Loading...
HomeMy WebLinkAboutWPO201600048 Checklist - Project Closeout (Administrative) 2021-10-26 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form . " .111.: F`� , release; place the completed form in the WPO folder and forward to the Imaging Center for digitaldigitalcloseout d Filing. _ WPO# ' LX1C2k PROJECT TITL FULL NAME INSPECTOkjecia4FINAL ACTION DATE: -b CountyView- Status/Status Date updated Hardco----_- - ____ _____ ______mow__________--__�---- ____-___------------ pal Fide reverse e Folder Closeout: All items listed should be placed in project folder in _ - -� chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applica ble to I next to the check box. The Inspector/Management Analyst has the � this file,place an"N/A" Iprovide clarity to the file,please indicate that item on the"Other"lines poviddmchde any item deemed necessary to Digital Closeout Instructions: Below each item please indicate if Ima or, if the document is already in digital format,can be save d to LaserFiche. Please ovide the digital location (path/name)of the document in the space provided. ❑ Precons i ction Meeting Form ❑ can 0 Saved location ❑ Grading Perna ❑ Scan ❑ Saved location 0 Inspection Requests ❑ Scan ❑ Saved location ❑ Inspect❑ion Results(Include , .,inspection tickets,memos,photos,etc.) Sc \ Saved location ❑ Bond Reduction/Bond Release N. 'ces from Inspector to Management Analyst ❑ Scan El Say- . location y ❑ Conservation Checklist ❑ Scan 0 Saved loc. 'on 0 As-built/Construction Plans ❑ Scan 0 Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location I ❑ Other Plans - At the Inspector's discretion, copies of i approved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such pl. .s are included, they should be cl ' unapproved and contain a note clarifying why it was inc ded. early marked as ❑ Scan ❑ Saved location NOTES: pgig items re complete: -- -- O project folders will be accepted by the Imaging Center whe; the follows g items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronolo_ cal orde 3) Documents are sufficiently identified as to which need to be scanned 'r saved to Lase Fi he. on top); If the above items are not complete,Imaging Center staff will circle the inco Engineer for corrective action. che. mplet� item aid return folder to the County 1 1 Draft 12-5-2013 j