Loading...
HomeMy WebLinkAboutWPO201600048 Bond Release 2021-10-260 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 97211126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECTNAME: PLAN/PERMITNO.: DATE: 10.124 ! ' ( This project has been satisfactorily completed and the erosion control performance bond maybe released at this time if all re -inspection and annual maintenance fees invoiced have been paid. S L:)A Erosion Control Inspector DEQTermination Date N/A i Community Development Department 1�2 All fees invoiced on the above project have been Director of Cornrhunity Deve PA Date Cc: Ana Kilmer Revised: 07/03/2018 hntu-I Inv Ury �(I oast• Kvn•iv�1W1/: yla'�� p / ; '�1, + w.,\� Pdbee Pain:!:t(_.�,ICr i1n1 InluAr: Funmrrlry Arnprwur ldmini•1+nlm BOND INSPECTION RFQtfFST APPROVFD PLAN #: _ w 1QQ 1- PROJECT NAME (inclucling Phase 11): rby I As Ilacd on thr approred Pl; 1-----�'- oel c This fonts IF lr op is sed to tt; ox St b a YL` for'On 01. 1'c"'sc ()1 a bond. A Ile Is I'egtlired for eaei) inspection. Please check the appropriate box below 1'or the reque.ted inSpeclion(s). Fees includes 4/0 "Technology Fee. Inspections for the purposes of bond reduction or release will require a separate fee for each bond. ❑ VSMP/VESCP Frosion Control. Stnnnwatcr Management and/nr Mitigation per Water Protecliol Ordinance sections 17,207 & 17-208 a Reduction { 4zlease $294.32 ❑ Subdivision (roads, drautage. etc.) per Subdivision Ordinance sections 14.435 & 14-438 $307.84 ri Reduction :. Release ❑ Water & Sewer bond per Subdil ision Ordinance section 14-435 Reduction Relcosr $307.84 ❑ Site Dcvcloi)menl Performanee Ixmd (InconlPIcle Site Work & Landscaping) $344.24 Reduction (site work oul)') . Release TOTAL FEES Submit rcquesis to: Dcpattnlettt of Cbmnurltity Development. 4t)I McIntire Roa(1, North Will,, Ci - h;tr— lottc,ville, VA 22902, Attention: Management Anil - Photic 434-296-3832: Pax 434-972-4126, All roads and slormwater facilities will require construclion record drawing.,, inspection reports, videos/photos, plats/esnns, certifications, and completion Processes thnxlgh VDO'f or 1)Fcedures). Q treter to County acceptance pro Bonds will not be reduced or raieased without record (11 awiugs and inspectiat docunteutation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance ofall bonded intProven)ents. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received a nhin 30 days ol'recelpt (A this request. this aPptication shall be deemed inconplcte and shall be rejccecd. If rglcetcd, u new apPlication. supposing documentation and fee will -ed..Applications lilay be withdraws) lilt a full rclluld within 30 days ofreccipt. be requi If this is a reduction request, the revised cstin)ate will be prepared by the plan reviewer and sent to the owner. Please provide contact infurinatiun. EMAIL: Atmk- OR REGULAR MAIL. ADDRL'SS: Signature of Uwner/Uevelaper Datu Rewsed 7115 2014, 7gtV2U 15, 11112015. 9)14/2017. 1 2n:2U2(). ? I ]u21 y ,