Loading...
HomeMy WebLinkAboutFDP202100009 Plan - Approved 2021-10-28PROPOSED CUT (18"t A SECTION #1) TO ALLOW LINED OUTLET PROTECTIOf FLAT AT 0% GRADE MINIMUM VESCH REQUIREMEN OF RIPRAP LINED PROTECTION ELEVATION N STREAM's TOP OF BANK ELI 365 365 CROSS RIPRAP Z6o I To BE 360 MEETING TS. TOP OUTLET ATCHES NATION. 355 355 W W O N J J W LD Llu O O � m m W W 0+50 -EXISTING PROPOSED FLAT VDOT CLASS Al, EC-1 RIPRAP OUTLET PROTECI GRADE ELEV.=343.00') w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT. I BE KEYED INTO EX. GROUND 9' MIN. AT ENDS & ALONG PE FABRIC TO OVERLAP A MIN. OF 9" (OP L=130% W 1=9', W2=1 --PROPOSED FLAT VDOT CLASS Al, EC-1 RIPRAP OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT. FABRIC TO BE KEYED INTO EX. GROUND 9" MIN. AT ENDS & ALONG PERIMETER. FABRIC TO OVERLAP A MIN. OF 9" (OP L=64', W1=9% W2=16', D=18") SWM FACILITY A- X-SEC #i PROFILE SCALES: "=S (V) l..=5o'(T) 350 35o ION (TOP ABRICTO RIMETER. 7', D=18") 345 345 w ' -XISTING GRADE 340 340 W W O n J J w W m l7 m W W 0+50 PROPOSED CUT ( 12" 18"f AT CROSS SECTION #1) TO ALLOW RIPRAP LINED OUTLET PROTECTION TO BE FLAT AT 0% GRADE MEETING MINIMUM VESCH REQUIREMENTS. TOP OF RIPRAP LINED OUTLET PROTECTION ELEVATION MATCHES STREAM's TOP OF BANK ELEVATION. SWM FACILITY B- X-SEC #i ioo-YEAR FLOODPLAIN NOTES: 1. ALL LAND DISTURBANCES WITHIN THE soo-YEAR FLOODPLAIN ASSOCIATED WITH THIS PERMIT (FDP 2021.00009) SHALL RESULT IN A NO NET CHANGE TO THE FLOODPLAIN. 2. ANY CUT REQUIRED FOR THE 3:3. TIE -BACK GRADES FROM THE PROPOSED FLAT RIPRAP LINED OUTLET PROTECTIONS TO THE EXISTING GRADES SHALL BE EVENLY SPREAD ADJACENT TO THE RIPRAP WITHIN THE FLOODPLAIN, WITHOUT CREATING PONDING AREAS. THE DISTURBED AREAS SHALL BE IMMEDIATELY STABILIZED WITH PERMANENT SEEDING MEETING MINIMUM VESCH REQUIREMENTS. SEE THE SHEET 3 EXCERPT FROM WPO 2023-00007 FOR PERMANENT SEEDING SCHEDULE. 3. ANY CUT REQUIRED FOR THE 18" DEEP RIPRAP LINED OUTLET PROTECTIONS SHALL BE RELOCATED OUTSIDE THE LIMITS OF THE ioo-YEAR FLOODPLAIN AND THIS EARTH'S VOLUME SHALL BE REPLACED WITH THE PROPOSED STONE'S VOLUME. RELOCATED CUT SHALL BE PLACED WITHIN THE PROPOSED LIMITS OF DISTURBANCE COVERED UNDER WPO 2021-00007's PERMIT. 4. ANY DISTURBANCES WITHIN THE soo-YEAR FLOODPLAIN LIMITS FOR POTENTIAL PROPOSED IMPACTS #3 & #4 SHALL BE BROUGHT BACK TO PRE -CONSTRUCTION GRADES AFTER THE PROPOSED SANITARY SEWER CONNECTIONS ARE MADE. ANY DISTURBED AREAS WITHIN THE ioo-YEAR FLOODPLAIN FROM THE UTILITY CONNECTIONS SHALL BE IMMEDIATELY STABILIZED WITH PERMANENT SEEDING, MEETING THE SEEDING SCHEDULE REQUIREMENTS SET FORTH IN THE SHEET 3 EXCERPT FROM WPO 202100007. 5. CONSTRUCTION EQUIPMENT ASSOCIATED WITH POTENTIAL PROPOSED IMPACTS #3 & #4 SHALL BE PLACED ON THE UPHILL SIDE WHEN POSSIBLE TO LIMIT POTENTIAL DISTURBANCES BELOW THE MANHOLES AND WITHIN THE ioo-YEAR FLOODPLAIN. PROPOSED LAND DISTURBANCE #1 WITHIN FLOODPLAIN. SEE SHEET 16B EXCERPT " FROM WPO 202100007 FOR DETAILS. 0+00 0 r o i 0 \. o PRO o POSED a / a GREENWAY, o o TYP. o a ' POLO GROUNDS ROAD (VARIABLE WIDTH) LOCATION OF PROPOSED DRY DETENTION BASIN A' & UGD SYSTEM 'A' OUTFALL. SWM FACILITY OUTFALL WILL GENERATE A LAND DISTURBANCE ' WITHIN THE ioo-YEAR FLOODPLAIN. PROPOSED LAND DISTURBANCES WITHIN ioo-YEAR FLOODPLAIN PLAN, SCALE i"=ioo' i - PROPOSED DEVELOPMENT OF BROOKHILL's BLOCKS 16 & 17 POTENTIAL PROPOSED DISTURBANCE #3 TO FLOODPLAIN. PROPOSED SANITARY SEWER CONNECTION TO EXISTING MANHOLE LOCATED OUTSIDE, BUT ON THE FRINGE OF, THE LIMITS OF THE 100-YEAR FLOODPLAIN. STREAM LIMITS, TYP. / Y S OF R FEMA APPROVE P FLOOD ! ; �/ r�l OTENTIAL PROPOSED DISTURBANCE #4 TO LOODPLAIN. PROPOSED SANITARY SEWER ONNECTION TO EXISTING MANHOLE OCATED OUTSIDE, BUT ON THE FRINGE OF, /\ HE LIMITS OF THE 100-YEAR FLOODPLAIN. //f �� / //i LOCATION OF PROPOSED DRY DETENTION BASIN /� l 'B' & UGD SYSTEM 'B' OUTFALL. SWM FACILITY //� / 7 f OUTFALL WILL GENERATE A LAND DISTURBANCE WITHIN THE ioo-YEAR FLOODPLAIN. \ / / PROPOSED HALSEY AVENUE CONNECTION TO PROPOSED POLO GROUNDS ROAD IMPROVEMENTS. l IMPACTS TO THE ioo-YEAR FLOODPLAIN ASSOCIATED WITH THESE ROAD IMPROVEMENTS HAVE BEEN APPROVED UNDER FDP 2o1600004._ II I� �I III \ \ \\\ \� \\ MON GOMERY RIDGE---�-�� ��������I SUBDIVISION / A% SSSSS������ x 4� ,, t^ Mp SCOTT/R. Ci,LLLINS'Z Lic. No. 035791,D 10/18/21 0 �'SIONAL 0A Z O J a Z Ln U w 0 0 Z J Q O Vl > Z w W ce 0 0') ti ZM M d� N z a N 0 W o N N J LL W > �' _ LLi LL c;6 ~ Z J �10 z (> T--1 _ W >� o U w Q v Z U m z a m LLJ W J 0 o ul cl) Z ~ a ZLLJ � ca 0 � W J � o w 0 J a � 0 0 c:) N U r JOB NO. 182150 SCALE AS SHOWN SHEET NO. 1 OF 1 EROSION & SEDIMENT CONTROL MEASURES: EROSION CONTROL NOTES: STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE /N ACCORDANCE WI774 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRACTICES USED PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND IN THIS SECTION CONSIST OF THE FOLLOWING DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED 3.01 SAFETY FENCE: ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE ORGINIA EROSION AND A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. APPLICABLE SEDIMENT CONTROL REGULATIONS. TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE OR77JE OF P07EN77AL ACCESS BY 7HE PUBLIC. FIRST STEP IN CLEARING. 3.02 CONS7RUC77ON ENTRANCE: 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON A STABILIZED CONSTRUCTION ENTRANCE LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS THE S/7E AT ALL TIMES. ON A CONSTRUCTION SITE TO REDUCE 7HE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS 07HER THAN INDICATED ON ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), 7N£ SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT 7RANSPORTED ONTO PUBLIC ROADWAYS. CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 303 CONSTRUCTION ROAD STABILIZATION 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLA77ON OF ANY ADDITIONAL EROSION CONTROL THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AREAS, AND MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN OTHER S17E VEHICLE 7RANSPORTA77ON ROUTES WITH STONE IMMEDIATELY AFTER GRADING. TO APPROVING AU774ORITY. REDUCE EROSION OF TEMPORARY ROADBEDS BY CONS77?UCT70N 7RAFF7C DURING WET WEATHER AND TO REDUCE EROSION AND SUBSEQUENT REGRADING OF PERMANENT ROADBEDS BETWEEN THE 77ME 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL OF INITIAL GRADING AND FINAL STABILIZATION. USE WHEREVER STONE -BASE ROADS OR PARKING 77MES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UN77L FINAL AREAS ARE CONSTRUCTED, WHETHER PERMANENT OR TEMPORARY, FOR USE BY CONS7RUCTION STABILIZATION IS ACHIEVED. TRAFFIC. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 3.05 SILT FENCE & SUPER SILT FENCE: 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYN7HE77C FILTER FABRIC STRETCHED ACROSS EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO AND ATTACHED TO SUPPOR77NG POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONS7RUCT0N OPERATIONS IN ORDER TO 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. PREVENT SEDIMENT FROM LEAVING THE SITE AND TDECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET INERT MATERIALS ONLY FREE OF ROOTS STUMPS WOOD RUBBISH AND 07HER DEBRIS. FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING MAINTAINED IN ACCORDANCE WITH THE 14RGINIA EROSION & SEDIMENT CONTROL HANDBOOK ORDINANCE SECTION 5.1.28. (VESCH). 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECT70N 13-301 OF THE CODE OF ALBEMARLE. 3.07 STORM DRAIN INLET PROTEC770N: 14. BORROW, FILL OR WASTE AC77VITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR LIMITED TO THE HOURS OF 7.•00 AM TO 9.,00 PM. CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS PERMANENT STABILIZATION OF THE DISTURBED AREA. INLET PR07EC77ON APPLIES WHERE STORM LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATION OF THE ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, CORRESPONDING DISTURBED DRAINAGE AREA. SINKING, OR COLLAPSE. 3.09 TEMPORARY DIVERSION DIKE: 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO DIVERT OTHER PORTION OF THE PROPERTY. SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY SUCH AS 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX TEMPORARILY DIVERTED TO PR07ECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON S17E OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF DURING CONSTRUCTION THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 MONTHS ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO OR LESS, WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. BE APPLIED AT 80LBS f00SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE EROSION 3.11 TEMPORARY RIGHT-OF-WAY DIVERSION: CONTROL INSPECTOR. A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED 18. PERMANENT STABILIZA 77ON SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN 7HE FLOW LENGTH WITHIN A SLOPING AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 1000SF, INCORPORATED INTO RIGHT-OF-WAY, THEREBY REDUCING THE EROSION P07EN77AL BY DIVER77NG STORM RUNOFF TO A THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIEDLIED AT 1000LBS ACRE AND CONSIST STABILIZED OUTLET. GENERALLY, EARTHEN DIVERSIONS ARE APPLICABLE WHERE THERE WILL BE OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS ACRE AND LITTLE OR NO CONSTRUCTION TRAFFIC WI1HlN 174E RIGHT-OF-WAY. GRAVEL STRUCTURES ARE MORE APPLICABLE TO ROADS AND OTHER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR CONSIST OF 95Z KENTUCKY 31 OR TALL FESCUE AND 0-57 PERENNIAL RYGRASS OR KENTUCKY TRAFFIC. BLUEGRASS STRAW MULCH IS TO BE APPLIED AT 80LBS1100SF. ALTERNA77VES ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. 313 TEMPORARY SEDIMENT TRAP: 19. MAINTENANCE ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY A TEMPORARY PONDING AREA FORMED BY CONSTRUC77NO AN EARTHEN EMBANKMENT WI7H A STONE DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED K17H SEDIMENT. ALL ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW DISTURBED AREAS WHERE SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS THAN 3 ACRES, WHERE THE SEDIMENT TRAP SILT FENCE AND DIVERSION DYKES WHICH ARE COLLEC77NG SEDIMENT TO HALF THEIR HEIGHT WILL BE USED NO LONGER THAN 18 MONTHS, AND IT MAYBE CONSTRUCTED EITHER INDEPENDENTLY OR IN CONJUNCTION WITH A TEMPORARY DIVERSION DIKE. MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 314 TEMPORARY SEDIMENT BASIN: DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE S7RUCTURE FORMED APPROVAL BY THE EROSION CONTROL INSPECTOR. BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. TO DETAIL 21. THE £&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE £&S CONTROLS AS NECESSARY IN SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET" AND 'DRY" STORAGE LONG ENOUGH THE FIELD AS SITE CONDITIONS CHANGE. IN ADDITION, NO SEDIMENT BASIN OR TRAP CAN BE FOR THE MAJORITY OF 7HE SEDIMENT TO SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE REMOVED WITHOUT WRITTEN AUTHORIZATION. THE TOTAL CONTRIBUTING DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES. ]HERE MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A SOIL DESCRIPTION.• TEMPORARY IMPOUNDMENT. SOILS ON -SITE ARE CURRENTLY AS FOLLOWS: 3.18 OUTLET PROTECTION: S7RUCTURALLY LINED APRONS OR 07HER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED AT 16-CODORUS SILT LOAM-2 TO 29 SLOPES. SOIL IS SOMEWHAT POORLY DRAINED WITH A VERY HIGH 7HE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS TO PREVENT SCOUR AT STORMWATER RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-8" THICK. OUTLETS, TO PR07ECT THE OUTLET STRUCTURE, AND TO MINIMIZE 7HE P07EN77AL FOR THE DEPTH TO THE WATER TABLE IS GENERALLY 9-18". DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWA TER 28D3-ELIOAK CLAY LOAM-15 TO 257 SLOPES. SOIL /S TYPICALLY WELL DRAINED WITH A HIGH FLOWS. APPLICABLE TO THE OUTLETS OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS. RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY CLAY LOAM AND ABOUT 0-8" THICK. 319 RIPRAP: THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH 278-ELIOAK LOAM-2 TO 79 SLOPES. SOIL /S TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT 7HE SOIL FROM 7HE EROSIVE FORCES OF - CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0 8' THICK THE DEPTH TO CONCEN7RATED RUNOFF, SLOW 7HE VELOCITY OF CONCEN7RATED RUNOFF WHILE ENHANCING THE THE WATER TABLE IS GENERALLY MORE THAN 80". P07EN77AL FOR INFILTRATION AND TO STABILIZE SLOPES WI7H SEEPAGE PROBLEMS AND OR 27C-SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF L LOAM 7 TOFICATION. NON-COHESIVE SOILS USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS CSURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK THE DEPTH TO CLASSIFICATION. WATER TURBULENCE AND VELOCITY, EXPECTED VEGETATIVE COVER, ETC., ARE SUCH THAT THE SOIL THE WATER TABLE IS GENERALLY MORE THAN 80". MAY ERODE UNDER THE DESIGN FLOW CONDITIONS 34B-GLENELG LOAM-2 TO 79 SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF 3.31 TEMPORARY SEEDING: CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT O 8" THICK. THE DEPTH TO 7HE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH THE WATER TABLE IS GENERALLY MORE THAN 80". APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. TO REDUCE EROSION AND SEDIMENTATION BY 34C-GLENELG LOAM-7 TO 157 SLOPES. SOIL /S TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO MORE THAN 30 DAYS TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNS7REAM OR THE WATER TABLE IS GENERALLY MORE THAN 80". F OFSITE AREAS, AND TO PROVIDE PR07EC77ON TO BARE SOILS EXPOSED DURING CONSTRUCTION UN77L PERMANENT VEGETATION OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 34D-GLENELG LOAM-15 TO 25% SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A HIGH RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-6" THICK. THE DEPTH TO 3.32 PERMANENT STABILIZATION: THE WATER TABLE IS GENERALLY MORE THAN 80". THE ESTABLISHMENT OF PERENNIAL VEGETA FIVE COVER ON DISTURBED AREAS BY PLAN77NG SEED. 39D-HAZEL LOAM-15 TO 259 SLOPES. SOIL IS TYPICALLY EXCESSIVELY DRAINED WITH A MEDIUM TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. TO PERMANENTLY RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-10" THICK. THE STABILIZE DISTURBED AREAS IN A MANNER 77-IAT IS ECONOMICAL, ADAPTABLE TO S17E CONDITIONS, DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE 39E-HAZEL LOAM-25 TO 45% SLOPES. SOIL IS TYPICALLY EXCESSIVELY DRAINED WITH A MEDIUM HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-10" THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". 3.38 TREE PRESERVA77ON AND PRO7EC7ON - - 95 HATBORO SILT LOAM-0 70 29 SLOPES. SOIL IS TYPICALLY POORLY DRAINED WITH A VERY HIGH PR07EC77ON OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND DISTURBING RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-10" THICK. AND CONSTRUCTION ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL THE DEPTH TO THE WATER TABLE IS GENERALLY 0-30". BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL WATERSHED PROTECTION LANDSCAPE BEAU7IFICA770N, DUST AND POLLUTION CONTROL, NOISE REDUCTION, SHADE AND OTHER REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND A7 ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN -TYPE USES APPLIES IN 7REE-INHAB17ED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES http://websoilsurvey.nres.usda.govlappIWebSoilSurvey.aspx 3.39 DUST CONTROL: 1992 REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION ACTIVITIES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE /N ACCORDANCE WTH THE VESCH. SEDIMENT BASIN BAFFLE DETAIL NO SCALE N07E. BAFFLES SHALL EXTEND FROM THE SHEETS OF 4'x8i}' EXTERIOR BOTTOM TO 6" ABOVE THE OVERFLOW. PLYWOOD OR EQUIVALENT � 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO I I II I II 1 11 II 4' 11 11 1 1 CREST TRENCH UPSLOPE ALONG THE LINE THE POSTS. OF POSTS. 77ON MIN. SIZE IT�0!�,rs.� �, S�!ill j���l` I1 GROUND -Ii�1141111. Q_ � `�� N �,��I VII`1- VA �� TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" Rate PlantinE Dates 54mcies lbs. acre Sept. 1 - Feb. 15 50/50 Mix of Annual Ryegrass (Lolium multi-floruml & 50 - 100 Cereal (Winter) Rye (S(�ale�reale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (Lolium multi-florum) May 1 - Aug 31 German Millet (Setaria italics) 50 Source: Va. DSWC -III-III FLOW !77t�;1 � I I I- 4 J. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. �/ - - - 1 / �_ �11r -11 �l IIIII1 I III' FLOW / `�/ EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SUPER SILT ssF FENC5 (WITH WIRE -BACK o5- NO SCALE EROSION CONTROL NOTES & NARRATIVE. DESCRIPTION OF EROSION & SEDIMENT CONTROL MEASURES: PROJECT DESCRIPTION: THE PURPOSE OF THIS LAND DISTURBANCE ACTIVITY IS TO CONSTRUCT A RESIDENTIAL SUBDIVISION. THIS PLAN PROPOSES 26.25 cc. OF LAND EROSION AND SEDIMENT CONTROL MEASURES: DISTURBANCE. THE PROJECT WILL BEGIN ITS CONSTRUCTION WITH THE PROPOSED ESC MEASURES FOLLOWING PLAN APPROVAL, WHICH IS IT IS ANTICIPATED TO USE A CONSTRUCTION ENTRANCE, RIPRAP, OUTLET PROTECTION, ANTICIPATED TO BE IN THE SUMMER OF 2021. THE WORK IS ANTICIPATED TO BE COMPLETED WITHIN 24 MONTHS AND TO CONCLUDE IN THE DIVERSIONS, TWO SEDIMENT BASINS, A SEDIMENT TRAP AND SILT FENCES TO CONTROL SUMMER OF 2023. SURFACE DRAINAGE TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL EXISTING S17E CONDITIONS: LAND DISTURBANCE ACTIVITIES. TEMPORARY STOCKPILE AREAS SHALL BE DISCUSSED WISH THE PROPOSED DEVELOPMENT IS LOCATED ON A PARCEL WITH EXISTING WOODS AND GRASSY LAWNS THIS SITE IS GENERALLY WELL SLOPED WITH THE ESC INSPECTOR AHEAD OF 77ME & WILL NEED TO BE MAINTAINED AND STORED FOR A RIDGE RUNNING NORTHEAST THROUGH THE PROPERTY, WITH POLO GROUNDS ROAD TO THE SOUTH AND THE STREAM TO THE WEST BEING THE LOWER AREAS LATER SPREADING. STOCKPILE LOCATIONS SHALL BE ON SITE AND SHALL BE STABILIZED ADJACENT AREAS: K17H A TEMPORARY VEGETATIVE COVER. PERMANENT SEEDING WILL BE PERFORMED FOR THIS SITE IS SURROUNDED TO THE NORTH OPEN SPACES TREES AND LIGHT UNDERBRUSH. TO THE WEST OF THE PROPERTY IS A STREAM. ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION ACTIVITIES THE SOUTHERN PORTION OF THE SITE IS BORDERED GROUNDS BY POLO GROUNDS ROAD, AND THE RESIDENTIAL SUBDIVISION MONTGOMERY RIDGE IS LOCATED HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED TO THE EAST. SILT FENCE WITH WIRE BACKING, DIVERSIONS, TWO SEDIMENT BASINS, A SEDIMENT TRAP, INLET CONTROLS AND VARIOUS 07HER ESC AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECT70N OF SEED MEASURES ARE PROPOSED TO LIMIT THE POTEN77AL FOR CONTAMINATION OF THESE ADJACENT PROPER77ES AND WATERWAYS. MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE OFFSITE LAND DISTURBANCE.• PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN OFFSITE LAND DIS7URBANCE /S LIMITED TO PUBLIC RIGHT-OF-WAY AND EASEMENTS. SEVEN DAYS. THESE AREAS SHALL BE SEEDED WITH FAST GERMINATING VEGETATION SOILS,• IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECT70N OF SEED MIXTURE WILL SEE SOIL DESCRIPTIONS ON THIS PAGE, AND THE PHASE l ESC PLAN FOR THE BOUNDARIES. DEPEND ON THE TIME OF YEAR APPLIED. THESE MEASURES, AND THE FOLLOWING, ARE CRI77CAL AREAS: PROPOSED: EXISTING STEEP SLOPES, A STREAM AND A GREENWAY ARE LOCATED AROUND THE PERIMETER OF THIS SITE. THE STEEP SLOPES ARE A MIXTURE OF PRESERVED AND MANAGED STEEP SLOPES THESE AREAS ARE CONSIDERED TO BE CRITICAL AREAS THE CONTRACTOR SHALL GIVE EXTRA ATTENTION AND CAUTION IN AND AROUND THESE AREAS TO ENSURE SEDIMENT IS NOT DEPOS17ED ON THEM OUTSIDE THE SCOPE OF THE 3.01 SAFETY FENCE- TO DISCOURAGE ACCESS TO A PAR77CULAR AREA. PROPOSED PLAN. TREE PR07ECT70N FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES SHALL ALSO BE INSTALLED AS A FIRST 3.02 CONSTRUCTION ENTRANCE - TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO STEP IN LAND DISTURBANCE TO ENSURE 774ESE CRI77CAL AREAS ARE MAINTAINED. PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. SEQUENCE OF CONS77?UC770N: 3.03 CONSTRUCTION ROAD STABILIZATION - TO REDUCE THE EROSION OF TEMPORARY 1. CONTRACTOR SHALL NOTIFY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A ROADBEDS BY CONSTRUCTION TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT PRE- CONS 7RUC77ON MEETING. REGRADING OF PERMANENT ROADBEDS BETWEEN THE 77ME OF 1N177AL GRADING AND FINAL 2• PRIOR TO DISTURBANCES, THE LIMITS OF DISTURBANCE SHALL BE FLAGGED AND THE TREE PR07ECTION FENCING SHALL BE INSTALLED. ADDITIONALLY, THE PRESERVED SLOPES & GREENWAY SHALL BE FLAGGED OR MARKED BEFORE LAND DISTURBANCE CAN START. STABILIZATION. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE J. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE APPROVAL FROM THE INSPECTOR ON CONTRACTOR PARKING & STAGING AREAS AS NEEDED. 774E PROJECT. 3.05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. 4. INSTALLA7ION OF THE PROPOSED CONSTRUCTION ENTRANCE SHALL OCCUR NEXT. THE CONTRACTOR SHALL MODIFY THE EXISTING PAVED 3.07 STORM DRAIN INLET PROTECTION- INLET PR07ECTION IS PROPOSED ON INLETS, ENTRANCE TO MEET THE MINIMUM CONSTRUC770N ENTRANCE REQUIREMENTS SHOWN ON THE THE DETAIL ON THIS SHEET. THE CONTRACTOR WHERE SHOWN ON THE PLANS SHALL ALSO GRADE, WITH THE APPLICA77ON OF CONSTRUCTION ROAD STABILIZATION, IMMEDIATELY BEYOND THE CONSTRUCTION ENTRANCE TO M177GATE THE SHARP INCLINE IMMEDIATELY BEHIND THE EXIS77NG ENTRANCE BEING MODIFIED. THE CONTRACTOR SHALL ALSO PROVIDE 3.09 DIVERSION- PERIMETER DIVERSIONS ARE PROPOSED WHERE SHOWN ON THE PLANS TO CONSTRUCTION ROAD STABILIZATION TO THE SURROUNDING AREA ENVISIONED FOR THE CONTRACTOR PARKING & STAGING AREA. CONTRACTOR DIRECT RUNOFF INTO A SEDIMENT TRAPPING DEVICE. SHALL ENSURE 774E CONSTRUCTION ENTRANCE AND PARKING AREA ARE PROPERLY GRADED AND DRAIN TO AN ADEQUATE E&S MEASURE. THE 3.11 RIGHT OF WAY DIVERSION- A RIGHT OF WAY DIVERSION IS PROPOSED AT THE CONTRACTOR SHALL INSTALL A SMALL NEARBY SEDIMENT TRAP FOR VEHICULAR FLASH WASH OFF, WITH A PAVED RIGHT-OF-WAY DIVERSION CONSTRUCTION ENTRANCE. DISCHARGING INTO IT. CONSTRUCTION ENTRANCES ARE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC 3.13 SEDIMENT TRAP- A SEDIMENT TRAP IS PROPOSED WHERE SHOWN ON THE PLANS. ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. 3.14 SEDIMENT BASIN- TWO SEDIMENT BASINS ARE PROPOSED WHERE SHOWN ON THE WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. PLANS. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND 7RANSPOR77NG TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 3.18 OUTLET PROTECTION -OUTLET PROTECTION IS PROPOSED AT THE OUTLET OF PIPES. 5. 774E 1N177AL ESC CONSTRUCTION MEASURES, AS SHOWN ON THE PHASE l EROSION & SEDIMENT CONTROL PLAN, SHALL BE INSTALLED NEXT. 3.19 RIPRAP- RIPRAP IS PROPOSED AT THE OUTLET OF PIPES. 774E CONTRACTOR SHALL BEGIN BY INSTALLING THE PERIMETER SILT FENCE. PERIMETER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE 3.32 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED KITH THIS CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND PLAN. DISTURBANCE TAKES PLACE. 3.38 TREE PRESERVATION AND PROTECTION- TREE PROTECTION IS PROPOSED WITH THIS 6. ONCE THE PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND THE COUNTY INSPECTOR HAS APPROVED THESE MEASURES, 774E CONTRACTOR SHALL PROCEED TO LIGHT CLEARING OF THE SITE. THE CONTRACTOR SHALL BEGIN BY CLEARING THE AREAS REQUIRED TO PLAN. SEE THE ESC PLAN FOR THE REQUIRED LOCATIONS ACCESS THE LOCATIONS OF SEDIMENT BASIN A, SEDIMENT BASIN B' AND THE AREAS DESIGNATED AND/OR APPROVED BY THE INSPECTOR PLAN DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED WITH THIS PLAN. FOR CUT REQUIRED FOR THE BASINS' INSTALLATIONS. INSTALLATION OF SEDIMENT BASIN A' & SEDIMENT BASIN B' SHALL IMMEDIATELY FOLLOW THE SELECTIVE CLEARING. FOLLOWING THE INSTALLATION OF THESE MEASURES THE CONTRACTOR SHALL INSTALL THE DIVERSIONS. THE MAINTENANCE. DIVERSIONS SHALL MAINTAIN POSITIVE DRAINAGE TO THE SEDIMENT TRAPPING DEVICES AT ALL TIMES 774ROUGHOUT CONSTRUCTION. ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON 774E PHASE I EROSION CONTROL PLAN SHALL ALSO BE CONSTRUCTED AT THIS TIME. IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL 7 ONCE ALL THE PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, DRAINAGE IS PROPERLY CONVEYED TO THESE EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN CLEARING THE REMAINDER OF THE SITE. RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF NEEDED. SPECIFIC TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. ATTENTION WILL BE GIVEN SHE FOLLOWING ITEMS aAFTER CLEARING THE PROPOSED AREAS, THE CONTRACTOR CAN PROCEED TO PHASE 11 OF THE EROSION &SEDIMENT CONTROL PLAN. UPON a.SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE INSPECTOR APPROVAL, THE CONTRACTOR SHALL BEGIN ROUGH GRADING THE SITE TO THE CONTOURS SHOWN ON THE PHASE ll EROSION & WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. b.ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT WILL SEDIMENT CONTROL PLAN. ANY RETAINING WALL CONSTRUCTION THAT OCCURS IN ESC PHASE Il WITH THE GRADING OPERATIONS SHALL FILL THE AREAS PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL SURROUNDING THE RETAINING WALLS IN A MANNER THAT ENSURES THE FILL LOCATIONS ARE LEVEL VERTICALLY AT THE END OF EACH WORK DAY. SUCH A WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. PRACTICE WILL LIMIT CHANNEL FLOW AND PROMOTE SHEET FLOW. WORK ASSOCIATED WIN ANY RETAINING WALLS NEAR A GREENWAY SHALL OCCUR ON THE c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR TOP SIDE TO REDUCE P07EN77AL IMPACTS TO THE DOWNSTREAM AREA. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE FIRST STEP KITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. REMOVED WHEN THE LEVEL OF SEDIMENT DEPOS177ON REACHED HALF WAY TO THE TOP 9. 774E CONTRACTOR SHALL INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN. TEMPORARY OF THE BARRIER. SEEDING PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS 10. ONCE ALL THE PHASE Y EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, THE S17E /S ROUGH GRADED, DRAINAGE IS MAINTAINED. AREAS SHOULD BE FER77LIZED AND RESEEDED AS NEEDED. PROPERLY CONVEYED TO THESE MEASURES, AND 774E ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN PHASE Ill OF IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD OR 774E EROSION & SEDIMENT CONTROL PLAN. CONTRACTOR ON -SITE 774E RLD's CONTACT INFORMATION CAN BE FOUND IN THE SWPPP, 12. 774E CONTRACTOR CAN BEGIN INSTALLATION OF THE UTILITIES, CURB AND GUTTER, AND PAVED ROADS INLET PR07EC77ON SHALL ALSO BE WHICH IS TO BE LOCATED ONS17E AT ALL 77MES DURING CONSTRUC770N. IN ADDITION, THE INSTALLED AS THE STORM SEWER IS CONSTRUCTED. INLET PR07EC77ON SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS OWNER MAY BE CONTACTED. UPON COMPLETION OF THE PROJECT, THE OWNER WILL BE SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS RESPONSIBLE FOR SI7F MAINTENANCE. FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. TO PROLONG THE LIFE OF TEMPORARY SEDIMENT BASIN A; THE FINAL CONSTRUCTION OF COTS 124-127 & UNDERGROUND DETENTION SYSTEM A' SHALL BE DELAYED. TO FURTHER PROLONG THE LIFE EROSION CONTROL NOTES: OF SEDIMENT BASIN A', AND TO PROLONG THE LIFE OF SEDIMENT BASIN B; THE PERMANENT STORM SEWER OUTFALLING INTO THE UNDERGROUND DETENTION SYSTEMS (AND ITS NEARBY MANHOLES) SHALL BE TEMPORARILY MODIFIED TO DIRECT UPLAND RUNOFF INTO THE BASINS VIA THE TEMPORARY OUTFALLS SHOWN ON THE ESC PHASE 111 SHEETS. SEE SHEETS 10 & 12's NOTES FOR ADDITIONAL GUIDANCE. ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND 13 AFTER ALL OTHER PHASE 111 ESC MEASURES HAVE BEEN INSTALLED THE CONTRACTOR SHALL COORDINATE THE TIMING OF THE FINAL STORM SEWER SEDIMENT CONTROL PRACTCES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO TO PERMANENT STRUCTURES, THE FINAL GRADING LOTS &THE INSTALLATION OF THE TWO UNDERGROUND MODIFl770N MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT SYSTEMS INS 'A' DETENTION SYSTEMS KITH THE ESC INSPECTOR. AT THIS TIME SEDIMENT BASINS :4' AND B' SHALL BE CONVERTED TO PERMANENT SWIM IM CONTROL HANDBOOK AND VIRGINIA N. REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIO FACIL177ES AND THE RETAINING WALLS ADJACENT TO SWM FACILITIES A' SHALL BE INSTALLED. PRIOR TO CONVER77NG SEDIMENT BASINS 'A' ES-2: 774E PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE AND B' THE CONTRACTOR SHALL ENSURE THE UPLAND WATERSHEDS ARE STABILIZED. THE CONTRACTOR SHALL ALSO OBTAIN APPROVALS PRE-CONS7RUC770N CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND FROM THE INSPECTOR TO INSTALL THE TWO UNDERGROUND DETENTION SYSTEMS AND FINALIZE 7HE CONS7RUC770N OF THE PERMANENT STORMW47ER DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPEC770N MANAGEMENT FACILITIES. AT THE TIME OF 7HE BASINS' CONVERSIONS, 7HE CONTRACTOR SHALL REMOVE SEDIMENT LADEN MATERIAL & BACKFILL THE AREAS ES-3-ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS WITH STRUCTURAL FILL TO THE GRADES SHOWN ON THE STORMWATER MANAGEMENT SHEETS THE CONTRACTOR SHALL PAY SPECIAL AT7EN770N TO THE THE FIRST STEP IN CLEARING. SILT FENCE BENEATH THESE AREAS AT THIS TIME AND ENSURE THE FENCING CON77NUES TO BE EFFECTIVE. THE CONVERSIONS OF SEDIMENT ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE BASINS 'A' & B' SHALL ONLY OCCUR AFTER ESC INSPECTOR APPROVAL. MAINTAINED ON 774E SITE AT ALL TIMES. 14. FOLLOWING 774E CONVERSIONS OF THE SEDIMENT BASINS TO PERMANENT SWIM FACILITIES, AND 774E INSTALLATION OF UNDERGROUND DETENTION ES-5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED SYSTEMS A' AND 'B', SHE CONTRACTOR CAN REMOVE THE REMAINDER OF THE EROSION & SEDIMENT CONTROL MEASURES NO ITEM SHALL BE ON THESE PLANS (INCLUDING BUT NOT LIM17ED TO, OFF -SITE BORROW OR WASTE REMOVED, THROUGHOUT ALL PHASES OF CONSTRUCTION, UNLESS THE UPS7REAM AREAS ARE STABILIZED AND SHE INSPECTOR GIVES AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN PERMISSION. TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 15. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS W774IN SEVEN DAYS AFTER FINAL GRADE IS REACHED ES-6: 774E CONTRACTOR IS RESPONSIBLE FOR INSTALLA77ON OF ANY ADDITIONAL EROSION ON ANY PORTION OF THE SITE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED W774IN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. BE AT FINAL GRADE BUT KILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED ES -].•ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL 16. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL FINAL STABILIZATION IS ACHIEVED. HANDBOOK REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND - ES 8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER K. SEDIMENT CONTROL HANDBOOK. FILTERING DEVICE. 17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL S17E STABILIZA7ON OR ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. BE MADE IMMEDIATELY. 3.05 1992 3.11 Pared construction entrance for erosion control plans 1992 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 47X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'MAX. / 'e�jrpl I /1 /�.1 FLOW - 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control Sherwood and Wyant TEMPORARY RIGHT-OF-WAY DIVERSIONS VDOT #1 COARSE AGGREGATE I11, Mt. I g• MINIMUM TYPICAL GRAVEL STRUCTURE COMPACTED SOIL / - --------------- -- _ 10. Mlrt I 6, MINIMUM TYPICAL EARTHEN STRUCTURE Plate 3.05-2 Source: Va. DSWC Plate 3.11-1 CONSTRUCTION Vi`�ii`�i\`Nci`�9`�xi\�i�Xi\.�,A-�.P:i .i:: i.:i .:i::i::i::i •:i �. PROFIL J..'' ....... Y i�POSITNE DRAINAGE •MUST EXTEND FULL WIDTH L-.-0 TO SEDIMENT ]F INGRESS AND EGRESS DPERATION I TRAPPING, DEVICE ELM 12' MIN. rILTER CLO'H (HIVE DRAINA01 SEDIMENT RPING DEVICE A ulummmt walat lap of I Much iuI be msWlcd wtlh a uutwmou 1 Much balko.l ,hutoti cah a supphniu a wash Is"e NTth a t1 ainc'In ut 1 ' mLhc� lol ;I(IC c LOWA2111 pleS'Sltte. WaAl Walel Must be canietlawi% liom the elh ince to an appl o%,etl ..aeNlule ai ea to I eaoce Aetluuetd .all ..<e,]I AhaO be pl eveated 8xm calcimu Etotm dean,-. dttch6 of waterc MuFe9 PAVED WASH RAC4C CONTRACTOR MAY SELECT A RETAINING WALL MATERIAL/ DESIGN EQUIVALENT TO ANCHOR DIAMOND BEVBLED UNITS lloo ,,,,, mwR.M.�.­THE w� FF IF1 . ,w<-I F �/�/�\\ Mchor- Diamond® aEBJPORCBMENT CONNECTION WX INarro.ca.E1 '-"""-wWm_.. E_..-FF­­1 I 06v�MEW L'NQ Y I �>nN a .o.E ..E�",,T,��a._ Em wa �Mc- O'_ "° 1:1 EXCAVATION OVBRSIZWO WX $ E:1." VCF • "•"w.w."mmvm X TYPICAL BASE PREPARATTON WX (NOT TO SCALD - �. FB,TER FABRIC ENTRENCHED 6- COMPACTED SOIL3,tTM s' Imtnl I �III _-IIrII�IIH _7ItT1tTIII=III 1 �T-ITT-m-TI T�T�l ta' �. - II-II-II�II�I =III-III=llrll-II-II�II�II-III=1 II Ildll=III-III=I �II II TIII-�II�II III-III=I --- - IF�IIdILIIL=I - - 1 ll� - L Id =III=1 -1 -I -1 L- - �L�1' _-- e wNluou DD TEMPORARY 113" DIVERSION BERM GENERAL SLOPE (11 OR LESS) PER ACRE TOTAL LBS KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 50 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION IN ACCORDANCE W VESCH STD 3.35. OPS PERMANENT SEEDING SCHEDULE NO SCALE STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) TABLE 331-A LIMING REQUIREMENTS FOR TEMPORARY SITES Recommended Application PH Test of Agricultural Limestone below 42 3 tons per acre 4.2 to 5.2 2 tons per acre 52 to 6 1 ton per acre Source: Va. DSWC 3.38 Source: Va. DSWC Plate 3.38-2 iCOTT/R. CbLLINSZ_ Lic. No. 035791� L. 10/15/21 ,,'j FI z j L, x I x I O I U z O J � i F ¢ z ; a � _. 0 O � I Z 0 M to -i Q O O Q w u (n . m I �^//�� j z Q I L � : V/ M 0- i Q I L W > I Ce LU I H � N Ln ¢ ' m , O � � iz o LU Cy) r ti O? z (3) M N � C4 ly qzT N I) (N W N Q W L J J U) LLB L9 0 NJ LL TZ WI LLJ Ul C/) LU LLI z 01-1 'l�__^ I V) Jw j Q O r) C:) �11 N z CL - �G V\/ 1^/ ` T_1 W 110 T_1 U O m 1-1 i O LL co , %La Q W 0 W \W\ F_ tea// LNN1_ Q. Q z VJ W O z NJ Of F_ O 0 W 2 0 W z O O Of PLU Ji o CL JOB NOin 182150 SCALE N/A SHEET NO. 3 DRY DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. 2. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FORA FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF COLLINS ENGINEERING PRIOR TO THE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OFTHE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY AT 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS DECAY DISEASES INSECT PEST EGGS AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAYBE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90°%CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR'S CONTROL. FACILITY CONSTRUCTION 1. DETENTION BASINS MAY SERVE AS SEDIMENT BASINS AND/OR TRAPS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED ( Q DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BESET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE THEN THE FACILITY WILL BE DEWATERED DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 4. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TO THE DESIRED SUB -GRADE. 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OFTHE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALLTHE RISER OUTFLOW STRUCTURE AND/OR THE BARREL s WITH PERMANENT COLLARS DURING THE ESC PHASE. CONTRACTOR SHALL ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT. THE CONTRACTOR SHALL ALSO ADHERE TO THE CLAY LINER SPECIFICATIONS OUTLINED IN TABLE 14.4 BELOW: Table 14.4. Clay Liner Specmcations Pro Test Method Unk swillication Permeability ASTM D-2434 Cmtsec 1 x 1 Plasticity Index of Clay ASTM D-4231424 % Not less than 15 Liquid Limit of Clay ASTM D-2216 % Not less than 30 Clay ParlI Pass" ASTM D422 % Not less than 30 Clay Compaction ASTM D-2216 % 95%ol standard pfotlordens Source: Virginia Stormwaler Management. Handbook (1999) 9. UPON COMPLETION OF THE EMBANKMENT GRADING THE CONTRACTOR SHALL EXCAVATEGRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALLTHEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP PROTECTION IF APPLICABLE. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS, IF APPLICABLE. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECTTHE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE EROSION OR UNDERCUTTING. 4. INSPECTTHE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS AS APPLICABLE FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICALTO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) 5. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING IF APPLICABLE) 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) 400 400 PR POSED FADE ®--m m® PROPOSED RETAINING WALL, TYP. 390 390 FOUNDATION, -PROPOSED TYP. SEE RETAINING WALL DESIGN, BY OTHERS, FOR CONSTRUCTION 385 385 DETAILS TYPICAL. Di4 400 395 PROPOSED RETAINING WALL, TYP. 39 PROPOSED FOUNDATION, TYP. 385 380 GRADE PROPOSED STORMTECH --XISTINC CHAMBERS TO BE GRADE SURROUNDED WITH STONE & FILTER FABRIC CLOTH. A 30 mil LINER SHALL BE NSTALLED ON THE WEST SIDE 375 375 375 OF THE SYSTEM. .0' MIP COVER 370 370 1 370 PROPOSED ADS 6" DUAL WALL PERFORATED HDPE UNDERDRAIN STORMTECH - 1Z BENEATH EACH ROW OF STORMTECH CHAMBERS, CHAMBERS, TYP. TYPICAL. UNDERDRAIN TO BE SLOPED AT 0.50%, DOWNSTREAM INV. AT STR. Al2=363.50 CHAMBER BOTTOM= 366.50' 6 6 6 5 3 5 3 5 3 WESTERN / UNDERDRAIN RAL INV. AT CROSS UNDE DRAIN SECTION INV. AT CROSS 36o SECTION 363.6 r6 00 01 It J J W LU10 11 N O W 6 w0 m M ^� Dm ^� m 0+50 0+75 UNDERDRAII INV. AT CROS SECTION=364.1 STONE BOTTOM= 363.50' - 360 INV. AT crrTl I UNDERDRAIN w w n NV. AT CROSS w w SECTION=363.56 M W LL )OSED ADE 395 390 P OPOSE 0-GRIE TYP. 385 TG 5 38o 375 O PROPOSED ADS STORMTECH CHAMBERS TYP 365 ASTERN UNDERDRAIN INV. AT CROSS SECTION=364.02 \IN oS 360 0) IN P., Do 00 rn m m 0+50 0+75 U G D A- X-SEC # 1 PROFILE SCALES U G D A- X-SEC # 2 1"=5' (V) VAA6114'IDLO STORMWATER DESIGN SPECIFICATION NO. 2 SHEET FLOW TO FILTER OR OPEN SPACE KEY LEVEL SPREADER INTO EXISTING GRADE RIPRAPPLUNaE POOL STORMWATER MANAGEMENT FACILITY STORAGE TABLE (D) AIPRAPAPAON `�� (A) (B) (C) (B+c) 6' X6"TREATED UGD S stem Facilit Area of StormTech D Basin Area Total Facility .1 TIMBERS OR Y Y Dry Y �� wCONCRETE LIP Elevations (ft) System (sf) (Sf) Area (sf) LENG0_01% LIP TORE BASEDOF ` ONDESIiGGNN FLOW 363.00 0 304 304 AND ALLOWABLE VE LOCITY 363.50 1,726 442 2,168 1 TOP BL.EVEL SPREADER 364.00 1,726 598 2,324 E FLAT 364.50 1,726 778 2,504 365.00 1,726 979 2,705 1-3 IN. COURSE AGGREGATE 365.50 1,726 1200 2,926 OR OTHER LJNING AS DESIGNED FOR STABILITY 366.00 1,726 1441 3,167 PLAN VIEW 366.50 1,726 1703 3,429 DIMENSION BASED ON Unnr6TVRBED EXIT W E 367.00 3,274 1985 5,259 DESIGN DISCHARGE S% C20I OR LEES. IF VECfTATSD FLTER S'rP1P OR CONSERVED 2'MIN OPEFR4TiOFEETLFe6 367.50 3,229 2195 5,424 3 TMMBJeP4CMIN 368.00 3,167 2391 5,558 19 MIN 3 IN 368.50 3,087 2608 5,695 M I 369.00 2,987 2835 5,822 12 369.50 2,861 3073 5,934 f MIN. oEvrH aASEOo I 370.00 2,702 3320 6,022 / REQUIRED STONE SIZE ) I. 370.50 2,488 3577 6,065 II II 371.00 2,135 3844 5,979 371.50 1,749 4122 5,871 SECTIONA A 372.00 1,726 4,410 6,136 Figure 2.4: Level Spreader: Pipe or Channel Flow to Filter Ship or Ffese~4 Con Served 372.50 1,726 4,708 6,434 Op en Space 373.00 0 5,017 5,017 375 375 Q � K 370 30' 370 P OPOSED FADE P R S FI 365 365 c XISTIN GRADE 362 362 ao o u1 0NDm ELIOUJOL�u lDm ^'� m ^'� m NOTE, AFTER AN EVALUATION OF THE SITE'S HYDRAULICS IT IS BELIEVED THAT LEVEL SPREADER UPLAND OF THE WETLANDS TO REMAIN IS A SUITABLE DESIGN. THE WETLANDS ARE RELATIVELY LEVEL WITH GENTLE SLOPES, AND HAVE A HIGH INFILTRATION RATE. THESE .� W CHARACTERISTICS ARE SUITABLE FOR THE SWM CONSERVED W OPEN SPACE EASEMENT BELOW THE LEVEL SPREADER. ALSO, THE RUNOFF ENTERING THE WETLANDS WILL NOT BE ALTERED DRASTICALLY. THE SMALLER/ LOWER OUTFALL DIRECTING RUNOFFTOTHE LEVEL SPREADER WILL ENSURE ,� W s MORE FREQUENT AND LESS SIGNIFICANT RAINFALL EVENTS S J DRAIN TO THE WETLANDS. AND THE LARGER/UPPER J OUTFALL DIRECTING RUNOFF AWAY FROM THE WETLANDS W \ WILL ENSURE LESS FREQUENT AND MORE SIGNIFICANT RAINFALL EVENTS DO NOT BURDEN THE WETLANDS. / S 's DRY DETENTION BASIN'A' & UNDERGROUND DETENTION SYSTEM'A' DETAIL: SCALE 1"=30' PROPOSED 30' WIDE VDOT CL. Al RIPRAP LINED EMERGENCY/ 0000 SPILLWAY w/4:2 SIDE SLOPES & FILTER FABRIC UNDERLAYMENT \ (STONE DEPTH=22"). SPILLWAY CREST ELEV.=372.75'. U \ / l it PROPOSED 20' WIDE EMBANKMENT & HANDRAILS ALONG RETAINING WALL / - - SURROUND THE DRY BASIN &SERVE / j AS A SAFETY BENCH/ MEASURE. PROPOSED ELEVATED 030" OUTFALL CARRYING LARGER STORM EVENTS TO THE OUTLE T PROTECTION / SEE THIS SHEET FOR SCALED PROFILES -j. .. .. .......... OF THE SWM FACILITY, TYP. / \ - io'WIDE GRADED, GRASS LINED --- ACCESS ROAD TO SWM FACILITIES / STR, q) ul - FOR POTENTIAL MAINTENANCE. 2+0O37�`_ ACCESS ROAD ENCASED IN VAR. / --- \ WIDTH SWM &ACCESS ESMT. / 1 - 0 / R. A10 17 �Q-' / uluu '1_\ PROPOSED FLAT VOOT CLASS At, EC-1 RIPRAP PROPOSED STIR. T(/ A4 TO SERVE - OUTLET PROTECTION w/ GEOTEXTILE FILTER / AS THE RISER STRUCTURE P 1 FABRIC UNDERLAYMENT. FABRIC TO BE KEYED I \ O � 1 h INTO EX. GROUND FABRIC 9OOVERLAP ENDS MI ALONG PERIMETER. FABRIC TO OVERLAP A MIN. OF 9" i 1 W E W I (OP L-64', W1-9', W2-16', D-18") / \ !LI r PROP SED VAR. H \_ iiJ- + O ISWM WAC( E55. T �I PROPOSED zo' WIDE TOP 1 OF DAM ELEVATION=373..0' PROPOSED LOWER OUTFALL(78.6o LF OF 01.5"HDPE_ i. / @o.5o0%) CARRYING THE TREATMENT VOLUME =u Q FLOW TO LEVEL SPREADER W. 11=36z.8o', 10=362.4z) 7= \ 0 ti / PROPOSED STIR. Ai, A 030" HDPE, TO >+� �\ / CONVEY RUNOFF FROM UGD SYSTEM Jk \ �'�\v / WTO DRY DETENTION BASIN'A'. COUNTY DEFINED-n�'J \\ +00 _ W STR=�A2 V - ' PRESERVED STEEP f 'SLOPES TYP. k i \ 0 I 360.0 50 LIMITS ,LlllOF I I W 362.1 FEMA 10(p-YR LIMITS OF LO DPLIIAIN \ STREAM,TYP. 3622 w-- \ Q W W V I OT O A r l W D G I I I E PROPOSED 94' LONG FLAT LEVEL SPREADER W. LS TO HAVE A 12" MIN. DEEP X PLUNGE POOL&6"WIDE RIGID LIP. LS TO INCLUDE AVDOT CL. Al RIPRAP LINING I �I AND SLOPED 3( )MIN. VDOT CL. Al RIPRAPLINED EMBANKMENT DOWNSTREAM FROM THE RIGID LIP EXTENDING TO THE EXISTING GRADE. ALL � / RIPRAP TO INCLUDE FILTER FABRIC UNDERLAYMENTS&BE A MIN. OF 12" DEEP. _� J 3:1 W 1 1 1 PROPOSED 5o'x94'SWM CONSERVED WIW W W W W W I 1 OPEN SPACE EASEMENT. AREA I WITHIN EASEMENTTO REMAIN UNDISTURBED & TO BE LOCATED 362.32-TOP OF LEVEL SPREADE OUTSIDE THE LIMITS OF - DISTURBANCE. EASEMENT PREVENTS FUTURE DEVELOPMENT, I 361..31 BOTTOM OF LEVEL SPREADER I DISTURBANCES & SITE CLEARING. +II PROPOSED VAR. WIDT v I 1 I SWM&ACCESS ES \ I PROPERTY LINE, TYP N PROPOSED STORMTECH +O X G.#2 r ,SE CONTRACTOR SHALL CALL THE COUNTY INSPECTOR& ISOLATOR ROW TO PROVIDE, PROPOSED STORMWATER QUALITY & \ I ENGINEERING DEPARTMENT z -HOURS BEFOREANY 4 4EENWAY, TYP. 0 QUANTITY TREATMENT, TYP. II ANTICIPATED CONSTRUCTION ACTIVITIES FOR THE BMPs. THIS \ - � IS INCLUSIVE OF WHEN THE UNDERGROUND DETENTION \ 6" DUAL WALL PERFORATED HDPE UNDERDRAIN BENEATH EACH SYSTEM SUBGRADE IS READY FOR PIPE CONSTRUCTION, BUT ROW OF STORMTECH CHAMBERS, TYPICAL. UNDERDRAIN TO BE BEFORE STONE BEDDING IS INSTALLED.I I I ' ' \ X SLOPED AT 0.50%, DOWNSTREAM INV. AT STR. Alt=363.50 SWM CONSERVED OPEN SPACE EASEMENT & LEVEL SPREADER REQUIREMENTS: MAINTENANCE INSPECTIONS: ANNUAL INSPECTIONS SHALL BE CONDUCTED IN THE NON -GROWING SEASON DURING THE FALL AND WINTER MONTHS. INSPECTIONS SHALL TRIGGER MAINTENANCE OPERATIONS, AS REQUIRED. MAINTENANCE OPERATIONS MAY INCLUDE, BUT IS NOT LIMITED TO, SEDIMENT REMOVAL, PERIODIC MOWING, REPAIR OFTHE LEVEL SPREADER AND ENSURING A DENSE, HEALTHY VEGETATED GROUNDCOVER. MOWING SHALL BE COMPLETED AT LEAST TW ICE A YEAR TO PREVENT FURTHER WOODY GROWTH AND SPOT RE -VEGETATION OFTHE CONSERVATION AREA, BUTSHALL NOT EXCEED 4TIMES A YEAR. THIS MOWING 15 REQUIRED IN ORDER TO MAINTAIN Ago% MINIMUM COVERAGE RATE. THE CONTRACTOR SHALL CONDUCT THE INSPECTIONS FOLLOWING THE FIRST YEAR THE PROJECT 15 COMPLETED, AND THE OWNER SHALL CONDUCTTHE INSPECTIONS THEREAFTER. INSPECTIONS SHALL INCLUDE THE FOLLOWING ATA MINIMUM: 2. ENSURE FLOW PATHSARE NOTSHORT-CIRCUITED INTHE LEVEL SPREADER AND THROUGH THE SWM CONSERVED OPEN SPACE EASEMENT. 2. ENSURE DEBRIS AND SEDIMENT HAS NOTACCUMULATED. 3. CHECK FOR SCOUR AND EROSION WITHIN THE LEVEL SPREADER SYSTEM AND CONSERVATION AREA. 4. CHECK FOR FOOT OR VEHICULAR TRAFFIC DAMAGE IN THE STONE. 5. ENSURE VEGETATIVE DENSITY MEETS OR EXCEEDS go% OF THE SWM CONSERVED OPEN SPACE EASEMENT. IN THE EVENT MAINTENANCE IS REQUIRED DURING THE ABOVE NOTED INSPECTIONS, CORRECTIVE MEASURES SHALL BE COMPLETED IMMEDIATELY. PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (o.5%MIN.) WITH POSITIVE SLOPES THROUGHOUT. BASIN FLOOR TO BE LINED WITH VDOT CL. At STONE 380 (1.8" DEPTH) & FILTER FABRIC UNDERLAYMENTTO REDUCE THE RISK OF CLOGGING. PROPOSED id WIDE TOP OF DAM ELEVATION=373.0' ZOPOSED 30' WIDE VDOT CL. A PRAP LINED EMERGENCY 'ILLWAY w/ 4:1 SIDE SLOPES & -TER FABRIC UNDERLAYMENT TONE DEPTH=12"). SPILLWAY ZEST ELEV.=372.75'. 0+50 BASIN A SPILLWAY i _J r 373- iil„ _- O / TO PREVENT FLOTATION THE RISER / / BASE SHALL BE FIRMLY EMBEDDED 6" INTOA36"THICK REINFORCED CONCRETE FOUNDATION THAT IS l idxio', AND BURIED BELOW GROUND. �J J O / V � PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (o.5% MIN.) / WITH POSITIVE SLOPES THROUGHOUT. � / / III„Ro f. PROPOSED MANHOLE (A22)TO PROVIDE - / ACCESS TO STORMTECH SYSTEM FOR / INSPECTION & MAINTENANCE. MANHOLE TO ACCEPT 6"UNDERDRAINS FROM STONES' BOTTOM (11=363.50') & THE 28" PIPES FROM THE CHAMBERS. 5 MANHOLE TO INCLUDE A 2' SUMP, WITH AN ELEV. SET 2' BELOW THE ISOLATOR iI ROW FOR CLEANOUT. I \ 1 A PROPOSED FLAT VDOT STD. CLASS AI -1 RIPRAP LINED OUTLET PROTECTION WITH FILTER FABRIC UNDERLAYMENT(L=8', �\ I W1=3', W2=9, D=28", TOP ELEV.=362.4i') II PROPOSED VAR. WIDTH SWM 4Q\A--- `, & ACCESS ESMT. COINCIDES \ WITH PROPERTY LINE \ :. 1 12 4 PROPOSED STORMTECH CHAMBERS TO BE SURROUNDED WITH STONE & FILTER FABRIC CLOTH. A 30 mil LINER SHALL BE INSTALLED ON THE WEST SIDE OF THE SYSTEM. SEE SHEET 19 FOR ADDITIONAL DETAILS. PROPOSED MANHOLE TO PROVIDE ACCESS TO STORMTECH SYSTEM FOR INSPECTION & MAINTENANCE. MANHOLE TO INCLUDE A WEIR TO DIVERT INITIAL TREATMENT VOLUME RUNOFF TO THE i + I SOLATOR ROW. TOP OF WEI R(367.50') TO BESET 12" ABOVETHE BOTTOM OF THE CHAMBER TO ALLOW (366.5o), GREATER STORM EVENTS TO OVERFLOW 'INTO THE ADDITIONAL CHAMBERS ROWS. 8 I COUNTY DEFINED MANAGED STEEP SLOPES, TYP.11 SWM CONSERVED OPEN SPACE EASEMENT LANDSCAPING REQUIREMENTS: IN ACCORDANCE WITH VA DEQ SPECIFICATION #2, NO GRADING OR CLEARING OF NATIVE VEGETATION IS ALLOWED WITHIN THE SWM CONSERVED OPEN SPACE EASEMENT. THE CONTRACTOR IS HOWEVER REQUIRED TO REFORESTTHE EASEMENT's AREA WITH NATIVE TREES AND SHRUBS WHERE VEGETATION IS SPARSE. THE LANDSCAPER SHALL INITIALLY REMOVE ANY INVASIVE SPECIES WITHIN THE SWM CONSERVED OPEN SPACE EASEMENT. FOLLOWING THIS THE CONTRACTOR SHALL PLANTTREES io' ON -CENTER OUTSIDE OFTHE SANITARY SEWER EASEMENT AND SHRUBS 5' ON -CENTER WITHIN THE SANITARY SEWER EASEMENT WHERE NATIVE SPECIES ARE NOTALREADY PRESENT. THIS OVER -PLANTING WILLASSIST IN THEAREA's FAST ESTABLISHMENT AND WILL ACCOUNT FOR MORTALITY. TREES AND SHRUBS WITH DEEP ROOTING CAPABILITIES ARE REQUIRED FOR PLANTING TO MAXIMIZE SOIL INFILTRATION CAPACITY. THETREES SHALL BE A COMBINATION OF 2" CAL. ROTUNDILOBA AMERICAN SWEETGUMS (LIQUIDAMBAR STYRACIFLUA'ROTUNDILOBA') AND 2" CAL. PINCETON ELMS (ULMUS AMERICANA'PRINCETON'). THE SHRUBS SHALL BEA COMBINATION OF 2" CAL. BUFORD HOLLIES (ILLEXCORNUTA 'BURFORDII')AND 2"' CAL. NELLIE R. STEVENS HOLLIES ILLEXX'NELLIE R. STEVENS). ATTHE COMPLETION OFTHE TREE AND SHRUB PLANTINGS THE CONTRACTOR SHALL APPLY A NATIVE SLOPE MIXTOTHE GROUNDCOVER WITH AN ANNUAL RYEGRASS BY ERNST CONSERVATION SEEDS ATA RATE OF 6o LBS. PER ACRE OR 2 LB. PER 2 000sf UNLESS OTHERWISE SPECIFIED. THIS GROUNDCOVER WILL HELP TO ENSURE RAPID VEGETATIVE COVER OFTHE SWM CONSERVED OPEN SPACE EASEMENT. PROPOSED MANHOLE (A22) TO PROVIDE ACCESS TO STORMTECH SYSTEM FOR INSPECTION & MAINTENANCE. MANHOLE TO ACCEPT 6" UNDERDRAINS FROM STONES' BOTTOM (11=16i.so') & THE 28" PIPES FROM 100-yr PEAK WSE=371.7 10-yr PEAK WSE=371.36 2-yr PEAK WSE=370.73 1-yr PEAK WSE=369.69 PROPOSED 06" HDPE STUB PIPE, 19.50 LF @ 0.50% WITH VDOT STD. EW-12 HEADWALL. CONTRACTOR TO INSTALL A MANUFACTURED STEEL WEIR PLATE IN LIEU OF THE SPECIFIED TYPICAL FLATTENED 'EXPANDED STEEL MESH'. WEIR PLATE TO INCLUDE A 1-16" LOW -FLOW ORIFICE OPENING DIRECTING RUNOFF INTO THE 06" STUB PIPE. ALTERNATIVELY, A 1-,6" x 1-,6" SQUARE LOW -FLOW ORIFICE CAN BE CUT INTO THE WEIR PLATE. EW-12 HEADWALL OPENING TO BE COVERED WITH A LANE ENTERPRISES TRASHRACK, OR EQUIVALENT. SEE SHEET 19B FOR EW-12 HEADWALL & TRASHRACK DETAIL. SEPARATION OF 1.5' IS REQ'D W W 'i O a rn n m N r� 01 00 p J J f^ N Doi 17 0 M M M M M m M M rn M m 11, m m m r, W LL 0+50 1+00 PROPOSED FLAT VDOT CLASS Al, EC-1 RIPRAP OUTLET PROTECTIONw/GEOTEXTILE FILTER FABRIC UN DERLAYM ENT. FABRIC TO BE KEYED INTO EX. GROUND 9" MIN. AT ENDS & ALONG PERIMETER. FABRIC TO OVERLAP A MIN. OF 9" (OP L=64', W1=9', W2=16', D=18") 1+50 2+00 2+50 3+00 3+50 FUGD SYSTEM A AND BASIN A 4+00 PROFILE SCALES 1"=5' (V) 1"=50'(H) 4+50 5+00 SCOTT/R. CD•LLINSZ ti Lic. No. 035791,' p 10/15/21 �41 r r i � c Z w < ~¢ F LU F o f i O zU I LUL w a Q z 2 ,,AA k OU Y/ Q OV co J Zw � f _ O Q OV Q LU Lit ~ caJ J L w ¢ ' ' H a m i LU LU J - w LULU a UIf w LL \ N Ln CD N m Za i:�- 'a ti M N C 1 O W 0)N N \Q LLI J J_ ® LIJ 0 0 NJ LL z U W Y LU Ul j LU Z LU LL U) JNL1J LL JQ 01 O O N a V / 1 ` TMr W 1110 T_1 Y 0 MJ W H� 2 0 0 m Ln J_ Q LIJ 0 Z LIJ LLj 0 a Z Q 0 JOB NO. 182150 SCALE AS SHOWN SHEET NO. 168 r UNDERGROUND DETENTION SYSTEM (UGD) U REQUIREMENTS CONTRACTOR REQUIREMENTS: i. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. z. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 3. REFER TOTH E APPROVED FINALS ITE PLAN FOR ANY DETAILED SITE INFORMATION. 4 ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 5. MINOR FIELD ADJUSTMENTS MAYBE NECESSARY DUE TO SITE CONDITIONS. MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. GENERAL CONSTRUCTION SEQUENCE NARRATIVE i. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. z. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TOTH E DESIRED SUB -GRADE. 3. CONTRACTOR SHALL EXCAVATE THE TRENCH. 4. THE TRENCH FOR THE UGD SYSTEM SHALL EXTEND 3' BEYOND THE PIPES' SPRINGLINES. 5. CONTRACTOR SHALL WRAP THE EXCAVATED TRENCH WITH A 6 OUNCE FILTER FABRIC CLOTH. A SUITABLE FOUNDATIONS SHALL BE BENEATH THE TRENCH's FILTER CLOTHS. 6. TRENCH TO INCLUDE A 6"#57 STONE BED AT 95% COMPACTION BENEATH THE STORM PIPES. 7. CONTRACTOR SHALL INSTALL THE UGD DETENTION SYSTEM, INCLUSIVE OF THE OUTFALLS AND ALL OF THE ASSOCIATED STRUCTURES. 8. TRENCH SHALL BE BACKFILLED WITH COMPACTED #57 STONE IN 8" LIFTS AND SHALL EXTEND 6" VERTICALLY ABOVE THE CROWNS OF THE PIPES. 9. THE TOP OF THE #57 STONE SHALL BE COVERED WITH A 6 OUNCE FILTER FABRIC CLOTH, OVERLAPPING THE PREVIOUSLY INSTALLED CLOTH THAT SURROUNDS THE BOTTOM AND SIDES OF THE TRENCH. io. SUITABLE FILL REACHING THE FINISHED GRADE SHALL BE APPLIED ABOVE THE TOP LAYER'S FILTER CLOTHES, MEETING MINIMUM PIPE MANUFACTURER'S REQUIREMENTS TO PREVENT FLOATATION AND ENSURING PIPE INTEGRITY IS MAINTAINED. ii. A MINIMUM COVER OF 18" IS REQUIRED ABOVE THE CROWN OF THE DETENTION SYSTEM's PIPES. THE MINIMUM 6"OF#57 STONE ABOVE THE CROWN OF THE PIPES CAN BE PART OF THE MINIMUM 18" OF COVER. 12. SEE THE MANUFACTURER'S SPECIFICATIONS FOR ADDITIONAL UNDERGROUND DETENTION SYSTEM REQUIREMENTS. INSPECTIONS DURING CONSTRUCTION: CONSTRUCTION INSPECTIONS ARE CRITICAL TO ENSURE THE UNDERGROUND DETENTION SYSTEM IS PROPERLY BUILT. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER COUNTY INSPECTOR AND CONTECH REPRESENTATIVE PRIOR TO INSTALLATION. CONTECH OR AN EQUIVALENT PIPE MANUFACTURER SHALL BE CONTACTED WELL AHEAD OF THE CONSTRUCTION START DATE TO ENSURE ADEQUATE LEAD TIME FOR MATERIALS AND DELIVERY. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER, COUNTY INSPECTOR & PIPE MANUFACTURER, DURING THE FOLLOWING STAGES OF THE UNDERGROUND DETENTION SYSTEM CONSTRUCTION PROCESS: i. PRE -CONSTRUCTION MEETING z. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING(E.G., INTERIM/FINAL ELEVATIONS). 4. WHEN THE DETENTION PIPE SUBGRADE IS READY FOR PIPE CONSTRUCTION, BUT BEFORE STONE BEDDING IS INSTALLED. 5. AFTER STONE BEDDING IS PLACED AND COMPACTED, BUT PRIOR TO PIPE INSTALLATION. 6. ATTHE TIME OF THE PIPE INSTALLATION. 7. AFTER PIPE INSTALLATION, BUT PRIOR TO PLACING BACKFILL & FILL OVER THE SYSTEM. 8. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) PLEASE ALSO SEE BELOW, UNDER FACILITY MAINTENANCE, FOR REQUIRED INSPECTIONS AFTER INSTALLATION IS COMPLETE. INSPECTIONS & MAINTENANCE AFTER CONSTRUCTION: THE FOLLOWING MAINTENANCE TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING THE INSTALLATION OF THE UNDERGROUND DETENTION SYSTEM. i. FOR THE FIRSTYEAR FOLLOWING CONSTRUCTION THE SITE SHALL BE INSPECTED BY THE CONTRACTOR QUARTERLY AND AFTER STORM EVENTS THAT EXCEED 3/2 INCH OF RAINFALL. 2. THE CONTRACTOR SHALL LOOK FOR BARE OR ERODING AREAS IN THE CONTRIBUTING DRAINAGE AREA AND AROUND THE UNDERGROUND DETENTION SYSTEM AND MAKE SURE THEY ARE IMMEDIATELY STABILIZED. CONTRACTOR SHALL SPOT RESEED AS NECESSARYAND ENSURE ADEQUATE SITE COVERAGE IS PROVIDED WITHIN THE FIRSTYEAR. AT THE QUARTERLY INSPECTIONS, AND AFTER EACH RAINFALL EVENT IN EXCESS OF"', THE CONTRACTOR SHALL PERFORM THE ANNUAL MAINTENANCE TASKS DESCRIBED BELOW IN #3. AFTER THE FIRSTYEAR THE OWNER SHALL PERFORM FOLLOW-UP INSPECTIONS ANNUALLY, AND AFTER EACH SIGNIFICANT RAINFALL EVENT: 3. A SPRING MAINTENANCE INSPECTION AND CLEANUP SHALL BE CONDUCTED ANNUALLY. THE MAINTENANCE PROGRAM FOR THE UNDERGROUND DETENTION SYSTEM SHALL INCLUDE CLEANING ITANNUALLY OFTRASH, DEBRIS & SEDIMENTAND ENSURING THE INTEGRITY OF THE TRASH RACKS AND OUTFALL & INFLOW PIPES. THE OWNER SHALL ENSURE THE SYSTEM IS OPERATING AS INTENDED AND IS NOT CLOGGED OR DAMAGED. THE OWNER SHALL IMMEDIATELY CLEAN & REPAIR THE FACILITY AS NECESSARY AND SHALL PAY SPECIAL ATTENTION TO THE INLETAND OUTLET LOCATIONS. THE ACCESS MANHOLES SHALL BE USED FOR INSPECTION AND MAINTENANCE. 390 GENERAL SWM NOTES: i. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE DETAILS IN THIS PLAN SET OR EQUIVALENT, FOR DESIGN. z. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH .i SPECIFICATIONS. 3 4 3. CONTRACTOR SHALL HIRE ATHIRD PARTY GEOTECHNICAL ENGINEER TO ENSURE THE EMBANKMENTS ARE STRUCTURALLY SOUND. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFFTRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN SET. ALL EXISTING AND PROPOSED FILL MATERIAL AND PROPOSED CONSTRUCTION SHALL BE APPROVED BYAN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS AND PRESENT DURING THE CORE SAMPLING. 4. THE DOWNSTREAM EMBANKMENT SIDE SLOPES OF ALL PERMANENT FACILITIES SHALL HAVE A MAXIMUM 3:1 SLOPE. S. THE GENERAL CONTRACTOR, 3RD PARTY GEOTECHNICAL ENGINEER AND STRUCTURAL ENGINEER DESIGNING THE RETAINING WALLS SHALL WORK TOGETHER TO ENSURE THE SWM FACILITIES AND RETAINING WALLS DO NOT UNDERMINE EACH OTHER. THESE PARTIES SHALL ENSURE THE STRUCTURAL INTEGRITY OF THE WALLS AND SWM FACILITIES ARE MAINTAINED. 0120" WEIR PLATE DETAIL NOTE: (UNDERGROUND DETENTION SYSTEM 'B' SCALE:i"=5' ) WEIR PLATE TO BE SECURELY BOLTED, OR SIMILARLY FASTENED, TO THE DETENTION SYSTEM. 9.01' ELEV.=379.50' (TOP OF PIPE; OVERFLOW WEIR IS HYDRAULICALLY ELEV.=377.67' EQUIVALENTTO AN ORIFICE WITH AN APPROX. DIAMETER OF 021.24" INSTALLTRASH RACKS ON ALL - ORIFICES, TYP. SEE SHEET i9B FOR THE WEIR PLATE's TRASHRACK ON THE LOW -FLOW ORIFICE, OR EQUIVALENT. NFORCED 12 GA. STEEL PLATE ELEV.=369.5' (BOTTOM OF F MANUFACTURE / INSTALL ONE l 0za" LOW -FLOW ORIFICE IN THE STEEL WEIR PLATE AT THE LOW POINT OF THE DETENTION SYSTEM (INVERT ELEVATION 369.50') 390 NOTE: PROP SEDACC SS MHw f STAIRS ANY DRAINAGE STRUCTURE WITH k DROP IM EXCES 3 OF 4' ERTICAL Y SHALL HAVE FOR INSPECTION & MAINTENANCE A 1" THI K STEEL PLATE ATTHE BOTTOM 017 THE ST ZUCTURE, TYPICA . 385 385 60" MH z RI =388.55 I =369.37 IC =369.27 38o STIR. BBIl 38o RIN =387.22 I/I I =368.14 III IC =366.64 III I 030" F DPE ° ELEVATE CY BYP EMERGE SS 375 PIPES, V.=377. 0' 375 STIR. Bab TO SERVE AS A RISER STR. BB z TOP OF WEIR PLATE= 77.67' STIR UCTURE. SEE DETAILS ON P OPOSE 6 8 0 5 3 0 6 3 " SHE 19B. RISER TO INCLUDE RADE HOPE z.00% A 60" NER DI METER WITH A OPEN TOP & TRASHRACK TR. BB8 RIM-361.33 60" MH 370 II=349. 5 (06" RIFICE) RI =366.5 370 I0=3 6.50 l 36 II 360.79 IO 357.04 01 " LOW- LOW FICE INV OR IN WEIR P 10 -yr PEAK WSE 362.56 1 -yr P AK WSE 361.64 030" INV. OUT= 69.47' 365 ROPOS SoSPILD IDESRI. EMERGEICY PEAK WSE 359.57 365 AYw zSIzVDOT OPESN&DILTERFA FABRIC _� UNDI RLAYME 4T (STONE DEPTH iz ). SPILLWAY CIR EST STIR. BBi PROPOSED LOWER LEV.=362 33'. (10' IDE TOP F DAM LEV. 364 00) PROPOS D VDOT 030HD , E PRIMA Y OUTF LL S D. EW-1 _ (io.o6 LF II 36g.4 10 36g. 7) CON RACTOR SHALL INSTALL / `�' STR. BB EMBAN<MENTII w/ THE 54-54'O 036" 3ROPOSE DOizo ERFORA ED CMP ACCORDANCE DI SIGN S OWN ON THESE PLANS. 4RI HDPE@10.70% NDERGR UNDO TENTIO SYSTEM o.5o% 31 TR. BB4 360 -357.33 (MH2-M 1A). A I =345.40 MIN. SEI 1ARATIOI I =344.65 OF 1. 0' IS RE 'D APPROX. LOCA ION OF I X. 021" STR. BB7 DIPS IL (INV= 50.42t . A MIN. r? 20.00' O 036" 355 SEP RATION OF 1.0' S REQ'D ' HOPE Qa .5o% 355 INV. OU =356.14' EXISTING- STR. BBz FADE `� So" MH CONTRA OR SH LL REP CE STE L WEIR LATE A ACHED O THE ISER WIT A TEEL RI =348.0o E IN V =343.66 STABILIZED, OR HEN T E ESC INSPECTO DIRECT THE O NER (W ICHEVE INV T=343.16 COMES IRST). P OPOSE WEIR P -ATE BEL W IS S ZED FO BLOCKS 16 & 17 NEW 350 WEIR P TE IS S ZED FOF BLOCKE 16 & 17 AND THE PORTIO OF FUl URE BLC CK 18 350 SHOWN DIN THESE PLANS. NEW WEIR PLATE TO INCIIUDE A 1 16" LOW FLOW ORIFICE PROPOSED VDOT (INVERT 350.00 , OR A 1 a" x 1-a" SQUARE OPENIN WITH N INVER OF 350 00. D. ES-1 sFEDUFFiHALLBE INV. OU 343.00' SLOPED ODRAI TOTHE ISER(o.5 MIN.) 345 WITHPO ITIVESL PESTH OUGHO T. 345 STR. BB CONTRA OR SH LL INST LL A 12 x12" MA14UFACTL RED STEEL WEIR 8z.8o' O 036" :` PLATE O ER THE ISER's 6" LOW FLOW DRIFT EO ENING. EIR PLATE STR. BB HDPE Le11.30% TO INCLUDE A 1 4" LOW-F OW ORI ICE (IN ERT=35 .00), O A 1-L6" 1-I6" 48-05'OF 036" RE OPENING WITH A IN 350.00. -PLATE OPENHV STR. BB HOPE dal z. o% WILL DI ECT RU OFF INT THE R RISER 0 " ORIFI E. A LAN ENTER RISE 7.85' OF 036" TRASH CK, OR EQUIVALENT, SH ILL BE IN TALLIED OVER T E WEIR LATE 340 HOPE z.o% &AFFIX D TO THEE RISER. SEE LAN ENTER RISE T SHRAC DETAIL N 340 TO IF REVENTIFLOTATIC N THE RISER BASE SHALL BE FIRMLY SHEET 1 B. NOTE, TO RE UCE THE RISK OF CLOGGI 4G THE ONTRACrOR EIV BEDDED "INTO 36"THI K REINF RCED C NCRETE SHALL IP STALL A 10'Lx10' x12"D i.L. AI RIPRAP LINED STON PIT WI H A FOUNDATION HAT IS i 'xio', AN BURIED BELOW GROUND. FILTER F NBRIC Ul IDERLAYMENT AT THE RIS R's LOW HFILOW O IFICE PROPOSE DFLAT V OTCLASS ET PROTECTION (T0 1, EC-1 RIF RAP OUT LOW-FLC W ORIFI E, WHE14 DIRECT LY BELOW THE L( & ELEV: 34 .00')w/G OTEXTILE ILTERFA RICUNDE LAYMENT FABRICT TRASH CK. 335 BE KEYED NTO EX. GROUND 9" MIN. ATENDS & ALC NG PERIM TER. 335 FABRICT OVERLAPA MIN. OF9" OPL= 30' W1=9 W2=17' =18" LU LUJ O Ol O Ch N n N N 0 Ql 0 �t M N M O 0) 01 N n Ln LU W W N M d l0 l0 N n n d ON l0 W O0 N N rl06 S It It d IA lDkD l0 Ln l0 Ln 1p l0 t0 n 00 n !^ 00 L.DV M M M M M M M M M M M M M M M M M M M M M M w w 0+50 1+00 1+50 2+00 PROFILE SCALES 1"=5' (V) 1"=50'(H) 2+50 3+00 3+50 4+00 4+50 5+00 UGD SYSTEM B AND BASIN B 5+50 6+oo 6+5o 6+75 UNDERGROUND DETENTION SYSTEM'B' i & DRY DETENTION BASIN'B' DETAIL: SCALE 1"=30' j I - PROPOSED ACCESS MH w/ STAIRS FOR INSPECTION & MAINTENANCE, TYP. 1 W I '0120"- INV. 370.16' (� \ 0120" INV. 370.09' 0120" INV. 370,03' 0120" INV. 369.96' to -\ 2 �z / I " 0120" INV. 3I9.90' 1 I• / / \ \ I I I 0120" INV. 369,83' II \ I 10120" INV. 369.77' 0120" INV. 369.70' I \\ \ \ 1 I I 0120" INV. 369.64' I 1 , 00 I M IV' I IO I 22.00m OF 0120" CMP 0 0.50%, TYP. / I I PROPOSED ELEVATED !o" LE I \�„ EMERGENCY OUTFALL (14.75 LF, 11=377.00, 10=376.5o) ■ 1 W PROPOSED ELEVATED 030" HOPE EMERGENCY OUTFALL (22.5o LF, 11=377.00, 10=372.00) \ \ \ 1 " ■ 1 I PROPOSED 06oMH WITH;" I STEEL PLATE, RIM=386.50' PROPOSED 036"HDPE I EMERGENCY OUTFALL W W W W I\ \' (4.85 LF, 11=3693o, 10=36937) \ I l/ � W .W.WW 1 I / EXISTING WETLANDS TO--!' \ „ W ,��U,(J�Y DE�INF�W / ISTEEP, I I REMAIN UNDISTURBED,PRESE13VEQ ' \W TYP. ", SLOPES TYP.". W I I I 11 \ II I I 1 /pWWWWW�W\a1I �1` "I� X I) 1I S I s PROPOSED io'WIDE TOP I 'I �IIT w W OF DAM ELEVATION- 6 PROPOSED 4.0' J m GREENWAY, TYP. IW W W W W W W I I IDIIEIIEITIITI TI PROPOSED VARIABLE WIDTH SWM"& IDTI=ITI IS � ACCESSESMT:",- PROPOSED FLAT VDOT CLASS Al, EC-1 RIPRAP OUTLET PROTECTION (TOP III ELEV: 343.00') w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT. FABRIC TO BE KEYED INTO EX. GROUND 9" MIN. AT \\ I ENDSOV RLAP A`MIN OF 9" (OP D i 0O STIR. Bz ' I / " +00 I�i -111 1 / 3 PROPOSED 60"X60" BOX CULVERT (UNDER SEPARATE SET OF PLANS) 340 - PROPOSED 5o' WIDE VDOT CL. Al RIPRAP LINED EMERGENCY SPILLWAY & FILTER FABRIC UNDERLAYMENT (STONE DEPTH=12"). SPILLWAY 365 CREST ELEV.=362.33'. 365 Q 360 360 r5O' DROPOSIED EXISTNG GRADE GRACE 355 355 MN OM Eouujjou�j N ILI M Min PROPOSED id WIDE TOP OF DAM ELEVATION=364.0' 0+50 0+75 BASIN B SPILLWAY r � SEE THIS SHEET FOR PROPOSED VDOT SCALED PROFILES OF 1 STD. ES-1 \ THE ALIGNMENTS (TYP.) " 1 1 I V B ` PROPR SPL\WI� VDOTCL.AI I II NED RGE CY SPILL AYE�''/4 SI SLOP& FILTER FABRIC UD YMENT0+7� (STONE EPT�i3"). ILLW Y T E 6z3�'. I� xS \ \ CONTRACTOR SHALLCALLTHE COUNTY INSPECTOR& \ \\ \ \ ENGINEERING DEPARTMENT 24-HOURS BEFORE ANY Y\ ANTICIPATED CONSTRUCTION ACTIVITIES FOR THE BMPs. THIS IS INCLUSIVE OF WHEN THE UNDERGROUND DETENTION SYSTEM SUBGRADE IS READY FOR PIPE CONSTRUCTION BUT J BEFORE STONE BEDDING IS INSTALLED. i 4,6 I 0 7 120" INV. 3 005' 0120" INV. 369.98' I__ _ 3 0120 11INV. 36992 0120 INV. 369.85' 0120" INV. 3 69.79' I I / 109.00' OF 0120" CMP @ 0.50% I/ I \ 0120" INV. 369.72' 0120" INV. 369.66' - 0120" INV: 369.59' 0120" INV:--369.53' I 1 0120" INV. 369.52' I\ 030" INV. 376.50' 1 0120" INV. 369.50' / STIR. BB13, PROPOSED LOWER \: \ / '<R BBiz 03o" HOPE PRIMARY OUTFALL `\ \ \ (a0.06 LF, 11=369-47, 10=36937) m/ 5+00 1 \ 3.�0 \ 5 STR. BB1�' \ \ 384 1 \ LOT \ I \ / 1 \ I L PROPOSED VDOT SWM&-CCESS E _ T. STD. EW-1 PROPOSE VDOT STD. -1 -� '...:. 5� zo' WIDE GRADED, GRASS LINED ACCESS ROAD C. FOR POTENTIAL MAINTENANCE. ACCESS s� _ v ROAD ENCASED IN VAR. WIDTH SWM & = ACCESS EASEMENT. ROAD TO EXTEND FROM r ` PUBLIC RIGHT-OF-WAY TO THE SYSTEM. UNDERGROUND DETENTION SYSTEM 'B'STORAGE TABLE i a PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (o.5% MIN.) WITH POSITIVE SLOPES THROUGHOUT. J-PROPOSED STIR. BB6 TO SERVE AS THE _ RISER STRUCTURE. RISER TO INCLUDE A TOP TRASHRACK AND A LOW -FLOW ORIFICE THAT CONTAINS A STEEL WEIR PLATE & TRASHRACK. SEE THE PROFILE ON THIS SHEET FOR ADDITIONAL INFORMATION. 1-n4 Y TO PREVENT FLOTATION THE RISER BASE SHALL BE FIRMLY EMBEDDED 6 / INTO A 36" THICK REINFORCED CONCRETE FOUNDATION THAT IS io'xi0', AND BURIED BELOW GROUND. 36 . (E) (F) (G) (A) (B) (C) (D) C-B DxE B+F Facility Elevations Area of 120" UGD System Void Space of Area of Stone Storage Area in Total UGD System (ft) Perforated CMP (sf) Footprint (sf) Stone (%) (sf) Stone (cf) Storage Area (sf) 369.00 0 3,960 40% 3,960 1,584 1,584 369.50 0 3,960 40% 3,960 1,584 1,584 370.50 11842 3,960 40% 2,118 847 2,689 371.50 2,456 3,960 40% 1,504 602 3,058 372.50 2,814 3,960 40% 1,146 459 3,272 373.50 3,008 3,960 40% 952 381 3,389 374.50 3,070 3,960 40% 890 356 3,426 375.50 3,008 3,960 40% 952 381 3,389 376.50 2,814 3,960 40% 1,146 459 3,272 377.50 2,456 3,960 40% 1,504 602 3,058 378.50 1,842 3,960 40% 2,118 847 2,689 379.50 0 3,960 40% 3,960 1,584 1,584 380.50 0 3,960 40% 3,960 1,584 1,584 DRY BASIN 'B' STORAGE TABLE (H) (1) Facility Elevations Area of Contours (ft) (sf) 350 2,672 352 3,816 354 5,127 356 6,609 358 8,268 360 10,105 362 12,089 364 14,178 FAP SCOTT7 R. CD'LLINS'Z Lic. No. 035791,E p 10/15/21 �41 ti to i rq Z w < ~¢ F LU 0 l O F- L z 1 Z - O LU J L F-' Q Z 0 a k� O U) UU Z o NQ _E OQ OV w In ~ m J z ¢ L w ¢ V/ ' ' H o m Lu w J - W w 0- i cw If W \ N C CD a o ti 0 O M M N C 1 N O N N W> LLI J \J_ U) - LU L9 F- 0 z� W' LU Ul U) LU ZLU 0� U) JLLI JQ O O N JOB NO. 182150 SCALE AS SHOWN SHEET NO. 17 r