Loading...
HomeMy WebLinkAboutWPO201800005 Plan - VSMP 2021-10-28� OvO1io W n W y.OIV U � a8Q EROSION & SEDIMENT CONTROL PLAN FOR 8 CA i 20 00 a BLOCKS "O" & "M" da 13- oN C) T a Z 3 IRN M WOO 95) °> WJ CHI °C Q RIO DISTRICT ALBEMARLE COUNTY,VIRGINIA zo O Q N W J r J S Z� 0C) � o n W W Q PARCEL• SHEET INDEX =Q a m U El Cover Sheet „� E2 Erosion Control Narrative & Notes E3 Block "O" Erosion and Sediment Control Plan E4 Block "M" Erosion and Sediment Control Plan luk SITE TABULATIONS \ ° A North Woods at Q OWNER: BW Lots, LLC \ Drillers Service, Inc Q the Four Seasons Z o � eQA 9 P.O. BOX 5306 O z j> c WPok coor� s �d' Charlottesville, VA 22905 Rgg1y NeA i63 s,�� �q �,�roo° so Contact: Steve Houchens Phone: (434)977-4181, ext. 115 `� rEa� a TAX MAP/PARCEL: oz z �✓ �' �` '� / Unity of Charlottesville m� J Loaves 8 Fishes Q ® `��, TMP 61W2-01-OM-1 through 5 a W 7 h TMP 61W2-01-NN-1 through 5 a I Fond Pantry o 1 c, TOPOGRAPHIC INFORMATION BASED ON FIELD w SURVEY BY ROUDABUSH &GALE DATED MARCH 2021. We High School Q ti Charlotte weir, o Yancey °y ��\ asp Khhe Hunnphns Park a Compacted Soil oZ 18" MIN Flow %Ra DESIGNED BY: DEG DRAWN BY: I ARC Oak Fq. IIIIIIIIIIIIIIIIIIIIIIII—III CHECKED BY: DEG �o{���yTH OF+ `f�G� r� o .� Dustin E 9 Lic. No. Apo�� L �M/r G: } 3`97aNAL �� 70' MIN. EXISTING PAVEMENT CONSTRUCTION OF A SILT FENCE A A A 3 5:1 (WITHOUT WIRE SUPPORT) 1-III-III-III-III-III-1il= 2. EXCAVATE A 4" x 4" TRENCH LIIIII IIIII IIIII IIIII IIII, 1. SET THE STAKES UPSLOPE ALONG THE LINE OF FILTER CLOTH 6. MIN. A MOUNTABLE BERM STAKES. (OPTIONAL) 6" F ad I SIDE ELEVATION �� MAXI PIPE OUTLET TO EXISTING GROUND _ 2 r FLAT AREA WITH ,- ^� J NO DEFINED CHANNEL 70' MIN. PLAN VIEW #3, #357, or CLASS II B 10' MIN. #5 STONE RIP RAP OWASHRA �0� / / �\ J O F FLOW _ 50 /\�%\ �� �_ , E0% — 12' MIN. + 1� 0 MIN. ���i� �\�/ii\\ 4 z I` PEXISTING AVEM NT /\ \jam 4„ z O C1I� m 3 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT (� W W STONE WEIR DETAIL SECTION A -A �TO STAKES AND EXTEND THE EXCAVATED SOIL. x VDOT p1 NAGE 10' MIN. FILTER CLOTH KEY IN 6"-9"; IT INTO THE TRENCH. z COURSE AGGREGATE TO SEDIMEM RECOMMENDED FOR B TRAPPING DEVICE W w APRON LINING SHALL BE ENTIRE PERIMETER O Y m W k MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS s OPERATION PLAN VIEW )- - O U Q b 6 WIRE SUPPORTED �// Q O UL O SILT FENCE 12' MIN. y / y/ W A — — 3" MIN. /� !� \�\� w /� ��• �..; ..; _�( G -111 III„I� - 3" MIN. PIPE OUTLET TO nLTERaorH SECTION A -A �� \\C � WELL-DEFINED SHEET FLOW INSTALLATION o ry� CHANNEL 6-7 LJJ SEE STONE PLAN VIEW (PERSPECTIVE VIEW) WEIR DETAIL41 s Note: Modified Mud Trap d 50 R' A y 3 To Be Placed At Low Point 0%— _ �� B A SECTION A -A T REINFORCED CONCRETE DRAIN SPACE \ / MUD TRAP SECTION a-B \ - - _ _ _ / DATE: 05-21-2021 (O.IMODIFIED FILTER CLOTH LKEY IN ENDED SCALE: N.T.S. TO SCALE RECOMMENDED FOR POINT A SHOULD BE HIGHER THAN POINT B. APRON LINING SHALL BE ENTIRE PERIMETER JOB: 16.0098 DRAINAGEWAY INSTALLATION FILE: 16.0098 (FRONT ELEVATION) OUTLET PROTECTION TABLE 3 C�ONoS TRUCTION ENTRANCE DETAIL CEJ LE SILT SCALE DETAIL SF NOT E I SHEET: OF 04 4.5' MIN Outlet Protection Table TEMPORARY DIVERSION DIKE DD Outlet Pipe Diameter Discharge (cfs) Apron Upstream Apron Width Downstream Stone Depth NOT TO SCALE Structure (in) Length (ft) (ft) Apron Width (ft) (in) 1 18 27.97 20 4.5' 4.5' 6 L\P,Ojtt6\Cm'I P,y¢tt5\2016\160098\ENGINEERING\OWG\161A9" 8-BIRNAM W WO$ -EN$ -BLOCK$ 0 and M.dwg, 10/28/20211061'A8 AM, AUIOCAO POF (High Quality Pnn4.p6 1 EROSION AND SEDIMENT CONTROL NARRATIVE PRIOR TO CONSTRUCTION 1. OWNER SHALL POST SURETY BONDS FOR CONSTRUCTION, EROSION & SEDIMENT CONTROL. 2. CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE RIGHT-OF-WAY (VDOT LAND -USE PERMIT). BONDING FOR WORK WITHIN THE VDOT RIGHT-OF-WAY MAY BE REQUIRED TO OBTAIN THE PERMIT. 3. CONTRACTOR SHALL COORDINATE WITH OWNER TO OBTAIN VSMP PERMITS, AS REQUIRED BY THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). 4. CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY OF ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION. 5. A PRE -CONSTRUCTION MEETING WITH THE ENGINEER, THE CERTIFIED LAND DISTURBER, AND THE ENVIRONMENTAL INSPECTOR MAY ALSO BE REQUIRED. ALLOW 72 HOURS FOR COORDINATION AND SCHEDULING OF PRE -CONSTRUCTION MEETING. PROJECT DESCRIPTION THE FIRST STAGE OF CONSTRUCTION IS BIRNAM WOOD BLOCK "O" PROPOSING THE CONSTRUCTION OF 5 ATTACHED TOWNHOUSE UNITS. THE SECOND STAGE OF CONSTRUCTION IS BIRNAM WOOD BLOCK "M" PROPOSING THE CONSTRUCTION OF 5 ATTACHED TOWNHOUSE UNITS. EXISTING SITE CONDITIONS & ADJACENT AREAS THE CURRENT CONDITIONS OF TMP 62-16D CONSISTS OF OPEN GRASS AREAS. SOILS 65B - FAIRVIEW SANDY LOAM (2% TO 7% SLOPES): MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF SANDY LOAM, CLAY, SANDY CLAY LOAM PERMEABILITY IS MODERATELY HIGH TO HIGH, AVAILABLE WATER STORAGE CAPACITY IS MODERATE. SURFACE RUNOFF IS MEDIUM. 65C - FAIRVIEW SANDY LOAM (7% TO 15% SLOPES): MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF SANDY LOAM, CLAY, SANDY CLAY LOAM. PERMEABILITY IS MODERATELY HIGH TO HIGH, AVAILABLE WATER STORAGE CAPACITY IS MODERATE. SURFACE RUNOFF IS MEDIUM. STRUCTURAL PRACTICES 1. TEMPORARY CONSTRUCTION ENTRANCE (3.02) - A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT SITE ENTRANCE ON FOWLER STREET. 2. SILT FENCE BARRIER (3.05) - SILT FENCE BARRIERS WILL BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. VEGETATIVE PRACTICES 1. TOPSOILING & STOCKPILING (3.30) - TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES ARE TO BE STABILIZED WITH TEMPORARY VEGETATION OR TO HAVE SILT FENCE INSTALLED ALONG THE LOWER PERIMETER TO PROTECT DOWNSTREAM AREAS. 2. TEMPORARY SEEDING (3.31 ) - AREAS NOT BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS SHALL BE STABILIZED WITH A TEMPORARY SEED MIXTURE ACCEPTABLE FOR THAT TIME OF YEAR. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 3. PERMANENT SEEDING (3.32) - AREAS BROUGHT TO FINAL GRADE OR THOSE CONSTRUCTION AREAS THAT WILL REMAIN DORMANT FOR YEAR OR MORE SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE ACCEPTABLE TO THAT TIME OF YEAR. PREPARE SURFACE WITH APPROVED TREATMENT AND ADDITIVES PRIOR TO APPLYING SEED. 4. MULCH (3.35) - PLANT RESIDUES OR OTHER SUITABLE MATERIALS SHALL BE APPLIED TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERLAND FLOW VELOCITIES. THIS PRACTICE SHOULD BE APPLIED TO ALL SEEDING OPERATIONS, OTHER PLANTER MATERIALS WHICH DO NOT PROVIDE ADEQUATE SOIL PROTECTION BY THEMSELVES, AND BARE AREAS WHICH CANNOT BE SEEDED DUE TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT SOIL LOSS. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 5. DUST CONTROL (3.39) - DUST CONTROL METHODS MUST BE USED TO REDUCE THE AMOUNT OF AIRBORNE DUST DURING ALL PHASES OF CONSTRUCTION WHERE SOIL IS EXPOSED OR DISTURBED. MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BE SEQUENCED, AND ALSO BEGIN AND END AS QUICKLY AS POSSIBLE. 2. THE CONSTRUCTION ENTRANCE AND PERIMETER EROSION CONTROL MEASURES SUCH AS DIVERSION DIKES AND SILT FENCE SHALL BE INSTALLED AS THE FIRST STEP OF DISTURBANCE. 3. MUD TRAP MEASURES SHALL BE INSTALLED WITH PERIMETER SILT FENCE PRIOR TO ANY GRADING AND SHALL BE SEEDED AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION. 4. THE MUD TRAP SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE-HALF OF THE DESIGN VOLUME. 5. TEMPORARY SEEDING OR OTHER STABILIZATION METHODS SUCH AS BASE AGGREGATE WILL FOLLOW IMMEDIATELY AFTER REACHING FINAL GRADES. 6. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED TO ESTABLISH GROWTH. 7. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 8. DURING FINE GRADING OPERATIONS MAINTAIN ALL DIVERSION DIKES TO THE MUD TRAPS. THE MUD TRAPS SHALL REMAIN FUNCTIONAL THROUGHOUT CONSTRUCTION. 9. AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT CONTROL ADMINISTRATOR, THE TEMPORARY EROSION AND SEDIMENT CONTROLS MAY BE CLEANED UP OR REMOVED, AND THE MUD TRAPS CAN BE FILLED IN AND SEEDED, THEREBY REDIRECTING DRAINAGE TO THE PERMANENT FACILITIES. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW & SEED IMMEDIATELY FOLLOWING FINISHED GRADE. SEEDING SHALL BE DONE WITH KENTUCKY 31 TALL FESCUE IN ACCORDANCE TO STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS SHALL BE IN ACCORDANCE WITH SOIL TEST RESULTS. ALL SEEDED AREAS WILL BE STRAW MULCHED TO PROTECT AGAINST RILL EROSION AND TO PRESERVE SOIL MOISTURE THAT WILL ENHANCE SEED GERMINATION. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. EROSION CONTROL MAINTENANCE 1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR: 2. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL BUILDUP. IF THE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO PREVENT THE TRANSPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED. 3. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE hL AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED, AND SEEDED. 4. DIVERSION DIKES SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE FLOW CHANNEL OUTLET OR SEDIMENT TRAPPING FACILITY AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY. 5. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED. IN THE EVENT THAT THE APPLIED SEEDING FAILS TO TAKE HOLD, BLANKET MATTING SHALL BE PLACED IN APPROPRIATE AREAS DEEMED NECESSARY BY THE ENGINEER OR EROSION CONTROL INSPECTOR. SEQUENCE OF CONSTRUCTION AFTER OBTAINING ALL REQUIRED PERMITS THE CONTRACTOR SHALL COORDINATE A PRE -CONSTRUCTION MEETING, ALLOWING 72 HOURS FOR ITS COORDINATION. 1. PHASE 1 1.1. PRIOR TO ANY LAND DISTURBANCE, CONTRACTOR TO HAVE SURVEYOR FLAG PHASE 1 CLEARING LIMITS. NO CLEARING OR GRADING IS ALLOWED OUTSIDE OF PHASE 1 LIMITS UNTIL THE PHASE IS COMPLETE. 1.2. INSTALL CONSTRUCTION ENTRANCE AT SITE ENTRANCE. SHOULD THE TEMPORARY CONSTRUCTION ENTRANCE NOT BE MAINTAINED PROPERLY OR AN EXCESSIVE AMOUNT OF SOIL FOUND TRACKED ONTO THE PUBLIC ROADWAY, THEN A PAVED CONSTRUCTION ENTRANCE, WATER TANKER TRUCK WITH TWO (2) PRESSURE WASHERS AND A SETTLING AREA MAY BE REQUIRED BY THE EROSION AND SEDIMENT CONTROL PROGRAM ADMINISTRATOR. 1.3. CLEARING AND GRUBBING SHALL FIRST BE LIMITED TO THAT NECESSARY TO INSTALL SILT FENCE AND OTHER PERIMETER CONTROLS. PERIMETER CONTROLS MUST BE MADE FUNCTIONAL PRIOR TO ANY UPSLOPE LAND DISTURBANCE THAT TAKES PLACE. 1.4. SILT FENCE REQUIRES "J-HOOKS" AT LEAST EVERY 100 FEET WHERE SILT FENCE IS NOT NEAR PARALLEL TO EXISTING SLOPE. CONTRACTOR TO INSTALL AS NEEDED. 1.5. INSTALL MUD TRAP. 1.6. CONTRACTOR TO CONSTRUCT DIVERSION DIKES (DD) TO DIRECT RUNOFF TO THE MUD TRAP. 1.7. ONCE ALL OF THE PHASE 1 CONTROLS ARE INSTALLED, AND PRIOR TO ADDITIONAL CLEARING AND GRUBBING, THE CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE COUNTY OF ALBEMARLE. 2. PHASE 2 2.1. UPON APPROVAL OF E&S CONTROL MEASURES BY COUNTY INSPECTOR, BEGIN CLEARING AND GRADING OF THE PROJECT AREA. THE LAND DISTURBANCE SHALL BE RESTRICTED TO THE LIMITS OF DISTURBANCE SHOWN IN THE APPROVED EROSION CONTROL PLANS. 2.2. CONTRACTOR TO BRING SITE UP TO GRADE AS SHOWN ON THE PHASE 2 EROSION CONTROL PLAN. MIUD TRAP MAY BE REMOVED IF DEEMED APPROPRIATE BY THE COUNTY INSPECTOR. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL MEASURE AT ALL TIMES DURING CONSTRUCTION. ALL PERIMETER CONTROLS SHOULD BE MAINTAINED UNTIL SITE IS UP TO GRADE AND AREA HAS ACHIEVED TEMPORARY STABILIZATION. 2.3. DIVERSION DIKES (DD) SHOULD BE MAINTAINED TO DIVERT WATER TO MUD TRAP AS SHOWN ON PHASE 1 PLAN. 2.4. STOCKPILE TOPSOIL WITHIN AN AREA ON THE PROPERTY AT A LOCATION APPROVED BY ALBEMARLE COUNTY COMMUNITY DEVELOPMENT. INSTALL SILT FENCE AT THE PERIMETER OF STOCKPILE(S). 2.5. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. 2.6. REPAIR SILT FENCE WHERE NECESSARY. 2.7. CONTRACTOR TO PROCEED WITH CONSTRUCTION OF TOWNHOUSE UNITS AND SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE ALBEMARLE COUNTY SERVICE AUTHORITY. 2.8. REVISIT PERIMETER CONTROLS, CHECK AND REINFORCE SILT FENCE AS NEEDED. ENSURE NO WASH -AROUND IS OCCURRING NEAR TOPSOIL STOCKPILE. 2.9. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS 4. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR 4.1. CONTRACTOR SHALL ESTABLISH A STABILIZED SITE, AND NOT ALLOW ANY SEDIMENT TO EXIT THE PROJECT LIMITS. 5. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 5.1. CONTRACTOR TO PROTECT STOCKPILE AREAS WITH SILT FENCE. 6. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 6.1. CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS. 7. MUD TRAP, DIVERSION DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 7.1. CONTRACTOR SHALL ESTABLISH THE PERIMETER CONTROLS OF SUPER SILT FENCE AS THE FIRST STEP OF THE LANDS DISTURBANCE FOR THIS PROJECT. 8. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 8.1. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH RAINFALL EVENT. 9. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. 9.1. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. 9.2. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 10. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.THERE ARE NO PROPOSED CUT OR FILL SLOPES. HOWEVER, THE CONTRACTOR IS TO RESTORE THE PROJECT AREA TO EXISTING GRADE. IF THE AREAS WITH NATURALLY STEEP SLOPES ARE FOUND TO BE ERODING EXCESSIVELY AFTER ONE YEAR, CONTRACTOR IS TO PROVIDE ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 11. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.MAXIMIZE SHEETFLOW AND GROUNDWATER INFILTRATION 12. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.CONTRACTOR TO NOTIFY ENGINEER AND COUNTY EROSION CONTROL INSPECTOR. 13. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.THERE ARE NO STORM SEWER INLETS PROPOSED. 14. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.THERE ARE NO STORMWATER CONVEYANCE CHANNELS OR PIPES PROPOSED. 15. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER MATERIALS.NO STREAM CROSSINGS ARE PROPOSED. 16. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE PROVIDED. 17. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.CONTRACTOR SHALL FOLLOW FOLLOW ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS FOR STREAM CROSSINGS. 18. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 19. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: 19.1. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. 19.2. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 19.3. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. 19.4. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. 19.5. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. 19.6. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.CONTRACTOR TO ADHERE TO THE APPLICABLE STANDARD FOR PRIVATE AND PUBLIC UTILITY INSTALLATION. 20. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL BUILD-UP. 21. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDI MEN TATION.CONTRACTOR SHALL STABILIZE SITE, AND OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING EC MEASURES. UPON APPROVAL OF THE ENVIRONMENTAL INSPECTOR, INSTALL INFILTRATION AREAS AND CONNECT ROOF DRAINS. 22. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:THIS PROJECT DOES NOT INCLUDE ANY ADDITIONAL IMPERVIOUS SURFACES AND THE PROJECT AREA WILL BE RESTORED TO ITS EXISTING CONIDTIONS. THEREFORE WILL NOT PRODUCE ANY ADDITIONAL STORMWATER RUNOFF. 22.1. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. 22.2. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED USING THE VSMP CHANNEL PROTECTION CRITERIA. STORMWATER DISCHARGES ARE CLASSIFIED INTO ONE OF THREE TYPES OF CHANNEL. (1) "MANMADE STORMWATER CONVEYANCE SYSTEM" MEANS A PIPE, DITCH, VEGETATED SWALE, OR OTHER STORMWATER CONVEYANCE SYSTEM CONSTRUCTED BY MAN EXCEPT FOR RESTORED STORMWATER CONVEYANCE SYSTEMS OR, (A) THE MANMADE STORMWATER CONVEYANCE SYSTEM SHALL CONVEY THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE TWO-YEAR EVENT WITHOUT CAUSING EROSION OF THE SYSTEM DETENTION OF THE STORMWATER OR DOWNSTREAM IMPROVEMENTS MAY BE INCORPORATED INTO THE APPROVED LAND -DISTURBING ACTIVITY TO MEET THIS CRITERIA AT THE DISCRETION OF THE STORMWATER PROGRAM ADMINISTRATIVE AUTHORITY. (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. QDEVELOPED <= I.F. * (QPRE-DEV. * RVPRE-DEV.) / RVDEVELOPED UNDER NO CONDITION SHALL QDEVELOPED > Q PRE-DEV. NOR SHALL QDEVELOPED BE REQUIRED TO BE LESS THAN THAT QFOREST * RVPRE-DEV.)/RVDEVELOPED OR IN ACCORDANCE WITH ANOTHER METHODOLOGY THAT IS DEMONSTRATED BY THE VSMP AUTHORITY TO ACHIEVE EQUIVALENT RESULTS AND IS APPROVED BY THE BOARD. (2) "NATURAL STORMWATER CONVEYANCE SYSTEM" MEANS THE MAIN CHANNEL OF A NATURAL STREAM AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL OR, (3) "RESTORED STORMWATER CONVEYANCE SYSTEM" MEANS A STORMWATER CONVEYANCE SYSTEM THAT HAS BEEN DESIGNED AND CONSTRUCTED USING NATURAL CHANNEL DESIGN CONCEPTS. RESTORED STORMWATER CONVEYANCE SYSTEMS INCLUDE THE MAIN CHANNEL AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL. (A) THE DEVELOPMENT SHALL BE CONSISTENT, IN COMBINATION WITH OTHER STORMWATER RUNOFF WITH THE DESIGN PARAMETERS OF THE RESTORED STORMWATER CONVEYANCE SYSTEM THAT IS FUNCTIONING IN ACCORDANCE WITH THE DESIGN OBJECTIVES. (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. SEE 19(B)(1)(B). GENERAL EROSION AND SEDIMENT CONTROL NOTES WORK AREA PROTECTION & MAINTENANCE 1. ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. IF SUCH FENCE MATERIAL CANNOT BE REUSED DUE TO DAMAGE CAUSED BY CONTRACTOR, CONTRACTOR SHALL INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF REMOVING ANY FENCE IN ORDER TO COORDINATE RELOCATION AND/OR PROTECTION OF ANY ANIMALS AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED, DISTURBED OR REPLACED. 2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT (FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS. HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTOR'S FAILURE TO SO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY RESULT IN DELAYS. 3. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. 4. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTOR'S EXPENSE. 5. CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS VEGETATION 1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK. 2. TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. 3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. 4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS "STABILIZED". THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS. GENERAL CONSTRUCTION NOTES APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 14 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO CONTRACTOR'S RECORD DRAWING REQUIREMENTS THE FINAL INSPECTION. CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ANY CHANGES 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED SUBSTITUTIONS, ALTERATIONS, VARIATIONS OR UNUSUAL CONDITIONS ENCOUNTERED OR AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS IMPLEMENTED WHILE ENGAGED ON THIS PROJECT. THESE RECORDS SHALL BE IN THE FORM OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA OF 'REDLINES". 'REDLINES" SHALL REFER TO THE CONTRACTOR'S HAND ANNOTATIONS USING REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL RED COLORED PEN/PENCIL TO DEPICT ACTUAL CHANGE, SUBSTITUTION, OR CONDITION. REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR PRIOR TO CONTRACTOR REQUESTING PARTIAL OR FULL PAYMENT, CONTRACTOR SHALL TO OR AS THE FIRST STEP IN CLEARING. PROVIDE THE OWNER WITH AN UP-TO-DATE CONTRACTOR'S RECORD 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL DRAWING. SPECIFICALLY, THIS SET OF PLANS, ISSUED TO THE CONTRACTOR AS FINAL BE MAINTAINED N THE SITE ALL TIMES. BE CONSTRUCTION DRAWINGS, SHALL BEAR THE MARKINGS LISTED BELOW AS WELL AS THE CONTRACTOR (AGENT OR SUPERINTENDENT) SIGNATURE AND CERTIFICATION BELOW: 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE 1. REDLINES SHOULD ALWAYS BE ACCURATE NEAT, LEGIBLE, DATED AND REASONABLY BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SCALED. SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND 2. ADD LARGE RED LETTERS TO TITLE SHEET WITH 'CONTRACTOR'S RECORD DRAWING' APPROVAL BY THE PLAN APPROVING AUTHORITY. INCLUDING CONTRACTOR'S NAME, DATE, AND OTHER RELEVANT INFORMATION 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND 3. CONTRACTOR'S REPRESENTATIVE OR SUPERINTENDENT SHALL INITIAL EACH SHEET. IF A SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. SHEET HAS NOT BEEN CHANGED AT ALL OR NO MARK HAS BEEN ADDED, LABEL THE 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL SHEET ONLY 'NO CHANGES' MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING 4, IF A SHEET HAS BEEN CHANGED OR MODIFICATIONS HAVE BEEN ADDED, LABEL IT SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 'REVISED' 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 5. USE WRITTEN EXPLANATION TO DESCRIBE CHANGES. REFER TO SPECIFIC ACTIONS 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES INSTEAD OF REFERENCING CHANGE ORDER NUMBERS OR RELATED DOCUMENTS PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY 6. USE CLEAR LETTERING NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 7. NEVER REMOVE OLD VALUES OR DETAILS, JUST REDLINE OR "X" THROUGH THEM. IF 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW THERE IS NO ROOM FOR THE NEW VALUE, YOU CAN GO TO THE SIDE AND REDLINE THE AREA. REPLACEMENT VALUE. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. 8. PROVIDE THE REDLINE DETAILS OF CHANGES OR ADDITIONAL INFORMATION, INCLUDING EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, BUT NOT LIMITED TO FABRICATION, ERECTION, INSTALLATION, LOCATION, SIZING, WOOD, RUBBISH, AND OTHER DEBRIS. MATERIAL, DIMENSION, ADDITIONS, RELOCATIONS, SUBSTITUTIONS, ETC 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF 9. BE SPECIFIC WHEN MAKING NOTES TO UNDERGROUND UTILITIES, SHOWING EXACT COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. LOCATION, DEPTH, AND MATERIAL USED (EXAMPLE: SEWER LATERALS) 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH 10. PROVIDE ALL NECESSARY INFORMATION OF CONTRACTOR'S DESIGNED SYSTEMS OR SECTION 13-301 OF THE CODE OF ALBEMARLE. SUBSTITUTIONS 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER 11. CROSS OUT ANY PLAN REFERENCE TO "APPROVED EQUAL" AND REPLACE WITH ANY EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. SPECIFIC INFORMATION OF VARIANCE USED DURING THE CONSTRUCTION PROCESS 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE 12. ANY CHANGES IN INVERT ELEVATIONS, GRADE MODIFICATIONS, SLOPES, AND RELATED MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY INFORMATION ON PIPING UTILITIES, EARTHWORK, ETC. SHALL BE REDLINED. HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, 13. RECORD ALL UNEXPECTED OBSTRUCTIONS, COMPLICATING FACTORS, UNSUITABLE SINKING, OR COLLAPSE. CONDITIONS FOUND IN THE PROJECT AREA INCLUDING ROCK, UNUSUAL TOPSOIL 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE CONDITIONS, BURIED DEBRIS, ETC. OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE 14. ATTACH OR INCLUDE ANY SHOW DRAWINGS OR SUPPLEMENTAL INFORMATION TO THE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN CONTRACTOR'S RECORD DRAWING REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION 15. CHANGES MADE AS A RESULT OF ANY REGULATORY OR OWNER INSPECTION PROCESS OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER CERTIFICATION STATEMENT: TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL THIS HAND -MARKED SET OF DRAWINGS HAS BEEN REDLINED" TO PROVIDE ACCURATE RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW DETAILED RECORD OF ANY SUBSTANTIVE CHANGES TO THE APPROVED DESIGN MULCH IS TO BE APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUBJECT DRAWINGS. ANY ITEM NOT 'REDLINED" ON THIS PLAN SET OR SUBSEQUENT PAGES "CONSTRUCTED TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. SHOULD BE CONSIDERED TO BE IN ACCORDANCE WITH THE DESIGN AS SHOWN". 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90 LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000 LBS/ACRE AND CONSIST OF A NAME TITLE DATE 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE FOR: (CONTRACTOR) , w Q�8 �sF� y Q ama 4 35w 00 z amp I it 3 ¢ w 0 T S w w K ti a0 dO ° D -14 irZ < < O o < q J 3 Z 0 Z ¢ ►=i co Ell CO (7 4 0 Z o rn a ¢ < �g w > w couLLi z 0 < ¢ r > O a o O w a w 6 °,o N n W w Q r -< a chw0 o}4$NI T H O p `rPc 1 o � r) > _CJ ` " "- Dustin E. Greene Lic. No. ,Q. A$0 55833 ��'b i0/28/2021 � G s`QIONAL �� z Qz 0-p In J - F O - < z Z_ �3 z C) 0 W OEr O m > E- U�°6W � � W � � zC)CnW z W Y m O �� )< F �000 0 W � J } U (n m I- z z O O � z all b O Oz w r'r O m CE z O a z V 0 a 0 z O z z � o a �, � u ,,, z o w J V N a o � N 0 z DESIGNED BY: DEG DRAWN BY: ARC CHECKED BY: DEG DATE: 05-21-2021 SCALE: N.T.S. JOB: 16.0098 FILE: 16.0098 SHEET: E2 OF 04 L\P,Ojtt6\Cm'IP,y¢tt5\2016\160098\ENGINEERING\OWG\161A9" 8-BIRNAM WWO$-EN$-BLOCK$ 0 and M.dwg,l0/28/2021101229 AM, AUIOCAO POF (High Quality Pnn4.p6 TEMPORARY SEEDING MIXTURES Ts FOR THE PIEDMONT AREA TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES Seeding Rate Planting depth 36 Seeding37 and SeedingDate zones 1 38 Species3/ Per Lbs/1000 7a and 7b 6b 6a and 5b acre Sq. ft (Inches) 2/1— 5/1— 8/15— 3/1— 5/1— 8/15— 3/15— 6/1— 8/1- 4/30 1 8/14 11/30 4/30 8/14 11/15 5/31 7/31 10/31 Choose one: BY BY BY Barley 2.5 bu. 2.80 1-2 X — 10/15 X — 10/15 X — 10/1 Oats 3 bu. 2.21 1-2 X — — X — — X — — Rye39 2.5 bu. 3.22 1-2 X — X X — X X — X Barley or Rye Plus 150 lbs. 3.45 1 X X 10/15 X X 10/15 X X 10/1 Foxtail X X X X X X X X X millet40 Weeping 4 Its. 0.09 1/4-1/2 — X — — X — — X — lovegross4l Annual ryegrasS 50 Ids. 1.15 1/4-1/2 X — 11/1 X — 11/1 X — 8/15 M1llet42 50 Ids. 1.15 1/2 — X — — X — — X — 3_BZ Applicable on slopes of 3:1 or flatter 371 Refer to figure A — Adopted from USDA, AIRS Miscellaneous Publication #1475, January 1990 38Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed 39 May be used as a nurse crop for late fall/early winter permanent seedings, add 56 Ibs/ac. to the permanent seeding mixture 40 Maryland State Highway Administration Temporary Seed Mix May be used as a nurse crop for mid —summer permanent seedings. Add 2 Ibs/ac 41Z to permanent seed mix. May be used as a nurse crop for mid —summer permanent seedings. Add 10 Ibs/ac. 42 to the permanent seeding mix. INFORMATION FROM TABLE 3.32-C OF THE VA ESC HANDBOOK IS PROVIDED BELOW FOR SEEDING SELECTION TOTAL LIES. PER ACRE MINIMUM CARE LAWN 200-250 LBS —COMMERCIAL OR RESIDENTIAL 90-100% KENTUCKY 31 OR TURF —TYPE TALL FESCUE 0-10% IMPROVED PERENNIAL RYEGRASS 0-10% KENTUCKY BLUEGRASS GENERAL SLOPE (3:1 OR LESS) 128 LBS KENTUCKY 31 FESCUE 2 LBS RED TOP GRASS 20 LBS SAEASONAL NURSE CROP ** ** USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: MARCH, APRIL THROUGH MAY 15TH ANNUAL RYE MAY 16TH THROUGH AUGUST 15TH FOXTAIL MILLET AUGUST 16TH THROUGH SEPTEMBER, OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY WINTER RYE FERTILIZER (10-20-10 OR EQ) SHALL BE APPLIED AT THE RATE OF 1000 LBS/ ACRE. AGRICULTURAL LIME SHALL BE APPLIED TO SEEDBEDS AT TTHE RATE OF 90 LBS/ 1000 SQ. FT. SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10 1,000 LBS/ACRE SEPTEMBER— FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16—APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY —AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH —MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16—AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16—OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER—FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE N 7�� T/C/TyTV pg 00 pegs' LIMITS OF DISTURBANCE = 0.41 � f%9 G �2 C 0 A - 1yAe*' sssAct s 19s INV=535.7' 36" HOPE PHASE 2 ENS PLAN SCALE: 1 "=20' pe �1SF�FN�CI l0 PC 359 \ \ \ s s INV=532.2' \ DC �_ \ —534 — TD �-18" HDRE TO BE EXTENDE ±20' FD�F 0c, 20 0 20 40 6 RINIFNMMIWHOM k I0'� T/C/TyTV pg�00pFgSF2 1q �92 LIMITS OF DISTURBANCE = 0.41 INV=535.7' 36" HOPE PHASE 1 ENS PLAN SCALE: 1 "=20' KEY MAP 1 CSq pe'10 PC/V�(lTy pC 359 1 qpp I ?o•F okiM ?0 pB FCT / TF /\ C 0 0 /Fpy pCFgSF� TOr y 9 �j�NF F 6T9 FNT S / °C AAFMFNT / l0T / Q s� \' s 12.2' s 1004-01, i THIS PROJECT WILL NOT HAVE A FUEL STORAGE AREA 20 0 0 -0 .0 Q 9 m N W � o �WQ a — 1- w . O0 z �vJ Q01 r 3 ¢ W O al W O rA W S aU 0 o� = o C 0 Q � J Z 3 Z3 � ¢ rn > rry LL 0> $ rn W a W > Wz (p GO u Q Q ¢ r > O a o O GO a W U C) O0 W N � � F a � m03 ILJ NyTH OF+ r� o 7 Dustin �EE..GrGreene Uc. No. 4 A4P0 55833 �' 10/28/2021 Gl '431ONAL 4'1 C\2 Z W x 0-0 a. OU i Q a Z� 0°C F O m > z U 5 °6 LD J Z Q H O Y m Ov< w 0 0LL U) Z z 06 z 0 z z Q 0 0 O z C) 0 0m o W x 0 as Z O H V w 17 W 0 O� N z z � o a > W u � w w V ti N W O a 0 ti z DESIGNED BY: DEG DRAWN BY: ARC CHECKED BY: DEG ZY DATE: 05-21-2021 SCALE: 1 °=20' JOB: 16.0098 FILE: 16.0098 E3 SHEET: OF 04 L\Pr0jtt6\CiviI Pry¢tt5\2016\160098\ENGINEERING\aWG\161A9" 8-BIRNAM WWO$-EN$-BLOCK$ 0 and M.dwg,l0/28/20211069:10 AM, AUIOCAO POF (High Quality Pnn4.p6 ZY DATE: 05-21-2021 SCALE: 1 °=20' JOB: 16.0098 FILE: 16.0098 E3 SHEET: OF 04 L\Pr0jtt6\CiviI Pry¢tt5\2016\160098\ENGINEERING\aWG\161A9" 8-BIRNAM WWO$-EN$-BLOCK$ 0 and M.dwg,l0/28/20211069:10 AM, AUIOCAO POF (High Quality Pnn4.p6 L\Pr0jtt6\CiviI Pry¢tt5\2016\160098\ENGINEERING\aWG\161A9" 8-BIRNAM WWO$-EN$-BLOCK$ 0 and M.dwg,l0/28/20211069:10 AM, AUIOCAO POF (High Quality Pnn4.p6 PERMANENT SEEDING MIXTURES Ps FOR THE PIEDMONT AREA TABLE 25 TOTAL LBS. PER ACRE MINIMUM CARE LAWN — COMMERCIAL OR RESIDENTIAL 175-200 LBS. — KENTUCKY 31 OR TURF —TYPE TALL FESCUE %95-100% — IMPROVED PERENNIAL RYE GRASS 0-5% — KENTUCKY BLUEGRASS 0-5% HIGH MAINTENANCE LAWN 200-250 LBS. — KENTUCKY 31 OR TURF —TYPE TALL FESCUE 100% GENERAL SLOPE (3:1 OR LESS) — KENTUCKY 31 FESCUE 128 LBS. — RED TOP GRASS 2 LBS. — SEASONAL NURSE CROP* 20 LBS. TOTAL 150 LBS. LOW —MAINTENANCE SLOPE (STEEPER THAN 3:1) — KENTUCKY 31 FESCUE 108 LBS. — RED TOP GRASS 2 LBS. — SEASONAL NURSE CROP* 20 LBS. — CROWN VETCH** 20 LBS. TOTAL 150 LBS. *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: FEBRUARY 16TH THROUGH APRIL 30TH. . . . . . . . . . . . ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH . . . . . . . . . . . . . . FOXTAIL MILLET AUGUST 1 6TH THROUGH OCTOBER 31 ST. . . . . . . . . . . .ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH . . . . . . . . . . ANNUAL RYE ** SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. \Ps PERMANENT SEEDING FERTILIZATION & MAINTENANCE TABLE 24 Maintenance Fertilization for Permanent Spacings Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Formulation Lbs. per Los. per Time Mowing Acre 1000 sf Tail fescue makes 10-10-10 500 11.5 Yearly, or as needed *Not closer than 3" up 70% or more or if occasional mowing of cover. 30-10-10 400 9.2 fall is desired. Spring the year Do not mow Crownvetch following establish — Service lespedeza 0-20-0 400 9.2 ment and every 4-5 crownvetch Birdsfoot trefoil years thereafter. Not required. not Fairlyuniform Fall the year closer than 4" if stand of tall 500 11.5 following establish— occasional mowing is fescue & service 5-10-10 ment and ever 4-5 Y desired, and then in lespedeza, or years thereafter. fall after seed has birdsfoot trefoil. matured. Not required. not weeping love toss P 9 9 Spring the year closer than 4" if & series lespedeza 11.5 following establish— occasional mowing is fair) uniform Y —— 51010 500 ment and every 3-4 desired, and fall plant distribution years thereafter. after sericea has matured. September, Mow no closer than Red & chewi 20-10-10 250 5.8 30 days later 2" for red fescue fescue, Kentucky and Ky bluegrass; bluegrass: hard December, and closer than 3" fescue mixture: 20-10-10 100 2.3 Y Ma 20—June-30, for fescue. if needed. 534 — _ e 5/ / \�s \/ \ \ l \ — — _ y / C, 14 \ P FF e \ �LFq pe C7,Y/C IOCq y t\_ Og CTR/C (OCq f \ \ s PC 586MFNT / � ( x1Y► \ \ s . \ 9 '0C 586MFN � 12's P 12'i P \ \ C, wM �e GIN VNOWN) ` �� \ C' I \ \t GIN INKNOWN) ` \ \ \ s PROP. 20'-18" ` \ \ \ \ \ \ s PROP. 20'-18" \ \ s HDPE EXTENTION �� \ I \ \ \ \ �{ s HOPE EXTENTION �V=52 0 \ \ INV=525.0 \ /� \ \ 18" H �� \ I \18" HOPE1 ,7 �� \ 9T f \ e \ CHEMICAL \ \ ,' STORAGERi WM WM �„ �� \ M T ��, 5� w �� i / \ MT pR/ qY At \O CONCREi \ \ \ �{yqY \ WASHOUT` \ WM \ 11-SB \ / I \ \ \s�-0 V v v A V VATO \ \ \s�00 \ ��T F SnN�\ �\ \ ' DUMPS R \� \ lOT GF o 0 LOT PS v sov� y -eo / TP ,oS� 6'000 j1yy2Ag0�, \ A \ J� TP pe Fqs/) 0 Fpy NF PHASE 2 ENS PLAN SCALE: 1 "=20' \ 20 0 20 40 61 / ` \ LIMITS OF DISTURBANCE = 0.38 A \ \ / I / 0' Oe 1700 0 3 2MFyT TP / ?ll� �ljr s l PHASE 1 ENS PLAN SCALE: 1 "=20' LET LET s \ n \ / Tk qAp\ \� R / TP ' 4OC ?O4 pMgTF \ \ pB F48, Fph� \ THIS PROJECT WILL NOT HAVE A FUEL STORAGE AREA I 0 20 40 of E M i KEY MAP -J I (n QNN O Y g m Z 3F> ( O0) cD _u J �nJ rz' Q J_ Q _ O 0 w ¢ w K a 0 W N O = W T 0 0 o Q Z6 01 w> R LL 0 Z a rn rr A w LL w Q N M� O 0 ❑ co a aw 0 C o 0 T w rn a - mca CT) Z d a v 0 Lu 0 z O z Z Z Z 0 0 N_ d � w � u w Z w U N Q 00 00 N 2 ti Z .-I DESIGNED BY: DEG DRAWN BY: ARC CHECKED BY: DEG Il,yTa op P1 40. r� U Dustin E. Greene Lic. No. APO 55833 P 10/25/2021 78^iIONAL li G C\2 Z w _J z x a- O a 0 U a a Z 0 0 000 U � �> W z o �Cl) Q E~ Y 00 w 0 O J LL Q 0 W 0LL J 0 } r� 06 m z Z Q o Oz o I w 000 W x 0 DATE: 05-21-2021 SCALE: 1 "=20' JOB: 16.0098 FILE: 16.0098 SHEET: FA OF 04 L\PFoj"Wivil PryectA2016\160098\ENGINEEMNG\DWG\161 8-BIRNAM WWOSENS-BLOCKS 0 and M.dw 10/28/2021112828AM, Anoci,DPDF (High Quality Pnn4.p6