Loading...
HomeMy WebLinkAboutWPO201700029 Checklist - Project Closeout (Administrative) 2019-08-26 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form ','. it• ,;`�., release; place the completed form in the WPO folder and forward to the Imaging Center for digital LaserFiche. Once items have been placed in Lase � �''� of project completion and/or bond rFiche,Imaging Center staff will forward to Centralized Filing. --WPO# :t ('7 3 PROJECT TITLE M l( 00 FULL NAME INSPECTOR: jyh n Al 5« FINAL ACTION DATE: q C --� ountyView— ----------- Status/StatusDate updated --1 1----a r—d-c--r oAy----File Folder Closeout: All items liste 1 chronological order(latest on top), d should be placed in project folder,in revers--��- Please check each item included in this folder. To indicate that an item is not applicable to next to the check box. The Inspector/Management Analyst has the discretion to incliide any itehism file, lace a essay provide clarity to the file,please indicate that item on the"Other"lines provided. deemed necessary to Digital Closeout Instructions: Below each item please indicate if Imaging or, if the document is already in digital format,can be saved to ��Centervid to scan the document; (path/name)of the document in the space provided. �serFiche. Please provide the digital location ❑ Preconstruction Meeting Form 1 ❑ Scan ❑ Saved location ❑ G• rading Permit ❑ Scan 0 Saved location 0 Inspection Requests 0 Scan ❑ Saved location 0 Inspection Results(Include any inspection tickets,memos,photos,etc.) ❑ Scan ❑ Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to Management Anal st ❑ Scan 0 Saved location Y 0 C• onservation Checklist ❑ Scan 0 Saved location 0 As-built/Construction Plans ❑ Scan ❑ Saved location , 'Other explain) (Please ,�. - tea Scan ❑ Saved location 0 O• ther Plans - At the Inspector's discretion, copies of unapproved plans/plats'may lend clarity to the review at a later date. If such plans are included, they should be Ilea unapproved and contain a note clarifying � be placed in the file if they why it was included, rlv marked as ❑ Scan 0 Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder;2) Documents are Acco-fastened(except plats/plans),and in chronological orde 3) Documents are sufficiently identified as to which need to be scanned or saved to L se Ficheents on top);If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the County K.....,,..____ Engineer for corrective action. /_. r,c/ 5/17//6 r .R// //y me.-4drne P/ani5 t ' wpoaoi7-zq r� �: 0 .oe5- 33 /Alpu (o/4. -Ili Draft 12-5-2 013