HomeMy WebLinkAboutSDP202000036 Correspondence 2021-10-14Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Tuesday, September 14, 2021 12:12 PM
To: Adam Moore
Cc: Cameron Langille; Steve Krohn; Don Franco
Subject: RE: Belvedere 5A FSP LOR not
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Adam,
Following upon an LOR for Belvedere 5, below. I know you're just getting back in the office but I think this one might be
an easy one if you have a few minutes.
Thank you.
Jim Taggart
For RGA
From: Jim Taggart
Sent: Friday, September 3, 2021 1:38 PM
To: Moore, Adam <adam.moore@vdot.virginia.gov>
Cc: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>
Subject: FW: Belvedere SA FSP LOR not
Hi Adam,
Working on the Belvedere Phase 5A subdivision. I am writing up our first LOR for the recently approved SP. Cameron
suggests that I send to you to help expedite. This LOR involves lot 33 (Corner lot at Fowler Dr. and Fowler Circle). We
are asking that this lot continue to front on Fowler Circle but be side loaded from Fowler Dr. (See the attached LOR
submittal). The other matters likely do not involve you.
If possible, please review and let Cameron and me, know of your findings.
Thanks!
Jim Taggart
For RGA
From: Jim Taggart
Sent: Friday, September 3, 2021 12:51 PM
To:'Cameron Langille' <blaneille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethanv@roudabush.com>; Don Franco
<DFranco@roudabush.com>; Alease Shiflett <AShiflett@roudabush.com>
Subject: Belvedere 5A FSP LOR not
Cameron,
Thank you for our discussion yesterday. As usual, you were very helpful and your guidance here is most valuable.
Please find attached: LOR No. 1 for Belvedere Phase 5A Final Site plan. This addresses
1. Revision of the setbacks and removal of the privacy fences shown on lots 15 and 33
2. Side loading of Lot 33
3. Extension of the rear retaining wall shown on Lot 1
As we discussed I will be reaching immediately to VDOT regarding the side load matter. Should you have any questions
or comments, please feel free to call me directly at the number below or email, should you prefer.
Have a great holiday weekend.
JT
Thank You,
Vl' . T.�
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (a.,a) 26o-g68o (Direct)
www.roudabush.com
itaeeart(Wroudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
Cameron Langille
From:
Jim Taggart <JTaggart@roudabush.com>
Sent:
Wednesday, September 8, 2021 8:27 AM
To:
Cameron Langille
Cc:
Alease Shiflett
Subject:
RE: Belvedere 5A FSP LOR not
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I clearly dropped the ball here. I will ask Alease from our office to get the application underway for the LOR
paperwork. Thanks for the heads up.
Thanks!
Jim Taggart
For RGA
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, September 7, 20217:12 PM
To: Jim Taggart <JTaggart@roudabush.com>
Subject: RE: Belvedere 5A FSP LOR nol
Hi Jim,
Thanks for emailing this over. Question — did you submit a copy of this application through our electronic submittal
portal and pay the fee electronically, or submit hard copies of the application materials & fee in person at our office? I
checked the new application submittal box today, and it doesn't appear that this application was officially submitted yet.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCcbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, September 3, 2021 12:52 PM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethany@roudabush.com>; Don Franco
<DFranco@roudabush.com>; Alease Shiflett <AShiflett@roudabush.com>
Subject: Belvedere 5A F513 LOR nol
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Thank you for our discussion yesterday. As usual, you were very helpful and your guidance here is most valuable.
Please find attached: LOR No. 1 for Belvedere Phase 5A Final Site plan. This addresses
1. Revision of the setbacks and removal of the privacy fences shown on lots 15 and 33
2. Side loading of Lot 33
3. Extension of the rear retaining wall shown on Lot 1
As we discussed I will be reaching immediately to VDOT regarding the side load matter. Should you have any questions
or comments, please feel free to call me directly at the number below or email, should you prefer.
Have a great holiday weekend.
JT
Thank You,
Vl' . T.�
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (4.a4) 26o-g68o (Direct)
www.roudabush.com
itaeeart(Wroudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
Cameron Langille
From: Cameron Langille
Sent: Tuesday, September 7, 2021 7:12 PM
To: Jim Taggart
Subject: RE: Belvedere 5A FSP LOR not
Hi Jim,
Thanks for emailing this over. Question — did you submit a copy of this application through our electronic submittal
portal and pay the fee electronically, or submit hard copies of the application materials & fee in person at our office? I
checked the new application submittal box today, and it doesn't appear that this application was officially submitted yet.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, September 3, 2021 12:52 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethany@roudabush.com>; Don Franco
<DFranco@roudabush.com>; Alease Shiflett <AShiflett@roudabush.com>
Subject: Belvedere SA FSP LOR not
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Thank you for our discussion yesterday. As usual, you were very helpful and your guidance here is most valuable.
Please find attached: LOR No. 1 for Belvedere Phase 5A Final Site plan. This addresses
1. Revision of the setbacks and removal of the privacy fences shown on lots 15 and 33
2. Side loading of Lot 33
3. Extension of the rear retaining wall shown on Lot 1
As we discussed I will be reaching immediately to VDOT regarding the side load matter. Should you have any questions
or comments, please feel free to call me directly at the number below or email, should you prefer.
Have a great holiday weekend.
JT
Thank You,
V.. T.�
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (4.a4) 260-g680 (Direct)
www.roudabush.com
itaeearWrou labush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
Cameron Langille
From:
Jim Taggart <JTaggart@roudabush.com>
Sent:
Friday, September 3, 2021 1:38 PM
To:
Adam Moore
Cc:
Cameron Langille; Steve Krohn; Don Franco
Subject:
FW: Belvedere 5A FSP LOR not
Attachments:
RGAbelv5aNOl lor03SEP21.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Adam,
Working on the Belvedere Phase 5A subdivision. I am writing up our first LOR for the recently approved SP. Cameron
suggests that I send to you to help expedite. This LOR involves lot 33 (Corner lot at Fowler Dr. and Fowler Circle). We
are asking that this lot continue to front on Fowler Circle but be side loaded from Fowler Dr. (See the attached LOR
submittal). The other matters likely do not involve you.
If possible, please review and let Cameron and me, know of your findings.
Thanks!
Jim Taggart
For RGA
From: Jim Taggart
Sent: Friday, September 3, 2021 12:51 PM
To:'Cameron Langille' <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethany@roudabush.com>; Don Franco
<DFranco@roudabush.com>; Alease Shiflett <AShiflett@roudabush.com>
Subject: Belvedere 5A FSP LOR not
Cameron,
Thank you for our discussion yesterday. As usual, you were very helpful and your guidance here is most valuable.
Please find attached: LOR No. 1 for Belvedere Phase 5A Final Site plan. This addresses
1. Revision of the setbacks and removal of the privacy fences shown on lots 15 and 33
2. Side loading of Lot 33
3. Extension of the rear retaining wall shown on Lot 1
As we discussed I will be reaching immediately to VDOT regarding the side load matter. Should you have any questions
or comments, please feel free to call me directly at the number below or email, should you prefer.
Have a great holiday weekend.
JT
Thank You,
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (aaa) 260-g680 (Direct)
www.roudabush.com
itaeeart(Wrou labush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, September 3, 2021 12:52 PM
To: Cameron Langille
Cc: Steve Krohn; Bethany Velasquez; Don Franco; Alease Shiflett
Subject: Belvedere 5A FSP LOR not
Attachments: RGAbeIv5aNC 1lor03SEP21.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Thank you for our discussion yesterday. As usual, you were very helpful and your guidance here is most valuable.
Please find attached: LOR No. 1 for Belvedere Phase 5A Final Site plan. This addresses
1. Revision of the setbacks and removal of the privacy fences shown on lots 15 and 33
2. Side loading of Lot 33
3. Extension of the rear retaining wall shown on Lot 1
As we discussed I will be reaching immediately to VDOT regarding the side load matter. Should you have any questions
or comments, please feel free to call me directly at the number below or email, should you prefer.
Have a great holiday weekend.
JT
Thank You,
tl,,. T.�
Jim Taggart, P.E.
Roudabush, Gale & Assoc. INC. I
Director of Engineering
office: (4.34) 26o-g68o (Direct)
www.roudabush.com
itaeeart(Wroudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
Cameron Langille
From: Cameron Langille
Sent: Wednesday, September 1, 2021 5:33 PM
To: Jim Taggart
Cc: Don Franco; Bethany Velasquez; Steve Krohn
Subject: RE: Belvedere 5
Hi Jim,
Does tomorrow at 1 PM work for you for the Teams meeting? Let me know and I will send the invite via email.
The Phase 5A plat is almost ready for approval. I am waiting to hear back from RWSA to see if they have any remaining
comments and they said they would get me an answer on Friday. If they have no remaining comments, I will send you
all an email letting you know that the final copies of the plat can be submitted for signature and approval.
Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, September 1, 20214:56 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Don Franco <DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>; Steve Krohn
<skroh n @ resortscom pa nies.com>
Subject: Belvedere 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA again but, I would really like to move forward with that Teams meeting regarding the LOR for
5A. Time is becoming critical.
Also, I thought I understood that we were about to wrap up the 5A Final Plat comments but it looks like County view
shows another 3 weeks or so (24SEP). I think we might be at the finish line here... any way we can advance that?
Thank You,
V:. T.�
Jim Taggart, P.E.
10
Aoudabush, Gale & Assoc. INC.
Director of Engineering
office: (4.a4) 260-g680 (Direct)
www.roudabush.com
itaeeart(Wroudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
11
Cameron Langille
From:
Jim Taggart <JTaggart@roudabush.com>
Sent:
Wednesday, September 1, 2021 4:56 PM
To:
Cameron Langille
Cc:
Don Franco; Bethany Velasquez; Steve Krohn
Subject:
Belvedere 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA again but, I would really like to move forward with that Teams meeting regarding the LOR for
5A. Time is becoming critical.
Also, I thought I understood that we were about to wrap up the 5A Final Plat comments but it looks like County view
shows another 3 weeks or so (24SEP). I think we might be at the finish line here... any way we can advance that?
Thank You,
✓,,. Tyr
Jim Taggart, P.E.
Roudabush, Gale & Assoc. INC. I
Director of Engineering
office: (,ma) 26o-a68o (Direct)
www.roudabush.com
itaeeartw roudabush.com
office.
999 Second Street SE, Suite tot
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
12
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Monday, August 30, 2021 6:24 PM
To: Cameron Langille
Subject: Re: Belvedere 5A Upcoming LOR
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks Cameron. I'd like to take you up on that call please. How can we schedule?
Jim Taggart
Sent from my Whone, pardon the typos please.
On Aug 28, 2021, at 16:06, Cameron Langille <blangille@albemarle.org> wrote:
Hi Jim,
Thanks for sending this over and raising these questions ahead of submitting the LOR. This will help
things go smoothly.
There were several iterations of the design for open space and screening adjacent to/behind Lots 15,33,
34, and 43. 1 see what you're saying with Lots 33 and 15, they do appear to meet the definition of a
corner lot, with the "front" of the lot being the boundary along Fowler Circle, and the side being the
boundary with Fowler Street. I don't see an issue with doing an LOR to make lot 33 have a side loading
garage onto Fowler Street, it will just need to mee the side loading garage setback specified by Section
18-4.19 which is "Five feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is
outside of the right-of-way." I'd also send the LOR over to VDOT just con confirm that they don't have
any objections to the driveway relocation.
For the retaining wall extension on Lot 1, would the extension still be contained within the lot or would
it go into the adjacent open space? You'd just need to verify whether the retaining wall easement that
was recorded with SUB200200123 covers the extension or if the easement needs to be enlarged.
Let me know if you'd still like to discuss over the phone or a Microsoft Teams call and we can set
something up.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
13
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Friday, August 27, 2021 12:05 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A Upcoming LOR
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Cameron,
I need to begin an LOR process for the issues outlined below and want to open a discussion with you
before I formally submit. Would you have a few minutes to zoom or chat by phone about these
issues? Maybe early next week?
<image001.png>
Lot 33 is, to me, clearly a corner lot. The comment deemed it double frontage during review and asked
Riki to put up a screening fence. I missed it thinking it was only applied to the playground side. Now I
need to try and undo this since we clearly can't put a house there and I want the fence gone. Here is the
comment and Riki's response:
1. [32.7.9.7 (a)(4)] Lots 15, 33, 34, and 43 are double frontage lots. Please provide
screening for these lots.
a. [32.7.9.7] If landscaping will be provided, show how the screening measures
on each lot comply with Section 32.7.9.7 (c) and 32.7.9.7 (d). Rev. 1:
Comment not addressed. Not screening measure are shown on Sheet 18 for
these lots. Please identify what screening measures will be provided at the
rear of these lots on the next submittal. Whether landscaping or fencing is
provided, the site plan must provide details of the plant materials or fencing in
accordance with Section 32.7.9.7 (c), 32.7.9.7 (d), and/or 32.7.9.7 (e). Rev. 2:
Comment not fully addressed. Lots 43 and 34 are still double -frontage
lots. Per the Zoning Ordinance definition of corner lots, a corner lot
means a lot abutting on two or more streets at their intersection. The
front of a corner lot shall be deemed to be the shortest of the sides
fronting on streets except where existing development of such lot shall
already have defined the front of such lot. The strip of open space
provided along adjacent to Fowler Street results in lots 34 and 43 only
having frontage along 1 street. Furthermore, in order for open space to
qualify as a screening measure for double -frontage lots, it must be a
minimum of 20' wide and currently it only measures 11'
wide. Therefore, the open space needs to be widened to 20' and
landscaping must be provided to screen these lots.
Response: A fence is provided for screening.
It looks like Lots 33 & 15 were dropped from consideration as double frontage with County comment
#2. So while revision of the setbacks doesn't fall into the strict, allowable list for a LOR, it seems to be
more in line with correcting an interpretation. Thoughts?
Here are the items I am holding so far, for my first LOR
14
1. Remove the fence and adjust the SBL of lots 33 and 15 as discussed above.
2. Side loading this same lot (#33) If we can get rid of the fence and shift the setback line, I
would like to access the garage from the side.
3. Extending a retaining wall on Lot 1 (not shown). The actual field conditions call for
extending one of the retaining walls by 5-10 ft. I will of course have a drawing of this
included in the LOR.
What do you think?
JT
Thank You,
✓,,. %zt
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-368o (Direct)
www.roudabush.com
jtaggart@mudabush.com
office:
999 Second Street SE, Suite tot
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with
any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with
its deletion, so that we can ensure such a mistake does not occur in the future.
15
Cameron Langille
From: Cameron Langille
Sent: Saturday, August 28, 2021 4:06 PM
To: Jim Taggart
Subject: RE: Belvedere 5A Upcoming LOR
Hi Jim,
Thanks for sending this over and raising these questions ahead of submitting the LOR. This will help things go smoothly.
There were several iterations of the design for open space and screening adjacent to/behind Lots 15,33, 34, and 43. 1 see
what you're saying with Lots 33 and 15, they do appear to meet the definition of a corner lot, with the "front" of the lot
being the boundary along Fowler Circle, and the side being the boundary with Fowler Street. I don't see an issue with
doing an LOR to make lot 33 have a side loading garage onto Fowler Street, it will just need to mee the side loading
garage setback specified by Section 18-4.19 which is "Five feet from the right-of-way or the exterior edge of the
sidewalk if the sidewalk is outside of the right-of-way." I'd also send the LOR over to VDOT just con confirm that they
don't have any objections to the driveway relocation.
For the retaining wall extension on Lot 1, would the extension still be contained within the lot or would it go into the
adjacent open space? You'd just need to verify whether the retaining wall easement that was recorded with
SUB200200123 covers the extension or if the easement needs to be enlarged.
Let me know if you'd still like to discuss over the phone or a Microsoft Teams call and we can set something up.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, August 27, 2021 12:05 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A Upcoming LOR
CAUTIOI• This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I need to begin an LOR process for the issues outlined below and want to open a discussion with you before I formally
submit. Would you have a few minutes to zoom or chat by phone about these issues? Maybe early next week?
16
OSEO J `
WALK `\
YIN. s' - MAX. 25' �-
` ' FRONT SETBACK (TNP) /.
• EXISTING SIDEWALK
TO REMAIN .•
Lot 33 is, to me, clearly a corner lot. The comment deemed it double frontage during review and asked Riki to put up a
screening fence. I missed it thinking it was only applied to the playground side. Now I need to try and undo this since
we clearly can't put a house there and I want the fence gone. Here is the comment and Riki's response:
1. [32.7.9.7 (a)(4)] Lots 15, 33, 34, and 43 are double frontage lots. Please provide screening for
these lots.
a. [32.7.9.7] If landscaping will be provided, show how the screening measures on each lot
comply with Section 32.7.9.7 (c) and 32.7.9.7 (d). Rev. 1: Comment not addressed. Not
screening measure are shown on Sheet 18 for these lots. Please identify what screening
measures will be provided at the rear of these lots on the next submittal. Whether
landscaping or fencing is provided, the site plan must provide details of the plant materials
or fencing in accordance with Section 32.7.9.7 (c), 32.7.9.7 (d), and/or 32.7.9.7 (e). Rev. 2:
Comment not fully addressed. Lots 43 and 34 are still double -frontage lots. Per the
Zoning Ordinance definition of corner lots, a corner lot means a lot abutting on two
or more streets at their intersection. The front of a corner lot shall be deemed to be
the shortest of the sides fronting on streets except where existing development of
such lot shall already have defined the front of such lot. The strip of open space
provided along adjacent to Fowler Street results in lots 34 and 43 only having
frontage along 1 street. Furthermore, in order for open space to qualify as a
screening measure for double -frontage lots, it must be a minimum of 20' wide and
currently it only measures f 1' wide. Therefore, the open space needs to be widened
to 20' and landscaping must be provided to screen these lots.
Response: A fence is provided for screening.
It looks like Lots 33 & 15 were dropped from consideration as double frontage with County comment #2. So while
revision of the setbacks doesn't fall into the strict, allowable list for a LOR, it seems to be more in line with correcting an
interpretation. Thoughts?
Here are the items I am holding so far, for my first LOR
1. Remove the fence and adjust the SBL of lots 33 and 15 as discussed above.
17
2. Side loading this same lot (#33) If we can get rid of the fence and shift the setback line, I would like to
access the garage from the side.
3. Extending a retaining wall on Lot 1 (not shown). The actual field conditions call for extending one of
the retaining walls by 5-10 ft. I will of course have a drawing of this included in the LOR.
What do you think?
JT
Thank You,
tl,,. T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail.,
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
18
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, August 27, 2021 12:05 PM
To: Cameron Langille
Subject: Belvedere 5A Upcoming LOR
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I need to begin an LOR process for the issues outlined below and want to open a discussion with you before I formally
submit. Would you have a few minutes to zoom or chat by phone about these issues? Maybe early next week?
OSED J
WALK,
• EXISTING SIDEWALK
TO REMAIN
i 18' GARAGE v � ✓ ^\,
i SETBACK (IV)� �/ \
�SCRIENING FOn.
SEE SHEET 23
ice/ ice/ ti� \
YIN. 5' - YAWL 25' y v
FRONT SETBACK (TYP) i
<,
Lot 33 is, to me, clearly a corner lot. The comment deemed it double frontage during review and asked Riki to put up a
screening fence. I missed it thinking it was only applied to the playground side. Now I need to try and undo this since
we clearly can't put a house there and I want the fence gone. Here is the comment and Riki's response:
1. [32.7.9.7 (a)(4)] Lots 15, 33, 34, and 43 are double frontage lots. Please provide screening for
these lots.
a. [32.7.9.7] If landscaping will be provided, show how the screening measures on each lot
comply with Section 32.7.9.7 (c) and 32.7.9.7 (d). Rev. 1: Comment not addressed. Not
screening measure are shown on Sheet 18 for these lots. Please identify what screening
measures will be provided at the rear of these lots on the next submittal. Whether
landscaping or fencing is provided, the site plan must provide details of the plant materials
or fencing in accordance with Section 32.7.9.7 (c), 32.7.9.7 (d), and/or 32.7.9.7 (e). Rev. 2:
Comment not fully addressed. Lots 43 and 34 are still double -frontage lots. Per the
Zoning Ordinance definition of corner lots, a corner lot means a lot abutting on two
or more streets at their intersection. The front of a corner lot shall be deemed to be
19
the shortest of the sides fronting on streets except where existing development of
such lot shall already have defined the front of such lot. The strip of open space
provided along adjacent to Fowler Street results in lots 34 and 43 only having
frontage along 1 street. Furthermore, in order for open space to qualify as a
screening measure for double -frontage lots, it must be a minimum of 20' wide and
currently it only measures f 1' wide. Therefore, the open space needs to be widened
to 20' and landscaping must be provided to screen these lots.
Response: A fence is provided for screening.
It looks like Lots 33 & 15 were dropped from consideration as double frontage with County comment #2. So while
revision of the setbacks doesn't fall into the strict, allowable list for a LOR, it seems to be more in line with correcting an
interpretation. Thoughts?
Here are the items I am holding so far, for my first LOR
1. Remove the fence and adjust the SBL of lots 33 and 15 as discussed above.
2. Side loading this same lot (#33) If we can get rid of the fence and shift the setback line, I would like to
access the garage from the side.
3. Extending a retaining wall on Lot 1 (not shown). The actual field conditions call for extending one of
the retaining walls by 5-10 ft. I will of course have a drawing of this included in the LOR.
What do you think?
1T
Thank You,
✓,,. Tyr
Jim Taggart, P.E.
Roudabush, Gale & Assoc INC. I
Director of Engineering
office: (434) 260-368o (Direct)
www.roudabush.com
jtaggart@roiidabush.com
O is :
999 Second Street SE, Suite tot
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to Share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
20
Cameron Langille
From: Alease Shiflett <AShiflett@roudabush.com>
Sent: Wednesday, August 11, 2021 7:06 AM
To: Cameron Langille; Jim Taggart; Zachary Dahl
Cc: Don Franco; Bethany Velasquez
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks Cameron,
I will run by and pick it up today.
W X*1111i1 h11. GAI 1:
xAti1rx1,\I1\I\[:
Alease H. Russell Shiflett
Roudabosh, Gale & Assoc., Inc.
999 Second St. SE
Suite 201
Charlottesville, VA 229o2
(4¢4)077-020s
www.roudabosh.com
ashiflett(a)roudabush.com
Follow us:
9
IMPORTANT: The contents of this email and any attachments are confidential. It is Strictly forbidden to Share any
part of this message with any third party, without a written consent of the Sender. If you received this message by
mistake, please reply to this message and follow with its deletion, so that we can ensure Such a mistake does not
occur in the future.
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, August 10, 20215:24 PM
To: Jim Taggart <1Taggart@roudabush.com>; Zachary Dahl <ZDahl@roudabush.com>
Cc: Don Franco <DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>; Alease Shiflett
<ASh iflett@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
The final site plan for Belvedere Phase 5A has been signed and approved. There is one copy for you in the bin in the
lobby of the COD office. There is a coversheet attached to it stating the project name and application number
(SDP202000036).
Please let me know if you have any questions. Thanks,
21
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, August 6, 2021 12:26 PM
To: Cameron Langille <blangille@albemarle.org>; Zachary Dahl <ZDahl@roudabush.com>
Cc: Don Franco <DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>; Alease Shiflett
<AShiflett@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Thank you. Alease has the sets printed and is headed your way.
cover sheet (specifically the benchmark elevation was corrected)
thing altered from the pdf you saw last.
Anyway, we are headed your way with the submittal.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
I am told that we fixed a typo in the site data of the
. I apologize and Feel free to compare. That is the only
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Thursday, August 05, 20216:28 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha nv@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
Good news —the final site plan is now ready to be submitted for final County signature and approval. Please submit four
(4) hard copies of the final site plan to the CDD office. I will sign and approve the plans and one copy will be returned to
you, the rest will be kept for County records.
Once you have dropped them off, please send me an email so I can be sure they are routed to me by my intake
staff. Once I have approved the plans, I will send you a follow-up email letting you know where you can pick up your
approved copy.
Thanks,
Cameron Langille
22
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Friday, July 23, 20213:39 PM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Jim Taggart <JTagaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello Cameron,
Please use the link below to access a pdf of the complete Final Site Plan for Belvedere 5A.
https://files. roudabush.com:5001/sha ri ng/ishZEoN Id
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, July 23, 20212:50 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Cc: Jim Taggart <JTagaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha nV@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
This addresses my last remaining comment.
The process we're doing right now is asking applicants to send us a PDF of the complete final site plan set. The lead
planners then email all of the Site Review Committee (SRC) members a copy of the PDF and ask their consent to approve
the plans. The lead planners are signing final site plans on behalf of all the SRC reviewers, including ACSA and VDOT
staff.
23
So, please send me a copy of the full site plan PDF. I will then coordinate with SRC members to confirm that they are fine
with me signing the plans. Once they do so, you can submit the hard copies to me for final approval.
Please let me know if you have any questions.Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 20213:19 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>; Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha nv@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
24
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <1Taggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethanv@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 202112:06 PM
25
To: Jim Taggart <1Taesart@roudabush.com>; Scott Schiller <sschiller@rivanna.ors>; ilynn@serviceauthoritv.ors
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blansille@albemarle.ore>; Victoria Fort <vfort@rivanna.ors>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
!��VA"NTEA & SEWEA AIJ 1- RY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.ore
From: Jim Taggart <JTasaart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.ore>; ilynn@serviceauthoritv.ors
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blaneille@albemarle.ore>; Victoria Fort <vfort@rivanna.ors>; Dyon Vega <dveaa@rivanna.ors>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.ore]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <1Taesart@roudabush.com>; ilynn@serviceauthoritv.ors
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
26
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
wAISEMRAUTH
arurT
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: mlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
27
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille(cbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
28
Cameron Langille
From: Cameron Langille
Sent: Tuesday, August 10, 2021 5:24 PM
To: Jim Taggart; Zachary Dahl
Cc: Don Franco; Bethany Velasquez; Alease Shiflett
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
The final site plan for Belvedere Phase 5A has been signed and approved. There is one copy for you in the bin in the
lobby of the CDD office. There is a coversheet attached to it stating the project name and application number
(SDP202000036).
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCcbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Friday, August 6, 2021 12:26 PM
To: Cameron Langille <blangille@albemarle.org>; Zachary Dahl <ZDahl@roudabush.com>
Cc: Don Franco <DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>; Alease Shiflett
<AShiflett@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Thank you. Alease has the sets printed and is headed your way.
cover sheet (specifically the benchmark elevation was corrected)
thing altered from the pdf you saw last.
Anyway, we are headed your way with the submittal.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille [mailto:blangille@albemarle.org
Sent: Thursday, August 05, 2021 6:28 PM
To: Zachary Dahl <ZDahl@roudabush.com>
I am told that we fixed a typo in the site data of the
. I apologize and Feel free to compare. That is the only
29
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha nv@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
Good news —the final site plan is now ready to be submitted for final County signature and approval. Please submit four
(4) hard copies of the final site plan to the CDD office. I will sign and approve the plans and one copy will be returned to
you, the rest will be kept for County records.
Once you have dropped them off, please send me an email so I can be sure they are routed to me by my intake
staff. Once I have approved the plans, I will send you a follow-up email letting you know where you can pick up your
approved copy.
Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Friday, July 23, 20213:39 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello Cameron,
Please use the link below to access a pdf of the complete Final Site Plan for Belvedere 5A.
https://files. roudabush.com:5OO1/sha ri nVishZEoN Id
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
30
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, July 23, 20212:50 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Cc: Jim Taggart <JTagaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>; Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
This addresses my last remaining comment.
The process we're doing right now is asking applicants to send us a PDF of the complete final site plan set. The lead
planners then email all of the Site Review Committee (SRC) members a copy of the PDF and ask their consent to approve
the plans. The lead planners are signing final site plans on behalf of all the SRC reviewers, including ACSA and VDOT
staff.
So, please send me a copy of the full site plan PDF. I will then coordinate with SRC members to confirm that they are fine
with me signing the plans. Once they do so, you can submit the hard copies to me for final approval.
Please let me know if you have any questions.Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCcbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 20213:19 PM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Jim Taggart <JTagaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
Zach Dahl
31
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethanv@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verity it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
32
This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
1T
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
NNA
WATER R SEWEAA TH
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
33
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANoe_NA
WA TER!<SEWERAUTHOARY�
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.nvanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
34
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank you,
35
I& T.ffa
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
www.roudabush.com
jtaggart@roudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
36
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, August 6, 2021 12:26 PM
To: Cameron Langille; Zachary Dahl
Cc: Don Franco; Bethany Velasquez; Alease Shiflett
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Cameron,
Thank you. Alease has the sets printed and is headed your way.
cover sheet (specifically the benchmark elevation was corrected)
thing altered from the pdf you saw last.
Anyway, we are headed your way with the submittal.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille [mailto:blangille@albemarle.org]
Sent: Thursday, August 05, 2021 6:28 PM
To: Zachary Dahl <ZDahl@roudabush.com>
I am told that we fixed a typo in the site data of the
. I apologize and Feel free to compare. That is the only
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>; Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
Good news —the final site plan is now ready to be submitted for final County signature and approval. Please submit four
(4) hard copies of the final site plan to the CDD office. I will sign and approve the plans and one copy will be returned to
you, the rest will be kept for County records.
Once you have dropped them off, please send me an email so I can be sure they are routed to me by my intake
staff. Once I have approved the plans, I will send you a follow-up email letting you know where you can pick up your
approved copy.
Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille0albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
37
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Friday, July 23, 20213:39 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha nv@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hello Cameron,
Please use the link below to access a pdf of the complete Final Site Plan for Belvedere 5A.
https://f i les. roudabush.com:5001/sharing/ishZEoNId
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, July 23, 20212:50 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
This addresses my last remaining comment.
The process we're doing right now is asking applicants to send us a PDF of the complete final site plan set. The lead
planners then email all of the Site Review Committee (SRC) members a copy of the PDF and ask their consent to approve
the plans. The lead planners are signing final site plans on behalf of all the SRC reviewers, including ACSA and VDOT
staff.
So, please send me a copy of the full site plan PDF. I will then coordinate with SRC members to confirm that they are fine
with me signing the plans. Once they do so, you can submit the hard copies to me for final approval.
Please let me know if you have any questions.Thanks,
Cameron Langille
38
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 20213:19 PM
To: Cameron Langille <blaneille@albemarle.ore>
Cc: Jim Taggart <JTasaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTasaart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille Imailto:blaneille@albemarle.orsl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
39
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
2
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WATER 6 SEWERAU
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <1Taggart@roudabush.com>; ]lynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere SA Final Site Plan
Jim,
41
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
WATEII 8 SEW ER AUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.org)
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
42
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTasaart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blaneille@albemarle.ors>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.com
Office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
43
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Thursday, August 5, 2021 6:43 PM
To: Cameron Langille
Cc: Steve Krohn; Zachary Dahl
Subject: Re: Belvedere 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks Cameron,
We will roll in on this right away! As always, I really appreciate the help!
Jim Taggart
Sent from my iPhone, pardon the typos please.
On Aug 5, 2021, at 18:24, Cameron Langille <blangille@albemarle.org> wrote:
Hi Jim,
Everything is good and I am actually about to send an email to your whole team. All comments have
been addressed, no further changes are needed to the cover sheet.
You'll see another email from me in a couple of minutes.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangiIIe@aIbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Thursday, August 5, 2021 10:08 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Zachary Dahl <ZDahl@roudabush.com>
Subject: Belvedere 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Cameron,
I may have missed a communique last week but I think I read that you now had the last of the comments
worked off of the 5A final site plan. I think you needed a correction on the cover sheet and the plan
44
would be approved. I believe we corrected that cover and sent to you that day. County view does not
appear to be operable today and I am wondering if the final letter went out?
Thank You,
tl,,. T,ffa
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
www.roudabush.com
jtaggart@roudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with
any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with
its deletion, so that we can ensure such a mistake does not occur in the future.
45
Cameron Langille
From: Bethany Velasquez < Bethany@roudabush.com >
Sent: Thursday, August 5, 2021 6:29 PM
To: Cameron Langille
Subject: Automatic reply: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I will be out of the office beginning Friday, August 6th and returning Wednesday, August 18th. I will be checking and responding to
emails periodically, but if you need immediate assistance, please contact Brian Jamison at bjamison@roudabush.com
Thanks,
Bethany Velasquez
0
Cameron Langille
From: Cameron Langille
Sent: Thursday, August 5, 2021 6:24 PM
To: Jim Taggart
Cc: Steve Krohn; Zachary Dahl
Subject: RE: Belvedere 5A
Hi Jim,
Everything is good and I am actually about to send an email to your whole team. All comments have been addressed, no
further changes are needed to the cover sheet.
You'll see another email from me in a couple of minutes.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille(cbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Thursday, August 5, 2021 10:08 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>; Zachary Dahl <ZDahl@roudabush.com>
Subject: Belvedere 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I may have missed a communique last week but I think I read that you now had the last of the comments worked off of
the 5A final site plan. I think you needed a correction on the cover sheet and the plan would be approved. I believe we
corrected that cover and sent to you that day. County view does not appear to be operable today and I am wondering if
the final letter went out?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
w .roudabush.com
jtaggart@roudabush.com
office:
999 Second Street SE, Suite 201
Mail:
435 Merchant Walk Square, Suite 300-159
47
Charlottesville, VA 22902 Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
48
Cameron Langille
From: Betty Slough
Sent: Thursday, August 5, 2021 10:55 AM
To: Cameron Langille
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Cameron,
I'm ok with you signing for Inspections.
Regards,
Betty R Slough
Commercial Plan Reviewer/ Deputy Building Official
Albemarle County
https://www.albemarle.orci
bsloughCa)albemarle.org
office 434-296-5832 x3362
cell 434-872-3793
401 McIntire Road, Charlottesville, VA 22902
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, August 5, 2021 10:30 AM
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
For those who have not yet responded, please be aware that I am going to be signing and approving these plans next
Monday.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Cameron Langille
Sent: Monday, July 26, 20215:36 PM
To: Adam Moore <Adam.Moore @vdot.virginia.gov>; Howard Lagomarsino <hlagomarsino@albemarle.org>; Betty
Slough <bslough@albemarle.org>; David James <diames2@albemarle.org>; Richard Nelson
<rnelson@ se rvicea uthoritv.org>
Cc: Brenda Loving <Brenda.Loving@vdot.virginia.gov>
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Hi everyone,
49
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site Review
Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan— Revision 2021-07-26" in Countyview.
Countyview link: https://Ifweb.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
Pla nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
50
Cameron Langille
From: Cameron Langille
Sent: Thursday, August 5, 2021 10:30 AM
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
For those who have not yet responded, please be aware that I am going to be signing and approving these plans next
Monday.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Cameron Langille
Sent: Monday, July 26, 20215:36 PM
To: Adam Moore <Adam.Moore@vdot.virginia.gov>; Howard Lagomarsino <hlagomarsino@albemarle.org>; Betty
Slough <bslough@albemarle.org>; David James <djames2@albemarle.org>; Richard Nelson
<rnelson @serviceauthority.org>
Cc: Brenda Loving <Brenda.Loving@vdot.virginia.gov>
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Hi everyone,
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site Review
Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan— Revision 2021-07-26" in Countyview.
Countyview link: https://Ifweb.albemarle.ore/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
P la nni ne%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
51
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Thursday, August 5, 2021 10:08 AM
To: Cameron Langille
Cc: Steve Krohn; Zachary Dahl
Subject: Belvedere 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I may have missed a communique last week but I think I read that you now had the last of the comments worked off of
the 5A final site plan. I think you needed a correction on the cover sheet and the plan would be approved. I believe we
corrected that cover and sent to you that day. County view does not appear to be operable today and I am wondering if
the final letter went out?
Thank You,
tl,,. T.�
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.eom
jtaggart@roudabwh.com
Office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
52
Cameron Langille
From: David lames
Sent: Monday, August 2, 2021 11:59 AM
To: Cameron Langille
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Hey Cameron, you can sign for me
Thanks,
David
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, July 26, 20215:36 PM
To: Adam Moore <Adam.Moore@vdot.virginia.gov>; Howard Lagomarsino <hlagomarsino@albemarle.org>; Betty
Slough <bslough@albemarle.org>; David James <djames2@albemarle.org>; Richard Nelson
<rnelson @serviceauthority.org>
Cc: Brenda Loving <Brenda.Loving@vdot.virginia.gov>
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Hi everyone,
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site Review
Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan— Revision 2021-07-26" in Countyview.
Countyview link: https://Ifweb.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
Pla nni ng%5d:%5 bAppl icatio n N u m ber%Sd=%22SDP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCcbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
53
Cameron Langille
From: Cameron Langille
Sent: Thursday, July 29, 2021 2:33 PM
To: Moore, Adam
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Thanks Adam!
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Moore, Adam <adam.moore@vdot.virginia.gov>
Sent: Thursday, July 29, 20219:18 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Re: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron, VDOT approved.
We would like an approved copy of the final plan.
On Mon, Jul 26, 2021 at 5:35 PM Cameron Langille <blaneille@albemarle.ore> wrote:
Hi everyone,
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site
Review Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan —Revision 2021-07-26" in Countyview.
54
Countyview link: https:Hlfweb.albemarle.ore/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
Pla n n i ng%5d:%5bAppl ication Num ber%5d=%225DP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle Countv
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road. Charlottesville, VA 22902
Adam J. Moore, P.E. I Assistant Resident Engineer— Land Use
VDOT - Charlottesville Residency
701 VDOT Way I Charlottesville I VA
main 434.422.9782
611
Cameron Langille
From: Moore, Adam <adam.moore@vdot.virginia.gov>
Sent: Thursday, July 29, 2021 9:18 AM
To: Cameron Langille
Subject: Re: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron, VDOT approved.
We would like an approved copy of the final plan.
On Mon, Jul 26, 2021 at 5:35 PM Cameron Langille <blangille@albemarle.org> wrote:
Hi everyone,
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site
Review Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan —Revision 2021-07-26" in Countyview.
Countyview link: https:Hlfweb.albemarle.ore/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCDD-
Pla n n i ng%5d:%5bAppl ication N u m be r%5d=%22SD P202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
56
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road. Charlottesville, VA 22902
Adam J. Moore, P.E. I Assistant Resident Engineer— Land Use
VDOT - Charlottesville Residency
701 VDOT Way I Charlottesville I VA
main 434.422.9782
57
Cameron Langille
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Tuesday, July 27, 2021 8:25 AM
To: Cameron Langille
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
This can be signed on behalf of ACSA.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, July 26, 20215:36 PM
To: Adam Moore <Adam.Moore@vdot.virginia.gov>; Howard Lagomarsino <hlagomarsino@albemarle.org>; Betty
Slough <bslough@albemarle.org>; David James <djames2@albemarle.org>; Richard Nelson
<rnelson @serviceauthority.org>
Cc: Brenda Loving <Brenda.Loving@vdot.virginia.gov>
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
ICAUTION: This email originated from outside the ACSA. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site Review
Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan— Revision 2021-07-26" in Countyview.
Countyview link: https://Ifweb.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCDD-
P la nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
58
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
59
Cameron Langille
From: Cameron Langille
Sent: Monday, July 26, 2021 5:36 PM
To: Adam Moore; Howard Lagomarsino; Betty Slough; David lames; Richard Nelson
Cc: Brenda Loving
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - Signature Set
Hi everyone,
The developer for the Belvedere Phase 5A Final Site Plan has received no objections from all members of the Site Review
Committee. They are now ready to submit hard copies of the final site plan for County signature and approval.
As per our plan signing/approval process under COVID, the lead planner is signing the signature sets on behalf of all SRC
members. The file size is too large to attach as a PDF over email. But I've included a link where you can access the final
plan set through Countyview. The document is titled "SDP202000036 Plan— Revision 2021-07-26" in Countyview.
Countyview link: https://Ifweb.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
Pla nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please take a look and let me know if you consent to me signing the hard copies on your behalf by Monday, August 2,
2021. Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
60
Cameron Langille
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Friday, July 23, 2021 3:39 PM
To: Cameron Langille
Cc: Jim Taggart; Steve Krohn <skrohn@resortscompanies.com>; Don Franco; Bethany
Velasquez
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello Cameron,
Please use the link below to access a pdf of the complete Final Site Plan for Belvedere 5A.
httos://files. roudabush.com:5001/sha ri ng/ishZEoN Id
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, July 23, 20212:50 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>; Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
This addresses my last remaining comment.
The process we're doing right now is asking applicants to send us a PDF of the complete final site plan set. The lead
planners then email all of the Site Review Committee (SRC) members a copy of the PDF and ask their consent to approve
the plans. The lead planners are signing final site plans on behalf of all the SRC reviewers, including ACSA and VDOT
staff.
So, please send me a copy of the full site plan PDF. I will then coordinate with SRC members to confirm that they are fine
with me signing the plans. Once they do so, you can submit the hard copies to me for final approval.
Please let me know if you have any questions.Thanks,
Cameron Langille
61
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 20213:19 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>;Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
62
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
63
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
R�VA"NA
WATER6SEmRAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
64
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
WATEII 8 SEW ER AUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.org)
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
65
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
4. T.ffw
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
66
Cameron Langille
From:
Cameron Langille
Sent:
Friday, July 23, 2021 2:50 PM
To:
Zachary Dahl
Cc:
Jim Taggart; Steve Krohn <skrohn@resortscompanies.com>; Don Franco; Bethany
Velasquez
Subject:
RE: Belvedere 5A Final Site Plan
Hi everyone,
This addresses my last remaining comment.
The process we're doing right now is asking applicants to send us a PDF of the complete final site plan set. The lead
planners then email all of the Site Review Committee (SRC) members a copy of the PDF and ask their consent to approve
the plans. The lead planners are signing final site plans on behalf of all the SRC reviewers, including ACSA and VDOT
staff.
So, please send me a copy of the full site plan PDF. I will then coordinate with SRC members to confirm that they are fine
with me signing the plans. Once they do so, you can submit the hard copies to me for final approval.
Please let me know if you have any questions.Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 20213:19 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
<skrohn@resortscompanies.com>; Don Franco <DFranco@roudabush.com>; Bethany Velasquez
<Betha ny@ rouda bush.com>
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
67
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <1Taggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: RE: Belvedere SA Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethanv@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
68
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA,\
WATER & SEWER AUTH�
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
69
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <1Taggart@roudabush.com>; jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
RIVANNA
WATER & SEWERAU��
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: I mlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
70
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <1Taggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
71
Thank You,
tl,,. T,�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
www.roudabush.com
jtaggart@roudabush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
72
Cameron Langille
From: Zachary Dahl <ZDahl@roudabush.com>
Sent: Wednesday, July 21, 2021 3:19 PM
To: Cameron Langille
Cc: Jim Taggart; Steve Krohn <skrohn@resortscompanies.com>; Don Franco; Bethany
Velasquez
Subject: RE: Belvedere 5A Final Site Plan
Attachments: SDP202000036_Updated Cover.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Per your direction, please find attached an updated Cover Sheet for the Final Site Plan for Adams Phase 5A. Please
confirm that this satisfactorily addresses your comment for Final Approval.
Thank you,
Zach Dahl
Roudabush, Gale & Associates, Inc.
zdahl@roudabush.com
999 Second Street SE, Suite 201
Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 20212:32 PM
To: Zachary Dahl <ZDahl@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
Zach,
We need to get a single note changed on the 5A final Site plan to gain approval. Can you help me get this knocked out
please? See attached.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <1Taeaart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
73
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verity it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
74
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WATER & SEWER AUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <1Taggart@roudabush.com>; ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
75
VA"A<A!EWERAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: mlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
76
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
77
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 2:35 PM
To: Cameron Langille; Steve Krohn; Don Franco; Bethany Velasquez
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Cameron,
Thanks! We are going to make that change right away and get that pdf back to you hopefully by end of the day.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille [mailto:blangille@albemarle.org]
Sent: Wednesday, July 21, 20212:30 PM
To: Jim Taggart <1Taggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
78
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
O5/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
NNA
WATER I SEWERAUA
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
79
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANoe_NA
WA TER!<SEWERAUTHOARY�
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.nvanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
80
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
81
Thank You,
✓,,. %zt
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
www.roudabush.com
jtaggart@roudabush.com
office:
999 Second Street SE, Suite tot
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
82
Cameron Langille
From: Cameron Langille
Sent: Wednesday, July 21, 2021 2:30 PM
To: Jim Taggart; Steve Krohn; Don Franco; Bethany Velasquez
Subject: RE: Belvedere 5A Final Site Plan
Attachments: SDP202000036 4th Review Comment Letter.pdf
Hi everyone,
I understand, just finished my review and the letter. Please see attached.
I have one last comment about a note needing to be updated on the first sheet, see my first comment. That is the last
change that is needed. You can just update the note on the plan and email me a PDF, and I will look at it immediately to
verify it has been addressed.
Let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>; Don Franco
<DFranco@roudabush.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
83
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA _
,�
WATER 8 SEWER AUTHORITY i
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ]lynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
84
To: Jim Taggart <1Taggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
!MANNA
WATEA R SEWEAAUTHORITY�J
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.riyanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blaneille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
85
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille(cbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank you,
✓,,.10.x
Jim Taggart, P.E.
Roudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
86
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:11 PM
To: Cameron Langille; Steve Krohn; Don Franco; Bethany Velasquez
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Cameron,
Sorry to be the PITA here but I'm pushing hard to get this FSP and Final plat approved as quickly as possible. I know
Bethany is working to resolve the comments issued Friday on the Final plat. I am hoping that the RWSA approval below
gets us across the line for the FSP.
Let me know what I can do. As always, thanks for your help here.
JT
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
87
VANA<A!EWERAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere SA Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
WATER 8 SEMRAUTHORm
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
88
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere 5A Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
90
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 12:07 PM
To: Dyon Vega; Scott Schiller; Jeremy Lynn
Cc: Don Franco; Steve Krohn; Cameron Langille; vfort@rivanna.org
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Dyer,
Thanks very much. As always, I appreciate your help here.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Dyon Vega [mailto:dvega@rivanna.org]
Sent: Wednesday, July 21, 2021 12:06 PM
To: Jim Taggart <1Taggart@roudabush.com>; Scott Schiller <sschiller@rivanna.org>; jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
O5/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WATER 6 SEWERAUTHORIT
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
91
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; ]lynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere SA Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
WATER6 SEMRAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: ilynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
92
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.org)
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <1Taggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
93
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.wm
office. Maik
999 Second Street SE, Suite zot 435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902 Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
94
Cameron Langille
From:
Dyon Vega <dvega@rivanna.org>
Sent:
Wednesday, July 21, 2021 12:06 PM
To:
Jim Taggart; Scott Schiller; Jeremy Lynn
Cc:
Don Franco; Steve Krohn; Cameron Langille; vfort@rivanna.org
Subject:
RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Jim,
I sent this response over to Cameron yesterday.
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
O5/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WATER 6 SEWER HORITY 3�
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rrvanna.ore
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:41 AM
To: Scott Schiller <sschiller@rivanna.org>; jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Scott,
Thank you very much. I'll look forward to Dyon's review.
95
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <JTaggart@roudabush.com>; ilynn@serviceauthoritv.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R_YANNA
WATER & SEWBAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.nvanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: mlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaRRart@roudabush.com>
96
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.ors>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank you,
Tyr
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
w .roudabush.com
jtaggart@roudabwh.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
97
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
98
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11Al AM
To: Scott Schiller; Jeremy Lynn
Cc: Don Franco; Steve Krohn; Cameron Langille; vfort@rivanna.org; Dyon Vega
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Scott,
Thank you very much. I'll look forward to Dyon's review.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Scott Schiller [mailto:sschiller@rivanna.org]
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart <1Taggart@roudabush.com>; jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Victoria Fort <vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: RE: Belvedere 5A Final Site Plan
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R�VANNA
WATER I SEWERAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: I mlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
99
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille[mailto:blansille@albemarle.orsl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaeaart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTasaart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blaneille@albemarle.ors>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
100
I know we are to expect your comments on 23JUL but it seems tome that this one might be ready to pushover the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@rourlabush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
101
Cameron Langille
From: Scott Schiller <sschiller@rivanna.org>
Sent: Wednesday, July 21, 2021 11:39 AM
To: Jim Taggart; Jeremy Lynn
Cc: Don Franco; Steve Krohn; Cameron Langille; vfort@rivanna.org; Dyon Vega
Subject: RE: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Jim,
I received your e-mail yesterday and spoke with Dyon Vega who works with Victoria on our development review
process. He was finalizing his review and is intending to respond today. Thanks.
Scott A. Schiller, P.E.
Engineering Manager
R��ANNA
WATER1 SEWERALITHORITT
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 206
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.orQ
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: jlynn@serviceauthority.org
Cc: Don Franco <DFranco@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>; Cameron Langille
<blangille@albemarle.org>; Scott Schiller <sschiller@rivanna.org>; Victoria Fort <vfort@rivanna.org>
Subject: FW: Belvedere SA Final Site Plan
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
102
From: Cameron Langille[mailto:blangille@albemarle.orgl
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <JTaggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank you,
tl,,. Zoa
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
w .roudabush.00m
103
jtaggart@roudabush.com
Office. Maik
999 Second Street SE, Suite 201 435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902 Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
104
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, July 21, 2021 11:20 AM
To: Jeremy Lynn
Cc: Don Franco; Steve Krohn; Cameron Langille; sschiller@rivanna.org; vfort@rivanna.org
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Jeremy,
Hoping you can help. The final site plan for Belvedere 5A is hung up on awaiting a response from RWSA (see
below). This project's sanitary system is connected entirely through an ACSA line so I assume their comment would
involve simply issuing a flow acceptance to you. I have messages to Victoria's email and voicemail both of which
indicate she is out of the office, and I have left voicemails and emails with Scott Schiller at RWSA.
I think this is a pretty easy check -in to resolve but can't get a connection with RWSA established. Can you help?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille [mailto:blangille@albemarle.org]
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <1Taggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
105
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
lx:. T.�
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.coan
jtaggart@roudabush.com
Office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
106
Cameron Langille
From: Dyon Vega <dvega@rivanna.org>
Sent: Tuesday, July 20, 2021 1:23 PIA
To: Cameron Langille
Cc: vfort@rivanna.org; Richard Nelson
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WATER i SEWERAUTHOZ7 �9
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.ore
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, June 11, 20215:59 PM
To: David James <djames2@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Victoria Fort
<vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: Transmittal of 5DP202000036 Belvedere Phase 5A Final Site Plan -4th Submittal
Good evening everyone,
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
107
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ne%5d:%5 bAppl icatio n N u m ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
108
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Tuesday, July 20, 2021 10:50 AM
To: vfort@rivanna.org
Cc: Cameron Langille; Steve Krohn; Bethany Velasquez; Jeremy Lynn
Subject: FW: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Good morning Victoria,
We are working to get a final site plan approved for the Belvedere 5A project. I expect you have already heard from
Cameron about this but I am writing to see if there is anything I can provide to help expedite. We are reaching critical
mass on the construction and need to get the site plan finalized. Is there anything I can help with? I would very much
appreciate your helping to push this one through.
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille [mailto:blangille@albemarle.org]
Sent: Friday, July 16, 20215:57 PM
To: Jim Taggart <1Taggart@roudabush.com>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
109
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
lx:. T.�
Jim Taggart, P.E.
Aoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.coan
jtaggart@roudabush.com
Office:
999 Second Street SE, Suite tot
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
110
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 7:01 PM
To: Cameron Langille
Cc: Steve Krohn
Subject: Re: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I appreciate it very much. Have great weekend.
Jim Taggart
Sent from my Whore, pardon the typos please.
On Jul 16, 2021, at 17:57, Cameron Langille <blangille@albemarle.org> wrote:
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final
confirmation from RWSA that all of their remaining comments have been addressed. I sent them an
email earlier today asking for an update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A
Subdivision Plat is scheduled for your approval and that most other reviewers have responded or have
111
missed their deadline of 16JUN. I also noticed that the Easement Plat has been approved and that
Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to
push over the finish line. A final plat approval would be an enormous help here. The site's
infrastructure construction is well past critical mass and home permits will be needed almost
immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra
work for anyone but do you think it would be possible to advance this approval if it really is ready to be
approved as it appears?
Thank You,
Vl.T.�
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-368o (Direct)
www.roudabush.com
jteggart@mudabush.com
office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with
any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with
its deletion, so that we can ensure such a mistake does not occur in the future.
112
Cameron Langille
From: Cameron Langille
Sent: Friday, July 16, 2021 5:57 PM
To: Jim Taggart
Cc: Steve Krohn
Subject: RE: Belvedere 5A Final Site Plan
Hi Jim,
As you noted, ACSA and Engineering have no objections to the site plan. I am waiting on final confirmation from RWSA
that all of their remaining comments have been addressed. I sent them an email earlier today asking for an
update. Once I hear from them, I will circle back with you.
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere 5A. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank You,
✓,,. %zr
113
Jim Taggart, P.E.
Eoudabush, Gale & Assoc. INC. I
Director of Engineering
office: (434) 260-3680 (Direct)
www.roudabush.com
jtaggart@roudabush.com
Office.
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
114
Cameron Langille
From: Victoria Fort <vfort@rivanna.org>
Sent: Friday, July 16, 2021 4:56 PM
To: Cameron Langille
Subject: Automatic reply: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th
Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I will be out of the office until Tuesday, July 6, 2021 and will respond to messages and emails upon my return. If you need immediate
assistance, please contact Scott Schiller at ext. 206 or sschiller@rivanna.org.
Thank you,
Victoria
Victoria Fort, P.E.
Rivanna Water & Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone (434) 977-2970 ext. 205
Mobile (434) 906-2813
Fax (434) 295-1146
115
Cameron Langille
From: Cameron Langille
Sent: Friday, July 16, 2021 4:56 PM
To: vfort@rivanna.org; Dyon Vega
Subject: FW: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
Attachments: SDP202000036 ACSA Approval 6-15-2021.pdf; SDP202000036 RWSA 3rd Review
Comments.pdf
Hi Victoria & Dyon,
Just checking in on the status of RWSA review for this one. ACSA has granted approval of this site plan (approval email
attached). I haven't heard anything from RWSA since the revised plans were redistributed back on June 111h. RWSA had
some comments on the previous review (also attached) that were required prior to final site plan approval.
Can you let me know if all RWSA comments have been addressed? Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleC@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Tuesday, June 15, 2021 10:25 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I recommend SDP202000036 Belvedere Phase 5A Final Site Plan For approval.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, June 11, 20215:59 PM
116
To: David James <diames2@albemarle.org>; Richard Nelson <rnelson@serviceauthoritv.org>; vfort(c@rivanna.ore; Dyon
Vega <DVega@rivanna.org>
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan -4th Submittal
ICAUTION: This email originated from outside the ACSA. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
117
Cameron Langille
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, July 16, 2021 10:38 AM
To: Cameron Langille
Cc: Steve Krohn
Subject: Belvedere 5A Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I am writing to check in on the Final Site Plan for Belvedere SA. I saw on County View that the Final 5A Subdivision Plat is
scheduled for your approval and that most other reviewers have responded or have missed their deadline of 16JUN. I
also noticed that the Easement Plat has been approved and that Engineering has offered "No Objections" on the FSP.
I know we are to expect your comments on 23JUL but it seems to me that this one might be ready to push over the
finish line. A final plat approval would be an enormous help here. The site's infrastructure construction is well past
critical mass and home permits will be needed almost immediately.
So at the risk of restating the obvious, this final plat is a critical step for us. I don't want to create extra work for anyone
but do you think it would be possible to advance this approval if it really is ready to be approved as it appears?
Thank you,
Jim Taggart, P.E.
Aoudabusb, Gale & Assoc. INC. I
Director of Engineering
office: (434) 26o-368o (Direct)
www.roudabush.com
jtaggart@roudabwh.wm
Office:
999 Second Street SE, Suite 201
Charlottesville, VA 22902
Mail:
435 Merchant Walk Square, Suite 300-159
Charlottesville, VA 22902
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with any third party, without
a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a
mistake does not occur in the future.
118
Cameron Langille
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Tuesday, June 15, 2021 10:25 AM
To: Cameron Langille
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I recommend SDP202000036 Belvedere Phase 5A Final Site Plan For approval.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, June 11, 20215:59 PM
To: David James <djames2@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; vfort@rivanna.org; Dyon
Vega <DVega@rivanna.org>
Subject: Transmittal of 5DP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
ICAUTION: This email originated from outside the ACSA. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ne%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
119
blangiIle@aIbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
120
Cameron Langille
From: Cameron Langille
Sent: Friday, June 11, 2021 5:59 PM
To: David James; Richard Nelson; vfort@rivanna.org; Dyon Vega
Subject: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
Attachments: SDP202000036 APplicant Comment Response Letter.pdf, SDP202000036 Applicant
Request Letter to RWSA.pdf, SDP202000036 Plan - Revision 2021-05-26.pdf
Good evening everyone,
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.ore/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
Pla nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
121
Cameron Langille
From: Jennifer Smith
Sent: Wednesday, June 2, 2021 8:08 AM
To: Cameron Langille
Subject: RE: Re -Submission from COD Portal - Transaction #00016627
Good morning Cameron:
There seems to be an issued with the uploads right now. I have sent IT a help desk ticket to look into it.
Thanks
Jen Smith
Intake Support Specialist ll
Albemarle County — Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(d albemarle. org
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.al bema rle.org/gove rnment/comm u n ity-development/request/a ppl ication-tracking-status-update
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, June 1, 20215:02 PM
To: Jennifer Smith <jsmith2@albemarle.org>
Subject: RE: Re -Submission from CDD Portal -Transaction #00016627
Hi Jen,
I just noticed that it doesn't appear that these revised materials are in CV under SDP202000036. The most recent files
under SDP202000036 are dated back in October of 2020. Can you see if these got stuck when being uploaded to CV?
Cameron Langille
(pronounced "LAN-JILL")
Senior Planner 11
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jennifer Smith <Ismith2@albemarle.org>
Sent: Friday, May 28, 202111:18 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Re -Submission from CDD Portal -Transaction #00016627
122
Good morning Cameron:
I have uploaded the documents to County View.
Thanks
Jen Smith
Intake Support Specialist ll
Albemarle County — Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(cb albemarle. oro
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.a I bema rle.org/gove rnment/comm u n ity-developme nt/reg uest/a ppl ication-tracki ng-status-update
From: Laserfiche-Notification@albemarle.org <Laserfiche-Notification@albemarle.org>
Sent: Wednesday, May 26, 20214:32 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: CDD Submittal <CDDSubmittal@albemarle.org>
Subject: Re -Submission from CDD Portal -Transaction #00016627
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 434-977-0205
Files Submitted: 060502CapacityCertificationBelvederePhase5Part1101620.pdf, Application SDP202000036_Belvedere Ph 5A
Final Site Plan.pdf, Belvedere Phase 5A_SDP202000036_Final Site Plan sheets 1-2 Lpdf, Checklist_ SPD202000036_Belvedere
Phase 5A Final Site Plan.pdf, Comment response letter _SPD202000036_Belvedere Ph 5A Final Site Plan.pdf,
Transmittal_ SDP202000036_Belvedere Phase 5A Final Site Plan.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand=I[CDD-
WebSubmissionsl:[ReceiptNumberl="00016627"}
123
Cameron Langille
From:
Jennifer Smith
Sent:
Wednesday, June 2, 2021 7:03 AM
To:
Paul Bjornsen
Cc:
Cameron Langille
Subject:
FW: Re -Submission from COD Portal - Transaction #00016627
Good morning Paul:
Could you check to see if the documents are stuck in the background? Please and thank you.
Jen Smith
Intake Support Specialist ll
Albemarle County — Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2@a1bemar1e. oro
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.a I bema rle.org/gove rnment/comm u n ity-developme nt/rea uest/a ppl ication-tracking-status-update
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, June 1, 20215:02 PM
To: Jennifer Smith <jsmith2@albemarle.org>
Subject: RE: Re -Submission from CDD Portal -Transaction #00016627
Hi Jen,
I just noticed that it doesn't appear that these revised materials are in CV under SDP202000036. The most recent files
under SDP202000036 are dated back in October of 2020. Can you see if these got stuck when being uploaded to CV?
Cameron Langille
(pronounced "LAN-JILL")
Senior Planner 11
Albemarle County
blangilleCcbalbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jennifer Smith <Ismith2@albemarle.org>
Sent: Friday, May 28, 202111:18 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Re -Submission from CDD Portal - Transaction #00016627
124
Good morning Cameron:
I have uploaded the documents to County View.
Thanks
Jen Smith
Intake Support Specialist ll
Albemarle County— Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(Dalbemarle. org
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.a I bema rle.org/gove rnment/comm u n ity-developme nt/rea uest/a ppl ication-tracking-status-update
From: Laserfiche-Notification@albemarle.org <Laserfiche-Notification@albemarle.org>
Sent: Wednesday, May 26, 20214:32 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: CDD Submittal <CDDSubmittal@albemarle.org>
Subject: Re -Submission from CDD Portal -Transaction #00016627
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 434-977-0205
Files Submitted: 060502CapacityCertificationBelvederePhase5Part1101620.pdf, Application SDP202000036_Belvedere Ph 5A
Final Site Plan.pdf, Belvedere Phase 5A_SDP202000036_Final Site Plan sheets 1-2 Lpdf, Checklist_ SPD202000036_Belvedere
Phase 5A Final Site Plan.pdf, Comment response letter _SPD202000036_Belvedere Ph 5A Final Site Plan.pdf,
Transmittal_ SDP202000036_Belvedere Phase 5A Final Site Plan.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand=I[CDD-
WebSubmissionsl:f ReceiptNumberl="00016627"}
125
Cameron Langille
From: Cameron Langille
Sent: Tuesday, June 1, 2021 5:02 PM
To: Jennifer Smith
Subject: RE: Re -Submission from COD Portal - Transaction #00016627
Hi Jen,
I just noticed that it doesn't appear that these revised materials are in CV under SDP202000036. The most recent files
under SDP202000036 are dated back in October of 2020. Can you see if these got stuck when being uploaded to CV?
Cameron Langille
(pronounced "LAN-JILL")
Senior Planner 11
Albemarle County
blangille(c@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Jennifer Smith <jsmith2@albemarle.org>
Sent: Friday, May 28, 2021 11:18 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Re -Submission from CDD Portal - Transaction #00016627
Good morning Cameron:
I have uploaded the documents to County View.
Thanks
Jen Smith
Intake Support Specialist ll
Albemarle County — Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(cb albemarle. oro
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.albemarle.org/government/community-development/request/a ppl ication-tracking-status-update
From: Laserfiche-Notification@albemarle.org <Laserfiche-Notification@albemarle.org>
Sent: Wednesday, May 26, 20214:32 PM
To: Cameron Langille <blangille@albemarle.org>
126
Cc: CDD Submittal <CDDSubmittal@albemarle.ore>
Subject: Re -Submission from CDD Portal -Transaction #00016627
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone:434-977-0205
Files Submitted: 060502CapacityCertificationBelvederePhase5Part1101620.pdf, Application SDP202000036_Belvedere Ph 5A
Final Site Plan.pdf, Belvedere Phase 5A_SDP202000036_Final Site Plan_sheetsl-21.pdf, Checklist_ SPD202000036_Belvedere
Phase 5A Final Site Plan.pdf, Comment response letter _SPD202000036_Belvedere Ph 5A Final Site Plan.pdf,
Transmittal _SDP202000036_Belvedere Phase 5A Final Site Plan.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand=I[CDD-
WebSubmissionsl:[ReceiptNumberl="00016627"}
127
Cameron Langille
From: Jennifer Smith
Sent: Friday, May 28, 2021 11:18 AM
To: Cameron Langille
Subject: FW: Re -Submission from CDD Portal - Transaction #00016627
Good morning Cameron:
I have uploaded the documents to County View.
Thanks
Jen Smith
Intake Support Specialist ll
Albemarle County — Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(d albemarle. org
Please Note: We are unable to give timeframes of a permit review. Please track the status of your permit by using
the link below.
Permit Status and Inspection Status Tracking
You can track the status of your permit and scheduled inspections by using the permit number and the following link.
https://www.al bema rle.org/gove rnment/comm u n ity-development/request/a ppl ication-tracking-status-update
From: Laserfiche-Notification@albemarle.org <Laserfiche-Notification@albemarle.org>
Sent: Wednesday, May 26, 20214:32 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: CDD Submittal <CDDSubmittal@albemarle.org>
Subject: Re -Submission from CDD Portal -Transaction #00016627
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 434-977-0205
Files Submitted: 060502CapacityCertificationBelvederePhase5Part1101620.pdf, Application SDP202000036_Belvedere Ph 5A
Final Site Plan.pdf, Belvedere Phase 5A_SDP202000036_Final Site Plan _sheets 1-2Lpdf, Checklist_ SPD202000036_Belvedere
Phase 5A Final Site Plan.pdf, Comment response letter _SPD202000036_Belvedere Ph 5A Final Site Plan.pdf,
Transmittal_ SDP202000036_Belvedere Phase 5A Final Site Plan.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand=I[CDD-
W ebSubm issionsl:lRecei ptNu m be rl="00016627"}
128
Cameron Langille
From: Laserfiche-Notification@albemarle.org
Sent: Wednesday, May 26, 2021 4:32 PM
To: Cameron Langille
Cc: CDD Submittal
Subject: Re -Submission from CDD Portal - Transaction #00016627
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 434-977-0205
Files Submitted: 060502CapacityCertificationBelvederePhase5Part1 101 620.pdf,
Application_SDP202000036_Belvedere Ph 5A Final Site Plan.pdf, Belvedere Phase 5A_SDP202000036_Final Site
Plan_sheets1-21.pdf, Checklist_SPD202000036_Belvedere Phase 5A Final Site Plan.pdf, Comment response
letter_SPD202000036_Belvedere Ph 5A Final Site Plan.pdf, Transmittal_SDP202000036_Belvedere Phase
5A—Final Site Plan.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand={[CDD-
WebSu bm issions]: [ReceiptN u m ber]="00016627"]
129
Cameron Langille
From: Cameron Langille
Sent: Wednesday, March 24, 2021 11:11 AM
To: Elise Kiewra
Subject: RE: Belvedere Phase 5A addresses
Yes, this one is final enough o do pre -addressing.
Cameron Langille
(pronounced "LAN-JILL")
Senior Planner 11
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Elise Kiewra <ekiewra@albemarle.org>
Sent: Wednesday, March 24, 20217:58 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Belvedere Phase 5A addresses
Cameron,
I think you were the planner on this one. We would not normally do pre -addressing until the final is signed. I see
SDP202000036 in CV where Brian had no objections. Do you know if this one is final enough for me to do pre -
addressing?
Elise Kiewra, GISP
GIS Analyst Community Development
Albemarle County
eki ewra C@al bemarl e.org
once 434-296-5832 x 3030
401 McIntire Road, Charlottesville, VA 22902
From: Brian Becker <bbecker@albemarle.org>
Sent: Tuesday, March 23, 20214:45 PM
To: Elise Kiewra <ekiewra@albemarle.ore>
Subject: FW: Belvedere Phase 5A addresses
Elise,
With the new duties, do you want me to pass this on to you, or would you like me to do it?
Regards,
Brian
Brian Becker
GIS Specialist, Community Development
Albemarle County
130
Office of Geographic Data Services
GIS Web
bbecker(o)albemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
From: Carrie Kimbrough<ckimbrough@resortscompanies.com>
Sent: Monday, March 22, 2021 10:37 AM
To: Brian Becker <bbecker@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere Phase 5A addresses
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Brian -
Is it possible to have addresses assigned to the lots shown on the attachment?
This Subdivision Plat has been submitted to the County but hasn't received its final approval yet - they had
to review the Easement Plat first, which they now have. Normally, they assign street addresses after the plat
has been approved, but in this case, Dominion needs them now. The lot layout is final, and the County has
approved the related Site Plan, if that's of any help.
There are 14 Townhomes that front Fowler Street, and there are 5 single family detached homes plus 24
Townhomes that front Fowler Circle.
Carrie K. Kimbrough
Executive Assistant
New Belvedere, Inc.
PO Box 7505
Charlottesville, VA 22906
Office: (434) 220 -7722
arb@belvedereneiahborhood.com
r
BE L EDERE
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is forthe sole use of the intended
recipient(s) and may contain confidential and/or privileged information and/or may otherwise be protected by law. Any
unauthorized review, use, disclosure or distribution is prohibited. If you believe you are not the intended recipient,
please notify the sender by reply e-mail and permanently delete and/or destroy all copies of the original message and
any attachment thereto.
131
Cameron Langille
From:
Elise Kiewra
Sent:
Wednesday, March 24, 2021 7:58 AM
To:
Cameron Langille
Subject:
FW: Belvedere Phase 5A addresses
Attachments:
PHASE 5A-SUBD-20200821.pdf
Cameron,
I think you were the planner on this one. We would not normally do pre -addressing until the final is signed. I see
SDP202000036 in CV where Brian had no objections. Do you know if this one is final enough for me to do pre -
addressing?
Elise Kiewra, GISP
GIS Analyst Community Development
Albemarle Countv
eki ewra Ca@al bemarl e.org
office 434-296-5832 x 3030
401 McIntire Road, Charlottesville, VA 22902
From: Brian Becker <bbecker@albemarle.org>
Sent: Tuesday, March 23, 20214:45 PM
To: Elise Kiewra <ekiewra@albemarle.org>
Subject: FW: Belvedere Phase 5A addresses
Elise,
With the new duties, do you want me to pass this on to you, or would you like me to do it?
Regards,
Brian
Brian Becker
GIS Specialist, Community Development
Albemarle Countv
Office of Geoaraphic Data Services
GIS Web
bbecker(o)albemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
From: Carrie Kimbrough<ckimbrough@resortscompanies.com>
Sent: Monday, March 22, 2021 10:37 AM
To: Brian Becker <bbecker@albemarle.org>
Cc: Steve Krohn <skrohn@resortscompanies.com>
Subject: Belvedere Phase 5A addresses
132
This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Brian -
Is it possible to have addresses assigned to the lots shown on the attachment?
This Subdivision Plat has been submitted to the County but hasn't received its final approval yet - they had
to review the Easement Plat first, which they now have. Normally, they assign street addresses after the plat
has been approved, but in this case, Dominion needs them now. The lot layout is final, and the County has
approved the related Site Plan, if that's of any help.
There are 14 Townhomes that front Fowler Street, and there are 5 single family detached homes plus 24
Townhomes that front Fowler Circle.
Carrie K. Kimbrough
Executive Assistant
New Belvedere, Inc.
PO Box 7505
Charlottesville, VA 22906
Office: (434) 220 -7722
a rb6D be Ivedereneieh borhood.com
"LW
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended
recipient(s) and may contain confidential and/or privileged information and/or may otherwise be protected by law. Any
unauthorized review, use, disclosure or distribution is prohibited. If you believe you are not the intended recipient,
please notify the sender by reply e-mail and permanently delete and/or destroy all copies of the original message and
any attachment thereto.
133
Cameron Langille
From: Steve's imac <ssassonl@rochester.rr.com>
Sent: Wednesday, March 17, 2021 10:58 AM
To: Cameron Langille
Subject: Re: Sub202100033 Belvedere Phase 513-Preliminary Plat- Digital
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron, Thanks for sending the link to the plans for phase 5A. Now I can make sense out of what I am seeing unfold
out my back window!
Steve
> On Mar 16, 2021, at 5:57 PM, Cameron Langille <blangille@albemarle.org> wrote:
> Absolutely. Here is a link to the Phase 5A plans that are under review:
https:Hlfweb.a I bemarle.org/webl i n k/search.aspx?d bid=3&sea rchcomma nd=%7b%5 bCDD-
Planning%5d:%5 bAppl ication N um ber%5d=%22SDP202000036%22%7d
> The applicant has revised the plans a couple of times. The file you will want to click is titled "SDP202000036 Plan -
Revision Final Site Plan and Comps. 2020-09-03." That is the most recent set of drawings.
> Cameron Langille
> (pronounced "LAN-JILL")
> Senior Planner II
> Albemarle County
> blangille@albemarle.org
> 434-296-5832 x3432
> 401 McIntire Road, Charlottesville, VA 22902
> -----Original Message-----
* From: Steve's imac <ssassonl@rochester.rr.com>
> Sent: Tuesday, March 16, 20215:39 PM
> To: Cameron Langille <blangille@albemarle.org>
> Subject: Re: Sub202100033 Belvedere Phase 56-Preliminary Plat- Digital
> CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
> Hi Cameron,
> Thanks for sending the links to Belvedere Block B. Do you have a more detailed plan for Belvedere Phase A that is
under construction at the present time ( Greyed out section adjacent to the Block B diagram you sent) . Just interested
to see what the design is for this area that is directly behind my home ( lot 201).
> Thanks
> Steve Sasso
> 1248 Farrow Drive
> 585 752 4140
134
>> On Mar 16, 2021, at 3:59 PM, Cameron Langille <blangille@albemarle.org> wrote:
>> Good afternoon Steven,
>> Here is a link to the plans that are currently under review:
https:Hlfweb.a I bemarle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcomma nd=%7b%5 bCDD-
Planni ng%5d:%5 bAppl ication N um ber%5d=%22SU B202100033%22%7d
>> Please allow a full 1-2 minutes for the page to load in your web browser once you click the link. Please let me know if
you have any questions.
>> Thanks,
>> Cameron
>> Cameron Langille
>> (pronounced "LAN-JILL")
>> Senior Planner II
>> Albemarle County
>> blangille@albemarle.org
>> 434-296-5832 x3432
>> 401 McIntire Road, Charlottesville, VA 22902
>> ----- Original Message -----
>> From: Steve's imac <ssassonl@rochester.rr.com>
>> Sent: Tuesday, March 16, 2021 11:24 AM
>> To: Cameron Langille <blangille@albemarle.org>
>> Subject: Sub202100033 Belvedere Phase 56-Preliminary Plat- Digital
>> CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
>> Hi Cameron
>> As per the march 3 letter from the County of Albemarle community development department about the preliminary
plat for Belevedere Block 5B. Could you send me the online link to the plans available for review for this project?
Thanks
>> Steven Sasson
>> 1248 Farrow Drive
>> 585 752 4140
135
Cameron Langille
From: Cameron Langille
Sent: Tuesday, March 16, 2021 5:58 PM
To: Steve's imac
Subject: RE: Sub202100033 Belvedere Phase 513-Preliminary Plat- Digital
Absolutely. Here is a link to the Phase 5A plans that are under review:
https://Ifwe b.a I bemarle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcomma nd=%7b%5 bCDD-
Planni ng%5d:%5 bAppl ication N um ber%5d=%22SDP202000036%22%7d
The applicant has revised the plans a couple of times. The file you will want to click is titled "SDP202000036 Plan -
Revision Final Site Plan and Comps. 2020-09-03." That is the most recent set of drawings.
Cameron Langille
(pronounced "LAN-JILL")
Senior Planner II
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
-----Original Message -----
From: Steve's imac <ssassonl@rochester.rr.com>
Sent: Tuesday, March 16, 2021 5:39 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Re: Sub202100033 Belvedere Phase 56-Preliminary Plat- Digital
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Thanks for sending the links to Belvedere Block B. Do you have a more detailed plan for Belvedere Phase A that is under
construction at the present time ( Greyed out section adjacent to the Block B diagram you sent) . Just interested to see
what the design is for this area that is directly behind my home ( lot 201).
Thanks
Steve Sasson
1248 Farrow Drive
585 752 4140
> On Mar 16, 2021, at 3:59 PM, Cameron Langille <blangille@albemarle.org> wrote:
> Good afternoon Steven,
> Here is a link to the plans that are currently under review:
https://Ifweb.al bema rle.org/webl i n k/sea rch.aspx?d bid=3&searchcomma nd=%7b%SbCDD-
Pla n n i ng%5d:%5 bAppl ication N um ber%5d=%22SU B202100033%22%7d
136
> Please allow a full 1-2 minutes for the page to load in your web browser once you click the link. Please let me know if
you have any questions.
> Thanks,
> Cameron
> Cameron Langille
> (pronounced "LAN-JILL")
> Senior Planner II
> Albemarle County
> blangille@albemarle.org
> 434-296-5832 x3432
> 401 McIntire Road, Charlottesville, VA 22902
> -----Original Message -----
> From: Steve's imac <ssassonl@rochester.rr.com>
> Sent: Tuesday, March 16, 2021 11:24 AM
> To: Cameron Langille <blangille@albemarle.org>
> Subject: Sub202100033 Belvedere Phase 56-Preliminary Plat- Digital
> CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
> Hi Cameron
> As per the march 3 letter from the County of Albemarle community development department about the preliminary
plat for Belevedere Block 5B. Could you send me the online link to the plans available for review for this project?
Thanks
> Steven Sasson
> 1248 Farrow Drive
> 585 752 4140
137
Cameron Langille
From: Steve's imac <ssassonl@rochester.rr.com>
Sent: Tuesday, March 16, 2021 5:39 PM
To: Cameron Langille
Subject: Re: Sub202100033 Belvedere Phase 513-Preliminary Plat- Digital
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
Thanks for sending the links to Belvedere Block B. Do you have a more detailed plan for Belvedere Phase A that is under
construction at the present time ( Greyed out section adjacent to the Block B diagram you sent) . Just interested to see
what the design is for this area that is directly behind my home ( lot 201).
Thanks
Steve Sasson
1248 Farrow Drive
585 752 4140
> On Mar 16, 2021, at 3:59 PM, Cameron Langille <blangille@albemarle.org> wrote:
> Good afternoon Steven,
> Here is a link to the plans that are currently under review:
https://Ifweb.albema rle.org/weblink/sea rch.aspx?dbid=3&sea rchcomma nd=%7b%5 bCDD-
Pla n n i ng%5d:%SbAppl ication Nu m ber%5d=%22SU B202100033%22%7d
> Please allow a full 1-2 minutes for the page to load in your web browser once you click the link. Please let me know if
you have any questions.
> Thanks,
> Cameron
> Cameron Langille
> (pronounced "LAN-JILL")
> Senior Planner II
> Albemarle County
> blangille@albemarle.org
> 434-296-5832 x3432
> 401 McIntire Road, Charlottesville, VA 22902
> ----- Original Message-----
* From: Steve's imac <ssassonl@rochester.rr.com>
> Sent: Tuesday, March 16, 2021 11:24 AM
> To: Cameron Langille <blangille@albemarle.org>
> Subject: Sub202100033 Belvedere Phase 56-Preliminary Plat- Digital
> CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
138
> Hi Cameron
> As perthe march 3 letter from the County of Albemarle community development department about the preliminary
plat for Belevedere Block 5B. Could you send me the online link to the plans available for review for this project?
Thanks
> Steven Sasson
> 1248 Farrow Drive
> 585 752 4140
139
Cameron Langille
From: Brian Becker
Sent: Thursday, October 15, 2020 2:29 PM
To: Cameron Langille
Subject: RE: Belvedere Phase 5A status?
Ok, I will let her know and be on the look out for the final site plan. Thanks!
Brian Becker
GIS Specialist, Community Development
Albemarle Countv
Office of Geographic Data Services
GIS Web
bbeckerCcaalbemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, October 15, 2020 2:27 PM
To: Brian Becker <bbecker@albemarle.org>
Subject: RE: Belvedere Phase 5A status?
Yeah the developer's consultants from Roudabush Gale & Associates (the engineers and surveyors doing the site plan,
road plans, and plats) have been calling me and Engineering and saying the same thing. The road plans and final site
plan are still under review and have not yet been approved yet.
I sent the engineer doing the site plan my comments yesterday afternoon, so they should know that there are still
revisions needed.
From: Brian Becker <bbecker@albemarle.org>
Sent: Thursday, October 15, 2020 1:38 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere Phase 5A status?
Hi Cameron,
I have received a request from a Belvedere employee asking for preaddressing for Phase 5A to provide to a utility. CV
shows this plan is till under review? She seems to think the plan has been approved...
Regards,
Brian
Brian Becker
GIS Specialist, Community Development
Albemarle Countv
Office of Geoaraphic Data Services
GIS Web
140
bbeckerCoDalbemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
141
Cameron Langille
From: Cameron Langille
Sent: Thursday, October 15, 2020 2:27 PM
To: Brian Becker
Subject: RE: Belvedere Phase 5A status?
Yeah the developer's consultants from Roudabush Gale & Associates (the engineers and surveyors doing the site plan,
road plans, and plats) have been calling me and Engineering and saying the same thing. The road plans and final site
plan are still under review and have not yet been approved yet.
I sent the engineer doing the site plan my comments yesterday afternoon, so they should know that there are still
revisions needed.
From: Brian Becker <bbecker@albemarle.org>
Sent: Thursday, October 15, 2020 1:38 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere Phase 5A status?
Hi Cameron,
I have received a request from a Belvedere employee asking for preaddressing for Phase 5A to provide to a utility. CV
shows this plan is till under review? She seems to think the plan has been approved...
Regards,
Brian
Brian Becker
GIS Specialist, Community Development
Albemarle County
Office of Geoaraohic Data Services
GIS Web
bbeckerCc@albemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
142
Cameron Langille
From:
Brian Becker
Sent:
Thursday, October 15, 2020 1:38 PM
To:
Cameron Langille
Subject:
Belvedere Phase 5A status?
Hi Cameron,
I have received a request from a Belvedere employee asking for preaddressing for Phase 5A to provide to a utility. CV
shows this plan is till under review? She seems to think the plan has been approved...
Regards,
Brian
Brian Becker
GIS Specialist, Community Development
Albemarle County
Office of Geooraohic Data Services
GIS Web
bbeckerCo)aI bemarle.org
office 434-296-5832 x3031
401 McIntire Road, Charlottesville, VA 22902
143
Cameron Langille
From: Cameron Langille
Sent: Wednesday, October 14, 2020 5:07 PM
To: Riki Van-Niekerk
Cc: Steve Krohn (skrohn@resortscompanies.com); Jim Taggart
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Attachments: SDP202000036 3rd Review Comment Letter.pdf
Hi Riki,
Attached are the 3rd review comments for the final site plan (SDP202000036). I have not received any comments
directly from ACSA for the most recent submittal. I transmitted a copy of the revised plans to them on September 3rd
but I haven't received comments yet.
There's still some comments from Planning, Engineering, and RWSA that need to be addressed. Please let me know if
you have any questions. Thanks,
Cameron
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Wednesday, October 14, 2020 10:40 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Steve Krohn (skrohn@resortscompanies.com) <skrohn@resortscompanies.com>; Jim Taggart
<JTaggart@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I am checking -in regarding the Final Site Plan comments? I asked David to withdraw his tree comment and have not
heard back. Jeremy Lynn, ACSA, has one outstanding comment related to Phase 2B needing to be dedicated, which has
happened since I last spoke to him. Are there any outstanding comments that I am forgetting?
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: Cameron Langille <blaneilleC@albemarle.ore>
Sent: Wednesday, September 30, 2020 5:57 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Riki,
I plan to have my comments to you by tomorrow. I apologize for the delay. I've been waiting on the other reviewers in
order to finish up the letter.
144
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Tuesday, September 22, 2020 3:26 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I am checking in on the status of Final Site Plan comments for Phase 5A. Trying to get an idea of everyone's schedule so
that we can keep the developer, and his construction schedule, updated as much as possible.
Thank you,
Riki
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, September 3, 2020 6:43 PM
To: Bethany Velasquez <Bethany@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Bethany,
If the site plan was ready for signatures/approval from the County, you could defer. However, the site plan was just re-
submitted today for review with Planning, Engineering, ACSA, and RWSA. Since approvals from all reviewers have not
yet been received, we can't review the plat because there may be further revisions needed with the site
plan. Therefore, you will need to withdraw the application unless you want to go with option #1.
The staff member you should contact to initiate the refund is Jennifer Pritchett and her email is
0pritchett@albemarle.org. Please CC me when you email her, and I will take care of withdrawing the plat through our
County View system.
Please let me know if you have any questions. Thanks,
Cameron
From: Bethany Velasquez <Bethany@roudabush.com>
Sent: Monday, August 31, 202011:30 AM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
145
Hope you had a great weekend! Can we defer the application until the Final Site Plan is approved? It looks like
hopefully that's not too far out. If that's not a possibility, let me know and we will just withdraw it until the FSP is
approved.
Thanks,
Bethany Velasquez
Roudabush, Gale & Associates
434-977-0205
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, August 28, 2020 3:24 PM
To: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Good afternoon Steve & Bethany,
A final subdivision plat application for Belvedere Phase 5A was submitted to the County this week. The application type
selected was "Subdivision following final site plan approval."
The final site plan for Belvedere Phase 5A, SDP202000036, is still under review and not yet approved. A final plat for
Phase 5A cannot be submitted for review as the application type that was selected.
There are two options:
• A final plat for Phase 5A can be reviewed, but a different application must be filled out and submitted. Since the
final site plan is not approved, any final plats that you wish to have reviewed will need to go through the site
review committee (SRC) process as a combined preliminary/final subdivision plat. The plat type would be a
standard final plat, but the fees for both a preliminary plat and final plat must be paid. You paid $742.00 +
$75.00 for the application, but the applicable fees are $1,236.00 + $75.00 (preliminary plat application fee) +
$1,322.00 + $75.00 (final plat application fee) for a total of $2,708.00. You can submit the fee difference of
$1,891.00 and a new application and revised plat under the current application number, and it will be reviewed
by the SRC.
o Please be aware that this subdivision type requires additional information on the actual plat in
accordance with the Subdivision Ordinance. The current plat would need to be revised so that all
applicable Ordinance requirements are met.
• Withdraw SUB202000159 and get a refund of your $817.00 payment. You can then wait until the final site plan
for Phase 5A is approved, and submit a new application for approval of a final plat following final site plan
approval.
It is entirely up to you for which option you choose. The second option is cheaper and requires less information on the
plat, which may be an easier route to pursue.
If you want to proceed with option 1, review of the plat will not begin until the fee difference is paid, and a revised plat
addressing all applicable Ordinance sections is submitted.
Please let me know as soon as possible which option you would like to take with this project. Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
146
blaneille@albemarle.org
(434) 296-5832 ext. 3432
147
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Wednesday, October 14, 2020 10:40 AM
To: Cameron Langille
Cc: Steve Krohn (skrohn@resortscompanies.com); Jim Taggart
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I am checking -in regarding the Final Site Plan comments? I asked David to withdraw his tree comment and have not
heard back. Jeremy Lynn, ACSA, has one outstanding comment related to Phase 2B needing to be dedicated, which has
happened since I last spoke to him. Are there any outstanding comments that I am forgetting?
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, September 30, 2020 5:57 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Riki,
I plan to have my comments to you by tomorrow. I apologize for the delay. I've been waiting on the other reviewers in
order to finish up the letter.
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, September 22, 2020 3:26 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I am checking in on the status of Final Site Plan comments for Phase 5A. Trying to get an idea of everyone's schedule so
that we can keep the developer, and his construction schedule, updated as much as possible.
Thank you,
Riki
148
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, September 3, 2020 6:43 PM
To: Bethany Velasquez <Bethanv@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Bethany,
If the site plan was ready for signatures/approval from the County, you could defer. However, the site plan was just re-
submitted today for review with Planning, Engineering, ACSA, and RWSA. Since approvals from all reviewers have not
yet been received, we can't review the plat because there may be further revisions needed with the site
plan. Therefore, you will need to withdraw the application unless you want to go with option #1.
The staff member you should contact to initiate the refund is Jennifer Pritchett and her email is
0pritchett@albemarle.org. Please CC me when you email her, and I will take care of withdrawing the plat through our
County View system.
Please let me know if you have any questions. Thanks,
Cameron
From: Bethany Velasquez <Bethany@roudabush.com>
Sent: Monday, August 31, 202011:30 AM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
Hope you had a great weekend! Can we defer the application until the Final Site Plan is approved? It looks like
hopefully that's not too far out. If that's not a possibility, let me know and we will just withdraw it until the FSP is
approved.
Thanks,
Bethany Velasquez
Roudabush, Gale & Associates
434-977-0205
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, August 28, 2020 3:24 PM
To: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethanv@roudabush.com>
Subject: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Good afternoon Steve & Bethany,
A final subdivision plat application for Belvedere Phase 5A was submitted to the County this week. The application type
selected was "Subdivision following final site plan approval."
149
The final site plan for Belvedere Phase 5A, SDP202000036, is still under review and not yet approved. A final plat for
Phase 5A cannot be submitted for review as the application type that was selected.
There are two options:
• A final plat for Phase 5A can be reviewed, but a different application must be filled out and submitted. Since the
final site plan is not approved, any final plats that you wish to have reviewed will need to go through the site
review committee (SRC) process as a combined preliminary/final subdivision plat. The plat type would be a
standard final plat, but the fees for both a preliminary plat and final plat must be paid. You paid $742.00+
$75.00 for the application, but the applicable fees are $1,236.00 + $75.00 (preliminary plat application fee) +
$1,322.00 + $75.00 (final plat application fee) for a total of $2,708.00. You can submit the fee difference of
$1,891.00 and a new application and revised plat under the current application number, and it will be reviewed
by the SRC.
o Please be aware that this subdivision type requires additional information on the actual plat in
accordance with the Subdivision Ordinance. The current plat would need to be revised so that all
applicable Ordinance requirements are met.
• Withdraw SUB202000159 and get a refund of your $817.00 payment. You can then wait until the final site plan
for Phase 5A is approved, and submit a new application for approval of a final plat following final site plan
approval.
It is entirely up to you for which option you choose. The second option is cheaper and requires less information on the
plat, which may be an easier route to pursue.
If you want to proceed with option 1, review of the plat will not begin until the fee difference is paid, and a revised plat
addressing all applicable Ordinance sections is submitted.
Please let me know as soon as possible which option you would like to take with this project. Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
150
Cameron Langille
From: Cameron Langille
Sent: Wednesday, September 30, 2020 5:57 PM
To: Riki Van-Niekerk
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Riki,
I plan to have my comments to you by tomorrow. I apologize for the delay. I've been waiting on the other reviewers in
order to finish up the letter.
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Tuesday, September 22, 2020 3:26 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I am checking in on the status of Final Site Plan comments for Phase 5A. Trying to get an idea of everyone's schedule so
that we can keep the developer, and his construction schedule, updated as much as possible.
Thank you,
Riki
From: Cameron Langille <blaneille@albemarle.org>
Sent: Thursday, September 3, 2020 6:43 PM
To: Bethany Velasquez <Bethany@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Bethany,
If the site plan was ready for signatures/approval from the County, you could defer. However, the site plan was just re-
submitted today for review with Planning, Engineering, ACSA, and RWSA. Since approvals from all reviewers have not
yet been received, we can't review the plat because there may be further revisions needed with the site
plan. Therefore, you will need to withdraw the application unless you want to go with option #1.
The staff member you should contact to initiate the refund is Jennifer Pritchett and her email is
0pritchett@albemarle.org. Please CC me when you email her, and I will take care of withdrawing the plat through our
County View system.
Please let me know if you have any questions. Thanks,
Cameron
151
From: Bethany Velasquez <Bethany@roudabush.com>
Sent: Monday, August 31, 202011:30 AM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
Hope you had a great weekend! Can we defer the application until the Final Site Plan is approved? It looks like
hopefully that's not too far out. If that's not a possibility, let me know and we will just withdraw it until the FSP is
approved.
Thanks,
Bethany Velasquez
Roudabush, Gale & Associates
434-977-0205
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, August 28, 2020 3:24 PM
To: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethanv@roudabush.com>
Subject: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Good afternoon Steve & Bethany,
A final subdivision plat application for Belvedere Phase SA was submitted to the County this week. The application type
selected was "Subdivision following final site plan approval."
The final site plan for Belvedere Phase 5A, SDP202000036, is still under review and not yet approved. A final plat for
Phase 5A cannot be submitted for review as the application type that was selected.
There are two options:
• A final plat for Phase 5A can be reviewed, but a different application must be filled out and submitted. Since the
final site plan is not approved, any final plats that you wish to have reviewed will need to go through the site
review committee (SRC) process as a combined preliminary/final subdivision plat. The plat type would be a
standard final plat, but the fees for both a preliminary plat and final plat must be paid. You paid $742.00 +
$75.00 for the application, but the applicable fees are $1,236.00 + $75.00 (preliminary plat application fee) +
$1,322.00 + $75.00 (final plat application fee) for a total of $2,708.00. You can submit the fee difference of
$1,891.00 and a new application and revised plat under the current application number, and it will be reviewed
by the SRC.
o Please be aware that this subdivision type requires additional information on the actual plat in
accordance with the Subdivision Ordinance. The current plat would need to be revised so that all
applicable Ordinance requirements are met.
• Withdraw SUB202000159 and get a refund of your $817.00 payment. You can then wait until the final site plan
for Phase 5A is approved, and submit a new application for approval of a final plat following final site plan
approval.
152
It is entirely up to you for which option you choose. The second option is cheaper and requires less information on the
plat, which may be an easier route to pursue.
If you want to proceed with option 1, review of the plat will not begin until the fee difference is paid, and a revised plat
addressing all applicable Ordinance sections is submitted.
Please let me know as soon as possible which option you would like to take with this project. Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
153
Cameron Langille
From: Cameron Langille
Sent: Wednesday, September 30, 2020 3:27 PM
To: Dyon Vega
Cc: vfort@rivanna.org; Richard Nelson
Subject: RE: Belvedere Phase 5a comments
Thanks Dyon!
From: Dyon Vega <dvega@rivanna.org>
Sent: Wednesday, September 30, 2020 12:17 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: vfort@rivanna.org; Richard Nelson <rnelson@serviceauthority.org>
Subject: Belvedere Phase 5a comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
RWSA has reviewed the Belvedere Phase 5a Site Plan dated September 2nd 2020 and has the following comments.
General comments:
RWSA will require a sewer flow acceptance prior to final site plan approval.
The request will need to be sent to us by ACSA and will include the following:
• Estimated average daily dry weather sewage flow (ADDWF)
• Point of connection into RWSA system (which manhole)
• Number of units/square footage
• Estimated in-service date
Let me know if you have any questions.
Dyon Vega
Civil Engineer
RIVANNA
WATER & SEAT
AAUTHORII �
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.ora
154
Cameron Langille
From:
Dyon Vega <dvega@rivanna.org>
Sent:
Wednesday, September 30, 2020 12:17 PM
To:
Cameron Langille
Cc:
vfort@rivanna.org; Richard Nelson
Subject:
Belvedere Phase 5a comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
RWSA has reviewed the Belvedere Phase 5a Site Plan dated September 2nd 2020 and has the following comments.
General comments:
RWSA will require a sewer flow acceptance prior to final site plan approval.
The request will need to be sent to us by ACSA and will include the following:
• Estimated average daily dry weather sewage flow (ADDWF)
• Point of connection into RWSA system (which manhole)
• Number of units/square footage
• Estimated in-service date
Let me know if you have any questions.
Dyon Vega
Civil Engineer
ANNA
WATER 3 SEWERAUTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.ora
155
Cameron Langille
From:
David lames
Sent:
Monday, September 28, 2020 4:54 PM
To:
Cameron Langille
Subject:
SDP202000036 - Belvedere 5A FSP review
Hi Cameron,
Requested changes, new comments are in CV.
Thanks,
David James
_....uemari
434-296-5832:3273
156
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, September 22, 2020 3:26 PM
To: Cameron Langille
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I am checking in on the status of Final Site Plan comments for Phase 5A. Trying to get an idea of everyone's schedule so
that we can keep the developer, and his construction schedule, updated as much as possible.
Thank you,
Riki
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, September 3, 2020 6:43 PM
To: Bethany Velasquez <Bethany@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Hi Bethany,
If the site plan was ready for signatures/approval from the County, you could defer. However, the site plan was just re-
submitted today for review with Planning, Engineering, ACSA, and RWSA. Since approvals from all reviewers have not
yet been received, we can't review the plat because there may be further revisions needed with the site
plan. Therefore, you will need to withdraw the application unless you want to go with option #1.
The staff member you should contact to initiate the refund is Jennifer Pritchett and her email is
0pritchett@albemarle.org. Please CC me when you email her, and I will take care of withdrawing the plat through our
County View system.
Please let me know if you have any questions. Thanks,
Cameron
From: Bethany Velasquez <Bethany@roudabush.com>
Sent: Monday, August 31, 202011:30 AM
To: Cameron Langille <blangille@albemarle.org>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
157
Hope you had a great weekend! Can we defer the application until the Final Site Plan is approved? It looks like
hopefully that's not too far out. If that's not a possibility, let me know and we will just withdraw it until the FSP is
approved.
Thanks,
Bethany Velasquez
Roudabush, Gale & Associates
434-977-0205
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, August 28, 2020 3:24 PM
To: Steve Krohn <skrohn@resortscompanies.com>; Bethany Velasquez <Bethany@roudabush.com>
Subject: SUB202000159 Belvedere Phase 5A - Final Subdivision Plat Application
Good afternoon Steve & Bethany,
A final subdivision plat application for Belvedere Phase 5A was submitted to the County this week. The application type
selected was "Subdivision following final site plan approval."
The final site plan for Belvedere Phase 5A, SDP202000036, is still under review and not yet approved. A final plat for
Phase 5A cannot be submitted for review as the application type that was selected.
There are two options:
• A final plat for Phase 5A can be reviewed, but a different application must be filled out and submitted. Since the
final site plan is not approved, any final plats that you wish to have reviewed will need to go through the site
review committee (SRC) process as a combined preliminary/final subdivision plat. The plat type would be a
standard final plat, but the fees for both a preliminary plat and final plat must be paid. You paid $742.00 +
$75.00 for the application, but the applicable fees are $1,236.00 + $75.00 (preliminary plat application fee) +
$1,322.00 + $75.00 (final plat application fee) for a total of $2,708.00. You can submit the fee difference of
$1,891.00 and a new application and revised plat under the current application number, and it will be reviewed
by the SRC.
o Please be aware that this subdivision type requires additional information on the actual plat in
accordance with the Subdivision Ordinance. The current plat would need to be revised so that all
applicable Ordinance requirements are met.
• Withdraw SUB202000159 and get a refund of your $817.00 payment. You can then wait until the final site plan
for Phase 5A is approved, and submit a new application for approval of a final plat following final site plan
approval.
It is entirely up to you for which option you choose. The second option is cheaper and requires less information on the
plat, which may be an easier route to pursue.
If you want to proceed with option 1, review of the plat will not begin until the fee difference is paid, and a revised plat
addressing all applicable Ordinance sections is submitted.
Please let me know as soon as possible which option you would like to take with this project. Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
158
blaneille@albemarle.org
(434) 296-5832 ext. 3432
159
Cameron Langille
From: Cameron Langille
Sent: Thursday, September 3, 2020 6:33 PM
To: David lames; Richard Nelson; vfort@rivanna.org; Dyon Vega
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 3rd Submittal
Good evening,
The applicant forthis project has submitted a revised site plan and other materials for review. The materials are
uploaded to the County View system and may be accessed through the link below. The applicant has indicated that hard
copies of the materials have been transmitted directly to ACSA.
A description of each item and it's name as it appears in County View is as follows:
• Applicant comment response letter: "SDP202000036 Correspondence 2020-09-03 (3)"
• Revised site plan: "SDP202000036 Other 2020-09-03"
• Retaining wall design plans: "SDP202000036 Plan - Revision 2020-09-03"
• Supplemental HOA documents that will be submitted and reviewed with a future subdivision plat:
"SDP202000036 Other 2020-09-03 (3)"
• Second set of supplemental HOA documents that will be submitted and reviewed with a future subdivision
plat: "SDP202000036 Other 2020-09-03 (4)"
• Deed of conveyance:"SDP202000036 Other 2020-09-03 (5)"
Link to County View: https://Ifweb.albemarle.ore/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD-
P Ia nni ne%Sd:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, September 251'. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner I/
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Suite 228, Charlottesville, VA 22902
160
Cameron Langille
From: Cameron Langille
Sent: Thursday, September 3, 2020 10:06 AM
To: Riki Van-Niekerk; David lames
Subject: RE: Belvedere Phase 5A - Final site plan
Thanks Riki, I'll get it distributed.
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Wednesday, September 2, 2020 10:42 PM
To: Cameron Langille <blangille@albemarle.org>; David James <djames2@albemarle.org>
Subject: RE: Belvedere Phase SA - Final site plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I forgot to add the attached draft of the HOA documents to the online portal. I tried adding it in under the same SDP
number online, but not sure if I was successful.
Thanks,
Riki
From: Riki Van-Niekerk
Sent: Wednesday, September 2, 2020 10:36 PM
To:'Cameron Langille' <blangille@albemarle.org>;'David James' <diames2@albemarle.org>
Subject: Belvedere Phase 5A - Final site plan
Cameron,
I just submitted the Final site plan for Belvedere Phase 5A. Attached is the transaction # and I also delivered hardcopies
to the county office building.
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
161
Cameron Langille
From:
Jennifer Pritchett
Sent:
Thursday, September 3, 2020 8:33 AM
To:
Cameron Langille
Subject:
FW: Re -Submission from CDD Portal - Transaction #00007073
Good morning Cameron,
The documents have been uploaded.
Have a great day!
Jennifer
From: Laserfiche-Notification@albemarle.org <Laserfiche-Notification@albemarle.org>
Sent: Wednesday, September 2, 2020 10:39 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: CDD Submittal <CDDSubmittal@albemarle.org>
Subject: Re -Submission from CDD Portal -Transaction #00007073
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 806-283-1802
Files Submitted: draft _20-02 Supplemental Declaration for Phase 5 (Adams) drl.pdf
View Files Submitted: httD://cob-ificheO3/WebLinkWA/Search.aSDx?dbid=2&searchcommand=I[CDD-
W ebSubm issionsl:IRecei ptN u m be rl="00007073'
162
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Wednesday, September 2, 2020 10:42 PM
To: Cameron Langille; David James
Subject: RE: Belvedere Phase 5A - Final site plan
Attachments: draft_20-02 Supplemental Declaration for Phase 5 (Adams) drl.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I forgot to add the attached draft of the HOA documents to the online portal. I tried adding it in under the same SDP
number online, but not sure if I was successful.
Thanks,
Riki
From: Riki Van-Niekerk
Sent: Wednesday, September 2, 2020 10:36 PM
To:'Cameron Langille'<blangille@albemarle.org>;'David James' <djames2@albemarle.org>
Subject: Belvedere Phase 5A - Final site plan
Cameron,
I just submitted the Final site plan for Belvedere Phase 5A. Attached is the transaction # and I also delivered hardcopies
to the county office building.
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
163
Cameron Langille
From: Laserfiche-Notification@albemarle.org
Sent: Wednesday, September 2, 2020 10:39 PM
To: Cameron Langille
Cc: CDD Submittal
Subject: Re -Submission from CDD Portal - Transaction #00007073
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 806-283-1802
Files Submitted: draft_20-02 Supplemental Declaration for Phase 5 (Adams) dr1.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand={[CDD-
WebSu bm issions]: [ Recei ptN u mber]="00007073")
164
Cameron Langille
From: Laserfiche-Notification@albemarle.org
Sent: Wednesday, September 2, 2020 10:40 PM
To: Cameron Langille
Cc: CDD Submittal
Subject: Re -Submission from CDD Portal - Transaction #00007073
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 806-283-1802
Files Submitted: draft_20-02 Supplemental Declaration for Phase 5 (Adams) dr1.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand={[CDD-
WebSu bm issions]: [ Recei ptN u mber]="00007073")
165
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Wednesday, September 2, 2020 10:36 PM
To: Cameron Langille; David James
Subject: Belvedere Phase 5A - Final site plan
Attachments: Proof of submission.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I just submitted the Final site plan for Belvedere Phase 5A. Attached is the transaction # and I also delivered hardcopies
to the county office building.
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct:(434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
166
Cameron Langille
From: Laserfiche-Notification@albemarle.org
Sent: Wednesday, September 2, 2020 10:32 PM
To: Cameron Langille
Cc: CDD Submittal
Subject: Re -Submission from CDD Portal - Transaction #00007072
Re -Submission was made to CDD Portal. Please review.
Summary of Submission:
Project: Belvedere Phase 5A - Final - Digital
App Number: sdp202000036
Name: Riki van Niekerk
Email: riki@roudabush.com
Phone: 806-283-1802
Files Submitted: Application_SDP202000036_Belvedere Ph 5A Final Site Plan.pdf,
Checklist -Final -Site -Plan -Belvedere Ph 5A.pdf, Comment Response letter -Belvedere Phase 5A-Final site
plan.pdf, Tree Save Area Documentation.pdf, Belvedere -Phase 5-retaining wall plans.pdf, DRAFT_20-02
Supplemental Declaration for 5A dr2.pdf, DRAFT -Deed from BLH to NBI (002).pdf, Transmittal Belvedere Phase
5A_FSP.pdf, Belvedere Phase 5A_FSP_sheets 1-24.pdf
View Files Submitted: http://cob-ificheO3/WebLinkWA/Search.aspx?dbid=2&searchcommand={[CDD-
WebSu bm issions]: [ReceiptN u m ber]="00007072")
167
Cameron Langille
From: Cameron Langille
Sent: Tuesday, August 11, 2020 4:01 PM
To: Riki Van-Niekerk
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Attachments: SDP202000036 Belvedere Phase 5A Final Site Plan - First Review Comments
Hi Riki,
When this application was first submitted, the application only had Steve Krohn listed as the applicant and contact
person. I sent an email with the site plan comments directly to him (see attached). The email has a PDF of the comment
letter.
I can call you at 4:30 today if you'd like to discuss.
-Cameron
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 10:29 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I never received the comments for the previous submission of the FSP. I did receive an email from David who forwarded
comments from you — mistakenly those were only for the Road Plan. Do you have time for a quick phone call today?
Thanks,
Riki
From: Cameron Langille <blaneilleCa@albemarle.ore>
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk <Riki@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Good evening,
The 2"a review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
168
Albemarle County, Virginia
blangille@albemarle.org
(434) 296-5832 ext. 3432
169
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 1:43 PM
To: Cameron Langille
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Additionally, we received comments from Jeremy Lynn, ACSA, the same day that we submitted the Road Plan and Final
Site Plan. I addressed the minor comments with exhibits. I emailed him a few moments ago to ask that he sends you the
official response letter. To my knowledge, the only outstanding comment is that Phase 2B needs to be dedicated prior to
plan approval. He is out of town until Thursday.
Thanks,
Riki
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, August 11, 2020 1:34 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Hi Riki,
I wasn't sure if RWSA needed to be a party to this review, so I've been sending them copies. ACSA usually coordinates
RWSA reviews anyways and incorporates any RWSA comments into ACSA comments. So, I was going to assume RWSA
had signed off on the plans once ACSA sends me an approval letter. But thanks for clarifying that you're not connecting
to RWSA lines.
-Cameron
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 12:17 PM
To: Cameron Langille <blangille@albemarle.orR>
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Just covering my bases here and checked county view. It seems that we never received comments from RWSA— ever.
We are not connecting to an RWSA line for this plan, so I am curious if we require approval from them? Please confirm.
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
170
From: Cameron Langille <blaneille@albemarle.org>
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk <Riki@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Good evening,
The 2" review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blaneille@albemarle.org
(434) 296-5832 ext. 3432
171
Cameron Langille
From: Cameron Langille
Sent: Tuesday, August 11, 2020 1:34 PM
To: Riki Van-Niekerk
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Hi Riki,
I wasn't sure if RWSA needed to be a party to this review, so I've been sending them copies. ACSA usually coordinates
RWSA reviews anyways and incorporates any RWSA comments into ACSA comments. So, I was going to assume RWSA
had signed off on the plans once ACSA sends me an approval letter. But thanks for clarifying that you're not connecting
to RWSA lines.
-Cameron
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 12:17 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Just covering my bases here and checked county view. It seems that we never received comments from RWSA — ever.
We are not connecting to an RWSA line for this plan, so I am curious if we require approval from them? Please confirm.
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk <Riki@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Subject: SDP202000036 Belvedere Phase SA Final Site Plan - 2nd Review Comment Letter
Good evening,
The 2"a review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
172
Albemarle County, Virginia
blangille@albemarle.org
(434) 296-5832 ext. 3432
173
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 12:17 PM
To: Cameron Langille
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Just covering my bases here and checked county view. It seems that we never received comments from RWSA— ever.
We are not connecting to an RWSA line for this plan, so I am curious if we require approval from them? Please confirm.
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk <Riki@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Good evening,
The 2°d review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blangille(c)albemarle.org
(434) 296-5832 ext. 3432
174
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, August 11, 2020 10:29 AM
To: Cameron Langille
Subject: RE: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I never received the comments for the previous submission of the FSP. I did receive an email from David who forwarded
comments from you — mistakenly those were only for the Road Plan. Do you have time for a quick phone call today?
Thanks,
Riki
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk <Riki@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Good evening,
The 2"a review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blangille@albemarle.org
(434) 296-5832 ext. 3432
175
Cameron Langille
From: Steve Krohn <skrohn@resortscompanies.com>
Sent: Monday, August 10, 2020 7:08 PM
To: Cameron Langille
Subject: Automatic reply: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review
Comment Letter
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I will be out of the office until Tuesday, Augst 11, 2020, with very limited access to email. I will respond to you when
return. If you need immediate assistance, please call Carrie Kimbrough at (434) 220-7722 or
cibmmbroughc@resortscomoanies.com, and she'll direct you to someone who can assist in my absence.
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended
recipient(s) and may contain confidential and/or privileged information and/or may otherwise be protected by law. Any
unauthorized review, use, disclosure or distribution is prohibited. If you believe you are not the intended recipient,
please notify the sender by reply e-mail and permanently delete and/or destroy all copies of the original message and
any attachment thereto.
176
Cameron Langille
From: Cameron Langille
Sent: Monday, August 10, 2020 7:08 PM
To: Riki Van-Niekerk; Steve Krohn
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Review Comment Letter
Attachments: SDP202000036 2nd Review Comment Letter.pdf
Good evening,
The 2"a review comment letter for this site plan is attached. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner II
Community Development Department
Albemarle County, Virginia
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
177
Cameron Langille
From: Cameron Langille
Sent: Thursday, July 30, 2020 3:53 PM
To: David lames
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Hi David,
They are allowed to install water and sewer lines in that 0.07 acre conservation area, according to page 13 of the Code
of Development. Let me know if you want me to send you a copy of the COD.
From: David James <djames2@albemarle.org>
Sent: Thursday, July 30, 2020 3:08 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
178
It's actually a conservation area, but adjacent to it is a preservation area. They're putting in a sewer connection
there.
OTHERWISE NOTED
i
V
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, July 28, 2020 5:47 PM
To: David James <diames2@albemarle.ore>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Okay, thanks David. I haven't had a chance to open these plans yet, so if you take a look let me know where you saw it.
179
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 28, 2020 5:03 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Cameron,
I think on the existing conditions sheet near the entrance. I'll try and find on plans later...
David
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, July 28, 2020 4:38 PM
To: David James <diames2@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Hi David,
The "Preservation Area" is land that was shown on the Belvedere ZMA that was supposed to be protected so an extent
(some uses and grading prohibited). But the Preservation Areas are only within the portions of Belvedere that are zoned
NMD Neighborhood Model District. These two applications are in the R-4 section of Belvedere, which is a by -right
section not subject to the ZMA. So, I don't think there's any official "preservation areas" that apply to these
blocks. Mind if I ask where you saw a reference to preservation areas on these?
-Cameron
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 21, 202011:42 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A 5DP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
180
Cameron Langille
From: David James
Sent: Thursday, July 30, 2020 3:08 PM
To: Cameron Langille
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
It's actually a conservation area, but adjacent to it is a preservation area. They're putting in a sewer connection
there.
181
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, July 28, 2020 5:47 PM
To: David James <djames2@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Okay, thanks David. I haven't had a chance to open these plans yet, so if you take a look let me know where you saw it.
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 28, 2020 5:03 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Cameron,
I think on the existing conditions sheet near the entrance. I'll try and find on plans later...
David
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, July 28, 2020 4:38 PM
To: David James <diames2@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Hi David,
The "Preservation Area" is land that was shown on the Belvedere ZMA that was supposed to be protected so an extent
(some uses and grading prohibited). But the Preservation Areas are only within the portions of Belvedere that are zoned
NMD Neighborhood Model District. These two applications are in the R-4 section of Belvedere, which is a by -right
section not subject to the ZMA. So, I don't think there's any official "preservation areas" that apply to these
blocks. Mind if I ask where you saw a reference to preservation areas on these?
-Cameron
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 21, 202011:42 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A 5DP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
182
Cameron Langille
From: Cameron Langille
Sent: Tuesday, July 28, 2020 5:47 PM
To: David James
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Okay, thanks David. I haven't had a chance to open these plans yet, so if you take a look let me know where you saw it.
From: David James <djames2@albemarle.org>
Sent: Tuesday, July 28, 2020 5:03 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Cameron,
think on the existing conditions sheet near the entrance. I'll try and find on plans later...
David
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, July 28, 2020 4:38 PM
To: David James <diames2@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Hi David,
The "Preservation Area" is land that was shown on the Belvedere ZMA that was supposed to be protected so an extent
(some uses and grading prohibited). But the Preservation Areas are only within the portions of Belvedere that are zoned
NMD Neighborhood Model District. These two applications are in the R-4 section of Belvedere, which is a by -right
section not subject to the ZMA. So, I don't think there's any official "preservation areas" that apply to these
blocks. Mind if I ask where you saw a reference to preservation areas on these?
-Cameron
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 21, 202011:42 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A 5DP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
183
434-296-5832:3273
184
Cameron Langille
From: David James
Sent: Tuesday, July 28, 2020 5:03 PM
To: Cameron Langille
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Cameron,
I think on the existing conditions sheet near the entrance. I'll try and find on plans later...
David
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, July 28, 2020 4:38 PM
To: David James <djames2@albemarle.org>
Subject: RE: Belvedere 5A SDP202000036 & SU B202000123 reviews
Hi David,
The "Preservation Area" is land that was shown on the Belvedere ZMA that was supposed to be protected so an extent
(some uses and grading prohibited). But the Preservation Areas are only within the portions of Belvedere that are zoned
NMD Neighborhood Model District. These two applications are in the R-4 section of Belvedere, which is a by -right
section not subject to the ZMA. So, I don't think there's any official "preservation areas" that apply to these
blocks. Mind if I ask where you saw a reference to preservation areas on these?
-Cameron
From: David James <diames2@albemarle.org>
Sent: Tuesday, July 21, 202011:42 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A 5DP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
185
Cameron Langille
From: Cameron Langille
Sent: Tuesday, July 28, 2020 4:38 PM
To: David James
Subject: RE: Belvedere 5A SDP202000036 & SUB202000123 reviews
Hi David,
The "Preservation Area" is land that was shown on the Belvedere ZMA that was supposed to be protected so an extent
(some uses and grading prohibited). But the Preservation Areas are only within the portions of Belvedere that are zoned
NMD Neighborhood Model District. These two applications are in the R-4 section of Belvedere, which is a by -right
section not subject to the ZMA. So, I don't think there's any official "preservation areas" that apply to these
blocks. Mind if I ask where you saw a reference to preservation areas on these?
-Cameron
From: David James <djames2@albemarle.org>
Sent: Tuesday, July 21, 2020 11:42 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere 5A 5DP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
186
Cameron Langille
From: David James
Sent: Tuesday, July 21, 2020 11 A2 AM
To: Cameron Langille
Subject: Belvedere 5A SDP202000036 & SUB202000123 reviews
Cameron,
I've complete these reviews. Please see comments in CV.
I noticed they're doing some improvements, grading mostly in an existing Preservation area. I didn't make any comment
but just pointing this out if you think its an issue.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
187
Cameron Langille
From: Greene, Max <max.greene@vdot.virginia.gov>
Sent: Thursday, July 16, 2020 1:49 PM
To: David James; Cameron Langille
Cc: Adam Moore; Jim Taggart; Riki@roudabush.com
Subject: SUB-2019-00170 - Belvedere Phase 5, Part 1 — Road Plan - Review #3 SDP-2020-00036 -
Belvedere Phase 5A — Final Site Plan — Review #2
Attachments: SUB-2019-00170 & SDP-2020-00036 Belvedere - Phase 5, Part 1 - Road & Site Plan -
Dated 06-22-2020.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Please find the attached review comment Letter.
Max Greene
Architect/ Engineer I
Land Use
Southern Culpeper District
Charlottesville Res. Admin.
Office: 434-422-9894
Cell: 434-906-6415
max.ereene@vdot.vireinia.gov
188
Cameron Langille
From: Jennifer Smith - CDD - Planning
Sent: Monday, June 29, 2020 9:49 AM
To: Cameron Langille
Subject: SDP2020-36
Good morning Cameron:
I have uploaded documents to County View for SDP2020-36.
Thank you!
Jen Smith
Intake Support Specialist ll
Albemarle County— Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext. 3835
Jsmith2(a) abemarle. org
189
Cameron Langille
From: Cameron Langille
Sent: Thursday, June 25, 2020 2:23 PM
To: David lames; Brian Becker; Max Greene; Richard Nelson; vfort@rivanna.org; Dyon Vega
Cc: Adam Moore
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - 2nd Submittal
Good afternoon,
The applicant has submitted a revised final site plan for Belvedere Phase 5A. The application and associated materials
have been uploaded to the County View system for your review. A summary of the resubmittal materials and their titles
as they appear in County View are listed below:
• Revised final site plan — "SDP202000036 Plan - Revision Final Site Plan and Comps. 2020-06-22"
• Applicant Comment Response Letter— "SDP202000036 Correspondence 2020-06-22"
• Sewer and Water Usage Data Sheet— "SDP202000036 Calculations 2020-06-04"
• Resubmittal Checklist—"SDP202000036 Checklist 2020-06-22"
Link to County View: https://Ifweb.albemarle.ore/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCDD-
P Ia nni ne%5d:%5 bAppl ication N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Thursday, July 16`h. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
190
Cameron Langille
From: Cameron Langille
Sent: Thursday, June 25, 2020 2:14 PM
To: Paul Bjornsen
Subject: RE: County View Upload Issue
Thanks Paul!
From: Paul Bjornsen <pbjornsen@albemarle.org>
Sent: Thursday, June 25, 2020 11:16 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: County View Upload Issue
Hey Cameron,
It was a pretty hefty size and there were also font issues, but I got it in the system this morning.
Cheers,
Pb
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Wednesday, June 24, 2020 16:27
To: Paul Bjornsen <pb!ornsen@albemarle.org>
Subject: County View Upload Issue
Hi Paul,
I am trying to upload a plan to CV but the uploader won't complete the upload for some reason. It will attempt to upload and then a
pop-up window appears saying "A task was canceled"
I've tried reducing the file size, restarting my computer, etc. and nothing seems to work. Could you try and see if it works for you?
The application number is SDP202000036. The document date for the file (attached) should be 6-22-2020 and the document type
should be "Plan — Revision"
Let me know if there is anything else I can do. I appreciate your help. Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
191
Cameron Langille
From: Paul Bjornsen
Sent: Thursday, June 25, 2020 11:16 AM
To: Cameron Langille
Subject: RE: County View Upload Issue
Hey Cameron,
It was a pretty hefty size and there were also font issues, but I got it in the system this morning.
Cheers,
Pb
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, June 24, 2020 16:27
To: Paul Bjornsen <pbjornsen@albemarle.org>
Subject: County View Upload Issue
Hi Paul,
I am trying to upload a plan to CV but the uploader won't complete the upload for some reason. It will attempt to upload and then a
pop-up window appears saying "A task was canceled"
I've tried reducing the file size, restarting my computer, etc. and nothing seems to work. Could you try and see if it works for you?
The application number is SDP202000036. The document date for the file (attached) should be 6-22-2020 and the document type
should be "Plan — Revision"
Let me know if there is anything else I can do. I appreciate your help. Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blangille(@albemarle.org
(434) 296-5832 ext. 3432
192
Cameron Langille
From: Cameron Langille
Sent: Wednesday, June 24, 2020 4:27 PM
To: Paul Bjornsen
Subject: County View Upload Issue
Attachments: SDP202000036 Revised Plans 2nd Submittal 6-22-2020.pdf
Hi Paul,
I am trying to upload a plan to CV but the uploader won't complete the upload for some reason. It will attempt to
upload and then a pop-up window appears saying "A task was canceled."
I've tried reducing the file size, restarting my computer, etc. and nothing seems to work. Could you try and see if it
works for you?
The application number is SDP202000036. The document date for the file (attached) should be 6-22-2020 and the
document type should be "Plan — Revision."
Let me know if there is anything else I can do. I appreciate your help. Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
193
Cameron Langille
From:
Jim Taggart <JTaggart@roudabush.com>
Sent:
Friday, June 19, 2020 2:07 PM
To:
Jeremy Lynn
Cc:
Cameron Langille; Riki Van-Niekerk
Subject:
RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Understood. Thanks!
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Jeremy Lynn[mailto:jlynn@serviceauthority.org]
Sent: Friday, June 19, 2020 2:05 PM
To: Jim Taggart <1Taggart@roudabush.com>
Cc: blangille@albemarle.org; Riki Van-Niekerk <Riki@roudabush.com>
Subject: Re: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Our utilities can be in the RM, but VDOT is opposed to NM's in the pavement.
Jeremy Lynn
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, June 19, 2020 2:02:27 PM
To: Jeremy Lynn <jlynn@serviceauthority.org>
Cc: blangille@albemarle.org <blangille@albemarle.org>; Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Hi Jeremy,
Quick question before you leave town. Comment from Cameron at the County, see highlighted below.
I have been advising Riki to keep the water and sewer mains out of the right-of-way because I thought that was how
ACSA required placement these days. Cameron indicates that these can be moved into the ROW to make room for
trees.
Will you weigh in on behalf of ACSA please?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, June 17, 2020 6:51 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
194
Cc: David James <d0ames2@albemarle.org>; Ammy George <AGeorge@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Hi Riki,
The first sentence of 32.7.9.5 (d) states this " Street trees shall be planted with even spacing in a row within the
public street right-of-way or adjacent to the public street right-of-way if not permitted therein by the Virginia
Department of Transportation, and within the private street right-of-way." This means that trees have to be in the
road unless VDOT states that they won't allow it.
When 32.7.9.5 (d) states "If required street trees cannot be planted within the parking setback or within ten feet of
the street right-of-way due to sight distance, utility easements or other conflicting requirements, then the planting
strip shall be enlarged to accommodate the trees' it is referring to moving trees on parcels that feature uses other than
single-family attached/detached residential. The reference to utility easements means existing utility easements, not new
ones proposed as part of the development. New streets that have no existing utilities or sight distance easements have to
have their trees in the planting strip/ROW.
Based on my review of the plans, the conflict with new utilities appears to be because the lines are located under
driveways/sidewalks and on private lots. If the main utility lines are moved into the street ROW and then tap lines extend
into individual lots, there should be adequate spacing to comply with ACSA requirements and also move the trees into the
planting strip.
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Tuesday, June 16, 202010:56 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: David James <d0ames2@albemarle.org>; Ammy George <AGeorge@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Cameron,
Regarding comment #4: " [32.7.9.5 (d)] Street trees must be provided within the 6' landscaping strip within the public
right-of-way, and cannot be provided on private lots within a landscaping easement unless VDOT specifically says the
trees have to be located outside of the ROW. Conflicts with proposed utilities is a reason that street trees can be located
on private lots under Section 32.7.9.5; this is a design issue that must be rectified. Trees on lots 2, 4, 8, 33, 34, 35, 36, 39,
42, and 43 need to be relocated so that they are within the landscaping strip within the street right-of-way."
In addition to your comment, ACSA has commented that they wants 10' separation form all utility lines. To meet ACSA's
requirement, we will need to place additional trees behind the sidewalk. I simply do not have the space to move all the
trees into the planting strip, and be 10' from utilities, and provided the required 28 trees along Fowler street and 23
trees along Fowler circle. My understanding from 32.7.9.S.d is that we are permitted to offset the ROW by 10-feet to
create a landscaping easement which will help us meet the tree requirements. It is our preference to have all the trees
in the ROW, but we do not have the space due to driveways and utilities.
How can we proceed to address your comment?
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
195
From: David James <diames2@albemarle.ore>
Sent: Wednesday, June 10, 202012:01 PM
To: Jim Taggart <JTaesart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>; Cameron Langille <blangille@albemarle.ore>
Subject: FW: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Good afternoon,
Please address comments from Planning, attached.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
196
Cameron Langille
From:
Jeremy Lynn <jlynn@serviceauthority.org>
Sent:
Friday, June 19, 2020 2:05 PM
To:
Jim Taggart
Cc:
Cameron Langille; Riki Van-Niekerk
Subject:
Re: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Our utilities can be in the R/W, but VDOT is opposed to MH's in the pavement.
Jeremy Lynn
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Friday, June 19, 2020 2:02:27 PM
To: Jeremy Lynn <jlynn@serviceauthority.org>
Cc: blangille@albemarle.org <blangille@albemarle.org>; Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Hi Jeremy,
Quick question before you leave town. Comment from Cameron at the County, see highlighted below.
I have been advising Riki to keep the water and sewer mains out of the right-of-way because I thought that was how
ACSA required placement these days. Cameron indicates that these can be moved into the ROW to make room for
trees.
Will you weigh in on behalf of ACSA please?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille <blanaille@albemarle.ore>
Sent: Wednesday, June 17, 2020 6:51 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Cc: David James <d0ames2@albemarle.ora>; Ammy George <AGeorge@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Hi Riki,
The first sentence of 32.7.9.5 (d) states this " Street trees shall be planted with even spacing in a row within the
public street right-of-way or adjacent to the public street right-of-way if not permitted therein by the Virginia
Department of Transportation, and within the private street right-of-way." This means that trees have to be in the
road unless VDOT states that they won't allow it.
When 32.7.9.5 (d) states "if required street trees cannot be planted within the parking setback or within ten feet of
the street right-of-way due to sight distance, utility easements or other conflicting requirements, then the planting
strip shall be enlarged to accommodate the trees' it is referring to moving trees on parcels that feature uses other than
197
single-family attached/detached residential. The reference to utility easements means existing utility easements, not new
ones proposed as part of the development. New streets that have no existing utilities or sight distance easements have to
have their trees in the planting strip/ROW.
Based on my review of the plans, the conflict with new utilities appears to be because the lines are located under
driveways/sidewalks and on private lots. If the main utility lines are moved into the street ROW and then tap lines extend
into individual lots, there should be adequate spacing to comply with ACSA requirements and also move the trees into the
planting strip.
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Tuesday, June 16, 202010:56 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: David James <d0ames2@albemarle.org>; Ammy George <AGeorge@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Cameron,
Regarding comment #4: " [32.7.9.5 (d)] Street trees must be provided within the 6' landscaping strip within the public
right-of-way, and cannot be provided on private lots within a landscaping easement unless VDOT specifically says the
trees have to be located outside of the ROW. Conflicts with proposed utilities is a reason that street trees can be located
on private lots under Section 32.7.9.5; this is a design issue that must be rectified. Trees on lots 2, 4, 8, 33, 34, 35, 36, 39,
42, and 43 need to be relocated so that they are within the landscaping strip within the street right-of-way."
In addition to your comment, ACSA has commented that they wants 10' separation form all utility lines. To meet ACSA's
requirement, we will need to place additional trees behind the sidewalk. I simply do not have the space to move all the
trees into the planting strip, and be 10' from utilities, and provided the required 28 trees along Fowler street and 23
trees along Fowler circle. My understanding from 32.7.9.S.d is that we are permitted to offset the ROW by 10-feet to
create a landscaping easement which will help us meet the tree requirements. It is our preference to have all the trees
in the ROW, but we do not have the space due to driveways and utilities.
How can we proceed to address your comment?
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: David James <diames2@albemarle.org>
Sent: Wednesday, June 10, 202012:01 PM
To: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>; Cameron Langille <blangille@albemarle.org>
Subject: FW: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Good afternoon,
Please address comments from Planning, attached.
Thanks,
David James
198
CEI I County of Albemarle
434-296-5832:3273
199
Cameron Langille
From:
Jim Taggart <JTaggart@roudabush.com>
Sent:
Friday, June 19, 2020 2:02 PM
To:
Jeremy Lynn
Cc:
Cameron Langille; Riki Van-Niekerk
Subject:
RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Jeremy,
Quick question before you leave town. Comment from Cameron at the County, see highlighted below.
I have been advising Riki to keep the water and sewer mains out of the right-of-way because I thought that was how
ACSA required placement these days. Cameron indicates that these can be moved into the ROW to make room for
trees.
Will you weigh in on behalf of ACSA please?
Thanks,
Jim Taggart
Roudabush Gale & Assoc., Inc.
From: Cameron Langille <blanRille@albemarle.ore>
Sent: Wednesday, June 17, 2020 6:51 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Cc: David James <d0ames2@albemarle.orR>; Ammy George <AGeorRe@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Hi Riki,
The first sentence of 32.7.9.5 (d) states this " Street trees shall be planted with even spacing in a row within the
public street right-of-way or adjacent to the public street right-of-way if not permitted therein by the Virginia
Department of Transportation, and within the private street right-of-way." This means that trees have to be in the
road unless VDOT states that they won't allow it.
When 32.7.9.5 (d) states "if required street trees cannot be planted within the parking setback or within ten feet of
the street right-of-way due to sight distance, utility easements or other conflicting requirements, then the planting
strip shall be enlarged to accommodate the trees' it is referring to moving trees on parcels that feature uses other than
single-family attached/detached residential. The reference to utility easements means existing utility easements, not new
ones proposed as part of the development. New streets that have no existing utilities or sight distance easements have to
have their trees in the planting strip/ROW.
Based on my review of the plans, the conflict with new utilities appears to be because the lines are located under
driveways/sidewalks and on private lots. If the main utility lines are moved into the street ROW and then tap lines extend
into individual lots, there should be adequate spacing to comply with ACSA requirements and also move the trees into the
planting strip.
200
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Tuesday, June 16, 202010:56 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: David James <diames2@albemarle.org>; Ammy George <AGeorge@roudabush.com>
Subject: RE: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or
open attachments unless you are sure the content is safe.
Cameron,
Regarding comment #4: " [32.7.9.5 (d)] Street trees must be provided within the 6' landscaping strip within the public
right-of-way, and cannot be provided on private lots within a landscaping easement unless VDOT specifically says the
trees have to be located outside of the ROW. Conflicts with proposed utilities is a reason that street trees can be located
on private lots under Section 32.7.9.5; this is a design issue that must be rectified. Trees on lots 2, 4, 8, 33, 34, 35, 36, 39,
42, and 43 need to be relocated so that they are within the landscaping strip within the street right-of-way."
In addition to your comment, ACSA has commented that they wants 10' separation form all utility lines. To meet ACSA's
requirement, we will need to place additional trees behind the sidewalk. I simply do not have the space to move all the
trees into the planting strip, and be 10' from utilities, and provided the required 28 trees along Fowler street and 23
trees along Fowler circle. My understanding from 32.7.9.S.d is that we are permitted to offset the ROW by 10-feet to
create a landscaping easement which will help us meet the tree requirements. It is our preference to have all the trees
in the ROW, but we do not have the space due to driveways and utilities.
How can we proceed to address your comment?
Thank you,
Riki van Niekerk
Roudabush, Gale & Associates, Inc.
(434)260-6983
From: David James <diames2@albemarle.org>
Sent: Wednesday, June 10, 202012:01 PM
To: Jim Taggart <JTaggart@roudabush.com>; Steve Krohn <skrohn@resortscompanies.com>
Cc: Riki Van-Niekerk <Riki@roudabush.com>; Cameron Langille <blangille@albemarle.org>
Subject: FW: SUB201900170 Belvedere Phase 5A - Road Plans - Review Comments
Good afternoon,
Please address comments from Planning, attached.
Thanks,
David James
CEI I County of Albemarle
434-296-5832:3273
201
Cameron Langille
From: Cameron Langille
Sent: Wednesday, June 17, 2020 5:18 PM
To: Steve Krohn
Subject: SDP202000036 Belvedere Phase 5A Final Site Plan - First Review Comments
Attachments: SDP202000036 First Review Comment Letter.pdf
Good evening,
The first review comment letter for Belvedere Phase 5A are attached.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.org
(434) 296-5832 ext. 3432
202
Cameron Langille
From: Microsoft Outlook
To: skrohn@resortcompanies.com
Sent: Wednesday, June 17, 2020 5:12 PM
Subject: Undeliverable: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Q Office 365
Your message to skrohn@resortcompanies.com couldn't be delivered.
skrohn wasn't found at resortcompanies.com.
blangille Office 365 skrohn
Action Required Recipient
Unknown To address
How to Fix It
The address may be misspelled or may not exist. Try one or more of
the following:
• Send the message again following these steps: In Outlook,
open this non -delivery report (NDR) and choose Send Again
from the Report ribbon. In Outlook on the web, select this
NDR, then select the link "To send this message again, click
here." Then delete and retype the entire recipient address. If
prompted with an Auto -Complete List suggestion don't select
it. After typing the complete address, click Send.
• Contact the recipient (by phone, for example) to check that
the address exists and is correct.
• The recipient may have set up email forwarding to an
incorrect address. Ask them to check that any forwarding
they've set up is working correctly.
• Clear the recipient Auto -Complete List in Outlook or Outlook
on the web by following the steps in this article: Fix email
delivery issues for error code 5.1.1 in Office 365, and then
send the message again. Retype the entire recipient address
before selecting Send.
203
If the problem continues, forward this message to your email admin. If
you're an email admin, refer to the More Info for Email Admins
section below.
Was this helpful? Send feedback to Microsoft.
More Info for Email Admins
Status code: 550 5.1.1
This error occurs because the sender sent a message to an email address outside of
Office 365, but the address is incorrect or doesn't exist at the destination domain. The
error is reported by the recipient domain's email server, but most often it must be fixed
by the person who sent the message. If the steps in the How to Fix It section above
don't fix the problem, and you're the email admin for the recipient, try one or more of
the following:
The email address exists and is correct - Confirm that the recipient address exists, is
correct, and is accepting messages.
Synchronize your directories - If you have a hybrid environment and are using
directory synchronization make sure the recipient's email address is synced correctly in
both Office 365 and in your on -premises directory.
Errant forwarding rule - Check for forwarding rules that aren't behaving as expected.
Forwarding can be set up by an admin via mail flow rules or mailbox forwarding address
settings, or by the recipient via the Inbox Rules feature.
Mail flow settings and MX records are not correct - Misconfigured mail flow or MX
record settings can cause this error. Check your Office 365 mail flow settings to make
sure your domain and any mail flow connectors are set up correctly. Also, work with your
domain registrar to make sure the MX records for your domain are configured correctly.
For more information and additional tips to fix this issue, see Fix email delivery issues for
error code 550 5.1.1 in Office 365.
Original Message Details
Created Date: 6/17/2020 9:12:25 PM
Sender Address: blangille@albemarle.org
Recipient Address: skrohn@resortcompanies.com
Subject: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Error Details
Reported error: 550 5.1.1 <skrohn@resortcompanies.com>: Email address could
not be found, or was misspelled (G8)
DSN generated by: MN2PR09MB4697.namprd09.prod.outlook.com
204
Remote server: smtp21.gate.iad3a.rsapps.net
Message Hops
HOP TIME (UTC) FROM
TO
WITH
1 6/17/2020 MN2PR09MB5516.namprd09.prod.outlook.com MN2PR09MB5516.namprd09.prod.outlookcom mapi
9:12:25 PM
2 6/17/2020 MN2PR09MB5516.namprd09.prod.outlook.com MN2PR09MB4697.namprd09.prod.outlook.com Microsoft sMTP Sen
9:12:25 PM cipher=TLs-ECDHE-
Original Message Headers
ARC -Seal: i=1; a=rsa-sha256; s=areselector9901; d=microsoft.com; cv=none;
b=KiTZDESUuxCFcu/JDCUcuJ+I7NNfjBWONOPtZLprL4grSQwNKZq/EQj06elnsALUDBjmhAlfjnOkiTJlOHirmMS
LCO30YN3uF1+q+2wLi6m673IzNz7dcphZcBpfaFl+RSTkEmQfzBWn7aHGZaloyGgf3g4kMrGc39eptlsvIBKzVeqj
9Q9dhBcgCO+EGTivosn5CZeQjIBMTa1M5MP8JRRTX3f6M6nL7md5XwA9XjIXtRr/UJh9/aBrmCloobWThrw/NUYjo
hvs/AYnVWCQCHVqfkZB/PSdwvpvDiVSou++cpzXLLpehilQQBveJCYrpKnfKJ2i0a3s/n+DtgYhRA==
ARC -Message -Signature: i=1; a=rsa-sha256; c=relaxed/relaxed; d=microsoft.com;
s=areselector9901;
h=From:Date:Subject:Message-ID:Content-Type:MIME-Version:X-MS-Exchange-SenderADCheck;
bh=TkE5bh93v/E403xS/yIBANAOvMNz0i2TPprMSEQddhQ=;
b=lxc40SvR/2Z9R7L9BngJOeZXibloODS5x9WZ9tB4HYSGHIrxN9z241YBofO2bTxR2HOft5StuawhOKMWQG0606n
NSOYSMEPdsfQerBJGX4tNlTgoyVOxJ8y9Ug6dTmdhzc4L8jM1sPlRCZizTgn7xtChC8y4E7£Idgf8O+WV9JDkLxCb
ndriBVYAg5ye0sJW1OnMSxCzy3oHFEs5QtgyiXggiJV5PpP8Au389£/VLKcm7JgrjNCWBAG+jtRgOR+tpQlTpsmO+
iNxz5MLO525H7ZgQnKmszeLA1/ekQ1Z8vH9b6Sd9ALhPNjpWAX6M+mEeUITYkyHSBIbHWmyAr2gFg==
ARC -Authentication -Results: i=1; mx.microsoft.com 1; spf=pass
smtp.mailfrom=albemarle.org; dmarc=pass action=none
header.£rom=albemarle.org; dkim=pass header.d=albemarle.org; arc=none
DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed;
d=albemarlecountyVA.onmicrosoft.com;
s=selector2-albemarlecountyVA-onmicrosoft-com;
h=From:Date:Subject:Message-ID:Content-Type:MIME-Version:X-MS-Exchange-SenderADCheck;
bh=TkE5bh93v/E403xS/yIBANAOvMNz0i2TPprMSEQddhQ=;
b=Ub+74gY6SU2yuyFpnUOC4gU5SdNktkSalHSmEnGaDOL+7V45J+8ZW97nxOAB4fncAttyRNfurOOlobJkQekzSC+
+penAEKk6gUyTrYLSR+gwJSNggIQoBOViyAVlfldwHI9A374gkEUIUB4zPnOhkVV6ZMIVtRkBCArJGOy3TUA-
Received: from MN2PR09MB5516.namprd09.prod.outlook.com (2603:1Ob6:208:21d::11)
by MN2PR09MB4697.namprd09.prod.outlook.com (2603:1Ob6:208:223::19) with
Microsoft SMTP Server (version=TLS1_2,
cipher=TLS_ECDHE_RSA _ WITH_AES_256_GCM_SHA384) id 15.20.3109.22; Wed, 17 Jun
2020 21:12:25 +0000
Received: from MN2PR09MB5516.namprd09.prod.outlook.com
([fe80::9562:a8ed:c3fe:e952]) by MN2PR09MB5516.namprd09.prod.outlook.com
([fe80::9562:a8ed:C3fe:e952%6]) with mapi id 15.20.3109.021; Wed, 17 Jun 2020
21:12:25 +0000
From: Cameron Langille <blangille@albemarle.org>
To: "skrohn@resortcompanies.com" <skrohn@resortcompanies.com>
205
Subject: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Thread -Topic: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Thread -Index: AdZE6/5rZI/rdR6t SBioK3EeA+1COg==
Date: Wed, 17 Jun 2020 21:12:25 +0000
Message-ID:
<MN2PR09MB5516A90ACOE613881CFF4C6AB99AO@MN2PR09MB5516.namprd09.prod.outlook.com>
Accept -Language: en -US
Content -Language: en -US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
authentication -results: resortcompanies.com; dkim=none (message not signed)
header.d=none;resortcompanies.com; dmarc=none action=none
header.£rom=albemarle.org;
x-originating-ip: [73.152.164.156]
x-ms-publictra£fictype: Email
x-ms-o£fice365-filtering-correlation-id: 93a649ld-7bc6-457b-9e21-08d813032293
x-ms-tra££ictypediagnostic: MN2PR09MB4697:
x-microsoft-antispam-pros:
<MN2PR09MB4697F073B9F8D5824802A37FB99AO@MN2PR09MB4697.namprd09.prod.outlook.com>
x-ms-oob-tic-oobclassifiers: OLM:10000;
x-forefront-pros: 04371797A5
x-ms-exchange-senderadcheck: 1
x-microsoft-antispam: BCL:O;
x-microsoft-antispam-message-info:
W9FkRkchr/vlvS+VAWoyzxhzQ1p9c9dTYd81BHv+Ua80ldBCoulypubNDbuNA5DE2xOdIIm3zo6sC7on6k9FUBD7A
x/zUOd804S9FBZUT12870PkXvELTJBMfQElvkhEsstbSFyzKtUHSXEXixGDugtJd5gM266r658BF/wLRz+eJgQ/d6
zTxW6ZD8NSZF4MNXagH1M/DC+kyQsAUVPW1EJyjeFDDzm7KOej7UeLdjglZGgpGDaCbHyIgxF6M8cxxSKCDNRyepV
OSAtFOHaOiHTxg/wQ5WNS9CT6P8gUemledlmrtTIsjAexFJ72um9AZUbN/Dz9Qwk79eRIOt7myw==
x-forefront-antispam-report:
CIP:255.255.255.255;CTRY:;LANG:en;SCL:I;SRV:;IPV:NLI;SFV:NSPM;H:MN2PR09MB5516.namprd09.pr
od.outlook.com;PTR:;CAT:NONE;SFTY:;SFS:(39850400004)(366004)(346002)(396003)(136003)(3760
02)(7696005)(558084003)(55016002)(6506007)(99936003)(478600001)(316002)(186003)(712004000
O1)(26005)(9686003)(86362001)(6916009)(66476007)(8936002)(33656002)(8676002)(83380400001)
(64756008)(2906002)(66616009)(52536014)(66446008)(76116006)(66556008)(66946007)(566030000
2);DIR:OUT;SFP:1101;
x-ms-exchange-antispam-messagedata:
CSACV+XFybPDCYJTjOFayMRpXkegbzkJ7LkLwjZo+TUpVQfPr431Y4FDCNzgl2ASIAOD4pNpRWwXi3hJVeL£vjPjr
wkUHCXC8ogRR92zB2C/Lt LHEJ3NOtZ5wnABIuOG9NOC4kDARtNtEldxlXOkIALNT6rXiiM3G6SjAVw4EDJKs62apk
jtgXkafVBlRw4+4YWO9s£zsxSpIZrAj9I8KhkA£CP1UVaM+PJkCgWZROF55EvCrjRHmNyljum/fltBm2exc1CIm3Z
9wxN3a£QKIemkw/Z29oiuBumlSbjDZn1SJD£3vv+WOln/yjrmwEMIBy7vMXLkcWAxY3wYRkZRtYQgOnnhQaMkJcS9
p8laVmcmXhPpSh8nLVGQpyhs09TOuYkjSdnmw/O8333AdwuB/JohgV6y3PpRzZSjrrvxaOQNWV1NwGPIKPB2Pv0em
DkvoFn£HadgdA8NwH6UocQvuHsk+lIH6LmNwx6ACDCaA1SWgSNK£S44YrELUT1LxNO9
x-ms-exchange-transport-forked: True
Content -Type: multipart/mixed;
boundary="_004_MN2PR09MB5516A90ACOE613881CFF4C6AB99AOMN2PR09MB5516namp_"
MIME -Version: 1.0
X-OriginatorOrg: albemarle.org
X-MS-Exchange-CrossTenant-Network-Message-Id: 93a6491d-7bc6-457b-9e21-08d813032293
X-MS-Exchange-CrossTenant-originalarrivaltime: 17 Jun 2020 21:12:25.7062
206
(UTC)
X-MS-Exchange-CrossTenant-£romentityheader: Hosted
X-MS-Exchange-CrossTenant-id: 472f3939-9689-4fe6-afc7-839b4790cbee
X-MS-Exchange-CrossTenant-mailboxtype: HOSTED
X-MS-Exchange-CrossTenant-userprincipalname:
SgaLOpfJSROukpMY+CAgm9KxxKCHDa1M/JRCvJP7pgIYJdZSHPWgI8MRj69UjmOmT37T066GtxgiVMTVPxkRww==
X-MS-Exchange-Transport-CrossTenantHeadersStamped: MN2PR09MB4697
207
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, June 17, 2020 5:12 PM
To:
skrohn@resortcompanies.com
Subject:
SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review Comments
Attachments:
SDP202000036 First Review Comment Letter.pdf
Good evening,
The first review comments for the Belvedere Phase 5A final site plan are attached.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille(@albemarle.org
(434) 296-5832 ext. 3432
ZiT3
Cameron Langille
From: Microsoft Outlook
To: skrohn@resortcompanies.com
Sent: Wednesday, June 17, 2020 5:08 PM
Subject: Undeliverable: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Q Office 365
Your message to skrohn@resortcompanies.com couldn't be delivered.
skrohn wasn't found at resortcompanies.com.
blangille Office 365 skrohn
Action Required Recipient
Unknown To address
How to Fix It
The address may be misspelled or may not exist. Try one or more of
the following:
• Send the message again following these steps: In Outlook,
open this non -delivery report (NDR) and choose Send Again
from the Report ribbon. In Outlook on the web, select this
NDR, then select the link "To send this message again, click
here." Then delete and retype the entire recipient address. If
prompted with an Auto -Complete List suggestion don't select
it. After typing the complete address, click Send.
• Contact the recipient (by phone, for example) to check that
the address exists and is correct.
• The recipient may have set up email forwarding to an
incorrect address. Ask them to check that any forwarding
they've set up is working correctly.
• Clear the recipient Auto -Complete List in Outlook or Outlook
on the web by following the steps in this article: Fix email
delivery issues for error code 5.1.1 in Office 365, and then
send the message again. Retype the entire recipient address
before selecting Send.
209
If the problem continues, forward this message to your email admin. If
you're an email admin, refer to the More Info for Email Admins
section below.
Was this helpful? Send feedback to Microsoft.
More Info for Email Admins
Status code: 550 5.1.1
This error occurs because the sender sent a message to an email address outside of
Office 365, but the address is incorrect or doesn't exist at the destination domain. The
error is reported by the recipient domain's email server, but most often it must be fixed
by the person who sent the message. If the steps in the How to Fix It section above
don't fix the problem, and you're the email admin for the recipient, try one or more of
the following:
The email address exists and is correct - Confirm that the recipient address exists, is
correct, and is accepting messages.
Synchronize your directories - If you have a hybrid environment and are using
directory synchronization make sure the recipient's email address is synced correctly in
both Office 365 and in your on -premises directory.
Errant forwarding rule - Check for forwarding rules that aren't behaving as expected.
Forwarding can be set up by an admin via mail flow rules or mailbox forwarding address
settings, or by the recipient via the Inbox Rules feature.
Mail flow settings and MX records are not correct - Misconfigured mail flow or MX
record settings can cause this error. Check your Office 365 mail flow settings to make
sure your domain and any mail flow connectors are set up correctly. Also, work with your
domain registrar to make sure the MX records for your domain are configured correctly.
For more information and additional tips to fix this issue, see Fix email delivery issues for
error code 550 5.1.1 in Office 365.
Original Message Details
Created Date: 6/17/2020 9:08:12 PM
Sender Address: blangille@albemarle.org
Recipient Address: skrohn@resortcompanies.com
Subject: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Error Details
Reported error: 550 5.1.1 <skrohn@resortcompanies.com>: Email address could
not be found, or was misspelled (G8)
DSN generated by: BLOPR0901MB4179.namprd09.prod.outlook.com
210
Remote server: smtp2.gate.ord1c.rsapps.net
Message Hops
HOP TIME (UTC) FROM
TO
WITH
1 6/17/2020 MN2PR09MB5516.namprdO9.prod.outlook.com MN2PR09MB5516.namprdO9.prod.outlookcom mapi
9:08:12 PM
2 6/17/2020 MN2PR09MB5516.namprdO9.prod.outlook.com BLOPRO901MB4179.namprdO9.prod.outlook.com Microsoft SMTP Sei
9:08:12 PM cipher=TLS-ECDHE,
Original Message Headers
ARC -Seal: i=1; a=rsa-sha256; s=areselector9901; d=microsoft.com; cv=none;
b=KOdbhGO01xmQ7tG91IN5ZsfhdS9snWML5ZU9e/aGLYlazvSOKgBXzhJr4UK2CZbP41Z3nL3+eAyWMWh5+iCXSyw
tRRotHQsnXS74llTcZZMoiUNER5dCROBHKuBsmLeRldmGY3MBsVHX1sNEUoYthlwIkABwktBiH5TxFKj=VVKkvrn
k20mlFmbTLlXbNwfNK5yFriOlWiru+2fXcaHlFmtw£N/XGVCugsb2Ga5xr2xypD6RujBJ5gOXZhv+z1HYgb2E86kp
3RoXrgYVZFv4JwDTx£XbMO4neOiSDKLAOGwQtlGrrkD484v4CWg4EduLDTKokXdziYOQrgimPVaAw==
ARC -Message -Signature: i=1; a=rsa-sha256; c=relaxed/relaxed; d=microsoft.com;
s=areselector9901;
h=From:Date:Subject:Message-ID:Content-Type:MIME-Version:X-MS-Exchange-SenderADCheck;
bh=XZgaQA25briMHev6FZest64/w/jBDUxJ7JbQIM/PBFM=;
b=ZmthpvOnnwbgUuu2+5BmEsGXGzPEjj2DKWpupKOOsDkflocIXgI8twH6mzgT2KeRQ/iLt5OaOkMRWhfPKB82E8+
MsMsJ04d8MIA8BXEGSR4kLlhb95ElZ5hSmI/s6wfNtu7MhNrdMuiS7PPbSykX3jgCJQH8/gD4sljbHeTfaKkSN+Za
rhxZfRZFdJ1ebDHGPVTtsBgtKTrK2q/1WURllpBNOk8sR7olwY4rw+OgBtQyKrmjaDd3xSt3gN3WVJT+ZANJjvA9f
RsjtEQmt0krQ2wX9gUr5QS9/IfLd7On3FOlGZYg4aeiCPZ7vjhaj/oFjlAjo97vpleCRuJrGn94GQ==
ARC -Authentication -Results: i=1; mx.microsoft.com 1; spf=pass
smtp.mailfrom=albemarle.org; dmarc=pass action=none
header.£rom=albemarle.org; dkim=pass header.d=albemarle.org; arc=none
DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed;
d=albemarlecountyVA.onmicrosoft.com;
s=selector2-albemarlecountyVA-onmicrosoft-com;
h=From:Date:Subject:Message-ID:Content-Type:MIME-Version:X-MS-Exchange-SenderADCheck;
bh=XZgaQA25briMHev6FZest64/w/jBDUxJ7JbQIM/PBFM=;
b=POd6Ze9Y5TmGwIg5BiLioeyL1I/xB7+2dZKwxR581Lj9dDbc3yaKrQC5X19OROOfiEScJr835M1dVa6PjXZANlk
dgaDFhGo3YIEcfPCRL£iy3LvgMAWNZ3nmB7V/Tgr+60Y+tB9L2kkLHtcfElAYHEsRfHwAM7PO/th/OVYtrJU=
Received: from MN2PR09MB5516.namprdO9.prod.outlook.com (2603:1Ob6:208:21d::11)
by BLOPRO901MB4179.namprdO9.prod.outlook.com (2603:1Ob6:208:lc4::7) with
Microsoft SMTP Server (version=TLS1_2,
cipher=TLS_ECDHE_ RSA_ WITH_AES_256_GCM_SHA384) id 15.20.3088.22; Wed, 17 Jun
2020 21:08:12 +0000
Received: from MN2PR09MB5516.namprdO9.prod.outlook.com
([fe80::9562:a8ed:c3fe:e952]) by MN2PR09MB5516.namprdO9.prod.outlook.com
([fe80::9562:a8ed:c3fe:e952%6]) with mapi id 15.20.3109.021; Wed, 17 Jun 2020
21:08:12 +0000
From: Cameron Langille <blangille@albemarle.org>
To: "skrohn@resortcompanies.com" <skrohn@resortcompanies.com>
211
Subject: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Thread -Topic: SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review
Comments
Thread -Index: AdZE6zSR5rYy98gxTdgxmzzD4MXngw==
Date: Wed, 17 Jun 2020 21:08:12 +0000
Message-ID:
<MN2PR09MB5516781F66386C607CE2C28FB99AO@MN2PR09MB5516.namprd09.prod.outlook.com>
Accept -Language: en -US
Content -Language: en -US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
authentication -results: resortcompanies.com; dkim=none (message not signed)
header.d=none;resortcompanies.com; dmarc=none action=none
header.£rom=albemarle.org;
x-originating-ip: [73.152.164.156]
x-ms-publictra£fictype: Email
x-ms-office365-filtering-correlation-id: d8839c4£-adbe-44a2-e055-08d813028bbb
x-ms-tra£fictypediagnostic: BLOPR0901MB4179:
x-microsoft-antispam-prvs:
<BLOPR0901MB41792F97CFABEB5A139522AFB99AO@BLOPR0901MB4179.namprd09.prod.outlook.com>
x-ms-oob-tic-oobclassifiers: OLM:10000;
x-forefront-prvs: 04371797A5
x-ms-exchange-senderadcheck: 1
x-microsoft-antispam: BCL:O;
x-microsoft-antispam-message-info:
5W61IcgxrMw5PJz£LjKETZzLj4wzS7sESyLdlQnWtzepISJYH+SCuYSNB8fN26D6Xk/QsaMjp5ZWTOhJJLXznsadB
IImuRwMSi84bv9/P63k8aTon6Kzu9Gmz3zTo+V9cFY1HIix6kxSpiXLFDn8Ey5dmuE7aohT6hVXc7Hb44+ji5M8jD
rAmWkhUAUBOtCJhjCVVUR1X+wXOnyq+ByrWBv3jbR/8vkOgxKhg4Z84vrL7navZUSiKh6ka2TNIAWRXXhn3QCJGC4
Vy/6yw+DtT4Td3DXVgdKPFtrWdm/9jjzDzbvBQDrR+tpbbBwmIYFMH+BVhuj2fkNgksZenFOCwg==
x-forefront-antispam-report:
CIP:255.255.255.255;CTRY:;LANG:en;SCL:I;SRV:;IPV:NLI;SFV:NSPM;H:MN2PR09MB5516.namprd09.pr
od.outlook.com;PTR:;CAT:NONE;SFTY:;SFS:(346002)(376002)(136003)(396003)(39850400004)(3660
04)(316002)(8936002)(8676002)(71200400001)(5660300002)(52536014)(55016002)(76116006)(5580
84003)(478600001)(86362001)(26005)(99936003)(186003)(83380400001)(7696005)(6506007)(66946
007)(33656002)(66446008)(64756008)(9686003)(6916009)(66616009)(66476007)(66556008)(290600
2);DIR:OUT;SFP:1101;
x-ms-exchange-antispam-messagedata:
Qmlz+Dx65igY1jWp5UEzNnlc5BhV9dHWYW9mgcU9rHQMJ4KkUBVEMJtkROgCFUglShhyWF4Y1R3ADKiDVNZadFgV/
AwESHnhKBPHrAHOVjsVhOcbv/R481/DOjn/YbAteCg2Nalg6KURylUWM9ic8RNchlvNB8h2FaNqAHtN3cnHzMWmIx
eMg5Ase60brLA9xge7lwMetplu6IwCuNYpIlowvVI5Po9vocl5RiH8iKpvdsZgQLz4PCUGiwnjRJdJgDHywtwjjD8
+KOH6V1UcJxxSBFE/4lstjnix8=B/LEa7voONTRccliWNokif+JtgDSlpStrrlaMU776zX29C£mPKfY8gFdGvKOy
06bj2bnZaFSgMeeoBvtOJUlSgplkz/D9Xz+iFtkhAHP9hdkKdtOLmSZOiwZxiGpnaUduOiVGGE188TU6EN+teImTT
gKvyKiJAuvOH15S9GCP55aBwzLe67AhCECV/6xkdMzXGNDrjGvMBMjbU2s5xeWgZL3r
x-ms-exchange-transport-forked: True
Content -Type: multipart/mixed;
boundary="_004_MN2PR09MB5516781F66386C607CE2C28FB99AOMN2PR09MB5516namp_"
MIME -Version: 1.0
X-OriginatorOrg: albemarle.org
X-MS-Exchange-CrossTenant-Network-Message-Id: d8839c4£-adbe-44a2-e055-08d813028bbb
X-MS-Exchange-CrossTenant-originalarrivaltime: 17 Jun 2020 21:08:12.6928
212
(UTC)
X-MS-Exchange-CrossTenant-£romentityheader: Hosted
X-MS-Exchange-CrossTenant-id: 472f3939-9689-4fe6-a£c7-839b4790cbee
X-MS-Exchange-CrossTenant-mailboxtype: HOSTED
X-MS-Exchange-CrossTenant-userprincipalname:
vLt+IwUzTbacAedm+g2EgdkZM814is8+FG/WDCu+sto2llb3FkyQth+xSidesauXXEo4MdD/JZOCYMkU65GO+Q==
X-MS-Exchange-Transport-CrossTenantHeadersStamped: BLOPR0901MB4179
213
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, June 17, 2020 5:08 PM
To:
skrohn@resortcompanies.com
Subject:
SDP202000036 Belvedere Phase 5A - Final Site Plan - First Review Comments
Attachments:
SDP202000036 First Review Comment Letter.pdf
Good evening,
The first review comments for the Belvedere Phase 5A final site plan are attached.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.or6
(434) 296-5832 ext. 3432
214
Cameron Langille
From: Cameron Langille
Sent: Monday, June 15, 2020 3.46 PM
To: David lames
Subject: RE: Belvedere Phase 5A
Hi David,
When the initial site plan was approved, RWSA had never sent any comments. RWSA coordinates with ACSA on this
projects if they need to, and Richard Nelson is reviewing their sewer/water utility plans. I am assuming he has sent this
to RWSA and when he gave me his comments for the final site plan review, he didn't say that he needed anything else
related to RWSA.
So, you can just tells Riki that it is our understanding that ACSA staff are coordinating with RWSA, and she should contact
Richard Nelson directly to get a definite answer about what (if anything) is needed for RWSA.
-Cameron
From: David James <djames2@albemarle.org>
Sent: Friday, June 12, 2020 2:21 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Belvedere Phase 5A
Hi Cameron,
Was there anything for Victoria/RWSA to look at on the FSP? Let her know if comments are needed/necessary.
Thanks,
David
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Friday, June 12, 20201:43 PM
To: David James <diames2@albemarle.ore>
Subject: Belvedere Phase 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
David,
I am about ready to resubmit the Road Plan and Final Site Plan for Belvedere Phase 5A. I just realized that Victoria Fort
has not produced any comments. Do you mind reaching out to her to request comments please?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
215
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
216
Cameron Langille
From:
David James
Sent:
Friday, June 12, 2020 2:21 PM
To:
Cameron Langille
Subject:
FW: Belvedere Phase 5A
Hi Cameron,
Was there anything for Victoria/RWSA to look at on the FSP? Let her know if comments are needed/necessary.
Thanks,
David
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Friday, June 12, 2020 1:43 PM
To: David James <djames2@albemarle.org>
Subject: Belvedere Phase 5A
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
David,
I am about ready to resubmit the Road Plan and Final Site Plan for Belvedere Phase 5A. I just realized that Victoria Fort
has not produced any comments. Do you mind reaching out to her to request comments please?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct:(434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
217
Cameron Langille
From: Cameron Langille
Sent: Monday, June 8, 2020 10:57 AM
To: Riki Van-Niekerk
Subject: RE: Belvedere Phase 5
Hi Riki,
Comments will be sent out to you on or before June 181h
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Thursday, June 4, 2020 1:04 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I just wanted to check when we can expect comments from Planning on Phase 5A?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, June 2, 2020 9:53 AM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Riki,
Since these are attached units, you are allowed to submit a final subdivision plat AFTER the final site plan is
approved. It's called a "subdivision following final site plan approval." It must comply with all the code sections listed
under Section 14-206 of the subdivision ordinance.
Here's a link to the application:
http://www.albemarle.org/upload/images/forms center/departments/Community Development/fonns/Subdivisi
on Applications/Subdivision Plat & Checklist.pdf
218
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Monday, June 1, 2020 8:19 AM
To: Cameron Langille <blaneille@albemarle.org>
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Correct, Phase 5A.
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Sunday, May 31, 2020 3:31 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Hi Riki,
Are you referencing the Belvedere Phase 5A section that currently has a final site plan under review with us?
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille <blaneille@albemarle.org>
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct:(434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
219
Cameron Langille
From: David James
Sent: Friday, June 5, 2020 1:47 PM
To: Riki Van-Niekerk; jimmy taggart Otaggart@roudabush.com); Cameron Langille; Steve
Krohn
Subject: SDP202000036 - Belvedere Phase 5A - Final - Digital
Good Afternoon Everyone,
I'd like to follow-up on item 7 below, and add a comment to address before you guys resubmit.
1. Submit a WPO plan for approval prior to FSP approval.
2. Remove Sheets 9, 10 & 12 from the set.
3. Sheet 2: Show the 100' stream buffer.
4. Submit design plans & comps for walls over 4' high.
5. Sheet 5-7: Show safety railing for walls over 30" high.
6. Sheet 7: Provide low -maintenance ground cover (not grass) on 2:1 graded slopes.
7. Note: Walls crossings property lines may need 3rd party agreements between owners.
Show an easement for both walls & show an access easement from the road to get to the lower wall. A maintenance
agreement for the walls will need to be recorded with the subdivision plat.
8. Provide driveway aprons & detail. Correct sheet 5 showing landscaping through driveway entrances.
Thanks,
David James
220
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Thursday, June 4, 2020 1:04 PM
To: Cameron Langille
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Cameron,
I just wanted to check when we can expect comments from Planning on Phase 5A?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, June 2, 2020 9:53 AM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Riki,
Since these are attached units, you are allowed to submit a final subdivision plat AFTER the final site plan is
approved. It's called a "subdivision following final site plan approval." It must comply with all the code sections listed
under Section 14-206 of the subdivision ordinance.
Here's a link to the application:
http://www.albemarle.org/upload/images/forms center/departments/Community Development/forms/Subdivisi
on Applications/Subdivision Plat & Checklist.pdf
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Monday, June 1, 2020 8:19 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Correct, Phase 5A.
221
From: Cameron Langille <blaneille@albemarle.ora>
Sent: Sunday, May 31, 2020 3:31 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Hi Riki,
Are you referencing the Belvedere Phase 5A section that currently has a final site plan under review with us?
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille <blaneille@albemarle.org>
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct:(434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
222
Cameron Langille
From:
Cameron Langille
Sent:
Tuesday, June 2, 2020 9:53 AM
To:
Riki Van-Niekerk
Subject:
RE: Belvedere Phase 5
Riki,
Since these are attached units, you are allowed to submit a final subdivision plat AFTER the final site plan is
approved. It's called a "subdivision following final site plan approval." It must comply with all the code sections listed
under Section 14-206 of the subdivision ordinance.
Here's a link to the application:
http://www.albemarle.orgJupload/images/forms center/departments/Community Development/forms/Subdivisi
on Applications/Subdivision_ Plat & Checklist.pdf
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Monday, June 1, 2020 8:19 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Correct, Phase 5A.
From: Cameron Langille <blangille@albemarle.org>
Sent: Sunday, May 31, 2020 3:31 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Hi Riki,
Are you referencing the Belvedere Phase 5A section that currently has a final site plan under review with us?
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
223
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
RIM van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
224
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Monday, June 1, 2020 8:19 AM
To: Cameron Langille
Subject: RE: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Correct, Phase 5A.
From: Cameron Langille <blangille@albemarle.org>
Sent: Sunday, May 31, 2020 3:31 PM
To: Riki Van-Niekerk <Riki@roudabush.com>
Subject: RE: Belvedere Phase 5
Hi Riki,
Are you referencing the Belvedere Phase 5A section that currently has a final site plan under review with us?
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
225
Cameron Langille
From: Cameron Langille
Sent: Sunday, May 31, 2020 3:31 PM
To: Riki Van-Niekerk
Subject: RE: Belvedere Phase 5
Hi Riki,
Are you referencing the Belvedere Phase 5A section that currently has a final site plan under review with us?
From: Riki Van-Niekerk<Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
226
Cameron Langille
From: Riki Van-Niekerk <Riki@roudabush.com>
Sent: Thursday, May 28, 2020 4:58 PM
To: Cameron Langille
Subject: Belvedere Phase 5
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Quick question:
For Belvedere Phase 5, do we need to submit a preliminary plat or can we go straight to final?
Thank you,
Riki van-Niekerk, EIT
Roudabush, Gale & Assoc., Inc.
Office: (434)979-8121
Direct: (434)260-6983
Mail: 435 Merchant Walk sq., Suite 300-159, Charlottesville, VA 22902
Location: 999 Second St. SE, Suite 201, Charlottesville, VA 22902
227
Cameron Langille
From: David lames
Sent: Wednesday, May 27, 2020 5:24 PM
To: Cameron Langille
Subject: Planning Application Review for SDP202000036 Belvedere Phase 5A - Final - Digital.
The Review for the following application has been completed:
Application Number = SDP202000036
Reviewer = David James
Review Status = Requested Changes
Completed Date = 05/27/2020
This email was sent from County View Production.
Cameron,
My comments are in CV. Let me know if you have any questions.
Thanks,
David James
228
Cameron Langille
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Thursday, May 14, 2020 4:26 PM
To: Cameron Langille
Subject: RE: SDP202000036 Belvedere Phase 5A - Final Site Plan
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Belvedere 5A is under review.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, April 28, 2020 3:31 PM
To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox2@albemarle.org>; John Anderson
<janderson2@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; David James
<djames2@albemarle.org>; Michael Dellinger<mdellinger@albemarle.org>; Brian Becker<bbecker@albemarle.org>;
Shawn Maddox <smaddox@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Adam Moore
<Adam.Moore@vdot.virginia.gov>; vfort@rivanna.org
Cc: Bill Fritz <BFRITZ@albemarle.org>
Subject: SDP202000036 Belvedere Phase 5A- Final Site Plan
Good afternoon,
This final site plan has been submitted for review. This is the first submittal of the plan. The approved initial site plan
associated with this project is SDP201900060.
You can access digital copies of the SDP202000036 application and final site plan through the following link:
https:Hlfweb.a I bemarle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ne%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
The approved initial site plan and action letter can be accessed through the following link:
https://Ifwe b.a I bema rle.ore/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P Ia nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP201900060%22%7d
Please send me and review comments you have for this application by Wednesday, May 20, 2020. Let me know if you
have any questions about this project or if you have trouble accessing the plans through the links.
Thanks,
Cameron
229
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille(@albemarle.ore
(434) 296-5832 ext. 3432
230
Cameron Langille
From:
Greene, Max <max.greene@vdot.virginia.gov>
Sent:
Friday, May 8, 2020 4:19 PM
To:
David James; Cameron Langille
Cc:
Adam Moore; Jim Taggart; Riki@roudabush.com
Subject:
SUB-2019-00170 - Belvedere Phase 5, Part 1 — Road Plan - Review #2 SDP-2020-00036 -
Belvedere Phase 5A — Final Site Plan — Review #1
Attachments: SUB-2019-00170 & SDP-2020-00036 Belvedere - Phase 5, Part 1 - Road & Site Plan -
Dated 04-17-2020.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Please find the attached review comment letter.
Max Greene
Architect/ Engineer I
Land Use
Southern Culpeper District
Charlottesville Res. Admin.
Office: 434-422-9894
Cell: 434-906-6415
max.¢reene@vdot.virs inia. gov
231
Cameron Langille
From: Cameron Langille
Sent: Tuesday, April 28, 2020 3:31 PM
To: Frank Pohl; Emily Cox; John Anderson; Matthew Wentland; David James; Michael
Dellinger, Brian Becker, Shawn Maddox, Richard Nelson; Adam Moore;
vfort@rivanna.org
Cc: Bill Fritz
Subject: SDP202000036 Belvedere Phase 5A - Final Site Plan
Good afternoon,
This final site plan has been submitted for review. This is the first submittal of the plan. The approved initial site plan
associated with this project is SDP201900060.
You can access digital copies of the SDP202000036 application and final site plan through the following link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ng%5d:%5 bAppl ication N um ber%5d=%22SDP202000036%22%7d
The approved initial site plan and action letter can be accessed through the following link:
https:Hlfwe b.a I bema rle.ore/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ng%5d:%5 bAppl icatio n N um ber%5d=%22SDP201900060%22%7d
Please send me and review comments you have for this application by Wednesday, May 20, 2020. Let me know if you
have any questions about this project or if you have trouble accessing the plans through the links.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
232
Cameron Langille
From: Megan Nedostup
Sent: Thursday, April 23, 2020 5:08 PM
To: Margaret Maliszewski; Frank Pohl; Cameron Langille; Patricia Saternye; Tori
Kanellopoulos; Andy Reitelbach; Brent Nelson; Mariah Gleason; Andrew Knuppel; Scott
Clark; Daniel Butch; David Benish; Michaela Accardi; Kevin McDermott; Marsha Alley,
Carla Harris - CDD; Vivian Groeschel; Jeffrey Baker; Amelia McCulley; Jodie Filardo;
Charles Rapp; Christopher Perez•, Rachel Falkenstein
Subject: RE: Submittals 4/20/2020
Attachments: 4-20-20_submittals.pdf
Assigned.
Let me know if there are questions.
Thanks!
Megan Nedostup, AICP
(pronounced nuh-DAHST-up)
she/her/hers (What is this?)
Principal Planner
Community Development Department
Planning Services
ph: 434.296.5832 ext. 3004
From: Megan Nedostup
Sent: Wednesday, April 22, 2020 3:44 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>; Frank Pohl <fpohl@albemarle.org>; Cameron Langille
<blangille@albemarle.org>; Patricia Saternye <psaternye@albemarle.org>; vkanellopoulos@albemarle.org; Andy
Reitelbach <mreitelbach@albemarle.org>; Brent Nelson <bnelson@albemarle.org>; Mariah Gleason
<mgleason@albemarle.org>; Andrew Knuppel <aknuppel@albemarle.org>; Scott Clark <Sclark@albemarle.org>; Daniel
Butch <dbutch@albemarle.org>; David Benish <DBENISH@albemarle.org>; Michaela Accardi
<maccardi@albemarle.org>; Kevin McDermott <kmcdermott@albemarle.org>; Marsha Alley <malley3@albemarle.org>;
Carla Harris - CDD <CHARRIS@albemarle.org>; Vivian Groeschel <vgroeschel@albemarle.org>; Jeffrey Baker
<jbaker@albemarle.org>; Amelia McCulley <AMCCU LLE@albemarle.org>; Jodie Filardo <jfilardo@albemarle.org>;
Charles Rapp <rappc@albemarle.org>; Christopher Perez <cperez@albemarle.org>; Rachel Falkenstein
<rfalkenstein@albemarle.org>
Subject: Submittals 4/20/2020
Good Afternoon,
See attached list. Another large submittal. Only one ZMA though. 4 SRC items. Let me know if you have
interest in taking any of these or if you have history with them. Otherwise, will assign tomorrow. Will also be
going into the office to see if there are any LORs, so let me know if you have plats that need signing.
Thanks!
Megan Nedostup, AICP
(pronounced nuh-DAHST-up)
sheihedhers (What is this?)
Principal Planner
Community Development Department
233
Planning Services
ph: 434.296.5832 ext. 3004
234