HomeMy WebLinkAboutSP202100015 Review Comments Special Use Permit 2021-11-05(S� OF AL8
County of Albemarle
o i, en
Community Development Department - Planning Division
G�RGIN�Q'
November 5, 2021
Mr. Charles E. Ward, Jr., PE
Central Virginia Electric Cooperative
PO Box 247
Lovingston VA 22949
RE: SP202100015 Midway -Martin's Store 115kV Transmission Line
Dear Mr. Ward,
Scott Clark
sclark@al bemarle.or¢
tel: 434-296-5832 ext. 3249
fax:434-972-4126
Thank you for the recent submittal for this special use permit application. Please find review comments for the
application included in this letter.
Review Comments
Engineering (Frank Pohl)
Show the limits of the 100-yr floodplain on all sheets, where applicable. New poles are allowed "by -
right" to be located within the floodplain overlay district [18-30.3.11], however, a Floodplain
Development Permit is required if any are located within the district. If the Structure Mat Pads are
located with the floodplain, please provide pad dimensions and a detail/section of the pad, including
existing and proposed grade and pad elevations.
Please provide the total land disturbance area, including areas to be cleared and the disturbance related
to installing the Structure Mat Pads. Please provide a detail of the Structure Mat Pads, including
dimensions at each location. A VSMP permit is required prior to the start of land disturbing activities if
the cumulative land disturbance area exceeds 10,000 sf [Chapter 17, Albemarle County Code].
Show the stream buffer on all sheets, where applicable [17-600].
Planning (Scott Clark)
• Please describe the "bridge matting' to be used on indicated stream crossings; does the matting span the
streams that being crossed, or does it rest on the streambed and banks? (If the latter, staff may
recommend a condition requiring alternative structures to span the streams, to avoid impacts to the
streams.)
o Indicate the potential impacts on streamside soil and vegetation; and list measures the measures
that will be used to restore the bridge matting area after the matting is removed.
• On Sheet 1, at pole location 2, there is a "clearing area' that appears to extend outside the existing right-
of-way. Is new right-of-way required for this area, or is this only temporary clearing being done for
construction -access purposes?
• To clarify the relationship between this use and the recently -proposed solar facility for TMP 85-17B -
on page 8 of the application narrative, response #3 says, "The Midway Solar Project will not
interconnect to the CVEC 115kV transmission line." If this is the case, what will the solar project
connect to? Is a new line planned, either along this existing corridor or otherwise?
Action After Receipt of Comments
After you have read this letter, please take one of the actions identified in the "Action After Receipt of
Comment Letter" memo that is attached.
Resubmittal
If you choose to resubmit, please use the attached form. Note that, as listed on the form, further resubmittals
for these applications will require a fee of $538.
Feel free to contact me if you wish to meet or need additional information. I can be reached at
sclark@albemarle.org.
Sincerely,
Scan M. c1ar1l
Scott Clark
Senior Planner, Planning Division
DEPARTMENT OF COMMUNITY DEVELOPMENT
ACTION AFTER RECEIPT OF COMMENT LETTER
Within 30 days of the date of this letter, please do one of the following:
(1) Resubmit in response to review comments
(2) Request indefinite deferral
(3) Request that your Planning Commission public hearing date be set
(4) Withdraw your application
(1) Resubmittal in Response to Review Comments
If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as
published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org
in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the
last page of your comment letter with your submittal.
The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each
subsequent resubmittal requires an additional fee. (See attached Fee Schedule.)
(2) Request Indefinite Deferral
If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite
deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite
deferral means that you intend to resubmit/request a public hearing be set with the Planning Commission
after the 30 day period.)
(3) Request Planning Commission Public Hearing Date be Set
At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise
that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed
with a resubmittal.
After outstanding issues have been resolved and/or when you are ready to request a public hearing, staff will
set your public hearing date for the Planning Commission in accordance with the Planning Commission's
published schedule and as mutually agreed by you and the County. The staff report and recommendation will
be based on the latest information provided by you with your initial submittal or resubmittal. Please
remember that all resubmittals must be made on or before a resubmittal date.
By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper
advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule.) Your
comment letter will contain the actual fees you need to pay. Payment for an additional newspaper
advertisement is also required twenty-two (22) days prior to the Board of Supervisors public hearing.
Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning
Commission's public hearing will be allowed during the life of the application. The only exception to this rule
will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more
issues identified by staff that have not previously been brought to the applicant's attention. As always, an
applicant may request deferral at the Planning Commission meeting.
(4) Withdraw Your Application
If at any time you wish to withdraw your application, please provide your request in writing.
Failure to Respond
If we have not received a response from you within 30 days, we will contact you again. At that time, you will
be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of
your application to a specific Planning Commission date as mutually agreed to with staff, or c) request
indefinite deferral and state your justification for requesting the deferral. If none of these choices is made
within 10 days, staff will schedule your application for a public hearing based on the information provided with
your original submittal or the latest submittal staff received on a resubmittal date.
Fee Payment
Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make checks
payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Fees may also be
paid by credit card using the secure online payment system, accessed at
http://www.albemarle.org/department.asp?department=cdd&relpage=21685.
FOR OFFICE USE ONLY SP # or ZMA #
Fee Amowd $ Date Paid By who?
Receipt# ck7 By:
Resubmittal of information for Special Use Permit or
Zoning Map Amendment
PROJECT NUMBER:
PROJECT NAME:
❑ Resubmittal Fee is Required ❑ Per Request ❑ Resubmittal Fee is Not Required
Community Development Project Coordinator
Signature Date
Name of Applicant
Phone Number
Signature Date
FEES
Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,075
❑ First resubmission
FREE
❑ Each additional resubmission
$538
Resubmittal fees for original Special Use Permit fee of $2,150
❑ First resubmission
FREE
❑ Each additional resubmission
$1,075
Resubmittal fees for original Zoning Map Amendment fee of $2,688
❑ First resubmission
FREE
❑ Each additional resubmission
$1,344
Resubmittal fees for original Zoning Map Amendment fee of S3,763
❑ First resubmission
FREE
❑ Each additional resubmission
$1,881
❑ Deferral of scheduled public hearing at applicant's request —Add'1 notice fees will be required
$194
To be Daid after staff review for Dublic notice:
Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission
and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing
a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be
provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body.
11 AI \ 7 WIN: I Oro 1110 l I[171r1111O1 WK11 aI_\ 112 016VA I_\'711 afl7\V I Al DIOI II_V IF21111A 11A 111011 YV 11 eV/ al KO WA 1 a1C11[K11WON a 11 N
Preparing and mailing or delivering up to fifty (50) notices
$215 + actual cost of first-class postage
Preparing and mailing or delivering each notice after fifty (50)
$1.00 for each additional notice + actual
cost of first-class postage
Legal advertisement (published twice in the newspaper for each public hearing)
Actual cost
minimum of $280 for total of 4publications)