HomeMy WebLinkAboutWPO202000002 Application 2021-11-03Virginia Stormwater Management Program (VSMP)
Application for Albemarle County Is
Project Name: Horseshoe Farm Bridge
(The name should be the same as it appears on plans)
Is this an amendment to an approved plan? Yes ® No ❑
Is this a revision or resubmission for review? Yes ❑ No
County File Number: WP0202000002 (to be provided by the County for new applications)
The following are required elements of new applications [from code section 17-4011. For revisions or
amendments, please indicate which items are being amended. Signatures must be provided for any
submission.
14A. Signature of the Owner for each parcel: (Required with every submission or revision, NOT TO BE
SIGNED BY AN AGENT OR CONSULTANT)
By signing this application as the owner, I hereby certify that all requirements of these plans and permits will be
complied with, and I have the authority to authorize the land disturbing activities and development on the subject
property. I hereby grant the County of Albemarle the right to enter mercy as required to ensure
compliance with the approved plans and permits.
29-63A
rax Map & Parcel
30-10
Horseshoe CV LLC
Print Name of Owner
Horseshoe CV LLC
Print Name of Owner
Signature of Owner
Tax Map & Parcel Print Name of Owner Signature of Owner Date
Tax Map & Parcel Print Name of Owner Signature of Owner Date
Contact Information for the Owner(s) to receive correspondence
Print Name Horseshoe CV LLC
LI
Address P.O. Box 69
City Richmond State VA Zip 23218
Daytime Phone (_) -Email jodandi@pintailcapitalllc.com
Revised 07/24/18 Page 1 of 2
013. All Fees [Code § 17-208]
For new or modified plans: Total acres proposed to be disturbed 0.4 AC
Fee Due with this
Transfer or
Acres to be Disturbed
Application
Modification Fee
Total Fee = (Application Fee + 4% Technology Surcharge)
Single Family Dwelling only
$171.60
$23.92
Less than 1 acre
($165 + $6.60)
($23 + $0.92)
Single Family Dwelling only
$171.60
$236.08
1 and less than 5 acres
($165 + $6.60)
($227 + $9.08)
Less than 1 acre
$171.60
$20.80
($165 + $6.60)
($20 + $0.80)
1 and less than 5 acres
$1,591.20
$236.08
($1,530+$61.20)
($227+$9.08)
5 and less than 10 acres
$2,004.08
$294.32
($1,927+$77.08)
($283 + $11.32)
10 and less than 50 acres
$2,652.00
$353.60
$2,550+$102
$340+$13.60
50 and less than 100 acres
$3,596.32
$530.40
($3,458 + $138.32)
($510 + $20.40)
100 acres or more
$5,657.60
$824.72
($5,440 + $217.60)
($793 + $31.72)
❑ C. Registration Statement on the official DEQ form.
0 D. Erosion and Sediment Control Plan satisfying the requirements of Code § 17-402.
❑ E. Stormwater Management Plan satisfying the requirements of Code § 17-403.
❑ F. Pollution Prevention Plan satisfying the requirements of Code § 17-404.
❑ G. Stormwater Pollution Prevention Plan satisfying the requirements of Code § 17-405.
OH. Mitigation Plan satisfying the requirements of Code § 17-406 for any proposed disturbance of
stream buffers. $176.80 ($170 fee + $6.80 technology surcharge)
❑ I. Requested Variations or Exceptions as provided in Code § 17-407 and § 17-408. $176.80 ($170 fee + $6.80
technology surcharge)
Provide 2 copies of all plans and any supporting documents or submit all documents online. Professional
seals must have original signatures.
Additional information if not provided on plans and documents:
Name of a Contact Person for correspondence (usually the plan preparer, consultant, or agent):
Name (Print): Justin
Address: 912 E High St.
City: Charlottesville
VA 22902
Daytime Phone: (434 227-5140 E-mail: lustin@shimp-engineering.com
s When applications and plans are reviewed, but not approved, and a response to comments is not received within 6
months from the date of county comments, the application will be deemed withdrawn. Applications without valid owner's
signatures will not be considered valid. Active permits are subject to annual maintenance fees [§ 17-2081.
FOR OFFICE USE ONLY WPO #
Fee Amount $ Date Paid By who? Receipt # Ck# By:
Revised 07/1/21, 7/26/2021