Loading...
HomeMy WebLinkAboutSUB202000226 Calculations 2021-11-07 (2)WATER DATA SHEET Date 11/4/2021 (1) Project Name Pleasant Green - Phase II (2) Project Location Crozet, Albemarle County (3) Consultant Collins Engineering (4) Primary Water Plant Beaver Creek Reservoir (5) Design Population 134 Single Family Units (96 Attached & 38 DetachE (6) Hydraulic Capacity 5,420 gpm @ 20 PSI (7) Pipe Material Cl. 52 Ductile Iron (8) Pipe Diameter (Inches) Length (Feet) 4" 178.98' 6^ 651.48' 81, 3,322.03' 101, 12" (9) Total Pipe Length 4,153' (10) Fire Hydrant Assemblies 8 (11) Blow -off Assemblies 2 (12) Air Relief Valves 2 (13) Gate Valves (Inches) Quantity (Number) 4" 6" 2 81, 19 101, 12" (14) Minimum pressure at critical water meter Authority Provide: Booster Station Water Storage Tank Pressure Zone A-1 143 psi (Feet) (Number) (Number) (Number) (20 psi required)