not serviced by public water) ❑ If the plans show a use using less than 2,000 gallons/day (average) Tier 3 Groundwater Review = $627.12 Fee $603 + Technology Surcharge $24.12 ❑ If the plans show a use using greater than 2,000 gallons/day (average) Tier 4 Groundwater Review = $1,354.08 Fee 11302 + Technology Surcharge $52.08 Special Exception = $523.12 Fee $503 +Technology Surcharge This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be Owner/Applicant Must Read and Sign This site plan as submitted contains all of the information required by Section 32.5 (Initial Site Plan) or Section 32.6 (Final Site Plan) of Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 of Chapter 18 of the Code as the case may be. By signing this application I am consenting to written comments, letters and or notifications regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such written communication from also being sent via first class mail. Signature oTOwndf. Contract Purchaser. Agent l *ffl1zew tNi • E_ws S Print Name tol2t Date Zos�z�3� 3X Da.Nlime phone number of Signatory Site Plan Application REVISED 7/12021 (Fee update) Page 2 of