Loading...
HomeMy WebLinkAboutSUB202000133 Correspondence 2021-10-26® COLLINS ENGINEERING October 15, 2021 Tori Kanellopoulos County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE. SDP202000053 Lochlyn Hills Phase IV— Final Site Plan SUB202000133 Lochlyn Hills Phase IV— Road Plan Dear Tori: l 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 F% www.coll1n engineering.com Thank you for your comments dated March 2021 on the above -referenced project. The following are responses to the items in your letter: Final Site Plan Comments Planning 1. Addressed. 2. Label has been adjusted to state variable width R/W. 3. Addressed. 4. Addressed. 5. This comment is acknowledged. 6. Addressed. 7. Addressed. 8. This comment is acknowledged. 9. The easement plat will show these dimensions. 10. See below: a. Easements are shown on landscape plan. b. Addressed. 11. Access and maintenance easement has been added to street tree between Lots 18& 19. The streets trees along Pen Park Lane East Ext in front of Lots 13-20 are within the ROW, which is why no access and maintenance easements are shown. 12. This comment is acknowledged, 13. This label has been added. Engineering 1. The VSMP plan will be submitted prior to FSP approval. 2. The applicant acknowledges this requirement. 3. The applicant acknowledges this requirement. 4. The seals are now signed and dated. 5. A waiver is provided with this resubmittal for the dead-end alley. 6. Addressed. 7. Sheet 5 has been corrected so all details sho a 6" stone base of 21-A under the curb/curb&gutter. VDOT 1. VDOT has accepted this plan per letter dated February 19, 2021 ACSA 1. Please see responses to ACSA comments for Road Plans. RWSA 1. The applicant acknowledges this comment. 2. Sheet 4: a. This note has been added. b. This waterline location is from an updated survey. Fire/Rescue 1. No comments. E911 1. Page 7 has been corrected to show correct road names. Road Plan Comments Planning 1. Addressed. 2. Addressed. 3. This comment is acknowledged. 4. Access and maintenance easement has been added to street tree between Lots 18& 19. The streets trees along Pen Park Lane East Ext in front of Lots 13-20 are within the ROW, which is why no access and maintenance easements are shown. 5. Addressed. 6. Addressed. 7. Medium and large street tress are intermixed with an average of 40' O.C. spacing between each tree, but where large trees are next to each other, the plan has been revised to provide an average 50' O.C. spacing. 8. This comment is addressed. 9. This comment is addressed. Engineering 1. Addressed. 2. A waiver request will be submitted for the dead end alley. 3. Addressed. 4. Addressed. 5. The revised approach grades allow a nearly flat landing for the vehicle approaching Lochlyn Hill from Evanson Alley, approaching Evanson Alley from Ellie Alley, and other intersections where the vehicle will be at the end of the intersecting road and having to stop before turning onto the other road. The landing allows "for the stopping of vehicles and sight distance" at these intersections, and as shown on the road profiles, does not exceed 4% for a distance of at least 40' as the referenced ordinance states. 6. Road sections and CG-2 details have been revised to show 6" 21A stone. 7. Addressed. 8. Addressed. 9. Addressed, 10. Addressed. 11. Spreads for inlets are provided with inlet calculations (where intensi".0 in/hr) on sheet 15. As shown, spreads are below 10'. 12. Trees within sight distance on Lochlyn Hill Dr have been removed. VDOT 1. VDOT has accepted this plan per letter dated February 19, 2021 E911 1. Page 9 has been corrected to show correct road names. Fire Rescue 1. No comments ACSA General 1. Water/sewer data sheets are provided. 2. Original PE stamp and signature is included with this submission. 3. The projected sewer flows and anticipated construction start and final buildout timing is now provided on the Cover Sheet. 4. This comment is acknowledged. Sheet 5 1. The 10" ACSA water main has been correctly located on the plans with updated survey. The line is no longer located under the proposed sidewalk along Pen Park Lane. 2. Water meters have been relocated between curb and sidewalk. 3. The updated survey located the existing water meter to serve future Lot 13. 4. The existing 2" watermain along Pen Park Lane is to be demolished. The proposed watermain will be at least 5' apart from the existing 18" watermain. 5. The existing sanitary was built with Amendment #3 of the Phase II&III plans. 6. Meters have been relocated to roadside side of sidewalk. 7. Private 10' sanitary sewer easements have been created for Lots 1-3, 21&22 8. Watermain along Lochlyn Drive has been shifted to be outside of parking and C&G. 9. New water lateral has been proposed to serve Lot 21. Sheet 12 1. This inconsistency has been corrected. Please note, Sanitary sewer alignment has shifted since 2"d submission, and a new MH and 8" PVC line is proposed to replace the existing 6" line in a new vertical alignment (but same horizontal alignment). Please contact me with any questions or requests for additional information required for your review of this plan. Sincerely, Scott Collins, PE