Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SUB202000133 Calculations 2021-10-26
(1) (2) (3) (4) (5) (6) (7) (8) (9) SEWER DATA SHEET Date 10/15/2021 Project Name Lochlyn Hill Phase IV Project Location Pen Park Drive & Lochlyn Hill Dr. Charlottesville Consultants Collins Engineering, Inc. Waste Treatment Facility Moore's Creek AWRRF Design Population 10 SFA, 14 SFD Connections 2 Industrial Waste N/A Pipe Material SDR-26 PVC/SDR-35 PVC Pipe Diameter (Inches) 6" Length (Feet) (Number) (Number) 8" 314 10" 12" 15" 18" 21" 24" TOTAL FEET 314 (10) Manholes: (A) Standard 1 (Number) (B) Drop 1 (exterior drop on ex mh) (Number) (11) (A) Siphons & Pump Stations N/A (Number) (B) Force Main (Size -Length) N/A (Feet) Authority Provide: Drainage Basin Sub Drainage Basin A-2