Loading...
HomeMy WebLinkAboutSUB202000226 Calculations 2021-11-07SEWER DATA SHEET Date 11/4/2021 (1) Project Name Pleasant Green - Phase 2 (2) Project Location Crozet, Albemarle County (3) Consultant Collins Engineering (4) Wastewater Treatment Facility Moores Creek Treatment Plant (5) Design Population 134 Single Family Units (96 Attached & 38 Detached) (6) Industrial Waste (7) Pipe Material PVC, DIP (8) Pipe Diameter (Inches) DIP Length (Feet) PVC Length (Feet) 6" 81, 1,406.65' 10" 12" 15" 18" 21" 24" (9) Total Pipe Length (Feet) 1,406.65' (10) Manholes: (A) Standard (B) Drop (11) (A) Siphons & Pump Stations (B) Force Main (Size -Length) Authority Provide: Drainage Basin Sub Drainage Basin 33 L> 2,089.43' 2,089.43' (Number) (Number) (Number) (Inches -Feet)