Loading...
HomeMy WebLinkAboutSUB202100195 Plan - Submittal (First) 2021-11-01Q 110 00 N 0 , SITE DATA A OWNER: NEW BELVEDERE, Inc. 610 WEST RIO RD CHARLOTTESVILLE, VA 22901 DEVELOPER: NEW BELVEDERE, Inc. 610 WEST RIO RD CHARLOTTESVILLE, VA 22901 PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES 999 SECOND STREET. SE. CHARLOTTESVILLE, VA. 22902 (434)-977-0205 TAX MAP PARCEL No: 06200-00-00-016DO TOTAL PARCEL AREA: 7.04 ACRES (BELVEDERE PHASE 5 A) 7.96 ACRES (BELVEDERE PHASE 5 B) 15.00 ACRES (TOTAL AREA) ZONING: R4 RESIDENTIAL (THIS PARCEL IS NOT PART OF THE BELVEDERE ZMA-2004-0007) STEEP SLOPES - MANAGED STEEP SLOPES - PRESERVED CURRENT USE: VACANT R4 STANDARD DENSITY: 4 DU/AC ALLOWABLE DENSITY: 4 DU/AC + 5% DENSITY BONUS CREDIT FOR MAINTENANCE OF EXISTING WOODED AREA (1.5 ACRES, SEE LANDSCAPING PLAN) 4 + (4 * 0.05) = 4.2 DU/AC PROPOSED USE: STANDARD LEVEL CLUSTER DEVELOPMENT. 5 SINGLE FAMILY DETACHED (PHASE 5A) 20 SINGLE FAMILY DETACHED (PHASE 5B) 38 SINGLE FAMILY ATTACHED (PHASE 5A) 63 TOTAL LOTS PROPOSED USE DENSITY: 63 LOTS/15 AC = 4.2 DU/AC a1 11 PER APPROVED wi•Iw. y r, J THE DEVELOPMENT OF BELVEDERE PHASE 5, TMP 62-16D, WILL OCCUR IN TWO SEPARATE STAGES OF CONSTRUCTION. THE COMPLETED SUBDIVISION WILL UTILIZE AN EXTENDED DETENTION FACILITY TO FACILITATE CHANNEL AND FLOOD PROTECTION. STORMWATER RUNOFF WILL BE COLLECTED AND CONVEYED THROUGH A STORMWATER PIPE NETWORK TO THE FACILITY. SEE APPROVED VSMP PLAN, WPO-2020-00034 FOR DETAILS. REGARDING WATER QUALITY ANALYSIS: n z ulnumumupl pluuuumuuluum yll I►Ir luuuuuuuuuuuul Iunuunuuulp�ll luulluuuuuuuuul mill `IIIIIIIIIIIilllllilllll muum�l I hmmuuuuuumuu mmluuuuumu I�III� Ilumuumuuuliauu Immmuuuuulll� luuunmuuuuutml i , (ll. Iluuuuuuuuuuum �Wit" �i I � I,11 1 iJ I'i !11 i it I III I I1`Ii I I � t � li�i;li 1:4 I ,1 I it I I k1 S U B-2021 SHEET 1---------- COVER SHEET SHEET 2---------- SITE DATA & NOTES SHEET 3---------- GENERAL CONSTRUCTION NOTES SHEET 4---------- EXISTING CONDITIONS & DEMOLITION PLAN SHEET 5---------- LAYOUT PLAN SHEET 6---------- GRADING PLAN SHEET 7---------- UTILITY PLAN SHEET 8 SHEET 9 SHEET 10 6y,'C�ii® SHEET 12 SIGHT DISTANCE PROFILE STORM SEWER PROFILES & CALCULATIONS STORM INLET DRAINAGE AREA MAP LANDSCAPING PLAN K rn In V o o co cn o rn err/ z zoN Q Oy 0) O cc w J� = Q mO fr =W wpus Do UU Q �< Q zZ �v V 0j w W C3 o o a z w N o N v v W N W QU) > z O J uj U J J = 0 ® �z W o y U)Cc °) T rnU DESIGNED BY:j MSK DRAWN BY: MSK CHECKED BY: ZQD p. t`Jimmy L Taggart lta. N1. ��'o,�s11�2021 ,gd ZONAL DEVELOPMENT OF BELVEDERE PHASE 5 (A AND B), TMP 62-16D, WATER QUALITY PORTIONS OF THIS PLAN HAVE BEEN SATISFIED WITH PURCHASING vl iul Ivy Q 9.68 LB/YR OF OFFSITE NUTRIENT CREDITS IN THE SAME OF ADJACENT HYDROLOGIC UNIT CODE (02080204). COMPLIANCE OF 9VAC25-870-65.F: teSVIII2 Z OFFSITE ALTERNATIVE IAW 9VAC25-870-69 PURCHASE OF NUTRIENT OFFSET CREDITS IS PROPOSED AND AFFIRMED. SEE APPROVED VSMP PLAN, --{ WPO-2020-00034 FOR DETAILS. -17 z REGARDING WATER QUANITY ANALYSIS FOR POINT OF DISCHARGE COMPLIANCE OF 9VAC25-870. 13.1.13 CHANNEL PROTECTION : —� ® 2 ( ) VICINITY MAP APPROVALS CL u) � m IN ACCORDANCE WITH CHANNEL PROTECTION SECTION B.3.A OF 9VAC25-870-66 OF VIRGINIA LAW; THE MAXIMUM PEAK FLOW RATE FROM THE W < Q ONE-YEAR 24-HOUR STORM FOLLOWING THE LAND- DISTURBING ACTIVITY IS IN ACCORDANCE WITH THE ENERGY BALANCE METHODOLOGY. SEE SCALE: 1 1000 FEET DEPARTMENT SIGNATURE DATE W LL O w APPROVED VSMP PLAN, WPO-2020-00034 FOR DETAILS. Gt U W ENGINEERING z a- Q Z DEPARTMENT OF FIRE RESCUE Q W O iZ' COMPLIANCE OF 9VAC25-870-66.0 (FLOOD PROTECTION): cc N U VA. DEPARTMENT OF TRANSPORTATION ® W Cfl IN REFERENCE TO FLOOD PROTECTION SECTION C.1, THE SITE'S POINT OF DISCHARGE RELEASES CAPTURED STORMWATER INTO A CONVEYANCE W U U PLANNING/ZONING 06 0 Q SYSTEM THAT, FOLLOWING LAND DISTURBING ACTIVITY, CONFINES THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE 10-YEAR 24-HOUR STORM 0 W F- EVENT WITHIN THE STORMWATER CONVEYANCE SYSTEM. Q10POST-DEVELOPED <_ Q10PRE-DEVELOPED. SEE APPROVED VSMP PLAN, WPO-2020-00034 FOR DETAILS. I-- Q ® M W W � W O L\_ �'A DATE: 11-01-2021 SCALE: 1 ":1000' JOB: 8438 SUB: 2021-000 SHEET: OF12 r 0 01 w r N 0 cV SITE DATA OWNER: NEW BELVEDERE, Inc. 610 WEST RIO RD CHARLOTTESVILLE, VA 22901 DEVELOPER: NEW BELVEDERE, Inc. 610 WEST RIO RD CHARLOTTESVILLE, VA 22901 PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES 999 SECOND STREET. SE. CHARLOTTESVILLE, VA. 22902 (434)-977-0205 TAX MAP PARCEL No: 06200-00-00-016DO PARCEL AREA: 7.04 ACRES (BELVEDERE PHASE 5A) 7.96 ACRES (BELVEDERE PHASE 5B) 15.00 ACRES (TOTAL AREA) ZONING: R4 RESIDENTIAL (THIS PARCEL IS NOT PART OF THE BELVEDERE ZMA-2004-0007) STEEP SLOPES - MANAGED STEEP SLOPES - PRESERVED CURRENT USE: VACANT R4 STANDARD DENSITY: 4 DU/AC ALLOWABLE DENSITY: 4 DU/AC + 5% DENSITY BONUS CREDIT FOR MAINTENANCE OF EXISTING WOODED AREA (1.5 ACRES SEE LANDSCAPING PLAN) 4 + (4 * 0.05) = 4.2 DU/AC PROPOSED USE: STANDARD LEVEL CLUSTER DEVELOPMENT. 5 SINGLE FAMILY DETACHED (PHASE 5A) + 20 SINGLE FAMILY DETACHED (PHASE 5B) + 38 SINGLE FAMILY ATTACHED (PHASE 5A) = 63 TOTAL LOTS PROPOSED USE DENSITY: 63 LOTS/15 AC = 4.2 DU/AC MINIMUM LOT SIZE PERMITTED: N/A BUILDING HEIGHT: 35' MAXIMUM REQUIRED OPEN SPACE (25%): 25% * 15 ACRES = 3.75 ACRES FOR THE ENTIRE PARCEL (PHASE 5A + 5B) OPENS SPACE PROVIDED: 3.68 ACRES (OPEN SPACE A, B, C) + 0.07 ACRES (TOT LOT) = 3.75 ACRES TOTAL PROVIDED (2.13 ACRES IN PRESERVED SLOPES = 58% OF PROVIDED OPEN SPACE) NON-INFILL SETBACKS FRONT SETBACK & MINIMUM FROM ROW (25' MAXIMUM FROM ROW) SIDE SETBACK & MINIMUM UNLESS THE BUILDINGS SHARE A COMMON WALL (NO MAXIMUM) GARAGE FRONT LOADING GARAGE 18' MINIMUM FROM THE ROW (NO MAXIMUM) SIDE LOADING GARAGE & MINIMUM FROM THE ROW (NO MAXIMUM) BUILDING SEPARATION MINIMUM 1U UNLESS THE BUILDINGS SHARES A COMMON WALL MAXIMUM NONE REAR 20' MINIMUM, NO MAXIMUM LOT TABULATION 25 SFD LOTS 6.00 ACRES 38 SFA LOTS 2.63 ACRES RIGHT-OF-WAY* 2.62 ACRES* OPEN SPACE** 3.75 ACRES** (25%) TOTAL 15.00 ACRES *ALL NEW RIGHT-OF-WAY SHOWN HEREON SHALL BE DEDICATED TO ALBEMARLE COUNTY FOR PUBLIC USE WITH RECORDATION OF THE FINAL SUBDIVISION PLAT **OPEN SPACE & TOT LOT FOR TMP 62-16D TO BE DEDICATED & MAINTAINED BY THE HOA MAGISTERIAL DISTRICT: RIO MAGISTERIAL DISTRICT STORMWATER MANAGEMENT: SEE VSMP SUBMITTED UNDER SEPARATE COVER, WPO-2020-00034, APPROVED 11/04/2020. WATERSHED: UPPER RIVANNA RIVER BOUNDARY SOURCE: PLAT "DIVISION OF DUNLORA" PREPARED BY WM. MORRIS FOSTER, LAND SURVEYOR, DATED NOVEMBER 1, 1985, REVISED DECEMBER 20, 1985, RECORDED AT DB 875 PG 331. TOPOGRAPHY: BARE EARTH DEM FROM LiDAR, SOURCE VGIN (2016). POINT CLOUD FILTERED BY RGA, FEBRUARY 2021. BENCHMARK: FIRE HYDRANT 453.77, RIGHT FRONT BONNET BOLT, AT CORNER OF FOWLER STREET AND FARROW DRIVE DATUNM: HORZ.:NAVD 83; VERT.:NAD88 FLOODPLAIN: THIS PROJECT IS LOCATED WITHIN "ZONE X" AS SHOWN ON FLOOD INSURANCE RATE MAP. COMMUNITY PANEL NUMBER 510003C 0279 D. EFFECTIVE DATE:FEBRUARY 4. 2005. PARKING REQUIRED FOR FULL BUILD -OUT OF PROJECT: TWO (2) PARKING SPACES FOR SFD = 2 * 25 = 50 SPACES TWO (2) PARKING SPACES FOR SFA = 2 * 38 = 76 SPACES ONE GUEST PARKING SPACE PER EVERY 4 ATTACHED SINGLE FAMILY LOT = 0.25 * 38 = 10 SPACES EXISTING ON -STREET PARKING SPACES REPLACED AT FOWLER STREET & FARROW DRIVE INTERSECTION = 4 SPACES 140 PARKING SPACES REQUIRED (MINIMUM 14 ON -STREET PARKING SPACES REQUIRED) PARKING PROVIDED AT FULL BUILD -OUT OF PROJECT: SFD: (2 DRIVEWAY SPACES + 2 GARAGE SPACES PER UNIT) * 25 = 100 SPACES (PHASE 5A + 5B) SFA: (1 DRIVEWAY SPACE + 1 GARAGE SPACE PER UNIT) * 38 = 76 SPACES (PHASE 5A, SUB-2019-00170) 19 ON -STREET GUEST PARKING PROVIDED ALONG FOWLER STREET (PHASE 5A, SUB-2019-00170) 195 TOTAL PARKING SPACES PROVIDED RECREATION SPACE REQUIRED = 200 SF PER UNIT: 63 * 200 = 12,600 SF RECREATION SPACE PROVIDED = 2,860 SF ACTIVE RECREATION SPACE (TOT LOT PROVIDED WITH PHASE 5A, SUB-2019-00170) 108,120 SF PASSIVE RECREATION SPACE (OPEN SPACE "C" W/ NATURE TRAIL) 110,980 SF TOTAL RECREATION SPACE PROVIDED RECREATION EQUIPMENT AND FACILITIES, INCLUDING THE TOT LOT, SHALL BE MAINTAINED IN A SAFE CONDITION AND REPLACED AS NECESSARY. MAINTENANCE SHALL BE THE RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION. RECREATIONAL FACILITIES SHALL BE COMPLETED WHEN FIFTY PERCENT (50%) OF THE UNITS HAVE RECEIVED CERTIFICATE OF OCCUPANCY. LANDSCAPING: SEE LANDSCAPING PLAN SHEET 12 FOR MORE DETAILS LIGHTING: ALL PROPOSED LIGHTING WILL NOT EXCEED 3,000 LUMENS. EACH OUTDOOR LUMINARIES EQUIPPED WITH A LAMP THAT EMITS 3,000 OR MORE INITIAL LUMENS SHALL BE A FULL CUTOFF LUMINARIES AND SHALL BE ARRANGED OR SHIELDED TO REFLECT LIGHT AWAY FROM ADJOINING RESIDENTIAL DISTRICTS AND FROM ADJACENT ROADS. ALL OUTDOOR LIGHTING SHALL BE ARRANGED OR SHIELDED TO REFLECT LIGHT AWAY FROM ADJOINING RESIDENTIAL DISTRICTS AND AWAY FROM ADJACENT ROADS. NO EVIDENCE OF A BURIAL SITE WAS FOUND ON SUBJECT PARCEL. NO STREAM BUFFER(S) ARE PRESENT ON THE SUBJECT PARCEL. THE SUBJECT PROPERTY IS NOT LOCATED WITHIN AN AGRICULTURAL -FORESTAL DISTRICT. THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. RELATED PLANS WITH THIS PARCEL: 1. APPROVAL OF ROAD PLANS IS ONLY FOR THE ELEMENTS WITHIN THE RIGHT-OF-WAY. APPROVAL OF ROAD PLANS DOES NOT GRANT APPROVAL OF OTHER ITEMS OUTSIDE OF THE RIGHT-OF-WAY, SUCH AS PARCEL BOUNDARIES, OPEN SPACE LOCATIONS, ETC. 2. PUBLIC STREET RIGHT-OF-WAY SHALL BE DEDICATED TO ALBEMARLE COUNTY PUBLIC USE IN ACCORDANCE WITH ALL APPLICABLE SECTIONS OF THE ALBEMARLE COUNTY CODE. 3. ASSOCIATED PLANS WITH THIS PARCEL, TMP 62-16D: 3.1. BELVEDERE PHASE 5B - ROAD AND DRAINAGE PLAN (THIS PLAN) 3.2. BELVEDERE PHASE 5B - WATER AND SEWER PLAN 3.3. BELVEDERE PHASE 5B - PRELIMINARY SUBDIVISION PLAT - SUB-2021-00033 3.4. BELVEDERE PHASE 5 - STORMWATER MANAGEMENT PLAN - WPO-2020-00034, APPROVED 11/04/2020 3.5. BELVEDERE PHASE 5A - FINAL SITE PLAN - SDP-2020-00036 3.6. BELVEDERE PHASE 5A - ROAD & UTILITY PLAN - SUB-2019-00170, APPROVED 01/29/2021 3.7. BELVEDERE PHASE 5A - EASEMENT PLAT - SUB-2020-00123 3.8. BELVEDERE PHASE 5A - SUBDIVISION PLAT i t=npnin EXISTING INTERMEDIATE CONTOUR - - -- --3z EXISTING INDEX CONTOUR PROPOSED CONTOUR 20 EXISTING EDGE OF PAVEMENT _ EX. EP PROPOSED EDGE OF PAVEMENT EP EXISTING CURB AND GUTTER___ EX. C&G_ PROPOSED CURB AND GUTTER CG-6 TRANSITION FROM CG-6 ROLL-TOP CG-6 ROLL-TOP EX. 15" RCP EXISTING STORM SEWER t t t t 15" RCP PROPOSED STORM SEWER EXISTING SANITARY SEWER - s - s s - PROPOSED SANITARY SEWER ----->--� - ->--- PROPERTY LINE EASEMENT LINE CENTERLINE LIMITS OF CLEARING AND/OR GRADING ■aasaaaaaaaaaaaa EXISTING SPOT ELEVATION 12 0 PROPOSED SPOT ELEVATION +12.0 EXISTING TREE DRIP LINE EXISTING TREE EC. O ;IC PROPOSED TREE OAK EXISTING WATERLINE W/ TEE PROPOSED WATERLINE W/ TEE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED WATER VALVE PROPOSED WATER METER EXISTING REDUCER PROPOSED REDUCER HANDICAP RAMP (CG-12) DENOTES LOCATION OF STD. VDOT CG-12 AND/OR JURISDICTIONAL STANDARD RAMP CONSTRUCTION PARKING INDICATOR INDICATES THE NUMBER OF TYPICAL PARKING SPACES BENCHMARK CRITICAL SLOPE SLOPES TO BE SEEDED, MULCHED & TACKED VEHICLES PER DAY COUNT PROPOSED STREET NAME SIGN EXISTING SIGN PROPOSED SIGN SANITARY MANHOLE IDENTIFIER STORM DRAIN STRUCTURE IDENTIFIER CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ANY CHANGES SUBSTITUTIONS, ALTERATIONS, VARIATIONS OR UNUSUAL CONDITIONS ENCOUNTERED OR IMPLEMENTED WHILE ENGAGED ON THIS PROJECT. THESE RECORDS SHALL BE IN THE FORM OF "REDLINES". "REDLINES" SHALL REFER TO THE CONTRACTOR'S HAND ANNOTATIONS USING RED COLORED PEN/PENCIL TO DEPICT ACTUAL CHANGE, SUBSTITUTION, OR CONDITION. PRIOR TO CONTRACTOR REQUESTING PARTIAL OR FULL PAYMENT, CONTRACTOR SHALL PROVIDE THE OWNER WITH AN UP-TO-DATE CONTRACTOR'S RECORD DRAWING. SPECIFICALLY, THIS SET OF PLANS, ISSUED TO THE CONTRACTOR AS FINAL CONSTRUCTION DRAWINGS, SHALL BEAR THE "REDLINE" MARKINGS LISTED BELOW AS WELL AS THE CONTRACTOR (AGENT OR SUPERINTENDENT) SIGNATURE AND CERTIFICATION BELOW: 1. REDLINES SHOULD ALWAYS BE ACCURATE NEAT, LEGIBLE, DATED AND REASONABLY SCALED. 2. ADD LARGE RED LETTERS TO TITLE SHEET WITH 'CONTRACTOR'S RECORD DRAWING' INCLUDING CONTRACTOR'S NAME, DATE, AND OTHER RELEVANT INFORMATION 3. CONTRACTOR'S REPRESENTATIVE OR SUPERINTENDENT SHALL INITIAL EACH SHEET. IF A SHEET HAS NOT BEEN CHANGED AT ALL OR NO MARK HAS BEEN ADDED, LABEL THE SHEET ONLY'NO CHANGES' 4. IF A SHEET HAS BEEN CHANGED OR MODIFICATIONS HAVE BEEN ADDED, LABEL IT'REVISED' 5. USE WRITTEN EXPLANATION TO DESCRIBE CHANGES. REFER TO SPECIFIC ACTIONS INSTEAD OF REFERENCING CHANGE ORDER NUMBERS OR RELATED DOCUMENTS 6. USE CLEAR LETTERING 7. NEVER REMOVE OLD VALUES OR DETAILS, JUST REDLINE OR "X" THROUGH THEM. IF THERE IS NO ROOM FOR THE NEW VALUE, YOU CAN GO TO THE SIDE AND REDLINE THE REPLACEMENT VALUE. 8. PROVIDE THE REDLINE DETAILS OF CHANGES OR ADDITIONAL INFORMATION, INCLUDING BUT NOT LIMITED TO FABRICATION, ERECTION, INSTALLATION, LOCATION, SIZING, MATERIAL, DIMENSION, ADDITIONS, RELOCATIONS, SUBSTITUTIONS, ETC 9. BE SPECIFIC WHEN MAKING NOTES TO UNDERGROUND UTILITIES, SHOWING EXACT LOCATION, DEPTH, AND MATERIAL USED (EXAMPLE: SEWER LATERALS) 10. PROVIDE ALL NECESSARY INFORMATION OF CONTRACTOR'S DESIGNED SYSTEMS OR SUBSTITUTIONS 11. CROSS OUT ANY PLAN REFERENCE TO "APPROVED EQUAL" AND REPLACE WITH ANY SPECIFIC INFORMATION OF VARIANCE USED DURING THE CONSTRUCTION PROCESS 12. ANY CHANGES IN INVERT ELEVATIONS, GRADE MODIFICATIONS, SLOPES, AND RELATED INFORMATION ON PIPING UTILITIES, EARTHWORK, ETC. SHALL BE REDLINED. 13. RECORD ALL UNEXPECTED OBSTRUCTIONS, COMPLICATING FACTORS, UNSUITABLE CONDITIONS FOUND IN THE PROJECT AREA INCLUDING ROCK, UNUSUAL TOPSOIL CONDITIONS, BURIED DEBRIS, ETC. 14. ATTACH OR INCLUDE ANY SHOW DRAWINGS OR SUPPLEMENTAL INFORMATION TO THE CONTRACTOR'S RECORD DRAWING 15. CHANGES MADE AS A RESULT OF ANY REGULATORY OR OWNER INSPECTION PROCESS CERTIFICATION STATEMENT: THIS HAND -MARKED SET OF DRAWINGS HAS BEEN "REDLINED" TO PROVIDE ACCURATE DETAILED RECORD OF ANY SUBSTANTIVE CHANGES TO THE APPROVED DESIGN DRAWINGS. ANY ITEM NOT "REDLINED" ON THIS PLAN SET OR SUBSEQUENT PAGES SHOULD BE CONSIDERED TO BE "CONSTRUCTED IN ACCORDANCE WITH THE DESIGN AS SHOWN". NAME, TITLE FOR: (DATE) (CONTRACTOR) rn �n U o o M CO o U-0- -)Z Q N ® 0 (0 LO Z Y � 2 O Q � _j J Ir OU J QC0 = �z =w< m W uFb "Q wo �¢ 0 �z t0 Q� Z O > �, N o LL Z > a W o N yr 't Q < > LLI z Z J U O a J J _)� ❑ ® O L1J O y W C/) Q o-, = C)-, oi U oi I 1 I i V W i j w ; j O� z o u ,LU o -- r- - 4- - W z DESIGNED BY:j MSK DRAWN BY: MSK CHECKED BY: ZQD $dLRS OF Pr�� Q C; C% Jimmy L. Taggart Lk. No. 1 1r� 0,11 Ol /2021 ti SggZONAL 6 Q Z_ CO z CO w J LO W � W n- (.C)m W � '- Q w C� � W O Q� � z Z Q z QW °-o OC CC N E- C w U 06 Q � 0 W 2 u) Co Q>0 -j �- Q 0 W w 0 Q O rr DATE: 11-01-2021 SCALE: N/A JOB: 8438 SUB: 2021-000 SHEET: OF 12 00 N 0 co r v a� Ln w V) a LU w J w m 00 M d' 00 I- w V) a 0- V) a 0 a ry w 0 w J W m 00 m O ry n i a l7 i r IN GENERAL CONSTRUCTION NOTES of AM nin=0 1. THE OWNER MAY ACT AS THE PROJECT MANAGER OR DESIGNATE A PROJECT MANAGER TO ACT AS OWNER'S REPRESENTATIVE DURING THIS PROJECT. CONTRACTOR SHALL REPORT DIRECTLY TO THIS PROJECT MANAGER UNLESS OTHERWISE DIRECTED. 2. THE DESIGNER HAS CONDUCTED NO STUDIES DESIGNED TO DISCOVER THE PRESENCE OF ANY HAZARDOUS SUBSTANCES ON THIS PROPERTY AND ASSUMES NO RESPONSIBILITY OR LIABILITY RESULTING FROM THE PRESENCE ON ANY SUCH SUBSTANCE. 3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR THIS WORK AND PAY ALL ASSOCIATED FEES. THIS INCLUDES ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER APPROVAL RELATED ITEMS IN ACCORDANCE WITH THESE PLANS AS WELL AS LOCAL, STATE, AND FEDERAL POLICIES. 4. PAVED OR RIP RAP DITCH MAY BE REQUIRED WHEN, IN THE OPINION OF THE RESIDENT ENGINEER OR HIS DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 5. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION, AND SHALL BE PROVIDED BY THE CONTRACTOR. 6. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 7. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE VDOT ROAD AND BRIDGE STANDARDS (LATEST EDITION) AND THE VDOT ROAD AND BRIDGE SPECIFICATIONS (LATEST EDITION). 8. RETAINING WALLS GREATER THAN 3 FEET IN HEIGHT REQUIRE A SEPARATE BUILDING PERMIT. WALLS EXCEEDING 4 FEET IN HEIGHT REQUIRE A STAMPED ENGINEERING DESIGN. WALLS REQUIRE INSPECTIONS AS OUTLINED IN THE USBC. 9. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 10. WHERE THE FLOOD LEVEL RIMS OF PLUMBING FIXTURES ARE BELOW THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER, THE FIXTURES SHALL BE PROTECTED BY A BACKWATER VALVE INSTALLED IN THE BUILDING DRAIN, BRANCH OF THE BUILDING DRAIN OR HORIZONTAL BRANCH SERVING SUCH PLUMBING FIXTURES. PL S U NG FIXTURES HAVING FLOOD LEVEL RIMS TH ABOVE EL 0 E ELEVATION ON OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER SHALL NOT DISCHARGE THROUGH A BACKWATER VALVE. EARTHWORK, DRAINAGE, & SITE CONDITIONS 1. EXCEPT AS OTHERWISE SHOWN ON THE PLANS, ALL CUTS AND FILLS SHALL MATCH EXISTING SLOPES OR BE NO GREATER THAN 2:1. 2. UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS, ALL FILL MATERIALS SHALL BE COMPACTED TO 95% OF THEORETICAL MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99 METHOD A, WITHIN PLUS OR MINUS 2% OF OPTIMUM MOISTURE, FOR THE FULL WIDTH AND DEPTH OF THE FILL. 3. ALL GRADING AND IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA UNLESS OTHERWISE INDICATED. 4. ALL MATERIALS AND INSTALLATION DETAILS SHALL CONFORM TO APPLICABLE LOCAL ORDINANCES AND VDOT ROAD & BRIDGE STANDARDS (LATEST EDITION) UNLESS OTHERWISE STATED WITHIN THE PLANS.. 5. ANY UNUSUAL OR UNANTICIPATED SUBSURFACE CONDITIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER. 6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND LOCATIONS PRIOR TO BEGINNING WORK, AND IMMEDIATELY NOTIFY THE PROJECT MANAGER IN THE EVENT THERE ARE ANY DISCREPANCIES BETWEEN SUCH CONDITIONS AND THOSE SHOWN ON THE PLANS AND SPECIFICATIONS. 7. IN THE EVENT THAT GRADING AS SHOWN ON THE PLANS IS NOT FEASIBLE, CONTRACTOR SHALL ADVISE THE PROJECT MANAGER AND ENGINEER BEFORE FINAL GRADING COMPLETION FOR ADVICE AND CONSENT. UTILITIES & DRAINAGE SYSTEMS UTILITIES -I . ANY DAMAGE TO EXISTING UTILITIES CAUSED BY CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE CONTRACTOR'S SOLE RESPONSIBILITY AND REPAIRED AT CONTRACTOR'S EXPENSE. 2. THESE PLANS DO NOT GUARANTEE THE EXISTENCE, NON-EXISTENCE OR LOCATION OF UTILITIES. CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OR THE NON-EXISTENCE F UTILITIES. - - C O U LI IES. AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION OR CONSTRUCTION, CONTRACTOR SHALL NOTIFY MISS UTILITY (1 800 552-7001) AND/OR THE RESPECTIVE UTILITY COMPANIES FOR GAS, WATER, SEWER, POWER, PHONE AND CABLE. CONTRACTOR SHALL TIMELY ARRANGE TO HAVE THE VARIOUS UTILITIES LOCATED, AND TO HAVE THEM REMOVED OR RELOCATED, OR TO DETERMINE THE METHOD OF PROTECTION ACCEPTABLE TO THE RESPECTIVE OWNER, IF THE METHOD OF PROTECTION IS NOT OTHERWISE SPECIFIED. CONTRACTOR SHALL CONDUCT ITS WORK IN THE VICINITY OF EXISTING UTILITIES IN ACCORDANCE WITH THE RESPECTIVE UTILITY'S RULES AND REGULATIONS. ANY COST INCURRED FOR REMOVING, RELOCATING OR PROTECTING UTILITIES SHALL BE BORNE BY CONTRACTOR UNLESS INDICATED OTHERWISE. CONTRACTOR SHALL EXCAVATE TO LOCATE BURIED UTILITIES FAR ENOUGH IN ADVANCE OF ITS WORK TO ALLOW FOR HORIZONTAL AND /OR VERTICAL ADJUSTMENTS TO ITS WORK AND/OR THE UTILITIES. NO ADJUSTMENT IN COMPENSATION OR SCHEDULE WILL BE ALLOWED FOR DELAYS RESULTING FROM CONTRACTOR'S FAILURE TO CONTACT AND COORDINATE WITH UTILITIES. 3. WHEN THE WORK CROSSES EXISTING UTILITIES, THE EXISTING UTILITIES SHALL BE ADEQUATELY SUPPORTED AND PROTECTED FROM DAMAGE DUE TO THE WORK. ALL METHODS FOR SUPPORTING AND MAINTAINING THE EXISTING UTILITIES SHALL BE APPROVED BY THE RESPECTIVE UTILITY COMPANY AND/OR THE ENGINEER. CONTRACTOR SHALL EXERCISE CARE TO INSURE THAT THE GRADE AND ALIGNMENT OF EXISTING UTILITIES ARE MAINTAINED AND THAT NO JOINTS OR CONNECTIONS ARE DISPLACED. BACKFILL SHALL BE CAREFULLY PLACED AND COMPACTED TO PREVENT FUTURE DAMAGE OR SETTLEMENT TO EXISTING UTILITIES, ANY UTILITIES REMOVED AS PART OF THE WORK, AND NOT INDICATED TO BE REMOVED OR ABANDONED, SHALL BE RESTORED USING MATERIALS AND INSTALLATION EQUAL TO THE UTILITY'S STANDARDS. 4. CONTRACTOR SHALL NOTIFY LANDOWNERS, TENANTS AND THE PROJECT MANAGER PRIOR TO THE INTERRUPTION OF ANY SERVICES. SERVICE INTERRUPTIONS SHALL BE KEPT TO A MINIMUM AND SHALL ONLY OCCUR WITH THE KNOWLEDGE AND PERMISSION OF THE SERVICE'S OWNER OR AUTHORITY. 5. THE ADJUSTMENT OF ALL MANHOLE TOPS, WATER VALVE BOXES, GAS VALVE BOXES AND WATER METER BOXES SHALL BE THE RESPONSIBILITY OF CONTRACTOR. 6. ALL WATER METER, VALVES AND FIRE HYDRANT ADJUSTMENTS/RELOCATIONS SHALL BE PERFORMED BY THE CONTRACTOR. CONTRACTOR SHALL KEEP A "REDLINE" SET OF PLANS DOCUMENTING ALL SUCH AS -BUILT REVISIONS. DRAINAGE SYSTEMS 1. CONTRACTOR SHALL EXERCISE CARE, ESPECIALLY AT INTERSECTIONS AND GUTTER LINES, TO PROVIDE POSITIVE DRAINAGE. ANY AREAS WHERE WATER IS IMPOUNDED SHALL BE CORRECTED BY CONTRACTOR AT NO ADDITIONAL COST. POSITIVE DRAINAGE OF ALL ROADWAY AREAS TO THE STORM DRAIN INLETS OR OTHER ACCEPTABLE DRAINAGE CHANNELS AS NOTED ON THE PLANS IS REQUIRED. 2. CONTRACTOR SHALL MAINTAIN EXISTING STREAMS, DITCHES, DRAINAGE STRUCTURES, CULVERTS, AND FLOWS AT ALL TIMES DURING THE WORK. CONTRACTOR SHALL PAY FOR ALL PERSONAL INJURY AND PROPERTY DAMAGE WHICH MAY OCCUR AS A RESULT OF FAILING TO MAINTAIN ADEQUATE DRAINAGE. 3. ALL PIPES, DI'S AND OTHER STRUCTURES SHALL BE INSPECTED BY THE PROJECT MANAGER BEFORE BEING BACKFILLED OR BURIED. THE PROJECT MANAGER MAY REQUIRE CONTRACTOR, AT NO ADDITIONAL COST, TO UNCOVER AND RE-COVER SUCH STRUCTURES IF THEY HAVE BEEN BACKFILLED OR BURIED WITHOUT SUCH INSPECTION. 4. ALL CATCH BASINS ENCOMPASSED WITHIN NEW CONSTRUCTION SHALL BE CONVERTED TO DROP INLETS. 5. REMOVED PIPE SHALL BE THE PROPERTY OF CONTRACTOR UNLESS NEGOTIATED OTHERWISE BEFORE PROJECT BIDDING; AND IF NOT SALVAGED FOR RE -USE, SHALL BE DISPOSED OF LAWFULLY. 6. ALL STORM SEWER PIPE AND DROP INLETS SHALL BE CLEARED OF DEBRIS AND ERODED MATERIAL PRIOR TO FINAL ACCEPTANCE. 7. ALL STORM SEWER PIPE JOINTS SHALL BE SEATED AND SEALED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. 8. ALL EXISTING ROOF DRAINS AND OTHER DRAINAGE CONDUIT BLOCKED OR DISRUPTED FROM THEIR PRE -CONSTRUCTION DRAINAGE PATTERNS SHALL BE SHORTENED, EXTENDED OR OTHERWISE ROUTED USING MATERIALS APPROVED BY THE ENGINEER, AND IN SUCH A WAY THAT THE NEW DRAINAGE PATTERNS ARE ACCEPTABLE TO ENGINEER AND THE PROJECT MANAGER. CONCRETE & ASPHALT 1. ALL FORMS SHALL BE INSPECTED BY THE PROJECT MANAGER OR HIS REPRESENTATIVE BEFORE ANY CONCRETE IS PLACED. THE PROJECT MANAGER MAY REQUIRE CONTRACTOR, AT NO ADDITIONAL COST, TO REMOVE AND REPLACE CONCRETE PLACED PRIOR TO OR WITHOUT SUCH INSPECTION. 2. ALL MATERIAL INSIDE FORMS SHALL BE CLEAN AND FREE OF ALL ROCKS AND OTHER LOOSE DEBRIS. SUB -BASE MATERIAL SHALL BE COMPACTED BY MECHANICAL MEANS. 3. CONCRETE SHALL NOT BE PLACED UNLESS THE AIR TEMPERATURE IS AT LEAST 40 DEGREES FAHRENHEIT (F) IN THE SHADE AND RISING. 4. 1/2" PREMOLDED EXPANSION JOINT MATERIAL SHALL BE PLACED AT A MAXIMUM OF 30' INTERVALS ON NEW SIDEWALK, CURB, CURB & GUTTER, AT EACH END OF DRIVEWAY ENTRANCES, AT EACH END OF HANDICAP RAMPS, SOME POINT ON ENTRANCE WALKS AND STEPS ADJUSTMENTS, AND ALONG BUILDINGS AND WALLS WHERE NEW CONCRETE SIDEWALKS ARE PLACED AGAINST THEM. 5. ALL EXISTING CURBS, CURB & GUTTER, SIDEWALK AND STEPS TO BE REMOVED SHALL BE TAKEN OUT TO THE NEAREST JOINT. 6. EXISTING ASPHALT CONCRETE PAVEMENT SHALL BE SAW CUT AND REMOVED AS PER THE SPECIFICATIONS. REMOVAL SHALL BE DONE IN SUCH A MANNER AS TO NOT TEAR, BULGE OR DISPLACE ADJACENT PAVEMENT. EDGES SHALL BE CLEAN AND VERTICAL, ALL CUTS SHALL BE PARALLEL OR PERPENDICULAR TO THE DIRECTION OF TRAFFIC. 7. DISPOSAL OF ALL EXCESS MATERIAL IS THE RESPONSIBILITY OF CONTRACTOR. 8. SEAL (TACK) COAT SHALL BE APPLIED IMMEDIATELY BEFORE ASPHALT IS LAID AND SHALL EXTEND ALONG THE BURIED VERTICAL EDGE OF CURBING UP TO THE ELEVATION OF THE TOP OF THE ASPHALT LAYER. TRAFFIC & SIGNAGE 1. ALL "NO PARKING" REQUIREMENTS SHALL BE PROVIDED BY CONTRACTOR WITH APPROVAL OF THE PROJECT MANAGER. 2. CONTRACTOR SHALL PROVIDE NECESSARY REFLECTORS, BARRICADES, TRAFFIC CONTROL DEVICES AND/OR FLAG PERSONS TO INSURE THE SAFETY OF ITS WORKERS AND THE PUBLIC. TRAFFIC CONTROL SHALL BE DONE WITH THE KNOWLEDGE AND PERMISSION FROM THE STREET'S OWNER OR AUTHORITY. 3. CONTRACTOR SHALL MAINTAIN SAFE AND PASSABLE PUBLIC ACCESS TO PROPERTIES AND THE PUBLIC RIGHT-OF-WAY DURING CONSTRUCTION. ACCESS FOR EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES. 4. EXCEPT AS OTHERWISE AUTHORIZED IN WRITING BY THE PROPER AUTHORITY, THE WORK SHALL BE COORDINATED AND PERFORMED IN A MANNER SO THAT ALL EXISTING FIRE HYDRANTS SHALL BE ACCESSIBLE AT ALL TIMES DURING THE WORK. 5. CONTRACTOR SHALL NOTIFY AND GAIN PERMISSION FROM THE PROPERTY OWNER(S) TWELVE (12) HOURS IN ADVANCE OF BLOCKING ANY ENTRANCE. NO ENTRANCE SHALL BE BLOCKED FOR MORE THAN TWELVE (12) HOURS IN ANY 24 HOUR PERIOD WITHOUT APPROVAL OF THE PROPERTY OWNER, EXCEPT WHERE NEW ENTRANCES ARE CONSTRUCTED. 6. WITHIN 24 HOURS OF THEIR REMOVAL, CONTRACTOR SHALL REPLACE MAILBOXES, STREET SIGNS, TRAFFIC SIGNS, AND THE LIKE THAT ARE REMOVED FOR CONSTRUCTION. PERMANENT OR SUITABLE TEMPORARY ITEMS WILL BE USED AS THE STATUS OF WORK PERMITS. PERMANENT OR TEMPORARY STOP SIGNS MUST BE IN PLACE AT ALL TIMES. COSTS SHOULD BE INCLUDED UNDER THE VARIOUS UNIT BID ITEMS. NO SEPARATE PAYMENT WILL BE MADE. CONTRACTOR RESPONSIBILITIES REGARDING ADA COMPLIANCE 1. CONTRACTORS SHALL PERFORM WITH REQUIRED CARE AND PRECISION IN CONSTRUCTION OF ADA (ACCESSIBLE) COMPONENTS AND ACCESSIBLE ROUTES WITHIN THE SITE. THESE CONSTRUCTED PRODUCTS, AS THE CONTRACTOR LEAVES THEM, MUST COMPLY WITH ALL APPLICABLE STATE AND LOCAL ACCESSIBILITY LAWS AND REGULATION AN THE ADA AND/OR A S D CURRENT STATE ARCHITECTURAL CCESS BOARD STANDARDS AND REGULATIONS' BARRIER FREE ACCESS AND ANY MODIFICATIONS, INCLUDING REVISIONS OR UPDATES. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE(S) FROM PARKING SPACES, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER -BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE OR EXIT, MUST COMPLY WITH THESE ADA OR ACCESS BOARD CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 1.1. HANDICAP PARKING SPACES AND PARKING AISLES -SLOPE SHALL NOT EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 1.2. RAMPS (CONCRETE OR OTHERWISE) -SLOPE MUST NOT EXCEED 1:12 (8.3%) FOR A MAXIMUM OF SIX (6) FEET. 1.3. LANDINGS -MUST BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 1.4. ACCESSIBLE ROUTE PATH OF TRAVEL -MUST PROVIDE A 36-INCH OR GREATER UNOBSTRUCTED WIDTH OF TRAVEL (ENCROACHMENTS SUCH AS CAR OVERHANGS OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO GREATER THAN 1:20 ( 0) 0) 5.0% FOLLOWING THE DIRECTION OF TRAVEL AND MUST NOT EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2 08/0FOR CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:20 (5.0%), RAMP SPECIFICATIONS (ABOVE) MUST BE ADHERED TO. MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, MUST BE PROVIDED. RAMPS MUST HAVE ADA HAND RAILS AND "LEVEL" LANDINGS ON EACH END THAT ARE CROSS SLOPED N THAN I 0 O MORE AN 1:50 IN ANY DIRECTION 1 4 PER FOOT OR NOMINALLY 2.08/o FOR POSITIVE DRAINAGE. (1/4" / ) 1.5. ALONG ACCESSIBLE - DOORWAYS ROUTES MUST HAVE A LEVEL" LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (1/4" PER FOOT OR NOMINALLY 2.08%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICCANSI A117.1-2003 AND OTHER REFERENCED INCORPORATED BY CODE.) 1.6. IF PROJECT INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE COMMENCEMENT OF THAT WORK. IMPROVEMENTS PLACED BY THE CONTRACTOR MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. 1.7. CONTRACTOR SHALL VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE NON -CONFORMING CONCRETE. 2. CONTRACTOR IS URGED TO REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL BUILDING CODE AFTER FORMS ARE SET AND PRIOR TO COMMENCEMENT OF CONSTRUCTION OR IMPROVEMENTS. ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN AN EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPES SHALL BE REINFORCED CONCRETE PIPE- CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR STREETS 1. CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTIFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296-5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TEST PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFACE EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE, EXACT LENGTH, LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN,. IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG-9 (A, B OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE-1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE SMPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12, VDOT STANDARD CD-1 OR CD-2 CROSS -DRAINS UNDER TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR PUBLIC ROADS 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTIFY THE DEPARTMENT OF ENGINEERING (296-5861) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 3. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926), 4. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND MUST BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 5. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. 6. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED SEEDED AND MULCHED. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 4:1 OR BETTER ARE TO BE ACHIEVED. 7. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY VDOT. ALL DRAINAGE OUTFACE EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. THE CONTRACTOR SHALL FIELD VERIFY THE LENGTH OF ALL STORM DRAINAGE PIPE. 8. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD DETERMINED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAYBE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF VDOT, THE DIRECTOR OF ENGINEERING, OR THE DIRECTOR'S DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 9. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG-9(A,B OR C). 10. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE-1. 11. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED TO STABILIZE A DRAINAGE CHANNEL WHEN, IN THE OPINION OF VDOT, THE DIRECTOR OF ENGINEERING, OR THE DIRECTOR=S DESIGNEE, IT IS DEEMED NECESSARY. 12. A MINIMUM CLEAR ZONE OF TEN (10) FEET FROM THE EDGE OF PAVEMENT SHALL BE MAINTAINED ON ALL RESIDENTIAL SUBDIVISION STREETS. ADDITIONAL CLEAR ZONE MAY BE REQUIRED DEPENDING ON THE CATEGORY OF ROAD DESIGN. 13. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED T0. THE CROSS SLOPE SHALL BE MAINTAINED AS SHOWN ON THE PLANS. EXCEPTIONS WILL NOT BE ALLOWED. 14. ALL REQUIRED SIGNS (STOP, STREET NAME, SPEED LIMIT SIGNS, ETC.) ARE TO BE FURNISHED AND INSTALLED BY THE DEVELOPER PRIOR TO ACCEPTANCE SIGNS AND THEIR INSTALLATION SHALL CONFORM TO "ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL" AND THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. THE LOCATIONS OF ALL SIGNS ARE SHOWN ON THE PLANS. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE SIGNS UNTIL THE ROADS HAVE BEEN ACCEPTED INTO THE STATE SECONDARY ROAD SYSTEM. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE TO BE DETERMINED BY VDOT PRIOR TO ACCEPTANCE. THE SPEED LIMIT IS TO BE POSTED 5MP H BELOW THE DESIGN SPEED. 15. ROAD PLAN APPROVAL IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 16. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE DIRECTOR OF ENGINEERING, OR THE DIRECTOR'S DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 17. USE VDOT STANDARD CD-1 OR CD-2 UNDERDRAINS UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS. 18. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT INSPECTIONS AND ARE TO BE ACCEPTED INTO VDOT'S MAINTENANCE PROGRAM AND OWNERSHIP. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT AND/OR COUNTY INSPECTOR PRESENT. IN ADDITION, IF HIGH -DENSITY POLYETHYLENE (HDPE) PIPE OR PIPE SYSTEM IS INSTALLED, THE CONTRACTOR AND A REPRESENTATIVE FROM THE PIPE MANUFACTURER SHOULD (HOLD APRE- CONSTRUCTION MEETING FOR INSTALLATION TRAINING. THE PIPE MANUFACTURER SHOULD SPEND A MINIMUM OF TWO HOURS ON THE JOB SITE DURING THE INITIAL PIPE INSTALLATION. IL I m r U o cl) W f- D N CO rn V z ZaN ® O 0 � � O �Qw J = oC) QUm 0- z _ W pca Wo w OQ 2Q ZO 0Cc j o M•n•j cj) o u- Z_ 4. > N d ;lrA°r) o W N U) N W > o Llj U C� J W J F- - } (n > ® 2 z W UJo cn Q 0')_ rnU CC I 0 a -- - - - O z i I i O � I v w I �I Lu I r i r T }- O I-- I o{�$Sj,RH Op pl�� r Jimmy L. Taggart Uc. No. A 841 -,11 01 /2021 a{� gBrONAL el Z_ 0 Ir zm w J `O CE 2 w m o w�'-Q � C3 = v o 0 z a. r u W 0- � � Ir N o co ® W z U O Q� �W U' Q> 0w -� �-- Q z O W W m �_ 0 O Cc 3 DESIGNED BY: MSK DRAWN BY: MSK CHECKED BY: ZQD DATE; 11-01-2021 SCALE: N/A JOB: 8438 SUB: 2021-000 SHEET: OF 12 `J BOUNDARY LINE INFORMATION LINE BEARING DISTANCE L1 N 81'23'05" E 26.04' ,4 _ ) 1 L2 S 29'18'35" E 2Z36' /kip `�'--- �-�'� � � � O Ob CL STREAM � 1 L3 N 71'0975" E- 27.84' \/ ALBEMARLE COUNTY STEEP SLOPES OVERLAY -MANAGED / I F-1 ALBEMARLE COUNTY STEEP SLOPES OVERLAY -PRESERVED oll SOIL LINE 1 \ EX. MH (TIP) —430— \ \ 1 I a 1 / NEW BELVEDERE, If TMP NC 62A3-1 aip / VACANT f / ZONING: D 91,414ACRES SOILS INFORMATION: 2C - ALBEMARLE FINE SANDY LOAM - 7 TO 15 PERCENT SLOPES, 35 TO 60 / / / .h10 PROPOSED SANITARY SEWER / / / INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC CONNECTION POINT TO /a 2 Ao\ \ GROUP: c / EXISTING MH-L — . 5 E 27B - ELIOAK LOAM - 2 TO 7 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 3g0/ '390�. / o \ / 27C - ELIOAK LOAM - 7 TO 15 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 4 95 - HATBORO SILT LOAM - 0 TO 2 PERCENT SLOPES, MORE THAN 80 ALBEMARLE / / / I ! J tq / COUNTY INCHES TO RESTRICTIVE FEATURES, POORLY DRAINED, HYDROLOGIC � / i ` O// / 0 / / I / PRESERVED SLOPES � / � \ � \ PHILUPs, E L & ANN P GROUP: BID - y,� / / _ - _ - / t i (TYP) �q° \ / TMP 52-164 ® / / RESIDENTIAL ZONING: R4 i 95.77 / / 130— R � � \ -NEW BEC VEDERE, INC. / Z I / / ! I \ TMP 62-76D OPEN SPADE / HIS PLAN) \ ZONING Ra 50 BELVEDERE PHASE �B // \ A. /430� / �� i WPO-2020-00034 / APPRpVED l \ r, - - -- - — 11/04/2020 COVERS OTH \ \\ �`l- - - �� — --- PHASE 5A & PHA3* 5B _ a _- -- ----- J U U a lJ _ l._/.__1 _ f } " �- - , ,- - U lJ L r� EX. TRAIL T.B.R / I/ / / ! / 4a0/ JJ� PROPOSED STREET & r✓ \ WATERLINE CONNECTION POINT D�NLORA FARM PHASE 1 EX. SHED TAR SOIL LINE (`r 1• .� \ BELVEDERE 7 ` °' _ _ \ PHASE 5A 7 ( ) SUB2020-00170 /� �� -�. ` f SEX. POLE T.B.R (UNDER CON ON) EX. TREEUNE TO PROPERTY LINE T.B.R ALBEMARLE COUNTY MANAGED SLOPES - -430 -_ C���//I�/// %II��vAv PROPOSED STORMWATER C T -_ / D/SCHARGE AREA APPROVED UNDER WPO-2020-00034 - - _ 3p N 23'51 '36" W 1069. -a3o BONDSTONE VENTURES LLC V o- \ TMP 62F7 -D / �\ OPEN SPACE ZONING: R4 / / A ��_-- 7.09 ACRES ,_ �-- _ -- —aaD 50 0 50 100 150 7 - - SCALE: 1"=50' � , LEGEND TREE SAVE AREA F-1 ALBEMARLE COUNTY STEEP SLOPES OVERLAY -MANAGED F-1 ALBEMARLE COUNTY STEEP SLOPES OVERLAY -PRESERVED EXISTING BELVEDERE PHASE 5A --- 44.2-X2.56% SANITARY STRUCTURE 3® J / / FJ`' STORM STRUCTURE / I r ED EXPECTED LOCATION OF TRANSFORMER -L FIRE HYDRANT f ROAD SIGN L2 Co RETAINING WALL gyp— SAFETY RAILING PAVEMENT BTL: BUILD -TO -LINE OS: OPEN SPACE NEW BELVEDERE, / \ -- — — — i INC 1 �•NOTE: GRA ING WITHIN TMP 6243-1 / / \ STEEP SLOS IN THIS VACANT CAl / / / A�/AREA IS A DIRECT RESULT ZONING.: NM0 ( .� OF ROAD GR ES. / //// j//�/ f / 91_414 ACRES TEMPORP GRADING PHILLIPS. E L & ANN P IMP 62-16A — — - RESIDENTIAL ZONING, R4 Lo o io zo so 4� SCALE: i"=io' / _ / s / / 61PEN PACE 9571 41•25�35 46 J� s i i \ \ \ L �. _ \ \ \ v -- - NEW BELVEDERE, INC. \ \ \ / TMP 62-160 "I OPEN SPACE / J u> 45 ZONING: R4 \ \ \ \ \ 15.0 ACRES q a m 44 f 49 Y — 50\ -- - / / $EE'DUIyLORA / f I1-1'...:..;' `:'"^:,.. •.:: - e ' o i• / — FARM - PHASE 1• RONi ♦ ♦ S \ 14i00 -15 FOWLER STREET + TEMPORARY GRA�ING EASEMENT \ \` 63 \ / '— � 54m 56 — oI t eEivEDene ' ' PHASE SA NNDER OOIJBTRILJGTION) I _ i 1 1 A o1GY 5� 58 57 �f I a�`- ���� •� >\' /// 1/ lilt $ � �`.I f, "�\\\\\ \ \ � /N �3•�1'3 "IW ! 16.�4/ / / / \\ \ \ \ \ — \ / / --- --�� _a30 ' I I \ I I \1 1 I � \\1�\ \IJ .g;r � p yyete'` T\ 1 ) \—��J�\---•�''�'' r / ,/-`\ ` \ \1 \\ �- _� � � /_ `-__ /'/ // // // � l l /1 ! I I I I I � \\\� �� � � �_ _ ---�. / -- — — — _ — \ — 50 0 50 100 150 ' /' SCALE: 1"=50' //- STORM STRUCTURE TABLE STRUCTURE #: DETAILS: PIPES IN: PIPES OUT: 30 RIM = 431.81 (31-30), 24" RCP INV IN=426.81 (30 to OUTFALL), 24" RCP INV OUT=426,61 31 RIM = 441.76 (32-31), 24" RCP INV IN=431.33 (31-30), 24" RCP INV OUT=431.14 32 RIM = 441.76 (40-32), 15" RCP INV IN=433.15 (33-32), 15" RCP INV IN=432.63 (32-31), 24" RCP INV OUT=432.43 33 RIM = 443.42 (34-33), 115" RCP INV IN-435.46 (37-33), 5" RCP INV IN=435.46 (33-32), 15" RCP INV OUT=435.26 34 RIM = 444.67 (35-34), 15" RCP INV IN=436.39 (34-33), 15" RCP INV OUT=436.19 35 HIM = 444.08 (36-35), 15" RCP INV IN=439.10 (46-35), 12" RCP INV IN=439.10 (35-34), 15" RCP INV OUT=438.90 36 RIM = 444.08 (36-35), 15" RCP INV OUT=440.17 37 RIM = 443.42 (38-37). 15" RCP INV IN=437.24 (37-33), 15" RCP INV OUT=437.04 38 RIM = 443.97 (39-38). 15" RCP INV IN=439.78 (38-37), 15" RCP INV OUT=439.62 39 RIM = 443.78 (39-38), 15" RCP INV OUT=440.27 40 RIM = 437.84 (41-40), 15" RCP INV IN=434.28 (4032), 15" RCP INV OUT=434.08 41 RIM = 437.84 (41-40), 15" RCP INV OUT=434.42 42 RIM = 430.83 (43-42), 15" RCP INV IN=424.98 43 RIM =. 433,86 (44-43), 15" RCP INV IN=425.75 (43-42), 15" RCP INV OUT=425.56 44 RIM = 433.86 (45-44), 15" FOP INV IN=426.31 (44-43), 15" RCP INV OUT=426.11 45 RIM = 432,55 (45-44), 15" RCP INV OUT=428.02 46 RIM = 443.22 (47-46), 12" RCP INV IN=439.69 (46-35), 12" RCP INV OUT=439.52 47 RIM = 443.17 (47-46), 12" RCP INV OUT=439.83 v 65 18� 5.55 h5 3h E 95 �7 5 41 25 35. E r_ NEW BELVEDERE, INC. I TMP 62-16D OPEN SPACE ZONING: R4 15.0 ACRES A6h 99 I \ CONNECT TO EXISTING WATERLINE. Nf �� CONTRACTOR TO REMOVE EXISTING BLOW -OFF :~ -rtec>'[5.:.. M':•'? :":'ke. \ AT THE WATER CONNECTION POINT �1. 1 � � h NEW BELVEDERE, -I INC TMP 62A3-1 VACANT ZONING: NMD 91.414 ACRES \R vp E � p5 ELECTRICAL TRANSFORMER (TYP). FINAL PLACEMENT TO 0 BE DETERMINED BY DOMINION POWER 8x6 FHA p 1 MW I � �'�'�`��- 5 C BOA & PLUG ' 22+p0 • o PUg \C O FOR EXPANSION 5 ::.....:::...x \ ................. 8x8 TEE: 3 GATE pM A:;'•T'i ???;:;7;:;:::. _ — \ \ VALVES & BOX 'ta \ypQ Sc�Slft' „2R, 00 / . 14�1 DO—`—�,=—i-]—_�_ •— -..r DI-3A (TYP) CD �pL_ FOWLER STREET ��� �8+0� ------ VDOTS — — — ROF �S� EX FHA01, Py BELVEDERE PHASE 5A 9 t. SUB 2020-00170 \ l:✓ 7 7 �� SDP-2020-00036 VDOT STD. MH-1 UNDER CONSTRUCTION WATER METER (TYP) PROP. STORM SEWER ESMT. PROP. STORM / SEWER ESMT. rr SANITARY SEWER / LATERAL (TYP) / 8x6 FHA �2 VDOT STD. EC-1 DOMESTIC 0` PARES i 2 To'l V& 8 Op \ S0"'0 SOONPYS' \ 0 Al 23.51 30" W 1069.24' WATERMETER (TYP). i VDOT STD. VDOT STD. - DI-3A (TYP) LEGEND PROPOSED EASEMENTS EXISTING EASEMENTS TREE SAVE AREA EXISTING BELVEDERE PHASE 5A ® SANITARY STRUCTURE 31 FZ-1 STORM STRUCTURE 0 EXPECTED LOCATION OF TRANSFORMER -� FIRE HYDRANT f ROAD SIGN RETAINING WALL SAFETY RAILING PAVEMENT PHILLIPS, E L & ANN P TMP 62-16A RESIDENTIAL ZONING: R4 NOTE: CONTRACTOR TO UTILIZE VDOT DETAIL 101.01 (EW-1,1A), 105.02 (IC-2), 106.08 (IS-1), 106.14 (106.14), AND 303.02 (WP-2) AS NEEDED. STORM STIR 45 & 44 HAVE BEEN DESIGN TO CAPTURE 100% OF FLOW ELECTRICAL TRANSFORMER (TYP). FINAL PLACEMENT TO BE DETERMINED BY DOMINION POWER 8" DIP WATERUNE BOA & PLUG FOR EXPANSION 4 � W- `PROP. STORM .o SEWER ESMT, r o QY Z zti$ Q Q 0,0 �w rT7 Q N a O O O o Z � U O v Z 011 V1 LL 0 O > 11 jr W Y ��/L411 Q N z $ o AA QQ Ld Yh> a 1 ►O aon z� °o U O 0 0 Q 0 z z O a H 0 a 0 d DESIGNED BY: MSK DRAWN BYI MSK CHECKED BY: ZQD ytH Op . U. N> 11/ul/2vn Q Z 0 0: zm Wi LID g�°m W Q a _j 2 W 0 z a a Z °~ Lu o N, o W W ~ a� W N 0 Ow�y'� Q CC W N Q O It DATE: 1 11-01-2021 SCALE: 1i'=50' JOB: B438 SUB: 2021-DOD SHEET: 7 OF 12 58' PUBLIC R-O-W R-/W POINT OF R/W 4' 3000 PSI CONCRETE VDOT ST'D CG-6 FINISHED GRADE VDOT ST'D 1.5' SM-9.5 CG-6 4" 3000 PSI CONCRETE 114": 1 1/4-: 1 1/4": V 4' VDOT 21A "- - -^� 4' VDDT 21A STONE BASE BA5E A STONE BASE 6" V00T 21A STONE BASE 3' BM-25 B" SUBBASE (2fA) 6' VDDT 21A STONE BASE 1' 5' 6' 2' 19' f0' 2' 6' 5' 1 CONCRETE PLANTING TRAVEL LANE TRAVEL LANE PLANTING CONCRETE SIDEWALK STRIP 0.5' INCLUDING PARKING 0.5' STRIP SIDEWALK 33.5' 24.5' TYPICAL SECTION - A FOWLER STREET STA 18+33.57 TO 19+10.98 (25 MPH DESIGN SPEED) N.T.S. TYPICAL SECTION - A TRANSITION TO TYPICAL SECTION - B STA 19+10.98 TO 19+86.18 50' PUBLIC R-O-W R/N POINT OF c FIINISHED R N 4' �O oO BSI VOOT ST'O GRADE VDOT ST'D 4' 3000 P5I TAR"R�.e 1/4': V -� -- 4' VDOT 21A STONE BASE fA ESTONE 5E CONCRETE PLANTING SIDEWALK STRIP 0.5' 4 91� 1.5' SM-9.5A s-- 1/4': 1 1/4': 1' -a BASE 3" 11 B" SUBBASE (21A) 10, 10' 25. 0' I 25. 0' TYPICAL SECTION - B FOWLER STREET STA 19+86.18 TO 23+25.87 (25 MPH DESIGN SPEED) N.T S. 50' PUBLIC R-O-W - 1/4": V 4' VDDT 21A 8' VDDT 21A STONE BASE STONE BASE 6' 5' PLANTING CONCRETE 0.5' STRIP SIDENALK �GRADE VDOT5T'D 4' 3000 PSI 1.5' SM-9.5A C _6 CONCRETE f- 1/4': V% 1/4-: 1' --� �- 1/4': V 4' VDOT 21A Y R-F STONE BASE 5' 6' 2' 10' 10' 2' 6' 5' CONCRETE PLANTING TRAVEL LANE TRAVEL LANE PLANTING CONCRETE SIDENALK STRIP 0.5' 0.5' STRIP SIDEWALK 25.0' 25.0' TYPICAL SECTION - C MIRANDA CROSSING STA 10+00.00 TO 15+20.64 (25 MPH DESIGN SPEED) N.T.S. 46`. 46( 45: 45( 44`. 44( 43`. 43( 42`. 42( 41! FOWLER ROAD EXT. PROFILE DESIGN SPEED: 25 MPH HORIZ. SCALE: 1"=50" VERTICAL SCALE: 1"=10" VPI STA = 20+51,28 VPI ST 19+01.28 VPI EL = 445.07 LEN = 63,18' K = 24,94 K = 2(.03 VSD = 563.27 14z is 16 - PROPOSED GRAD :2i o N 8 rn v MIN CO ER=3. • a od win a m� - EXISTING- - -- GRADE.. - A-- -6- CLASS 52- a m DIP WATERLINE a SS! N-Q o a z G ADE CATCH m r�i 3c'j II II ° n `v S A=24+38.20 �+ 4 o a it II G it F-J FW FJ ox ad N N aD V O M aJ V r O N N O O to N N aJ N q N aJ O In r N O as r O N M r r O r r ul R V T a V V V a V V "r N O V V O V O P'1 r V M M V N V O V O V V V V V 45E 45( 44. 44( 43`. 43( 42`. 42( 41E $65 t60 t55 t50 t45 t40 t35 t30 t25 120 t15 19+00 20+00 21+00 22+00 23+00 24+00 24+50 MIRANDA CROSSING PROFILE DESIGN SPEED: 25 MPH HORIZ. SCALE: 1"=50" VERTICAL SCALE: 1"=10" c ;� s 5R N + o - - - IN COVER-3.5' PROPOSI D GRADE t2 $ ~ - _ x Td < _z Al r bN K DIP WATERLINE PROPOSED X X N GRADE CATCH STA=16+02 M d N W N + M Z - � N � a 0o s r No q v u> M 9 ao r o N co co o ro ro 9 co o o 9 �� r- ro r rn coo r M 00 r V O M m (Nj m w O 1-m r co r 1- V1 ID -It In O 7 v v v v v v a v v a v v v v v v v a v v v v 1U+UU 11+UU FILLAREA THE CONTRACTOR IS TO VERIFY 95% COMPACTION IN ALL FILL AREAS. 12+UU 13+UU 14+UU 15+UU 16+00 155 150 145 140 135 130 125 120 115 50 0 50 100 150 SCALE: 1 "=50'(H) 10 0 10 20 30 SCALE: 1"=10'(V) 5' MANDATORY INSPECTIONS AT THE FOLLOWING 4' 3000 PSI CONCRETE NOTE TO CONTRACTOR: PHASES ARE REQUIRED FOR ROADS THAT ARE �•=L I nzme'--:' PROPOSED TO BE STATE MAINTAINED: Tyr-i r-r '• "• . • - - - 4' VDOT 21A - SPECIAL ATTENTION ANY UNDER -DRAINS OR CROSS -DRAINS INSTALLED MUST BE VIDEO INSPECTED SIMILAR 1. INSTALLATION OF ANY ENCLOSED DRAINAGE SYSTEM BEFORE IT IS COVERED. STONE BASE COMPACTED THAT REQUIRED FOR VDOT ACCEPTANCE OF STORM SEWER. CONTRACTOR IS 2. INSTALLATION OF ANY ENCLOSED UTILITY PLACEMENTS WITHIN THE RIGHT-OF-WAY BEFORE BEING COVERED. TYPICAL SIDEWALK SECTION RE RESPONSIBLE FOR ACCEPTABLE CONDITION AT ALL TIMES UNTIL STREET ACCEPTANCE. 3. CONSTRUCTION OF THE CUTS AND FILLS, INCLUDING FIELD DENSITY TESTS, BEFORE PLACEMENT OF ROADBED BASE MATERIALS. N.T.S. 4. A FINAL PAVEMENT DESIGN, BASED ON ACTUAL SOIL CHARACTERISTICS AND CERTIFIED TESTS, SHALL BE NOTES: COMPLETED AND APPROVED BEFORE THE PAVEMENT STRUCTURE IS PLACED. 5. PLACEMENT OF BASE MATERIALS, INCLUDING STONE DEPTHS, CONSISTENT WITH THE APPROVED PAVEMENT DESIGN. PRIOR TO PLACEMENT OF THE PAVING COURSE OR COURSES, FOLLOWED BY FIELD DENSITY AND 1. MAINTAIN A MINIMUM OF 3.5' OF COVER OVER WATERLINE. MOISTURE TESTS AND THE PLACEMENT OF A PAVING COURSE AS SOON AS POSSIBLE. 2. ALL FILL AREAS ARE TO BE PLACED AT 95% COMPACTION. 6. CONSTRUCTION OF PAVEMENT, INCLUDING DEPTH AND DENSITY, UPON COMPLETION AS PART OF THE FINAL 3. MAINTAIN V MINIMUM VERTICAL SEPARATION BETWEEN STORM AND WATERLINE. INSPECTION. 4. MAINTAIN 1.F MINIMUM VERTICAL SEPARATION BETWEEN SANITARY SEWER AND WATERLINE. 7. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING VDOT A MINIMUM OF ONE WEEK PRIOR TO EACH OF THE 5. STANDARD CD-1 AND CD-2 UNDERDRAINS ARE TO BE PROVIDED AS SHOWN HEREON OR AS FIELD CONDITIONS DICTATE. ABOVE PHASES OF CONSTRUCTION TO SCHEDULE AN INSPECTION. 6. INTERSECTION SIGHT DISTANCE LINES ARE SHOWN USING A 3.5' HEIGHT OF EYE AND A 3.5' HEIGHT OF OBJECT, B. FAILURE OF THE CONTRACTOR TO SCHEDULE THESE INSPECTIONS WILL REQUIRE ADDITIONAL TESTING OF THE ROADS AT THE DISCRETION OF VDOT OR MAY LEAD TO THE ROADS NOT BEING ELIGIBLE FOR STATE MAINTENANCE. ([ 1 .0 ID D 0 Y j ¢0 7,3� o rN OU a o� ¢ON W0. 05 rn � Z QQ !C coa z Q N°x a NN z z 04 yQ+ Yn' U Oz 0 K a 0 O ti u Q z DESIGNED BY: MSK DRAWN BY: MSK CHECKED BY: ZQD 7 /I Jimmy L Taggorl Ile. No. # 11 M1 21 ZONAL Q Z CO m Z ¢ v' o W W W Q Q J 0 = U O U_ z °- < z cr N o �3 pW�1 W N J21a O ~g WM o= C7 O Q DATE: 11-01-2021 SCALE: ji 1-:50' ; 1'=10' JOB: 843E SUB: 1 2021-000 SHEET: 8 OF 12 7,__ FLEXIBLE PAVEMENT DESIGN Design ADT Soil Support Average Daily Traffic, or VPD: i 457 Measured CBR 1 4 Present Year: 2021 Results: 2 Design Year 2022 3 Growth Rate (% ): 0 4 Design ADT at Design Year: 457 5 Percent Trucks: 0 Measured CBR Average: 4 Design Traffic Volume: 457 Design CBR: 4 Resiliency Factor 1 Soil Support Value 4 Design Pavement Index: 12 Total Proposed Thickness Index: 12.3 OK Material Equivalency Min. Max. Thickness, (h) Value, (a) Inches Inches (a x h) Surface Asphalt Concrete (SM-2A,B, orC) (Superpave SM-9.5A) 1.5 r 1.67 1.5 3 2.5 Prime & Double Seal or Blotted Seal Surface 0 0.84 0.0 Intermediate Asphalt Concrete (IMv 1Aor 1B)(Superpave lM-19.OA) 0 1.67 2 2 0.0 Base 1 Asphalt Concrete (BM-2 or BM-3)(Superpave BMv 25.0) 3 1.67 3 ` 5.0 Full Depth Asphalt Concrete (BM-2 or BM-3) over Surface 0 1.60 6 0.0 Untreated Aggregate (21A or 21 B) 0 1.00 6 4 0.0 Cement Treated Aggregate 0 1,67 6 4 0.0 Cement Treated Select Material, Type It, min. CBR=20 0 1.50 6 4 0.0 Select Material Type I & II, non -plastic, min CBR = 30 0 0.84 6 4 0.0 Select Material Type 11, non -plastic, min CBR = 20 0 0.60 6 4 0.0 Soil Cement 0 1.00 6 r 4 0.0 Cement Treated Select Material, Type II 0 1.17 6 4 0.0 Cement Treated Select Borrow 0 1.00 6 4 0.0 Base 2 Untreated Aggregate (21A or 216) 8 0.60 4 8 4.8 Cement Treated Aggregate 0 1.33 4 8 0.0 Select Material Type I, non -plastic, min CBR = 30 0 0.50 4 8 0.0 Select Material Type I & II, non -plastic, min CBR = 20 0 0.40 4 8 0.0 Soil Cement 0 1.00 6 8 0.0 Soil Lime 0 0.92 6 8 0.0 Cement Treated Select Material, Type 11 _ 0 1.17 6 8 0.0 Cement Treated Select Borrow 0 '.. 1.00 6 8 0.0 Total Proposed Thickness Index: 12.3 TRIP GENERATION PROPOSED ITE CODE DESIGN SPEED DU PEAK PERIOD RATE %PM VPD/ PER DAILY VPD PM PEAK TRIPS PM IN PM OUT IN OUT SFD 210 25 mph 25 9.44 63% 1 37% 0.99 236 25 16 9 SFA 230 25 mph 38 5.81 677 1337 10.52 221 20 13 7 PROPOSED TOTAL 457 45 29 16 46C 45` 45C 44` 44C 43` 43C 0,00 S1GyTalsTq�c 11(00 ( "- 00 m SCALE: 1"=50' MIRANDA CROSSING (ISD) PROFILE PROFILE DESIGN SPEED: 25 MPH HORIZ. SCALE: 1"=50" VERTICAL SCALE: 1"=10" 15+00 28�0' + 3.5' HT OF OBJECT 280' SGHT DISTANCE LEFT O.D 2 0' SIGHT DISTANCE RIGHT 3.5' HT OF OBJECT VLAI _------ - FOWLER STREET MIRANDA CROSSING FOWLER STREET - - - - - - - 10+00 11+00 12+00 13+00 14+00 15+00 160 *5 150 i45 t40 f35 f30 50 0 50 100 150 SCALE: 1"=50'(H) 10 0 10 20 30 SCALE: 1"=10'(V) 7� U�za O � O(a Y> a° �3j aU iN m CIS pro -'0 OQ EQ ZO rrr rn o w O rr o o- aN z > _ �NW d O az 0o N bi U o_ u 0 a 0 z Oz 0 0 a c 1021 DESIGNED BY: MSK DRAWN BY: MSK CHECKED BY: ZOD 4ysn o.. 0 Jimmy L Taggart o 01/2021 +ll a14� °s10NAL Q 2 O J z Y,W^^,cr J Q W Lu T m W a Q o U o a z a ¢ z L) W (L. � Cr CC N U E- 0 W CC A E- O W O Q J a O W a CO N O CC DATE: 11-01-2021 SCALE: I 1'=50'(H); 1'=10'M JOB: 1 8438 SUB: 1 2021-000 SHEET: 9 OF 12 rn N cV m N O N r LEGEND EASEMENTS TREE SAVE AREA F7ALBEMARLE COUNTY STEEP SLOPES OVERLAY - MANAGED ALBEMARLE COUNTY STEEP SLOPES OVERLAY -PRESERVED EXISTING BELVEDERE PHASE 5A DRIP LINE PROTECTIVE DEVICE `l.- MAXIMUM LIMITS OF '���✓,✓���NS'jf/ CLEARING AND GRADING PROPOSED GRADING MIN. 5' WHERE DRIPLINE IS LESS THAN 5' VILLAGE GREEN ZELKOVA SCARLET OAK 0 SHADEMASTER THORNLESS HONEYLOCUST }-r :2. CONSTRUCTION OPERATIONS RELATIVE TO THE LOCATION OF PROTECTED TREES Source: Public Facilities Manual, Vol. III, Fairfax Co., Va., 1976 Plot. 3.38-1 (2)TREE PROTECTION NO SCALE REINFORCED RUBBER HOSE, ARBOR TAPE, NYLON WEBBING PRUNE DEAD OR DAMAGED BRANCHES. DO NOT PRUNE CENTRAL LEADER. -REINFORCED RUBBER HOSE, ARBOR TAPE, OR NYLON WEBBING - 2X2 HARDWOOD STAKE PLACE TOP OF ROOT BALL SLIGHTLY ABOVE GRADE. TRUNK OF TREE) EARTH BERM AROUND BED REMOVE STRINGS, WIRE, BURLAP FROM TOP 1/3 OF BALL ON UNDISTURBED SOIL DECIDUOUS TREE PLANTING DETAIL NO SCALE VDOT NOTES: 1. STREET TREES PROVIDED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE MABQTAINED IN ACCORDANCE WITH THE REOUIREMENTS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION. 2. LANDSCAPING PLANTS AND TREES ADJACENT TO THE SIGHT DISTANCE TRIANGLE WILL NEED TO BE MAINTAINED IN AREA BETWEEN 2 AND 7 FEET ABOVE GROUND AS A CLEAR ZONE TO PRESERVE SIGHT LINES MID ACCOMMODATE PEDESTRIANS County of Albemarle Conservation Plan Cherklisl -"To he placed on Landscape Plans (Handbook, pp 111-284-111-297 for complete specilirm ion.) I. The rollewlne $hens vhdl be ahawn an the .lest: ® Trees to be saved; Limi. or clearing (ontudc dripline mf bee, to be saved); id Location and type ofpracelive fencing 0 Grade changes requiring tree wells or wells; m Pr M,cd trenching or tunneling beyond the limits ofelearing. 2. mil bees to be saved that$ he amAc l wish print or rihben at a height clearly visible to nptipment operators. m No grading shall begin until the t,m marking has been inspttted and approved by a County Inspector, 3. Pre ,,Ifracli C- .-, Treem preservation am] pnnwtinn mwsnresshall b,reviewed wish the r-mcaronsitc. 4. E u mutt O d nHeavy cyuipmem, vehicular traffic and swinge of consnucticn mateials including soil thWl nor be p- mad within the driplires of trees w be saved. S. Soil Erasion and Storm ter Detention Devkm: Such devices shall trot adversely tfecl trees m be saved. 6. rues ues are tat permincd within 100 feet af,hc dripline of,- to be saved. 7. T s Toxe materials shell not be stored wilhin 100 No of the dripline of trees to be saved. 8. 110 7 thee- Fencing: 1'rces to he rclnined wilhin 40 feet of n proposed building or grading activity shall be protected by fencing. m Fencing shall be in place and shall be inspected and approved by n Cmnty Impectnr print to Sending ar c-me ion. 9. T�W el UO When the ground level muv beraised wilhin lhedripline nfelreemhe saved. alrec well shallbeprovided andacunslmction detail suhmined for approval. 1 0. T.reeree Wall: m When the ground level must nc wavered within the dripline a tree w br saved, a Tree wall shall he provided: tent x cunstruninn dcwil nanmi❑ed earappinval. 11. ---�Tata"=: r Whcnll7 t bi"l g ns required within the limits ofcicarinp, ii slit$$he donem fin away l'mm the trunks oftrees as possible.'I'umeting under a large nee shell be considered as an after sai,c wben it is anneipated that necessary trenching will destroy reed,,, rums. 12. 1 micelivr forcing shall be the last items removed during the final cleanup. IJ. Da T tees shall be treated immediately by pruning, feniliration m other methods recommended by a mee specialist. NOTE: IT IS THE DEVELOPER'S RESPONSIBILITY TO CONFER WITH THE CONTRACTOR ON TREE CONSERVATION / REQUI M �Vp Ci/31/2020 OWNEROWNER SIGNATURE (DATE) CONTRACT PURCHASER SIGNATURE (DATE) 5/1/06 Page / of I NATIVE TRAILS STANDARDS PRIMITIVE TRAILS ARE TO BE CONSTRUCTED TO THE ALBEMARLE COUNTY DESIGN STANDARDS MANUAL CLASS B-TYPE 1, PRIMITIVE NATURE TRAILS STANDARDS. SURFACE: EARTH MIN. WIDTH: ENOUGH TO MARK LOCATION DESIGN ALIGNMENT: 20% MAXIMUM GRADE (THIS IS A MINIMUM IMPACT NATURE TRAIL) 1. OTHER DESIGN CONSIDERATIONS: TRAIL BREAKS TO PREVENT EROSION, WITH FOOT BRIDGES OVER MAJOR OBSTACLES.. GENERAL NOTES & MINIMUM STANDARDS 1. TREES SHOWN HEREON WERE SELECTED FROM ALBEMARLE COUNTY'S RECOMMENDED PLANT LIST. SUBSTITUTIONS MUST BE APPROVED BY THE ALBEMARLE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT AND THE LANDSCAPE ARCHITECT. 2. PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING. 3. TREES SHALL BE 1.5" MINIMUM CALIPER MEASURED 6" ABOVE GROUND LEVEL WHEN PLANTED. 4. TIMING OF INSTALLATION: ALL LANDSCAPING SHALL BE INSTALLED BY THE FIRST PLANTING SEASON FOLLOWING THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY WITHIN THE DEVELOPMENT, OR PHASE THEREOF. 5. ALL TREES TO BE PLANTED SHALL MEET THE SPECIFICATION OF THE AMERICAN ASSOCIATION OF NURSERYMEN. PLANTING SHALL BE DONE IN ACCORDANCE WITH EITHER THE STANDARDIZED LANDSCAPE SPECIFICATIONS JOINTLY ADOPTED BY THE VIRGINIA NURSERYMEN'S ASSOCIATION, THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS OR THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, OR THE ROAD AND BRIDGE SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION. 6. CONTRACTOR SHALL ASCERTAIN LOCATION OF ALL UTILITIES PRIOR TO EXCAVATION. PRIOR TO COMMENCING ANY WORK, CONTACT "MISS UTILITY" AT 1-800-552-7001. 7. ALL PLANT MATERIAL TO BE GUARANTEED DURING INSTALLATION AND UNTIL FINAL PROJECT ACCEPTANCE. ANY PLANT MATERIAL WHICH DIES, IS DAMAGED OR DISEASED, OR IS UNHEALTHY AND IN UNSIGHTLY CONDITION, OR OTHER CAUSES DUE TO CONTRACTORS NEGLIGENCE SHALL BE REPLACED IMMEDIATELY AT THE CONTRACTOR'S EXPENSE. B. MAINTAINING AND REPLACING STREET TREES: ALL STREET TREES SHALL BE MAINTAINED IN A HEALTHY CONDITION BY THE HOMEOWNERS ASSOCIATION AND REPLACED WHEN NECESSARY. REPLACEMENT MATERIAL SHALL COMPLY WITH THE APPROVED PLAN. 9. ALL SITE PLANTINGS OF TREES AND SHRUBS SHALL BE ALLOWED TO REACH, AND BE MAINTAINED AT MATURE HEIGHT. THE TOPPING OF TREES IS PROHIBITED. SHRUBS AND TREES SHALL BE PRUNED MINIMALLY AND ONLY TO SUPPORT THE OVERALL HEALTH OF THE PLANT. 10. STREET TREES PROVIDED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION. STREET TREE REQUIREMENTS PROPOSED WITH THIS PLAN, PHASE 5113 ® 1 TREE / 50 LINEAR FEET FRONTAGE FOWLER STREET (SECTION OF ROAD PROPOSED WITH PHASE 5B) 492.4 LINEAR FEET OF FRONTAGE / 50 = 9.8 a 2 = 19.6 TREE REQUIRED aa18 TREES PROVIDED MIRANDA CROSSING 520.5 LINEAR FEET OF FRONTAGE / 50 = 10.4 -2 = 20.8 TREES REQUIRED aa23 TREES PROVIDED -a DUE TO LIMITED SPACE FOR HEALTHY TREE GROWTH, TWO TREES FROM FOWLER STREET HAVE BEEN RELOCATED TO MIRANDA CROSSING. TREE CANOPY REQUIREMENTS (PHASE 5A + PHASE 5B) 20% TREE CANOPY REQUIRED TOTAL SITE AREA = 15.00 AC (653,479 SF) OPEN SPACE = 3.75 AC (163,350 SF) NET SITE AREA = 10.52 AC (490,129 SF) TREE CANOPY REQUIRED = 98,026 SF (20%) TREE SAVE AREA = 81,881 (65,505 a 1.25) PROPOSED TREE CANOPY = 32,947 (6.7%) TOTAL TREE CANOPY = 114,828 (23.4%) k k 50 100 150 k r✓ L & A 2-16A ENT14L G: R4 ys�s Z zaN 00 > Vi Fenw 8 OU a. Z w a ¢ON Woo O E¢ ¢ <Z eU z1[ FD O j LL z QQ 5.Q N O. w 55 Q >o w. =mow � a°o a�i U O H u 0 O Oz O F 0 0 0 z DESIGNED BY: MSK DRAWN BY: MSK CHECKED BY: I ZOD AJyta O/ . T' J� 439� JT Z �► Jimmy LTaggart U. N. A ps}1 3 1t/01 2021 1 �e2oTIAr. � Q Z_ (7 IS z m w J cc �woW m Wes �a Q 0J '0 a Z a Q z z Q W D- O p cr Ir � O 0 W q Q w CO QJ �a WFr Ir m CO 0 O DATE: 11-01-2021 SCALE: 1r=5U JOB: 8438 SUB: 2021-000 SHEET: 12 OF 12