HomeMy WebLinkAboutSDP201300061 Plan - Revision 2021-10-29PA .. H W W S w O U O O U 0 0 0 O J CIVIL CONSTRUCTION PLANS FOR CHARLOTTESVILLE ADA UPGRADES WAREHOUSE #1184 3771 DISTRICT AVENUE CHARLOTTESVILLE, VA 22901 VICINITY MAP N.T.S. I'VH/TFbyDOD R GQ' leg q� SITE 4- Rp NOTES: 1. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO CONTRACT COMPLETION AND THE FINAL CONNECTION OF SERVICES. 2. IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 24" X 36" SHEET. 3. CONTRACTOR IS RESPONSIBLE TO MEET THE ADA GRADING AS SHOWN IN THE CONTRACT DOCUMENTS. THIS INCLUDES ALL MEANS AND METHODS AND AT THE CONTRACTOR'S DISCRETION, THE NEED TO OBTAIN A SURVEYOR FOR CONSTRUCTION STAKING. CONTRACTOR SHALL BID THIS PROJECT WITH ALL NECESSARY MEANS INCORPORATED TO ENSURE ADA COMPLIANT SLOPES ARE MET. AFTER REVIEWING THE ADA SLOPE TRANSITION DETAIL ON THE DRAWINGS, SHOULD THE CONTRACTOR DETERMINE THAT CONSTRUCTION STAKING, OR ANY OTHER ACTIVITIES ARE STILL REQUIRED FOR THE ADA INSTALLATION, THESE SHOULD BE INCLUDED/BUILT IN TO THE UNIT COSTS ON THE CONTRACTOR'S BID FORM. NO EXTRAS WILL BE GIVEN TO THE CONTRACTOR FOR CONSTRUCTION STAKING SERVICES. ADDITIONALLY, ANY RE -WORK REQUIRED DUE TO THE WORK NOT MEETING ADA DESIGN AS SHOWN IN THESE CONSTRUCTION DRAWINGS WILL BE AT THE SOLE EXPENSES OF THE CONTRACTOR UNTIL THE ADA DESIGN HAS BEEN ADEQUATELY CONSTRUCTED. PROJECT NARRATIVE: PROJECT INVOLVES THE MAINTENANCE AND PAVING OF PARKING LOT FOR COSTCO IN ALBEMARLE COUNTY, VA. THE SCOPE OF THE PROJECT INCLUDES PAVING, MINOR REGRADING, ADJUSTMENTS TO LANDSCAPE ISLANDS, AND RELOCATION OF ADA STALLS TO LOCATIONS MORE ACCESSIBLE TO BUILDING ENTRANCES. THE DISTURBANCE CREATED BY THIS PROJECT IS 0.09 AC WITH AN ADDITIONAL 0.04 AC OF AREA THAT IS MILL AND OVERLAY ONLY WITH NO DISTURBANCE OF SUBGRADE. THERE IS NO WORK TO BE CONDUCTED IN THE PUBLIC RIGHT-OF-WAY AND THERE ARE NO CHANGES TO THE CIRCULATION PATTERN IN THE PARKING LOT. THE PROPOSED CHANGES WILL NOT INCLUDE ANY CHANGES TO THE BUILDING STRUCTURE. Know what's below. Call before you dig. 1 CAUTIONII i THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS DISCOVERED. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE CONTRACTOR SHALL REPLACE THEM AT HIS OWN EXPENSE. CALL 811 AT LEAST 72 HOURS I PRIOR TO COMMENCING CONSTRUCTION IN VICINITY. OCTOBER 2021 INDEX OF SHEETS SHEET NO. DESCRIPTION DATE REVISION C0.0 COVER SHEET 10/29/2021 1 OF 2 TOPOGRAPHIC SURVEY 10/29/2021 2 OF 2 TOPOGRAPHIC SURVEY 10/29/2021 C0.1 GENERAL NOTES 10/29/2021 C1.0 EROSION CONTROL AND DEMOLITION PLAN 10/29/2021 C1.1 EROSION CONTROL DETAILS 10/29/2021 C1.2 EROSION CONTROL NOTES 10/29/2021 C2.0 DIMENSION CONTROL PAVING & STRIPING PLAN 10/29/2021 C3.0 GRADING PLAN 10/29/2021 C4.0 CONSTRUCTION DETAILS 10/29/2021 PLANS SUBMITTAL/REVIEW LOG OWNER COSTCO WHOLESALE 999 LAKE DRIVE ISSAQUAH, WA 98027 TEL: (425) 313-6280 FAX: (425) 313-8105 SURVEYOR ROUSE-SIRINE ASSOCIATES, LTD 333 OFFICE SQUARE LANE VIRGINIA BEACH, VA 23462 TEL: (757) 490-2300 FAX: (757) 499-9136 i117NOIN6➢1i1 ARCHITECT MG2 CORPORATION 8444 WESTPARK DR, STE 120 MCLEAN, VA 22102 PH. (206) 692-6500 CONTACT: Alison McClellan ENGINEER Kimley»)Horn DC 1100 NEW JERSEY AVE SE SUITE 420 WASHINGTON, DC 20003 PH. (202) 919 3980 CONTACT: Alex Torres, P.E. ram C0.0 REVISIONS NOTES: 1. MERIDIAN SOURCE IS BASED ON VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE NAD 83(2011). 2. VERTICAL DATUM IS BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) AND IS EXPRESSED IN FEET. 3. UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON QUALITY LEVEL "C" AND MISS UTILITY TICKET #A121602233-00A. UTILITY SIZES SHOWN ARE BASED ON FIELD OBSERVATIONS. RSA CANNOT GUARANTEE THE EXISTENCE OR NON-EXISTENCE OF ANY UNDERGROUND UTILITIES SHOWN OR NOT SHOWN ON THIS SURVEY. FURTHERMORE, RSA CANNOT GUARANTEE UTILITY LINES ARE ACTIVE OR ABANDONED. PRIOR TO EXCAVATION, CONTACT "MISS UTILITY" OF VIRGINIA @ 811 OR 1-800-552-7001 TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES. THE ACCURACY OF SUBSURFACE DATA CAN BE INFLUENCED BY FACTORS BEYOND OUR CONTROL, SUCH AS CONDUCTIVITY OF MATERIALS AND THEIR SURROUNDINGS, MOISTURE, PROXIMITY OF OTHER UNDERGROUND UTILITIES OR STRUCTURES, DEPTHS, ETC. THEREFORE, ONLY THE ACCURACY OF DATA OBTAINED BY ACTUAL PHYSICAL VERIFICATION (THROUGH VACUUM EXCAVATION OR OTHERWISE, QUALITY LEVEL A) CAN BE GUARANTEED TO APPLICABLE SURVEYING AND/OR ENGINEERING STANDARDS. THIS TOPOGRAPHIC SURVEY OF "TOPOGRAPHIC SURVEY OF A PORTION OF PARCEL 2 PLAT SHOWING BOUNARY LINE ADJUSTMENT OF STONEFIELD PARCEL 1 AND PARCEL 2, BOTH OWNED BY ALBEMARLE PLACE EAAP, LLC, JACK JOUETT MAGISTERIAL DISTRICT, ALBEMARLE COUNTY, VIRGINIA" WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF GREGORY V. O'BRYANT, L.S., FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON AUGUST 12, 13, 14, AND SEPTEMBER 11, 2021; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. #2647 CO I/ N livkh:.9Iola Imgia lr 00 W N/ N LEGEND CB CATCH BASIN COMM. COMMUNICATION CONC. CONCRETE G ECB ELECTRIC CONTROL BOX 'c FH FIRE HYDRANT Ir FP FLAG POLE LP LIGHT POLE ON CONC. BASE @ MB MAIL BOX ® SCO SANITARY CLEANOUT ® SDMH STORM DRAIN MANHOLE ® SSMH SANITARY SEWER MANHOLE WV WATER VALVE WW WATER VALVE VAULT 09-14-21 DATE lb N54037'23' W 399.54' NOW OR FORMERLY SEMINOLE TRAIL PROPERTIES, LLC (D.B. 1999, P. 438) P I D: 061 WO-03-00-01800 S54037'31 "E 953.25' PARCEL 2 (D.B. 4489, P. 19-26-PLAT) PID: 061 WO0300019BO PROPERTY OF COSTCO WHOLESALE CORPORATION (D.B. 4492, P. 1) BLOCK & BRICK RETAIL WAREHOUSE "COSTCO WHOLESALE" 'Z.71' N47053'59"W BLACKBIjZD LANE (PRIVATE) J U AREA A=122.70' WORK AREA # # OF HANDICAP SPACES # OF REGULAR SPACES 1 0 3 2 8 20 3 0 6 4 8 2 TOTAL 16 31 R=337 00' AA 0r1'5VNN I VICINITY MAP I SCALE: 1" = 2000' B_0' A=63.14' pIN(F) W 0 00 DRILL HOLE(F) Ca �000� Q p M 7 (~ a i�� a OF VI >QD d UFO~ � U H � 3 W U O N G� a U1 ¢c7 � 3 x A M IG0 ID h C] F6i m � .. C) a w w w LL T / m co N O 0 Q\ a J a N W_ a Q Z m (7 cj U U> ILL J II_ Z) J O LU 2Uww H J �aUQ >LL QZdW O Z DZNzaJ¢UUwCO V1 U0WJJwH mwuwwmy as<zwm�M0w0� OLL�0aQ° Z oCa 0 O0>_ H z w EE Q �LL w� x oZZ- H-OO� W CL w m = I" O Y U Q SCALE: 1 "=40' DATE: SEPTEMBER 11 DRAWN: JMG CHECKED: GVO FIELD BK: 817, P. 56-59 JOB NO.: 13885-3 SHEET NO. 1 OF 2 REVISIONS LEGEND CB CATCH BASIN CM CREPE MYRTLE • CO CLEANOUT ® DI DROP INLET 0 ECB ELECTRIC CONTROL BOX FDC FIRE DEPARTMENT CONNECTION FH FIRE HYDRANT FP FLAG POLE e IV IRRIGATION VALVE LP LIGHT POLE ON CONC. BASE Q MG MAIL BOX ® SDMH STORM DRAIN MANHOLE ® SSMH SANITARY SEWER MANHOLE ® WATER LINE MANHOLE WV WATER VALVE WW WATER VALVE VAULT SINGLE DOOR SINGLE DOOR "FIRE EXIT" "FIRE EXIT" FFE=479.74 FFE=479.74 0 00006'✓(DO00 k'1g6� CONCRETE k�gb "201�g6 kIg 6)1g�j1 keg' keg N47°40'41 "W 40.07' 15.40' N54013'07'W 1011 .,,1p I I I I III I all PARCEL 2 (D.B. 4489, P. 19-26-PLAT) PI D: 061 WO0300019BO PROPERTY OF COSTCO WHOLESALE CORPORATION (D.B. 4492, P. 1) COMM. kk VAULT keg • keg k�9 keg kl . � keg k�g keg• �9 SINGLE DOOR SCO FIRE EXIT" 5 �g ' FFE=351.71 g+k 4" +NJ g• ROLL UP DOOR ° py TIRE CENTER k� y6 16 FFE=479.44 keg' ° +k SPEED UMP g ROLL UP DOOR ° Ag TIRE CENTER k g' + + FFE=479.45 k�gti �g1g� 4"OAK g k° y0 6 ROLL UP DOOR TIRE CENTER kl� + +keg Off+ kl FFE=479.48 5 k +k� +keg N +keg. ROLL UP DOOR S 2� �� 1 THE CENTER FFE=479.45 k1 ?y g- k1+ Wa �g 06 b, a +k 0 6 SINGLE DOOR FIRE EXIT" SPf ° 5"OAK FFE=479.76 5 QUMp FDC n k 9 S5;1-1 FH k}g +° + 4 6 k klg0 �4-1k� k� g.N 479.40 k + }k-\g. RIM INV.(NE)=467.04 INV. SW _467.12 INV. SE =466.86 k k1g' k' f Af o ° Ad m J D c� c� z U k M U' a LIGHT POLE ON tiM69 CONC. BASE CONCI nMEDIA y 55 k 16 Op 'I 66 g0 6 6• 6 $' �' �' �' �' k�6 �. 5 �. 6 6 6• f BLOCK & BRICK q f RETAIL WAREHOUSE ROLL U kgy6 °hp gig g 0 9 k� �k 6g '1 RAMP a 6 "COSTCO WHOLESALE" + +k �Ec��g'k�g�� CON�o 6� 1 k 'ji #3171 DISTRICT AVENUE k1g +g5� + g 10+ �LAMP��� ROLL UP DOOR ° keg' k FFE=479.43 G Lk 10 OLLfi RC w/SI N; (TYPI SLIDING DOOR ° h k ENTRANCEg1 16 �� FFE=479.42 + 0 1 + tk1 +1 + g' g' SLIDING DOOR ES k k i'L,-�,F•�F:1 FFE=479.44°+ g + k�g1 + 6°j +k�+k�6� +k�66 7 k1g' ROLL UP DOOR / x 0 �1 ROLL UP DOOR FFE=479.42 t, b,�o`{°TD SINGLE E 479.�0 FFE=479.55 1g , +1g' OT C g k1 +I69 +k1 $ +0 +N"I +k�6kL SINGLE DOOR ROLL UP DOOR k 5 "EYE EXAMS" FFE=479.63 g 6k keg h keg k rT FFE=479.75/ + ° k g k�6 + 16 k�ggg -�1 -��g �- '19-d,196 96 k�gg-cj6h-- klgkk o k 6 k'1$' 4"OAK 6 1k tip qb ° k 0 CANOP0 k k1 0 0 0 0 061 tit .1 6 L 6 8"PVC kA66 Ni- k16 k1 ' ss L +k k 9 + 69 " L k�gO g +k�g0 +I gi RIM=478.94 NINV. NW=469.15 66 INV. �SE�+468.96+k'16' ASPHALT SU 6k 66 E 6g +09'> �g +k�6 +k�6• +k�6 +k� WV WV 6k k6 +16 +16hk +1666 + 1 k6� 4"OAK 15 + `l'1 6. k�6ti k�61� CON C. POL E gg p6 gl 66 1g +k g + 66 11 gti Ok 1g +k�� q„'1_ + + + 6ti SIGN SfN lob O 6 6°j +1 -F k�15k 61 +kl� +k,�'16� +0*1 SDMH*® PAINT STRIPING 5 RIM=447 59 �'1+k k (TYPI ) 6 +k1�h +k,�1 ;S6 + +k1� +k��h +k��� 6g ,Lg 1jk kg y'1 k,1� + Al ° + k�1`� 6"BIRC + k + + + gti $6 66 +0*1 +kll +Nil DI 15 hBID RS L) (TYPICAID NN C' - k�lg�y6 °�g°' (TYPICALPAINT )RIING 6P g +k�gti +k�g�q g+k 5N y1 +keg +8"PVC ys 16 +keg +keg k�g06 +keg C.k�g s g113 g,k g-\6 gNg g10 g16 g10 g06 �O '169k '1691 +k'1 +k'1 +k'1 +k'1[�'1 +k'1 +k'1 +k'1 +k +k k6 9 61ti 6�yti 6�y`L 'yy 6'S•y 6.y5 6ry6 6�6 610 ��g0 '1�g'S +k'1 +k'I +k'1 +k'1 +k'1 +N ASPHALT SURFACE 61rL +k�6Tlb +k�'16A $� 4"BIRCH p'L 16 GT cr g_ 0� 6 cT � . CB ov ILIUM. URD M LP Q —� CLAMP GUTTER (TYPICAL) 901) R=319.00, 1N(6-�( A=32.34' N59°22'39"W 68.50' } N47°53'S9"W A `64.6g, BLAC"I" LANE e (PRIVATE) FP iCTURE� p \ k "REDBUD ci 1g kl'1 1 4"REDBU k�' + R DB k e0g �jti � o Cg RlM,4j667 A� z�1, k,16• *' 6qNV. NW=467.86 k'1 IN NE =467.64 15 RAMP+ k ASPHALT SU °OAKS 1� 11 a a 4"0A �6 l b,b,, 5"OA + +g RAMP klEC �6 L k 01 +kll +k�1�k +k �� k�1�p I 66 CON( SDMH* 5"1 RIM=477.60N 4j6 kk ® 5p k "k COMM. VAULT��LS 4"BIRCH 6 1n'9.1 �7 1k �1 p1 t,. 1 k ,L'y +k �, +k 6c �ti 5y 'Sg +k��� FACE njk 1'1 p0 6k 66 g0 •yk . h 5 g +k�� . +k1'1 +k�� i � � k1��6 +k�� k�� • tk�� 6, 50 a MHM= V 69 g.P +k,16 +k+k+k1-/\r+k'I�' +k��^� ASPHALT SURFACE \ Ok n ,16"S, II n?o +k,1� +ol v gP 1� 6• g6 '1 6k '1 " CE . . . �+1k,11 no /+yk�1 PAINT STRIPING (TYPICAL) 6 RSA WAS UNABLE TO OBTAIN PIPE SIZE AND DEPTH INFORMATION DUE TO DEPTHS OF STORM DRAIN STRUCTURES BEING GREATER THAN 25 FEET. Q p W M 7 ~ a OF v) '7 F W o� ¢ cD W LL o UFO~ U cn H'� cn 3 z U d W a d C�7 O u ad N N W C) a s ^ 1, O N i a' z � ck O O � tiA I a N a Q cj co U> U LL J O�Na? J 0 �Uww [� J ?- �aUQ >LL QZzdw cpZNco z _j U0x WJJOu < zowwLL w F- QOLL 4 o ° coo> -a A� H z w EE Q OWZL x F P02 W C� LI—~ 0 = Y-- O Y Q SCALE: 1 "=20' DATE: SEPTEMBER 11, 2021 DRAWN: JMG CHECKED: GVO FIELD BK: 817, P. 56-59 JOB NO.: 13885-3 SHEET NO. 2 OF 2 KH GENERAL NOTES OVERALL: 1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE PLANS, CITY (OR TOWN) STANDARD DETAILS AND SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND ALL ISSUED ADDENDA, AND COMMONLY ACCEPTED CONSTRUCTION STANDARDS. THE CITY SPECIFICATIONS SHALL GOVERN WHERE OTHER SPECIFICATIONS DO NOT EXIST. IN CASE OF CONFLICTING SPECIFICATIONS OR DETAILS, THE MORE RESTRICTIVE SPECIFICATION AND DETAIL SHALL BE FOLLOWED. 2. THE CONTRACTOR SHALL COMPLY WITH CITY (OR TOWN) "GENERAL NOTES' FOR CONSTRUCTION, IF EXISTING AND REQUIRED BY THE CITY. FOR INSTANCES WHERE THEY CONFLICT WITH THESE KH GENERAL NOTES, THEN THE MORE RESTRICTIVE SHALL APPLY. 3. THE CONTRACTOR SHALL FURNISH ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE AUTHORITIES' SPECIFICATIONS AND REQUIREMENTS. 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO DETERMINE EXISTING CONDITIONS. 5. THE EXISTING CONDITIONS SHOWN ON THESE PLANS WERE PROVIDED BY THE TOPOGRAPHIC SURVEY PREPARED BY THE PROJECT SURVEYOR, AND ARE BASED ON THE BENCHMARKS SHOWN. THE CONTRACTOR SHALL REFERENCE THE SAME BENCHMARKS. 6. THE CONTRACTOR SHALL REVIEW AND VERIFY THE EXISTING TOPOGRAPHIC SURVEY SHOWN ON THE PLANS REPRESENTS EXISTING FIELD CONDITIONS PRIOR TO CONSTRUCTION, AND SHALL REPORT ANY DISCREPANCIES FOUND TO THE OWNER AND ENGINEER IMMEDIATELY. 7. IF THE CONTRACTOR DOES NOT ACCEPT THE EXISTING TOPOGRAPHIC SURVEY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY AT THEIR OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED PROFESSIONAL LAND SURVEYOR TO THE OWNER AND ENGINEER FOR REVIEW. 8. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SURVEYING AND STAKING. 9. CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL CONTROL, INCLUDING BENCHMARKS PRIOR TO COMMENCING CONSTRUCTION OR STAKING OF IMPROVEMENTS. PROPERTY LINES AND CORNERS SHALL BE HELD AS THE HORIZONTAL CONTROL. 10.THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS, ELEVATIONS, AND FIELD CONDITIONS THAT MAY AFFECT CONSTRUCTION. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE ARCHITECT, ENGINEER, AND IF APPLICABLE THE CITY AND OWNER. NO CONSIDERATION WILL BE GIVEN TO CHANGE ORDERS FOR WHICH THE CITY, ENGINEER, AND OWNER WERE NOT CONTACTED PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM. 11.CONTRACTOR SHALL THOROUGHLY CHECK COORDINATION OF CIVIL, LANDSCAPE, MEP, ARCHITECTURAL, AND OTHER PLANS PRIOR TO COMMENCING CONSTRUCTION. OWNERIENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO COMMENCING WITH CONSTRUCTION. 12.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK TO HAVE THEM LOCATE THEIR EXISTING UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE AN ADEQUATE MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION. 13.CONTRACTOR SHALL CALL VIRGINIA 811 AN ADEQUATE AMOUNT OF TIME PRIOR TO COMMENCING CONSTRUCTION OR ANY EXCAVATION. 14.CONTRACTOR SHALL USE EXTREME CAUTION AS THE SITE CONTAINS VARIOUS KNOWN AND UNKNOWN PUBLIC AND PRIVATE UTILITIES. 15.THE LOCATIONS, ELEVATIONS, DEPTH, AND DIMENSIONS OF EXISTING UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM AVAILABLE UTILITY COMPANY MAPS AND PLANS, AND ARE CONSIDERED APPROXIMATE AND INCOMPLETE. IT SHALL BE THE CONTRACTORS' RESPONSIBILITY TO VERIFY THE PRESENCE, LOCATION, ELEVATION, DEPTH, AND DIMENSION OF EXISTING UTILITIES SUFFICIENTLY IN ADVANCE OF CONSTRUCTION SO THAT ADJUSTMENTS CAN BE MADE TO PROVIDE ADEQUATE CLEARANCES. THE ENGINEER SHALL BE NOTIFIED WHEN A PROPOSED IMPROVEMENT CONFLICTS WITH AN EXISTING UTILITY. 16.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY ADJUSTMENTS AND RELOCATIONS OF EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO, ADJUSTING EXISTING MANHOLES TO MATCH PROPOSED GRADE, RELOCATING EXISTING POLES AND GUY WIRES THAT ARE LOCATED IN PROPOSED DRIVEWAYS, ADJUSTING THE HORIZONTAL OR VERTICAL ALIGNMENT OF EXISTING UNDERGROUND UTILITIES TO ACCOMMODATE PROPOSED GRADE OR CROSSING WITH A PROPOSED UTILITY, AND ANY OTHERS THAT MAY BE ENCOUNTERED THAT ARE UNKNOWN AT THIS TIME AND NOT SHOWN ON THESE PLANS. 17.CONTRACTOR SHALL ARRANGE FOR OR PROVIDE, AT ITS EXPENSE, ALL GAS, TELECOMMUNICATIONS, CABLE, OVERHEAD AND UNDERGROUND POWER LINE, AND UTILITY POLE ADJUSTMENTS NEEDED. 18.CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF FRANCHISE UTILITIES THAT ARE NECESSARY FOR ON -SITE AND OFF-SITECONSTRUCTION, AND SERVICE TO THE PROPOSED DEVELOPMENT. 19.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL DAMAGES DUE TO THE CONTRACTORS' FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED BY THE CONTRACTOR AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 20.13RACING OF UTILITY POLES MAY BE REQUIRED BY THE UTILITY COMPANIES WHEN TRENCHING OR EXCAVATING IN CLOSE PROXIMITY TO THE POLES. THE COST OF BRACING POLES WILL BE BORNE BY THE CONTRACTOR, WITH NO SEPARATE PAY ITEM FOR THIS WORK. THE COST IS INCIDENTAL TO THE PAY ITEM. 21.CONTRACTOR SHALL USE ALL NECESSARY SAFETY PRECAUTIONS TO AVOID CONTACT WITH OVERHEAD AND UNDERGROUND POWER LINES. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, FEDERAL AND UTILITY OWNER REGULATIONS PERTAINING TO WORK SETBACKS FROM POWER LINES. 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL REQUIRED CONSTRUCTION PERMITS, APPROVALS, AND BONDS PRIOR TO CONSTRUCTION. 23.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES A COPY OF THE CONTRACT DOCUMENTS INCLUDING PLANS, GEOTECHNICAL REPORT AND ADDENDA, PROJECT AND CITY SPECIFICATIONS, AND SPECIAL CONDITIONS, COPIES OF ANY REQUIRED CONSTRUCTION PERMITS, EROSION CONTROL PLANS, SWPPP AND INSPECTION REPORTS. 24.ALL SHOP DRAWINGS AND OTHER DOCUMENTS THAT REQUIRE ENGINEER REVIEW SHALL BE SUBMITTED BY THE CONTRACTOR SUFFICIENTLY IN ADVANCE OF CONSTRUCTION OF THAT ITEM, SO THAT NO LESS THAN 10 BUSINESS DAYS FOR REVIEW AND RESPONSE IS AVAILABLE. 25.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, JURISDICTIONAL AGENCIES, AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO USE OF THE FACILITY AND THE FINAL CONNECTION OF SERVICES. 26.CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS. 27.CONTRACTOR'S BID PRICE SHALL INCLUDE ALL INSPECTION FEES. 28.ALL SYMBOLS SHOWN ON THESE PLANS (E.G. FIRE HYDRANT, METERS, VALVES, INLETS, ETC....) ARE FOR PRESENTATION PURPOSES ONLY AND ARE NOT TO SCALE. CONTRACTOR SHALL COORDINATE FINAL SIZES AND LOCATIONS WITH APPROPRIATE CITY INSPECTOR. 29.THE SCOPE OF WORK FOR THE CIVIL IMPROVEMENTS SHOWN ON THESE PLANS TERMINATES 5-FEET FROM THE BUILDING. REFERENCE THE BUILDING PLANS (E.G. ARCHITECTURAL, STRUCTURAL, MEP) FOR AREAS WITHIN 5-FEET OF THE BUILDING AND WITHIN THE BUILDING FOOTPRINT. 30.REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR ALL FINAL BUILDING DIMENSIONS. 31.THE PROPOSED BUILDING FOOTPRINTS) SHOWN IN THESE PLANS WAS PROVIDED TO KIMLEY-HORN AND ASSOCIATES, INC. (KH) BY THE PROJECT ARCHITECT AT THE TIME THESE PLANS WERE PREPARED. IT MAY NOT BE THE FINAL CORRECT VERSION BECAUSE THE BUILDING DESIGN WAS ONGOING. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFIRMING THE FINAL CORRECT VERSION OF THE BUILDING FOOTPRINT WITH THE ARCHITECT AND STRUCTURAL ENGINEER PRIOR TO LAYOUT. DIMENSIONS AND/OR COORDINATES SHOWN ON THESE PLANS WERE BASED ON THE ABOVE STATED ARCHITECTURAL FOOTPRINT AND ARE THEREFORE A PRELIMINARY LOCATION OF THE BUILDING. THE CONTRACTOR IS SOLELY RESPONSIBLE TO VERIFY WHAT PART OF THE BUILDING THE ARCHITECTS FOOTPRINT REPRESENTS (E.G. SLAB, OUTSIDE WALL, MASONRY LEDGE, ETC.....) AND TO CONFIRM ITS FINAL POSITION ON THE SITE BASED ON THE FINAL ARCHITECTURAL FOOTPRINT, CIVIL DIMENSION CONTROL PLAN, SURVEY BOUNDARY AND/OR PLAT. ANY DIFFERENCES FOUND SHALL BE REPORTED TO KH IMMEDIATELY. 32.ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECTS FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING SUBSEQUENT ADDENDA. 33.CONTRACTOR IS RESPONSIBLE FOR ALL MATERIALS TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL MATERIALS TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR AND COMPLY WITH CITY STANDARD SPECIFICATIONS AND GEOTECHNICAL REPORT. TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR TESTING MATERIALS. OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR MATERIALS TESTING. 34.ALL COPIES OF MATERIALS TEST RESULTS SHALL BE SENT TO THE OWNER, ENGINEER AND ARCHITECT DIRECTLY FROM THE TESTING AGENCY. 35.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE MATERIALS, THAT THE WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. 36.DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO GEOTECHNICAL REPORT'S RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. 37.ALL CONTRACTORS MUST CONFINE THEIR ACTIVITIES TO THE WORK AREA. NO ENCROACHMENTS OUTSIDE OF THE WORK AREA WILL BE ALLOWED. ANY DAMAGE RESULTING THEREFROM SHALL BE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR. 38.THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, UTILITIES, MANHOLES, POLES, GUY WIRES, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS, COMMUNICATION BOXES/PEDESTALS, AND OTHER FACILITIES TO REMAIN AND SHALL REPAIR ANY DAMAGES AT NO COST TO THE OWNER. 39.THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY PHYSICAL DAMAGE TO PRIVATE PROPERTY OR PUBLIC IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO: FENCES, WALLS, SIGNS, PAVEMENT, CURBS, UTILITIES, SIDEWALKS, GRASS, TREES, LANDSCAPING, AND IRRIGATION SYSTEMS, ETC.... TO ORIGINAL CONDITION OR BETTER AT NO COST TO THE OWNER. 40.ALL AREAS IN EXISTING RIGHT-OF-WAY DISTURBED BY SITE CONSTRUCTION SHALL BE REPAIRED TO ORIGINAL CONDITION OR BETTER, INCLUDING AS NECESSARY GRADING, LANDSCAPING, CULVERTS, AND PAVEMENT. 41.THE CONTRACTOR SHALL SALVAGE ALL EXISTING POWER POLES, SIGNS, WATER VALVES, FIRE HYDRANTS, METERS, ETC... THAT ARE TO BE RELOCATED DURING CONSTRUCTION. 42.CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION, INCLUDING MAINTAINING EXISTING DITCHES OR CULVERTS FREE OF OBSTRUCTIONS AT ALL TIMES. 43.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL ENGINEER IN THE STATE OF VIRGINIA, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY. 44.THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER. 45.SITE SAFETY IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. 46.THESE PLANS DO NOT EXTEND TO OR INCLUDE DESIGNS OR SYSTEMS PERTAINING TO THE SAFETY OF THE CONTRACTOR OR ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE ENGINEER'S SEAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF ALL REQUIRED SAFETY PROCEDURES AND PROGRAMS. 47.SIGNS RELATED TO SITE OPERATION OR SAFETY ARE NOT INCLUDED IN THESE PLANS. 48.CONTRACTOR OFFICE AND STAGING AREA SHALL BE AGREED ON BY THE OWNER AND CONTRACTOR PRIOR TO BEGINNING OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING REQUIREMENTS FOR THE CONSTRUCTION OFFICE, TRAILER, STORAGE, AND STAGING OPERATIONS AND LOCATIONS. 491IGHT POLES, SIGNS, AND OTHER OBSTRUCTIONS SHALL NOT BE PLACED IN ACCESSIBLE ROUTES. 50.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE "VIRGINIA SUPPLEMENT TO THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (VAMUTCD). 51.TOP RIM ELEVATIONS OF ALL EXISTING AND PROPOSED MANHOLES SHALL BE COORDINATED WITH TOP OF PAVEMENT OR FINISHED GRADE AND SHALL BE ADJUSTED TO BE FLUSH WITH THE ACTUAL FINISHED GRADE AT THE TIME OF PAVING. 52.CONTRACTOR SHALL ADJUST ALL EXISTING AND PROPOSED VALVES, FIRE HYDRANTS, AND OTHER UTILITY APPURTENANCES TO MATCH ACTUAL FINISHED GRADES AT THE TIME OF PAVING. 53.THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION SEQUENCING AND PHASING, AND SHALL CONTACT THE APPROPRIATE CITY OFFICIALS, INCLUDING BUILDING OFFICIAL, ENGINEERING INSPECTOR, AND FIRE MARSHALL TO LEARN OF ANY REQUIREMENTS. 54.CONTRACTOR IS RESPONSIBLE FOR PREPARATION, SUBMITTAL, AND APPROVAL BY THE CITY OF A TRAFFIC CONTROL PLAN PRIOR TO THE START OF CONSTRUCTION, AND THEN THE IMPLEMENTATION OF THE PLAN. 55.CONTRACTOR SHALL KEEP A NEAT AND ACCURATE RECORD OF CONSTRUCTION, INCLUDING ANY DEVIATIONS OR VARIANCES FROM THE PLANS. 56.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AS -BUILT PLANS TO THE ENGINEER AND CITY IDENTIFYING ALL DEVIATIONS AND VARIATIONS FROM THESE PLANS MADE DURING CONSTRUCTION. EROSION CONTROL: 1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL EROSION CONTROL AND WATER QUALITY REQUIREMENTS, LAWS, AND ORDINANCES THAT APPLY TO THE CONSTRUCTION SITE LAND DISTURBANCE. 2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM UNDER THE VDEQ. 3. EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN FOR THE PROJECT SHALL BE INSTALLED PRIOR TO THE START OF LAND DISTURBANCE. 4. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR THE PROJECT. 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR INSTALLATION, IMPLEMENTATION, MAINTENANCE, AND EFFECTIVENESS OF ALL EROSION CONTROL DEVICES, BEST MANAGEMENT PRACTICES (BMPS), AND FOR UPDATING THE EROSION CONTROL PLAN DURING CONSTRUCTION AS FIELD CONDITIONS CHANGE. 6. CONTRACTOR SHALL DOCUMENT THE DATES OF INSTALLATION, MAINTENANCE OR MODIFICATION, AND REMOVAL FOR EACH BMP EMPLOYED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF APPLICABLE. 7. AS STORM SEWER INLETS ARE INSTALLED ON -SITE, TEMPORARY EROSION CONTROL DEVICES SHALL BE INSTALLED AT EACH INLET PER APPROVED DETAILS. 8. THE EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL THE AREA IT PROTECTS HAS BEEN PERMANENTLY STABILIZED. 9. CONTRACTOR SHALL PROVIDE ADEQUATE EROSION CONTROL DEVICES NEEDED DUE TO PROJECT PHASING. 10.CONTRACTOR SHALL OBSERVE THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND MAKE FIELD ADJUSTMENTS AND MODIFICATIONS AS NEEDED TO PREVENT SEDIMENT FROM LEAVING THE SITE. IF THE EROSION CONTROL DEVICES DO NOT EFFECTIVELY CONTROL EROSION AND PREVENT SEDIMENTATION FROM WASHING OFF THE SITE, THEN THE CONTRACTOR SHALL NOTIFY THE ENGINEER. 11.OFF-SITE SOIL BORROW, SPOIL, AND STORAGE AREAS (IF APPLICABLE) ARE CONSIDERED AS PART OF THE PROJECT SITE AND MUST ALSO COMPLY WITH THE EROSION CONTROL REQUIREMENTS FOR THIS PROJECT. THIS INCLUDES THE INSTALLATION OF BMP'S TO CONTROL EROSION AND SEDIMENTATION AND THE ESTABLISHMENT OF PERMANENT GROUND COVER ON DISTURBED AREAS PRIOR TO FINAL APPROVAL OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR MODIFYING THE SWPPP AND EROSION CONTROL PLAN TO INCLUDE BMPS FOR ANY OFF -SITE THAT ARE NOT ANTICIPATED OR SHOWN ON THE EROSION CONTROL PLAN. 12. ALL STAGING, STOCKPILES, SPOIL, AND STORAGE SHALL BE LOCATED SUCH THAT THEY WILL NOT ADVERSELY AFFECT STORM WATER QUALITY. PROTECTIVE MEASURES SHALL BE PROVIDED IF NEEDED TO ACCOMPLISH THIS REQUIREMENT, SUCH AS COVERING OR ENCIRCLING THE AREA WITH AN APPROPRIATE BARRIER. 13. CONTRACTORS SHALL INSPECT ALL EROSION CONTROL DEVICES, BMPS, DISTURBED AREAS, AND VEHICLE ENTRY AND EXIT AREAS WEEKLY AND WITHIN 24 HOURS OF ALL RAINFALL EVENTS OF 0.5 INCHES OR GREATER, AND KEEP A RECORD OF THIS INSPECTION IN THE SWPPP BOOKLET IF APPLICABLE, TO VERIFY THAT THE DEVICES AND EROSION CONTROL PLAN ARE FUNCTIONING PROPERLY. 14. CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION ENTRANCE AT ALL PRIMARY POINTS OF ACCESS IN ACCORDANCE WITH CITY SPECIFICATIONS. CONTRACTOR SHALL ENSURE THAT ALL CONSTRUCTION TRAFFIC USES THE STABILIZED ENTRANCE AT ALL TIMES FOR ALL INGRESS/EGRESS. 15. SITE ENTRY AND EXITS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT THE TRACKING AND FLOWING OF SEDIMENT AND DIRT ONTO OFF -SITE ROADWAYS. ALL SEDIMENT AND DIRT FROM THE SITE THAT IS DEPOSITED ONTO AN OFF -SITE ROADWAY SHALL BE REMOVED IMMEDIATELY. 16. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL SILT AND DEBRIS FROM THE AFFECTED OFF -SITE ROADWAYS THAT ARE A RESULT OF THE CONSTRUCTION, AS REQUESTED BY OWNER AND CITY. AT A MINIMUM, THIS SHOULD OCCUR ONCE PER DAY FOR THE OFF -SITE ROADWAYS. 17. WHEN WASHING OF VEHICLES IS REQUIRED TO REMOVE SEDIMENT PRIOR TO EXITING THE SITE, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP BMP. 18. CONTRACTOR SHALL INSTALL A TEMPORARY SEDIMENT BASIN FOR ANY ON -SITE DRAINAGE AREAS THAT ARE GREATER THAN 10 ACRES, PER VDEQ AND CITY STANDARDS. IF NO ENGINEERING DESIGN HAS BEEN PROVIDED FOR A SEDIMENTATION BASIN ON THESE PLANS, THEN THE CONTRACTOR SHALL ARRANGE FOR AN APPROPRIATE DESIGN TO BE PROVIDED. 19. ALL FINES IMPOSED FOR SEDIMENT OR DIRT DISCHARGED FROM THE SITE SHALL BE PAID BY THE RESPONSIBLE CONTRACTOR. 20.WHEN SEDIMENT OR DIRT HAS CLOGGED THE CONSTRUCTION ENTRANCE VOID SPACES BETWEEN STONES OR DIRT IS BEING TRACKED ONTO A ROADWAY, THE AGGREGATE PAD MUST BE WASHED DOWN OR REPLACED. RUNOFF FROM THE WASH -DOWN OPERATION SHALL NOT BE ALLOWED TO DRAIN DIRECTLY OFF SITE WITHOUT FIRST FLOWING THROUGH ANOTHER BMP TO CONTROL SEDIMENTATION. PERIODIC RE -GRADING OR NEW STONE MAY BE REQUIRED TO MAINTAIN THE EFFECTIVENESS OF THE CONSTRUCTION ENTRANCE. 21.TEMPORARY SEEDING OR OTHER APPROVED STABILIZATION SHALL BE INITIATED WITHIN 14 DAYS OF THE LAST DISTURBANCE OF ANY AREA UNLESS ADDITIONAL CONSTRUCTION IN THE AREA IS EXPECTED WITHIN 21 DAYS OF THE LAST DISTURBANCE. 22.CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING CONSTRUCTION, ALWAYS CLEANING UP DIRT, LOOSE MATERIAL, AND TRASH AS CONSTRUCTION PROGRESSES. 23.UPON COMPLETION OF FINE GRADING ALL SURFACES OF DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED. STABILIZATION IS ACHIEVED WHEN THE AREA IS EITHER COVERED BY PERMANENT IMPERVIOUS STRUCTURES, SUCH AS BUILDINGS, SIDEWALK, PAVEMENT, OR A UNIFORM PERENNIAL VEGETATIVE COVER. 24.AT THE CONCLUSION OF THE PROJECT, ALL INLETS, DRAIN PIPE, CHANNELS, DRAINAGEWAYS AND BORROW DITCHES AFFECTED BY THE CONSTRUCTION SHALL BE DREDGED, AND THE SEDIMENT GENERATED BY THE PROJECT SHALL BE REMOVED AND DISPOSED IN ACCORDANCE WITH APPLICABLE REGULATIONS. STORM WATER DISCHARGE AUTHORIZATION: 1. CONTRACTOR SHALL COMPLY WITH ALL VDEQ AND EPA STORM WATER POLLUTION PREVENTION REQUIREMENTS. 2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM UNDER THE VDEQ. 3. THE CONTRACTOR SHALL ENSURE THAT ALL PRIMARY OPERATORS SUBMIT A NOI TO VDEQ AT LEAST SEVEN DAYS PRIOR TO COMMENCING CONSTRUCTION IF APPLICABLE),OR IF UTILIZING ELECTRONIC SUBMITTAL PRIOR TO COMMENCING CONSTRUCTION. ALL PRIMARY OPERATORS SHALL PROVIDE A COPY OF THE SIGNED NOI TO THE OPERATOR OF ANY MS4 (TYPICALLY THE CITY) RECEIVING DISCHARGE FROM THE SITE. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMPLEMENTATION OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF APPLICABLE, INCLUDING POSTING SITE NOTICE, INSPECTIONS, DOCUMENTATION, AND SUBMISSION OF ANY INFORMATION REQUIRED BY THE VDEQ AND EPA (E.G. NOI). 5. ALL CONTRACTORS AND SUBCONTRACTORS PROVIDING SERVICES RELATED TO THE SWPPP SHALL SIGN THE REQUIRED CONTRACTOR CERTIFICATION STATEMENT ACKNOWLEDGING THEIR RESPONSIBILITIES AS SPECIFIED IN THE SWPPP. 6. A COPY OF THE SWPPP, INCLUDING NOI, SITE NOTICE, CONTRACTOR CERTIFICATIONS, AND ANY REVISIONS, SHALL BE SUBMITTED TO THE CITY BY THE CONTRACTOR AND SHALL BE RETAINED ON -SITE DURING CONSTRUCTION. 7. A NOTICE OF TERMINATION (NOT) SHALL BE SUBMITTED TO VDEQ BY ANY PRIMARY OPERATOR WITHIN 30 DAYS AFTER ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND A UNIFORM VEGETATIVE COVER HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS AND AREAS NOT COVERED BY STRUCTURES A TRANSFER OF OPERATIONAL CONTROL HAS OCCURRED OR THE OPERATOR HAS OBTAINED ALTERNATIVE AUTHORIZATION UNDER A DIFFERENT PERMIT. A COPY OF THE NOT SHALL BE PROVIDED TO THE OPERATOR OF ANY MS4 RECEIVING DISCHARGE FROM THE SITE. DEMOLITION: 1. KH IS NOT RESPONSIBLE FOR THE MEANS AND METHODS EMPLOYED BY THE CONTRACTOR TO IMPLEMENT THIS DEMOLITION PLAN. THIS PRELIMINARY DEMOLITION PLAN SIMPLY INDICATES THE KNOWN OBJECTS ON THE SUBJECT TRACT THAT ARE TO BE DEMOLISHED AND REMOVED FROM THE SITE. 2. KH DOES NOT WARRANT OR REPRESENT THAT THE PLAN, WHICH WAS PREPARED BASED ON SURVEY AND UTILITY INFORMATION PROVIDED BY OTHERS, SHOWS ALL IMPROVEMENTS AND UTILITIES, THAT THE IMPROVEMENTS AND UTILITIES ARE SHOWN ACCURATELY, OR THAT THE UTILITIES SHOWN CAN BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ITS OWN SITE RECONNAISSANCE TO SCOPE ITS WORK AND TO CONFIRM WITH THE OWNERS OF IMPROVEMENTS AND UTILITIES THE ABILITY AND PROCESS FOR THE REMOVAL OF THEIR FACILITIES. 3. THIS PLAN IS INTENDED TO GIVE A GENERAL GUIDE TO THE CONTRACTOR, NOTHING MORE. THE GOAL OF THE DEMOLITION IS TO LEAVE THE SITE IN A STATE SUITABLE FOR THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. REMOVAL OR PRESERVATION OF IMPROVEMENTS, UTILITIES, ETC. TO ACCOMPLISH THIS GOAL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 4. CONTRACTOR IS STRONGLY CAUTIONED TO REVIEW THE FOLLOWING REPORTS DESCRIBING SITE CONDITIONS PRIOR TO BIDDING AND IMPLEMENTING THE DEMOLITION PLAN: e. ENVIRONMENTAL SITE ASSESSMENT PROVIDED BY THE OWNER, b. ASBESTOS BUILDING INSPECTION REPORTS) PROVIDED BY THE OWNER, C. GEOTECHNICAL REPORT PROVIDED BY THE OWNER. d. OTHER REPORTS THAT ARE APPLICABLE AND AVAILABLE. 5. CONTRACTOR SHALL CONTACT THE OWNER TO VERIFY WHETHER ADDITIONAL REPORTS OR AMENDMENTS TO THE ABOVE CITED REPORTS HAVE BEEN PREPARED AND TO OBTAIN/REVIEW/AND COMPLY WITH THE RECOMMENDATION OF SUCH STUDIES PRIOR TO STARTING ANY WORK ON THE SITE. 6. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS REGARDING THE DEMOLITION OF OBJECTS ON THE SITE AND THE DISPOSAL OF THE DEMOLISHED MATERIALS OFF -SITE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO REVIEW THE SITE, DETERMINE THE APPLICABLE REGULATIONS, RECEIVE THE REQUIRED PERMITS AND AUTHORIZATIONS, AND COMPLY. 7. KH DOES NOT REPRESENT THAT THE REPORTS AND SURVEYS REFERENCED ABOVE ARE ACCURATE, COMPLETE, OR COMPREHENSIVE SHOWING ALL ITEMS THAT WILL NEED TO BE DEMOLISHED AND REMOVED. 8. SURFACE PAVEMENT INDICATED MAY OVERLAY OTHER HIDDEN STRUCTURES, SUCH AS ADDITIONAL LAYERS OF PAVEMENT, FOUNDATIONS OR WALLS, THAT ARE ALSO TO BE REMOVED. GRADING: 1. THE CONTRACTOR AND GRADING SUBCONTRACTOR SHALL VERIFY THE SUITABILITY OF EXISTING AND PROPOSED SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS BEFORE START OF CONSTRUCTION. THE CIVIL ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. 2. CONTRACTOR SHALL OBTAIN ANY REQUIRED GRADING PERMITS FROM THE CITY. 3. UNLESS OTHERWISE NOTED, PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN PAVED AREA REFLECT TOP OF PAVEMENT SURFACE. IN LOCATIONS ALONG A CURB LINE, ADD 6-INCHES (OR THE HEIGHT OF THE CURB) TO THE PAVING GRADE FOR TOP OF CURB ELEVATION. 4. PROPOSED SPOT ELEVATIONS AND CONTOURS OUTSIDE THE PAVEMENT ARE TO TOP OF FINISHED GRADE. 5. PROPOSED CONTOURS ARE APPROXIMATE. PROPOSED SPOT ELEVATIONS AND DESIGNATED GRADIENT ARE TO BE USED IN CASE OF DISCREPANCY. 6. ALL FINISHED GRADES SHALL TRANSITION UNIFORMLY BETWEEN THE FINISHED ELEVATIONS SHOWN. 7. CONTOURS AND SPOT GRADES SHOWN ARE ELEVATIONS OF TOP OF THE FINISHED SURFACE. WHEN PERFORMING THE GRADING OPERATIONS, THE CONTRACTOR SHALL PROVIDE AN APPROPRIATE ELEVATION HOLD-DOWN ALLOWANCE FOR THE THICKNESS OF PAVEMENT, SIDEWALK, TOPSOIL, MULCH, STONE, LANDSCAPING, RIP -RAP AND ALL OTHER SURFACE MATERIALS THAT WILL CONTRIBUTE TO THE TOP OF FINISHED GRADE. FOR EXAMPLE, THE LIMITS OF EARTHWORK IN PAVED AREAS IS THE BOTTOM OF THE PAVEMENT SECTION. 8. NO REPRESENTATIONS OF EARTHWORK QUANTITIES OR SITE BALANCE ARE MADE BY THESE PLANS. THE CONTRACTOR SHALL PROVIDE THEIR OWN EARTHWORK CALCULATION TO DETERMINE THEIR CONTRACT QUANTITIES AND COST. ANY SIGNIFICANT VARIANCE FROM A BALANCED SITE SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CIVIL ENGINEER. 9. ALL GRADING AND EARTHWORK SHALL COMPLY WITH THE PROJECTS FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING SUBSEQUENT ADDENDA. 10. ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. UNUSABLE EXCAVATED MATERIAL AND ALL WASTE RESULTING FROM SITE CLEARING AND GRUBBING SHALL BE REMOVED FROM THE SITE AND APPROPRIATELY DISPOSED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE. 11. EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN FOR THE PROJECT SHALL BE INSTALLED PRIOR TO THE START OF GRADING. REFERENCE EROSION CONTROL PLAN, DETAILS, GENERAL NOTES, AND SWPPP FOR ADDITIONAL INFORMATION AND REQUIREMENTS. 12. BEFORE ANY EARTHWORK IS PERFORMED, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF THE PROJECT'S PROPERTY LINE AND SITE IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO EARTHWORK. 13. CONTRACTOR TO DISPOSE OF ALL EXCESS EXCAVATION MATERIALS IN A MANNER THAT ADHERES TO LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. THE CONTRACTOR SHALL KEEP A RECORD OF WHERE EXCESS EXCAVATION WAS DISPOSED, ALONG WITH THE RECEIVING LANDOWNER'S APPROVAL TO DO SO. 14. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF TOPSOIL AT THE COMPLETION OF FINE GRADING. CONTRACTOR SHALL REFER TO LANDSCAPE ARCHITECTURE PLANS FOR SPECIFICATIONS AND REQUIREMENTS FOR TOPSOIL. 15. CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION, INCLUDING MAINTAINING EXISTING DITCHES OR CULVERTS FREE OF OBSTRUCTIONS AT ALL TIMES. 16. NO EARTHWORK FILL SHALL BE PLACED IN ANY EXISTING DRAINAGE WAY, SWALE, CHANNEL, DITCH, CREEK, OR FLOODPLAIN FOR ANY REASON OR ANY LENGTH OF TIME, UNLESS THESE PLANS SPECIFICALLY INDICATE THIS IS REQUIRED. 17. TEMPORARY CULVERTS MAY BE REQUIRED IN SOME LOCATIONS TO CONVEY RUN-OFF. 18. REFER TO DIMENSION CONTROL PLAN, AND PLAT FOR HORIZONTAL DIMENSIONS. 19. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND CONDITION FILL PER THE PROJECT GEOTECHNICAL ENGINEER'S SPECIFICATIONS. THE FILL MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. 20.CONTRACTOR IS RESPONSIBLE FOR ALL SOILS TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL SOILS TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR AND SHALL COMPLY WITH CITY STANDARD SPECIFICATIONS AND THE GEOTECHNICAL REPORT. SOILS TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR TESTING SOILS. THE OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR SOILS TESTING. 21.ALL COPIES OF SOILS TEST RESULTS SHALL BE SENT TO THE OWNER, ENGINEER AND ARCHITECT DIRECTLY FROM THE TESTING AGENCY. 22.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE SOILS, THAT THE WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. 23.THE SCOPE OF WORK FOR CIVIL IMPROVEMENT SHOWN ON THESE PLANS TERMINATES 5-FEET FROM THE BUILDING. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT AND STRUCTURAL PLANS AND SPECIFICATIONS FILL, CONDITIONING, AND PREPARATION IN THE BUILDING PAD. 24.DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO GEOTECHNICAL REPORTS RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. 25.CONTRACTOR SHALL ENSURE THAT SUFFICIENT POSITIVE SLOPE AWAY FROM THE BUILDING PAD IS ACHIEVED FOR ENTIRE PERIMETER OF THE PROPOSED BUILDING(S) DURING GRADING OPERATIONS AND IN THE FINAL CONDITION. IF THE CONTRACTOR OBSERVES THAT THIS WILL NOT BE ACHIEVED, THE CONTRACTOR SHALL CONTACT THE ENGINEER TO REVIEW THE LOCATION. 26.THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST. CONTRACTOR SHALL CONTROL DUST BY SPRINKLING WATER, OR BY OTHER MEANS APPROVED BY THE CITY, AT NO ADDITIONAL COST TO THE OWNER. 27.CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY REQUIRED UTILITY ADJUSTMENTS AND/OR RELOCATIONS NEEDED FOR GRADING OPERATIONS AND TO ACCOMMODATE PROPOSED GRADE, INCLUDING THE UNKNOWN UTILITIES NOT SHOWN ON THESE PLANS. CONTRACTOR SHALL REFER TO THE GENERAL NOTES "OVERALL" SECTION THESE PLANS FOR ADDITIONAL INFORMATION. 28.EXISTING TREE LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE. CONTRACTOR SHALL REPORT ANY DISCREPANCIES FOUND IN THE FIELD THAT AFFECT THE GRADING PLAN TO THE CIVIL ENGINEER. 29.CONTRACTOR SHALL FIELD VERIFY ALL PROTECTED TREE LOCATIONS, INDIVIDUAL PROTECTED TREE CRITICAL ROOT ZONES, AND PROPOSED SITE GRADING, AND NOTIFY THE CIVIL ENGINEER AND LANDSCAPE ARCHITECT OF ANY CONFLICTS WITH THE TREE PRESERVATION PLAN BY THE LANDSCAPE ARCHITECT PRIOR TO COMMENCING THE WORK. 30.TREE PROTECTION MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE CITY STANDARD TREE PROTECTION DETAILS AND THE APPROVED TREE PRESERVATION PLANS BY THE LANDSCAPE ARCHITECT. 31.CONTRACTOR SHALL REFER TO THE LANDSCAPING AND TREE PRESERVATIONS PLANS FOR ALL INFORMATION AND DETAILS REGARDING EXISTING TREES TO BE REMOVED AND PRESERVED. 32.NO TREE SHALL BE REMOVED UNLESS A TREE REMOVAL PERMIT HAS BEEN ISSUED BY THE CITY, OR CITY HAS OTHERWISE CONFIRMED IN WRITING THAT ONE IS NOT NEEDED FOR THE TREE(S). 33.NO TREE SHALL BE REMOVED OR DAMAGED WITHOUT PRIOR AUTHORIZATION OF THE OWNER OR OWNER'S REPRESENTATIVE. EXISTING TREES SHALL BE PRESERVED WHENEVER POSSIBLE AND GRADING IMPACT TO THEM HELD TO A MINIMUM. 34.AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING AND INADEQUATE SLOPE FOR DRAINAGE. ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE TO CONVEY STORMWATER RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY AREAS OF POOR DRAINAGE ARE DISCOVERED. 35.CONTRACTOR FIELD ADJUSTMENT OF PROPOSED SPOT GRADES IS ALLOWED, IF THE APPROVAL OF THE CIVIL ENGINEER IS OBTAINED. RETAINING WALLS: 1. RETAINING WALLS SHOWN ARE FOR SITE GRADING PURPOSES ONLY, AND INCLUDE ONLY LOCATION AND SURFACE SPOT ELEVATIONS AT THE TOP AND BOTTOM OF THE WALL. 2. RETAINING WALL TYPE OR SYSTEM SHALL BE SELECTED BY THE OWNER. 3. RETAINING WALL DESIGN SHALL BE PROVIDED BY OTHERS AND SHALL FIT IN THE WALL ZONE OR LOCATION SHOWN ON THESE PLANS. STRUCTURAL DESIGN AND PERMITTING OF RETAINING WALLS, RAILINGS, AND OTHER WALL SAFETY DEVICES SHALL BE PERFORMED BY A LICENSED ENGINEER AND ARE NOT PART OF THIS PLAN SET. 4. RETAINING WALL DESIGN SHALL MEET THE INTENT OF THE GRADING PLAN AND SHALL ACCOUNT FOR ANY INFLUENCE ON ADJACENT BUILDING FOUNDATIONS, UTILITIES, PROPERTY LINES AND OTHER CONSTRUCTABILITY NOTES. 5. RETAINING WALL ENGINEER SHALL CONSULT THESE PLANS AND THE GEOTECHNICAL REPORT FOR POTENTIAL CONFLICTS. PAVING: 1. ALL PAVING MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY STANDARD DETAILS AND SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND ALL ISSUED ADDENDA, AND COMMONLY ACCEPTED CONSTRUCTION STANDARDS. THE CITY SPECIFICATIONS SHALL GOVERN WHERE OTHER SPECIFICATIONS DO NOT EXIST. IN CASE OF CONFLICTING SPECIFICATIONS OR DETAILS, THE MORE RESTRICTIVE SPECIFICATION/DETAIL SHALL BE FOLLOWED. 2. ALL PRIVATE ON -SITE PAVING AND PAVING SUBGRADE SHALL COMPLY WITH THE PROJECT'S FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING ALL ADDENDA. 3. ALL FIRELANE PAVING AND PAVING SUBGRADE SHALL COMPLY WITH CITY STANDARDS AND DETAILS. IF THESE ARE DIFFERENT THAN THOSE IN THE GEOTECHNICAL REPORT, THEN THE MORE RESTRICTIVE SHALL BE FOLLOWED. 4. ALL PUBLIC PAVING AND PAVING SUBGRADE SHALL COMPLY WITH CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS. 5. CONTRACTOR IS RESPONSIBLE FOR ALL PAVING AND PAVING SUBGRADE TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL PAVING AND PAVING SUBGRADE TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR. TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR TESTING PAVING AND SUBGRADE. OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR PAVING AND PAVING SUBGRADE TESTING. 6. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE PAVING AND PAVING SUBGRADE, THAT THE WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. 7. DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO GEOTECHNICAL REPORTS RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. 8. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE CONSTRUCTED BASED ON THE CITY STANDARD CONSTRUCTION DETAIL AND SPECIFICATIONS. 9. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL CONFORM TO ADA STANDARDS AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH AND FULL DEPTH OF THE CURB RAMP, NOT INCLUDING FLARES. 10. ALL ACCESSIBLE RAMPS CURB RAMPS STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS LATEST EDITION. 11. ANY COMPONENTS OF THE PROJECT SUBJECT TO RESIDENTIAL USE SHALL ALSO CONFORM TO THE FAIR HOUSING ACT, AND COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. 12.CONTRACTOR SHALL CONSTRUCT PROPOSED PAVEMENT TO MATCH EXISTING PAVEMENT WITH A SMOOTH, FLUSH, CONNECTION. 13.CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKINGS FOR FIRE LANES, PARKING STALLS, HANDICAPPED PARKING SYMBOLS, AND MISCELLANEOUS STRIPING WITHIN PARKING LOT AND AROUND BUILDING AS SHOWN ON THE PLANS. ALL PAINT AND PAVEMENT MARKINGS SHALL ADHERE TO CITY AND OWNER STANDARDS. 14.REFER TO GEOTECHNICAL REPORT FOR PAVING JOINT LAYOUT PLAN REQUIREMENTS FOR PRIVATE PAVEMENT. 15.REFER TO CITY STANDARD DETAILS AND SPECIFICATIONS FOR JOINT LAYOUT PLAN REQUIREMENTS FOR PUBLIC PAVEMENT. 16. ALL REINFORCING STEEL SHALL CONFORM TO THE GEOTECHNICAL REPORT, CITY STANDARDS, AND ASTM A-615, GRADE 60, AND SHALL BE SUPPORTED BY BAR CHAIRS. CONTRACTOR SHALL USE THE MORE STRINGENT OF THE CITY AND GEOTECHNICAL STANDARDS. 17. ALL JOINTS SHALL EXTEND THROUGH THE CURB. 18.THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET. 19.CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER AND OWNER PRIOR TO BEGINNING ANY OF THE PAVING WORK. 20.ALL SAWCUTS SHALL BE FULL DEPTH FOR PAVEMENT REMOVAL AND CONNECTION TO EXISTING PAVEMENT. 21.FIRE LANES SHALL BE MARKED AND LABELED AS A FIRELANE PER CITY STANDARDS. 22.UNLESS THE PLANS SPECIFICALLY DICTATE TO THE CONTRARY, ON -SITE AND OTHER DIRECTIONAL SIGNS SHALL BE ORIENTED SO THEY ARE READILY VISIBLE TO THE ONCOMING TRAFFIC FOR WHICH THEY ARE INTENDED. 23.CONTRACTOR IS RESPONSIBLE FOR INSTALLING NECESSARY CONDUIT FOR LIGHTING, IRRIGATION, ETC. PRIOR TO PLACEMENT OF PAVEMENT. ALL CONSTRUCTION DOCUMENTS (CIVIL, MEP, LANDSCAPE, IRRIGATION, AND ARCHITECT) SHALL BE CONSULTED. 24.13EFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION. 25.CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ADA SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR ADA SLOPE COMPLIANCE ISSUES. GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 1. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 2. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 3. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED, AND MULCHED. 4. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 5. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 6. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 7. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 8. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). ABBREVIATIONS AND DEFINITIONS: A AREA ADA AMERICANS WITH DISABILITIES ACT AWWA AMERICAN WATER WORKS ASSOCIATION B-B BACK TO BACK BC BEGIN CURVE BC BACK OF CURB BCR BEGIN CURB RETURN BMP BEST MANAGEMENT PRACTICE BOC BACK OF CURB BFR BARRIER FREE RAMP BVCE BEGIN VERTICAL CURVE ELEVATION BVCS BEGIN VERTICAL CURVE STATION BW BOTTOM OF WALL CFS CUBIC FEET PER SECOND CITY CITY, TOWN, OR OTHER APPLICABLE LOCAL GOVERNMENT JURISDICTION C/L CENTERLINE CL CENTERLINE CONC CONCRETE CY CUBIC YARD DEMO DEMOLITION DG DECOMPOSED GRANITE DTL DETAIL EA EACH EC END CURVE ECR END CURB RETURN EG EXISTING GROUND EL ELEVATION ELEC ELECTRICAL/ELECTRICITY ELEV ELEVATION EPA UNITES STATES ENVIRONMENTAL PROTECTION AGENCY ESMT EASEMENT EVCE END VERTICAL CURVE ELEVATION EVCS END VERTICAL CURVE STATION EX. EXISTING F-F FACE TO FACE FG FINISHED GROUND FH FIRE HYDRANT FL FLOW LINE FOC FACE OF CURB FT FEET HGL HYDRAULIC GRADE LINE KH KIMLEY-HORN AND ASSOCIATES, INC. KHA KIMLEY-HORN AND ASSOCIATES, INC. LAT LATERAL LF LINEAR FEET LT LEFT MAX MAXIMUM ME MATCH EXISTING ELEVATION MH MANHOLE MIN MINUTE / MINIMUM NO NUMBER NOI NOTICE OF INTENT, REF. TCEQ GENERAL PERMIT NOT NOTICE OF TERMINATION, REF. TCEQ GENERAL PERMIT NTS NOT TO SCALE OC ON CENTER OFF OFFSET OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PC POINT OF CURVATURE PCC PORTLAND CEMENT CONCRETE / POINT OF COMPOUND CURVATURE PGL PROPOSED GRADE LINE PI POINT OF INFLECTION PROP PROPOSED PRC POINT OF REVERSE CURVATURE PSI POUNDS PER SQUARE INCH PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE PVI POINT OF VERTICAL INFLECTION PVMT PAVEMENT RCP REINFORCED CONCRETE PIPE ROW RIGHT OF WAY RT RIGHT SF SQUAREFEET SS SANITARY SEWER SSMH SANITARY SEWER MANHOLE STA STATION STD STANDARD SY SQUARE YARD TC TOP OF CURB TEMP TEMPORARY TW TOP OF WALL TYP TYPICAL VAMUTCD VIRGINIA SUPPLEMENT TO THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES VC VERTICAL CURVE VDEQ VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY VDOT VIRGINIA DEPARTMENT OF TRANSPORTATION WTR WATER VWV WASTEWATER W H Q C) !n Z 0 In W 0_ O Z V in L. 0 z N - It (cm 0 =A i a) O � CD � 5 0 W (n 0 O N z:j O W Q W O _ % Z W O (n W W CD J Ld z :2 D - _ Y 2 cf) W Q N z 0 0 N 0 rsl u r 1 - �y l `i--�� P. ALMUNDER TORRES Lie. No. 0402061591 41al,491,7 Z1 A Z O O a = a N W C)0 N 0 O w N I ('r) } > d to Q 0) Q m } m O W N 0 m 0 _ w == o � 0 3 0 Y U w � S w 0 0 C) J N < rY0 W Z �LLI V O 0) N V LU N I W 0 -i (n - J 0c)U) m - W W 0 H Q � O M J a. Q = C) SHEET NUMBER Co.1 u cbsrw VVIMMS"E EXISTING WAREHOUSE FFE: 479.4' PARCEL 2 (D.B. 4489, P. 19-26-PLAT) PID: 061 WO0300019BO PROPERTY OF COSTCO WHOLESALE CORPORATION (D.B. 4492, P. 1) BLOCK & BRICK RETAIL WAREHOUSE "COSTCO WHOLESALE" #3171 DISTRICT AVENUE LIMITS OF WORK AND G o 0 MILLING AND OVERLAY ps (TYP.). NO LAND mim o DISTURBANCE TO OCCUR. 'r F (TM BOLLARDS 0 Tyr rl r r o LIMITS OF SAWCUT (TYP.). r I ° o 0 0 0 0 0 0 0 0 0 CONTRACTOR TO ENSURE SAWCUTS OCCAT EXISTING PAVEMENT t3,559 SF ASPHALT t40 LF CONCRETE CURB UR SFO PAVING TO BE REMOVED AND GUTTER REMOVAL _ EX. ASPHALT LIMITS OF ® PAVEMENT `� DISTURBANCE (TYP.) / EX. MH A \ OHS H -ter aG OH j� D s� Lao s� LOD i Loo s� L D s� Lo ±428 SF ASPHALT PAVING \ \ A I=> o N WV /TO BE REMOVED EX. ASPHALT /\ / 177 • ,� PAVEMENT VVV// = 11 I I II II 1 /fBM 0 U 1 0 OL 0 a v 3 u 3 0 ; u v C 0 v 0 0 FL 0 n 15.40' v N54°13'07"W Y `o E 0 N 0 C r v v c m a rn v v 0 0 a v 0 0 0 0 C v S • c 0 • t 0 0 4 0 Know what's below. Call before you dig. 1 EX. MH 459°2T39"W 68.50' \ s 001 s a s s s s s s s s \ Doi s� Doi s� Doi s� Doi oo aoi s� 9 \ CART CORRAL ` SFOP- SFO �- c EX. ASPHALT TO REMAIN / PAVEMENT LIMITS OF SAWCUT (TYP.). CONTRACTOR TO ENSURE / 340 LF CONCRETE CURB r SAWCUTS OCCUR AY AND GUTTER REMOVAL > EXISTING PAVEME44IT EX. GRATE INLET JONTS. TO REMAIN \ / IP \ / EX. GRATE INLET _ TO REMAIN LAMP-J"P �� -I��\ LP ° CB SETBACK LINE \ CAUTIONII , THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS DISCOVERED. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE CONTRACTOR SHALL REPLACE THEM AT HIS OWN EXPENSE. CALL 811 AT LEAST 72 HOURS PRIOR TO COMMENCING CONSTRUCTION IN VICINITY. 2.71' N4753'59,W (� LANE N3`5j?0 3g.9@ BENCHMARKS BM 101 DRILL HOLE, N: 3,912,678.714, E:11,485,573.432. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV. = 478.13' BM 102 PK NAIL, N: 3,912,618.377, E: 11,485,814.816 ELEV. = 479.12' BM 103 DRILL HOLE, N: 3,912,543.318, E:11,485,958.364. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV.= 477.35' IAMP ON VH U�ij ® EX. MH a p EX.A HALT A A PAVE ENT I� 1 I F 0 I 1 o EX. SPEED BUMPS TO REMAIN EX. LANDSCAPE 0 TO REMAIN LAMP o 0 Fl 0 1/LIMITS OF DISTURBANCE (TYP.) 10A ( 11; LAMP 1 EX. TREE TO BE ` M #1 O / E ASPH REMOVED A A PAV MENALT 477.3 LIMITS OF SAWCUT (TYP.). s s s CONTRACTOR TO ENSURE 5 SAWCUTS OCCUR AT 366 LF CON,CRETE CURB EXISTING PAVEMENT AND GU7ER REMOVAL o JOINTS. T° IN �� II II II / EX. ASPHALT ° / PAVEMENT pp EX. LIGHT POLE REMAIN. / ECB_.;_ 9 CONTRACTOR TO ENSURE r STRUCTURAL INTEGRITY OF O LIGHT POL ON r LIGHT POLE THROUGHOUT CONC. BA ° r' CONSTRUCTION LL D EX. MH s 5 r LIMITS OF WORK AND ° EX. FLAG POLE TO REMAIN. 1� I MILLING AND OVERLAY --- CONTRACTOR TO ENSURE s o�im s 1 (TYP.). NO LAND STRUCTURAL INTEGRITY OF LOp SFO FOP DISTURBANCE TO OCCUR. 0 A FLAG POLE THROUGHOUT `\� CONSTRUCTION EX. DSCAPE TO EX. TREE TO ,REMAIN E REMAIN (TYP.) �/ t1,132 SF ASPHALT ° PAVING TO BE REMOVED EX. FIRE HYDRANT TO REMAIN / H /I ECB CONIC o SIDEZALKTO / BE E REM VED \I r LIGF CON r� X. MH Rl4f,476.67 \ \ \ \ EX.ASPHALT PAVEMENT / I -E TREE TO REMAIN 0 DEMOLITION NOTES REFER TO GENERAL NOTES SHEET FOR DEMOLITION PLAN NOTES. EROSION CONTROL DETAILS REFER TO SHEET C1.1 FOR EROSION CONTROL DETAILS. BMP MAINTENANCE SCHEDULE CURB INLET/GRATE INLET/WYE INLET: INSPECTIONS SHALL BE MADE WEEKLY AND AFTER ALL RAIN EVENTS TO ENSURE THAT THE DEVICE IS FUNCTIONING PROPERLY. REMOVE SEDIMENT FROM THE STORAGE AREA SURROUNDING THE INLET/GRATE WHEN THE DEPTH OF SEDIMENT HAS BUILT UP TO ONE-HALF OF THE PROTECTION HEIGHT. DEVICE SHALL BE INSPECTED FOR GAPS AT BASE, AND SHALL BE REPLACED AS NEEDED. SITE DATA TOTAL SITE AREA 13.58 AC 591,545 SF LIMIT OF DISTURBANCE (LOD) 0.14 AC 6,005 SF LIMIT OF WORK (LOW) NO DISTURBANCE TO OCCUR 0.04 AC 1,546 SF TOTAL OFF -SITE AREA DISTURBED 0.00 AC 0 SF TOTAL AREA DISTURBED 0.14 AC 6,005 SF EROSION AND SEDIMENT NO. H TITLE KEY SYMBOL 3.051 .05 SILT FENCE ON PAVEMEN SF SFO TREE PROTECTISTOON 3.07 RM DRAIN INLET P OTECTION IP GRAPHIC SCALE IN FEET 0 10 20 40 GENERALNOTES 1. CONTRACTOR SHALL PHASE WORK SO THAT CUSTOMER ACCESS TO BUILDING ENTRANCES REMAIN OPEN AT ALL TIMES. 2. CONTRACTOR TO LOCATE ALL PRIVATE AND PUBLIC UTILITIES ON SITE WITHIN WORK AREAS. CONTRACTOR TO TAKE EXTRA CAUTION TO AVOID DAMAGE TO ELECTRICAL, TELEPHONE, IRRIGATION, AND OTHER CONDUITS TYPICALLY FOUND IN THE UPPER FEW FEET OF GROUND. CONTRACTOR SHALL REPLACE ANY DAMAGED OR DESTROYED UTILITIES AT NO ADDITIONAL COST TO THE OWNER. 3. CONTRACTOR TO REMOVE TREE ROOTS AS NECESSARY TO PERFORM REPAIRS INDICATED. WHEN ROOT CUTTING IS UNAVOIDABLE, A CLEAN SHARP CUT SHALL BE MADE TO AVOID SHREDDING OR SMASHING. ROOT CUTS SHOULD BE MADE BACK TO A LATERAL ROOT. WHENEVER POSSIBLE, TREE ROOTS SHOULD BE CUT BETWEEN LATE FALL AND BUD OPENING, WHEN ROOT ENERGY SUPPLIES ARE HIGH AND CONDITIONS ARE LEAST FAVORABLE FOR DISEASE CAUSING AGENTS. EXPOSED ROOTS SHALL BE COVERED IMMEDIATELY TO PREVENT DEHYDRATION. ROOTS SHALL BE COVERED WITH SOIL OR BURLAP AND KEPT MOIST. 4. RESTORE LANDSCAPING AREAS TO EQUAL OR GREATER CONDITION THAN EXISTED AT COMMENCEMENT OF WORK. ANY DAMAGE TO IRRIGATION HEADS DURING CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5. ALL SODDED AREAS SHALL BE SUBJECT TO ONE YEAR CORRECTION PERIOD WHICH SHALL COMMENCE UPON THE DATE OF FINAL ACCEPTANCE BY THE OWNER. SITE MAP GENERAL NOTES 1. CONTRACTOR IS SOLELY RESPONSIBLE FOR SELECTION, IMPLEMENTATION, MAINTENANCE, AND EFFECTIVENESS OF ALL SWPPP CONTROLS - CONTROLS SHOWN ON THIS SITE MAP ARE SUGGESTED CONTROLS ONLY. 2. CONTRACTOR SHALL RECORD INSTALLATION, MAINTENANCE OR MODIFICATION, AND REMOVAL DATES FOR EACH BMP EMPLOYED (WHETHER CALLED OUT ON ORIGINAL SWPPP OR NOT) DIRECTLY ON THE SITE MAP. 3. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE. AS AN EXAMPLE, PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE COMMENCEMENT OF ANY GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS SOON AS PRACTICABLE AND SHALL BE MAINTAINED UNTIL FINAL SITE STABILIZATION IS ATTAINED. CONTRACTOR SHALL ALSO REFERENCE DIMENSIONAL CONTROL AND PAVING PLAN SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPINGAND SITE PAVING. 4. BMP'S HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF. 5. SANITARY SEWER EFFLUENT IS DISPOSED OF VIAAN ONSITE SEWER SYSTEM CONNECTED TO A MUNICIPAL SEWER SYSTEM. LEGEND - - - PROPERTY LINE EXISTING CONCRETE PAVING, SIDEWALK, AND OTHER APPURTENANCES TO BE REMOVED " CONCRETE PAVEMENT EX. CONCRETE CURB TO BE REMOVED EXISTING PAVEMENT STRIPING TO BE REMOVED LOD LOD LOD LOW __ _= SAWCUT LINE EXISTING TREE TO REMAIN /�7 X BENCHMARK EXISTING SITE FEATURES -� SIGN XS "X" CUT IN CONCRETE SET G GREASE TRAP XF "X" CUT IN CONCRETE FOUND IRRIGATION VALVE C COMMUNICATIONS MANHOLE E ELECTRIC OR POWER MARKER SIGN F FIBER OPTIC O METER G NATURAL GAS POLE S SAN. SEWER OR WASTEWATER CD STORAGE TANK D STORM SEWER 0 VALVE (EXCEPT WATER) T TELEPHONE 0 VAULT TR TRAFFIC WELL U UNIDENTIFIED ELEVATION BENCHMARK W WATER FLOW DIRECTION >< WATER VALVE MONITORING WELL 0 SANITARY SEWER CLEAN OUT (u FUEL TANK STORM SEWER DRAIN FLOOD LIGHT • TRAFFIC BOLLARD UTILITY POLE TREE T ELECTRIC TRANSFORMER WATER BOX HANDICAPPED PARKING 0 FIRE DEPARTMENT CONNECTION FIRE HYDRANT STANDARD EROSION CONTROL GENERALNOTES 1. EROSION CONTROL DEVICES SHOWN ON THIS PLAN SHALL BE INSTALLED PRIOR TO THE START OF LAND DISTURBING ACTIVITIES ON THE PROJECT. 2. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR THIS PROJECT. CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY THE DESIGN ENGINEER AND THE CITY ENGINEERING DIVISION. 3. IF THE EROSION CONTROL PLAN AS APPROVED CANNOT CONTROL EROSION AND OFF -SITE SEDIMENTATION FROM THE PROJECT, THE EROSION CONTROL PLAN WILL BE REQUIRED TO BE REVISED AND/OR ADDITIONAL EROSION CONTROL DEVICES WILL BE REQUIRED ON SITE. 4. INSPECTIONS SHALL BE MADE WEEKLY AND AFTER RAIN STORM EVENTS TO INSURE THAT THE DEVICES ARE FUNCTIONING PROPERLY. WHEN SEDIMENT OR MUD HAS CLOGGED THE VOID SPACES BETWEEN STONES OR MUD IS BEING TRACKED ONTO A PUBLIC ROADWAY THE AGGREGATE PAD MUST BE WASHED DOWN OR REPLACED. RUNOFF FROM THE WASHDOWN OPERATION SHALL NOT BE ALLOWED TO DRAIN DIRECTLY OFF SITE WITHOUT FIRST FLOWING THROUGH ANOTHER BMP TO CONTROL OFF SITE SEDIMENTATION. PERIODIC RE -GRADING OR THE ADDITION OF NEW STONE MAY BE REQUIRED TO MAINTAIN THE EFFICIENCY OF THE INSTALLATION. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTAL OF N.O.I., N.O.T. AND ANY ADDITIONAL INFORMATION REQUIRED BY THE TCEQ CONTRACTOR SHALL COMPLY WITH ALL TCEQ STORMWATER POLLUTION PREVENTION REQUIREMENTS. NDA STRIPING AND REPAIR NOTES 1. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS OR OTHERWISE ESTABLISH A SURVEY OF THE EXISTING STRIPING IN ALL WORK AREAS IN ORDER TO ESTABLISH ALL EXISTING PAVEMENT MARKINGS WITH FULL COORDINATION OF NEW MARKINGS PROPOSED ON THIS PLAN. 2. UNLESS OTHERWISE INDICATED ON THE PLANS, THE CONTRACTOR SHALL ESTABLISH PAVEMENT MARKINGS FOR ALL FIRE LANES, DIRECTIONAL ARROWS, STOP BARS, CURBS, SIDEWALK, LIGHT POLE BASES, SIGN BASES AND PARKING STALLS TO MATCH THE EXISTING SITE WITHIN THE REPAIR LIMITS. 3. CONTRACTOR SHALL REMOVE EXISTING SIGN POSTS AND BASES AND PATCH PAVEMENT FULL DEPTH AND/OR RESTORE LANDSCAPING WHERE REVISED SIGN LOCATIONS ARE NOTED. REMOVAL COSTS SHALL BE INCIDENTAL TO NEW SIGN INSTALLATIONS. 4. ANY ADDITIONAL SIDEWALK AREAS DISTURBED OR DAMAGED DURING CONSTRUCTION MUST BE REPLACED TO EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 5. CONTRACTOR TO USE APPROPRIATE PAINT COLORS TO MATCH THE EXISTING FEATURES. ADA BARRIER FREE AREAS TO COMPLY WITH ALL LOCAL, FEDERAL, AND COSTCO ADA STANDARDS. PAVEMENT MARKINGS SHALL BE A HIGH QUALITY PAINT RECOMMENDED BY THE PAINT MANUFACTURER. 6. CONTRACTOR SHALL MAINTAIN A MINIMUM 9' WIDE STANDARD PARKING SPACE AT THE TRANSITION FROM OUTERMOST ADA PARKING SPACE IN EVERY AISLE. REF. PLAN FOR SPECIFIC DIMENSION. 7. DIMENSIONS NOTED ARE TO THE CENTERLINE OF MARKINGS. 8. MAXIMUM 2.0% SLOPE IN ALL DIRECTIONS WITHIN ALL ADA PARKING AREAS. 9. SIDEWALKS SHALL NOT EXCEED 2.0% CROSS SLOPE AND 5.0% LONGITUDINAL SLOPE, UNLESS OTHERWISE SHOWN. SIDEWALK LEVEL LANDINGS SHALL NOT EXCEED 2.0% IN ANY DIRECTION. 10. IN AREAS NOT BEING RESURFACED BUT REQUIRING RESTRIPING, CONTRACTOR SHALL REMOVE EXISTING STRIPING BY EITHER SAND BLASTING, WATER BLASTING, GRINDING OR BY ANOTHER APPROVED METHOD OF STRIPING REMOVAL. WHERE THE STRIPING REMOVAL CHANGES THE SURFACE TEXTURE OF THE EXISTING ASPHALT, CONTRACTOR SHALL SEAL COAT THE AREA PRIOR TO RESTRIPING. CONTRACTOR TO SUBMIT STRIPING REMOVAL METHOD TO PROPERTY MANAGER AND ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. 11. CONTRACTOR SHALL MATCH EXISTING ADA STRIPING IN ALL PAVEMENT REPAIR AREAS UNLESS REVISED STRIPING IS SPECIFICALLY SHOWN ON THE PLANS. 12. CONTRACTOR SHALL ENSURE PAVEMENT EDGES BETWEEN EXISTING AND PROPOSED PAVEMENT AND AT JOINTS DO NOT HAVE ABRUPT CHANGES IN GRADE. ENSURE CONNECTION TO EXISTING GRADE HAS A SMOOTH TRANSITION. DEMOLITION KEYNOTES SEE ADA STRIPING AND REPAIR NOTE 10. 0 © EXISTING POST AND BOLLARD TO REMAIN. FIELD VERIFY SIGN IS MOUNTED ACCORDING TO ARCH. DETAIL AND ADJUST AS NECESSARY. © REMOVE AND RELOCATE ADA SIGNAGE TO NEW ADA STALL. OD REMOVE AND RELOCATE VAN ACCESSIBLE SIGNAGE TO NEW VAN ACCESSIBLE STALL. O REMOVE POST AND BOLLARD. SALVAGE SIGN FOR REUSE AT RELOCATED STALL. O REMOVE WHEEL STOP AND PLACE AT CENTER OF RELOCATED STALL. CONTRACTOR TO PATCH EXISTING WHEEL STOP CONNECTION TO PAVING. © EXISTING WHEEL STOP TO REMAIN. !n Z 0 In W 0_ V (_30 Z N - It c LLI I) ((� i O O L n O O N Z j O Q � O =>z ISO i w 1_ CD J LJz Y W Q N Z � 0 E0 U P. ALEWDER TORRES' Lie. No. 0402061591 41al,4911O 1 A z m O O 0- = 0- N = w 0 0 U) O (Dw N a) F- > > a on Q 0 Q CO - p N o m 0 _ w CD 3 cYi Y ¢ DD ¢ Do 0 w _ Do 1 0 1 0 1 U 0 Z J Q O^rr'' � li Z z O� U J O� VJ W NO D 121L W O O) N V LLJ N 00Q> W ULLj (n - J Of O C/) 0 2 - W W H <�O Q > COJ > a. Q 2 O SHEET NUMBER C1.0 W Q 0 1992 3.07 SILT FENCE DROP INLET PROTECTION 2 x 4• WOOD FRAME DROP INLET WITH GRATE 1.51 MAX. FRAME �- 3• Mu+. GATHER 'I I I w5 EXCESS U TCCORNERS U PERSPECTIVE VIEWS STAKE FABRIC i GGG !' MIN. ELEVATION OF STAKE AND ` FABRIC ORIENTATION DETAIL A SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. III-35 S Temporary Seeding Data LT PLANTING DATES SPECIES September 1 - 50150 mix of February 15 Annual Ryegrass (Lolium multiflorum) and Cereal (Winter) Rye (Secale cereale) February 16- Annual Ryegrass April 30 (Lolium multiflorum) May 1 - August 31 German Millet (Selena italics) The following criteria shall apply to all seed species listed above: Lime and Fertilizer: Apply 10-10-10 fertilizer at the rate of 450 lbs./acre (or 101bs./1,000sf). Contractor shall be responsible for obtaining a soil test to determine the appropriate amount of lime required to adjust the soil pH. Incorporate lime and fertilizer into the top 4 to 6-inches of soil by disking. When applying slowly available nitrogen, use rate listed in Erosion and Sediment Control Technical Bulletin 94, 2003, Nutrient Management for Development Sites @ http:/A w .ticr.state.va.us/swle&s.htm#pubs. Seeding procedures: Seed shall be evenly applied with a broadcast seeder, cultipack seeder or hydroseeder. Small grains shall be planted no more than 1-inch deep. Grasses and legumes shall be planted with no less than )e" soil cover. Mulching procedures: Seed applied in the fall for winter cover and seed applied during hot and dry summer months shall be mulched according to MULCHING, Std. & Spec. 3.35, except that hydromulches (fiber) shall not be acceptable during these periods. Temporary seeding applications performed under favorable soil and site conditions during optimum spring and fall seeding dates, as listed above, may not require mulch. Source: Erosion and Sediment Control Technical Bulletin 94, 2003, Nutrient Management for Development Sites @ hftp:/Awwv.ticr.state.va.us/sw/e&s.htm#pubs. Plate 3.07-1 DRIP UNE SNOW FENCE BOARO FENCE FENCING AND A ORINC CORD FENCE wqw - � PLASTIC FENCE CORRECT METHODS OF TREE FENCING —�00— CORRECT TRUNK ARMORING TRIANGULAR BOARD FENCE Source: Va. DSWC TABLE 3.32-E iRe,ISac -tine 2r'1a3y PERMANENT SEEDING SPECIFICATIONS FOR COASTAL PLAIN AREA SEED' LAND USE SPECIES APPLICATION RATES Tall Fescue 175 - 200 lbs. Minimum Care Lawn or (Commercial or Residential) Bermudagrass' 75 Ibs- High-Maintenance Lawn Tall Fescue' Or 200-250 Ibs- Bermudagrass' (seed) 401bs. (unhulled) or 30 tbs.(hulled) Bermudagrass' (by other vegetative establishment method, see Std. & Spec. 3.34) Tall Fescue' 128 Ibs- General Slope (3:1 or less) Red Tap Grass or Creeping Red Fescue Seasonal Nurse Crop 2 lbs. 20 lbs. TOTAL. ISO tbs. Tall Fescue' 93-108 lbs. Bermudagress' 0-15 lbs. Low -Maintenance Slope Red Top Grass or Creeping Red Fescue Seasonal Nurse Crop 2 lbs. 20 lbs. (Steeper than 3:11 Sencea Lespedeza7 20 lbs. TOTAL: 1501bs- 1 - When selecting varieties of turfgrass, use the Virginia Crop Improvement Association (VCIA) recommended turfgrass variety list. Quality seed will bear a label indicating that they are approved by VCIA A Current turfgrass variety list is available at the local County Extension once or through VCIA at 804-746.4884 or at http://sudan.cses.vt.ed W htmVTu rftturf/publicabons/publications2. html 2 - Use seasonal nurse crop in accordance with seeding dates as staled below: February,March - April ......................... Annual Rye May I" - August ................................. Foxtart Millet September, October - November 19 ...... Annual Rye November l6"- January _...................... Winter Rye - May through October, use hulled seed. All other seeding periods, use unhuled seed. If Weeping Lovegrass is used, include in any slope or low maintenance mixture during warmer seeding periods. increase to 30 -40 Ibs/acre. FERTILIZER & LIME • Apply 10-20-10 fertilizer at a rate of 500 tbs. / acre (or 12 tbs. 11,000 sq. fL) • Apply Pulverized Agricultural Limestone at a rate of 2 tons/acre (or gO tbs. 11,000 sq. ft.) NOTE: - A soil test is necessary to determine the actual amount of lime required to adjust the soil pH of site. - Incorporate the lime and fertilizer Into the top 4 - 6 inches of the soil by disking or by other means. - When applying Slowly Available Nitrogen, use rates available in Erosion & Sediment Control Technical Bulletin a 4, 2003 Nutrient Management for Development Sites at ham:!/www.dcr.state.va.us/sw/e&s.him#pubswww.dcr.state.va.us/swle&s.himkpubs Plate 3.3&2 1992 3.07 GRAVEL CURB INLET SEDIMENT FIL TER i GRAVEL FILTER RUNOFF WATER SEDIMENT CONCRETE GUTTER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. • GRAVEL SHALL BE VDOT #3,0357 OR 5 COARSE AGGREGATE Source: Va. DSWC 2 hV. x 4 W. A CROSS TOF' OF STOr4L POSTS ST.4YLL �� LATHE JOINING ADJACENT SECTIONS OF GEOTEXTILE CONSTRUCTION SPECIFICATIONS NAILS /T F'j ISOMETRIC VIEW A Plate 3.07-6 STANDARD SYM80L } M,d STlfS'LA! FRAME /J / WOVEN ZF11 r"EO E X^ c SLT FENCE W r 4 SECTION A -A YV,7v-` N 5i =ii A! �LCr TEXT T1.L !dAs;-+fir Sg Pi L .'LSE 1VCMVM4 2 ;,NCH BY 4 IA'CP LUMBER _. USL WGbtN SLIT P;r_M CLO -Xr1--. 45 1'LCf-1LL] iN AYI'LNOIX A, 3. SY4i-E ;Ve Y?6.4T NO MORE rD ;'-FET ?PART 4 i-.YCIWDE A 2-F'SOT O('EAWVG HE TWEEN EVE.Vr SET OF SUPf';WTS AND PLAC= JTDM: eN THE OPENOYC OYER CE'07:X77LF ,5. KEEP Sr. T =ENCF TA;.+T AN;7 cEr: ,,REL Y 'TAP;_E Tr7 THE OPSL OPE SIDE 6 UF-Rer;NT ,SUPPnFTS, EXTENP GEOT�,:-X77,1E IINOEF 2.4, * VW. Lr=-190-; -GCT+UNS _,/ Lf OT£X V'LE AL,!UIN - E-VERL4". FOLLI, ANO STAIL_L TO 1'05T;N 4f C6WUANCL WITt THi+, DLTAIL, 4TTAr�;W LA-I+dL. 7 ..O'WT. E A MA^Trr' `EAr RE`W EN PAVEMENT (:E^TEXT7 E ANO 7:ra TG PrIEVENT .SEINMENT-; ADEN WATER FROM ESCAF'+Nr: ,RENEAT7+ _`:k T FE.IVCE iNSTA; i APDN B. SIE Ur -- hOAF.'DS TJ +'AV, .M} NT YNT' 40D AI;N+MU.M LENGT''; NA+L.s. 9. REMOI E ACCUM.R A TED S,-,'A/tNT ANO 7E&IVC' K1gEV - ES ; VEl (-P Ov .SH T FENCE ON )'1'HEn TEAfM.ElY REACWf - 159 OF r-ENGE g0fiHT: REP(:ACE GEOTEXnfE Ce OWN'_ MAINTAIN WATrR ', CST :EAI A! ONG FG-TCM. REPLACE SFONa r rwsn,y w-r � - _ �q -r -.- q__—� -_—, f -.a - � —1 _ C Z O (n J W V in Lj 0 Z N O LL cn o O cv z< �Q� O _ Z CLnLi o (j W CD —i U J z Y � � W Q C N Z � v� 0 O O O ■ E P. ALEWDER TORRES' Lie. No. 0402061591 p,(D/29/ZDZ/ z _ a a O O a = a ro N = W � O O O O W N M I— U1 } > C� Lo a M Q m} CO N o m p W Q O W Z Z y Y ¢ N ¢ w W 0 0 U J 00 I..L Z U) 0 J Z LU �0 p V) ' 0 0.r' W O Cr) 04 V LLl 04 00Q> W 0 -1 U) J O (n U)2 — W W H QUO M J a. Q 2 O SHEET NUMBER C1.1 ,� PROJECT DESCRIPTION 0 THIS PROJECT CONSISTS OF IMPROVEMENTS ASSOCIATED WITH MAINTENANCE OF ADA PARKING STALLS AT COSTCO IN NEWPORT NEWS, °v, VIRGINIA. THE SUBJECT SITE IS CURRENTLY DEVELOPED. THERE ARE NO CHANGES TO PARKING CIRCULATION. 0 - PROPOSED IMPROVEMENTS INCLUDE RESTRIPING PARKING STALLS AND ADDITION OF SOME PAVEMENT. SITE WORK INCLUDES PAVING. c THE PROPOSED LAND DISTURBANCE ENCOMPASSES t0.03 ACRES. 0 o NO PUBLIC ROADWAY IMPROVEMENTS OR IMPROVEMENTS WITHIN THE RIGHT-OF-WAY ARE PROPOSED AS PART OF THIS PROJECT. I PROJECT BIDDING, GENERAL CONTRACTOR SELECTION, AND CONSTRUCTION OPERATIONS ARE EXPECTED TO BEGIN ONCE THE E PERMITTING PROCESS IS COMPLETE. CONSTRUCTION IS EXPECTED TO BE COMPLETE WITHIN 2 MONTHS OF THE COMMENCEMENT OF 4 LAND -DISTURBING ACTIVITY. 0 THE CITY OF NEWPORT NEWS INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE EROSION SEDIMENT CONTROLS AS NEEDED IN THE . FIELD AS SITE CONDITIONS WARRANT. IN ADDITION, NO SEDIMENT TRAPS OR BASINS MAY BE REMOVED WITHOUT PRIOR APPROVAL OF a THE COUNTY INSPECTOR. oEXISTING SITE CONDITIONS 0 .E CURRENTLY, THE SUBJECT SITE IS WOODED WITH SLOPES RANGING FROM 1% TO 40%. ELEVATIONS RANGE FROM APPROXIMATELY 247 3 FEET TO 315 FEET. THERE ARE TWO EXISTING STREAMS THAT RUN FROM THE EAST TO THE WEST ACROSS THE SITE. AN EXISTING n SEDIMENT TRAP IS LOCATED IN THE NORTHWEST CORNER OF THE SITE. o ADJACENT AREAS s w 6 THE SITE IS BORDERED TO THE NORTH BY AN EXISTING PARK AND RIDE, TO THE SOUTH BY NOKES BOULEVARD AND EAST BY ATLANTIC BOULEVARD, AND TO THE WEST BY SULLY ROAD (VA ROUTE 28). APPROPRIATE PERIMETER CONTROLS AS SHOWN ON THE EROSION ,� CONTROL PLAN SHEET(S) OF THE SITE PLAN WILL PROVIDE PROTECTION FROM THESE ADJACENT AREAS. 0 OFF -SITE AREAS 0 a NO OFF -SITE LAND DISTURBANCE IS NECESSARY OR PROPOSED WITH THIS PROJECT. C WETLANDS o THERE ARE NO WETLANDS ON THE SITE. i, CONSTRUCTION ENTRANCE E CONSTRUCTION ENTRANCE WILL NOT BE USED. Y n CRITICAL AREAS C 0 CRITICAL AREAS TYPICALLY INCLUDE AREAS OF STEEP SLOPES, AREAS ADJACENT TO WETLANDS, AND OTHER AREAS WITH SERIOUS a EROSION POTENTIAL. THESE AREAS HAVE BEEN INDICATED ON THE EROSION CONTROL PLANS. 0 v 0 EROSION CONTROL MEASURES C 0 C THE FOLLOWING EROSION CONTROL MEASURES AS SHOWN ON THE EROSION CONTROL PLAN SHEET(S) OF THE SITE PLAN WILL BE USED FOR THIS PROJECT: 0 `0 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE - A STABILIZED STONE PAD WITH A FILTER FABRIC UNDERLINER WILL BE PROVIDED E AT THE PRIMARY CONSTRUCTION ACCESS POINT. THE PURPOSE OF THIS PRACTICE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED 'o ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL C PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL 0 STONE OR THE WASHING AND REWORKING OF EXISTING STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY E STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS 3 OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE MATERIALS DROPPED, WASHED, OR 0 TRACKED ONTO ROADWAYS WILL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES. 3 3.05 SILT FENCE - A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED WILL BE PROVIDED AROUND MUCH OF THE SITE PERIMETER AND PARALLEL TO SLOPED EE AREAS. THE PURPOSE OF THIS PRACTICE IS TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE. SILT FENCES SHALL BE INSPECTED 00 IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE - IMMEDIATELY. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND 9 UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED y USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE 0 REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE w BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO u CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. 0 SUPER SILT FENCE - SILT FENCE WITH ADDITION OF WOVEN WIRE SUPPORT. 0 0 a 3.07 STORM DRAIN INLET PROTECTION -A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET WILL BE PROVIDED AT ALL INLET LOCATIONS WITHIN THE LIMITS OF DISTURBANCE. THE PURPOSE OF THIS PRACTICE IS - TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. 0 THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN DEPTH OF THE TRAP. 0 REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. STRUCTURES SHALL m BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I o -6 3.13 TEMPORARY SEDIMENT TRAP - SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER m MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE 0a MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 0 a m 3.14 TEMPORARY SEDIMENT BASIN - SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER 3 MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE .- MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. r u 3 3.18 OUTLET PROTECTION - STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS. THE PURPOSE OF THIS PRACTICE IS TO PREVENT SCOUR AT STORMWATER OUTLETS, 0 TO PROTECT THE OUTLET STRUCTURE, AND TO MINIMIZE THE POTENTIAL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND - ENERGY OF CONCENTRATED STORMWATER FLOWS. v_ 0 3.20 ROCK CHECK DAM - SMALL TEMPORARY STONE DAMS CONSTRUCTION ACROSS A SWALE OR DRAINAGE DITCH. 0 w 3.31 TEMPORARY SEEDING - THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH o APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS WILL BE PROVIDED ON ALL DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL n GRADE WITHIN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL a GRADE BUT WILL REMAIN LONGER THAN 30 DAYS AS PER MS-1. THE PURPOSE OF THIS PRACTICE IS TO PROVIDE PROTECTION TO BARE SOILS EXPOSED DURING CONSTRUCTION UNTIL PERMANENT VEGETATION OR OTHER EROSION CONTROL MEASURES CAN BE 'u ESTABLISHED. a w 3.32 PERMANENT SEEDING - THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED WILL BE y PROVIDED AS SHOWN ON THE LANDSCAPING PLAN. PERMANENT SEEDING SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS `0 AFTER FINAL GRADE IS REACHED AS PER MS-1. THE PURPOSE OF THIS PRACTICE IS TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS AND TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. 0 a a 3.38 TREE PROTECTION - PROTECTION OF DESIRABLE TREES FROM MECHANICAL AND OTHER INJURY DURING LAND DISTURBING AND Y CONSTRUCTION ACTIVITY. THE PURPOSE OF THIS PRACTICE IS TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE C EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLUTION .w CONTROL, NOISE REDUCTION, SHADE, AND OTHER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN TYPE USES. SOIL AERATION, REPAIRS, OR FERTILIZATION SHOULD BE USED WHEN NECESSARY TO MAINTAIN THE HEALTH OF 0i TREES. ._ N w STORMWATER MANAGEMENT 0 C NO ADDITIONAL STORMWATER MANAGEMENT IS PROPOSED. 0 E m MAINTENANCE C o BETWEEN THE TIME THE EROSION CONTROL PLAN IS IMPLEMENTED AND FINAL SITE STABILIZATION IS ACHIEVED, ALL DISTURBED AREAS w AND EROSION CONTROLS MUST BE INSPECTED NOT LESS THAN ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 48 HOURS OF A 0 RUNOFF PRODUCING RAINFALL EVENT. C 0 2 EXAMPLES OF PARTICULAR ITEMS TO BE EVALUATED DURING SITE INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE v COMPREHENSIVE. DURING EACH INSPECTION, EACH INSPECTOR MUST EVALUATE OVERALL EROSION CONTROL SYSTEM PERFORMANCE, w AS WELL AS THE EFFECTIVENESS OF SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE TO THE 0 CIRCUMSTANCES. w a • LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF OFF -SITE SEDIMENT C TRACKING. A STABILIZED CONSTRUCTION ENTRANCE WILL BE CONSTRUCTED WHERE VEHICLES ENTER AND EXIT. THIS .2' ENTRANCE WILL BE MAINTAINED OR SUPPLEMENTED AS NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE SITE -0 ON VEHICLES. SEDIMENT TRACKED ONTO PUBLIC ROADWAYS MUST BE SHOVELED OR SWEPT FROM THE ROADWAY AND v RE -DEPOSITED ON SITE IN A MANNER THAT MINIMIZES ITS OFFSITE RELEASE POTENTIAL. C • SEDIMENT BARRIERS MUST BE INSPECTED AND, IF NECESSARY, THEY MUST BE ENLARGED OR CLEANED IN ORDER TO 0 PROVIDE ADDITIONAL CAPACITY. ALL MATERIAL EXCAVATED FROM BEHIND SEDIMENT BARRIERS SHALL BE STOCKPILED m ON THE UP SLOPE SIDE OF THE BARRIER. ADDITIONAL SEDIMENT BARRIERS MUST BE CONSTRUCTED AS NEEDED. 0 • INSPECTIONS WILL EVALUATE DISTURBED AREAS AND AREAS USED FOR STORING MATERIALS THAT ARE EXPOSED TO C 0 RAINFALL FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM. IF NECESSARY, w THE MATERIALS MUST BE COVERED OR ORIGINAL COVERS MUST BE REPAIRED OR SUPPLEMENTED. ALSO, PROTECTIVE BERMS MUST BE CONSTRUCTED, IF NEEDED, IN ORDER TO CONTAIN RUNOFF FROM MATERIAL STORAGE AREAS. y • GRASSED AREAS WILL BE INSPECTED TO CONFIRM THAT A HEALTHY STAND OF GRASS IS MAINTAINED. THE SITE HAS 3 ACHIEVED FINAL STABILIZATION WHEN TURF GRASS COVER PROVIDES PERMANENT STABILIZATION OF THE SOIL `v SURFACE EXCLUSIVE OF AREAS THAT HAVE BEEN PAVED OR COVERED BY BUILDING(S). PERMANENT STABILIZATION IS E NOT CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE o, AND WILL INHIBIT EROSION. ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING IMPACTS TO RECEIVING WATERS. C w E D BASED UPON THE RESULTS OF THE INSPECTIONS, EACH EROSION AND SEDIMENT CONTROL MEASURE SHALL BE REPAIRED AND/OR -Oo MAINTAINED IN ACCORDANCE WITH THE MAINTENANCE REQUIREMENTS SPECIFIED IN THE CORRESPONDING SECTION OF THE VIRGINIA r EROSION AND SEDIMENT CONTROL HANDBOOK. THE CONTRACTOR SHALL MAINTAIN A COPY OF THIS HANDBOOK ON SITE AT ALL TIMES DURING CONSTRUCTION. STOCKPILING - TOPSOIL SHALL BE STOCKPILED IN SUCH A MANNER THAT NATURAL DRAINAGE IS NOT OBSTRUCTED AND NO OFF -SITE SEDIMENT DAMAGE SHALL RESULT. STABILIZE OR PROTECT STOCKPILES IN ACCORDANCE WITH MINIMUM STANDARD #2. THE SIDE SLOPES OF THE STOCKPILE SHALL NOT EXCEED 2H:1 V. PERIMETER CONTROLS MUST BE PLACED AROUND THE STOCKPILE IMMEDIATELY; SEEDING OF STOCKPILES SHALL BE COMPLETED WITHIN 7 DAYS OF THE FORMATION OF THE STOCKPILE, IN ACCORDANCE WITH STD. AND SPEC. 3.31 (TEMPORARY SEEDING). IF IT IS TO REMAIN DORMANT FOR LONGER THAN 30 DAYS (REFER TO MINIMUM STANDARD #1 AND #2). PERMANENT STABILIZATION PERMANENT STABILIZATION WILL BE ACHIEVED WITH SEEDING AS SHOWN ON THE LANDSCAPING AND PHASE II EROSION CONTROL PLAN SHEETS OF THE SITE PLAN FOR ALL VEGETATED OR LANDSCAPING AREAS. CONCRETE, PAVEMENT, AND OTHER IMPERVIOUS SURFACES WILL STABILIZE THE REMAINDER OF THE SITE. THE PROJECT SHALL GENERALLY CONFORM TO THE FOLLOWING: PHASE A- GRADING 1. CONSTRUCT SILT FENCE ACCORDING TO THE APPROXIMATE LOCATION AS SHOWN ON GRADING AND EROSION CONTROL PLAN NOTES AND DETAIL SHEET. 2. BEGIN CLEARING AND GRADING OF SITE. 3. SEED AND REVEGETATE SLOPES WHERE SHOWN. PHASE B - PAVING 1. KEEP ALL STORM WATER POLLUTION PREVENTION MEASURES IN PLACE. REMOVE AS NEEDED TO PAVE. 2. STABILIZE SUBGRADE. 3. PAVE STREETS AND SIDEWALKS AS SPECIFIED ON PLAN SHEETS. 4. RE -INSTALL ANY STORM WATER POLLUTION PREVENTION MEASURES REMOVED FOR PAVING OPERATIONS. PHASE C - LANDSCAPING AND SOIL STABILIZATION. 1. REVEGETATE LOT AND PARKWAYS 2. LANDSCAPE CONTRACTOR SHALL REVEGETATE ALL AREAS RESERVED FOR LANDSCAPE VEGETATIVE COVERS. 3. REMOVE EROSION CONTROL DEVICES WHEN MINIMUM 70% GROUND COVER IS ESTABLISHED. VEGETATION MUST BE ESTABLISHED BEFORE STRUCTURAL CONTROLS REMOVED. TEMPORARY STABILIZATION TEMPORARY STABILIZATION SHOULD BE USED WHERE SOIL SURFACES ARE NOT TO BE FINE GRADED FOR PERIODS LONGER THAN FOURTEEN (14) DAYS. SUCH ARES INCLUDE DENUDED ARES, SOIL STOCKPILES, DIKES, DAMS, SIDES OF SEDIMENT BASINS, TEMPORARY ROADBANK, ETC. A PERMANENT VEGATIVE COVER SHALL BE APPLIED TO AREAS THAT WILL BE LEFT DORMANT FOR MORE THAN 1 YEAR. SPECIFICATIONS 3.31 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SHALL BE FOLLOWED FOR TEMPORARY STABILIZATION. SEDIMENT BASIN EMBANKMENTS, OUTFALL PIPES AND SEDIMENT TRAPS A. SEDIMENT BASIN EMBANKMENTS -SHALL BE CONSTRUCTED OF PROPER MATERIAL THAT WILL CONTAIN THE APPROPRIATE MOISTURE CONTENT TO ENSURE THAT 95% COMPACTION WILL BE ACHIEVED. (VESCH STD. & SPEC. 3.14) B. SEDIMENT BASIN OUTFALL PIPES -FILL MATERIAL PLACED AROUND THE OUTFALL PIPE SHALL BE ACCOMPLISHED IN 4 INCH LIFTS AND COMPACTED UNTIL 95% COMPACTION IS ACHIEVED. (VESCH STD. & SPEC. 3.14) THIRD PARTY GEOTECHNICAL VERIFICATION MAY BE REQUIRED TO ENSURE THAT BOTH OF THESE STANDARDS AND SPECIFICATIONS ARE MET. C. SEDIMENT TRAPS -FILL MATERIAL USED FOR CONSTRUCTION OF SEDIMENT TRAP EMBANKMENTS SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES AND OTHER OBJECTIONABLE MATERIAL. SEDIMENT TRAP EMBANKMENTS SHOULD BE COMPACTED IN 6 INCH LAYERS BY TRAVERSING WITH CONSTRUCTION EQUIPMENT. (VESCH STD. & SPEC 3.13) SEQUENCE OF CONSTRUCTION FOR WET POND BMPS STEP 1: USE OF WET POND AS AN E&S CONTROL. A WET POND MAY SERVE AS A SEDIMENT BASIN DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHOULD BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENT VS. WATER QUALITY TREATMENT REQUIREMENT). INSTALLATION OF THE PERMANENT RISER SHOULD BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHOULD BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION WET POND IN MIND. THE BOTTOM ELEVATION OF THE WET POND SHOULD BE LOWER THAN THE BOTTOM ELEVATION OF THE TEMPORARY SEDIMENT BASIN. APPROPRIATE PROCEDURES SHOULD BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBID WATERS WHEN THE BASIN IS BEING CONVERTED INTO A WET POND. STEP 2: STABILIZE THE DRAINAGE AREA. WET PONDS SHOULD ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THE CONSTRUCTION NOTES SHOULD CLEARLY INDICATE THAT THE FACILITY WILL BE DE -WATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. STEP 3: ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKE SURE THEY MEET DESIGN SPECIFICATIONS, AND PREPARE ANY STAGING AREAS. STEP 4: INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE POND THAT ARE GRADED OR DENUDED DURING CONSTRUCTION MUST BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. STEP 5: CLEAR AND STRIP THE PROJECT AREA TO THE DESIRED SUB -GRADE. STEP 6: EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE. STEP 7: INSTALL THE RISER OR OUTFLOW STRUCTURE, AND ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. STEP 8: CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8- TO 12-INCH LIFTS, OR AS DIRECTED BY GEOTECHNICAL RECOMMENDATIONS, AND COMPACT AS REQUIRED WITH APPROPRIATE EQUIPMENT. STEP 9: EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE POND. STEP 10: CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. STEP 11: INSTALL OUTLET PROTECTION, INCLUDING EMERGENCY AND PRIMARY OUTLET APRON PROTECTION. STEP 12: STABILIZE EXPOSED SOILS WITH TEMPORARY SEED MIXTURES APPROPRIATE FOR THE POND BUFFER. ALL AREAS ABOVE THE NORMAL POOL ELEVATION SHOULD BE PERMANENTLY STABILIZED BY HYDROSEEDING OR SEEDING OVER STRAW. STEP 13: PLANT THE POND BUFFER AREA, FOLLOWING THE PONDSCAPING PLAN ON SHEETS L-101-L-103. VESCP MINIMUM STANDARDS NOTES AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH. 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: i. THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS 100 TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR ii. (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS; 20. (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND 21. (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. a. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: i. IMPROVE THE CHANNELS TO A CONDITION WHERE A 10-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; ii. IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE 10-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; iii. DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A 10-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR iv.PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. b. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. c. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. d. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. e. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. f. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. g. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. h. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. i. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. i. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. k. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES (I) ARE IN ACCORDANCE WITH PROVISIONS FOR TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47 OR GRANDFATHERING IN 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION, IN WHICH CASE THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT SHALL APPLY, OR (II) ARE EXEMPT PURSUANT TO § 62.1-44.15:34 C 7 OF THE ACT. I. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS SUBDIVISION 19. General construction notes for Erosion and Sediment Control plans 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff - producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner than maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 lbs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4 6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. W H C) (n z 0 Cn W 0- O Z V in Lj 0 Z N - It ��� L. i 5 O O L� Cn o O N Z j O 0 < C� O =>_z Cn O ;_0 � >- L J QY CD �� J Lv z :2 D - Y to W Q N Z IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII oN 0 O E 0 ■ r 1 - �y l `i--�� P. ALEWDER TORRES' Lie. No. 0402061591 41al,491,7 Z1 A Z � ¢ ¢ O O 0- = a 7 N = W C)0 to 0 0 W" 6) � (n > > a-- 0 0 0 m > co W N 0 m p _ w = = o � 0 3 (Y) `1 ¢ N ¢ w 0 w m = W 0 0 U J 00 0. Z 0 U Z 0 � V i 00 ry W Cl) W 0 Z O C) N V LLl N I W 0 � rn Of 0LnU) 2 - W W 0 I- Q � O CM J a. Q = U SHEET NUMBER C1.2 0 0000000000 1 1000oo EX. MH® NWV 1 EX. MH n ` 15.40' N59°22'39"W 68.50' y N54'13'07"W `o v m 0 L Y C o C v S • c • 0 m rn o Know what's below. Call before you dig. cbsrw W/OIIMESALE EXISTING WAREHOUSE FFE: 479.4' PARCEL 2 (D.B. 4489, P. 19-26-PLAT) PID: 061 WO0300019BO PROPERTY OF COSTCO WHOLESALE CORPORATION (D.B. 4492, P. 1) BLOCK & BRICK RETAIL WAREHOUSE "COSTCO WHOLESALE" #3171 DISTRICT AVENUE t 428 SF OF PROP. ASPHALT PAVEMENT.CONTRACTOR TO MATCH SUBGRADE AND THICKNESS OF EXISTING PAVEMENT SECTION VAN ' 0 0 x o /// BOLLARDS e � (TYPICAL) C ASPHALT SURFACE LIMITS ADAACCESSIBLE PARKING i 10.0 i 10.0 0 0 N EX. r �0 NCO Imp i 479.1 0 0 EX. BOL S � 0 0 0 0 0 0 0 0 0 10.0 10.0 zi U U U U U 1 8.9 1 9.0 1 9.0 1 9.0 RELOCATED C CORRAL /� g PAINT STRIPING ASPHALT SURFACE r (TYPICAL) p OLAMP )u ULM- wrce ac LPG U TIER (TYPICAL) MH SETBACK LINErj -W CAUTIONII THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS DISCOVERED. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE CONTRACTOR SHALL REPLACE THEM AT HIS OWN EXPENSE. CALL 811 AT LEAST 72 HOURS PRIOR TO COMMENCING CONSTRUCTION IN VICINITY. PAINT STRIPING (TYPICAL) 10.0 i 9.0 i 10.0 6.0 10.0 1 11.0�16.0 1 � --_ WIN w U � Vµ �a g C B C t 3,549 SF OF PROP. ASPHALT / 5. PAVEMENT. CONTRACTOR TO MATCH SUBGRADE AND THICKNESS OF EXISTING L , o� 6.1 ` \ eUS \ ftTfR 2 N4753,53'59"W BL ACgB�i�NE LAIV \ tA)/p 3g COAlc SIG \ C \ \ BENCHMARKS BM 101 DRILL HOLE, N: 3,912,678.714, E:11,485,573.432. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV. = 478.13' BM 102 PK NAIL, N: 3,912,618.377, E: 11,485,814.816 ELEV. = 479.12' BM 103 DRILL HOLE, N: 3,912,543.318, E:11,485,958.364. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV.= 477.35' EX. MH a ASPHALT SURFACE i /9.0 i 9.0 i 9.0 i 9.0 i 9.0 i 9.0 i 9.1=> t 53 LF OF PROP. CONC.CURB LIGHT POLE CONC. BASE EX. MH ®wv ®wv t 322 SF OF PROP. CONCRETE SIDEWALK L"Y EX. MH t 293 SF OF PROP. CONCRETE RlM,476.67 \ \ \ 10.0 15.01 9.0 1 9.0 1 10.0 7.0 11.0 10.0 �s mmem 10A SURFACE NPAIN TRIPIN (TYPIL) LAMP GRAPHIC SCALE IN FEET 0 10 20 40 C ` t 1,213 SF OF PROP. ASPHALT PAVEMENT. CONTRAqTZRT0 MATCH SUBGRADE A THICKNESS OF EXISTING \ PAVEMENT SECTION LIMITS OF ADA ACCESSIBLE PARKING EC IGHT LE ON CONC. ASE STRIPING AND SIGNAGE KEYNOTES OA PROVIDE NEW STRIPING © PROVIDE NEW ADA PAINTED SYMBOL © PROVIDE 4" PAINTED WHITE TRAFFIC STRIPES AT 45° SPACED AT 2'-0" O.C. O PROVIDE NEW OR RELOCATED BOLLARD AND POST OE PROVIDE NEW OR RELOCATED ADA SIGN O DESIGNATED VAN ACCESSIBLE STALL. RELOCATE OR PROVIDE VAN ACCESS SIGN © SIGNS TO BE DOUBLE MOUNTED ON POST OH PROVIDE NEW OR RELOCATED WHEEL STOP SITE DATA TOTAL SITE AREA 13.58 AC LIMIT OF DISTURBANCE (LOD) 0.14 AC LIMIT OF WORK (LOW) NO DISTURBANCE TO OCCUR 0.04 AC j TOTAL OFF -SITE AREA DISTURBED 0.00AC TOTAL AREA DISTURBED 0.14AC LEGEND PROPERTY LINE V EXISTING TREE EXISTING LIGHTPOLE © EXISTING SANITARY SEWER MANHOLE 0- EXISTING FIRE HYDRANT 0 EXISTING GRATE INLET DO EXISTING CURB INLET PROP. CONCRETE SIDEWALK. a - CONTRACTOR TO MATCH SUBGRADE AND THICKNESS OF EX. PAVEMENT SECTION. PROP. LIGHT DUTY CONCRETE PAVEMENT. CONTRACTOR TO MATCH SUBGRADE AND THICKNESS OF EX. PAVEMENT SECTION. ADA STRIPING AND REPAIR NOTES 1. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS OR OTHERWISE ESTABLISH A SURVEY OF THE EXISTING STRIPING IN ALL WORK AREAS IN ORDER TO ESTABLISH ALL EXISTING PAVEMENT MARKINGS WITH FULL COORDINATION OF NEW MARKINGS PROPOSED ON THIS PLAN. 2. UNLESS OTHERWISE INDICATED ON THE PLANS, THE CONTRACTOR SHALL ESTABLISH PAVEMENT MARKINGS FOR ALL FIRE LANES, DIRECTIONAL ARROWS, STOP BARS, CURBS, SIDEWALK, LIGHT POLE BASES, SIGN BASES AND PARKING STALLS TO MATCH THE EXISTING SITE WITHIN THE REPAIR LIMITS. 3. CONTRACTOR SHALL REMOVE EXISTING SIGN POSTS AND BASES AND PATCH PAVEMENT FULL DEPTH AND/OR RESTORE LANDSCAPING WHERE REVISED SIGN LOCATIONS ARE NOTED. REMOVAL COSTS SHALL BE INCIDENTAL TO NEW SIGN INSTALLATIONS. 4. ANY ADDITIONAL SIDEWALK AREAS DISTURBED OR DAMAGED DURING CONSTRUCTION MUST BE REPLACED TO EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 5. CONTRACTOR TO USE APPROPRIATE PAINT COLORS TO MATCH THE EXISTING FEATURES. ADA BARRIER FREE AREAS TO COMPLY WITH ALL LOCAL, FEDERAL, AND COSTCO ADA STANDARDS. PAVEMENT MARKINGS SHALL BE A HIGH QUALITY PAINT RECOMMENDED BY THE PAINT MANUFACTURER. 6. CONTRACTOR SHALL MAINTAIN A MINIMUM 9' WIDE STANDARD PARKING SPACE AT THE TRANSITION FROM OUTERMOST ADA PARKING SPACE IN EVERY AISLE. REF. PLAN FOR SPECIFIC DIMENSION. 7. DIMENSIONS NOTED ARE TO THE CENTERLINE OF MARKINGS. 8. MAXIMUM 2.0% SLOPE IN ALL DIRECTIONS WITHIN ALL ADA PARKING AREAS. 9. SIDEWALKS SHALL NOT EXCEED 2% CROSS SLOPE AND 5% LONGITUDINAL SLOPE, UNLESS OTHERWISE SHOWN. SIDEWALK LEVEL LANDINGS SHALL NOT EXCEED 2% IN ANY DIRECTION. 10. IN AREAS NOT BEING RESURFACED BUT REQUIRING RESTRIPING, CONTRACTOR SHALL REMOVE EXISTING STRIPING BY EITHER SAND BLASTING, WATER BLASTING, GRINDING OR BY ANOTHER APPROVED METHOD OF STRIPING REMOVAL. WHERE THE STRIPING REMOVAL CHANGES THE SURFACE TEXTURE OF THE EXISTING ASPHALT, CONTRACTOR SHALL SEAL COAT THE AREA PRIOR TO RESTRIPING. CONTRACTOR TO SUBMIT STRIPING REMOVAL METHOD TO PROPERTY MANAGER AND ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. 11. CONTRACTOR SHALL MATCH EXISTING ADA STRIPING IN ALL PAVEMENT REPAIR AREAS UNLESS REVISED STRIPING IS SPECIFICALLY SHOWN ON THE PLANS. 12. CONTRACTOR SHALL ENSURE PAVEMENT EDGES BETWEEN EXISTING AND PROPOSED PAVEMENT AND AT JOINTS DO NOT HAVE ABRUPT CHANGES IN GRADE. ENSURE CONNECTION TO EXISTING GRADE HAS A SMOOTH TRANSITION. 13. REFERENCE ARCH PLANS FOR ALL STRIPING & SIGNAGE DETAILS GENERALNOTES 1. CONTRACTOR SHALL PHASE WORK SO THAT CUSTOMER ACCESS TO BUILDING ENTRANCES REMAIN OPEN AT ALL TIMES. 2. CONTRACTOR TO LOCATE ALL PRIVATE AND PUBLIC UTILITIES ON SITE WITHIN WORK AREAS. CONTRACTOR TO TAKE EXTRA CAUTION TO AVOID DAMAGE TO ELECTRICAL, TELEPHONE, IRRIGATION, AND OTHER CONDUITS TYPICALLY FOUND IN THE UPPER FEW FEET OF GROUND. CONTRACTOR SHALL REPLACE ANY DAMAGED OR DESTROYED UTILITIES AT NO ADDITIONAL COST TO THE OWNER. 3. CONTRACTOR TO REMOVE TREE ROOTS AS NECESSARY TO PERFORM REPAIRS INDICATED. WHEN ROOT CUTTING IS UNAVOIDABLE, A CLEAN SHARP CUT SHALL BE MADE TO AVOID SHREDDING OR SMASHING. ROOT CUTS SHOULD BE MADE BACK TO A LATERAL ROOT. WHENEVER POSSIBLE, TREE ROOTS SHOULD BE CUT BETWEEN LATE FALL AND BUD OPENING, WHEN ROOT ENERGY SUPPLIES ARE HIGH AND CONDITIONS ARE LEAST FAVORABLE FOR DISEASE CAUSING AGENTS. EXPOSED ROOTS SHALL BE COVERED IMMEDIATELY TO PREVENT DEHYDRATION. ROOTS SHALL BE COVERED WITH SOIL OR BURLAP AND KEPT MOIST. 4. RESTORE LANDSCAPING AREAS TO EQUAL OR GREATER CONDITION THAN EXISTED AT COMMENCEMENT OF WORK. ANY DAMAGE TO IRRIGATION HEADS DURING CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5. ALL SODDED AREAS SHALL BE SUBJECT TO ONE YEAR CORRECTION PERIOD WHICH SHALL COMMENCE UPON THE DATE OF FINAL ACCEPTANCE BY THE OWNER. PARKING TABULATIONS EXISTING PROPOSED STANDARD 607 600 ADA 16 16 VAN 0 3 TOTAL 623 616 r m w F- a 0 z 0 !n w o' z U Lj 0 Z N cSLLIr) 5... o O W n O O (N z:j O D Q W 0 _ % Z ISO i� W C_ CD J W Z Y 2 U) W Q N Z � ON O O O P. ALM ANDER TORRES Lie. No. 0402061591 p,(D/29/ZDZ/ A O � W C)0 N z 0 = a a = a a O CDw 6) a in N F- Q m p NCD ( Q > m o } m > m p _ Y ¢ CD v 3 ¢ w cYi w J Q 0 I- z z O� z� O Vi v! W z C GQ zz </� I..L 0 N � LL1 N 1Q> W 0LLj cn -J 0 cn 0 2 - W W I- Q�o M J a. Q 2 U SHEET NUMBER C2.0 000000000001 1 o3coQ n ` 15.40' r N59"2T39"W 68.50' y N54"13'07"W `o 0 v `v v Y 0 o C v L • c m 0 o Know what's below. Call before you dig. W/�O�LE�ALE CbSFW EXISTING WAREHOUSE FFE: 479.4' PARCEL 2 (D.B. 4489, P. 19-26-PLAT) PID: 061 WO0300019BO PROPERTY OF COSTCO WHOLESALE CORPORATION (D.B. 4492, P. 1) BLOCK & BRICK RETAIL WAREHOUSE "COSTCO WHOLESALE" J• ° #3171 DISTRICT AVENUE �1 ° ��O���� ° lQ \ �����/�' M#10 V C� 479.1 t79.53 ° o o / ® o / 0 0 0 0 0 0 0 0 0 0 0 0 0 / Vlw _17II 47 7 M SAWCUT LIMITS (TYP.) 4j9\ CAUTIONII THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION AND SHALL NOTIFY THE CONSTRUCTION MANAGER AND ENGINEER OF ANY CONFLICTS DISCOVERED. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE CONTRACTOR SHALL REPLACE THEM AT HIS OWN EXPENSE. CALL 811 AT LEAST 72 HOURS PRIOR TO COMMENCING CONSTRUCTION IN VICINITY. / /at9. 478.90 ME 478.87 ME 47 M m M o m m m m m 478.90 6,19 478.81 478.80 4i Alo ow uc d]R Rd rvvn AW - 478.29 478.38 El 478.48 M 478.42 `mil 478.19 / 475.15 / ��\\ 47 . �/ / C SAWCUT LIMITS (TYP.) mwv r.,r. WV 477. 1 M �478/ \CB SETBACK LINE) I\ N4753'59"W BLA C _ - c ° (�)LANE N3`5j?0 / 3g'96' 67 BENCHMARKS BM 101 DRILL HOLE, N: 3,912,678.714, E:11,485,573.432. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV. = 478.13' BM 102 PK NAIL, N: 3,912,618.377, E: 11,485,814.816 ELEV. = 479.12' BM 103 DRILL HOLE, N: 3,912,543.318, E:11,485,958.364. TBM IS CHISELED SQUARE SET IN TOP OF CURB. ELEV.= 477.35' ��UUUUU,,'U i I � I I => 7>0 n n n n n n n 4j8\ ° o o ✓ I 478.59 47. 1M _ I m m m WA 478.25 478.46 4"bAK 478.60 SAWCUT I LIMITS (TYP.) 0 1.48 8.37 478.10 478.26 --- 79 _ 478.10 478.03 ME Y / GRADING NOTES 1. SPOT ELEVATIONS ARE TO TOP OF PAVEMENT UNLESS OTHERWISE NOTED. 2. ALL FILL MATERIAL SHALL BE COMPACTED PER GEOTECH RECOMMENDATION. REFER TO PAVING SECTION DETAILS FOR SUBGRADE PREPARATION REQUIREMENTS UNDER ALL PAVED AREAS. (REFER TO GEOTECH REPORT) 3. CONTRACTOR SHALL VERIFY ALL SIDEWALKS HAVE A MAXIMUM RUNNING SLOPE OF 5.0% AND A MAXIMUM CROSS SLOPE OF 2.0%. IF THE CONTRACTOR IDENTIFIES SLOPES GREATER, CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO CONSTRUCTION. 4. SPOT ELEVATIONS IDENTIFIED AS "MATCH EXISTING" SHALL BE FIELD VERIFIED. CONTRACTOR SHALL NOTIFY CIVIL ENGINEERING CONSULTANT (CEC) OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH GRADING ACTIVITIES. SITE DATA TOTAL SITE AREA 13.58 AC 591,545 SF LIMIT OF DISTURBANCE (LOD) 0.14 AC 6,005 SF LIMIT OF WORK (LOW) NO DISTURBANCE TO OCCUR 0.04 AC 1,546 SF TOTAL OFF -SITE AREA DISTURBED 0.00 AC 0 SF TOTAL AREA DISTURBED 0.14 AC 6,005 SF GRAPHIC SCALE IN FEET 0 10 20 40 LEGEND PROPERTY LINE - 670 - - EXISTING CONTOUR ■ 670.00 PROPOSED SPOT ELEVATION ME MATCH EXISTING TC TOP OF CURB ELEVATION GENERAL NOTES 1. CONTRACTOR SHALL PHASE WORK SO THAT CUSTOMER ACCESS TO BUILDING ENTRANCES REMAIN OPEN AT ALL TIMES. 2. CONTRACTOR TO LOCATE ALL PRIVATE AND PUBLIC UTILITIES ON SITE WITHIN WORK AREAS. CONTRACTOR TO TAKE EXTRA CAUTION TO AVOID DAMAGE TO ELECTRICAL, TELEPHONE, IRRIGATION, AND OTHER CONDUITS TYPICALLY FOUND IN THE UPPER FEW FEET OF GROUND. CONTRACTOR SHALL REPLACE ANY DAMAGED OR DESTROYED UTILITIES AT NO ADDITIONAL COST TO THE OWNER. 3. CONTRACTOR TO REMOVE TREE ROOTS AS NECESSARY TO PERFORM REPAIRS INDICATED. WHEN ROOT CUTTING IS UNAVOIDABLE, A CLEAN SHARP CUT SHALL BE MADE TO AVOID SHREDDING OR SMASHING. ROOT CUTS SHOULD BE MADE BACK TO A LATERAL ROOT. WHENEVER POSSIBLE, TREE ROOTS SHOULD BE CUT BETWEEN LATE FALL AND BUD OPENING, WHEN ROOT ENERGY SUPPLIES ARE HIGH AND CONDITIONS ARE LEAST FAVORABLE FOR DISEASE CAUSING AGENTS. EXPOSED ROOTS SHALL BE COVERED IMMEDIATELY TO PREVENT DEHYDRATION. ROOTS SHALL BE COVERED WITH SOIL OR BURLAP AND KEPT MOIST. 4. RESTORE LANDSCAPING AREAS TO EQUAL OR GREATER CONDITION THAN EXISTED AT COMMENCEMENT OF WORK. ANY DAMAGE TO IRRIGATION HEADS DURING CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5. ALL SODDED AREAS SHALL BE SUBJECT TO ONE YEAR CORRECTION PERIOD WHICH SHALL COMMENCE UPON THE DATE OF FINAL ACCEPTANCE BY THE OWNER. ADA STRIPING AND REPAIR NOTES 1. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS OR OTHERWISE ESTABLISH A SURVEY OF THE EXISTING STRIPING IN ALL WORK AREAS IN ORDER TO ESTABLISH ALL EXISTING PAVEMENT MARKINGS WITH FULL COORDINATION OF NEW MARKINGS PROPOSED ON THIS PLAN. 2. UNLESS OTHERWISE INDICATED ON THE PLANS, THE CONTRACTOR SHALL ESTABLISH PAVEMENT MARKINGS FOR ALL FIRE LANES, DIRECTIONAL ARROWS, STOP BARS, CURBS, SIDEWALK, LIGHT POLE BASES, SIGN BASES AND PARKING STALLS TO MATCH THE EXISTING SITE WITHIN THE REPAIR LIMITS. 3. CONTRACTOR SHALL REMOVE EXISTING SIGN POSTS AND BASES AND PATCH PAVEMENT FULL DEPTH AND/OR RESTORE LANDSCAPING WHERE REVISED SIGN LOCATIONS ARE NOTED. REMOVAL COSTS SHALL BE INCIDENTAL TO NEW SIGN INSTALLATIONS. 4. ANY ADDITIONAL SIDEWALK AREAS DISTURBED OR DAMAGED DURING CONSTRUCTION MUST BE REPLACED TO EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 5. CONTRACTOR TO USE APPROPRIATE PAINT COLORS TO MATCH THE EXISTING FEATURES. ADA BARRIER FREE AREAS TO COMPLY WITH ALL LOCAL, FEDERAL, AND COSTCO ADA STANDARDS. PAVEMENT MARKINGS SHALL BE A HIGH QUALITY PAINT RECOMMENDED BY THE PAINT MANUFACTURER. 6. CONTRACTOR SHALL MAINTAIN A MINIMUM 9' WIDE STANDARD PARKING SPACE AT THE TRANSITION FROM OUTERMOST ADA PARKING SPACE IN EVERY AISLE. REF. PLAN FOR SPECIFIC DIMENSION. 7. DIMENSIONS NOTED ARE TO THE CENTERLINE OF MARKINGS. 8. MAXIMUM 2.0% SLOPE IN ALL DIRECTIONS WITHIN ALL ADA PARKING AREAS. 9. SIDEWALKS SHALL NOT EXCEED 2.0% CROSS SLOPE AND 5.0% LONGITUDINAL SLOPE, UNLESS OTHERWISE SHOWN. SIDEWALK LEVEL LANDINGS SHALL NOT EXCEED 2.0% IN ANY DIRECTION. 10. IN AREAS NOT BEING RESURFACED BUT REQUIRING RESTRIPING, CONTRACTOR SHALL REMOVE EXISTING STRIPING BY EITHER SAND BLASTING, WATER BLASTING, GRINDING OR BY ANOTHER APPROVED METHOD OF STRIPING REMOVAL. WHERE THE STRIPING REMOVAL CHANGES THE SURFACE TEXTURE OF THE EXISTING ASPHALT, CONTRACTOR SHALL SEAL COAT THE AREA PRIOR TO RESTRIPING. CONTRACTOR TO SUBMIT STRIPING REMOVAL METHOD TO PROPERTY MANAGER AND ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. 11. CONTRACTOR SHALL MATCH EXISTING ADA STRIPING IN ALL PAVEMENT REPAIR AREAS UNLESS REVISED STRIPING IS SPECIFICALLY SHOWN ON THE PLANS. 12. CONTRACTOR SHALL ENSURE PAVEMENT EDGES BETWEEN EXISTING AND PROPOSED PAVEMENT AND AT JOINTS DO NOT HAVE ABRUPT CHANGES IN GRADE. ENSURE CONNECTION TO EXISTING GRADE HAS A SMOOTH TRANSITION. z 0 Ld V 60 Z N ��LLI r-) _ CD ((a i 50 O 0 n O N z > 0 Q 0 _ % Z /^/� � O ice\ w 1_ CD J LJz S2 � Y W Q N Z � ON 0 Oo P. ALEWDER TORRES� Lie. No. 0402061591 z 3: a a 0 o- = a U N W = O O O W N O O � > > a L Q� m m Q p N o m p CD w QCD O Z Z y W ¢ 1 ¢ v w a_ Z C) 04 N LLI N 00Q> W 0LLj U) J OcnU) m - W W H Quo CO J a. Q m U SHEET NUMBER C3.0 w Q 0 2" R. 6" CURB HEIGHT UNLESS OTHERWISE SHOWN ON PLANS. SEE PLANS FOR FINAL PROPOSED ELEVATIONS. MATCH EXISTING ADJACENT CURB PROFILE UNLESS OTHERWISE SHOWN ON PLANS. 5 7/8'. C - . 14" "18" TO 24" (MATCH EXISTING) n 4„ 4'.. EPDXY COATED <' #4 REBAR STANDARD PAN MINIMUM OF 4" AGGREGATE BASE COURSE REQUIRED EXISTING SUBGRADE - TO REMAIN 6" CURB HEIGHT UNLESS OTHERWISE SHOWN ON PLANS. SEE PLANS FOR FINAL PROPOSED ELEVATIONS. MATCH EXISTING ADJACENT CURB PROFILE UNLESS OTHERWISE SHOWN ON PLANS. °.'•A. I 1/8" i2" R. 14" •' 18" TO 24" (MATCH EXISTING): , a .�. EPDXY a . COATED ! #4 REBAR REVERSE PAN MINIMUM OF 4" AGGREGATE BASE COURSE REQUIRED EXISTING SUBGRADE - TO REMAIN NOTES: 1. DETAIL SHOWN FOR REFERENCE ONLY. FIELD CONSTRUCTION SHALL MATCH EXISTING CURB AND GUTTER TYPE, INCLUDING DIMENSIONS AND REINFORCEMENT, AS WELL AS ELEVATION UNLESS OTHERWISE SPECIFIED ON THE PLANS. 2. GUTTER PAN SHALL BE SLOPED LESS THAN 2.0% IN ALL DIRECTIONS WHEN ADJACENT TO ANY ADA PARKING AREA. IF GUTTER IS FOUND TO EXCEED 2.0% IN ANY DIRECTION, CONTRACTOR SHALL REMOVE AND REPLACE TO CORRECT SLOPES ON THEIR OWN ACCORD. 3. VERTICAL SAWCUT SHALL BE MADE AT ALL LIMITS OF REMOVAL TO CREATE A CLEAN EDGE. 4. GRADING AND SEEDING OF ADJACENT LANDSCAPE AREA SHALL BE INCIDENTAL TO, AND BID AS PART OF, CURB AND GUTTER CONSTRUCTION. 5. IF AGGREGATE BASE COURSE IS NOT PRESENT CONTRACTOR TO NOTIFY ENGINEER OF RECORD IMMEDIATELY. DETAIL CP-CG CONCRETE PAVEMENT - REMOVE AND REPLACE CURB AND GUTTER 6" CURB HEIGHT UNLESS OTHERWISE SHOWN ON PLANS. SEE PLANS FOR FINAL PROPOSED ELEVATIONS. MATCH EXISTING ADJACENT CURB PROFILE UNLESS OTHERWISE SHOWN ON PLANS. SAWCUT, REMOVE, AND REPLACE 2' X TOTAL LENGTH OF CURB REMOVAL SECTION AND PROVIDE REPLACEMENT ASPHALT TO MATCH EXISTING PAVEMENT SECTION IN TWO LIFT COURSES AS NEEDED. THIS SHALL BE INCIDENTAL TO, AND BID AS PART OF, CURB CONSTRUCTION. EXISTING BASE EXISTING SUBGRADE - TO REMAIN NOTES: 1. DETAIL SHOWN FOR REFERENCE ONLY. FIELD CONSTRUCTION SHALL MATCH EXISTING CURB TYPE, INCLUDING DIMENSIONS AND REINFORCEMENT, AS WELL AS ELEVATION, UNLESS OTHERWISE SPECIFICALLY SHOWN ON PLANS. 2. VERTICAL SAWCUT SHALL BE MADE AT ALL LIMITS OF REMOVAL TO CREATE A CLEAN EDGE. 3. GRADING, ADDITIONAL AGGREGATE/CONCRETE REQUIRED TO MATCH EXISTING CROSS SECTION GRADES, AND SEEDING OF ADJACENT LANDSCAPE AREA SHALL BE INCIDENTAL TO, AND BID AS PART OF. CURB CONSTRUCTION. DETAIL CONCRETE PAVEMENT - REMOVE AND REPLACE VERTICAL CURB EXISTING CONCRETE (TO BE REMOVED) EXISTING BASE EXISTING SUBGRADE 4" CONCRETE PAVEMENT (PER SPECIFICATIONS) MINIMUM 4" OF AGGREGATE BASE COURSE REQUIRED. EXISTING AGGREGATE BASE COURSE MEETING MATERIAL & COMPACTION REQUIREMENTS - TO REMAIN. EXISTING SUBGRADE - TO REMAIN !1.4XW1.4 WELDED WIRE FABRIC (ONLY IF MATCHING EXISTING) NOTES: 1. VERTICAL SAWCUT SHALL BE MADE AT ALL LIMITS OF REMOVAL TO CREATE A CLEAN EDGE. 2. MATCH EXISTING CONTROL AND EXPANSION JOINTS, UNLESS WHERE REQUIRING MODIFICATION OF JOINTING TO ALLOW FOR LEVEL LANDINGS AND TRANSITION ZONES. 3. ALL SIDEWALKS CONSTRUCTED WITHIN ADA ROUTES SHALL NOT EXCEED 2.0% CROSS SLOPE AND 5.0% LONGITUDINAL SLOPE (IN THE DIRECTION OF TRAVEL), UNLESS OTHERWISE SPECIFICALLY SHOWN ON PLANS. LEVEL LANDINGS IN FRONT OF DOORS AND AT TOP OF RAMPS SHALL NOT EXCEED 2.0% IN ANY DIRECTION. 4. IF AGGREGATE BASE COURSE IS NOT PRESENT CONTRACTOR TO NOTIFY ENGINEER OF RECORD IMMEDIATELY. 5. CONTRACTOR SHALL NOTIFY ENGINEER IF EXISTING BASE MATERIAL DOES NOT MEET REQUIREMENTS PER SPECIFICATIONS. DETAIL CONCRETE PAVEMENT- REMOVE, REGRADE, AND REPLACE SIDEWALK PROPOSED ASPHALT 1.5% TARGET SLOPE IN ALL DIRECTIONS (2.0% MAX.) EXISTING 4NDSCAPING OR SIDEWALK EXISTING CURB `SEE PLANS FOR PROPOSED GRADING` LIMITS OF ADA PARKING AREA DISTANCE VARIES (SEE PLANS) EXISTING ASPHALT PAVEMENT (SLOPES EXCEED 2.0%) SALVAGED AGGREGATE BASE AND/OR NEW AGGREGATE BASE AS NEEDED ' - "'--"'G ASPHALT SURFACE COURSE )AT (INCLUDING VERTICAL FACES) z 0 w cr— V 60 Z N — i 50 O n O 0 N Z j O �QO O _ % Z IcnO i� w�CD J W z Y 2 cf) wQ N z � oN o O P. ALEWDER TORRES' Lie. No. 0402061591 p,(D/29/ZDZ/ z 3: a a O 0 _ N O = a = a W o O O o W N u� a) a in Q rn Q > m } r m p N o mCD p w TRANSITION ZONE _ _ CD 3 DISTANCE VARIES Y 0 w � _ (SEE PLANS) PROPOSED ASPHALT 5.0% MAX. TRANSITION SLOPE TO EXISTING GRADE, UNLESS OTHERWISE 7 SHOWN ON PLANS z 0 CREATE A SMOOTH TRANSITION TO r� MATCH EXISTING GRADE. SEE PLAN U FOR APPROXIMATE REMOVE, REGRADE, AND REPLACE LIMITS. — REMOVE EXISTING ASPHALT PAVEMENT, AGGREGATE BASE, z AND SUBGRADE MATERIAL TO REQUIRED ELEVATION TO O ACHIEVE PROPOSED SLOPES AND SURFACE ELEVATIONS SHOWN ON PLANS. PLACE COMPACTED BASE MATERIAL TO U REQUIRED ELEVATION AND PLACE ASPHALT PER CROSS SECTION BELOW. MATCH EXISTING ASPHALT BASE COURSE EXISTING AGGREGATE BASE COURSE MEETING MATERIAL & COMPACTION REQUIREMENTS - TO REMAIN. ADD OR REMOVE MATERIAL AS NECESSARY TO ACHIEVE FINAL PROPOSED GRADES. EXISTING SUBGRADE - TO REMAIN NOTES: 1. SURFACE COURSE SHALL BE INSTALLED AT THE SAME TIME AS ADJACENT PAVEMENT REPAIR SURFACE COURSES. 2. IF AGGREGATE BASE COURSE IS NOT PRESENT CONTRACTOR TO NOTIFY ENGINEER OF RECORD IMMEDIATELY. 3. THE AGGREGATE BASE COURSE SHALL BE INSPECTED BY THE TESTING AGENCY, OWNER OR DESIGN CONSULTANT AFTER ASPHALT REMOVAL AND BASE PREPARATION, PRIOR TO ASPHALT REPLACEMENT. DETAIL J Q UJ 0 0 rn N LL1 N I Q W 0 -1 U) E J O cj U) 2 — W W H QUO CO J Q 2 U ASPHALT PAVEMENT - REMOVE, REGRADE, AND REPLACE SHEET NUMBER C4.0