Loading...
HomeMy WebLinkAboutWPO201700052 Plan - VSMP 2021-11-09'He31��i.�/.7 rl f�`r�yY�1Cy OWNER/APPLICANT.• 06100-00-00-165RO DUNLORA INVESTMENTS, LLC 455 SECOND ST SE, SUITE 400 CHARLOTTESVILLE, VA 22902 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 (434)293-3719 TAX MAP NO.: 06100-00-00-165RO (OB 4967 PG 169) TOTAL PROJECT AREA: 8.62 ACRES TOTAL (PHASE I = 7.60 AC, • PHASE ll = 1.02 AC) ZONING. R-4 RESIDEN77AL (BY -RIGHT) - NO PROFFERS AIRPORT IMPACT AREA (AIA) PROPOSED USE: PHASE I - 16 SINGLE FAMILY ATTACHED UNITS AND 12 SINGLE FAMILY DETACHED UNITS PHASE H - 3 TOWNHOUSES & 3 SINGLE FAMILY DETACHED HOUSES REQUIRED DENSITY: 4 DU/AC CLUSTER DEVELOPMENT (NO MINIMUM LOT SIZE) PROPOSED DENSITY: PHASE I - 28 UNITS PHASE ll - 6 UNITS TOTAL - 34 DLl/8.62 AC = 3.94 UNITS/AC OPEN SPACE.• RED. 2.16 AC OF DEVELOPMENT AREA (25%); PROV.• OPEN SPACE A (0.05 AC) + OPEN SPACE B (2.55 AC) = 2.60 AC (30.29,) 0.98 AC OUTSIDE CRITICAL SLOPES AND SWM (387 OF TOTAL) THE OPEN SPACE WILL BE DEDICATED TO THE HOA FOR PUBLIC USE BUILDING HEIGHTS. MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 35' NON-INFILL SETBACKS. FRONT. 5' MIN AND 25' MAX SIDE: 10' BUILDING SEPARA77ON REAR: 20' MIN AND NO MAX SUBDIVISION STREETS: PHASE I - CURB & GUTTER (PARKING ON ONE SIDE ONLY) PHASE // - UNITS FRONTING RIO ROAD & DUNLORA DRIVE WITH PRIVATE ACCESS ALLEY FROM VARICK STREET WATERSHED: THIS PARCEL IS NOT IN A WATER SUPPLY PROTECTED AREA - SITE DRAINS TO MEADOW CREEK. AGRICULTURAL/ FORESTAL DISTRICT.• NONE TOPO & SURVEY. TOPOGRAPHY AND BOUNDARY INFORMAT70N PROVIDED WITH ON -GROUND SURVEY BY CARDINAL SURVEY IN SEPTEMBER 2016. NOTE. TOPOGRAPHY HAS BEEN UPDATED FOR PHASE I LAND DISTURBANCE. TOPO VISUALLY FIELD VERIFIED IN AUGUST, 2021. DATUM: NAD 83 EXIS77NG VEGETATION: PAR77ALLY WOODED WITH EXISTING RESIDENCE STRUCTURES LIGHTING. NO LIGHTING IS PROPOSED PHASING THIS PLAN IS PHASE // OF DUNLORA PARK (WINTER OF 2021) RECREATION: 2.60 ACRES OPEN SPACE (PASSIVE RECREA7ON AREA) PARKING. PHASE // 2 OFF-STREET PARKING SPACES SHALL BE PROVIDED FOR EACH DWELLING UNIT + 1 SPACE PER (4) UNITS FOR GUEST PARKING. TOTAL PARKING REQUIRED: 12 SPACES ON THE LOTS + (1) GUEST SPACES TOTAL PARKING PROVIDED: 12 SPACES ON THE LOTS + (1) GUEST SPACES BUILDING SITES PARCELS 1-34 MAY NOT BE FURTHER DIVIDED. ONLY (1) DWELLING UNIT PER LOT SHALL BE ALLOWED. BURIAL SITES. NONE STREAM BUFFERS/FLOODPLAIN: THERE /S A PORTION OF A WPO STREAM BUFFER LOCATED AT THE SOUTHEAST CORNER OF THE SITE. THERE IS NO 100-YEAR FLOODPLAIN LIMITS ON THE SUBJECT PARCEL, PER FEMA MAP 51003CO229D; FEBRUARY 4, 2005. OFFS17E DISTURBANCE: NO OFFSIDE DISTURBANCE IS PROPOSED WITH THIS PLAN, EXCEPT FOR THE TIE-IN CONNECT70N TO THE SANITARY SEWER WITHIN EXISTING UTILITY EASEMENT LANDSCAPING. STREET TREES ARE PROPOSED ALONG THE NEIGHBORHOOD STREETS IN ACCORDANCE WITH ALBEMARLE COUNTY LANDSCAPING REQUIREMENTS. LAND AREAS. OPEN SPACE. • 2.60 AC. (30%) LOTS 4.86 AC. (567) ROW/ACCESS ESMT DEDICATION: 1.16 AC. (149) IMPERVIOUS AREA: ROADWAY= 29,600 (PHASE /) + 6,974 (PHASE ll) = 36,574 SF (0.84 AC) SIDEWALK/DRIVEWAYS= 21,188 (PHASE /) + 1,267 (PHASE //) = 22,455 SF (0.52 AC) BUILDINGS= 63,700 (PHASE I) + 7,955 (PHASE //) = 71,655 SF (1.64 AC) ITE TRIP GENERATION. TRAFFIC IMPACT NUMBERS ARE BASED ON 7HE ITE TRIP GENERAT70N MANUAL, 8TH EDITION. PHASE I. CODES 210 WERE USED FOR THE DEVELOPMENT PROPOSED 28 DWELLING UNITS ADT RATE - 268 ADT (134 ENTER/134 EXIT) AM PEAK RATE - 21 VPH (5 ENTER/16 EXIT) PM PEAK RATE - 28 VPH (18 ENTER/10 EXIT) PHASE lh CODES 230 & 210 WERE USED FOR THE DEVELOPMENT PROPOSED 3 TOWNHOUSE UNITS & 3 SFD UNITS ADT RA7E - 46 ADT (23 ENTER/23 EXIT) AM PEAK RATE - 3 VPH (1 ENTER/2 EXIT) PM PEAK RATE - 5 VPH (3 ENTER/2 EXIT) SLOPES: THIS S17F CONTAINS BOTH MANAGED AND PRESERVED SLOPES AS SHOWN ON THIS PLAN. TRASH. ALL TRASH SHALL BE COLLECTED BY A DRIVING DUMPSTER SERVICE - EACH LOT SHALL HAVE AN INDIVIDUAL TRASH CONTAINER. LIGH77NG. NO ON STREET LIGH77NG IS PROPOSED WITH THIS PLAN. DAM INUNDATION: THIS PROPERTY IS NOT LOCATED WITHIN A DAM INUNDA7ON ZONE. FIRE FLOW., AS REQUIRED, ALL FIRE FLOWS WITHIN THE DEVELOPMENT SHALL BE A MINIMUM OF 1000 GPM AT 20 PSI. ADDIT70NALLY, FIRE HYDRANTS SHALL BE PROVIDED ALONG THE ROADWAYS FOR FIRE PREVENTION AT A MAXIMUM SPACING OF 500 FT PER TRAVELWAY. EXISTING FIRE FLOW 1135 GPM WITH 66 PSI PRESSURE. DUNLORA OVERLOOK WPO 201700052 (AMENDMENT #4 TO WPO 201600058) RIO MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA I 1 \ I 1 I I 1 I. 1 \\ 11 1 EXISTING PROPERTY LINE 1 t 1 1 1 \ 1 I - ,AS6 + ��� / vvvv vv vv `� vvvAvv w `v PHASE I / PHASE r o _ r , - - ° ----- SCALE: 1"=60' OWNER DUNLORA INVESTMENTS, LLC 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE, VA 22902 Jlyah7_11I;1PIe]a1;1►11W/i!a 611el-Ul0xeJ:1_1►Ecl*y THIS AMENDMENT #4 UPDATES THE PREVIOUSLY APPROVED WPO 201700052 AMENDMENT #2. THIS AMENDMENT NOW MATCHESTHE RECENTLY APPROVED PHASE II LAYOUT UNDER SDP 202100023 MAJOR SITE PLAN AMENDMENT, WHICH IS AN AMENDMENTTO SDP 201800002. THIS AMENDMENT#4 REFLECTS THE LESS IMPERVIOUS PHASE II LAYOUT AND THE REPLACEMENT OF THE PHASE II UNDERGROUND DETENTION SYSTEM WITH A NEW PHASE II DRY DETENTION BASIN (SWM FACILITY'B'). ENGINEER COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 D�ya17_101g011e7aIA►11ff1il►Eel I; 1. THE APPROVED WPO AMENDMENT#2 IS VOIDED WITH THE APPROVAL OF THIS PLAN AMENDMENT. 2. THE APPROVED WPO AMENDMENT#3 IS REPLACED WITH THE APPROVAL OF THIS PLAN AMENDMENT. 3. THE PHASE II RETAINING WALL ADJACENT TO SWM FACILITY'B' SHALL BE DESIGNED, SUBMITTED AND APPROVED BY THE COUNTY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. 4. THE SWM FACILITY EASEMENT, DEED & PLAT WILL NEED TO BE RECORDED PRIOR TO FINAL SITE PLAN APPROVAL. 5. PHASE I CONSTRUCTION IS SUBSTANTIALLY COMPLETE. Uy Chumh 1& Chh,lottesMi Txhdcel enter f e JohnW Warneropa,NaY - 0 Rlaec a c Q1i s, Pp�r ds Rrdye� o` Cha �Williaryp o, a VICINITY MAP SCALE: 1" = 500' Bleckbum WM m oanoa O, SCOTTIR. CTILLIN: 0cwR11 V Lic. No. 035791 °4_ 11/5/21 AU10. " Sekty Peseamn ' ro, 9WIIIiBm D* Sheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING APPROVED CONDITIONS 3 EROSION & SEDIMENT CONTROL NARRATIVE 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE II EROSION & SEDIMENT CONTROL PLAN 5A PHASE III EROSION & SEDIMENT CONTROL PLAN 6 EROSION & SEDIMENT CONTROL NOTES & DETAILS 7 STORMWATER MANAGEMENT PLAN (PRE -DEVELOPMENT) 8 STORMWATER MANAGEMENT PLAN (POST -DEVELOPMENT) 9 STORMWATER MANAGEMENT NOTES & DETAILS 10 STORMWATER MANAGEMENT NOTES & DETAILS 11 GRADING & UTILITY PLAN 12 TOTAL NUMBER OF SHEETS EROSION & SEDIMENT CONTROL LEGEND LIMITS OF LAND DISTURBANCE SAFETY FENCE PER VESCH 3.01 � 4 DIVERSION DIKE CE CONSTRUCTION ENTRANCE PER VESCH 3.02 BOUNDARY LINE SILT FENCE SF SILT FENCE PER VESCH 3.05 DIRECTION OF FLOW IP INLET PROTECTION PER VESCH 3.07 653.75 PROPOSED CONTOUR - DRAINAGE DIVIDE DD DIVERSION DIKE PER VESCH 3.09 SOILS LINE SB SEDIMENT BASIN PER VESCH 3.14 MANAGED SLOPES UP O OUTLET PROTECTION PER VESCH 3.18 PRESERVED SLOPES B/ SOIL STABILIZATION MATTING VESCH 3.36 STREAM BUFFER 0 OPEN SPACE PRESERVATION SITE PLAN LEGEND - EXISTING CULVERT 0 CULVERT DROP INLET CURB CURB & GUTTER PROPOSED PAVEMENT PROPOSED PERM PAVERS DRIVEWAY CULVERT - MOT STANDARD STOP SIGN :oo EXISTING CONTOUR PROPOSED CONTOUR 240.55 PROPOSED SPOT ELEVA RON N N 0 HITw H � W L ti M ZM N � M 1 O WN N W> L J _J > U) w L9 0 za U WLU Y Ul ZLU w U) clfLU Ja O N z LU LU G Ly > 0 O 0 0 � J�/ clL LU LL 0 z 0 w J U ~ LU w a U) JOB NO. 152118 SCALE AS NOTED SHEET NO. 1 I� 0 p i \\ I NIF EXISTING ROADSIDE DITCH PROPERTY LINE (TYP. CLUB DUNLORA LLC. NOTES: 1 _ _ PARCEL: 62F-Ai 1. IMPROVEMENTS SHOWN HEREIN ARE APPROVED PER DUNLORA PARK ROAD & UTILITY PLAN SUB2oi6-2o6 AND DUNLORA TH 0 \ I I g PARK VSMP PLAN WPO-201 - (AMENDED WPO-2o16- 8). 1 I � (D.B. 3574, PG. 668) 7 35 5 1 R-4 RECREATIONAL CLUB EXISTING PRESERVED z. THIS PROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, BASED ON FEMA MAP NUMBER 51003Co229D, DATED STEEP SLOPES FEBRUARY 4, z005. I 1 1 \ \ 1 1 \ I 3. TOPOGRAPHY BOUNDARY INFORMATION PROVIDED BY ON -GROUND SURVEY BY CARDINAL SURVEY IN SEPTEMBER SCOTT R. NS% 2o3.6, AND FROM DEEDS AND PLANS OF RECORD. SLOPES HAVE BEEN DETERMINED LESS THAN 259/0 WHERE INDICATED U Lic. No. 035791 a PER NEW TOPOGRAPHIC SURVEY AND SLOPES EXHIBIT PROVIDED BY ROUDABUSH GALE AND ASSOCIATES DATED MAY II y \ \ \ \ SCHWARTZMAN JOEL&ZIVA 11/5/21 PARCEL: 6zF-c�Q 18, zoi7, AS PERMITTED UNDER SECTION 30.7.4(b)(h). �b� 64 4. 4RESIDENCE MANAGED AND PRESERVED STEEP SLOPES EXISTAS SHOWN ON THE PROPERTY. �JSI lyGt ( 4679, PG. 643) 5. THERE IS A PORTION OF A WPO STREAM BUFFER LOCATED AT THE SOUTHEAST CORNER OF THE SITE. ONAL E 6. THE PROPERTY IS NOT LOCATED WITHIN A DAM INUNDATION ZONE. 7. THE PROJECTZONING IS R-4ANDAIRPORT IMPACT AREA (AIA). i APPROVED 15"RCP ENTRANCE CULVERT TO DIVERT UPSTREAM ROADSIDE DITCH UNDER NEW ENTRANCE APPROVED / \ \ \\ \ MCPHERSON,4 MICHAELORCAROLYN APPROVED STREET o WAT. LATERAL �/� / \ \ \ \ PARCEL: 62F-2 r TREE(TYP.)\'' (TYP.) \ \ \ \ \ \ \`` \�\ tu.B.3z20, PG.313) ¢ w APPROVED SIDEWALK / %— \ R-4 RESIDENCE a vr� \, V'�� K o APPROVED / V co z C, 6� w ��/ SAN. LATERAL w CITY OF CHARLOTTESVILLE + (TYP.) \ \ \ 1 ) \ Z Q PARCEL: 61-269 w — — �• \ \ \ \ ��� ��� \ c� O (D.B 4622, PG.5z3) / Q 0 / \ \ \ \ \ \ \ \` Z � R-4 ROADWAY & VACANT LAND + i /z ���� W W . CROSS, WHITMAN OR JOY LEVICK PARCEL: ( PG. 45 S) f y + \ \�, R- RESIDENCE APPROVED 4' WI DEEP V-DITCH / �46- TO CONVEY UPSTREAM FLOW TO THE STREAM � � �\ 75' WPO STREAM BUFFER / PHASE LINE A + +' / V A J rj 0 / �� ��� j� ` �� LEVIN, JULIUS OR ETTA EXIS+INGEOP PARCEL:6zF- \ \ \APPROVED / y u LATERAL APPROVED EXISTING , + J \ / / /� \ / / \ \ �� �\� (D.6.4a6o, PG. 598) 00"PAINTLINE \ \ (TYPJ ,�8 WATERLINE / / \ / / / \ \� \ \ R-4RESIDENCE APPROVED 18" YARD DRAIN'B' + / RIM=444.00 �` APPROVED � � / / / A � / \ �C� M 8" SANITARY ` \� \ / / `\ \ \ \ \ C7 I Y \ \ \ \ \ SEWER04 ' RICHARDSON, DAVID OR VICTORIA M / PARCEL:62F-21 / I // (D.B.4424, PG. 5og) i D b \�� R-4RESIDENCE I APPROVED / \ Cn + 18"YARDDRAIN'A' o y �`� 04 y (� II IIWIDTH PUBLICA RIM=442.80 \ J CV DUNL ORA INVESTh ENTS L C \ \ \ d DRAINAGE EASEMENT PARCEL: 61-16 R B• 4967, PG.169I I \ / k i r \ \� \N W ZLo i I I A \ � \� \ APPROVED rl �j I i�A \ I I EXISTING SEGME AL 0, / n - \� J I I I I RETAINING WALL \ \ APPROVED — \ �6" WATERLINE I r / / \ \l\ \ PANGS, STEVE OR JOANNE \ APPROVED SIDEWALK AND STREET TREES WILL H MAX HT. - 6' SAN. LATERAL y / / , f PARCEL: 6zF-2o REVISED ALONG RIO ROAD IN ACCORDANCE WITH APPROVED x\ RIO ROAD IMPROVEMENT PLAN BY OTHERS. SIDEWALK AND STREET �V (TYP.) �� (D.B.1679, PG.341) \ \ TREES ONRIO ROAD ARE INCLUDED INTHE SCOPE OFTHIS PLAN. T ` \ / �_ R-4RESIDENCE / / I \ \ \\\ \ \ Q AL EXISTING SEGMENT� p RETAINING A.0 'LLA W 434 / : / ' I MAXHT.=6' \ / / / .A jl / O C) THESE SLOPES HAVE BEEN DETERMINED LESS THAN 25% \ \ V / / %i " / ' /� /� J PER NEW TOPOGRAPHIC SURVEY AND SLOPES EXHIBIT PROVIDED BY V'V A / / / / / '�\\� O \ ROUDABUSH, GALE, AND ASSOCIATES DATED MAY 18, zo27, AS k / / / \ A\ I PERMITTED UNDER SECTION 3o.7.4(b)(=� \ \ \ \ I x / / / / / ( G 2 9 ti �cA I J \ \\ \ \ \\ \ 'APPROVED SWM FOREST& \ \\\ // \ / \ / / / 1 \ \ �\ w Z \ V OPEN SPACE EASEMENTS \ \ —(FROM DUNLORA PARK \ \ \� Y' \ \ \ \ \ ROAD PLAN =1.og ac. MIN.)_\ \ �\ \ �� \ / / \ ` W RIO ROAD CURBV��� V A / / AND GUTTER \ v� �� MET \ �V > x / I A — �: // APPROVED (BY OTHERS) / \ �\ \ \ \\\\ ��\� \ TW4z y 133 / /j\ SWM FACILITY/ 0 ul V? \ v v — �� \\V �� \\420 — — /i 2 i/// �� li /' Lu W �z — — y / r EX S IT NG MANAGED\\ / /- / / w STEEPSLOPES APPROVED SEGMENTAL - �� / / WILLIFORD RETAINING WALL rr�'�i, / OR KWA I A V A\ F— MAX HT. = 6' i �����. / 1P \ (n - / _�� / PARCEL:62 9 TW 28 ;a/ // �� F (D.B. 3779, PG 329) N/F \ V A i/ 4"2-Z �-422--- � � � � A Bw r _ §l �C RESIDENCE � �✓;, �� LAWRENCE E. MARTIN, JR. , ,A 11J t� PARCEL: j, WETSEL THOMAS D LIFE EST\ \ � f y �. � � / § , � � ` PARCEL:62-167 A cy� (D.B. 4552, PG.15) -r _ --420— /� A (D.B.1688, PG. 564) \� \ CI, 9� R-4 RESIDENCE / T F _ — �� /' k R-4 RESIDENTIAL \ TEMPORARY GRADING EASEMENT FOR �' N/F�--, .�� gi WILLIAM H. ROGERS JR. & PUBLIC USE UPON DEMAND OF THE COUNTY �\ OF I \ SHARYON L. ROGERS ✓ / w \ \ ad PARCEL: 61-2656 FOREST PROPERTY (D.B. 526, PG. 432) »� n R-41RESIDENCE z5'WPOSTREAM BUFFER \ --OWNERS ASSOCIATION�INC. �j I— \ a \ c \ C/O NEST PROPERTY / w I1 \ MANAGEMENT \ / 5, C. O w � � x WETSEL THOMAS D & CLARENCE \ \\ \ PARCEL: 62F-o1-B / a m PARCEL: 61-167C / , / \\ \ \ (D B. 4717, PG. 196) / JOB NO. v GRAPHIC SCALE _ A R-4OPEN SPACE (D.B.1682,PG. 174) �52�Y8 R-4RESIDENTIAL \ s o so SCALE N/F \\\ WILLIAM L. SIBLEY \ \ \\ _ _�� TORMWATER �� 1"-30' / ( IN FEET ) PARCEL:61-165A MANAGE CCESS �' (D.B. PG. 580) AND MAINTENANCE E y� _Vy£LR T�OMAS OR MARY \ \ 1 inch = 30 ft. \ \ \ SHEET NO. R-4RESIDENCE D.B.4967, PG.133 \ \ \ — — PAR L: 62F-7 (D.B.21oi,�P_G.463) 2 R-4 RESIDENCE GENERAL NOTES EROSION CONTROL NOTES DESCRIPTION OF EROSION &a SEDIMENT 1. THE OWNER/DEVELOPER OF THIS PROPERTY IS: ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATVE AND STRUCTURAL EROSION CONTROL MEASURES: DUNLORA INVESTMENTS, LLC AND SEDIMENT CONTROL PRACTCES WILL BE CONSTRUCTED AND 455 SECOND STREET SE, SUITE 400 MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF EROSION AND SEDIMENT CONTROL MEASURES: CHARLOTTESVILLE, VA 22902 THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA 2. THESE PLANS HAVE BEEN PREPARED BY: REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL IT IS ANTICIPATED THAT A CONSTRUCTION ENTRANCE, TEMPORARY DIVERSION COLLINS ENGINEERING, INC REGULATIONS BERMS, RIGHT OF WAY DIVERSION, A SEDIMENT BASIN, SEDIMENT TRAPS, OUTLET 200 GARRETT STREET, SUITE K ES-2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO PROTECTION, AND SILT FENCE WILL BE INSTALLED TO CONTROL SURFACE CHARLOTTESVILLE, VA 22902 TELEPHONE: (434) 293-3719 FACSIMILE: (434) 293-2813 THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO 3. SOURCE OF TOPO & SURVEY: ON -GROUND SURVEY PROVIDED BY CARDINAL THE FINAL INSPECTION. LAND DISTURBANCE ACTIVITIES. TEMPORARY STOCKPILE AREAS WILL BE SURVEY IN SEPTEMBER 2016, AND FROM DEEDS AND PLANS OF RECORD. ES-J.-ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR MAINTAINED FROM TOPSOIL THAT WILL BE STRIPPED FROM AREAS TO BE GRADED 4. ZONING: R-4 RESIDENTIAL TO OR AS THE FIRST STEP IN CLEARING. AND STORED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE ON SITE 5. TAX MAP AND PARCEL NUMBER: TMP 61-165 ES-4.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL AND SHALL BE STABILIZED WITH A TEMPORARY VEGETATIVE COVER. PERMANENT 6. USGS DATUM: NAD 83 BE MAINTAINED ON THE SITE AT ALL TIMES. SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE 7. LOCATION/ADDRESS OF PROJECT: DUNLORA DRIVE ES-5.-PRIOR TO COMMENCING LAND DISTURBING AC77VI77ES IN AREAS OTHER THAN 8. PROJECT AREA: 8.62 ACRES INDICATED ON THESE PLANS (INCLUDING BUT NOT LIM17ED TO, OFF -SITE EXCAVATED AND WHERE CONSTRUCTION ACTIVITIES HAVE CEASED. PERMANENT 9. SITE PHASING: PHASE I AND PHASE II, AS SHOWN. BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE 10. PUBLIC UTILITIES: WATER &SEWER SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SEED MIXTURE WILL APPROVAL BY THE PLAN APPROVING AUTHORITY. DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE * COLLINS ENGINEERING SHALL NOT HAVE AUTHORITY OVER CONTRACTOR'S WORK, ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLAT70N OF ANY ADDITIONAL PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE SAFETY PRECAUTIONS, SCHEDULES, OR COMPLIANCE WITH LAWS AND EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND REGULATIONS. WE SHALL NOT ASSUME RESPONSIBILITY FOR ANY SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. THAN SEVEN DAYS. THESE AREAS SHALL BE SEEDED WITH FAST GERMINATING CONSTRUCTION STARTED PRIOR TO PLAN APPROVAL. ES-7.-ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. EROSION & SEDIMENT CONTROL SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8.-DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN 3.01 SAFETY FENCE - SAFETY FENCE WILL BE INSTALLED AROUND THE APPROVED WATER FILTERING DEVICE. MEASURES: ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PROPOSED SEDIMENT BASIN. STRUCTURAL EROSION AND SEDIMENT CON7ROL PRAC7CES SHALL BE IN PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT 3.02 CONSTRUCTION ENTRANCE - ONE CONSTRUCTION ENTRANCE SHALL BE ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFEC77VENESS INSTALLED AT THE EXISTING DRIVEWAY ON DUNLORA DRIVE. THIS WILL BE THE STRUCTURAL PRACTICES USED IN THIS SECTION CONSIST OF THE FOLLOWING. OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. ONLY POINT OF INGRESS AND EGRESS TO THE SITE. CARE WILL BE TAKEN TO 301 SAFETY FENCE., EROSION CONTROL NOTES PROTECT ADJACENT ROADWAYS FROM TRANSFER OF SEDIMENT. A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CON7ROL 3.05 SILT FENCE- SILT FENCE WILL BE PLACED ON THE DOWNSTREAM SIDE OF MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE DISTURBANCE WHERE NOTED ON THE PLANS. THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND 3.07 INLET PROTECTION - INLET PROTECTION SHALL BE INSTALLED ON EXISTING CAN BE CONSIDERED UNSAFE BY VIRTUE OF POTENTIAL ACCESS BY THE PUBLIC. DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED AND PROPOSED STRUCTURES WHERE INDICATED ON THE PLANS. 3.02 CONSTRUCTION ENTRANCE: ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND 3.09 TEMPORARY DIVERSION DIKE- DIVERSION DIKES WILL BE USED AROUND THE A STABILIZED PAVED CONSTRUC77ON ENTRANCE WI7H A WASH RACK LOCATED AT POINTS SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND PERIMETER OF SITE DISTURBANCE WHERE SHOWN ON THE PLANS TO DIRECT OF VEHICULAR INGRESS AND EGRESS ON A CONS7RUCTON S17E TO REDUCE 7HE SEDIMENT CONTROL REGULATIONS. AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS RUNOFF TO ON -SITE SEDIMENT CONTROL FACILITIES. RUNOFF. CONS7RUC77ON ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO THE FIRST STEP IN CLEARING. 3.13 TEMPORARY SEDIMENT TRAP- TEMPORARY SEDIMENT TRAPS WILL BE REDUCE THE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE INSTALLED WHERE SHOWN ON THE PLANS. MAINTAINED ON THE SITE AT ALL TIMES. 305 SILT FENCE: 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON 3.14 TEMPORARY SEDIMENT BASIN- TEMPORARY SEDIMENT BASIN WILL BE A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), INSTALLED WHERE SHOWN ON THE PLANS. ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE 3.15 TEMPORARY SLOPE DRAIN- TEMPORARY SLOPE DRAIN WILL BE INSTALLED DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. DISCHARGING INTO SEDIMENT TRAP #1 IN ESC PHASES II & III. OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING 7HE SITE AND TO 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION DECREASE 7HE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS 3.18 OUTLET PROTECTION- TO BE PROVIDED AT THE OUTFALL OF DRAINAGE FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH DETERMINED BY THE PLAN APPROVING AUTHORITY. PIPES WHERE SHOWN ON PLANS. MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT 3.19 RIPRAP- RIPRAP SHALL BE INSTALLED AS OUTLET PROTECTION WHERE THEY SHALL BE INSPECTED IMMEDIA7ELY AFTER EACH RAINFALL AND MAINTAINED IN ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). FINAL STABILIZATION IS ACHIEVED. SHOWN ON THE PLANS. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING 3.31 TEMPORARY SEEDING- TEMPORARY SEEDING SHALL BE APPLIED WHERE 3.07 STORM DRAIN INLET PROTECTION: DEVICE. SHOWN ON THE PLANS. A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP 3.32 PERMANENT SEEDING- PERMANENTLY SEEDING SHALL BE APPLIED WHERE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. INLET TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE SHOWN ON THE PLANS. PROTEC77ON APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL IMMEDIATELY. 3.38 TREE PRESERVATION AND PROTECTION- TREE PRESERVATION FENCING BEFORE PERMANENT STABILIZATION OF THE CORRESPONDING DISTURBED DRAINAGE AREA. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INSTALLED WHERE SHOWN ON THE PLANS. NO TREES SHALL BE 3.09 TEMPORARY DIVERSION DIKE. SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER HARMED OUTSIDE OF THE LIMITS OF TREE PROTECTION FENCING. A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A DEBRIS. 3.39 DUST CONTROL- DUST CONTROL SHALL BE APPLIED THROUGHOUT THE SITE SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER AWAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO ZONING ORDINANCE SECTION 5.1.28. WHERE SHOWN ON THE PLANS. DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER THE CODE OF ALBEMARLE. STORMWATER MANAGEMENT: RUNOFF MUST BE TEMPORARILY DIVERTED TO PR07ECT DISTURBED AREAS AND SLOPES 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL STORMWATER RUNOFF QUANTITY WILL BE TREATED WITH TWO DRY DETENTION OR RETAIN SEDIMENT ON SITE DURING CONSTRUCTION. THESE STRUCTURES GENERALLY BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. HAVE A LIFE EXPECTANCY OF 18 MONTHS OR LESS, WHICH CAN BE PROLONGED WITH 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN BASINS. STORMWATER QUALITY WILL BE TREATED WITH A NUTRIENT CREDIT PROPER MAINTENANCE. MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PURCHASE AND SLIM FOREST &OPEN SPACE PRESERVATION. SEE STORMWATER PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC 3.13 TEMPORARY SEDIMENT TRAP: STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. MANAGEMENT PLAN SHEETS AND REPORT FOR DETAILS. A TEMPORARY PONDING AREA FORMED BY CONS7RUC77NG AN EARTHEN EMBANKMENT WITH 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION MAINTENANCE.• A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO ALLOW 7HE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS THAN 3 UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. ALL EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH ACRES, WHERE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MONTHS, AND IT 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO SIGNIFICANT RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF MAY CONSTRUUCC TED EITHER INDEPENDENTLY OR IN CONJUNCTION KITH A TEMPORARY BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A NEEDED. SPECIFIC ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS: DIVERSION DIKE. 50 50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. a.SEDIMENT BASINS AND TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE J.14 TEMPORARY SEDIMENT BASIN: STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE STRUCTURE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. b.ALL INLET PROTECTION AND GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR FORMED BY CONS7RUCTNG AN EMBANKMENT OF COMPACTED SOIL ACROSS A 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND SEDIMENT BUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS DRAINAGEWAY. TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, CLOGGED BY SEDIMENT THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL IN "WET" AND `DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF 7HE SEDIMENT TO INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT BE REPLACED. SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE 7HE TOTAL CONTRIBUTING 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL c.ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DRAINAGE AREA IS EQUAL TO OR GREATER 7HAN THREE ACRES. ]HERE MUST BE BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL SUFFICIENT SPACE AND APPROPRIATF TOPOGRAPHY FOR THE CONSTRUC77ON OF A 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO 7EMPORARY IMPOUNDMENT. AT SOLBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION THE TOP OF THE BARRIER. CONTROL INSPECTOR. d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND J.15 TEMPORARY SLOPE DRAIN: 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. A FLEXIBLE TUBING OR CONDUIT EXTENDING FROM THE TOP TO THE BOTTOM OF A CUT RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD OR FILL SLOPE. TO TEMPORARILY CONVEY CONCENTRATED STORMWATER RUNOFF SAFELY IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME OR CONTRACTOR ON -SITE. THE CONTRACTOR WILL BE DETERMINED AT THE TIME THE DOWN THE FACE OF A CUT OR FILL SLOPE WITHOUT CAUSING EROSION ON OR BELOW THE IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY CONTRACT IS AWARDED. IN ADDITION THE DEVELOPER MAY BE CONTACTED. UPON SLOPE. USE ON CUT OR FILL SLOPES WHERE THERE IS A POTENTIAL FOR UPSLOPE TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COMPLETION OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE FOR SITE FLOWS TO MOVE OVER 7HE FACE OF THE SLOPE CAUSING EROSION AND PREVENTING COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY MAINTENANCE. ADEQUATE STABILIZATION. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED 318 OUTLET PROTECTION: WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPA77NG DEVICES SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS TO PREVENT SCOUR 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF 1. SET POSTS AND EXCAVA7E A 4 X4x AT STORMWATER OUTLETS, TO PROTECT 7HE OUTLET STRUCTURE, AND TO MINIMIZE THE THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) TRENCH UPSLOPE ALONG THE LINE POTENTIAL FOR DOWNS7REAM EROSION BY REDUCING 774E VELOCITY AND ENERGY OF 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) OF POSTS. CONCENTRATED STORMWATER FLOWS APPLICABLE TO 7HE OUTLETS OF ALL PIPES AND MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER ENGINEERED CHANNEL SECTIONS. PROTECTION ORDINANCE SECTION 17-207B) J. 19 RIPRAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE SOIL DESCRIPTIONS f WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PROTECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED 2C- ALBEMARLE FINE SANDY LOAM-7%TO35%SLOPES. � 6 RUNOFF WHILE ENHANCING THE POTENTIAL FOR INFILTRATION AND TO STABILIZE SLOPES SOIL CONSISTS OF DEEP WELL DRAINED SOILS. SURFACE RUNOFF IS MEDIUM TO LOW .� WITH SEEPAGE PROBLEMS, AND/OR NON -COHESIVE SOILS. USE WHEREVER SOIL AND WITH MODERATELY HIGH PERMEABILITY. HYDROLOGIC SOIL GROUP'C'. / WATER INTERFACE AND THE SOIL CONDITIONS, WATER TURBULENCE AND VELOCITY, 21B- CULPEPERFINE SANDY LOAM -2%TO7%SLOPES. EXPECTED VEGETATIVE COVER, ETC., ARE SUCH THAT THE SOIL MAY ERODE UNDER 7HE SOIL IS DEEP, WELL -DRAINED WITH MODERATE PERMEABILITY. FORMED IN RESIDUUM DESIGN FLOW CONDITIONS. WEATHERED FROM META-ARKOSIC SANDSTONE. HYDROLOGIC SOIL GROUP'B'. � 331 TEMPORARY SEEDING., HAZEL LOAM-15%TO25%SLOPES. III -I - FLOWI- THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SOIL IS DEEP, WELL -DRAINED WITH MODERATE PERMEABILITY. FORMED IN RESIDUUM -I 4 SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION WEATHERED FROM GREYWACKE SANDSTONE. HYDROLOGIC SOIL GROUP'B'. AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE PHUIECIIUN lU BAHE SUILS EXPUSEU UURING CUNSIHUCIIUN UNTIL PERMANENT VEGETATION OR 07HER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 332 PERMANENT STABILIZATION: 7HE ESTABLISHMENT OF PERENNIAL VEGETA7VE COVER ON DISTURBED AREAS BY PLANTING SEED. TO REDUCE EROSION AND DECREASE SEDIMENT WELD FROM DISTURBED AREAS. TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONSTRUCTION ACTVITES, ALL AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. 338 TREE PRESERVATION AND PR07EC770N. PROTECTION OF DESIRABLE TREES FROM MECHANICAL OR 07HER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE 7HE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLUTION CONTROL, NOISE REDUCTION, SHADE AND OTHER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN -TYPE USES. APPLIES IN TREE -INHABITED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. 339 DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING DEMOLITION AND CONSTRUCTION ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH 7HE VESCH. PfrWll eauElMclfW. el+a.tt ter erWBiB. maw Plw STONE 70' 41N. =UCT lDN ILOFSS 3. SM-]A A.SPNALT TOP �CWRSEIoe �EYSC r zx pawvry NumW M N. I+A AGGREGATE RASE PROFILE CdEIAICEpE ASPHALT PAVED ACO® OA WALIPACN E11m,sc a% xx PA,suSI-: 2S 12' WN.• �- 'MUST DIIQO FI11 WOIN L-0 I`vOSITIE pWNAGE rO (M WIGI® NO [IOI® /1 rRAEPING DT vII1G DEVICE ELM YWY. OEITM ONNNA;.! �12' Ex TO SEdMEDT IRAPPIIAy' DEviU .. Grp c.c-H SECTION A -A u mip try of 1 oah t fie outYlnl Wa R ck Od 1 .1"0 %- ] W'Mtl aOxY Nw11 i lYRI l 4 oia impull NIH,N boe Ot 1 1 Y.l iII1. In ie.�. W. . el A ..maalU pl exnae WEaI1 WNa 11Mlxt lx cWnnl aWaC fionl Rle Nhma,<IO M1 w .ppl oced xeNY,W Mea lo,al.ee xedanat a axlonall shallhe pi crated fiHn "ASH qA. hors. Olt." W7dawuxes PAVED WASH RACK C SCALE PERSPECTIVE VIEW PERSPECTIVE PLASTIC FENCE METAL FENCE scarce: AdBBted ft.. COR.nd Plmra RRd VDOT Road and Br'dnn Slsnda,da m-s Pl.e 3.01-1 2. STAPLE WIRE FENCING TO THE POSTS. ;`ftili 1t1I ■I I III■II l .7I, ii�%� �R lI IIE�� 11■ 1 �i14111�� !1'41 � pll fl �IIIU � SIL T FENCE sF (WITH WIRE SUPPORT) Na SCALE La SECTION A A PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL La d ' PLAN SECTION A A OP PIPE OUTLET CONDITIONS NOSCALE THE PURPOSE OF THIS LAND -DISTURBING ACTIVITY IS TO GRADE THE SITE FOR THE DEVELOPMENT OF DUNLORA. THE TOTAL ACREAGE TO BE DISTURBED WITH THIS PLAN IS 7.53 ACRES. EXISTING SITE CONDITIONS: THE EXISTING SITE IS A WOODED, SLOPING PARCEL WITH AN EXISTING RESIDENCE AND OUTBUILDINGS. THE SITE IS GENERALLY WELL DRAINED WITH PRESERVED AND MANAGED STEEP SLOPES. EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN DESIGNED TO CONFORM TO THE EXISTING SITE SLOPE AND PROTECT THE PERIMETER STREAMS AND ADJACENT PROPERTIES. ADJACENT AREAS: THE SITE IS BOUNDED TO THE WEST BY DUNLORA DRIVE AND TO THE SOUTH BY RIO ROAD EAST. IT IS BORDERED BY RESIDENTIAL LAND AND TWO CREEKS TO THE NORTH AND EAST. OFFSITE LAND DISTURBANCE: NO OFF -SITE LAND DISTURBANCE IS PROPOSED. CRITICAL AREAS: MANAGED STEEP SLOPES TO BE IMPACTED. STREAMS AND BUFFERS TO BE PROTECTED. WOODLAND/OPEN SPACE PRESERVATION AREAS TO BE MAINTAINED AND PROTECTED WITH TREE PROTECTION FENCING. SOILS: SEE SOILS BOUNDARIES ON THE EROSION AND SEDIMENT CONTROL PLAN SHEET, AND DESCRIPTIONS ON THIS SHEET. SEQUENCE OF CONSTRUCTION: 1. NOTIFY ALBEMARLE COUNTY TO SCHEDULE A PRE -CONSTRUCTION MEETING AS REQUIRED. 2. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE APPROVAL FROM THE INSPECTOR ON THE PROJECT. 3. CONTRACTOR SHALL IDENTIFY THE LIMITS OF DISTURBANCE AND INSTALL TREE PROTECTION FENCING WHERE INDICATED ON THE PLANS BEFORE ANY SITE DISTURBANCE SHALL TAKE PLACE. CONTRACTOR SHALL ENSURE THAT TREES TO BE SAVED ARE FLAGGED ALONG THE LIMITS OF CLEARING AND PROTECTED. 4. INSTALL THE PAVED CONSTRUCTION ENTRANCE WITH WASH RACK AS SHOWN ON THE PLANS. CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. INSTALL THE WASH RACK UPHILL FROM THE PROPOSED SEDIMENT BASIN. ACSA WILL DETERMINE THE APPROPRIATE METHOD OF SUPPLYING THE WASH RACK. PARKING AND CONSTRUCTION ENTRANCE AREAS SHALL BE CLEARED OF ALL VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIALS BEFORE CONSTRUCTION ROAD STABILIZATION IS INSTALLED. 5. CONTRACTOR DOES NOT HAVE PERMISSION TO CLEAR CUT THE SITE PRIOR TO INSTALLING THE PERIMETER MEASURES AS SHOWN ON THE E&S PLAN. CONTRACTOR SHALL EXPEDITE INSTALLATION OF THE PERIMETER EROSION AND SEDIMENT CONTROL MEASURES AND PROTECT THE SITE WITH THE LEAST AMOUNT OF TREE REMOVAL NECESSARY TO INSTALL THESE MEASURES. INSTALL THE INITIAL CONSTRUCTION MEASURES AS SHOWN ON THE PHASE I EROSION CONTROL PLAN SHEETS. THIS INCLUDES THE SEDIMENT TRAPS, THE SEDIMENT BASIN, SILT FENCE, DIVERSION BERMS AND THE TEMPORARY SLOPE DRAIN. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, BERMS, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 6. INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE I EROSION CONTROL PLAN. 7. ONCE ALL THE EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE PHASE I EROSION CONTROL PLAN AND THE INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, THE CONTRACTOR CAN BEGIN GRADING OPERATIONS. 8. ROUGH GRADE THE SITE TO THE CONTOURS SHOWN ON THE PHASE II EROSION CONTROL PLAN AND INSTALL THE PROPOSED STORM PIPE ADJACENT TO DUNLORA DRIVE WITH INLET AND OUTLET PROTECTION. 9. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 10. INSTALL PHASE III CONTROLS. SEE SHEET 5A FOR A MORE DETAILED SEQUENCE OF CONSTRUCTION FOR PHASE II OF THIS DEVELOPMENT (LOTS 29-34 & ITS INFRASTRUCTURE). 11. ONCE THE SITE IS STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN CONVERT THE SEDIMENT BASIN AND SEDIMENT TRAP 1 INTO PERMANENT STORMWATER MANAGEMENT FACILITIES. AT THIS TIME THE REMAINING PORTION OF THE ALLEY AND LOTS 33 & 34's DRIVEWAYS MAY BE INSTALLED. NO E&S ITEM SHALL BE REMOVED UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. 12. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 13. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 3 ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE THE WIRE FENCE AND EXTEND EXCAVATED SOIL. IT INTO THE TRENCH. 305-2 �11 i c -1' FLOW EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. TABLE 3] A ADHESIVES USED FOR DUST CONTROL W.- Appsalion ANh-ary Du ,m (AiSmS.�Waen Trx m Neale LaliBmlAm Ram Asianie Avplult emulsion 71 Couse sv..r 1,3W L,,,EmW,ioN 1351 F. Spey 735 Resin in Wa¢, 4.1 Finn Spny SE Aayli, Emulsion (NamTaTe) PI Comm, SIT, 450 ASTI., Emulsion (TffiEc) 33.1 dwrse Spry 350 Sava: v.DSWc SH, SLI TABLE 331-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS 'QUICK REFERENCE FOR ALL REGIONS' Rate njaUG& Dates SIncies bs. acre Sept. 1 - Feb. 15 50/50 Mix of Annual Ryegrass (Lolium multi-Romm) & 50 - 100 Cereal (Winter) Rye (Secale cerealel Feb. 16 - Apr. 30 Annual Ryegrass (Lolium multi-Mmm) 60 - IOD May 1 - Aug 31 German Millet (Selaria italic") 50 Source: Va. DSWC TOTAL LBS GENERAL SLOPE Ql OR LESS) PER ACRE KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MITEI AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION IN ACCORDANCE W VESCH STD 3.35. PS PERMANENT SEEDING SCHEDULE NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) P SILT FENCE DROP INLET PROTECTION x Dols MILET u wx Rne1 l ATxER nIT w V V PERSPECTIVE VIEWS ELEVATION OF STAKE AND FABRIC ORIENTATION DETAIL A SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION 1S APPLICABLE WHERE THE INLET DRAINS A REUSIVELY FLAT AREA (SLAPS NO GREATER THAN 5%) srHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 CF.S) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEMNG CONCENTRATED FLOWS, STEP AS IN STREET OR HIGHWAY MEDIANS. 0 ORXSCOARSEAGGREGATE. O BLOCK& GRAVEL CURB INLET IP O SEDIMENTFILTER 3.07s NO SCALE mw Same: vo. DS WT ALBEMARLE COUNTY CONSTRUCTION ENTRANCE 333 em,B 33S2 ' .,....��. o..., PLAN VIEW Nust Lxm(B rvD came IF IMRFSS MW Eptf4 W Somms SEt 1/Y 1M1FA X19R...Dar xrowwIH1r r IBJK 4ROLE 6' aEF Ede a vAW1IExr. 01" U SECTION A -A NOTE: A YNWN. WAIEx Risks IF I- IS RIELM wnX A ualuw w,sx Inme d, u , a' ePAVscuE x2sED TEMP COW ENTB 9 CE �xmr,EW.AxR,E �S NAO?SN�O rRS£Npl livinew SILTFENCE sF (WITHOUT WIRESUPPORT) sas-= S osu ON SLOPES, STRIPS N TECTVE COVERINGS MAY BE APPLIED ACROSS BERM THE SLOPE. F-III=III=111- WHERE THERE /S A BERM AT THE TOP OF THE SLOPE 1=11E=1T lm- BRING THE MAITERAL OVER THE BERM AND ANCHOR If IT ILE III=III=III= KItE111- III BEHIND THE BERM KIIE=_III III III=III I - I kueuelll III -III III u- -I �ukliEllll m Li=m m=u �Irr�rtHruuTu� 4 III III II II -HI` 111� BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP TERMRA7TyG THE INSTALLATION. TURN THE END SLOPE UNDER 4 AND STAPLE AT 12 INTERVALS. 12" PRLLEAYDROCOVERING AAtOHE/EC77N O FLOW USE CHECK THE CENTER AVOID F ID THE DITCH IF AT ALL POSSIBLE. ON SLOPES APPLY PR COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. ''��� �111�LPLl�LIJ II�II-IIdIIdIIdIL- g/(M SOIL STABILIZATION BLANKET NOTE.• TREATMENTz SOIL STABILIZATION MATTING MATERIAL SHALL BE INSTALLED AS NOSCALE REQUESTED BY THE ALBEMARLE COUNTY EROSION CONTROL INSPECTOR Lic. No. 035791 11/5/21 N Ln CD 0 H o co F- w Z 7:J ME O O U w CL `H V) / w In z w J 0 ti C''i N C`7 l N CD M N \N J J U) Is LU Q U l LLI LLI LU U) Uj L.L rQ V O 0 N w z � w Q z z W J O ^< 1..� O U) U LU � z O O C) oC � 0 0 1--1 O O LLIJ z c) w J F U F I w w CL U) JOB NO. 152118 SCALE N/A SHEET NO. 3 APPROVED VDOT EC-1 CLASS Ai RIPRAP/ W/FILTER FABRIC OUTLET PROTECTION 010=0.53 CFS V10z.61 FP L 5. D=1.4' W1=3x1.25'=3-75' \ I CONCRETE WASH . ■ ■ ■ ■ ■ ■ ■ �` NOTE: LEGEND LEGEND OUTAREA �♦ 1. TOTAL LIMITS OF DISTURBANCE PROPOSED WITH THIS PLAN = 7.og ACRES. V v 2. THE LIMITS OF DISTURBANCE SHALL BE CONCURRENT WITH THE PROPOSED LIMITS OF LAND DISTURBANCE SAF SAFETY FENCE PER VESCH 3.01 WASH RACK I .� SF � \ \ PROPERTY LINE (TYP.) �— — TREE PROTECTION FENCING. FENCING AND LOD SHOWN SEPARATELY IN THIS 4 DIVERSION DIKE CE CONSTRUCTION ENTRANCE PER VESCH 3.02 PLAN FOR GRAPHICAL PURPOSES ONLY. NO DISTURBANCE IS PERMITTED � BOUNDARY LINE OUTSIDE OF THE LO o o SILT FENCE SF SILT FENCE PER VESCH 3.05 \ i DIRECTION OF FLOW INLET PROTECTION PER VESCH 3.07 653.75 PROPOSED CONTOUR AP VED / TP 1 I l l \ — _ M ■ ■ ■ ■ N DRAINAGE DIVIDE DD DIVERSION DIKE PER VESCH 3.09 SOILS LINE 12'x7o MIN. �� STz \ \ \� \ \ \ \ = _ SB SEDIMENT BASIN PER VESCH 3.14 \ MANAGED SLOPES \ I I I \ \� \ _ _ OP OUTLET PROTECTION PER VESCH 3.18 . \- "C \ PRESERVED SLOP B/ SOIL STABILIZATION MATTING VESCH 3.36 f \ \ ', _ \ •��As■■ow��■■■■ ■ \ \ \ X \ \\ \ \ EAMBUFFER OPEN SPACE PRESERVATION CIP Lic. No. 035791 11/5/21 LOCATION OF FUELING AREA v, \ \ LOCATION OF o LOCATION OF PORT -A -POTTY ♦� TYPE, DUMPSTE44 R / \ \ / \ 2 \ -/ \ \ • \ \ \ :.�, ' / ♦\ FLOW DIRECTIONN ARROW( 6 pC / /\ \ \ \\� \� \ \ DO Z SOIL / / ♦♦ \ \ \ \ \ \•�\ \.\ \ s ET \ f U \ Z TYPE �� � \ V A \ \ \ �A��vv \ \ + \ � w S• ♦ d / vim/ l \ V ♦ VvV A V A A\ W ce SOIL TYPE v \ V A V A\\\ \ �� / 6 \♦ A\ \ �\ \ l I 12'x7o' MIN \ �a SB 1 9 �� EXISTING PRESERVED \ \ "'\ �AFE:a=5.31 aC.. ,.� STEEP SLOPES Cw-o.35 \ ONTRACTOR SHALL INSTA L OUNTABLEN \ \ P TC=1 .2 MIN.: . / / `` —/ \ \ \ T \ I \ 1 \5 E RIGHT-OF-WAY DIVERSION W THE ` p / \ \ CONSTRUCTION OF PHASE II OF TH✓ \(� e 75' ST \ A\ BUFFER / . -DEVELOPMENT. THE MOUNTABLE DI RSION BERM DAY& RESTOREDATTHE`END\ C \ EACH DAY&PRIOR- WEATHE VE TS. CONTRACTOR SHALL ENSUREZ I I • / \ \ \ ♦ \ e r / / / / /� \ \ \\ \ \ \\ POSITIVE SLOPE MAINTAINED, �/ J \\ \ \ 18"BERM PROVIDED. BERM I 1 I I � APPROVED VDOT EW-1 \ �. / / \ � � j \°\ \\ \S \\\ SHALL BE STABILIZED AS A FIRST \ p \ `� �- & VDOT EC-1 \ / / / . \ 1> ( \ \ STEP IN DISTURBANCE, TYP. \ \ \ I �\ / / W/FILTER FABRIC\ ♦ ♦ \ a / / ./ ` / SOIL �\\ \\ \ /� \ \ OUTLET PROTECTION S /y \ \ \\ 010=1.BCFs \ / // / TYPE \\\\\ \\ \ ITP . V1010.3 FPS \ \ \\— �(] � / / �• \ � \ \ I I I I I • 4D� . L=8'; D z.5 39 / I\ W1 3x1.z5' 3.75' \ / / \\ \ \ SF Wa=8+1.25=g.z5'\ \ /DRAINAGE DIVIDE (TYPJ\�:,\ \ \ \ \� - PR VED OT STD. TYPE I / IP IN FLEXIBLE PIPE TO \ \ 6 OL 78 �\ R T LE FC�TER FABRIC ♦ �' / / / / / \/ \ CONVEY RUNOFF FROM JNDERLAY�ENTCHANNEL \ I I I I I — 31 EXT�D TOSTR / / ` \ - PROPOSED DIVERSION TO RIPRAP �- _ / \ • I\�\ \\\ STOIXPILEAREA. \ \ SHALLBE- I , LINED OUTLET APPROVED Nk,�=40' / \ / 'SURROUNDEDBY I I I I I -'� ( PROTECTION& \ \� RIPRAP \\ \ SILT FE�NJc€- I I �I SEDIMENTTRAP#1 J � _ •. \ \ a -- / \ ` • \ \ \\ \ I o \ . NO SCALE \ \ \ / ♦ \ D fl ♦ \ / cp ) \\\ \ \ V IP / APPROVED VDOT EC CL. I RIPRAP S \ " I \ i EXISTING MANAGED \ - \ \ \ \ STEEP SLOPES (TYP.) \\ \ / \ \ / W1=4.5'; Wz=13.5; L=1z'; D=z.S' \\ d � ♦ a \ \ \ I \ \ APPRIVED DIVERSION BERM. I CONTRACTOR SHALL ENSURE l I I III SLOPEMAINTAINED, 18"BERMPROVIDED. BERMSHALL BE STABILIZED AS A - \\ APPROVED DIV SION BERM. FIRST STEP IN DISTURBANCE APPROVED CONTRACALLENSURE/POSITIVE _ \ \\ I OP 18' BERM PROVIDED. BERM I \I \ \ SHALL BE STABILIZEDASA � / ,: ♦ / � \\ \ \\ FIRST STEP IN DISTURBANCE Aw \ PHASE I \ \ B/ --- - \ \ \ \ \ \ \ . ♦ / / / A \�\ O Cw=0.35 SAF \ �� \ �� \ — ♦ ` \ \ / ' \j �� \ \ \ Tc= 5 MIN. 'bc - \\ V v ♦ v ' �� — — Y v i / / /-� vv �� \ \ \ \ S — _ �� \ \VA \\\\ \\ \ \� v — TS — / \ \ _ _ _ v - v vvv vvvvvvvv vvv��\ �v — v�/ / /M DC PS SF 1 LIMITS OF DISTURBANCE TYP. TOTAL \ ` AREA=7.53 ac.TREE PROTECTION SHALL BE \ PLACED ON LOD LINE IN FIELD woo 25' STREAM BUFFER \�'�y \ GR�PHIC SCALE _ \ \ \ I I inch FEET 30 ) ft. a N Ln N Ln u 2 N 00 ti 'y y C 0 U O a 0 J Lu 0) r CY) U C ' N rn N > N 0 D a N z a W o N W z Q o a W > z o� N o LLi W J N > Q 0 0 U) U w a L1J o L9O J r ^ v/ ° n/ \ ~I 3 = 0 z U U o-6 0 0 w Y O z 0 J DC P_I o �..�..� E ul `/) � w o �CD Z Z W Q LLJ w cl� Q =w z O wz Joz 0 a Qo 0 a 1 ^ fJ U X L � J � � C I w 0- Ln JOB NO. 152118 1"SCAL30' ■ SHEET NO. \ 4 ICONCREOTE WASH / ����������■ UTAREA IWASH RACK I ..0� SF TP --- _ PROPERTY LINE (TYP.) x I I x II C l AP VED I I I TP 1 \ 12 x70 MIN. ST2 . �, \ \ — — CIP s \ - LOCATION OF o \ / I \ \ \ \ X \ ••�� 1 \, \ \ \ \ ?o\\ \ \\ \ LEGEND LEGEND LIMITS OF LAND DISTURBANCE SAF SAFETY FENCE PER VESCH 3.01 DIVERSION DIKE CE CONSTRUCTION ENTRANCE PER VESCH 3.02 � 4 BOUNDARY LINE o o SILT FENCE SF SILT FENCE PER VESCH 3.05 DIRECTION OF FLOW IP INLET PROTECTION PER VESCH 3.07 653.75 PROPOSED CONTOUR ■ ■ ■ ■ ■ ■ DRAINAGE DIVIDE DD DIVERSION DIKE PER VESCH 3.09 - SOILS LINE SB SEDIMENT BASIN PER VESCH 3.14 MANAGED SLOPES OP OUTLET PROTECTION PER VESCH 3.18 PRESERVED SLOP B/ SOIL STABILIZATION MATTING VESCH 3.36 EAM BUFFER OPEN SPACE PRESERVATION NOTE: TOTAL LIMITS OF DISTURBANCE PROPOSED WITH ti Lic. No. 035791 11/5y F4 THIS PLAN = 7.09 ACRES. N Ln 0 0 a � Wi=3xi.25' 3.75' DC \ \ \ \ \ \ \ Ul m H ` w \ l ¢ME ET O 00 Lu v \ \ Z Lu Lu tk PROPOSED DIVERSION BERM. � \\ \ \ CONTRACTOR SHALL ENSURE \ ;/ \ 469 POSITIVE SLOPE MAINTAINED, \ j \ ✓ \ I \ / �, // �— \ \ \ \ \ \ ` \ \ \ I \ 1\ \ 18"BERM PROVIDED. BERM SHALL f SHALL BE STABILIZED AS A FIRST STEP INDISTURBANC \ / \ / _\ \ CEXIST SNG PRESERVED PI TE SLOPES (TYP.) I I ) I \\ ONTRACTORSHALLINSTA L OUNTABLE / / \ D RIGHT-OF-WAi`DIVERSIONW THE _ ea= 1 aC. \ / I) I \ \ \ �\ I CONSTRUCTION OF PHASE 11 OF T 53 / / \ \ 75':STREAM BUFFER R - o -DEVELOPMENT. THE MOUNTAB E DI RSION / / \ • BERMSHALLBE RESTORED ATTH NO F \ EACH DAY&PRIOR- WEATHER�VE T5. \ IP / aTc=1o.8 MI� �► 7 v v 'APPROVED VDOT EW-s _ ✓ — & VDOT EC-i \ � CLASS 1RIPRAP W/FILTER FABRIC / / \ s..E . \ \\ \ 02o=i8CFJ PROTECTION \S�/� I ® 4 k. Vio io.3 FPS \\ \ IP \ / / / / \ \\\ I \fig L=8'; D 2.5 I \ Wi=3xi.25' 3.75' \ \ / / / // / • \ \ \ \ \ . TS SF ® � \ \ \ .` - � \W2=8+2.25-9.25'/ \�\ \ \ a .DRAINAGE DIVIDE (TYPJ I 32'OFEXIB EEAV PIPE- FLEXIBLE PIPE \ / / \ CONVEY RUNOFF FROM \\ pRoposeo I I I DIVERSION TO RIPRAP \ \\\ \ STOCKPILE AREA. � \ / \ SHALL BE- . LINED OUTLET APPROVED \ _ SURROUNDEQBV PROTECTION & -/ .SILT FENCE I ( SEDIMENT TRAP#i \ RPRAP �V • 5 / VA\ � NO SCALE \ I �, 1 - '�'� • EXISTING MANAGED \\ \ \ _ IF \ \ \ APPROVED VDOT EGi CL. I RIPRAP\J`\ STEEP SLOPES (TYP.) \ \ s Wi=45�; W2=13 5, L RI CONTRACTOR SHALL ENSURE' \ \ \ - POSITIVE SLOPE MAINTAINED \ \ W IP BERM PROVIDED. BERM \� \ SHALLBESTABILIZED ASA \ V\ S13. 2 I / FIRST STEP IN DISTURBANCE \ O� \\ \Area=o.77 ac. � �P APpRovED 3; \ Cw=o.35 sT2 \ Tc=5 MIN V A — �'� ♦ �/ // / / // A \\� \ \ \ \ PS \ \ \ \ \ ° /M �\ \ DC � °A _ -®%►� '� v�\��\\VA\\\ \\� VA\�\ �_� \ D / A V A\�\ \\ \\\ — — �� — — _ �30— — — �� i PS I vv - \ \ \ SF LIMITS OF DISTURBANCE, TYP., TOTAL \ \ —� — \ AREA=7.53 ac.TREE PROTECTION SHALL BE \ \ Bi \ PLACED ON LOD LINE IN FIELD 25'STREAMBUFFER GRAPHIC SCALE / \ \ 30 15 30 60 120 V A ( IN FEET l 1 inch = 30 fL. ET \ L ti M z CY) M N ® co rn LZ z Ill N CL W > z o LLI L u J z Q O G Lu O V 1 _ > a _ Lf) v 0 66 z Lll Y o Lu I— cl. 0 W ul F_: O w w 0 < Q ~ cl� _ J w z J Q ZD O O N w J F u L w w Ln JOB NO. 152118 SCALE 111=30' SHEET N0. 5 1 I I CONCRETE WASH ESC PHASE III SEQUENCE OF CONSTRUCTION FOR PHASE II OF THIS DEVELOPMENT (LOTS 29-34 & ITS INFRASTRUCTURE): V OUTAREA •. y 1. THE CONTRACTOR SHALL BEGIN THE PHASE II (LOTS 29-34 & ITS INFRASTRUCTURE) ESC PHASE III BY MODIFYING THE CONSTRUCTION ENTRANCE. THE pH 0 WASH RACK �� PROPERTY LINE (TYP.) CONTRACTOR SHALL MAINTAIN THE ESC PHASE II DOWNHILL DIVERSION AS LONG AS POSSIBLE. THIS WILL ENSURE DISTURBED AREAS ARE DIRECTED F� INTO SEDIMENT TRAP #1 DURING THE INITIAL PHASE III GRADING OPERATIONS. 1� 2. IF FILL DIRT IS REQUIRED TO BE IMPORTED TO THIS SITE, OUTSIDE OF THIS PROJECT's PERMITTED AREA, THEN IT SHALL BE OBTAINED FROM AN ■ / 1 1 APPROVED PROVIDER OR SHALL ORIGINATE FROM A BORROW SITE THAT IS COVERED UNDER A SEPARATE VSMP PERMIT. SCOTT R. LINSZ ♦ ■ 3. DURING THIS ESC PHASE III, THE CONTRACTOR CAN BEGIN EXPANDING THE GRADING AND FILLING OPERATIONS. WHILE THE GRADING IS UNDERWAY THE CONTRACTOR CAN BEGIN INSTALLING THE PHASE II (LOTS 29-34) UTILITIES. THIS INCLUDES WATER, SANITARY SEWER AND STORM SEWER. THE U Lic. No. 035791,a I 1 PORTIONS OF THE PHASE II STORM SEWER SYSTEM INSTALLED WILL BE BLOCKED DURING ESC PHASE III TO ENSURE RUNOFF IS DIRECTED INTO 11/5/21 cs� I C I l (APPROVED TP 1 I I l - _ SEDIMENTTRAP #1. THIS WILL CONTINUE TO ENSURE DISTURBED AREAS ARE TREATED IN SEDIMENT TRAP #1. ASA BACKUP PLAN, AT ANY POINTSA _ x \ DURING CONSTRUCTION THE ESC INSPECTOR RESERVES THE RIGHTTO REQUIRE THE ACTIVATION OF THE PHASE II YARD DRAINS AND STORM SEWER. tg C1 12'x7o MIN. STz •� �„ \ \ THE ACTIVATION OF THESE INLETS WILL DIRECT RUNOFF INTO APPROVED SEDIMENT BASIN #1. PRIOR TO THE CLOSING OF THE PROJECT, THE SIONAL E� CONTRACTOR SHALL CLEAN THE STORM SEWER AND CONFIRM ITS STRUCTURAL INTEGRITY WAS MAINTAINED. ALL INLET PROTECTION SHALL BE a . I I I \ \ \ INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NECESSARY. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. �• �•4W \ \ \ \\ 4. WITH THE INSTALLATION OF THE SITE UTILITIES & DRAINAGE STRUCTURES ALREADY UNDERWAY, THE CONTRACTOR SHALL CONTINUE THESE IJ . \ / ■ ■ / I \ \ \\ \ \\ INSTALLATIONS AND CAN ROUGH GRADE THE LOTS AND THE ALLEY UP TO SEDIMENT TRAP # 1's 2:1 TIE-IN GRADES. ONCE THE BULK OF THE ALLEY IS I a \ \ \ \ \ \ \ \ AT ROUGH GRADE, THE CONTRACTOR SHALL INSTALL THE CURB, TERMINATING IT AT SEDIMENT TRAP #1's 2:1 TIE-IN GRADES AS SHOWN. INSTALLING A THE CURB IN THIS MANNER WILL ALLOW IT TO FUNCTION ASA DIVERSION, DIRECTING UPLAND RUNOFF INTO ATEMPORARY SLOPE DRAIN AND \ / I \ •� \ \ \\ \~\ \ \ ULTIMATELY SEDIMENT TRAP #1. ANY ESC MEASURES THAT ARE DISTURBED WITH THE INSTALLATION OF THE ALLEY SHALL BE RECONSTRUCTED AT CIP \ \ / 1 \ �. \ \\ \�� \\ \ \ THE END OF EACH DAY TO ENSURE THE SITE IS PROTECTED FROM RAINFALL EVENTS. ��� •, LOCATION F / . 5. ONCE THE MAJORITY OF THE SITE IS CLEARED AND ROUGH GRADED, MINUS THE SOUTHERN PORTION OF THE ALLEY, THE CONTRACTOR SHALL O\ \ TEMPORARILY STABILIZE THE UPLAND AREAS ON THE SITE WITH TEMPORARY SEEDING AND STRAW MATTING. THE CONTRACTOR CAN ALSO BEGIN TO FUELING AREA \ - \ \ / \ \ •.\ \ \\\\\ CONSTRUCT THE RESIDENTIAL BUILDINGS ONCE THE LOTS ARE AT ROUGH GRADE. v�i LOCATION OF 7. UPON PERMISSION AND AUTHORIZATION FROM THE ESC INSPECTOR, THE CONTRACTOR MAY BEGIN THE CONVERSION OF TEMPORARY SEDIMENT o LOCATION OF PORT -A -POTTY \ \ TRAP #1 TO A PERMANENT DETENTION BASIN. THE CONTRACTOR SHALL INSTALLTHE RETAINING WALL ADJACENT TO THE SEDIMENT TRAP & -� — UMPSTER \ / \ \ \ \ \ CONCURRENTLY REGRADE THE TRAP TO THE FINAL CONTOURS SHOWN ON THE SWM FACILITY'B' DETAIL DEPICTED ON SHEET 10 & THIS SHEET. WHILE � III \S \ \ THE TRAP IS BEING REGRADED THE CONTRACTOR SHALL INSTALLTHE PERMANENT RISER, BARREL & SPILLWAY TO MINIMIZE FUTURE DISTURBANCES. k Q THE RISER AND ITS LOW -FLOW ORIFICE SHALL BE TEMPORARILY PLUGGED WATERTIGHT AT THIS TIME AND THE REGRADED FACILITY SHALL FUNCTION o ASA SEDIMENT TRAPPING DEVICE UNTIL ALL UPLAND AREAS ARE STABILIZED. ../w� m En 8. WHILE THE RETAINING WALL ADJACENT TO SEDIMENT TRAP #1IS BEING INSTALLED, THE CONTRACTOR SHALL BACKFILL THE AREA BE HIND THE WALL V/ z Lu AND SHALL ROUGH GRADE THE FINAL PORTION OF THE ALLEY. ONCE THE LAST OF THE ALLEY HAS ACHIEVED ROUGH GRADES, THE CONTRACTOR CAN Z f FINISH THE INSTALLATION OF IT, ITS CURB AND THE REMAINING DRIVEWAYS. WITH THE CONSTRUCTION OF THE ALLEY, THE CONTRACTOR MAY ELECT O u TO DELAY THE INSTALLATION OF THE FINAL TOP COAT OF ASPHALT UNTIL THE CONSTRUCTION OF THE LOTS HAS BEEN COMPLETED. THIS DELAY WILL \ REDUCE THE RISK OF DAMAGE TO THE ASPHALT BY CONSTRUCTION TRAFFIC. w \ \ \ \�\ 9. THE CONTRACTOR SHALL CONTINUE TO CONTROL AND PROTECT THE SITE FROM RUNOFF WITH TEMPORARY STABILIZATION MEASURES AT LOCALIZED H` O \ LL AREAS THAT ARE NOT STABILIZED. THESE MEASURES INCLUDE, TEMPORARY SEEDING AND STRAW MATTING, SILT FENCE AND DUST CONTROL En \ DC PROTECTION. THE CONTRACTOR SHALL USE PERMANENT STABILIZATION OF THE FINE GRADED DISTURBED AREAS. PERMANENT OR TEMPORARY SOIL / \ STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY w SOIL STABILIZATION SHALL BE APPLIED WITHIN 7 DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT W (UNDISTURBED) FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN 1 YEAR. LOT zg S \ ` • \ 10.ONCE THE TRAP IS FULLY CONVERTED AND THE SITE's FINAL GRADES ARE PERMANENTLY STABILIZED, INCLUSIVE OF SWM FACILITY'B', THE LOT 30 1 \ I \ • \ \ \ CONTRACTOR CAN ACTIVATE THE RISER & LOW -FLOW ORIFICE IN SWIM FACILITY W AND REMOVE ANY REMAINING ESC MEASURES. THIS IS INCLUSIVE LOT 3-1\ OF PERIMETER SILT FENCE, TREE PROTECTION, ORANGE SAFETY FENCE AND INLET PROTECTION. NO ITEM SHALL BE REMOVED, THROUGHOUT ALL IP r \ \ PHASES OF CONSTRUCTION, UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE ESC INSPECTOR GIVES PERMISSION. CONTRACTOR SHALL / I \ \ > \\VA\ \ STABILIZE ALL AREAS OF THE SITE IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL REQUIREMENTS. It \ 11. THROUGHOUT ALL PHASES OF CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA P \ EROSION AND SEDIMENT EROSION CONTROL AND HANDBOOK, NT REMOVINGCONTROL BOOK. HEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE �, \ 12. THROUGHOUT ALL PHASES OF CONSTRUCTION, ALLTEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS CE / / \ 1 1 EXISTING PRESERVED AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL r1i r-4 i2'x70' M N S \ \ \ \ STEEP SLOPES TYP. PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES N Ln SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 00 IP ONCE THE BULK OFTHE ALLEY ISAT UGH GRADE, THE CONTRAC OR v _ A 75'STREAM BUFFER\ \ SHALL INSTALL THE PROPOSED STORM SEWER & CURB. THE CURB •/ . INSTALLATION SHALL TERMINATE AT SEDIMENT TRAP#1's 2a TIE-IN GRADES. APPROVED- - \ NSTALLING THE CURB IN THIS MANNER WILL ALLOW IT TO FUNCTION ASA \ . DIVERSION, DIRECTING UPLAND RUNOFF INTO THE TRAP. ALSO, THE PHASE III . PROPOSED PHASE II DROP INLET AND YARD INLETS SHALL REMAIN BLOCKED / Area=5.o8 ac. \\ ` DURING CONSTRUCTION TO ENSURE SEDIMENT IS DIRECTED INTO TRAP#1. i = / + \ \ Cw o.6 � n � \ 5 / &C' \ / / �APPROVED VDOT EW-1 L9I` VDOTEC-1 LASS i RIPRAP W/FILTER FABRIC "° -: � � \ CYi OUTLET PROTECTION 010 1CF5 <10-3 FPS L=8 � Tp '; D=�.5' M � �Fh \ �A W1 3x1.z5'=3J5' TS ------ S I \ \ Wz 8'+1.2S'=g.z5' \\ \ ° DRAINAGE DIVIDE(TYPJ\ \\ i I F n 32' OF 015" HEAVY-DUTY, V - A \ +�.. 0 Z \ FLEXIBLE PIPE TO �t-78� �' m Lu � N CONVEY RUNOFF FROM \ �I S 3 0 \ i / N CURB DIVERSION TO I � • i P r � I RIPRAP LINED OUTLET PROTECTION& -� J Q PHASE �II SEDIMENT TRAP#1.� > O ST1 � �i i D / � \ ro ce V � • p / � � � V � Area=o.g§ ac� .� A W W W S V A ��IP , / EXISTING MANAGED A - \ ,.. STEEP SLOPES TYP. \ APPROVED VDOT EC-i CL. I RIPRAP J z \ _ W1=4-5'; W2=13 5; L=12'; D=2 5" �OT3 �A r V ) \ — ' i Q U APPRIVED DIVERSION BERM. \ x U) z �1 CONTRACTOR SHALL ENSURE \ \� � \ w � Z POSITIVE SLOPE MAINTAINED, \ ~ Lu 18" BERM PROVIDED. BERM 0 J 0 PR SHALL BE STABILIZED ASA � \ \ -- \ V l v FIRST STEP IN DISTURBANCE \ ' \-_ _ \ \ \\\ PROVED �\ TS \ / I PS Lu 0 o T // cn :E� \ / I 0 06 \ LOT 33 O LuLu IF DEPICTION OF SEDIMENT TRAP CONVERSION TO SWMFACILITY'B' ul -1 ( SCALE "=301 W TS - AETER THE ATE S`� �OUGH GRA�D� TKO T�EI�'QI�RS SA LLI Lu Ol>LTHISRLAi�, ON STiALl IN5TALL`THE RETAININ \\� �� l / \M < m WALL ADJACENTTO TH E �EDI M E NT TR P&,CQNC�(JRRENTLY R�6,G DC� \\ \ + � � �/ / • \ �--- Q \ \ \ \ THE TRAP TO THE FINAL CONTOURS SiJ;HE O T SWM FACILITY' \ \\ \ /�� -"3 �/ S - (J) \ . DETAIL DEPICTED ON SHEET io&THIS §HE LlNHILE THE TR P�SB IN`G '_�_- \ 0- .. REGRADED THE CONTRACTOR SHALL INSTALL THEPEaMANE T RISER, \ \ BARREL & SPILLWAY TO MINIMIZE FUTURE DISTURBANCES. TH RISER \ \ or -an- \ rp SHALL BE TEMPORARILY PLUGGED WATERTIGHT AT THIS TIME AND THE \ .� \y REGRADED FACILITY SHALL FUNCTION ASA SEDIMENT TRAPPING W \ \ _ -JJJ - - _ \ \' '.: \\ �/ ♦♦ DEVICE UNTIL ALL UPLAND AREAS ARE STABILIZED. \\ \ \ 4 WITH TH STALLATION OF THE RETAINING WALL-- i' ADJ NT TO SEDIMENT TRAP#i, THE CONTRACTOR �� / j \ \ Q Q ALL BACKFILL THE AREA BEHIND THE WALL ♦ SF ALL OWING THE ALLEY TO ACHIEVE ROUGH GRADES. LIMITS OF DISTURBANCE, TYP., TOTAL vv ♦♦ ONCE THE LAST OF THE ALLEY HAS ACHIEVED ROUGH AREA=7.53 acTREE PROTECTION SHoALL . ♦ \ GRADES, THE CONTRACTOR CAN FINISH THE PLACED ON LOD LINE IN FIELD \ � INSTALLATION OF IT, ITS CURB AND THE REMAIN( - - DD - -- - \ =ti N DRIVEWAYS, AS DEPICTED ON THIS SHEET. \ i� - - - • �� o i w 25' STREAM BUFFER GRAPHIC SCALE \ \ - - - \ \ \ \ JOB NO. / \ 30 15 30 60 120 \� �\ \ .. i__ sAF / , \ 152118 SCALE \ \ ( IN FEET ) \ �� \� - 1 u = 30' 1 1 inch = 30 ft. �!b 1992 3.15 SEDIMENT BASIN #1 SCALE: 1"=20' \ -. ----- T OF RA -..-y•z.o � \ �� •\ � \ �- -� � P D. LASS 1 IL {L= - - t3yI SEDIMENT TRAP #1 SCALE: 1"=20' SEDIMENT TRjAP1 n A Nv I32PIPE TO CONVEY RUNOFF FROMI TSD I DIVERSION OUTLET PRO ROTECTION & SEDIw ENTD RAP #1� � I I i R � kv ---- - -- ST1\ SF Sediment Trap 1 design 4 \ \. drainage area (acres)(<3) 0.96 trap volumes: elevation (ft) area (sf) volume(cy) CINXI`riu E. 431.00 53.0 0.0 LID1 432.00 156.0 3.7 434.00 524.0 27.6 436.00 1013.0 83.5 437.00 1295.0 126.1 438.00 1603.0 179.7 wet storage: wet storage required (cy) (67*DA) 64.3 SEE PUS 3.1}1 bottom of stone weir (ft) 435.3 wet storage provided at this elevation (cy) 64.7 slope of wet storage sides 2:1 g WIDEVDOT TYPE I RIPRAP LINED, ' OUTLET PROTECTION CHANNEL IN VACCORDANCE WITH VESCH SPEC. 3.19. \CHANNEL TO BE 18" DEEP WITH 3:I SIDE SLOPES. SEE CALCULATIONS PACKET FOR ADDITIONAL INFORMATION. EXISTING MANAGED STEEP SLOPES (TYP. \ \ - 1• vAnMaF \ CREST OF STONE WEIR I WJUB E• DRY STORAGE - e+ NAPHffiI WET STORAGE Y AW (ExuvATED) weir length (ft) (6xDA) dry storage: bottom of trap elevation (ft) dry storage required (cy) (67*DA) 64.3 bottom trap dimensions: crest of stone weir 437.0 top of dam elevation (ft) dry storage provided at this elevation (cy) 64.7 top width of dam (ft) slope of dry storage sides 2:1 top trap dimensions FILTER CLOTH GOGIML gY%INC ELEV. COARSE AGGREGATE' CLASS I RIPRAP 5.8 431 5'x 18' 438 2 32'X66' Sediment Basin #1 Design MIN. 1' WI SPILLWAY 2 MHOUT CREST OF EMERGENCY SPILLWAY drainage area (acres) 5.31 basin volumes: (using 2' contour intervals) DESIGN NICN WATER (zs-YR. STORM ELIv.) elevation (ft) contour area (st) volume (cy) Or 402.00 610.0 0 MIN. ID. 404.00 1617.0 79.5 RISER CREST 406.00 2749.0 239.4 ' OF, STORAGE .:.:': DEWATERING SCE 408.00 3998.0 487.8 WET STORAGE 410.00 5349.0 832.8 412.00 6800.0 1281.7 SECRMENT CLEANOUT POINT (•TWEI STORAGE EDUCED �q wet storage: wet storage required (cy) (67*DA) 355.8 design high water (ft) 411.00 dewatering orifice elevation (ft) 406.9 top of dam (ft) 412.00 wet storage provided at this elevation (cy) 355.8 top width of dam (ft) 8.0 available volume before cleanout (cy) (min. 34*DA) 180.5 bottom of basin (ft) 402.00 cleanout elevation (ft) 405.3 approx. bottom dimensions: 125E112' distance from cleanout to orifice (ft) (> 1') 1.68 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67*DA) 355.8 baffles: NO principle spillway crest (ft) 409.67 length of flow, L (ft) 134 dry storage provided at this elevation (cy) 420.0 effective width, We (ft) 46 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if> 2) 2.88 diameter of flexible tubing (in) (orifice+2") 6.0 collars: YES runoff. depth of water at spillway crest (ft) 7.67 C (use 0.45 for bare earth) 0.65 slope of upstream face (Z:1) 2:1 tc (min) 10.8 slope of barrel (Sb) 1.33% 1 2yr 4.0 Q 2yr 13.8 length of barrel in saturated zone (Ls) 48.61 1 25yr 6.0 Q 25yr 22.8 number collars required 2 dimension of collars 4.4x4.4' principle spillway: available head (ft) 1.00 emergency spillway: YES diameter riser (in) 48 required capacity (Q25-Qp) (cfs) 7.8 spillway capacity, Qp (cis) 15.00 bottom width (ft) 33 diameter trash rack (in) 36 slope of exist channel (ft/ft) 33% barrel length (ft) 75 minimum length of exit channel (ft) 17 head on barrel through embankment (ft) 10.67 crest of spillway (ft) 410.67 diameter of barrel (in) 15 SEDIMENTTRAP #2 SCALE: 1"=20' CONCRETE WASH OUT AREA_'� I l \ iiV a \ 'y Sediment TraP2 design drainage area (acres)(<3) 0.1 trap volumes: elevation (ft) area (sf) volume(cy) 466.00 327.0 0.0 467.00 519.0 V15 468.00 736.0 38.7 Wet storage: wet storage required (cy) (67*DA) 6.7 bottom of stone weir (ft) 466.5 wet storage provided at this elevation 1 7.8 slope of wet storage sides 2:1 dry storage: dry storage required (cy) (67*DA) 6.7 crest of stone weir 46T0 dry storage provided at this elevation 1 7.7 TEMPORARY SLOPE DRAIN CORRUGATED METAL EXTENSION COLLAR WATERPROOF SEAL' nonlnnc nrtw L-r EARTHEN DIKE PROVIDE INLET (COMPACTED) I PROTECTION -7 1 SECTION VIEW NOTE: SEDIMENT MAY BE CONTROLLED AT OUTLET IF UPLAND PONDING WILL CREATE PROBLEMS EARTHEN DIKE (COMPACTED) Source: Va. DSWC ORICHAL ROUND i ELIN CREST OF STONE WEIR \ y 1.1 vm E WWIASIE• o, DRY STORAGE WET STORAGE (E%GYIRED) FLTER CLOM WO DEN. .SEE PLME 3.13-1 COWY MIGREWIE'• CIASS I RIPRAP weir length (ft) (60A) 0.6 bottom of trap elevation (ft) 466 bottom trap dimensions: 9'X40' top of dam elevation (ft) 468 top width of dam (ft) 4 V OF OTTY SECTION A - A ts D+6.. ? 11 T Plate 3.15-1 Lic. No. 035791 11/5/21 ,4j N Ln .ti CD '-I H1ZIW r1j "I Ln Ln N ti Goo ., Lo ti M Lei M CN N ® M N z C] W WG) _ N � U-) N J W oQ > z F- w J C M J G J U Q ce LU M z O U Q z ZZ: �Z LU U W Y O W LU J F- oC °-6 U) > Ul W O F --- I O Zw 0�Q�/LU c F- l J w 0 z J /QZD V 0 C] C:) N w J F U Lu W W C1. (n JOB NO. 152118 SCALE 11I = 20' SHEET NO. 6 PRE -DEVELOPMENT SCENARIO (SC L 0 I1'�=30') pment Impervious Areas Water Quantity) MANAGED SLOPES D.A. A Pre-Develo p ( ty) Existing Structures 5,328 sf PRESERVED SLOPES \ O / Existing Drive & Walkways 12,532 sf STREAM BUFFER EXISTING TREE LINE (TYP.) Total = 17,860 sf n1 ,, D.A.'A'Pre-Development Pervious Areas (Water Quantity) Existi ng Woods 86,500sf Existing Grass 70,334 sf I \ , D.A.'B'Pre-Develo Pre -Development Impervious Areas Water Quantity) \ 1 p p ( Q tY) Existing Structures 0 sf Existing Drive & Walkways 0 sf Total = 0 sf D.A.'B'Pre-Development Pervious Areas (Water Quantity) Existing Woods 23,830 sf —�� \� Existing Grass 21,908 sf \ OF OLF wwc-'0.223 hrs. / (Tc=0.1 hrs.) & I � � OF CF w/ 0 ELEV.=63' (Tc=VO4 hrs.) L_ CN= 6hr�. X x-6 'z — \ / / ��► \ p \\ \ vV/ EXISTING PRIES STEEP StOPEM-S-( YP.. \ / / ✓ _ ` ♦ ` / \ i l l� \ �\ �k\ \ I CN=58 I�� I l \ \ \ \ \��\ \ / / I ♦♦ /\ /\ / \\\\\ \\ `\\\ 0 I Tc—olio fhrs. o \q \ \\ LOCATION'OF iRC1�P0 ED \SWM FACILITY'S LOCATION OF PROPOS7 SW'M A�ILI1TY - `� \ � � XrST+N�,��q�0. Opts'(TXA.J' �\\ A \ PE AVE END ERMINED LESS \ — _ AN 25% D NEW TOPOGRAPHICMir \� EXHIBIT & URVEY PROVIDED BY \ ROUD BUSH, GALE Tc= 0.10 Ihrs. in. \ ND ASSO TES AS PERMITTED \ \ - — — � U ER SECTI N o. b h TYPICAL �' 100' OF OLF w/ � ELE 16' c= .10 .) \ 3 7.4O (TYPICAL) _ 42' OF CF w/ 4 ELE�V�=10 ( c<0. 1 h s� \ GRAPHIC SCALE\ \ ` \ \� �, -� - — — - �o o �s ao eo '�� APPROVED STREAM \ - BUFFER (TYP.) IN FEET ) � \ j 1 inch = 30 it. EXISTIN_G_PRE-SE4ZV� STEEP SLOPES (TYP:)-- SCOTT R. LLINS'_Z Lic. No. 035791,E p 11/5/21�4 ot:,5'IOnrer. l 0 1�1 Ln w TT1MG rrA L ti M c'7 N ® M LL N z z w W N 0 O 0 J W zw L W Uj Z J ' J W — w � z 0 _�j O ly- > z U �z Lu O W W o LU 0C z D LU z Ul U) / W ~ LU O a J w � o zU) J Q ZD 0 ® o 0 N Lu r W d � JOB NO. 152118 SCALE 1"=30' SHEET NO. 7 POST -DEVELOPMENT SCENARIO & BEST MANAGEMENT PRACTICE PRESERVATION EASEMENT APPROVED Watershed Summary for DA'A' (Per Approved Amendment #3 to WPO 201600058) Area, 1-year Flow, 2-year Flow, 10-year Flow, CN ac. cfs cfs cfs Pre -Development DA'A' 62 4.17 2.41 2.88 7.70 Post -Development DA'A' 80 4.17 0.66 1.12 7.17 D.A. 'A' Pre -Development Impervious Areas (Water Quantity) ExistingStructures 5,328 sf Existing Drive & Walkways 12,532 sf Total = 17,860 sf D.A. 'A' Post -Development Impervious Areas (Water Quantity) FRaway29,600 sf alks 19,300 sf ngs 46,650 sf 95,550 sf AMENDED Watershed Summary for DA'B' (*Per Approved Amendment #2 to WPO 201600058) NOTE: This Amendment #4 releases post -development flows below the previously approved peak post -development flows. Area, 1-year Flow, 2-year Flow, 10-year Flow, CN ac. cfs cfs cfs *APPROVED Pre -Development DA'B' 58 1.05 0.36 0.67 2.34 Q� *APPROVED Post -Development DA'B' 85 1.05 0.48 0.55 2.24 �� 3 AMENDED Post -Development DA'B' 1 73 1.05 0.32 0.36 1.95 *APPROVED D.A. 'B' Pre -Development Impervious Areas (Water Quantity) Q 3 Existing Structures 0 sf / Existing Drive & Walkways 0 sf Total = 0 sf 3 AMENDED D.A. 'B' Post -Development Impervious Areas (Water Quantity) Roadway 6,474 sf Sidewalks & Driveways 1,217 sf 14,921 sf APPROVED Impervious Areas for Water Quality (I otal unslte Impervious Areas) Phase I Roadway 29,600 sf Phase 11 Roadway 9,534 sf Phase I Sidewalks & Driveways 21,188 sf Phase 11 Sidewalks & Driveways 5,964 sf Phase I Buildings 63,700 sf Phase II Buildings 10,995 sf AMENDED Impervious Areas for Water Quality / ' // Total - 130,684 sf NOTE: This Amendment #4 proposes less impervious areas \ than the previously approved plans. Therefore the prior / nutrient credit purchase and SWM Preservation Easements / remain sufficient to meet the minimum water quality requirements. x 1 \ \ i i \L 1r05 ac. `1 \ I CN,= $� ) c 0 1/0r I fi I I / I AMENDED (UNCHANGED) Tc= 0.10 hrs,/ \\ / 50' OF OLF w/ A ELEV.=4' (Tc=0.07 hrs.) ' & 275' OF CF w/ A ELEV.=22' (Tc= 0.01 hrs.) (MIN. SCS Tc=0.10 hrs.) APPROVED STORMWATER MANAGEMENT NARRATIVE: �A THE PROPOSED PLAN PROVIDES STORMWATER TREATMENT FOR THE CONSTRUCTION OF THE DUNLORA LOTS (UNDER SEPARATE REVIEW). THIS VSMP PLAN ADHERES TO PART IIB / \\ REQUIREMENTS FOR STORMWATER MANAGEMENT. THE SUBMITTAL PACKAGE DOCUMENTS ASSOCIATED WITH THIS PLAN SHOW WATER QUALITY COMPLIANCE BEING MET THROUGH THE BEST MANAGEMENT PRACTICE OF OPEN SPACE PRESERVATION, AND A \� I NUTRIENT CREDIT PURCHASE. THIS PLAN ALSO COMPLIES WITH PART IIB REQUIREMENTS BY THE ATTENUATION OF FLOWS IN THE DETENTION BASIN. PLEASE SEETHE ATTACHED / STORMWATER MANAGEMENT CALCULATIONS PACKET FOR THE FULL DETAILS OF PLAN 1 COMPLIANCE. \ \ \\ \ 1 General Construction notes for Stormwater Management Plans i. All dams and constructed fill to be within 95% of maximum dry density and 2% of optimum moisture content. All fill material to be approved by a geotechnical engineer. A \ \ \ \ \ geotechnical engineer is to be present during construction of dams. \ \ \ \ \\ 2. Pipe and riserjoints are to be watertight within stormwater Management facilities.'\ 3. For temporary sediment traps or basins which are to be converted to permanent stormwater management facilities; conversion is not totake place until the site is \ stabilized, and permission has been obtained from the County erosion control inspector. \ - / I \ vLEA 1 �1'=�3Qf APPROVED Tc= 0.18 hrs. MANAGED SLOPES t1 • 211111104110 100' OF OLF w/ A ELEV.-3.5' (Tc-0.18 hrs.) PRESERVED SLOPESTH OFF •���1� 87' OF CF w/ A ELEV.=5' (Tc > 0.01 hrs.) l / ♦�� \� ♦♦♦ ) I 4175' OF CF @ 14 ft/s (Tc > 0.01 hrs.) STREAM BUFFER / / ♦♦♦ V ♦1�( \ 0SCOTT R. LLINSZ_ ' / ♦♦ / - - I I U Lie. No. 035791 L �3 ) ) / ♦♦ / - - I ♦♦ I I I I APPROVED LIMITS OFTREE 00� 11/5/21 1�4 \CLEARING (TYP.)- - �SSroxAL VARICK STREET, MARIN COURT, AND THE SURROUNDING LOTS ARE NOT PART OF O ��♦♦ / / \ \ \ \ \ \ �'\ \ THIS SET OF PLANS. THE PROPOSED SWM v / ��� v ��1♦ / I \ V A A V A V A V A V�'VA \ V A FACILITIES & BEST MANAGEMENT � / ` A - ♦ \ V A V V A V \ V A \\ \V�V PRACTICES ARE PROPOSED WITH THIS 3 \ - / / �� / ♦♦�� \ \ \ \ \ \ \ \ \ \\ �� \\\ \ SET OF PLANS & PROVIDE TREATMENT c FOR THE ROADWAYS AND SURROUNDING Wes.. `� �'' ♦ A V V LOTS. w co F- A♦ o LU �� w i7 ac. k V♦i V A I l lam( \ v%vvv v v v v W - \ =8o c=O.i8hr .\ \ ♦♦� \ V A�w�`�� vvv V v v .a . \ V ♦ �I I 1 A A A \ V ��\ TO\REST & OPEN SPACE / 1 \� / \ �♦ \ \ I 1 I \ \ \ \ \ �\ E�MtNl\(DB 04967, PG � O \ \ \ ♦ \ \ 1 \ \ `j 1�3f�3 ). EASEMENT IS A BEST ♦♦ ♦ �(� x V A♦ I I I 11 I \ I MAN MENT-PRACTICE & ♦1 _♦ ��� x / \ \\ I �� II I I \ \\ \ 1 1 I I I�� C IBI�S FUTURE T& o �m ♦♦< + - / / A ♦♦ A \ \. I A� )I�11 \ b LOI�MEN ♦40 %< / %-4 - - - - - - �/ A V I jl V A V A \ \ -A A I D�\S RB ANCES ♦ v _ / \1A \ \ �% \\ '��, �\ ♦:\\ �'FST°°/�-/ / il\ \ ��\ \ \ \\\ \ \ II '1 \ \\\ Pit\VET^� 7' 'P / / / / A ♦ A \ \ I. s��E�M'S FER (TYP.) 1 v vvv /�,�� ♦ v / ���/// /�-- �i♦\ \ \ \ �\�\ VA A v v L9 rn . '�. � A v v v♦♦v v v / •.e ,� / v/ / / > 1 ♦♦ A �Vv v v v v N \ 4D \ \ \ \ \♦ \ _ \ / / / / / // ♦J \ \\y \\ \ \N �� V A \ ♦A A > // 00 ' �V A V A A \ ♦�V / + _ V / / / / - - APPR V SHAPE\\ \ 111 i RIPR NED CHANNEL A I I, A �I/ \ \ \ ♦i \v \ - / ; DI TI RUNOFF IN ) w ♦j \ \ ♦1 \ \ \ / x } THS FACILI _I_- J ♦ ,._k l \ \ \ ♦� \ D. H, + r�"-'11,1%11_1=r11F1 y111 W rTL'- y ♦ IJ 11- I uh - 1 w ,1 �♦ / - v71t / w W -F L9 Fro I - / / + // SWM FACILITY EASEMENT c (DB 04967, PG 133-134) \ \ \ \ \\\ \ \ \ \ \ \ ♦♦ \ \ / / /J / J / /42�ill lii W - ' ,' 14,4Ci Mm4'4 6Eb \ \ A \ \ // iUl U) L _ � � � - _ � �'ST��`EP\�(�\�S`(T`��'� VA \ VA wA v � v � � - � �♦ - - � '1 � � / / //// I Il�u� I � W I'l NgvP)RE � VA VA�\V - - - - - ■o11son-* APPROVED SLOPES HAVE BEEN \ �\ \ \\ \ \ \\\ _% - _ - - - - - - - - - (- DETERMINED TO BE LESS THAN z % \ \ \ _ - - - - _ ♦ %' / / { J �" ♦♦ BASED ON NEW TOPOGRAPHIC EXH BIT & \ \ \\ \ > _ - - _ _ - - - _ - _ ♦♦♦ / / _ _ , ' � T_I-11 LU \ ♦ SURVEY PROVIDED BY ROUDABUSH, \ \ / IZ21 - - - ♦ / // _ \ - J ♦ -- ' GALE AND ASSOCIATES AS PERMITTED 422- \ � � _ - \ ♦ / / / ---�� - - - J -` �%�= J � ♦ UNDER SECTION 30.7.4(b)h (TYPICAL) (D ---- - -- - _--'-1- O CN _ �11%%I�J111�= ♦♦�, APPROVED STREAM \ BUFFER (TYP.) � s GRAPHIC SCALE \ - 30 15 30 60 120 - - SWM FOREST& OPEN SPACE EASEMENT (DB 04967, PG 133-134) \ ( IN FEET) COINCIDES WITH PROPERTY LINE- 1 inch = 30 ft. SWM FACILITY TO TREAT WATER QUANTITY NOT QUALITY). \ �� z w j.. j O w z w CW C) G 0 a V) Q w O 2: w 0 Q p� z W Q IY O LU LL �c G J O z� ZD 0 w W d � JOB NO. 152118 SCALE 1"=30' SHEET NO. 8 STORMWATER MANAGEMENT FACILITY 'A' DETAIL (SCALE OF 1"=30') CONTRACTOR SHALL STA V-CA PROPOSED SHA €�VJOT CIRE I RIPRAP-LINED DIT�H(. STON DEPT\ WITH FILTER FABRIC UN ERJ. ME N'f TO = I� \ �\\ �• \\\\ \ CONVEYRUNJFI W .FACIL /�107 i'� � RIPRAP +% / D a t�9VF j . SWALE / �G�opEf=7,%\ NO SCALE / \ CONTRACTOR TO FILL &STABILIZE '11 1 _ �, THE EXISTING ERODED RIPRAP LINED __41 \, CHANNELINTHIS LOCATION. CONTRACTOR TO REROUTE THE / / / / piEpROVF 81 III IE,, ASBUILT CHANNEL TO THE PROPOSED APPROVEDSANITARY SEWER I H }1 ALIGNMENT SHOWN, LENGTHENING / LOT LINE / III \ &STABILIZING THE FLOW PATH. NEW SWM FACILITY EASEMENT I 1111= \ FLOW PATH: WIDTH RATIO=12o':43' (DB 04967, PG 133-134) I (OR 11). /PROPOSED GRADING WITH THIS AMENDMENT. GRADING CREATES ANEW RIPRAP IIE LINED DITCH & EXPAN �/ 11+00.00II III I� \ BASIN's VOLUM L i' I 11 II �III II CONTRACTOR SHALL MAKE THE FOLLOWING MODIFICATIONS TO THE RISER: 1- PLUG THE 04" ESC DEWATERING ORIFICE WATERTIGHT (INV: 4o6.B3) 2 DRILL ONE(2) NEW 03.5" LOW -FLOW SWM ORIFICE(INV-4o2.00) 3. DRILL FOUR (4) NEW 012" MID -FLOW SWM ORIFICES (INV: 408.25) 4 INSTALL A WEIR PLATE OVER THE TOP HALF OF THE BARREL'S OPENING INSTALL TRASHRACKS ON THE LOW - I AND � MID-FLOWORIFICES. SEE DETAIL ON SHEET,THIS SHEET, OR EQUIVALENT. A I �•_ - --�.� ASBUILT GRADING, GENE ALL`Y�ILL- =III �IE=I \ � CONSISTENTWITH-THE, - - --III= - 1 I=1 -�. APPROVED PLAN. TYP. � -_ � III Ill- 7-11L- vv v � v � �- • � *a # \ � ASBUILT34�MtDEGR,�SS LINED -'- EMERGENCY SL�WAYCREST ELEVATION=410.T.(8'T P.,OFDA(VI \ \ i \ -_� / _ _ 1 +67.99 ELEV.=412.00')A ASBUILT 048�L. III RCP SANDPIP w/ TRASHRACKS SHALL SE EAR THE RISER STRUCTURE. ASBUILT RISER STRUCTURE RIM=409.70'. ASBUILT015'"RCP BARREL (71.g LF, S=1.4o INV. IN=4o0.90', INV. (71.9 L , S-1 APPROVED VDOT EC-1 CLASS Al OUTTET P ECT10� w/GEOTEXTILE FILTER FABRIC UNDERLAY T. •�. - ; ASBUILT DIMENSIONS: L=16.5', W1=7.4%W2=18. ' \ \ \1. BASIN NOTES: 1. STATEAPPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. 2. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. 3. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TOALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED W ITH THE BIORETENTION BASIN EXCAVATION. 4. CONTRACTOR SHALL REMOVE SEDIMENT LADEN SOIL& GRADE THE BASIN TO THE CONTOURS SHOWN ON THIS SHEETATTHETIME OFTHE TEMPORARY ESC BASIN's CONVERSION TO A PERMANENT SWM FACILITY. CONTRACTOR SHALL ENSURE THE PERMANENT SWM FACILITY HAS A STABILIZED GROUNDCOVER, SUCH AS GRASS OR OTHER FORMS OF VEGETATION, AND THE FACILITY FLOOR MAINTAINS POSITIVE SLOPE TO THE RISER STRUCTURE's LOW -FLOW ORIFICE. 435 435 CONTRACTOR SHALL MAKE THE FOLLOWING MODIFICATIONS TO THE RISER: 1. PLUG THE 04" ESC DEWATERING ORIFICE WATERTIGHT (INV.=4o6.83AB) 2. DRILL ONE (2) NEW 03.5" LOW -FLOW SWM ORIFICE (INV: 402.00) 3. DRILL FOUR (4) NEW 012" MID -FLOW SWM ORIFICES (INV.=4o8.25) 4. INSTALL A WEIR PLATE OVER THE TOP HALF OFTHE BARREL'S OPENING 5. INSTALL TRASHRACKS ON THE LOW -AND MID -FLOW ORIFICES. SEE DETAIL 430 ON THIS SHEET, OR EQUIVALENT. 430 APPRO ED ORIGIN LEXISTI GGRAD LOTGR DING � (PRE-CC\�_J ION) 425 425 420 \ 420 ASBUILT STIR. 2A TOP OF ALL=42 .24 PPROV D0 8 " 4 L. III RCP 10=421.6 (15''HD E) STANOPI Ew/TR SHRACK SHALL $ERVEA THE RIS RSTRUC URE. ASBUILT 048" RIS R RIM D - L J2' Q z= $. 7 CF ELEV.=4 9.70�. 415 V=4.8FP 415 RIP 3 AP Qro 11.13 Cl \ ASB )I LT 34' IDE GRA SLINED o D,0 91 FT EME RGENCY PI LLWA CREST ELEVAI ION=410. ' ASBUILT GRAD NG WITH - " (8'T POFDA ELEV.=412.00') PR POSED RADE CON RACTOR SHALL INSTALL A 410 M DIFICAT ONS PRO SEDV- HAPEDV OTCL.I 410 RIPR P-LINED ITCH 2.'STONE r DE TH) WITII FILTER I ABRIC X UN ERLAYM NT TOCONVEY Q RUN FF TOT ESWM ACILITY ?�� APPROVETEMPO ARY ESC ^' SIN TO BE CONVERI ED INTO PERM AN NT SWM ACILITY 405 PROVIDI G STOR ATER \ 405 UAW ITY TREAT ENT APPROVE D FLOOR GRADE E EV.=4o2 00'. CON RACTOR ENSURE POSITIVE SLOPE 0THE RISER ATA LTIMES. TD 400 400 CONNECTION SH LL BE FIRMLY EMBEDDED E " INTO A RE INFORCE 18"THICK CONC ETE FOLI DATION THAT Sk x ND IS BURIED BEL OW THE LIMITS OR THE BAS N GRADII 1G. SBUILT 15"RCP ARREL IINV.OU 395 1 =400.90', =3 9 90') 395 APPROVED IDOT EC-1 CLASS Al OUTLET PR TECTION w/ GE TEXTILE ILTER FAB IC UNDER YMENT. 392 ASBUILT DIM ENSIO S: L=16.5, W1=7.4', W2=18.9' 392 1d!3 N v 0Ot 0 0L0 O Nd CO mrtl .O ~ . d � It S �OLW7 10+So PROFILE SCALES 111=5, M 1"=5o'(H) 11+00 11+50 12+00 12+50 BASIN IAI 13+00 13+50 13+75 DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONALAND IS NOT REQUIRED. 2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 2:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT ALL TI MES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THETOE OFTHE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. A VEGETATED BUFFER SHALL BE PROVIDED THAT EXTENDS AT LEAST 25 FEETOUTWARD FROM THE BASIN TOP OF DAM ELEVATION. PERMANENT STRUCTURES (E.G., BUILDINGS, SHEDS, etc.) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AREA. EXISTING TREES SHALL BE PRESERVED IN THE BUFFER AREA DURING CONSTRUCTION IF AT ALL POSSIBLE. S. THE SOILS IN THE STORMWATER BUFFER AREAARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREATTHAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 6. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED ASA MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. S. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOT STOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. THE DETENTION BASIN MAY SERVE AS A SEDIMENT BASIN AND/OR TRAP DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENTTRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. 3. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 5. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 6. THE CONTRACTOR SHALL THEN CONSTRUCTTHE IMPERVIOUS CLAY CORE EMBANKMENT AND ANY INTERNAL BERMS IN 8TO 12-INCH UFTS AND COMPACT THE LIFTS WITH APPROPRIATE EQUIPMENT. 7. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 9. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION. 10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 11. THE CONTRACTOR SHALLTHEN INSTALLTHE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBSPLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES AS APPLICABLE. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECKTO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNALAND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASINS) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. EXTENDED DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) S. INSTALLATION OFTHE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING) 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) s 1 /2!" sine plated hook attached with 3/8- feelero. 1 /11" din. holes 1/4' HOPE p:n Lc (opltonal) OOOO �cction 5/8- did hole o _ o. o // (D single aririce DFRRIS CAGE STEEL WEIR PLATE TO BE FASTENED OVER THE IS" OUTLET OPENING, COVERING THE TOP HALF OF THE OUTLET OPENING. SEAL OPENINGS AROUND THE PLATE WITH MORTAR TO CREATE A WATER -TIGHT PLATE OVER THE OPENING. INSTALL STEPS IN EX. RISER STRUCTURE IF THE STEPS HAVE NOT PREVIOUSLY BEEN INSTALLED. 48" RISER ElCViltiorl OUTLET PIPE 15" RCP WEIR PLATE DETAIL N.T.S. E HOPF. structural plastic with 2-1/8" holes and 1/4" plate aenu:nclurcd by P1os-ac 9oluti6na Inc. or equal on*" ■'itb optional plate HDPF. structural plastic with 2-1/8" holes and 114' plate manufactured by Plastic Solutions Inc- or equal PLASTIC P.O. Box a386 SOLUTIONS Wiriihesur l'i 22604 IVC. 877-877-5727 vra.pladir-wlwnrnii. SECTION A-9: TYPICAL GRAPEIIC L DETAII.5 Homogeneous fill min T Qlt Off trench-metwilal JlIII! I Soil or rock L-----------J TYPICAL HOMOGENEOUS EMBANKMENT Perforated a FOUNDATION DRAIN 510IS drain Send, grael or KI /d10in DWiGt 7�JS/� - pock be -fransition filter CHIMNEY DRAIN fill or gravel BLANKET DRAIN Rad( or gravel Grain D Src� D Tron;aitlon filter TOE DRAIN Figure A -la. Homogeneous Embankments w/Seepage Controls Storrnll ROUND SERIES TRASH RACK CONCRETE MANHOLE STANDARD 601 NCH RACK SHOWN DIMENSIONS IN INCHES PLAN SIDE VIEW StorIRRaILTM Round Series for Concrete Manhole LaR Ne. MA 1 Mill me min NInOD RSlI fijl 1/36 28 � M 3D 0.536 213'i U 4D,S 36 43 u4T 2/ le S4. m S7 RSQ 211f 1a Y3 66i! I SD 1 A Plastc solutions, Inc. astowil, W b.43ifi. wurlaaln. VA 1 138M.fAee b. Wlnaraar, VA 22613 V771911-5Tl7ph. Pm1ECT: JM 71L2219 fin htnWA ww.ple a. Wo .axn u... ww MWI). a¢ 9wwTFR s:CIn" - sruarw�lroArcwss ISOMETRIC CONCRETE STRUCTURE DInlMIONS INSIDE STRUCTURE DIMENSpN OUTSIDE STRUCTURE DIMENSION AVAILABLE oFn0N1I CROSS BRACING FOR OVERHANG MOPE ANTI -VORTEX RATE are DRM1Nr. wu BT DETAIL Lic. No. 035791,'D > 11/5/21 40j .. N Ln CD .ti O ¢ LL U) co FF-- w Z 0 0 G o V/ W `7 0. V>W1 ■ ■ I DC 0 ti M M Z N M I N WN N W > LLI ZJ J ® C0 LU LF_ O Z C) WI LU Ul U) W ZLU l t_ VJ JLU rJ V 0 O N U W LEI w O W d Lr) JOB NO. 152118 SCALE AS SHOWN SHE°T NO. 9 COUNTY OF ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures- Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biofrlter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofrlter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. STORMWATER MANAGEMENT FACILITY 'B' DETAIL (SCALE OF 1"=10') GENERAL SWM NOTES: i. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE SHEET 9 FOR DETAILS OF THE ORIFICE's TRASHRACK AND THE RISER's TRASHRACK, OR EQUIVALENT. 2. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH 3.24 SPECIFICATIONS. 3. CONTRACTOR SHALL HIRE A THIRD PARTY GEOTECHNICAL ENGINEER TO ENSURE THE EMBANKMENTS ARE STRUCTURALLY SOUND. ALL EXISTING AND PROPOSED FILL MATERIAL AND PROPOSED CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS, AND PRESENT DURING THE CORE SAMPLING. SEE SHEET 9 & THIS SHEET FOR ADDITIONAL NOTES & DETAILS. 4. THE DOWNSTREAM EMBANKMENT SIDE SLOPES OFALL PERMANENT FACILITIES SHALL HAVE A MAXIMUM 3:2 SLOPE. 5. CONTRACTOR SHALL EXCAVATE SEDIMENT LADEN MATERIAL IN THE ESC SEDIMENT TRAPS& BASINS AT THE TIME OF THE FACILITIES' CONVERSIONS TO PERMANENT SWM FACILITIES, IF APPLICABLE. AT SUCH TIME THE CONTRACTOR SHALL REGRADE THE SEDIMENT BASINS/TRAPS TO THE PROPOSED GRADES SHOWN ON THE SWM SHEETS. THE CONTRACTOR SHALL MINIMIZE SOIL COMPACTION DURING THE CONVERSIONS. ALL SLOPES GREATER THAN 3:1 SHALL BE PLANTED WITH NON -EROSIVE LONG GRASSES OR OTHER TYPES OF NON -EROSIVE PLANTINGS. EMBANKMENT NOTES: THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN. FILL MATERIAL SHALL BE FREE OF WOOD, ROOTS, STUMPS, RUBBISH, STONES GREATER THAN 6" AND ANY OTHER NON COMPACTING SOIL. FILL MATERIAL FOR THE CENTER OF THE EMBANKMENT AND THE CUTOFF TRENCH SHALL CONFORM TO UNIFIED SOIL CLASSIFICATION CL, SC OR GC. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95%OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BYAN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. EMBANKMENT TO INCLUDE A FOUNDATION DRAIN, BLANKET DRAIN AND A DOWNSTREAM TOE DRAIN IN ACCORDANCE WITH VA DEQ DESIGN SPECIFICATION APPENDIX A, FIGURE A-Ia. SEE SHEET FOR DETAIL. ANTI -SEEPAGE COLLAR NOTES: BARRELS PASSING THROUGH THE EMBANKMENTS SHALL INCLUDE PERMANENT ANTI -SEEP COLLARS IN ACCORDANCE WITH VA DEQ DESIGN SPECIFICATION APPENDIX B, FIGURE B-2. SEE THIS SHEET FOR DETAIL. CONCRETE COLLARS SHALL MEETTHE FOLLOWING REQUIREMENTS, TYPICAL: A. A MINIMUM OF TWO (2) COLLARS ARE REQUIRED. SWM FACILITY B's BARREL REQUIRES TWO (2) COLLARS. B. THERE SHALL BE A MINIMUM OF 10' OF SEPARATION, AND A MAXIMUM OF 28' OF SEPARATION, BETWEEN THE TWO COLLARS PROPOSED ALONG SWM FACILITY B's BARREL. C. ANTI -SEEP COLLARS& THEIR CONNECTIONSTO THE BARREL SHALL BE WATERTIGHT& BE IN ACCORDANCE WITH VA DEC, DESIGN SPECIFICATION APPENDIX B, FIGURE B-2. SEE THE DETAIL ON THIS SHEET. D. COLLAR DIMENSIONS SHALL EXTEND A MINIMUM OF 2'IN ALL DIRECTIONS AROUNDTHE PIPE. SWIM FACILITY B's COLLARS SHALL BE A MINIMUM OF 5'x5'. E. COLLARS SHALL BE PLACED A MINIMUM OF 2' FROM PIPE JOINTS UNLESS FLANGED JOINTS ARE USED. PROPOSED FLAT VDOT CLASS Al RIPRAP 11, LINED OUTLET PROTECTION WITH FILTER FABRIC UNDERLAYMENT TO EXTEND TO THE \� CHANNEL'S BANK. RIPRAP TOP ELEV=424 (L=5', WI=2', W2=5', D=1.5' / \ / TO PREVENT FLOTATION THE RISER BASE SHALL BE FIRMLY / / EMBEDDED 6" INTO AN 18" THICK REINFORCED CONCRETE FOUNDATION THAT IS 4'x4, AND BURIED BELOW GROUND. / PROPOSED 024" HDPE STANDPIPE WITH A RIM ELEVATION OF 437.50' SHALL SERVE AS THE RISER STRUCTURE. RISER SHALL BE SET IN A REINFORCED CONCRETE FOUNDATION & HAVE \ A 03" LOW -FLOW ORIFICE WITH AN INVERT ELEV. AT THE LOW POINT OF THE BASIN p (434.00'). RISER TO INCLUDE STATE APPROVED / -A 2' TRASHRACKS ON ALL ORIFICE OPENINGS. SEE VSMP AMENDMENT #3's APPROVED SHEET 9 o b\Y FOR TRASHRACK DETAILS, OR EQUIVALENT. ^ or Lrol r W \ \ � PROPOSED/ O \ \ ALVE AS LEYWAY E A. THE DRY C A IN 0 3 53 APPROVED SLOPES HAVE BEEN iDETERMINED TO BE LESS THAN 25% BASED ON TOPOGRAPHIC EXHIBIT & > SURVEY PROVIDED BY ROUDABUSH, GALE AND ASSOCIATES AS PERMITTED IUNDER SECTION 30.7.4(b)h (TYPICAL) Voo \ SEE THIS SHEET FOR SCALED IPROFILES OF THE DRY BASIN, TYP. \ \ PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (o.5% MIN.) WITH POSITIVE SLOPES THROUGHOUT. CONTRACTOR SHALL CALL THE COUNTY INSPECTOR & ENGINEERING DEPARTMENT \ \ \ DSO 24-HOURS BEFORE ANY ANTICIPATED CONSTRUCTION ACTIVITIES FOR THE DRY BASIN. \ j o r o \ 2:1 Al \ vI � EXISTING MANAGED STEEP SLOPES, TYP, IN 1+00 y 1 25 \ \\ EXISTING PRESERVED PROPOSED 56.25 LF OF STEEP SLOPES, TYP. 06" HpPE @ 1420% ([IL432.00', Ic PROPOSED 15' WIDE VDOT CL. Al RIPRAP LINED EMERGENCY SPILLWAY w/ 4:1 SIDE \ SLOPES & FILTER FABRIC UNDERLAYMENT. \ SPILLWAY CREST ELEV.=438.50'. 5' WIDE TOP OF DAM ELEV.=446; oo' SWM FOREST & OPEN SPACE EASEMENT (DB 04967, PG 133-134)• EASEMENT IS A BEST MANAGEMENT \ PRACTICE & PROHIBITS FUTURE \ DEVELOPMENT& DISTURBANCES - - PROPOSED VARIABLE WIDTH SWM \ ACCESS & MAINTENANCE ESMT. \1 RAPHIC �C.ALE\� \\\ \\ ( IN F'III: I ) 1 inch- _- Pp fit. \ VA DEQ STORMWATER DESIGN SPECIFICATION INTRODUCTION: APPENDIX B: PRINCIPAL SPILLWAY Concrete shall be 3000 psi concrete g I NOTES: 3• min 1. 1. k9n. clearance between rebor and outside face of color shall be 3'. 2. Dimensions and bar 45 are design specific. 3. Campoct over -excavation to 95% density per ASfM D-698 - 4, Collars should be placed a minimum of 2' from pipe joints unless flanged pipe a I = joints are used, 12 Use side wall ands B bottom of trench as form No Scok Rebar each wary, front and bock, per plan NOTES: Collar to be some 1. All materials to be in accordance with Instal collar with gage as the pipe construction and construction manual carrugutions vertical with which R i3 uacd spesiflcotiom. 2. Unassembled collars sfiall be marked by painting or tagging to identify. Continuou;Band ld 3. The lap between the two half wetions and between the pipe and connecting band 1/2'x2' slotted shall be caulked with asphalt mostic wholes for 3/8'0 at time of instollation. bolts (typ) 4. Each collar shall be furnished with two } 1/2' Ifcc rods with standard tank lugs for y" ineudi,r �� r► B �2^ connecting collars to pipe. 1 r IT1 I 1 V Band I: F I i �ontanuous weld Weld bath sides Slotted holes Corru aced metal sheet ► B at $" C C welded to center of bunt ELEVATON OF UNASSEM(1M COLLAR 450 450 PROPOSED 024" HOPE STANDPIPE WITH A RIM ELEVATION OF 437.50' SHALL SERVE AS THE RISER STRUCTURE. RISER SHALL BE SET IN A REINFORCED CONCRETE FOUNDATION & HAVE A 03" LOW -FLOW ORIFICE WITH AN INVERT ELEV. AT THE LOW POINT OF XISTIN THE BASIN (434.00'). RISER TO INCLUDE STATE APPROVED TRASHRACKS ON ALL ORIFICE OPENINGS. SEE VSMP AMENDMENT GRADE 445 #3's APPROVED SHEET 9 FOR TRASHRACK DETAILS, OR EQUIVALENT. PROPOSED RETAINING WALL , TOP OF WALL=446\ BOTTOM GRADE AT WALL=440' r5' IDETOOFDAM P BOTTOM OF WALL FOUNDATION=438' ELEV.=, 100-yr PEAK WSE=438.73 440 1 440 10-yr PEAK WSE=438.35 CONTRACTOR SHALL INSTALL EMBANKMENT 2-yr PEAK WSE=437.44 IN ACCORDANCE w/ THE NOTES AND 1-yr PEAK WSE=436.72 I DETAILS SHOWN ON THE APPROVED SHEET 9. N � 435 \\ 435 445 GRADE PROPOSED BASIN's FLOOR SHALL BE SLOPED TO DRAIN TO THE RISER (0.5H MIN.) WITH POSITIVE SLOPES THROUGHOUT. TO PREVENT FLOTATION THE RISER BASE SHALL BE FIRMLY EMBEDDED 6" INTO AN 18" THICK REINFORCED CONCRETE FOUNDATION THAT IS 4'x4, AND BURIED BELOW GROUND. PROPOSED 5( 425 06" HDPE @ (II=442.00', n 430 'HREATIC LINE (ASSUMES A ;TARTING POINT AT THE PEAK 0-YEAR WSE W TH A 4H: 1 V SU HROUGH THE EMBAN,CMENT) iEFINES THE SATURATION ZONE, PRC GF APPROXIMATE LOCATIONS OF LF O LFI (+25 PROPOSED CONCRETE COLLAR FINAL LOCATIONS TO BE t4.00) DETERMINED BY THE CONTRAC 5 AI RIPRAP L NED WHICH IS PARTIALLY DEPENDE :TH F LTER FA RIC UPON THE LOCATION OF THE '0 BaEND TO THE JOINTS. SEE THIS SHEET's \PTOP ELEV= 24'. 'ANIT-SEEPAGE COLLAR NOTE' 420 (L=5', 1=2', 2=5', D=1.5') 420 AND ITS FIGURE B-2. cow n N °o 0 o J J W W 4 Ol S 1 R1 M N W l�L d 1 4 r 0+50 1+00 1+25 BASIN B SECTION PROFILE HORIZONTAL GRAPHIC SCALE 5 25 K too ( IN FEET ) 1 inch = 5C ft. B-2. Concrete Anti -Seep Collar 445 5' WIDE TOI I OF DAY )PE ELEV: 40.00' 440 7 440 d POSED LADE 1' 435 435 TOR, JT 'IPE 430 430 oOqOa 0 LOUUJJOI�i 3 O a. EXISTING GRADE -PROPOSED 15' WIDE VDOTCL. AI RIPRAP LINED EMERGENCY SPILLWAY w/ 4:1 SIDE SLOPES & FILTER FABRIC UNDERLAYMENT. SPILLWAY CREST ELEV.=438.50'. 0+50 BASIN B SPILLWAY PROFILE VERTICAL GRAPHIC SCALE 2C0 5 0 2.5 5 10 ( IN FEET ) 1 inch = 5 ft. zo N LO 0 .a w N Ln WN N W > W ZJJ CO W 0 0 O z� W' W Ul U) ZLUW Of rrrrrr� C0 J~ LU J< 0 O CD N z 0 z o W o;6 Q W O LU � z / 2: LU O z �_J LL W W � a O �I i cl. O i O z ZD 0 Lmi � w a JOB NO. 152118 S: ALE AS SHOWN SHEET NO. 10 O ~ I � o MATCHLINE - SEE T SHE T/ 1 STEEP SLOPE NOTES: 1. FOR CONSTRUCTED SLOPES, THE MAXIMUM STEEPNESS IS 2:1 (HORIZONTAL: VERTICAL). 2. FOR GRASS STABILIZATION ON CONSTRUCTED SLOPES, THE MAXIMUM STEEPNESS IS 3:1. SLOPES STEEPER THAN 3:1 MUST BE PERMANENTLY STABILIZED WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. ACSA NOTES: 1. NOTE: ALL WATER METERS SHALL BE ACSA APPROVED TRAFFIC -RATED METER BOXES. 2. ANY UNUSED SEWER LATERALS FROM PHASE I WILL NEED TO BE ABANDONED. ■ ■ ■ ■ ■ ■ -� w PROPOSED WATER 5 242 S F \ MA CHLINE - SE T IS T/. /� W LATERAL (LOTS 30&31) O PROPOSED WATER > \ LATERAL LOT 29 / \ / 4 2' C F A \ / SCOTT R. LINS Z J \ o / 8 Lic. No. 035791.'n \ 4 326 SF \ NEW SANITARY \��: SEWER LATERAL / // , L 0 T 6 42 S F A �/ \\\ 4,839 SF X oho 3 /� I l !�•4586�8FFGOj-2g � � �Qr� ��� °.°. \\ • a'.' \ o .: � / � , EXISTING SANITARY / (P) 10' PRIVATE AA � LATERAL TO BE / DRAINAGE ESM'T,: i DnlraPk-2-7 + > J EXTENDED° , i / \ / n.. a N RAISE RIM FROM S / / / / uO \ X ` Ln x V ELEV. 453. CD/ \ o / ° ��� \ / : /q: \ / e YDC YDB, - // CoF SFA 8 SF PROPOSED GRADING ` / k PROPOSED 20' STORM 0' P\ / SEWER EASEMENT I RIV TE SANI RY � � j $ ; v , SE R LATER / W RIM / PROPOSED SANITARY LATERAL \\ c / \ w ACC E EASEM T - / / \ WITH SADDLE CONNECTION - \ \ I O ` \ \ / ' / / 4 2 S/F A / �� \a I. W 55.45 \ T 2 7 \ \ s4.0 104 - _ -*2, + 14 4, 9 2,Ti SF N O 1 20 �,' X / ( i ` EXISTING SANITARY _ _ - -\4\6 <S F\ CUT \ / L 0 T 1 3 3 / °' CURB / // LATERAL g / EXTENDED \ \ \ x / a / _ a , 42 SFAS O EXISTING D.I. \ M 17 RAISE RIM FROM ELEV.v46.52v v`a. v 45 3 �F TO ELEV. 4, PROPOSED VDOTSTD. TYPE I aIP�AP A v LINED-HANNEL w GEOTEXTILE FILTE v 42 FABRIC -----RLAYME�1T. CHANNEL \ \ \ 4, S F \ k V / / Q \ A y v v v A EXTE4bTO STING RIPRAP CH EL, v % �� - �, - .�-/ �, A ' J. EXISTING 20 _ \ \ \ \\ \ \ \ \ aL=6" 4.70 PS DRAINAGE EASEMENT / \\ \ \ CFS /RIP V 0,0 12 FT ,SST ' s OP 30%) v v v v k v v v /L v v v 4 I F S/ EXISTfNG DITCH OUTFALL- / \ I \ \ TO. STREAM WATERLINE 3 / \N_ I �y. PROPOSED WATER A AV A _ A A A v v v v v v v .° P') EXIST IN WALL v v / �' 00 NEW SANITARY SEWER LATERAL A V /\ \ \� v \ \� \ `V - v . v v v v� - ° I \ N PRESERVED STEEP SLOPES v v v v v / + w CD �„U --v 2 C3i / / �k � LL�CV EASEMENT I'� �� \' �t I I � � � � A �`•v V A `v � vvv / /� � W N SEWER 64 _j J \ FA L Q CO � i n _j O\�� v v y:`v \ ��- v MH ��`� /I i NOTE: 3 / ox i \ \ \ j - WITH THE CONSTRUCTION OF THE - O HOMES, THE CONTRACTOR SHALL TIE THE / �� \/ \ \ \ i \ \ \ / \ \ . ` \ \ \ \ \` •,\ \ \ / J �i / ° ✓ I \ \ \ \.. \ \ \ \ .\ \\`\ .\ \ \ MANAGED STEEP SLOPES ----LOT- 21 Ing ROOF & FOUNDATION DRAINS FOR LOTS O V A C e v �. y v - / v PROPOSED SEGMENTED RETAINING WALL \ _ / Q C 32, 33 & 34 INTO THE YARD DRAIN SYSTEM / a�� / \ X \ \ \ - \ \ \ HEIGHT=6' FROM GROUND TO TOP OF WALL \ \ \ / YD G- CO D ALONG LINDLEY PLACE. / y � \ j \� i I I i � � \ � %' , �. \ / _4Q -SFD - _ / �� VAR. WIDTH PRIVATE \ \ \ _ TW=446, BG=440 �, \: _ \ / . - - _ _ / 7 218 S - / U UTILITY EASEMENT \ \ BOTTOM WALL 438 TEMPORARY GRADING EASEMENT FOR \ I \ \ \' \ \ \ `\\ \ \\ \ \ \ \ \ \ LU J Q LU PUBLIC USE UPON DEMAND OF THE COUNTY \ � \\\� �EW SANITARY\ \ _ CII WER LATERAL \ : \LU � \ � \ � � � \ \ / -- \VAR. WIDTH SWM L�� �Q U) ' \Ul A. \ \ \ \ .1 \ FACILITY EASEMENT \ \ \ \ \ \ \ \ 6877 SF LLJ PROPOSED DRY GRASS RETENTION SWIM 1 - < \ -FACILITY. SEE WPO AMENDMENT PLAN FOR '\ \ \ \ \ : \\ --- � 0L SWIM FACILITY DESIGN AND DETAILS. v vv A v -- DRAINAGE DESCRIPTIONS STIR. NO. PIPE INFORMATION INLET INFORMATION COMMENTS DIA. in. LENGTH ft. SLOPE % INVERT IN INVERT OUT MATERIAL INLETIYPE Curb Type SLOT LENGTH RIM ELEVATION YD C 12" YARD DRAIN - 458.00 C-B 6 17.45 0.57% 454.72 454.62 HOPE YD B 12" YARD DRAIN - 457.80 B-A 6 20.40 0.59% 454.62 454.50 HOPE YDA I 1 1 12" YARD DRAIN - - 457.80 A-102 6 33.02 0.76% 454.50 454.25 HOPE 104 DI-313 - 10 458.71 VDOTSTD. IS-1 REQ'D 103 15 90.43 0.91% 453.75 452.93 HOPE 102 MH-1 - - 460.91 VDOTSTD. IS-1 REQ'D 101 15 79.67 1.92% 452.83 451.30 HOPE YD G 12" YARD DRAIN - - 456.25 YD G-YD F 6 111.14 0.67% 450.25 449.50 HOPE YD F 12" YARD DRAIN - - 450.50 YD F-YD E 6 47.74 0.67% 449.50 449.18 HOPE YD E 12" YARD DRAIN - - 453.50 YD E-YD D 1 6 1 47.32 111.74%1 449.18 443.50 HOPE COD I I I 1 1 12" CLEANOUT - - 445.75 CO D-OUT 1 6 1 11.63 14.30% 1 443.50 443.00 HOPE THESE SLOPES HAVE BEEN DETERMINED LESS THAN 25 /o \ \ \ \ \ \ \ \ TOPOGRAPHIC SURVEY AND SLOPES EXHIBIT PROVIDED BY\ \ \ \ \ \ - �_ _ ZD Q Q ROUDABUSH, GALE, AND ASSOCIATES DATED MAY 18, 2017, AS PERMITTED UNDER SECTION 30.7.4(b)(h) \ `\ `\ \ \\ \ ` \ - - - CD CD \ N \.V A PROPOSED VDOT STD. TYPE I RIPRAP LINED CHANNEL w/ GEOTEXTILE FILTER - \ \ \ w FABRIC UNDERLAYMENT. CHANNEL TO EXTEND TO DRY GRASS RETENTION AREA, \ \ \ \ \ MH�cJ U w L=75 Q - 0.28 CFS \ \ - o w oL_5" V � 5.50 FPS \ \ \ \ ` \ \ Ln Q ,0 0.35 CFS \ JOB No. RIPRAP D ,0 0.22FT GRAPHIC SCALE �`y ` _ -v 152118 (SLOPEa30%) 20 0 10 20 40 80 \ \ \ , / \ ` \ \ � -- SCALE \ V v A IN FEET) \ 1 inch = 20 ft. v _ - - SHEET NO. \ \ \ 11