HomeMy WebLinkAboutSDP200600059 Correspondence Minor Amendment 2006-08-30 C�
hen ti ice l
908 East High Street I Charlottesville,VA 22902
esign Tel 434.220.2551 I Fax 434.220.2553 I www.benttree-design.com
LANDSCAPE ARCHITECTURE,ENGINEERING&PLANNING
transmittal
Date: 8/30/06
To: Allan Schuck
Company: County of Albemarle — Community Dev't
Address: 401 McIntire Road
Charlottesville VA 22902
From: Eliot Fendig and Ellie Carter
Cc: Ron Carter
Project: Mill Creek Offices
Project No.: 0602
No.: Description:
8 Site Plan Amendment
2 Drainage and Stormwater Management Computations
1 WPO Application & Fee
Delivered via:
❑ pick-up ® hand 0 mail 0 express 0 ground 0 other:
For your:
O use El review ® approval 0 comment 0 records ❑ distribution 0
The following:
® plans 0 specifications 0 shop drawings 0 reports ® computations
❑ narratives 0 as-builts El files El other:
® Urgent 0 Please reply ❑ Please return ❑ Please acknowledge
Comments: Please let us know if you have any questions. Thank you for your prompt approval of these plans.
'1)(1Id,) I
August 30, 2006
Mr. Allan Schuck, Engineer
County of Albemarle, Department of Community Development
401 McIntire Road
Charlottesville, VA 22902-4596
RE: Mill Creek Offices, Minor Amendment
Dear Mr. Schuck:
We have received your comments dated August 8, 2006 regarding the Mill Creek Offices Minor
Site Plan Amendment and have addressed them as follows:
A. Final Site Plan Comments
1. Please provide a professional signed and dated seal on the site plan. [18-32.6.1]
• The revised plans have been sealed with signature and date.
2. Please label the internal radii of all curbing. [18-32.6.6e]
• Face of curb radii have been labeled for all curb arcs.
3. Please submit new drainage computations and drainage maps that coordinate with the
new pipe layouts. [18-32.6.6d]
• Pursuant to our discussion on 17 August, we are resubmitting the origin/
computations, as the piple layout has not been revised with this resubmittal.
4. Please move structure 83. Drainage is not allowed to flow through dumpster areas. [18-
4.12.19b]
• Pursuant to our discussion on 17 August, we have addressed this concern by
redesigning the dumpster area such that the dumpster pad is elevated by 6',' with a
curb added to prevent ponding of water under the dumpsters. This change is
reflected on the Layout and Grading and Utilities plans with revised dimensions and
revised spot elevations.
5. Please show inlet shaping, IS-1, at each structure where flow drops exceed four feet.
[DM 505D9]
• We have added IS-1 Invert Shaping to the appropriate inlets.
B. Stormwater Management Plan Comments
6. This site is covered by an approved SWM plan, WPO-2005-00093. The approved SWM
plan has changed with this submittal. Please submit a new WPO application and fee for
the new SWM plan amendment that will be required with this plan amendment. Submit
/7
0
h 1 ree design 908 East High Street i Charlottesville,VA 22902
Tel 434.220.2551 I Fax 434.220.2553 1 www.henttree-design.com
LANDSCAPE ARCHITECTURE,ENGINEERING E PLANNING /
Mr.Allan Schuck
August 30, 2006
Page 2 of 2
two copies of the SWM sheets.
• We are including two copies of the plans for SWM approval, along with the WPO
application and$100 Amendment fee.
C. Erosion and Sediment Control Plan Comments
7. This site is covered by an approved SWM plan, WPO-2005-00093. The approved SWM
plan has changed with this submittal. Please submit a new WPO application and fee for
the new SWM plan amendment that will be required with this plan amendment. Submit
two copies of the SWM sheets.
• We are including four copies of the plans for E&SC approval, along with the WPO
application and$150 Amendment fee.
We trust that this adequately addresses all relevant comments. Please do not hesitate to
contact us should you need further explanation or have any additional questions.
Sincerely,
— Eliot R. Fendig, PE
Bent Tree Deign, PLC
cc: Ronald D. Carter
encl: 8 Revised Minor Site Plan Amendment (revised)
2 Drainage Computations