HomeMy WebLinkAboutWPO202100064 Plan - VSMP 2021-11-10 (10)TABLE 3.39-A
ADHESIVES USED FOR DUST CONTROL
Water
Application
Dilution
Type of
Rate
Adhesive
(Adhesive: Water)
Nossle
Gallons/Acre
Anionic
Asphalt Emulsion
7:1
Coarse Spray
1,200
Latex Emulsion
12.5:1
Fine Spray
235
Resin in Water
4:1
Fine Spray
300
Acrylic Emulsion
7:1
Coarse Spray
450
(Non -Traffic)
Acrylic Emulsion
3.5:1
Coarse Spray
350
(Traffic)
IVY ROAD
US ROUTE 250
80.00 R.O.W.
\
LIMITS OF DISTURBANCE \
+% +� ° -
\ �x
SF x 0 ---- -` ----
MU
O O
-.
TP \ TO I �/ �� CI II,I
/ PS I ;'I
Source: Va. DSWC j� _ a i/ / ;/ \ TS II i TP
/ \
„ 525
/ DQ ODOR \ / -523- — _
O / r _ ` \ \ \ 524 , �/ SF X\
TIC: I
O ._ 5.
q '
EXISTING 1 STORY '
HOUSE J
c 1303 SF '
/ / n FFE 527.91 T1 r
INN,525.65' .50' $
\ \ PO
525\ \ N TO
1 ca \
6 525.50' IN,_ \ '
I
MU \ DC( 1
I
I TO
PS I
525.85' EXISTING STORY FFE 526.9 I ' _-
HISTORIC TAVERN I O
525.95' 1612 SF IP ,
�
�\\
526.94' (TOP WALK)
MU '. + PROPOSED 285 'q
� �\ / O 526.2T (HIGH POINT) 526.94' (TOP WALK) 1 STORY / EXISTING 1 _ 2.
ADDITION STORY BLDG
K LIMITS OF DISTURBANCE / — PS 230 SF
523
7
, PROPOSED L'1P
2ST526.35'
ADDITION 526.35'
_ \ 979 SF i
526„ _ OTHER
AND LANDSCAPING- --, _ ___
MU 57'
CRITICAL STEEP SLOPES +�� 525.560 525.40'` 525 %\�I
526.35' 825.68'\.
JrQ.\ 5259C' 526
i0 O525.
�� // LIMITS OF DISTURBANCE +
2 ' �---------------O � O / / > `-� `` 525.83' (y\B/ - ,' \\ `_
—_ O`._
/
� II \
------ - -- / O O \ CRITICAL STEEP SLOPES ` a \ \
1 _� 1,,'7Z _77'
00 X /\
ice'_— ` �```• \`�O\``` \ `\ ii;' \ `\ ', `\ a \'` `,
a
O,
LIMITS OF DISTURBANCE \ \
1 �\
> \\
\\
T
n \
525. 00
- SYNTHETIC CONSTRUCTION ENTRANCE -
TRACKOUT CONTROL MATS BY FODS,
OR EQUIVALENT - SEE DETAIL 04l C-06 A
/ \ IN,
LIMITS OF DISTRUBANCE
TOTAL DISTURBED AREA
= 24,833.35 SQ FT = 0.57 AC.
GRAPHIC SCALE
20 0 10 20 40 so
i
( IN FEET )
i I inch = 20 ft.
GRADING/E&SC PLAN
SGALE: 1"=20'
LEGEND
N0. TITLE KEY SYMBOL
3.02 TEMPORARY SYNTHETIC
CONSTRUCTION ENTRANCE
3,Q5 SILT FENCE
3.U7 STORM DRAIN
INLET PROTECTION
3 08 CULVERT
INLET PROTECTION
3.30 TOPSOIL STOCKPILE TSSP TSSP
3.30 TOPSOILING
3.31 TEMPORARY SEEDING
3.32 PERMANENT SEEDING
3.35 MULCHING
GENERAL EROSION AND SEDIMENT CONTROL NOTES
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT
CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30).
ES-2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION
CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK
PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO
THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITY
SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE
LAND -DISTURBING ACTIVITY, THE PLAN'S APPROVAL WILL BE REVOKED.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS SOON AS THE
FIRST STEP IN CLEARING.
ES-4: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE
PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL
SUBMIT SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE
PLAN APPROVING AUTHORITY.
ES-5: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL
MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN
APPROVING AUTHORITY.
ES-6: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES
DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS
ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN -APPROVING AUTHORITY, THE CONTROLS SHALL BE
REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF
TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
SEDIMENTATION.
ES-7: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
ES-8: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND
IMMEDIATELY AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO
MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
ES-9: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE.
ES-10: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON
SUSPENSION OF GRADING OPERATIONS FOR AN ANTICIPATED DURATION OF GREATER THAN 30 DAYS OR
UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA.
ES-11: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST
FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM
ANIMAL OR PLANT LIFE.
ES-12: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED
CHESAPEAKE BAY PRESERVATION AREA (CBPA) OR 10,000 SQUARE FEET OR GREATER OUTSIDE THE CBPA. FOR
MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING WEB PAGE
AT: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx
TABLE 3.35-A
ORGANIC MULCH MATERIALS AND APPLICATION RATES
RATES
Mulches
Per Acre
Per 1000 sq. ft.
Notes
Free from weeds and
Straw or Hay
1 1 - 2 tons (Minimum 2 tons
70 - 90 lbs.
coarse matter. Must be
for winter cover)
anchored. Spread with
mulch blower or by hand.
Do not use as mulch for
Fiber Mulch
Minimum 1500 lbs.
35lbs.
winter cover or during hot,
dry periods. Apply as
slurry.
Cut or shredded in 4-6"
lengths. Air-dried. Do not
Corn Stalks
4 - 6 tons
185 - 275 lbs.
use in fine turf areas. Apply
with mulch blower or by
hand.
Free of coarse matter.
Air-dried. Treat with 12 Ibs
Wood Chips
4 - 6 tons
185 - 275 Ibs.
nitrogen per ton. Do not use
in fine turf areas. Apply with
mulch blower, chip handler,
or by hand.
Free of coarse matter.
Bark Chips or
Air-dried. Do not use in fine
Shredded Bark
50 - 70 cu. yds.
1 - 2 cu. yds.
turf areas. Apply with mulch
blower, chip handler, or by
hand.
* When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum
rate of 2000 Ibs. / ac. or 45 Ibs. / 1000 sq. ft.
Source: Va. DSWC
>14
W
Gzi
FIRM INFO:
Lineage Architects, P.C.
P.O. Box 991
98 Lee Highway
Verona, VA 24482
Phone: (540)248-3771
Fax: (540)248-1628
Email: info@lineagearch.com
ENGINEER NAME/SEAL:
ARCHITECT NAME/SEAL:
a
5
U
0
o
a
z
�
W
z
U
^�
-
l�
NO. I REVISIONASSUE I DATE
JOB NUMBER: 19066
DATE: OCTOBER 1, 2021
DRAWN BY: JMT
APPROVED BY: JFG
DRAWING DESCRIPTION:
GRADING/E&SC PLAN
DRAWING NUMBER:
l.,-VD