Loading...
HomeMy WebLinkAboutSDP202100075 Review Comments Minor Amendment 2021-11-01Kevin McCollum From: Kevin McCollum Sent: Monday, November 1, 2021 3:50 PM To: Jonathan Showalter Cc: David lames Subject: SDP202100075 Birdwood Pedestrian Path Minor Site Plan Amendment Review Comments Attachments: RE: Planning Application Review for SDP202100075 SDP2017-58 - MINOR - DIGITAL.; RE: Birdwood golfcourse sidewalk amendment Good Afternoon Jonathan, Below are some review comments that need to be addressed prior to approval of SDP202100075 Birdwood Pedestrian Path. Please work directly with the Engineering contact — David James, who is copied on this email, as there are no outstanding planning comments or concerns with regards to this project, only Engineering comments below. We need Engineering approval and approval of the WPO plan amendment prior to minor site plan amendment approval. Let us know if you have questions. Thanks so much! 1. It appears land disturbance is over 10,000sf. Please submit a VESCP or VSMP application for review. 2. Show any existing easements with deed book references. 3. VSMP plan will need to be approved prior to site plan amendment approval. 4. Install crosswalk at Birdwood Dr. S. The County would not allow mixed -use paths with vehicle travelways, so the path onto Birdwood Drive needs to be removed or revised with crosswalk to show cross -connection. 6. Ensure vehicle stopping site distances are met at crosswalks. a. Ensure landscape does not interfere with these site distances. 7. Provide drainage design tables with the site plan. 8. Provide drainage design and profiles with the WPO and/or site plan review. 9. Provide max height of retaining wall. a. Walls over 30" require safety railing; Walls over 3' require a building permit; Walls over 4' require design plans with P.E. seal. 10. Provide CG-6 instead of roll-top curb along Golf Course Dr. 11. Show concrete sidewalk width and provide design detail. 12. Provide paved path typical sections. 13. Note: For VESCP/VSMP plan verify drainage areas to downstream SWM facilities are adequate or will be designed adequate to handle increased flows. Kevin McCollum, AICP, C20 Senior Planner I Albemarle County Community Development Department Planning Division (434) 296-5832 ext. 3141 401 McIntire Rd, Charlottesville VA 22902