HomeMy WebLinkAboutWPO202100060 Plan - VSMP 2021-11-01VIRGINIA S TORMWA TER MANAGEMENT PLAN REFERENCES AND CONTACTS REFERENCES *BOUNDARY & TOPOGRAPHIC SURVEY: BOHLER 12825 WORLDGATE DRIVE, SUITE 700 HERNDON, VA20170 DATED: 04/20/2021 SURVEY JOB SV211201 ELEVATIONS: BASED ON GPS OBSERVATIONS *ARCHITECTURAL PLAN: ARCHITECTURAL RESOURCE TEAM 1055 E. INDIAN SCHOOL ROAD PHOENIX, AZ 85014 CAD FILE NAMED: "BASE-128X60-RH-CMU" DATED: 05/052021 GOVERNING AGENCIES ♦ALBEMARLE COUNTY SITE REVIEW COMMITTEE ALBEMARLE COUNTY, VA 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 PHONE: (434) 243-7929 UTILITIES ♦ALBEMARLE COUNTY SERVICE AUTHORITY 168 SPOTNAP ROAD CHARLOTTESVILLE, VA 22911 PHONF: (434) 977-4511 "THE ABOVE REFERENCED DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THESE PLANS, HOWEVER, BOHLER ENGINEERING DOES NOT CERTIFY THE ACCURACY OF THE WORK REFERENCED OR DERIVED FROM THESE DOCUMENTS, BY OTHERS. GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER $HALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FALL CONFORMANCE WITH LOCAL REGIIIATIfwS ANO CODES. J FOR E EE'o 9- U LOCATION OF SITE 1636 SEMINOLE TRAIL ALBERMARLE COUNTY N CHARLOTTESVILLE, VIRGINIA RIO MAGISTERIAL DISTRICT D.B. 1980 PG. 239 PIN: 06100-00-00-120JO �pA�'��muneeY comer . y�A, Car;ihtonk k4 j Lo f Flem[ntay Scnool OF F � Qy / Ej°�Woodbrook d so„ Nemm,m.y Scnool �a r Toamoul SITE a DD� 8 c coop SS� S i 8 8 d o 44 � va;,Npe hA + SeNxley 8 cnadettesvllle POq b0.d 1-h—I, p Off. N fK E �PJ C a 4� uea SRuire Hill a e i G '�cpeltd P�` c+tle i NMI OWNER OWNER ADDRESS:C/O DUFFY BIRCKHEAD P.O. BOX 7652 CHARLOTTESVILLE VA, 22906 OWNER CONTACT: FRANK BIRKHEAD LOCATION MAP SCALE: V = 2.000 Copyright: Microsoft Corporation DEVELOPER HALLE PROPERTIES, LLC C/O DISCOUNT TIRE 20225 N. SCOTTSDALE ROAD SCOTTSDALE, AZ 85255 CONTACT:MATTHEW JOHNSON DEVELOPER PHONE: (840)-606-5758 PREPARED BY HLER// CONTACT: RYAN T YAUGER, P.E. SHEETINDEX SHEET TITLE SHEET NUMBER COVER SHEET C-101 GENERAL NOTES C-102 GENERAL NOTES AND LEGEND C-103 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 C-601 EROSION AND SEDIMENT CONTROL PLAN PHASE 11 C-602 EROSION AND SEDIMENT CONTROL NOTES C-603 EROSION AND SEDIMENT CONTROL DETAILS C-604 STORMWATER COMPLIANCE PLAN C-901 - 904 SHEET TOTAL = 11 J 0 m r, z EE W UU W rn z W z Z j z W z W�OLu> 0 Z W W 01 j W zrc9Low orn jK aaQZQ zWZFF �zQQa~O Q J O D U) W Z z > aJ U W H C0 REVISIONS N MIIIIIIIIIII•L'\I�A181210II 15 Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -0 PROJECT VIRGINIA STORMWATER MANAGEMENT PLAN DOcl;�EMMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349-4500 Fax: (540) 349-0321 -1W Lic. No. 0402056625 10/29/2021 SHEET TITLE: COVER SHEET SHEET NUMBER: C-101 ORG. DATE - 8/27/2021 GENERAL NOTES (Rev. 22021) DEMOLITION NOTES (Rev. 22021) SITE LAYOUT NOTES (Rev. 12020) LIGHTING NOTES (Rev. 12020) 1. THESE PLANS ARE SOLELY BASED ON INFORMATION THE OWNER AND OTHERS PROVIDED TO BOHLER ENGINEERING, VIRGINIA (HEREIN "BOHLERj PRIOR TO THE DATE ON WHICH THE ENGINEER OF RECORD AND BOHLER PREPARED THESE PLANS. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING CONDITIONS AND IMMEDIATELY NOTIFY BOHLER , IN WRITING, IF ANY ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THESE PLANS, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES. 2. THE CONTRACTOR MUST STRICTLY COMPLY WITH THESE NOTES AND ALL SPECIFICATIONSIREPORTS CONTAINED HEREIN. THE CONTRACTOR MUST EN RE THAT ALL B NTRA T R F LLY AND MPLETELY NF RM T AND MPLY WITH THE E RE IREMENT THE E N TE AND THE SU SU CO COS U CO CO O O CO S QU S S O S REQUIREMENTS ARTICULATED IN THE NOTES CONTAINED IN ALL THE OTHER DRAWINGS THAT COMPRISE THE PLAN SET OF DRAWINGS. ADDITIONAL N TE AND PE IFI PLAN N TE MAY BE F ND N THE INDIVID AL PLAN . THE E ENERAL N TE APPLY T THI ENTIRE D MENT PA KA E. O S S C C O S OU O U S S G O S O S OCU C G IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE, PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. 3. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST CONFIRM WITH THE ENGINEER OF RECORD AND BOHLER THAT THE LATEST EDITION OF THE DOCUMENTS AND/OR REPORTS REFERENCED WITHIN THE PLAN REFERENCES ARE BEING USED FOR CONSTRUCTION. THIS IS THE CONTRACTOR'S SOLE AND COMPLETE RESPONSIBILITY. 4. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION IS TO BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE CONDITIONS OF APPROVAL TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND APPROVED BV THE PERMITTING AUTHORITIES AND HAS ALSO CONFIRMED THAT ALL NECESSARY AND REQUIRED PERMITS HAVE BEEN OBTAINED. THE CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. 5. THE CONTRACTOR MUST ENSURE THAT ALL WORK IS PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONSIREPORTS AND CONDITIONS OF APPROVAL AND ALL APPLICABLE REQUIREMENTS RULES REGULATIONS STATUTORY REQUIREMENTS CODES LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT AND ALL PROVISIONS IN AND CONDITIONS OF THE CONSTRUCTION CONTRACT WITH THE OWNER/DEVELOPER INCLUDING ALL EXHIBITS ATTACHMENTS AND ADDENDATO SAME. 6. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BV CAREFULLY REVIEWING THE MOST CURRENT ARCHITECTURAL CIVIL AND STRUCTURAL CONSTRUCTION DOCUMENTS INCLUDING BUT NOT LIMITED TO MECHANICAL ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLANS, WHERE APPLICABLE). THE CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND ENGINEER OF RECORD AND BOHLER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST BETWEEN THESE PLANS AND ANV OTHER PLANS THAT COMPRISE THE CONSTRUCTION DOCUMENTS. 7. CONTRACTOR MUST REFER TO AND ENSURE COMPLIANCE WITH THE APPROVED ARCHITECTURALBUILDING PLANS OF RECORD FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRVEXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS. 8. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS SHOWN ON THESE PLANS, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR MUST IMMEDIATELY NOTIFY ENGINEER OF RECORD AND BOHLER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE RE -DONE OR REPAIRED DUE TO DIMENSIONS MEASUREMENTS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO BOTH A THE CONTRACTOR GIVING ENGINEER OF RECORD AND BOHLER WRITTEN NOTIFICATION OF SAME AND B () () ENGINEER OF RECORD AND BOHLER, THEREAFTER, PROVIDING THE CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. 9. THE CONTRACTOR MUST VERIFY ALL DIMENSIONS AND MEASUREMENTS INCLUDED ON DESIGN DOCUMENTS HEREIN AND MUST NOT SCALE OFF THE DRAWINGS DUE TO POTENTIAL PRINTING INACCURACIES. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE CHECKED AND CONFIRMED BY THE GENERAL CONTRACTOR PRIOR TO PREPARATION OF SHOP DRAWINGS, FABRICATION/ORDERING OF PARTS AND MATERIALS AND COMMENCEMENT OF SITE WORK. SITE PLAN DRAWINGS ARE NOT INTENDED AS SURVEY DOCUMENTS. DIMENSIONS SUPERSEDE GRAPHICAL REPRESENTATIONS. THE CONTRACTOR MUST MAKE CONTRACTOR'S OWN MEASUREMENTS FOR LAYOUT OF IMPROVEMENTS. 10. THE OWNER AND CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANV AND ALL CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 11. WHEN INCLUDED AS ONE OF THE REFERENCED DOCUMENTS, THE GEOTECHNICAL REPORT, SPECIFICATIONS AND RECOMMENDATIONS SET FORTH THEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN: (A) THE PLANS; AND (B) THE GEOTECHNICAL REPORT AND RECOMMENDATIONS, MUST TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER OF RECORD AND BOHLER, IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE GEOTECHNICAL REPORT AND PLANS AND SPECIFICATIONS, PRIOR TO PROCEEDING WITH ANY FURTHER WORK. IF A GEOTECHNICAL REPORT WAS NOT CREATED, THEN THE CONTRACTOR MUST FOLLOW AND COMPLY WITH ALL OF THE REQUIREMENTS OF ANY AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE SPECIFICATIONS WHICH HAVE JURISDICTION OVER THIS PROJECT. 12. ENGINEER OF RECORD AND BOHLER ARE NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, HAS NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY. 13. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN AND WHERE SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANV ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURES AND PROPERTIES. ALL OF THIS WORK IS TO BE PERFORMED AT CONTRACTOR'S SOLE COST AND EXPENSE. 14. THE CONTRACTOR MUST EXERCISE EXTREME CAUTION WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. THE CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT. 15. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE. ALL DEMOLITION AND CONSTRUCTION WASTES, UNSUITABLE EXCAVATED MATERIAL, EXCESS SOIL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANV AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE CODES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER THE CONTRACTOR. 16. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO MAINTAIN RECORDS TO DEMONSTRATE PROPER AND FULLY COMPLIANT DISPOSAL ACTIVITIES, TO BE PROMPTLY PROVIDED TO THE OWNER UPON REQUEST. 17. THE CONTRACTOR MUST REPAIR, AT CONTRACTOR'S SOLE COST, ALL DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE -SURVEY, RE -PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANV UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANV SUCH NEW OR EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS, RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE CONTRACTOR MUST, PROMPTLY, DOCUMENT ALL EXISTING DAMAGE AND NOTIFY, IN WRITING, THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION. 18. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR AND HAVE NO CONTRACTUAL, LEGAL OR OTHER RESPONSIBILITIES FOR JOB SITE SAFETY JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME. THE ENGINEER OF RECORD AND BOHLER HAVE NOT BEEN RETAINED TO PERFORM OR TO BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER OF RECORD'S AND BOHLER SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES OR ANV JOB SITE CONDITIONS, AT ANY TIME. 19. THE CONTRACTOR MUST IMMEDIATELY IDENTIFY IN WRITING, TO THE ENGINEER OF RECORD AND BOHLER , ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF THE CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER WRITTEN NOTIFICATION AS DESCRIBED ABOVE, IT WILL BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, THE CONTRACTOR MUST INDEMNIFY, DEFEND AND HOLD HARMLESS THE ENGINEER OF RECORD AND BOHLER FOR ANY AND ALL DAMAGES, COSTS, INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM OR ARE IN ANY WAY RELATED TO SAME INCLUDING, BUT NOT LIMITED TO, ANY THIRD PARTY AND FIRST PARTY CLAIMS. 20. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANV INJURY OR DAMAGES RESULTING FROM THE CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT CODES, RULES, STATUTES AND THE LIKE. IF THE CONTRACTOR AND/OR OWNER FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, RULES, STATUTES, CODES AND THE LIKE, THE CONTRACTOR AND/OR OWNER AGREE TO AND MUST JOINTLY, INDEPENDENTLY, SEPARATELY, AND SEVERALLY INDEMNIFY AND HOLD THE ENGINEER OF RECORD AND BOHLER HARMLESS FOR AND FROM ALL INJURIES, CLAIMS AND DAMAGES THAT ENGINEER AND BOHLER SUFFER AND ANY AND ALL COSTS THAT ENGINEER AND BOHLER INCUR AS RELATED TO SAME. 21. ALL CONTRACTORS MUST CARRY AT LEAST THE MINIMUM AMOUNT OF THE SPECIFIED AND COMMERCIALLY REASONABLE STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND COMMERCIAL GENERAL LIABILITY INSURANCE (CGL) INCLUDING ALSO ALL UMBRELLA COVERAGES. ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER , AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ADDITIONAL NAMED INSUREDS AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE (DEFEND, IF APPLICABLE) AND HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED AND AGREED TO BY THE CONTRACTOR HEREIN. ALL CONTRACTORS MUST FURNISH BOHLER WITH CERTIFICATIONS OF INSURANCE OR CERTIFICATES OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE COVERAGES PRIOR TO COMMENCING ANY WORKAND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR TWO YEARS AFTER THE COMPLETION OF CONSTRUCTION AND AFTER ALL PERMITS ARE ISSUED, WHICHEVER DATE IS LATER. IN ADDITION, ALL CONTRACTORS AGREE THAT THEY WILL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANV DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTOR(S), ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. THE CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANV TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER. 22. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANV CONFLICTS IN SCOPE AND REVISIONS THAT RESULT FROM SAME. THE CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE FOR DETERMINING THE MEANS AND METHODS FOR COMPLETION OF THE WORK, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 23. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER, NOR THE PRESENCE OF BOHLER AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE (HEREIN "BOHLER PARTIES', RELIEVES OR WILL RELIEVE THE CONTRACTOR OF AND FROM CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE WITH ALL HEALTH AND SAFETY PRECAUTIONS REQUIRED BV ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER PARTIES HAVE NO AUTHORITY TO EXERCISE ANV CONTROL OVER (OR ANY RESPONSIBILITY FOR) ANY CONSTRUCTION, THE CONTRACTOR OR ITS EMPLOYEES RELATING TO THEIR WORKAND ANV AND ALL HEALTH AND SAFETY PROGRAMS OR PROCEDURES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. THE CONTRACTOR MUST INDEMNIFY, DEFEND, PROTECT AND HOLD HARMLESS BOHLER PARTIES FOR AND FROM ANY LIABILITY TO BOHLER PARTIES RESULTING FROM THE CONTRACTOR'S WORK, SERVICES AND/OR VIOLATIONS OF THIS NOTE, THESE NOTES OR ANV NOTES IN THE PLAN SET AND, FURTHER, THE CONTRACTOR MUST NAME BOHLER AS AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE. 24. WHEN IT IS CLEARLY AND SPECIFICALLY WITHIN BOHLER'S SCOPE OF SERVICES CONTRACT WITH THE OWNER/DEVELOPER, BOHLER WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF EVALUATING CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME. BOHLER WILL PERFORM ITS SHOP DRAWING REVIEW WITH REASONABLE PROMPTNESS, AS CONDITIONS PERMIT. ANV DOCUMENT, DOCUMENTING BOHLER'S REVIEW OF A SPECIFIC ITEM OR LIMITED SCOPE, MUST NOT INDICATE THAT BOHLER HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER IS NOT RESPONSIBLE FOR ANV DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR MUST, IN WRITING, PROMPTLY AND IMMEDIATELY BRING ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS TO BOHLER'S ATTENTION. BOHLER IS NOT REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED. 25. IF THE CONTRACTOR DEVIATES FROM THESE PLANS AND/OR SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER OF RECORD AND BOHLER FOR ALL DEVIATIONS WITHIN ENGINEER'S SCOPE, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANV WORK PERFORMED WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, MUST DEFEND, INDEMNIFY, PROTECT, AND HOLD HARMLESS THE ENGINEER OF RECORD AND BOHLER PARTIES TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, CLAIMS, INJURIES, PENALTIES AND THE LIKE RELATED TO SAME. 26. THE CONTRACTOR IS RESPONSIBLE FOR A MAINTAINING AND PROTECTING THE TRAFFIC CONTROL PLAN AND ELEMENTS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS, FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE RIGHT OF WAY OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S PRICE AND IS THE CONTRACTOR'S SOLE RESPONSIBILITY. 27. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN; AND, FURTHER, THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANV FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD THE ENGINEER OF RECORD AND BOHLER PARTIES, HARMLESS FOR ALL INJURIES, DAMAGES AND COSTS THAT ENGINEER OF RECORD AND BOHLER INCUR AS A RESULT OF SAID FAILURE OR FAILURE TO PRESERVE. 28. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION ACTIVITIES AND MATERIALS COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS, LAWS, ORDINANCES, AND CODES, AND ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 ET SEQ.) AS AMENDED, AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME. 29. THE CONTRACTOR MUST STRICTLY COMPLY WITH THE LATEST AND CURRENT OSHA STANDARDS AND REGULATIONS, AND/OR ANV OTHER AGENCY WITH JURISDICTION OVER EXCAVATION AND TRENCHING PROCEDURES. ENGINEER OF RECORD AND BOHLER HAS NO RESPONSIBILITY FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES AND WORK. 30. THE CONTRACTOR AND THE OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF THE CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY, INDEPENDENTLY, SEPARATELY, COLLECTIVELY, AND SEVERALLY INDEMNIFY, DEFEND, PROTECT AND HOLD ENGINEER OF RECORD AND BOHLER PARTIES HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. 31. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN AN ON -SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN COMPLIANCE WITH THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUIREMENTS OR LOCAL GOVERNING AGENCY FOR SITES WHERE ONE (1) ACRE OR MORE IS DISTURBED BY CONSTRUCTION ACTIVITIES (UNLESS THE LOCAL JURISDICTION REQUIRES A DIFFERENT THRESHOLD). THE CONTRACTOR MUST ENSURE THAT ALL ACTIVITIES, INCLUDING THOSE OF ALL SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS APPROPRIATE AND FURTHER, THE CONTRACTOR IS SOLELY AND COMPLETELY RESPONSIBLE FOR FAILING TO DO SO. 32. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED DOCUMENTS PREPARED BY THE ENGINEER OF RECORD AND BOHLER, THE USE OF THE WORDS'CERTIFY' OR'CERTIFICATION' CONSTITUTE(S) AN EXPRESSION ONLY OF PROFESSIONAL OPINION REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE ENGINEER OF RECORD'S AND BOHLER KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON AND ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE OF ANV NATURE OR TYPE, EITHER EXPRESSED OR IMPLIED, UNDER ANY CIRCUMSTANCES. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. THE CONTRACTOR MUST CONDUCT DEMOLITIONIREMOVALS ACTIVITIES IN SUCH A MANNER AS TO ENSURE MINIMUM INTERFERENCE WITH ROADS STREETS SIDEWALKS WALKWAYS AND ALL OTHER ADJACENT FACILITIES. THE CONTRACTOR MUST OBTAIN ALL APPLICABLE PERMITS FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY IES PRIOR TO THE ( ) COMMENCEMENT OF ANV ROAD OPENING OR DEMOLITION ACTIVITIES IN OR ADJACENT TO THE RIGHT-OF-WAY. 3. WHEN DEMOLITION -RELATED ACTIVITIES IMPACT ROADWAYS AND/OR ROADWAY RIGHT-OF-WAY, THE CONTRACTOR MUST PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH THE CURRENT FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" MUTCD AND THE FEDERAL STATE AND LOCAL REGULATIONS. 4. THE DEMOLITION AND/OR REMOVALS PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION AND TO IDENTIFY ONLY ( ) CONDITIONS REGARDING ITEMS TO BE DEMOLISHED REMOVED AND/OR TO REMAIN. A. THE CONTRACTOR MUST ALSO REVIEW ALL CONSTRUCTION DOCUMENTS AND INCLUDE WITHIN THE DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. B. THIS PLAN IS NOT INTENDED TO AND DOES NOT PROVIDE DIRECTION REGARDING THE MEANS METHODS SEQUENCING TECHNIQUES AND PROCEDURES TO BE EMPLOYED TO ACCOMPLISH THE WORK. ALL MEANS METHODS SEQUENCING TECHNIQUES AND PROCEDURES TO BE USED MUST BE IN STRICT ACCORDANCE AND CONFORMANCE WITH ALL STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR MUST COMPLY WITH ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE FOR THE CONTRACTOR AND THE PUBLIC. 5. THE CONTRACTOR MUST PROVIDE ALL "METHODS AND MEANS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE. THE CONTRACTOR, AT THE CONTRACTOR'S SOLE COST, MUST REPAIR ALL DAMAGE TO ALL ITEMS AND FEATURES THAT ARE TO REMAIN. CONTRACTOR MUST USE NEW MATERIAL FOR ALL REPAIRS. CONTRACTOR'S REPAIRS MUST INCLUDE THE RESTORATION OF ALL ITEMS AND FEATURES REPAIRED TO THEIR PRE -DEMOLITION CONDITION, OR BETTER. CONTRACTOR MUST PERFORM ALL REPAIRS AT THE CONTRACTOR'S SOLE EXPENSE. 6. ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. THE CONTRACTOR MUST PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER COMPLYING WITH ALL OSHA REQUIREMENTS TO ENSURE PUBLIC AND CONTRACTOR SAFETY AND SAFETY TO ALL PROPERTY ON THE SITE OR ADJACENT OR NEAR TO THE SAME. 7. THE CONTRACTOR IS RESPONSIBLE FOR JOB SITE SAFETY, WHICH MUST INCLUDE, BUT IS NOT LIMITED TO, THE INSTALLATION AND MAINTENANCE OF BARRIERS, FENCING, OTHER APPROPRIATE AND/OR NECESSARY SAFETY FEATURES AND ITEMS NECESSARY TO PROTECT THE PUBLIC FROM AREAS OF CONSTRUCTION AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF ALL UNAUTHORIZED PERSONS AT ANV TIME, TO OR NEAR THE DEMOLITION AREA. 8. PRIOR TO THE COMMENCEMENT OF ANV SITE ACTIVITY AND ANY DEMOLITION ACTIVITY, THE CONTRACTOR MUST, IN WRITING, RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS AND/OR SPECIFICATIONS, ALL CONCERNS OR QUESTIONS REGARDING THE APPLICABLE SAFETY STANDARDS, AND/OR THE SAFETY OF THE CONTRACTOR AND/OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT. ANY SUCH CONCERNS MUST BE CONVEYED TO THE ENGINEER OF RECORD AND BOHLER , IN WRITING AND MUST ADDRESS ALL ISSUES AND ITEMS RESPONDED TO, BY THE ENGINEER OF RECORD AND BV BOHLER, IN WRITING. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. 9. THE CONTRACTOR MUST BECOME FAMILIAR WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AND/OR DISCONNECTION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED, REMOVED AND/OR ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 10. PRIOR TO COMMENCING ANV DEMOLITION, THE CONTRACTOR MUST: A. OBTAIN ALL REQUIRED PERMITS AND MAINTAIN THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND ALL PUBLIC AGENCIES WITH JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK, AND DEMOLITION WORK. B. NOTIFY, AT A MINIMUM, THE MUNICIPAL ENGINEER, DESIGN ENGINEER, AND LOCAL SOIL CONSERVATION JURISDICTION, AT LEAST 72 BUSINESS HOURS PRIOR TO THE COMMENCEMENT OF WORK. C. INSTALL THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO SITE DISTURBANCE, AND MAINTAIN SAID CONTROLS UNTIL SITE IS STABILIZED D. IN ACCORDANCE WITH STATE LAW, THE CONTRACTOR MUST CALL THE STATE ONE -CALL DAMAGE PROTECTION SYSTEM FOR UTILITY MARK OUT, IN ADVANCE OF ANY EXCAVATION. E. LOCATE AND PROTECT ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN AND ADJACENT TO THE LIMITS OF PROJECT ACTIVITIES. THE CONTRACTOR MUST USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL UNDERGROUND UTILITIES. F. PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE UTILITIES AND SYSTEMS THAT ARE NOT BEING REMOVED DURING ANV DEMOLITION ACTIVITIES. G. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) FOR THE TEMPORARY OR PERMANENT TERMINATION OF SERVICE REQUIRED BY THE PROJECT PLANS AND SPECIFICATIONS REGARDING THE METHODS AND MEANS TO CONSTRUCT SAME. THESE ARE NOT THE ENGINEER OF RECORD'S RESPONSIBILITY. IN THE EVENT OF ABANDONMENT, THE CONTRACTOR MUST PROVIDE THE UTILITY ENGINEER AND OWNER WITH IMMEDIATE WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTIONAL AND UTILITY COMPANY REQUIREMENTS. H. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS NECESSARY OR AS REQUIRED TO MINIMIZE THE IMPACT ON, OF, AND TO THE AFFECTED PARTIES. WORK REQUIRED TO BE PERFORMED "OFF-PEAK' IS TO BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. I. IN THE EVENT THE CONTRACTOR DISCOVERS ANY HAZARDOUS MATERIAL, THE REMOVAL OF WHICH IS NOT ADDRESSED IN THE PROJECT PLANS AND SPECIFICATIONS OR THE CONTRACT WITH THE OWNER/DEVELOPER, THE CONTRACTOR MUST IMMEDIATELY CEASE ALL WORK IN THE AREA OF DISCOVERY, AND IMMEDIATELY NOTIFY, IN WRITING AND VERBALLY, THE OWNER AND ENGINEER OF RECORD AND BOHLER, THE DISCOVERY OF SUCH MATERIALS TO PURSUE PROPER AND COMPLIANT REMOVAL OF SAME. 11. THE CONTRACTOR MUST NOT PERFORM ANY EARTH MOVEMENT ACTIVITIES, DEMOLITION OR REMOVAL OF FOUNDATION WALLS, FOOTINGS, OR OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE, UNLESS SAME IS IN STRICT ACCORDANCE AND CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS, OR PURSUANT TO THE WRITTEN DIRECTION OF THE OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. 12. DEMOLITION ACTIVITIES AND EQUIPMENT MUST NOT USE OR INCLUDE AREAS OUTSIDE THE DEFINED PROJECT LIMIT LINE, WITHOUT SPECIFIC WRITTEN PERMISSION AND AUTHORITY OF AND FROM THE OWNER AND ALL GOVERNMENTAL AGENCIES WITH JURISDICTION. 13. THE CONTRACTOR MUST BACKFILL ALL EXCAVATION RESULTING FROM, OR INCIDENTAL TO, DEMOLITION ACTIVITIES. BACKFILL MUST BE ACCOMPLISHED WITH APPROVED BACKFILL MATERIALS AND MUST BE SUFFICIENTLY COMPACTED TO SUPPORT ALL NEW IMPROVEMENTS AND MUST BE PERFORMED IN COMPLIANCE WITH THE RECOMMENDATIONS AND GUIDANCE ARTICULATED IN THE GEOTECHNICAL REPORT. BACKFILLING MUST OCCUR IMMEDIATELY AFTER DEMOLITION ACTIVITIES AND MUST BE PERFORMED SO AS TO PREVENT WATER ENTERING THE EXCAVATION. FINISHED SURFACES MUST BE GRADED TO PROMOTE POSITIVE DRAINAGE. THE CONTRACTOR IS RESPONSIBLE FOR COMPACTION TESTING AND MUST SUBMIT SUCH REPORTS AND RESULTS TO THE ENGINEER OF RECORD AND THE OWNER. 14. EXPLOSIVES MUST NOT BE USED WITHOUT PRIOR WRITTEN CONSENT FROM BOTH THE OWNER AND ALL APPLICABLE, NECESSARY AND REQUIRED GOVERNMENTAL AUTHORITIES. PRIOR TO COMMENCING ANY EXPLOSIVE PROGRAM AND/OR ANY DEMOLITION ACTIVITIES, THE CONTRACTOR MUST ENSURE AND OVERSEE THE INSTALLATION OF ALL OF THE REQUIRED PERMIT AND EXPLOSIVE CONTROL MEASURES THAT THE FEDERAL, STATE, AND LOCAL GOVERNMENTS REQUIRE. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONDUCT AND PERFORM ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES AND THE LIKE. 15. IN ACCORDANCE WITH FEDERAL, STATE, AND/OR LOCAL STANDARDS, THE CONTRACTOR MUST USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR. AFTER THE DEMOLITION IS COMPLETE, THE CONTRACTOR MUST CLEAN ALL ADJACENT STRUCTURES AND IMPROVEMENTS TO REMOVE ALL DUST AND DEBRIS WHICH THE DEMOLITION OPERATIONS CAUSE. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE -DEMOLITION" CONDITION AT CONTRACTOR'S SOLE COST. 16. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS OUTSIDE OF APPROVED AREAS WILL NOT BE PERMITTED, INCLUDING BUT NOT LIMITED TO, THE PUBLIC RIGHT-OF-WAY. 17. THE CONTRACTOR MUST MAINTAIN A RECORD SET OF PLANS WHICH INDICATES THE LOCATION OF EXISTING UTILITIES THAT ARE CAPPED, ABANDONED IN PLACE, OR RELOCATED DUE TO DEMOLITION ACTIVITIES. THIS RECORD DOCUMENT MUST BE PREPARED IN A NEAT AND WORKMAN -LIKE MANNER AND TURNED OVER TO THE OWNER/DEVELOPER UPON COMPLETION OF THE WORK, ALL OF WHICH IS AT THE CONTRACTOR'S SOLE COST. 18. THE CONTRACTOR MUST EMPTY, CLEAN AND REMOVE FROM THE SITE ALL UNDERGROUND STORAGE TANKS, IF ENCOUNTERED, IN ACCORDANCE WITH FEDERAL, STATE, COUNTY AND LOCAL REQUIREMENTS, PRIOR TO CONTINUING CONSTRUCTION IN THE AREA AROUND THE TANK WHICH EMPTYING, CLEANING AND REMOVAL ARE AT THE CONTRACTOR'S SOLE COST. SOIL EROSION & SEDIMENT CONTROL PLAN NOTES (Rev.12020) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. EROSION CONTROL MEASURES MUST CONFORM TO THE VIRGINA GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL UNLESS OTHERWISE NOTED, OR UNLESS ENGINEER CLEARLY AND SPECIFICALLY, IN WRITING, DIRECTS OTHERWISE. INSTALLATION OF EROSION CONTROL, CLEARING, AND SITE WORK MUST BE PERFORMED EXACTLY AS INDICATED IN THE EROSION CONTROL CONSTRUCTION NOTES. 3. THE DISTURBED LAND AREA OF THIS SITE IS APPROXIMATELY 1.31 ACRES. 4. THE FOLLOWING EROSION CONTROL MEASURES ARE PROPOSED FOR THIS SITE: A STABILIZED CONSTRUCTION ENTRANCE/ EXIT -A TEMPORARY GRAVEL CONSTRUCTION ENTRANCEEXIT IS TO BE INSTALLED AT THE DESIGNATED LOCATION SHOWN ON THE PLAN. THIS AREA MUST BE GRADED SO THAT RUNOFF WATER WILL BE RETAINED ON -SITE. B. SEDIMENT FENCE - INSTALL SILT FENCE(S) AND/OR SILT SOCK AROUND ALL OF THE DOWNSLOPE PERIMETERS OF THE SITE, TEMPORARY FILL AND SOIL STOCKPILES. C. INSTALL FILTER FABRIC DROP INLET PROTECTION AROUND EACH DRAINAGE INLET AS DRAINAGE STRUCTURES ARE INSTALLED TO REDUCE THE QUANTITY OF SEDIMENT. INSTALL TEMPORARY INLET PROTECTION ON INLETS DOWNSLOPE FROM DISTURBANCE, WHICH MAY BE BEYOND THE LIMITS OF DISTURBED AREA. 5. INSTALLATION OF EROSION CONTROL DEVICES MUST BE IN ACCORDANCE WITH ALL OF THE MANUFACTURER'S RECOMMENDATIONS. 6. THE CONTRACTOR MUST INSPECT EROSION CONTROL MEASURES WEEKLY. THE CONTRACTOR MUST REMOVE ANY SILT DEPOSITS GREATER THAN 6" COLLECTED ON THE FILTER FABRIC AND/OR SILT SOCK BARRIERS AND EXCAVATE AND REMOVE ANY SILT FROM DROP INLET PROTECTION. 7. THE CONTRACTOR MUST APPLY TEMPORARY SEED AND MULCH TO ALL DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINISHED GRADE AND VEGETATED WITHIN 7 DAYS. WHEN AREAS ARE DISTURBED AFTER THE GROWING SEASON, THE CONTRACTOR MUST STABILIZE SAME WITH GEOTEXTILE FABRIC AND MAINTAIN SAME IN STRICT ACCORDANCE WITH BEST MANAGEMENT PRACTICES. 8. THE CONTRACTOR MUST INSTALL ADDITIONAL EROSION CONTROL MEASURES IF ENGINEER SO REQUIRES, TO PREVENT ANY, INCLUDING THE INCIDENTAL, DISCHARGE OF SILT -LADEN RUNOFF FROM EXITING THE SITE. 9. THE CONTRACTOR MUST BE RESPONSIBLE FOR INSPECTING AND MAINTAINING ALL EROSION CONTROL MEASURES ON THE SITE UNTIL PERMANENT PAVING AND TURF/LANDSCAPING IS ESTABLISHED. THE COSTS OF INSTALLING AND MAINTAINING THE EROSION CONTROL MEASURES MUST BE INCLUDED IN THE BID PRICE FOR THE SITE WORK AND THE CONTRACTOR IS RESPONSIBLE FOR ALL SUCH COSTS. 10. THE CONTRACTOR MUST CONTINUE TO MAINTAIN ALL EROSION CONTROL MEASURES UNTIL THE COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF VEGETATION. 11. THE CONTRACTOR MUST REMOVE EROSION CONTROL MEASURES, SILT AND DEBRIS AFTER ESTABLISHING PERMANENT VEGETATION COVER OR OTHER INSTALLING A DIFFERENT, SPECIFIED METHOD OF STABILIZATION. 12. THIS PLAN REPRESENTS THE MINIMUM LEVEL OF IMPLEMENTATION OF TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES, MEASURES AND STRUCTURES. ADDITIONAL FACILITIES, MEASURES AND STRUCTURES MUST BE INSTALLED WHERE NECESSARY TO COMPLY WITH ALLAPPLICABLE CODES AND STANDARDS AND/OR TO PREVENT ANV, INCLUDING THE INCIDENTAL DISCHARGE OF SILT -LADEN RUNOFF FROM EXITING THE SITE. 13. THE CONTRACTOR MUST PROTECT ALL EXISTING TREES AND SHRUBS. THE CONTRACTOR MUST REFER TO THE LANDSCAPE AND/OR DEMOLITION PLAN(S) FOR TREE PROTECTION, FENCE LOCATIONS AND DETAILS. 14. THE CONTRACTOR MUST REFER TO GRADING PLANS FOR ADDITIONAL INFORMATION. 15. THE CONTRACTOR MUST CLEAN EXISTING AND PROPOSED DRAINAGE STRUCTURES AND INTERCONNECTING PIPES ON OR OFF -SITE AS THE JURISDICTIONAL AGENCY REQUIRES, BOTH AT THE TIME OF SITE STABILIZATION AND AT END OF PROJECT. 16. SOIL EROSION CONTROL MEASURES MUST BE ADJUSTED OR RELOCATED BV THE CONTRACTOR AS IDENTIFIED DURING SITE OBSERVATION IN ORDER TO MAINTAIN THE COMPLETE EFFECTIVENESS OF ALL CONTROL MEASURES. 17. THE CONTRACTOR MUST IDENTIFY, ON THE PLAN, THE LOCATION OF WASTE CONTAINERS, FUEL STORAGE TANKS, CONCRETE WASHOUT AREAS AND ANV OTHER LOCATIONS WHERE HAZARDOUS MATERIALS ARE STORED. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. PRIOR TO THE COMMENCEMENT OF GENERAL CONSTRUCTION, THE CONTRACTOR MUST INSTALL SOIL EROSION CONTROL AND ANY STORMWATER POLLUTION PREVENTION PLAN SWPPP MEASURES NECESSARY AS INDICATED ON THE APPROVED SOIL ( ) EROSION AND SEDIMENT CONTROL PLAN AND IN ACCORDANCE WITH APPLICABLE AND/OR APPROPRIATE AGENCIES' GUIDELINES TO PREVENT SEDIMENT AND/OR LOOSE DEBRIS FROM WASHING ONTO ADJACENT PROPERTIES OR THE RIGHT OF WAY. 3. ALL DIRECTIONAL/TRAFFIC SIGNING AND PAVEMENT STRIPING MUST CONFORM TO THE LATEST STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ANY APPLICABLE STATE OR LOCALLY APPROVED SUPPLEMENTS, GUIDELINES RULES REGULATIONS STANDARDS AND THE LIKE. 4. THE LOCATIONS OF PROPOSED UTILITY POLES AND TRAFFIC SIGNS SHOWN ON THE PLANS ARE SCHEMATIC AND PRELIMINARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR FIELD -VERIFYING THEIR LOCATION. THE CONTRACTOR MUST COORDINATE THE RELOCATION OF TRAFFIC SIGNS WITH THE ENTITY WITH JURISDICTION OVER THE PROJECT. 5. ALL DIMENSIONS SHOWN ARE TO BOTTOM FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, EXCEPT WHEN DIMENSION IS TO A PROPERTY LINE, STAKE OUT OF LOCATIONS OF INLETS, LIGHT POLES, ETC. MUST BE PERFORMED IN STRICT ACCORDANCE WITH THE DETAILS UNLESS NOTED CLEARLY OTHERWISE. GRADING NOTES (Rev.22021) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AS REFERENCED IN THIS PLAN SET. IF NO GEOTECHNICAL REPORT HAS BEEN REFERENCED THE CONTRACTOR MUST HAVE A GEOTECHNICAL ENGINEER PROVIDE WRITTEN SPECIFICATIONS AND RECOMMENDATIONS PRIOR TO THE CONTRACTOR COMMENCING THE GRADING WORK. THE CONTRACTOR MUST FOLLOW THE REQUIREMENTS OF ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS, WHICH HAVE JURISDICTION OVER THIS PROJECT. 3. THE CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF -SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. THE CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO THE ENGINEER OF RECORD AND THE OWNER PRIOR TO THE CONTRACTOR COMMENCING ANV WORK. 4. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFYING EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. SHOULD DISCREPANCIES BETWEEN THE PLANS AND INFORMATION OBTAINED THROUGH FIELD VERIFICATIONS BE IDENTIFIED OR EXIST, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING. 5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING ALL UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE GEOTECHNICAL REPORT. THE CONTRACTOR MUST COMPACT ALL EXCAVATED OR FILLED AREAS IN STRICT ACCORDANCE WITH THE GEOTECHNICAL REPORTS GUIDANCE. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BV A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED. THIS REPORT MUST VERIFY THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES WHICH ARE IN EFFECT AND WHICH ARE APPLICABLE TO THE PROJECT. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BV OWNERIDEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE MUST BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL, COMPACTED AS THE GEOTECHNICAL REPORT DIRECTS. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH THE STANDARD STATE DOT SPECIFICATIONS FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANV AMENDMENTS OR REVISIONS THERETO. 6. IN THE EVENT OF A DISCREPANCY(IES) AND/OR A CONFLICTS) BETWEEN PLANS, OR RELATIVE TO OTHER PLANS, THE GRADING PLAN TAKES PRECEDENCE AND CONTROLS. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, OF ANY DISCREPANCV(IES) AND/OR CONFLICT(S). 7. THE CONTRACTOR IS RESPONSIBLE TO IMPORT FILL OR EXPORT EXCESS MATERIAL AS NECESSARY TO CONFORM TO THE PROPOSED GRADING, AND TO BACKFILL EXCAVATIONS FOR THE INSTALLATION OF UNDERGROUND IMPROVEMENTS. ACCESSIBILITY DESIGN GUIDELINES (Rev.12020) 1. ALL ACCESSIBLE (A.K.A. ADA) COMPONENTS AND ACCESSIBLE ROUTES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF: (A) THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S.C. § 12101 ET SEC. AND 42 U.S.C. § 4151 ET SEQ.); AND (B) ANY APPLICABLE LOCAL AND STATE GUIDELINES, AND ANV AND ALL AMENDMENTS TO BOTH, WHICH ARE IN EFFECT WHEN THESE PLANS WERE COMPLETED. 2. THE CONTRACTOR MUST REVIEW ALL DOCUMENTS REFERENCED IN THESE NOTES FOR ACCURACY, COMPLIANCE AND CONSISTENCY WITH INDUSTRY GUIDELINES. 3. THE CONTRACTOR MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ACCESSIBLE (ADA) COMPONENTS AND ACCESSIBLE ROUTES FOR THE SITE. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACES, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, AND INTER -BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCEEXIT, MUST COMPLY WITH THE ACCESSIBLE GUIDELINES AND REQUIREMENTS WHICH INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: T ACCESSIBLE PARKING SPACES AND ACCESS AISLES SLOPES MUST NOT EXCEED 1:50 (2.0%) IN ANV DIRECTION. B. PATH OF TRAVEL ALONG ACCESSIBLE ROUTE MUST PROVIDE A 36-INCHES MINIMUM WIDTH (48-INCHES PREFERRED), OR AS SPECIFIED BV THE GOVERNING AGENCY. UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS) MUST NOT REDUCE THIS MINIMUM WIDTH. THE SLOPE MUST NOT EXCEED 1:20 (5.0%) IN THE DIRECTION OF TRAVEL AND MUST NOT EXCEED 1:50 (2.0%) IN CROSS SLOPE. WHERE ACCESSIBLE PATH OF TRAVEL IS GREATER THAN 1:20 (5.0%), AN ACCESSIBLE RAMP MUST BE PROVIDED. ALONG THE ACCESSIBLE PATH OF TRAVEL, OPENINGS MUST NOT EXCEED 12-INCH IN WIDTH. VERTICAL CHANGES OF UP TO 12-INCH ARE PERMITTED ONLY IF THEY INCLUDES A 1/4-INCH BEVEL AT A SLOPE NOT STEEPER THAN 1:2. NO VERTICAL CHANGES OVER 114-INCH ARE PERMITTED. C. ACCESSIBLE RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%) AND A RISE OF 30-INCHES. LEVEL LANDINGS MUST BE PROVIDED AT EACH END OF ACCESSIBLE RAMPS. LANDING MUST PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES, AND MUST NOT EXCEED 1:50 (2.0%) SLOPE IN ANY DIRECTION. RAMPS THAT CHANGE DIRECTION BETWEEN RUNS AT LANDINGS MUST HAVE A CLEAR LANDING OF A MINIMUM OF 60-INCHES BV 60-INCHES. HAND RAILS ON BOTH SIDES OF THE RAMP MUST BE PROVIDED ON AN ACCESSIBLE RAMP WITH A RISE GREATER THAN 6-INCHES. D. ACCESSIBLE CURB RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). WHERE FLARED SIDES ARE PROVIDED, THEY MUST NOT EXCEED 1:10 (10%) SLOPE. LEVEL LANDING MUST BE PROVIDED AT RAMPS TOP AT A MINIMUM OF 36-INCHES LONG (48-INCHES PREFERRED). IN ALTERATIONS, WHEN THERE IS NO LANDING AT THE TOP, FLARE SIDES SLOPES MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). E. DOORWAY LANDINGS AREAS MUST BE PROVIDED ON THE EXTERIOR SIDE OF ANV DOOR LEADING TO AN ACCESSIBLE PATH OF TRAVEL. THIS LANDING MUST BE SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO FEWER THAN 60-INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE CLEARLY PERMITTED BY ACCESSIBLE STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI At 17.1-2009 AND OTHER REFERENCES INCORPORATED BY CODE). F. WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ACCESSIBLE COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, THE CONTRACTOR MUST VERIFY ALL EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR IN ANV RESPECT FROM WHAT IS SHOWN ON THE PLANS BEFORE COMMENCING ANV WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ACCESSIBLE GUIDELINES. G. THE CONTRACTOR MUST VERIFY ALL OF THE SLOPES OF THE CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE EXISTS OR IS OBSERVED OR DISCOVERED, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, PRIOR TO POURING CONCRETE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND/OR REPLACE NON -CONFORMING CONCRETE AND/OR PAVEMENT SURFACES. 4. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION TO ENSURE SAME IS CONSISTENT WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCING CONSTRUCTION. DRAINAGE AND UTILITY NOTES (Rev.22021) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE, AND THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM THOSE LOCATIONS AND SERVICES WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCING ANY CONSTRUCTION OR EXCAVATION. THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM ALL SANITARY CONNECTION POINTS AND ALL OTHER UTILITY SERVICE CONNECTION POINTS IN THE FIELD, PRIOR TO COMMENCING ANY CONSTRUCTION. THE CONTRACTOR MUST REPORT ALL DISCREPANCIES, ERRORS AND OMISSIONS IN WRITING, TO THE ENGINEER OF RECORD. 3. THE CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL OF THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANV EXISTING UTILITIES WHICH OCCUR DURING CONSTRUCTION, AT NO COST TO THE OWNER AND AT CONTRACTOR'S SOLE COST AND EXPENSE. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANV EXISTING UTILITIES WHICH OCCURS DURING CONSTRUCTION. 4. THE CONTRACTOR MUST FIELD VERIFY THE PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES BY USING A TEST PIT TO CONFIRM EXACT DEPTH, PRIOR TO COMMENCEMENT OF CONSTRUCTION. 5. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON ARCHITECTURAL PLANS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATIONS OF SAME BASED UPON FINAL ARCHITECTURAL PLANS. 6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING SITE PLAN DOCUMENTS AND ARCHITECTURAL PLANS FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS; GREASE TRAP REQUIREMENTS; AND DETAILS, DOOR ACCESS, AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITY SERVICES WITH THE INDIVIDUAL COMPANIES TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS OF THE APPLICABLE JURISDICTION AND REGULATORY AGENCIES AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFUCT(S) EXISTS BETWEEN THESE DOCUMENTS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, AND PRIOR TO CONSTRUCTION, MUST RESOLVE SAME. 7. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE EXACTLY AS PER THE RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND THE CONTRACTOR MUST COORDINATE SAME WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST COMPLY WITH APPLICABLE REQUIREMENTS AND SPECIFICATIONS. ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR DESIGN OF TRENCH BACKFILL OR FOR COMPACTION REQUIREMENTS 8. DURING THE INSTALLATION OF SANITARY, STORM, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS -INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANV INSTALLATIONS THAT DEVIATE, IN ANV RESPECT, FROM THE INFORMATION CONTAINED IN THESE PLANS. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THE APPROPRIATE PLAN(S), WHICH THE CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER IMMEDIATELY UPON THE COMPLETION OF WORK. 9. THE CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SANITARY, WATER AND STORM SYSTEMS, ARE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND OR STATE DOT DETAILS AS APPLICABLE. THE CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. 10. FINAL LOCATIONS OF PROPOSED UTILITY POLES, AND/ OR POLES TO BE RELOCATED ARE AT THE SOLE DISCRETION OF THE RESPECTIVE UTILITY COMPANY, REGARDLESS OF WHAT THIS PLAN DEPICTS. 11. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. THE CONTRACTOR MUST CONTACT THE APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING CONSTRUCTION. 12. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED FINISHED GRADES WITH NO TRIPPING OR SAFETY HAZARD IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. THE LIGHTING CONTRACTOR MUST COMPLY WITH ALL APPLICABLE CONTRACTOR REQUIREMENTS INDICATED IN THE PLANS, INCLUDING BUT NOT LIMITED TO GENERAL NOTES GRADING AND UTILITY NOTES SITE SAFETY AND ALL AGENCY AND GOVERNMENTAL REGULATIONS. 3. THE LIGHTING PLAN DEPICTS PROPOSED SUSTAINED ILLUMINATION LEVELS CALCULATED USING DATA PROVIDED BV THE NOTED MANUFACTURER. ACTUAL SUSTAINED SITE ILLUMINATION LEVELS AND PERFORMANCE OF LUMINAIRES MAY VARY DUE TO VARIATIONS IN WEATHER, ELECTRICAL VOLTAGE, TOLERANCE IN LAMPS, THE SERVICE LIFE OF EQUIPMENT AND LUMINAIRES AND OTHER RELATED VARIABLE FIELD CONDITIONS. 4. THE LIGHTING VALUES AND CALCULATION POINTS DEPICTED ON THIS PLAN ARE ANALYZED ON A HORIZONTAL GEOMETRIC PLANE AT GROUND LEVEL UNLESS OTHERWISE NOTED. ILLUMINATION LEVELS ARE SHOWN IN FOOT-CANDLES FC . ( ) 5. THE LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED/MAINTAINED TO ENSURE THAT THEY FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT IS NOT LIMITED TO, VISUAL OBSERVATION, CLEANING OF LENSES, AND RE-LAMPING ACCORDING TO MANUFACTURER RECOMMENDATIONS. FAILURE TO FOLLOW THE ABOVE STEPS COULD RESULT IN IMPROPER LIGHT DISTRIBUTION AND FAILURE TO COMPLY WITH THE APPROVED DESIGN. UPON COMPLETION AND OWNER'S ACCEPTANCE OF THE WORK THE ABOVE RESPONSIBILITIES BECOMES SOLELY THE OWNER'S. 6. THE LIGHTING PLAN IS INTENDED TO SHOW THE LOCATIONS AND TYPE OF LUMINAIRES. POWER SYSTEM, CONDUITS, WIRING AND OTHER ELECTRICAL COMPONENTS ARE SOLELY THE ARCHITECTS, MECHANICAL ENGINEER'S AND/OR LIGHTING CONTRACTOR'S RESPONSIBILITY, AS INDICATED IN THE CONSTRUCTION CONTRACT DOCUMENTS. THE LIGHTING CONTRACTOR MUST COORDINATE WITH THE PROJECT ARCHITECT AND/OR ELECTRICAL ENGINEER REGARDING ANY AND ALL POWER SOURCES AND TIMING DEVICES NECESSARY TO MEET THE DESIGN INTENT. THESE ITEMS MUST BE INSTALLED AS REQUIRED BY STATE AND LOCAL REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF LIGHTING FIXTURES AND APPURTENANCES IN ACCORDANCE WITH ALL APPLICABLE BUILDING AND ELECTRICAL CODES. 7. THE CONTRACTOR MUST BRING IMMEDIATELY, IN WRITING, ANV LIGHT LOCATIONS THAT CONFLICT WITH DRAINAGE, UTILITIES, OR OTHER STRUCTURE(S) TO THE ENGINEER OF RECORD'S ATTENTION, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 8. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT SHIELDING AND OR ROTATED OPTICS ARE INSTALLED AS INDICATED ON THE PLAN IN ORDER TO ACHIEVE THE LIGHTING LEVELS THE REVIEWING AGENCY APPROVED. ALBEMARLE COUNTY NOTES 1. ACCESSIBLE PARKING SPACES, ACCESS ISLES, AND ACCESSIBLE ROUTE SHALL BE INSTALLED IN ACCORDANCE WITH ICC ANSI A117.1-09 AND THE 2015 VIRGINIA CONSTRUCTION CODE. 2. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE LOCATED ON PRIVATE PROPERTY MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 3. WHERE THE FLOOD LEVEL RIMS OF PLUMBING FIXTURES ARE BELOW THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER, THE FIXTURES SHALL BE PROTECTED BY A BACKWATER VALVE INSTALLED IN THE BUILDING DRAIN, BRANCH OF THE BUILDING DRAIN OR HORIZONTAL BRANCH SERVING SUCH FIXTURES. PLUMBING FIXTURES HAVING FLOOD LEVEL RIMS ABOVE THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER SHALL NOT DISCHARGE THROUGH A BACKWATER VALVE. 4. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. 5. BUILDINGS OR STRUCTURES BUILT BEFORE JANUARY 1, 1985 MUST HAVE AN ASBESTOS SURVEY PERFORMED IN ORDER TO APPLY FOR A DEMOLITION PERMIT. ASBESTOS REMOVAL PERMITS ARE REQUIRED IF POSITIVE FOR SUCH FROM ALBEMARLE COUNTY AND VDOU. CONTACT VDOU FOR THEIR ADDITIONAL REQUIREMENTS AND PERMITS FOR DEMOLITION PROJECTS AT 540-562-3580 X131. 6. A KNOX BOX WILL BE REQUIRED. W 2 O m r, Z D_ W W W N Z W O ZjZ(nU Z W W H W -U O U D_ (7ZUJWUJ jW zrc9t=W�w F W Q 2 p W Z �><Ix-j - zU)2W<z< W Z F 0f OpQQQF� z O p Q U a Z J (i � Ci O7 p W Z Q (n d J d Q Of J F U W H_ r7 REVISIONS REV I DATE I COMMENT =� Know what's below, Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. I I PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR - DO�EMMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 TH Lic. No. 0402056625 10/29/2021 SHEET TITLE: GENERAL NOTES SHEET NUMBER: C-102 N O N W N i5 0 ORG. DATE - 8/27/2021 STANDARD DRAWING LEGEND FOR ENTIRE PLAN SEl STANDARD ABBREVIATIONS LIMIT OF WORK LOW LOW LIMIT OF DISTURBANCE LOD LOD EXIST/NG NOTE TYPICAL NOTE TEXT PROPOSED NOTE ONSITE PROPERTY LINE / R.O.W. LINE PROPERTY LINE / INTERIOR PARCEL LINE EASEMENT LINE ---------- SETBACK LINE CURB AND GUTTER SPILL TRANSITION CONCRETE CURB & GUTTER DEPRESSED CURB AND GUTTER UTILITY POLE WITH LIGHT POLE �c LIGHT TRAFFIC LIGHT O UTILITY O POLE 4 TYPICAL �S LIGHT ACORN LIGHT TYPICAL SIGN PARKING X COUNTS — — —170 — — CONTOUR 190 ------------- %6'.A------------ LINE 187 TC 516.4 SPOT TC 516.00 TC 516.00 MATCH EX OR 516..4 ELEVATIONS BC 515.551 J518.02±) JHIV SANITARY J%-mN LABEL # STORM e LABEL SL SANITARY SEWER cL LATERAL /y UNDERGROUND N WATER LINE E UNDERGROUND E ELECTRIC LINE C UNDERGROUND G GAS LINE Of! OVERHEAD ^vH WIRE T UNDERGROUND T TELEPHONE LINE �. UNDERGROUND C CABLE LINE STORM _ — — — — — — — — - SEWER SS SANITARY S SEWER MAIN �cr HYDRANT O SANITARY O MANHOLE STORM i O` I I� MANHOLE i ® M WATER METER WV WATER • VALVE El GAS El VALVE ® GAS METER TYPICAL END SECTION a� HEADWALL OR �ORQ ENDWALL O GRATE O INLET Q� CURB INLET O CLEAN O OUT O ELECTRIC O MANHOLE O TELEPHONE T MANHOLE EB ELECTRIC EB BOX EP ELECTRIC EP PEDESTAL MIN I 0 o N N N E h m 0 = MONITORING WELL TEST PIT BENCHMARK BORING FOR ENTIRE PLAN SET AC ACRES ADA AMERICANS WITH DISABILITY ACT ARCH ARCHITECTURAL BC BOTTOM OF CURB BF BASEMENT FLOOR BK BLOCK BL BASELINE BLDG BUILDING BM BUILDING BENCHMARK BRL BUILDING RESTRICTION LINE CIF CUBIC FEET CL CENTERLINE CMP CORRUGATED METAL PIPE CONN CONNECTION CONIC CONCRETE CPP CORRUGATED PLASTIC PIPE CY CUBIC YARDS DEC DECORATIVE DEP DEPRESSED DIP DUCTILE IRON PIPE DOM DOMESTIC ELEC ELECTRIC ELEV ELEVATION EP EDGE OF PAVEMENT ES EDGE OF SHOULDER EW END WALL EX EXISTING FES FLARED END SECTION FF FINISHED FLOOR FH FIRE HYDRANT FG FINISHED GRADE G GRADE GF GARAGE FLOOR (AT DOOR) GH GRADE HIGHER SIDE OF WALL GL GRADE LOWER SIDE OF WALL GIRT GRATE GV GATE VALVE HOPE HIGH DENSITY POLYETHYLENE PIPE HP HIGH POINT HOR HORIZONTAL HW HEADWALL INT INTERSECTION INV INVERT LF LINEAR FOOT LOC LIMITS OF CLEARING LOD LIMITS OF DISTURBANCE LOS LINE OF SIGHT LP LOW POINT US LANDSCAPE MAX MAXIMUM MIN MINIMUM MH MANHOLE MJ MECHANICAL JOINT OC ON CENTER PA POINT OF ANALYSIS PC POINTCURVATURE PCCR POINT OF COMPOUND CURVATURE, CURB RETURN PI POINT OF INTERSECTION POG POINT OF GRADE PROP PROPOSED PT POINT OF TANGENCY PTCR POINT OF TANGENCY, CURB RETURN PVC POLYVINYL CHLORIDE PIPE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY R RADIUS RCP REINFORCED CONCRETE PIPE RET WALL RETAINING WALL R/W RIGHT OF WAY S SLOPE SAN SANITARY SEWER SF SQUARE FEET STA STATION STM STORM SNV SIDEWALK TBR TO BE REMOVED TBRL TO BE RELOCATED TC TOP OF CURB TELE TELEPHONE TPF TREE PROTECTION FENCE TW TOP OF WALL TYP TYPICAL UG UNDERGROUND UP UTILITY POLE W WIDE W/L WATER LINE W/M WATER METER 3 PLUS OR MINUS DEGREE 0 DIAMETER # NUMBER PROPOSED EASEMENT LEGEND COMMON SHARED IE I INGRESS -EGRESS PA I PUBLIC ACCESS �Z I PUBLIC UTILITY SANITARY SEWER SI SIGHT DISTANCE T I STORM DRAIN VA VARIABLE WIDTHS WATER J 0 m r7 z EE W W W rn Z W O ZDZ02 Z W H U W> Ur Z W W W j W z r 0 1--LUW � F W Q 2 W Z J>zcJ W<n0 (n 7 Q Q Z Q zU) W ZFH 00 a -of zQQa~O Q J 0 U) W Z Z d Q J o Q of J F U W H REVISIONS REV I DATE I COMMENT • Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION NL DOCUMENT UESS INDICATED OTHWI ERSE. PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DO�Qa�aQ PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 TH Lic. No. 0402056625 10/29/2021 SHEET TITLE: GENERAL NOTES AND LEGEND SHEET NUMBER: C-103 ORG. DATE - 8/27/2021 a 0 W \ \ 1 1 I I 1 I \ v \ o\ h , r I II I I I I I , , , I I 1 1 1 1 1 1 1 I I I 1 1 1 1 , 1 I , \ I \ 1 \ I \ 1 ` 1 ` ` ` o \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 1 1 1 I 1 \ \ I 1 \ I 1 1 I 1 1 1 1 I 1 1 1 1 1 I 1 1 1 I 1 , 1 I 1 1 1 \ 1 I , I, 1 ' 1 ' 1 ' I 1 1 ' ` I 1 1 ` 1 ` 1 1 I ` 1 ` I 1 1 ` ' I1 I \ 1 \ 1 I I \ I\ 1 I \ I 1 \ 1 1 \` \ \ I \ 1 1 I \ \ \ 1 I I 1 1 1 1 I 1 1 1 I `\ 1 ` \ 1 \ I I II \ I 11 111 I \ \ \ 1 1 1 \1 1 \ ' 1 \ 1 \ \ n I \ I I I I I I I I I I I I I I I I I II I I `1 I 1 I I I 2000 1 1 / /MERC/AL) I 1 1 1 , , ` r 1 \ \ Ts SF' / 0i2 AC / Ts ' ' ` EX/ST/N EES R sus LANDS NS�F r ------------------------ SULL/VAN, W/LL/AM EDWARD & ✓OHN A F D.B. 10-0 - -12 / P/N. 06100-00-00-120W0 / \ ZONED..HC rH/GHWAY COMMERC/ALA E US COMMERC/AL 391-490 ' \ 1 _ — — — / SF TS r / / 5 ,- ------------- 5p5-------- ----------- ----------- \ --- I 5 � r•Xr$nycfS(f9N. - -------------------- - �--- --- , \ \ / y05 —505' 504 ------------- fXISTIK TREES (TER` •`•� ` ��\\�C OR'{_ j------- ----------- ; ' ( LANDS / \ \ ; h / ' \\---------------------- ----- CHARLOTTESV/LLE ALBEMARLE z�----------------- y' RENTAL PROPERT/ES LLC - - --- \ /< D.B. 5040 PG 206 \ \ 2^ , 1 ?\ \\ ---� ---- \' P/N 06100-00-00-120P0 O / \v\ ZONED.• HC LHICHWAY COMMERC/AL),- 1 \ /' ,I \ 4 11 , \ \ / 1 /i ) \ \ \ \ \ \ O (y1$1 Fes ) \\ � � i / / / i �� / � //�, ��\ \`\\ `` • ' ' S1p i , ,.509' I�11 ///\\ /' TREES l RAIST140 , LAND /'X'l %/ r; ; , I , - _�� 1 1 ELLY=499.1E \ \ \ ;'�� mpJ / I ? \ \ \\�yVv CURB INLET 18 R/M=50233 CRR�REJ `' \/\\ $ 71 AC L `.:� \ l /; ORNE TNRU MENU (rBRJ � \ ./�T / � It 'xx All zu 00 EX64TTNG TREES (TBR)\\ \\\I l \f\ EX CURB INLET \ \S4N/TARP MANHOLE NO ACCBR \ 1 �� NO ACCE S \ \ \ \ $ 0 RIM=50T 5 LAN, ,5 N/F ' \ �` �`•�� l l \\ LNG 492.00 a / \� l l ------ (�F DEMO NOTE 4J S S C ACQb(S/T/DNS. /NC. \ ; :`�� 1 \ Z1 I saN fi i D.B. 1429`10 P/N. 06100-00�00-120Q1 \ \ \`` `` ` ` �\ / ✓ \\ I\�\' \C"9h \ `. r / ZONED.• HC (HIGHWAY COMME/�C/AL) y \ 2\ ' NOAccESS4NNo[E , USE. SELF STOWAGE \� SPRNK \ `` `` ;\ \` �� I I \\\ °�/ RIM=49459 \ .:\�`.\.� \ l EX/STING TREES (TER) ` �I r� / / — r� � - / '9•n 'CURB INLET RIM (SEE DEMO NOTE 4) `.` IRON ROD `I FOUND0 ZIP J%� r Atd In h\ a PROP 54' CUT ZJP `\ ----- '-- ♦ `� `\`` .c �� 4tX {rRL7NE l �'/� / ,% l I /� n / 0� (/ J ----j-------------------' , / 3 / /// - A S------------------------------- - — / 1' °� RM= 9 \ --- = .92 / CE it \ - ♦F I / -- - -�------------------------------ --------------------------------- / /--------- ----- - 57, - W/LCOHESS ECG`,'--- r � , / I /RIA / ---- ----'' D 3682 PG 13[? ?° s, l / / -ZONED HC �H(GHWAY ZOMMERC/ALJ ; \ \ J ; _ P USE. FUEL \ T/dN. op PROP sA� -V/ h /• I TM EX-1 bl�K 494. 19 PROP S{W CVT zz ------------------ J�o109°, �R9j aP�V QUO°°tia 4 NJ917125 / \ \ 20 10 20 \ / \ 1 "= 20' VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL E SAFETY FENCE SAF 3.02 TEMPORARYSTONE (�[ CONSTRUCTION ENTRANCE lJC ESILT FENCE 3.07 RM DRAIN INLET PROTECTION Ir E TEMPORARY SEEDING TS TS EROSION AND SEDIMENT CONTROL NOTES: 1. SEE SHEET C-603 FOR SEQUENCE OF CONSTRUCTION. 2. OFFSITE BORROW OR HAUL TO BE FROM AN APPROVED SITE. SOILS TABLE SYMBOL SOIL NAME SLOPES HSG 88 UDORTHENTS, LOAMY 2-25% D LEGEND -----•--•— PROPSAWCUT —LOW—LOW— LIMIT OF WORK LOD LOD LIMIT OF DISTURBANCE EXISTING DRAINAGE DIVIDES v z EE w W W W N Z W W zZ2WW Z Ur Z W W WO j W zrc9oOfm mijEw>!3WWw6 (n 7 Q Q Z Q of zo2wzp" z mOU z W Q Q 2 00 Q J z W Z aJ of > O U W H 00 REVISIONS REV DATE I COMMENT Di Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DOcl;�Qa0aQ ffiaggs PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 VA@BohlerEng.com .� Lic. No. 0402056625 op VO.i{C,S 110/29/2021 t1 SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE 1 SHEET NUMBER: C-601 ORG. DATE - 8/27/2021 N a 0 X W � I \ 1 \ 1 \ I \ 1 \ 1 ` ` ` o \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 1 1 1 \ 1 1 I 1 1 1 I 1 1 1, I 1 1 1 I 1 1 1 1 I 1 1 1 1 1 I 1 1 I 1 1 1 1 I 1 1 1 1 1 I 1 1 1 I 1 ' ' 1 ' 1 ' I 1 1 ' ` I 1 1 ` 1 ' ' 1 1 ` ` I 1 ` 1 ` I 1 1 ` 1 ' 1 ' I 1 ' I I \ I \ I1 \ `\ 1 1 1 1 1 I 1 I \ 1 \ \ 1 \ 1 I I 1 1 1 1 I 1 1 1 1 \\ 1 ` \ 1 \ I \ I \ 1 I 1 1 1 ' 1 \ 1 1 1 ' \ \ 1 ' \ = 0.02 i hp1 , 1 ; 1 , 1 I I , I 1 N ' h � � I , , I \' • , i IP \ TO RD- '` A=0.09 AC RD-1 I IP LANDS NI�F SULL/VAN, W/LL/AM EDWARD & ✓OHN A F / D.B. 1095 PG. 237 PIN.- 06100-00-00-120WO ZONED. HC rHgljWAY COMMERCIAL) USE: COMMERC/AL , -- 501''' , 1 ;---------------------------------------------------- 00 /' ' s ' —505504 -- LANDS ` ----------- /,- N/F _____ / CHARLOTTESV/LLE ALBEMARLE RENTAL PROPERT/ES LLC - ---- --- D.B. 5040 PG 206 ` - -- PIN- 06100-00-00-120PO ZONED. HC /HIGHWAY COMMERCIAL),= U$� COMMERCIAL - cm STM I' 1 IP EE X .o PSII(1&8TONE ' RE AWING WALL LANb5' N/F 11 \ WITH RAILING `\ ``� S S C AC0151TIONS\ INC. OB. 1429\\PG 3✓'l% TO B BY O PIN.• 06100-00� BY OT RS `, \ 00-120Q1 \ \�\ ZONED.• HC (HIGHWAY COMMEI�C'IAL) \ USE.• SELF STOWAGE \ \ IRON ROD \ FOUNO \ _ _ -505— `k 1 \` \\ PROP. SITE AREA =1.32 A ---- ROP. K ONE - �`, RETAININ LL ' WITH RAILI ((MAX. HEIGHT: ' TO BE DESIGN BY OTHERS '1 \ 1 \\ TMB- `\ III ^�V jIV j ' A=0.44 AC ;; T RD- A = 0.09 AC / STM II A30 TMA- A = 0.22 A( v c=nog J ________ __ 5 \ --' = _ \ ------ -------------- - -- - ------+o----------------------------- \ ✓ , R99' �� \ ------------------ ___ _ / /--------- '\ - � \g0 / /------- ---= -- ---- WILCOHESS'Y,&-,'------ oo ' / ; ' / ,e/X_05100-00-00-120D0 - ZONED HC �AHGHWAY ZOMMERCIAL) USE. FUEL STATION. J ` ; zz/ / --- ,, Dn.. o �oa�ea =rov - Vol zz /------------------------zz 1 1 /1 1 \ 1 / 1 \ `--- - - - - - - PROP. SITE AREA = (R)1.314 (N1)`� \ \ CURB INLET \, R/M=0233 3 550 .� f 20' c/o O�ACCE MANHOZE N/TARY MANHOLE -5 ACCESS 0D� ' R/M=49459 CURB INLET PS / _ RIM-49934 ' 1161=490.00 SEE OEMO NOTE 4) PROP 54W CUT I I 0 I 1 / EX- ' \' A=).08A o IP �0�9°�1 aR9j ��\PQ�'p1h / / STM S°p Q W P0�p1Vp 5 N J917,125 b�O >` IP PROP SA91 CUT Y �� PROP S!W CUT 20 10 20 \ / 1 "= 20' ,l \ VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL E SAFETY FENCETEMPORARYSTONE SAF 3.02 CONSTRUCTION ENTRANCE IE L� CE 3.05 SILT FENCESTO 3.07 RM DRAIN INLET PROTECTION Ir E PERMANENT SEEDING IS PS EROSION AND SEDIMENT CONTROL NOTES: 1. SEE SHEET C-603 FOR SEQUENCE OF CONSTRUCTION. 2. OFFSITE BORROW OR HAUL TO BE FROM AN APPROVED SITE. LEGEND --•--•---- PROPSAWCUT LOW L0W— LIMIT OF WORK LOD LOD LIMIT OF DISTURBANCE PROPOSED DRAINAGE DIVIDES LU z EE W W W rn z W Wz1Z0W>W Z W H 2 W > z>-I � F W Q 2 W Z >z()WU)0 mij(n 7 2 Z Q zcn2 W z Fl- 0zQaa~O Qz X 0 0 J W Z z aQ > aJ of O U W H REVISIONS REV DATE I COMMENT Di Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT NO.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DO�Qa�aQ PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 VA@BohlerEng.com _.1sALTH A. Lic. No. 0402056625 6, 10/29/2021 .44 SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE It SHEET NUMBER C-602 ORG. DATE - 8/27/2021 EROSION AND SEDIMENT CONTROL NARRATIVE SEQUENCE OF CONSTRUCTION MINIMUM STANDARDS DESCRIPTION OF SITE THIS PROPERTY IS LOCATED ON AN COMMERCIAL PARCEL WITH AN EXISTING COMMERCIAL BUILDING AT 1636 SEMINOLE TRAIL IN ALBEMARLE COUNTY VIRGINIA. THIS PROJECT PROPOSES TO REDEVELOP THE EXISTING PARCEL FOR A NEW COMMERCIAL BUILDING. THE SUBJECT PARCEL SITE IS 1.32 ACRES AND THE AREA OF LAND DISTURBANCE REQUIRED FOR PROPOSED CONSTRUCTION IS APPROXIMATELY 1.31 ACRES. APPROXIMATELY 0.31 ACRES WILL BE PERMANENTLY SEEDED. SEDIMENT CONTROL FOR THE PROPOSED CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH THE POLICIES AND REQUIREMENTS OF THE VIRGINIA EROSION & SEDIMENT CONTROL FIELD HANDBOOK. AS REQUIRED, THIS PLAN PROPOSES EROSION AND SEDIMENT CONTROL IN TWO SEPARATE PHASES. A CONSTRUCTION SEQUENCE IS PROVIDED DETAILING THE PROPOSED PHASING OF EROSION AND SEDIMENT CONTROL BEFORE AND DURING CONSTRUCTION. EXISTING SITE CONDITIONS 0 THE PROPOSED SITE IS AN EXISTING COMMERCIAL LOT WITH PAVED PARKING AND GRASS AREAS. THE EXISTING SLOPE RANGES FROM 2% TO 12 /o. THE SITE GENERALLY DRAINS FROM NORTHWEST TO SOUTHEAST. CRITICAL EROSION AREAS THERE ARE NO CRITICAL EROSION AREAS KNOWN TO EXIST ON SITE. ADJACENT PROPERTY THE SITE FRONTS ON SEMINOLE TRAIL TO THE EAST AND IS SURROUNDED BY HIGHWAY COMMERCIAL ZONED PROPERTIES ON THE NORTH, SOUTH AND WEST. ADEQUATE OUTFALL ADEQUATE OUTFALL INFORMATION CAN BE FOUND IN THE STORMWATER MANAGEMENT PLAN. OFFSITE AREAS NO OFF -SITE AREAS REQUIRED FOR EXPORT OF MATERIALS ARE ANTICIPATED WITH THE PROJECT. IF EXCAVATED MATERIAL IS GENERATED IT SHALL BE DISPOSED OF IN A LAWFUL MANNER AND THE CONTRACTOR SHALL COORDINATE THE HAUL ROUTE WITH THE JURISDICTIONAL INSPECTOR. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL OFF -SITE HAULBORROW AREAS ARE PROPERLY PERMITTED. SOILS THE SOILS ON -SITE, PER THE NRCS WEB SOIL SURVEY, ARE AS FOLLOWS: 88 - UDORTHENTS, LOAMY, 2-25 PERCENT SLOPES HYDROLOGIC SOIL GROUP - D SINKHOLES ARE NOT ANTICIPATED TO AFFECT THE SITE. EROSION CONTROL PROGRAM EROSION CONTROL SHALL BE MAXIMIZED THROUGH RAPID STABILIZATION OF THE DISTURBED AREAS AND BY INSTALLATION OF PERIMETER CONTROLS. NOT MORE THAN 7 CALENDAR DAYS ARE TO ELAPSE WITH ANY DISTURBED AREA REMAINING DENUDED. TEMPORARY COVER, BY SEEDING AND/OR MULCHING, SHALL BE APPLIED TO AREAS THAT WILL BE EXPOSED FOR A PERIOD OF GREATER THAN 7 DAYS, BEFORE PERMANENT STABILIZATION. PERMANENT COVER SHOULD BE PROVIDED OVER ALL DISTURBED AREAS AS SOON AS POSSIBLE UPON ACHIEVING FINAL GRADE, BY MEANS OF SEEDING AND MULCHING, SODDING AND PEGGING, PAVING, OR AS OTHERWISE DIRECTED BY THE PLAN. LIKEWISE, ALL STOCKPILES SHALL BE STABILIZED WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. UTILITY TRENCHES SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILLING TO THE PROPOSED GRADE. SEDIMENT CONTROL PROGRAM SEDIMENT CONTROL SHALL BE ACCOMPLISHED THROUGH RAPID STABILIZATION AND BY THE INSTALLATION OF MECHANICAL DEVICES, AS SHOWN ON THE PHASE I PLAN: STRUCTURAL PRACTICES 1. SAFETY FENCE - 3.01 TO BE PROVIDED TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. 2. CONSTRUCTION ENTRANCE - 3.02 TEMPORARY CONSTRUCTION ENTRANCES WITH WASH RACKS AND SETTLING AREAS ARE TO BE PROVIDED AT EACH POINT OF ACCESS TO THE SITE FOR THE DURATION OF CONSTRUCTION. THE CONTRACTOR IS TO SUPPLY A WATER SOURCE BY PROVIDING A WATER TRUCKIWATER TANK ONSITE FOR WASHING CONSTRUCTION VEHICLES BEFORE ENTERING THE PUBLIC ROAD. 3. SILT FENCE - 3.05 TO BE PROVIDED FOR INTERCEPTING AND DETAINING SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS TO PREVENT SEDIMENT FROM LEAVING THE SITE. 4. STORM DRAIN INLET PROTECTION - 3.07 A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. 5. TEMPORARY SEEDING - 3.31 ESTABLISHMENT OF TEMPORARY VEGETATIVE COVER BY SEEDING WITH APPROPRIATE RAPIDLY GROWING PLANTS ON DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS. 6. PERMANENT SEEDING - 3.32 ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED ON ROUGH -GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE OR WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEEDED ON FINE -GRADED AREAS. VEGETATIVE PRACTICES 1. SURFACE ROUGHENING - AREAS TO BE SEEDED SHALL BE LIGHTLY ROUGHENED AND LOOSE TO A DEPTH OF 2" TO 4" PRIOR TO SEEDING. AREAS WHICH HAVE BEEN GRADED AND WILL NOT BE STABILIZED IMMEDIATELY MAY BE ROUGHENED TO REDUCE VELOCITY UNTIL SEEDING TAKES PLACE. 2. TOPSOILING (STOCKPILES) - TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILE ARE TO BE LOCATED ON -SITE IN OPEN SPACE AREAS, AS DEPICTED ON THE PLAN, ARE TO BE STABILIZED WITH TEMPORARY VEGETATION, AND ARE TO BE SURROUNDED AT THE BASE BY SUPER SILT FENCE. 3. TEMPORARY SEEDING - ALL DENUDED AREAS THAT WILL BE LEFT DORMANT FOR EXTENDED PERIODS OF TIME SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING. SELECTION OF THE SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR THAT IT IS APPLIED. 4. EROSION CONTROL BLANKETS OR MULCH - EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND SEEDED TO PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY. MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS AND WILL BE APPLIED AS A SECOND STEP IN THE SEEDING OPERATION. ALL SILTATION CONTROL MEASURES ARE INTENDED TO PREVENT SEDIMENT FROM ENCROACHING INTO ENVIRONMENTALLY SENSITIVE AREAS OR ONTO ADJACENT PROPERTIES AND ROADWAYS. THE FAUQUIER COUNTY INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE EROSION AND SEDIMENT CONTROLS IN THE FIELD AS SITE CONDITIONS WARRANT. IN ADDITION, NO SEDIMENT TRAPS OR SEDIMENT BASINS MAY BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY INSPECTOR. UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). THE MINIMUM STANDARDS OF VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. PHASE I: PHASE I OPERATIONS WILL INCLUDE THE INSTALLATION OF MEASURES TO CONTROL EROSION AND SILTATION ASSOCIATED WITH INITIAL CLEARING AND GRADING OPERATIONS. AS REQUIRED, PHASE I CONTROLS SHALL BE ESTABLISHED IN A ONE (1) STEP PROCESS: 1. CONTRACTOR TO NOTIFY ALBEMARLE COUNTY AT LEAST 48 HOURS PRIOR TO THE START OF CONSTRUCTION AND OBTAIN A LAND DISTURBANCE PERMIT. 2. OWNER CONTRACTOR RESPONSIBLE LAND DISTURBER AND PROJECT ENGINEER SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE COUNTY INSPECTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. OBTAIN A GRADING PERMIT AND VDOT ENTRANCE PERMIT PRIOR TO THE PRE -CONSTRUCTION MEETING. 3. AREAS WHICH ARE TO BE DISTURBED SHALL BE CLEARLY MARKED IN THE FIELD. 4. INSTALL PERIMETER CONTROLS INCLUDING SILT FENCE AND SAFETY FENCE. INSTALL INLET PROTECTION. 5. INSTALL CONSTRUCTION ENTRANCE C AS SHOWN ON PHASE I PLAN. PROVIDE THE CONSTRUCTION ENTRANCE WITH WASH RACKS THAT DRAIN TO AN APPROPRIATE SETTLING AREA AND ESTABLISH A PROTECTED STAGING AND EQUIPMENT AREA. ALL HARD SURFACE ROADS SHALL BE CLEANED AT THE END OF THE DAY AND SOURCE OF WATER SHALL BE ESTABLISHED ON SITE. 6. APPLY TEMPORARY STABILIZATION TO ALL DISTURBED AREAS IN ACCORDANCE WITH THE APPLICABLE MINIMUM STANDARDS FOUND IN 9VAC25-850-40. 7. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED AND REPAIRED AT THE END OF EACH DAY. 8. CONTRACTOR TO ENSURE THE THE COUNTY EROSION AND SEDIMENT CONTROL INSPECTOR HAS VERIFIED ALL PHASE I E&S MEASURES ARE CORRECTLY INSTALLED AND PHASE I WORK IS COMPLETED PRIOR TO THE START OF PHASE 11. PHASE It: THE PHASE II SEDIMENT CONTROL MEASURES ARE INTENDED FOR THE FINAL STAGES OF SITE DEVELOPMENT. PHASE I CONTROL MEASURES, WHICH ARE NOT IN CONFLICT WITH FINAL CONSTRUCTION AND PROVIDE EFFECTIVE CONTROL SHALL REMAIN IN PLACE FOR FINAL DEVELOPMENT. THE CONTRACTOR AND THE RESPONSIBLE LAND DISTURBER SHALL FOLLOW THE COUNTY INSPECTOR'S DIRECTION IN PROVIDING ADDITIONAL CONTROL MEASURES NEEDED DURING THE DEVELOPMENT PROCESS, TO ENSURE THAT SEDIMENT IS PREVENTED FROM POLLUTING OFF -SITE AREAS, STREAMS AND/OR PROTECTED ON -SITE AREAS. 1. INSTALL PHASE II SILT FENCE AND SAFETY FENCE AS SHOWN ON THE PHASE II E&S CONTROL PLAN. 2. BEGIN ROUGH GRADING. 3. TEMPORARILY STABILIZE THROUGHOUT CONSTRUCTION AND IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING ACTIVITY ANY DISTURBED AREAS INCLUDING MATERIALS STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 4. CONSTRUCT ENTRANCE AND PROPOSED PARKING AREAS. 5. INSTALL INLET PROTECTION AS REQUIRED AS PROPOSED UTILITIES ARE INSTALLED. 6. OBTAIN COUNTY E&S INSPECTORS APPROVAL PRIOR TO THE REMOVAL OF ANY SEDIMENT CONTROLS. 7. OBTAIN CONCURRENCE FROM THE INSPECTOR THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY EROSION CONTROL MEASURES. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE DONE WITH KENTUCKY 31 TALL FESCUE ACCORDING TO STD. & SPEC 3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES, WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND HAVE BEEN SEEDED. THIS WILL PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY. MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER AND LIME WILL BE APPLIED PRIOR TO MULCHING. APPROXIMATELY 3.75 ACRES OF THE SUBJECT SITE SHALL BE PERMANENTLY SEEDED. STREAM BANK STABILIZATION STREAM BANK STABILIZATION IS NOT REQUIRED FOR THIS SITE. STORMWATER RUNOFF CONSIDERATIONS CALCULATIONS PROVIDED IN STORMWATER MANAGEMENT PLAN. MAINTENANCE PROGRAM IN GENERAL ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL EVENT. THE FOLLOWING MEASURES WILL BE CHECKED IN PARTICULAR. SAFETY FENCE: INSPECTIONS SHALL BE CONDUCTED REGULARLY TO CHECK FOR WEATHER -RELATED OR OTHER DAMAGE; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. ALL ACCESS POINTS MUST BE SECURE AT THE END OF EACH WORKING DAY AND LOCKING DEVICES MUST BE REPLACED OR REPAIRED AS NECESSARY. CONSTRUCTION ENTRANCES: INSPECTIONS SHALL BE MADE DAILY FOR ENTRANCE INTEGRITY; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. THE CONSTRUCTION ENTRANCE IS TO BE REGULARLY MAINTAINED TO INCLUDE SCARIFICATION AND ADDITION OF FRESH STONE AS NEEDED. SILT FENCE: INSPECTIONS SHALL BE MADE DAILY FOR FENCE INTEGRITY; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT IS TO BE REMOVED WHEN DEPOSITS REACH ONE-HALF THE FENCE HEIGHT. TEMPORARY AND PERMANENT SEEDING: SEEDED AREAS SHALL BE CHECKED REGULARLY TO ASSURE A GOOD STAND OF GRASS IS BEING MAINTAINED. AREAS THAT FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION SHALL BE RE -SEEDED AS SOON AS THEY ARE IDENTIFIED. NO UNPROTECTED, DISTURBED AREA SHALL DRAIN TO ROADWAY PAVEMENTS SUCH THAT THE SUB BASE, BASE, OR WEARING SURFACE ARE CONTAMINATED BY SILT TRAPPED AT LOW POINTS OR INLETS. DEVICES SHOWN ARE TO BE CONSIDERED AS MINIMUM EROSION AND SEDIMENTATION CONTROLS. ADDITIONAL CONTROLS MAY BE NECESSARY DUE TO CONTRACTOR'S PHASING OR OTHER UNANTICIPATED CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL DEVICES AS NECESSARY IN ORDER TO CONTROL EROSION AND SEDIMENTATION. EROSION AND SEDIMENTATION MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION. THE CONTRACTOR IS TO PROVIDE ADEQUATE MEANS OF CLEANING AND REMOVING ALL LAYING DUST AS NECESSARY BY APPLYING EITHER MOISTURE, CALCIUM CHLORIDE, OR OTHER APPROVED MATERIALS ALONG THOSE SECTIONS OF THE PROJECT ADJACENT TO EXISTING DWELLINGS OR PUBLIC ACCESS. CONTROLS MAY BE REMOVED AFTER THE AREAS ABOVE THEM HAVE BEEN STABILIZED AND WITH THE APPROVAL OF THE COUNTY INSPECTOR. SPECIAL CARE NOTES IT IS THE INTENT OF THIS PLAN TO PRECLUDE SEDIMENT POLLUTION FROM LEAVING THE DELINEATED CONSTRUCTION ZONES. THE CONTRACTOR AND THE RESPONSIBLE LAND DISTURBER SHALL TAKE SPECIAL CARE TO PREVENT CONSTRUCTION DEBRIS AND MUD FROM BEING TRACKED ONTO SURROUNDING PUBLIC AND PRIVATE ROADS. CONSTRUCTION TRAFFIC SHALL ONLY ENTER AND EXIT THE CONSTRUCTION SITE VIA DESIGNATED LOCATIONS, WHICH HAVE WORKING CONSTRUCTION TRAFFIC WASH RACKS. THE CONTRACTOR AND RESPONSIBLE LAND DISTURBER SHALL TAKE SPECIAL CARE TO PROTECT THE EXISTING VEGETATION AND STREAMS OUTSIDE OF THE DESIGNATED LIMITS OF WORK SHOWN ON THE PLANS. GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLANS SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. CONTRACTOR MUST CONTACT THE COUNTY ARBORIST PRIOR TO THE INSTALLATION OF TREE PROTECTION AND PLANT MATERIAL. 11. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT PRIOR TO ENTERING THE PUBLIC RIGHT-OF-WAY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAR THE STREETS AND TAKE WHATEVER MEASURES NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN AND DUST -FREE CONDITION AT ALL TIMES. 12. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN SUCH A MANNER AS TO PREVENT THE WASHING OF ANY TOPSOIL OR DEBRIS ONTO ADJACENT PROPERTIES. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. GENERAL LAND CONSERVATION & STABILIZATION NOTES: 1. NO DISTURBED AREA WHICH IS NOT ACTIVELY BEING WORKED SHALL REMAIN DENUDED FOR MORE THAN 7 CALENDAR DAYS UNLESS OTHERWISE AUTHORIZED BY THE DIRECTOR. 2. ALL E&S CONTROL MEASURES APPROVED WITH THE PHASE I E&S CONTROL PLAN SHALL BE PLACED AS THE FIRST STEP IN GRADING. 3. ALL STORM AND SANITARY SEWER LINES NOT IN STREETS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. NO MORE THAN 500, SHALL BE OPEN AT ANY ONE TIME. 4. ELECTRIC, TELEPHONE AND GAS SUPPLY TRENCHES SHALL BE COMPACTED, SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. 5. ALL TEMPORARY EARTH BERMS, DIVERSIONS AND SEDIMENT CONTROL DAMS SHALL BE SEEDED AND MULCHED FOR TEMPORARY VEGETATIVE COVER IMMEDIATELY (AS SOON AS POSSIBLE, BUT NOT LATER THAN 48 HORS) AFTER COMPLETION OF GRADING. STRAW OR HAY MULCH IS REQUIRED. ALL SOIL STOCKPILES SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER GRADING. 6. ANY DISTURBED AREA NOT COVERED BY NOTE #1 ABOVE AND NOT PAVED, SODDED OR BUILT UPON BY NOVEMBER 1, OR DISTURBED AFTER THAT DATE, SHALL BE MULCHED IMMEDIATELY WITH HAY OR STRAW MULCH AT THE RATE OF 2 TONS/ACRE (4483 KG/HA) AND OVER -SEEDED BY APRIL 15. 7. AT THE COMPLETION OF ANY PROJECT CONSTRUCTION AND PRIOR TO BOND RELEASE, ALL TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED AND ALL DENUDED AREAS SHALL BE STABILIZED. 8. CONTRACTOR TO PROVIDE DOCUMENTATION SHOWING SOURCE OF OFF -SITE FILL AND TESTING RESULTS TO GEOTECHNICAL ENGINEER TO DOCUMENT CAPABILITY OF FILL TO MEET COMPACTION REQUIREMENTS. MS-1: FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE PERMANENT OR TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN: 1 SEVEN CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND 2) SEVEN DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS UPON REACHING FINAL GRADE OR THE SITE BEING IDLE. MS-2: TEMPORARY SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. PROVIDE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL TRANSPORTED FROM THE PROJECT SITE. MS-3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IN THE OPINION OF THE ARCHITECT/ENGINEER IS UNIFORM MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE OR TIMBERING TAKES PLACE. MS-5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAT THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED TO ACCOMMODATE THE ANTICIPATED SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE SERVED BY THE BASIN. MS-7: CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-1 0: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11: BEFORE STORM WATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-1 3: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIALS SHALL BE PROVIDED. MS-14: ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-1 5: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY FOLLOWING AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY. D. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. E. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-1 7: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. MS-1 8: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL AUTHORITY HAVING JURISDICTION. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-1 9: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINTS OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED BANKS. (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; OR (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE PLAN -APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENT ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (1) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (11) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (111) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES (1) ARE IN ACCORDANCE WITH PROVISIONS FOR TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47 OR GRANDFATHERING IN 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION, IN WHICH CASE THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT SHALL APPLY, OR (11) ARE EXEMPT PURSUANT TO § 62.1-44.15:34 C 7 OF THE ACT. N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS SUBDIVISION 19. J 0 m (9 Z EE W W W rn Z W ZZ= Z W U W 1-- U-10 Ur ZWLU0 jW Zr(9� of F W Q 2 W Z � woo (n > U J O (n 7 2 Q CD Q Z Q zU)2 W ZFH 0of zW< 0 Q U H a Q J D U) W Z Z d Q > aJ U W I- rn REVISIONS REV I DATE I COMMENT • Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -0 PROJECT VIRGINIA STORMWATER MANAGEMENT PLAN FOR 3_10 � N 11 PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 TH Lic. No. 0402056625 10/29/2021 SHEET TITLE: EROSION AND SEDIMENT CONTROL NOTES SHEET NUMBER C-603 ORG. DATE - 8/27/2021 SAFETY FENCE 3l1 ) T t •t PERSPECTIVE VIEW r aye! p Rk -.. IEI WIRE FABRIC i ' UNE POST i" o' wfAk. BRACING' 1 GROUND LINE CONCRETE FOOTING PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE METAL FENCE SOURCE: CONWED PLASTICS, VDOT ROAD AND BRIDGE STANDARDS, VA DSWC 1992 3.32 TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-10017b - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200-250 lbs. - Kentucky 31 or Turf -Type Tall Fescue 10(1% General Slope M1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop ' 20 lbs- 150 lbs. Low -Maintenance Slope (Steelier than 3A) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop* 20 lbs. . Crownvetch " 20 lbs. 150 lbs. ' Use seasonal nurse crop in accordance with seeding dates as stated below: February loth through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August loth through October ...................... Annual Rye November through February 15th ................... Winter Rye '* Substitute Sericea lespedem for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crowmetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegram may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. 1II - 303 BLOCK & GRAVEL CURB INLET 307T8 SEDIMENT FILTER - CURB INLET WIRE SCREEN N� a : r RUNOFF WATER WITH OVERFLOW FILTERED WATER SEDIMENT (I SEDIMENT —' WIRE SCREEN 2" X 4" WOOD STUD �• CURB INLET SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT 13, 1357 OR I5 COARSE AGGREGATE SOURCE: VA DSWC Albemarle County Design Standards Manual - Engineering STONE 70' MIN. CONSTRUCTION ACCESS 3- SM-2A ASPHALT TOP COURSE 2z 7% 6- MIN. 21A AGGREGATE BASE STONE CONSTRUCTION ASPHALT PAVED ACCESS A WASHRACK EXISTING 2% 2% PAVEMENT 2%• 12' MIN.• *MUST EXTEND FULL WIDTH L —POSITIVE DRAINAGE OF INGRESS AND EGRESS 11 TO SEDIMENT OPERATION TRAPPING DEVICE 112 MIN. POSITIVE DRAINAGE 2% TOSEDIMENT TRAPPING DFVirF FILTER CLOTH SECTION A -A A nimmumn water tap of I inch mu., be installed with a umhdumuuu 1 inch bagcock shutoff valve supplying a wash hose with a diameter of 1.5 itches for adequate constant pressure. Wash water mist be carried away from the enhance to an approved seNliug m" to ranove sedinimt. Ali sedune t shag be presented from ene* storm dtahms, ditches of waterconrves PAVED WASH RACK 199E 3.32 TABLE 332-E QUALITY OF SEED* Minimum Seed Minimum Purity M) Germination M) Lcermos Crowrwetch 98 65" Lespedeza, Korean 97 85" Lespedeza, Sericea Grasses 98 85-- Bluegrass, Kentucky 97 85 Fescue, Tall (Improved, Turf -Type Cultivars) 98 85 Fescue, Tall (Ky-31) 97 85 Fescue, Red 98 85 Redtop 94 80 Reed Canarygram 98 80 Perennial Ryegrass 98 90 Weeping Lovegrass 98 87 Annuals Annual Ryegrass 97 90 German Millet 98 85 Oats 98 80 Cereal Rye 98 85 ' Seed containing prohibited or restricted noxious weeds should not be accepted. Seed should not contain in excess of 0.5%weed seed. To calculate percent pure, live seed multiply germination times purity and divide by 100. EXampl4: Ky-31 Tall Fescue with a germination of 85 percent and a purity of 97 percent. 97 x 85 = 8245. 8245 = 100 = 82.45 percent pure live seed. " Includes "hard seed" TYPICAL ORIENTATION OF PLATE 6-1 TREATMENT — I (SOIL STABILIZATION BLANKET) cumrnw DN SHALLOW SLOPES, STRIPS OF NETTING PR07TO77VE COVERINGS MAY BE APPLIED ACROSS THE SLOPE BERM WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND ANCHOR IT BEHIND THE BERM.-Wqft ON STEEP SLOPES, APPLY PR07EC77VE COVERING PARALLEL TO THE DIRECTION OF ROW AND ANCHOR SECURELY. BRING MATERIAL DOWN TO A LEVEL AREA BEFORE TERMIM77NO THE INSTALL477LV TURN THE END '- UNDER 4 • AND STAPLE AT 12" INTERVALS IN DITCHES, APPLY PROTECTM COVERING PARALLEL TO THE DIRECTION OF FLOW. USE CHECK SLOTS AS REQUIRED. AVOID JOINING MATERIAL IN 771E CENTER OF THE DITCH IF AT ALL POSSIBLE SOURCE: ADAPTED FROM LUDLOW PRODUCTS BROCHURE Page 8 of 23 1992 CONSTRUCTION OF A SILT FENCE 3.05E1 (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. I L � I FLOW 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 011 FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SEDIMENT CONTROL, SHERWOOD & WYANT TABLE 3.33-A TYPE OF SOD AVAILABLE IN VIRGINIA AND RECOMMENDED USES Kentucky Bluegrass: Adapted to the Northern Piedmont and Mountain Regions. Individual varieties selected must make up not less than 10%, nor more than 35% of the total mixture on a weight basis. All varieties must be certified. Selections can be made from Category I alone or various combinations of Categories I, II and III, as noted. Category I -Recommended Kentucky Bluegrass Varieties 65% - 100% A-34, Abbey, Aspen, Asset, Baron, Blacksburg, Bristol, Cheri, Chateau, Classic, Coventry, Georgetown, Glade, Haga, Julia, Liberty, Loft's 1757, Merit, Midnight, Monopoly, Plush, Princeton 104, Rugby, Suffolk, Victa Category II - Special use varieties. If used, must contain at least 65% Category I varieties Shade Tolerant 10-35% Bristol, Columbia, Georgetown, Glade, Midnight Low -Maintenance Tolerant 10-35% Columbia, Georgetown, Monopoly, Ram 1, Touchdown, Victa Category III - Promising Kentucky Bluegrass - Limited performance data or seed availability 10-35% Dawn, Estate, Freedom, Kelly OVERFLOW RUNOFF WATER WITH SEDIMENT **(continued)*' 333 1992 CONSTRUCTION OF A SILT FENCE 3 STEp (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. i i FLOW I 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FIAW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) f SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SEDIMENT CONTROL,VA. DSWC, SHERWOOD AND WYANT TABLE 3.33-A (CONTINUED) TYPE OF SOD AVAILABLE IN VIRGINIA AND RECOMMENDED USES Tall Fescue: Adapted to the entire state. Recommended Tall Fescue Varieties: 90-100% Amigo, Apache, Bonanza, Chieftain, Finelawn 5GL, Mesa, Rebel II, Shenandoah, Tribute Promising Tall Fescues Certified Arriba, Austin, Avanti, Aztec, Cochise, Crossfire, Eldorado, Hubbard 87, Jaguar II, Maverick II, Monarch, Olympic II, Phoenix, Safari, Shortstop, Sundance, Taurus, Thoroughbred, Titan, Tradition, Vegas, Winchester, Wrangler 0-10% Kentucky bluegrass: Baron, Cheri, Columbia, Monopoly, Nassau, Ram I, Victa Bermudagrass: Tufcote is adapted to the Richmond -Danville -Newport News triangle. Midiron may be used east of Roanoke and south of Charlottesville. Tifgreen and Tifway may be used to the east and south of Richmond. Vamont may be used east of Roanoke and at lower elevations in southwestern Virginia. Certified Midiron, Tifgreen*, Tifway, Tifway IL Tufcote and Vamont Zoysiagrass: This sod performs best in southeastern Virginia Meyer, Emerald* NoLe: Common Bermudagrass is not recommended for sod production. * Only recommended in southeastern Virginia 3.33 1992 3.35 Source: 1991 Virginia Turfgrass Variety Recommendations, Virginia Crop Improvement Association \-DROP INLET WITH GATE SEDIMENT '- SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. * GRAVEL SHALL BE VDOT (/3, #357 OR #5 COARSE AGGREGATE. SOURCE: VA DSWC TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre I Per 1000 sq. ft. Straw or Hay 1; - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 I1 sq. ft. Source: Va. DSWC cp 3a Z 8 EE a Ul W Z F W W d Wz W Ic-) W ZLLJ Lill U) U LUT W 8N Z_ } CO ~ of g§ MIJFof< Wz �>ZU Wr4p �o v)Z)2 <ZQ aW zto2WZF� how OZ<QFFO &Qm ZJp0tn�Z Q CY Z d Q S$ a Q of =J J ro O U zx wg (n q war s� o< REVISIONS REV DATE COMMENT DRAMBYV Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT NO.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DO�Qa�aQ PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 VA@BohlerEng.com Lic. No. 0402056625 it�l 10/29/2021 A SHEET TITLE: EROSION AND SEDIMENT CONTROL DETAILS SHEET NUMBER C-604 ORG. DATE - 8/27/2021 , IN \ wIN I :\ W \ _ >l \ NN \ POI ZONED.'-h[ AREA = 0.12 AC CN = 83 j Q2 = 0.39 CFS Q10 = 0.72 CFS o\ 51 EDW RD & ✓0HN A F 295 PG. 237 %G`HW,4Y COMMERC/ALA COMMERCIAL , 506 CVAR OnES I A Sso gRLE,; , / R�TAL PROPER//ES ZL�C_; --- --------- -- - 505 \u o\ 0 I i ( I ,` 0/ 30♦ z i,11'' I ; / IN ; IN �: --- 401 If IN 11,\k1 ; ' (Vj� (�/) � V ,� � �`♦ \ _ IN \\ IN IN O\O /` - ` ♦ \♦♦♦1 IN IN QD IN ` \` ♦ ♦\\�♦♦♦O�` ♦` ` 1 / 1 `♦ yy J` 11`` ♦� : :N dint`` lam// \\`,\` \\` `\lJ\ `♦\ \ �I \\` ♦\ /III O ( ) I O ,` '1 ` `\ tn` II \\ \ `\```\` \ , I \ ♦ `\\ 99 \ It IN 49V N�!F `. LANDS \ ♦ �I � }-6- -� 55 C\ACOU/S/T/brVS INC. , �� O °gh �' o� D.B. 1429 I ItI `\ P/N.• 06101-00-00�120DK♦ ZONED.• HC (H/�YJWAY COCfAfERCIA{,J �I I \ ,USE.• SELF'`�5'TORAGE `\ \ ,_ - 505 - � \ , �♦ � ,/� \ 5 IN \_ / 5 I ----------- yg� / --- .50 �% ----------------- - gg" - IN bIf \ I 06f o Y',e91JO ',ZONED HCIN (Hw71W(1Y �119oM6tgL�`, v0 s USE.• FUEL TTAT112INN '> - P012IN I , I \ \ -- \ \ -- \ ----'l l0 20 10 0 40 1 "= 40' AREA=1.19AC CN = 90 Q2 = 4.90 CFS `\ Q10 = 8.24 CFS ,\ I I PRE DEVELOPED DRAINAGE AREA ENERGY BALANCE Site: Discount Tire Charlottesville Jurisdiction: Albemarle County Storm Event: 2 Year 24-Hour Rainfall Depth: 3.65" Point of Interest ID 1 2 Comments Pre -Development 1yr 1yr Q, Flow (cfs) 0.39 4.90 CN, Curve Number 83 90 RV, Runoff Depth (in) 1.99 2.59 Drainage Area (ac) 0.12 1.19 RV, Runoff Volume (ac-in) 0.24 3.08 Post -Development Q, Flow (cfs) 0.06 3.13 I.F. 0.90 0.80 Improvement Factor CN, Curve Number 80 94 RV, Runoff Depth (in) 1.76 2.98 Drainage Area (ac) 0.02 1.29 RV, Runoff Volume (ac-in) 0.04 3.85 Energy Balance (EB) Q, Post-Dev (cfs) 0.06 3.13 I.F. * Q pre * RV pre 0.39 3.14 Q, Post-Dev Allowable (cfs) RV post EB Achieved Yes Yes Notes: 1. Q Post-Dev must always be less than or equal to Q Pre-Dev 2. Q Post-Dev is not required to be less than that calculated in the equation (Q forest x RV forest) / RV Post-Dev 3. I.F. = 0.8 for sites > 1.0 acre, 0.9 for sites s 1.0 acre 4. 24-Hour Rainfall Depth per NOAA Atlas 14 Precipitation Frequency Estimates 5. RV value calculated using Equation 12.15, Chapter 12 of Virginia Stormwater Management Handbook P011 '' `ON AREA = 0.02 AC CN=80 Q2 = 0.uu CFS \ \ Q10=0.11 CFS o / \1 LANDS N/F W/LLIAM ED ARD & ✓OHN A F D.B. 1095 PG. 237 06100-00-00_ L2DWf1___"--'/ -FIC-�7lOHWAY COMMERC/ALA USE: COMMERCIAL \ \ \ \ sos ` ' ^ - h0� ;' - 0 - ------------------------- \ ho0 5 5-------------------------- ------------ \I----50506 C , a O T , 505IN _ 5p4 B. I ; 7IN IN , 1 \ \ it ; 00 \ IN IN .` \ \\` II II �_ - i I ' /_u--•\per \ \ `\ ♦ ♦ `♦ �� o II III ` ``\ `\\`\ `♦\ `♦`♦ ♦` '' I IN IN \ \,♦Soy\\ �`♦ OOOO \\ \ \\ \\ \\ `\ ♦ ♦`\ `\IN > IN I W \ I / LANDS �11F / ; I S S C\ACOU/S/T/brVS 'INC. \ ; D.B. `1429 PG. \330 As o \ { ; I PIN.- 06100-00-00­,1200�\♦ , I ZONED- HC (HIO WA)- CO1Wf_RC%Aq 1 ; USE.• SELF`\5'TORAGE`\ \ 505- 499 \ 505 0 ` 2 \ \------------------- y00 1 - --�\ 1 It \ -__-- '--_IN \`IN ,LINED HC (Hw7iW�9Y �[i PM�%t4 'L� Ix `flJ Vol \ \ ; I / ; , USE. FUEL ST�IN,(TION \ l I IN 12 IN IN AREA =1.29AC \ ------------------- ` 'INQ2 = 3.13 CFS 0 20 10 0 40 1 "= 40' Q10 = 8.20 CFS / POST DEVELOPED DRAINAGE AMEA PROPOSED IMPERVIOUS AREAS 44,262 SF - 1.02 AC STORMWATER MANAGEMENT NARRATIVE THE PROPOSED PROJECT IS FOR THE DEVELOPMENT OF A DISCOUNT TIRE STORE AND ASSOCIATED SITE IMPROVEMENTS. THE EXISTING PROPERTY IS CURRENTLY DEVELOPED AS A CLOSED FAST-FOOD RESTAURANT AND ADDITIONAL COMMERCIAL BUILDINGS IN THE REAR. THE TOTAL DISTURBED AREA IS 1.31 0 0 ACRES WITHIN THIS AREA THERE ARE 0.87 ACRES OF IMPERVIOUS AREA IN THE EXISTING CONDITION. THE POST DEVELOPMENT CONDITIONS WILL BE 78 /0 1.02 ACRES IMPERVIOUS AND 22 /0 0.29 ACRES PERVIOUS. THE SITE CONDITIONS WERE ANALYZED AT TWO POINTS OF INTEREST POI 1 AND P012. THE FIRST ANALYZED POINT OF INTEREST (POI 1) IS LOCATED TO THE NORTHWEST OF THE SITE THE SECOND ANALYZED POINT OF INTEREST (POI 2) IS LOCATED TO THE SOUTH OF THE SITE, ALONG SEMINOLE TRAIL, WHERE THE PROPOSED SITE RUNOFF CONVERGES AT THE SAME DOWNSTREAM POINT AND THE REDUCTION OF RUNOFF WITHIN OUR DISTURBED AREA RESULTS IN AN IMPROVED DOWNSTREAM CONDITION. WATER QUALITY REQUIREMENTS FOR THIS SITE WILL BE MET BY PURCHASING 0.66 LBS OF NUTRIENT OFFSET CREDITS. WATER QUANTITY REQUIREMENTS WILL BE MET THROUGH THE USE OF A UNDERGROUND STORAGE CHAMBERS. THE CHAMBERS ARE AN ON -SITE DETENTION SYSTEM THAT UTILIZES A WEIR OUTFALL STRUCTURE. THIS MEASURE ATTENUATES THE POST DEVELOPMENT FLOWS TO MEET ENERGY BALANCE AND FLOOD PROTECTION REQUIREMENTS. THE PRE AND POST -DEVELOPMENT FLOW RATES FOR THE 1-YEAR, 2-YEAR AND 10-YEAR STORM EVENTS FOR THIS SITE WERE CALCULATED USING THE SCS METHOD IN THE PROGRAM AUTOCAD HYDRAFLOW HYDROGRAPHS. TO CALCULATE THE RUNOFF REDUCTION REQUIRED TO MEET THE ENERGY BALANCE REQUIREMENTS, CURVE NUMBERS WERE CALCULATED USING VALUES FROM SCS TABLE 2.2A, RUNOFF CURVE NUMBERS FOR URBAN AREAS. RAINFALL DEPTHS USED TO CALCULATE FLOWS WERE TAKEN FROM NOAA ATLAS 14. THE PRE -DEVELOPMENT FLOW RATES ARE SHOWN BELOW: THE POST -DEVELOPMENT FLOW RATES ARE SHOWN BELOW: POI 1 POI 2 POI 1 POI 2 1-YEAR CFS: 0.284 1-YEAR CFS: 3.801 1-YEAR CFS: 0.041 1-YEAR CFS: 1.462 2-YEAR CFS: 0.390 2-YEAR CFS: 4.901 2-YEAR CFS: 0.058 2-YEAR CFS: 3.133 10-YEAR CFS: 0.724 10-YEAR CFS: 8.236 10-YEAR CFS: 0.112 10-YEAR CFS: 8.200 AS SHOWN IN THE POST DEVELOPED DRAINAGE PLAN ABOVE, THE RUNOFF FROM THE 1-YEAR, 2-YEAR AND 10-YEAR STORM EVENTS HAS BEEN REDUCED IN THE POST -DEVELOPMENT CONDITION TO LEVELS BELOW THE PRE -DEVELOPMENT CONDITION THEREFORE MEETING THE FLOOD PROTECTION REQUIREMENT. AS SHOWN ON THE ENERGY BALANCE CALCULATIONS ON THIS SHEET, THE REDUCTION IN THE POST DEVELOPMENT FLOWS ARE SUFFICIENT TO SATISFY THE ENERGY BALANCE EQUATION, THEREFORE MEETING THE CHANNEL PROTECTION REQUIREMENTS FOR THE SITE. THE ALLOWABLE RELEASE RATE FOR ENERGY BALANCE WAS CALCULATED TO BE 3.14 CFS. THE COMBINED RELEASE RATE OF THE UNDERGROUND DETENTION SYSTEM WAS CALCULATED TO BE 3.13 CFS. THEREFORE, BECAUSE BOTH FLOOD PROTECTION AND CHANNEL PROTECTION REQUIREMENTS HAVE BEEN MET FOR THE SITE, ALL STORMWATER QUANTITY REQUIREMENTS HAVE BEEN MET AND NO FURTHER CALCULATIONS ARE REQUIRED. BEST MANAGEMENT PRACTICES NARRATIVE SINCE THE SUBJECT SITE IS AN EXISTING DEVELOPED SITE, WATER QUALITY REQUIREMENTS FOR THE DEVELOPMENT OF THIS SITE WERE CALCULATED USING THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM) REDEVELOPMENT SPREADSHEET. USING THIS SPREADSHEET IT WAS DETERMINED THAT THE DEVELOPMENT OF THIS SITE WOULD REQUIRE THE TREATMENT OF AN ADDITIONAL 0.66 LB/YR OF PHOSPHOROUS REMOVAL. TO MEET THIS REMOVAL REQUIREMENT, NUTRIENT OFFSET CREDITS WILL BE PURCHASED. SINCE THE PHOSPHOROUS REMOVAL ACHIEVED BY THESE CREDITS MEETS THE AMOUNT REQUIRED BY THE VRRM REDEVELOPMENT SPREADSHEET, ALL STORMWATER QUALITY REQUIREMENTS FOR THIS PROJECT HAVE BEEN MET AND NO FURTHER ANALYSIS IS REQUIRED. CONCLUSION SINCE THE 1-YEAR, 2-YEAR, AND 10-YEAR FLOW RATES IN THE POST -DEVELOPED CONDITION MEET ENERGY BALANCE AND FLOOD PROTECTION, IN ADDITION TO THE PHOSPHOROUS REMOVAL RATE MEETING THE VRRM REDEVELOPMENT PHOSPHOROUS REMOVAL REQUIREMENT, IT IS THE OPINION OF THE ENGINEER THAT THE STORMWATER QUANTITY AND QUALITY REQUIREMENTS ARE SATISFIED FOR THIS PROJECT. ADEQUATE OUTFALL NARRATIVE THE EXISTING SITE GENERALLY DRAINS TO THE SOUTH INTO EXISTING STORM INLETS ALONG THE EDGES OF THE SITE. THE RUNOFF IS THEN ROUTED EAST ALONG SEMINOLE TRAIL WHERE ALL OF THE SITE RUNOFF CONVERGES AT THE EXISTING STRUCTURE NOTED AS EX-1. THE PROPOSED DEVELOPMENT CAPTURES AND DETAINS THE SITE RUNOFF BEFORE IT IS RELEASED AT POI-2 AT A RATE WHICH IS LESS THAN THE EXISTING CONDITION. SINCE THE OVERALL FLOWS TO POI-1 AND POI-2 AND ALL DOWNSTREAM STRUCTURES ARE REDUCED FOR THE 1-YEAR, 2-YEAR, AND 10-YEAR STORM EVENTS, THIS OUTFALL IS CONSIDERED ADEQUATE. AS SUCH, IT IS THE OPINION OF THE ENGINEER THAT ADEQUATE OUTFALL REQUIREMENTS HAVE BEEN MET FOR THE SUBJECT SITE. � 3 gX 3a z w a� uJ W U z FW W Wz WuLDw� m (D W WU)>W 8N Z�CO~�0_� g ~wQ= WZ >zUW<40 �o v)Z)2<<z< aMIJ W zU2WZP: how OZ<QFFO &Q0 D��Urn O_z Z O07W <& Q d' Z (n ILQ a� Xo Q J ro O zm H �& � s �a o� REVISIONS REV DATE COMMENT„ Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR ®0EE PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax 540 349-0321 TH R1'AN YAUGER Lic. No. 0402056625 6, 10/29/2021 j SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER: C-901 ORG. DATE - 8/27/2021 data input cells Project Name: Date: Discount Tire Charlottesville 10/18/2021 constant values Linear Development Project?No calculation cells Site Information Post -Development Project (Treatment Volume and Loads) Enter Total Disturbed Area (acres) 1 31 Check: BMP Design Specifications List. 2013 Draft Stds & Specs 0..rTotal 7csolls � Linearproject? Land cover areas entered correctly? No Pre-ReDevelopment Land Cover (acres)A disturbed area entered? Soils B Soils D Soils Totals Forest/Open Space (acres) - undisturbed forest/open space 0.00 Managed Turf (acres) -- disturbed, graded for yards or other turf to be mowed/managed 0.43 0.43 Impervious Cover (acres) 0.88 0.88 1.31 Post -Development Land Cover (acres) A Solis B Solis C Soils D Soils Totals Forest/Open Space (acres) - undisturbed, protected forest/open space or reforested land 0.00 Managed Turf (acres) - disturbed, graded for yards or other turf to be mowed/managed 0.29 0.29 Impervious Cover (acres) 1.02 1.02 Area Check OK. OK. OK. OK. 1.31 Constants Runoff Coefficients Rv Annual Rainfall (inches) 43 A Soils B Solis C Solis D Solis Target Rainfall Event (Inches) 1.00 Forest/Open Space 0.02 0.03 0.04 0.05 Total Phosphorus (TP) EMC (miI 0.26 Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen (TN) EMC (mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 Target TP Load (lb/acre/yr) 0.41 Pi (unitless correction factor) 0.90 Land Cover Summary -Pre Pre-ReDevelopment Listed Adjusted' Forest/Open Space Cover (acres) 0.00 0.00 Weighted Rv(forest) 0.00 0.00 %Forest 0% 0% Managed Turf Cover (acres) 0.43 0.29 Weighted Rv(turf) 0.25 0.25 %Managed Turf 33% 25% Impervious Cover (acres) 0.88 0.88 Rv(impervious) 0.95 0.95 %Impervious 67% 75% Total Site Area (acres) 1.31 1.17 Site Rv 0.72 0.78 Treatment Volume and Nutrient Load Pre-ReDevelopment Treatment Volume 0.0786 0.0757 (acre-ft) Pre-ReDevelopment Treatment Volume (cubic feet) 31425 3,298 Pre-ReDevelopment TP Load (lb/yr) 2.15 2.07 Pre-ReDevelopment TP Load per acre 64 n (Ib/acre/1 Baseline TP Load (lb/yr) (OA1 Ibs/aae/yr applied to pre -redevelopment area excluding pervious 0.48 land proposed for new impervious cover) 'Adjusted Land Cover Summary: Pre ReDevelopment land cover minus pervious land cover (foresVopen space or managed turf) acreage proposed for new impervious cover. Adjusted total acreage is consistent with Post-ReDevelopment acreage (minus acreage of new impervious cover). Column / shows load reduction requriement for new impervious cover (based on new development load limit 0.41 Ibs/acre/year). A-20 STM STM -20 ELEV = 495.10 ELEV = 495.1 INLET RIM INLET RIM ..-III-III-I d e. _ d 1 III INSIDE CEILING = 493.95 III III I=I I -I B ° I_I-III-III 5' I I= -III- -III- _III III= NSIDE CEILING = 493.95 10YR4ySEL=493.46 -III= - _ �/ 10YR-WSEL=493.46 _ I I -I I -I PE CAST �L III -III -III=1 CSOLID ONCRETE WA LSII-III-I . I=1 (TYP.) 1=I I I=1=1 1=1 a a 2_YR=WSEL= 4W 79_ d_ _�] 2VR-WSE_L=482.78 a "CONC. WALL a'� _ .dd" ° 1Y_R=WSEL=492.42_' TOP=493.35 _�_-_ 1.5' WEIR AT 492.2 1YR-WSEL=492A2 .p ° J .Q d . d A n d 4 FOLOWE 1.5' WEIR AT 492.20 ' ^. d o a a 12" O.C. (7yP.) M.H. g d STEPS/LADDER RUNGS STANDARD .a - ° 3" DIAMETER a 6" CONIC. WALtr- LOW FLOW ORIFICE (INV.=489.95) a d � ... CONTRACTOR TO ENSURE TRASH RACK PENINGS ARE<1/2") d . 24" RCP �.��?. a . . A . e OOUT�FALL d / n d INV.=489.95 24" RCP ° INV.= 489.95 = 489.85 - ° OUTFALL a - a- -d a - ... 6" REINF. CONC. . d:-d .. .*A .. . - FOOTING PROP TRASH RACK (CONTRACTOR TO ENSURE TRASH SECTION A -A PROP TRASH RACK 3-3" LOW FLOW ORIFICES (INV.=489.95) RACK OPENINGS ARE 5 1/2') OUTLET STRUCTURE DETAIL - STRUCTURE A-1 NOT TO SCALE NOTE: CONTRACTOR TO SUBMIT SHOP DRAWINGS TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. Virginia Runoff Reduction Method Worksheet DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version 3.0 BMP Design Specifications List: 2013 Draft Stds & Specs Site Summary Project Title: Discount Tire Charlottesville Date: 44487 Total Rainfall (in): 43 Total Disturbed Acreage: 1.31 Site Land Cover Summary Pre-ReDevelopment Land Cover (acres) A soils B Solis C Soils D Solis Totals IN of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 0.00 0.00 0.43 0.43 33 Impervious Cover (acres) 0.00 0.00 0.00 0.88 0.88 67 1.31 100 Post-ReDevelopment Land Cover (acres) A soils B Soils C Soils D Soils Totals % of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 0.00 0.00 0.29 0.29 22 Impervious Cover (acres) 0.00 0.00 0.00 1.02 1.02 78 1.31 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Post- Post- Adjusted Pre- (Post-ReDevelopment Development Impervious) & New Im p ) ReDevelopment (New Impervious) ReDevelopment Site Rv 0.80 0.78 0.95 0.78 Treatment Volume (ft3) 3,781 13,298 1 483 1 3,298 TP Load (lb/yr) 2.38 1 2.07 1 0.30 12.07 ITotal TP Load Reduction Required (lb/yr) 0.66 0.41 0.25 Final Post -Development Load (Post-ReDevelopment & New Impervious) Pre- ReDevelopment TN Load (lb/yr) 16.99 15.39 Pre - Final Post -Development Post-ReDevelopment TP ReDevelopment TP Load per acre Load per acre TP Load per acre (Ib/acre/yr) (Ib/acre/yr) (lb/acre/yr) 1.77 1.81 1.77 _ J UJ z it w Lu Ww � z0zow z w�OwU-102> 0 z LU LU W j W zrc9t=oOftn Fw¢x Luz _J > z U lu to 0 U)Z)2IX QZQ zcnMwzFl- �zQQa~O QJz EL< z aQ > aJ of O U w H REVISIONS REV DATE COMMENT Di • Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 MOHLER// 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax (540)349-0321 VA@BohlerEng.com _,V. ZTH n. .� TP Load Reduction Required (Ib/yr) 0.66 Site Compliance Summary Lic. No. 0402056625 �► OAS 10/29/2021 A Nitrogen Loads (Informational Purposes Only) Final Post -Development TN Loa Pre-ReDevelopment TN Load (lb/yr) 15.39 11 11 (Post-ReDevelopment & New 16.99 Maximum % Reduction Required Below 20% Pre-ReDevelopment Load Total Runoff Volume Reduction (ft3) 0 Total TP Load Reduction Achieved (lb/yr) 0.00 Total TN Load Reduction Achieved (lb/yr) 0.00 Remaining Post Development TP Load (lb/yr) 2.38 Remaining TP Load Reduction (lb/yr) Required 0.66 SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER C-902 ORG. DATE - 8/27/2021 Pond Report 6 Hydrograph Report 1 Hydrograph Report 2 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk®CMI 3D® by Autodesk, Inc. v2020 Thursday, 10 / 28 / 2021 Pond No. 1 - Storage Pond Data UG Chambers -Invert elev. = 489.95 ft Rise x Span = 4.00 x 4.00 ft, Barrel Len = 80.00 ft, No. Barrels = 5, Slope = 0.00%, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.4.5 Na o 0 0.440 0 490.35 Na 282 282 0.80 490.75 Na 455 716 1.60 491.55 Na 653 1,269 878 1.eo as1.55 Na sos 1,a7e 2.00 491.95 Na 636 2,514 2.80 492.75 Na 609 3,159 2.80 492.75 Na 609 3,759 3.20 493.15 We 553 4,312 3.60 493.55 We 454 4,766 4.00 493.95 Na 261 5,028 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10l28l2021 Hyd. No. 1 POI-1 Pre Hydrograph type = SCS Runoff Peak discharge = 0.284 Cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. = 574 lt Y. volume cu Drainage area = 0.120 ac Curve number = 83* Basin Sloe = 0.0 % Hydraulic length = Oft P Y 9 Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution T pe II = Y Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(0.100 x 60) + (0.020 x 98)] / 0.120 POI-1 Pre Q (cfs) Q (cfs) Hyd. No. 1 - 1 Year 0.50 0.50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10 / 28 / 2021 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.041 Cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs = 2 min Hyd. = 83 Tiinterval. volume cult me Y Drainage area = 0.020 ac Curve number = 80* Basin Sloe = 0.0 % Hydraulic length = Oft P Y 9 Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution T pe II = Y Storm duration = 24 hrs Shape factor = 484 ' Composite (Ama/CN) _ [(0.020 x 80)] 10.020 POI-1 Post Q (�) Q (�) Hyd. No. 2 -- 1 Year 0.10 0.10 Hydraflow Hydrographs Extension for Autodesk(b CNi13D® by Autodesk, Inc. v2o2o Thursday, 10 / 28 / 2021 Hyd. No. 3 POI-2 Pre Hydrograph type = SCS Runoff Peak discharge = 3.801 cis Storm frequency = 1 yrs Time to peak = 11.93 hrs TiintervalY me = 2 min Hyd. volume = 7,849 cult Drainage area = 1.190 ac Curve number = 90* Basin Sloe = 0.0 % Hydraulic length = Oft P Y 9 Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution T pe II = Y Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(0.330 x 60) + (0.860 x 98)] / 1.190 P0I-2 Pre Q (cfs) Hyd.(S) Hyd. NO. 3 -- 1 Year 4.00 4.00 Culvert /Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 Inactive Inactive Crest Len (ft) = 4.50 1.50 0.00 0.00 Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 493.35 492.20 0.00 0.00 No. Barrels = 1 3 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 489.85 489.95 0.00 0.00 Weir Type = 1 Rect -- - Length (ft) = 22.30 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope I%) = 0.50 0.00 0.00 Na N-Value = .013 .013 .013 Na Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multistage = ale Yes No No TW Elev. (it) = 0.00 0.45 0.40 0.45 0.40 0.09 0.09 *Ae:CuWrI?Cnfwcumoesareanalymeurmerinlel(ic)ane ouuet(oc)mmrd. weir risers diedcm toraiece mndiuona (iganeewmerpence (e). Stage (ft) Stage / Discharge Elev (ft) 0.06 0.08 3.00 3.00 0.35 0.35 0.07 0.07 0.30 0.30 0.06 0.06 5.00 494.95 0.25 0.25 0.05 0.05 4.00 493.95 2.00 2.00 0.20 0.20 0.04 0.04 1.00 1.00 0.15 0.15 0.03 0.03 3.00 492.95 2.00 491.95 0.10 0.10 0.02 0.01 0.02 0.05 0.05 0.01 1.03 490.95 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) - Hyd No. 3 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) - Hyd No. 1 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) - Hyd No. 2 0.00 489.95 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Q Discharge (cfs) Hydrograph Report 4 Hydrograph Report 5 Hydrograph Report 7 Hydrograph Report e Hydraflow Hydrographs Extension for AutDdwk® Civil 3130 by Autodesk, Inc. v202O Thursday, 10/28/2021 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCS Runoff Peak discharge = 4.700 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 10,105 cult Drainage area = 1.290 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(0.270 x 80) + (1.020 x 98)] ! 1.290 POI-2 to Underground Q (ars) Hyd. No. 4 - 1 Year Q (Cfs) Hydraflow Hydrographs Extension for AutodeskO Civil 3130 by Autodesk, Inc. v202O Thursday, 10/28l 2021 Hyd. No. 5 POI-2 Post Hydrograph type = Reservoir Peak discharge = 1.462 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 10,102 cult Inflow hyd. No. = 4 - P0I-2 to Underground Max. Elevation = 492.42 ft Reservoir name = Storage Max. Storage = 3,252 cult Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v202O Thursday, 10/28/2021 Hyd. No. 1 POI-1 Pre Hydrograph type = SCS Runoff Peak discharge = 0.390 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 790 cult Drainage area = 0.120 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydregraphs Extension for AutDdwk® Civil 3130 by Autodesk, Inc. v202O Thursday, 10 /2812021 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.058 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 116 cult Drainage area = 0.020 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Storage Indication method used. POI-2 Post Q (Cle) Hyd. No. 5 -- 1 Year Q (Cfs) ' Composite (Area/CN) _ [(0.100 x 80) + (0.020 x 98)] ! 0.120 POI-1 Pre Q (cfs) Hyd. No. 1 -- 2 Year Q (crs) ' Composite (Area/CN) _ [(0.020 x 30)] 10.020 P0I-1 Post Q (ars) Hyd. No. 2 -- 2 Year Q (crs) 0.10 5.00 5.00 5.00 5.00 0.50 0.50 0.09 0.10 0.09 0.45 0.45 4.00 4.00 4.00 4.00 0.40 0.40 0.08 0.08 3.00 3.00 3.00 3.00 0.35 0.35 0.07 0.07 0.30 0.30 0.06 0.06 2.00 2.00 2.00 2.00 0.25 0.25 0.05 0.05 0.20 0.20 0.04 0.04 1.00 1.00 0.15 0.10 0.15 0.10 0.03 0.03 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 4 Time (hrs) 0.02 0.02 0.05 0.05 0.01 0.01 0.00 0.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 _ Hyd No. 1 Time (hrs) 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 _ Hyd No. 2 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 _ Hyd No. 5 - Hyd No. 4 ® Total storage used = 3,252 tuft Time (hrs) Z EE W W W rn Z W O ZjZ(AU Eu WH W 0 Z W W j W i.gc9t=oErn Q 2 W Z J>Z0EU0 ai022aQZQ 00<a- Fof OzW< 0 Q J W D U) W Z Z aQ J D- Q Of J F U W H REVISIONS REV I DATE I COMMENT • I Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR - ��scouNt PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 - pLTH pF L V NYA R .O Lic. No. 0402056625 �O.t� 10/29/2021 t1� SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER: C-903 ORG. DATE - 8/27/2021 Hydrograph Report 9 Hydrograph Report 70 Hydrograph Report 11 Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by AutDdesk, Inc. v2020 Thursday, 10 J 2812021 Hyd. No. 3 POI-2 Pre Hydrograph type = SCSRunoff Peak ischarge = 4.901 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 10,255 cuft Drainage area = 1.190 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrogmphs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 J 2812021 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCSRunoff Peak ischarge = 5878 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 12,834 cuft Drainage area = 1.290 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydmflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 / 2812021 Hyd. No. 5 POI-2 Post Hydrograph type = Reservoir Peak discharge = 3.133 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 12,831 cuft Inflow hyd. No. = 4 - POI-2 to Underground Max. Elevation = 492.79 ft Reservoir name = Storage Max. Storage = 3,808 cuft Storage Indication method used. P0I-2 Post Q (�) Hyd. No. 5 -- 2 Year Q (Cfs) yd Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10l 2812021 Hyd. No. 1 POI-1 Pre Hydrograph type = SCSRunoff Peak ischarge = 0.724 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 1,497 cuft Drainage area = 0.120 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(0.330 x 80) + (0.860 x 98)] / 1.190 POI-2 Pre Q (ds) Hyd. No. 3 -- 2 Year Q (Cfs) yd ' Composite (Area/CN) _ [(0.270 x 60) + (1.020 x 98)] / 1.290 POI-2 to Underground Q (�) Hyd. No. 4 -- 2 Year Q (Cfs) y ' Composite (Area/CN) _ [(0.100 x 60) + (0.020 x 98)] / 0.120 P0I-1 Pre Q (Cfs) Q (cfs) Hyd. No. 1 --10 Year 1.00 1.00 5.00 5.00 6.00 6.00 6.00 6.00 4.00 4.00 0.90 0.80 0.90 0.80 5.00 5.00 5.00 5.00 4.00 4.00 0.70 0.70 3.00 3.00 4.00 4.00 0.60 0.60 3.00 3.00 3.00 3.00 0.50 0.50 2.00 2.00 0.40 0.40 2.00 2.00 2.00 1.00 2.00 1.00 0.30 0.30 0.20 0.20 1.00 1.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No 4 Time (hrs) 0.10 0.10 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 - Hyd No. 1 Time (hrs) 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 _ Hyd No. 5 - Hyd No. 4 ® Total storage used = 3,808 cult Time (hrs) 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 - Hyd No. 3 Time (hrs) Hydrograph Report 13 Hydrograph Report 74 Hydrograph Report 15 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by AutDdesk, Inc. v2020 Thursday, 10 J 2812021 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.112 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 229 cuft Drainage area = 0.020 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 J 2812021 Hyd. No. 3 POI-2 Pre Hydrograph type = SCS Runoff Peak discharge = 8.236 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 17,814 cuft Drainage area = 1.190 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydmflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 / 2812021 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCS Runoff Peak discharge = 9.424 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 21,254 cuft Drainage area = 1.290 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 / 2812021 Hyd. No. 5 POI-2 Post Hydrograph type = Reservoir Peak discharge = 8.200 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 21,251 cuft Inflow hyd. No. = 4 - POI-2 to Underground Max. Elevation = 493.46 ft Reservoir name = Storage Max. Storage = 4,667 cuft Storage indication method used. POI-2 Post Q (Cfs) Hyd. No. 5 --10 Year Q (ds) ' Composite (Area/CN) _ [(0.020 x 80)] 10.020 P0I-1 Post Q (Crs) Hyd. No. 2 --10 Year Q (Cfs) 0.50 0.50 ' Composite (Area/CN) _ [(0.330 x 60) + (0.860 x 98)] / 1.190 P0I-2 Pre Q (ars) Hyd. No. 3 --10 Year Q (Cfs) 10.00 10.00 ' Composite (Area/CN) _ [(0.270 x 60) + (1.020 x 98)] / 1.290 POI-2 to Underground Q (Crs) Hyd. No. 4 --10 Year Q (Cfs) 10.00 8.00 6.00 10.00 8.00 6.00 10.00 10.00 0.45 0.45 0.40 0.40 8.00 8.00 8.00 6.00 8.00 6.00 0.35 0.35 0.30 0.30 6.00 6.00 0.25 0.25 0.20 0.20 4.00 4.00 4.00 2.00 4.00 2.00 4.00 2.00 4.00 2.00 0.15 0.15 0.10 0.05 0.10 2.00 2.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 3 Time (hrs) 0.05 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 2 Time (hrs) 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 _ Hyd No. 4 Time (hrs) 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 - Hyd No. 5 - Hyd No. 4 Total storage used = 4,667 cult Time (hrs) mi 2 O m f, Z it W W W In Z W f7 ZjZ(AU w W H W 0 Z W W > W 0t=Q 2 i.gW oEZZW J> z U W 0 ai022aQZQ zcn2WZFOf C)zQQa~O Q J WD� W Z Z as J a Q Of J F U W V5 REVISIONS REV I DATE I COMMENT • I Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR - �iscouNt PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540)349-4500 Fax: (540)349-0321 Nf" pF L 4 V NYA R .� Lic. No. 0402056625 10/29/2021 t1� SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER: C-904 ORG. DATE - 8/27/2021