Loading...
HomeMy WebLinkAboutSDP202100038 Correspondence 2021-11-10Hazen November 10th, 2021 Hazen and Sawyer 4011 WestChase Blvd, Suite 500 Raleigh, North Carolina 27606 • 919.833.7152 Albemarle County — Community Development Attn: Mariah Gleason 401 McIntire Rd. Charlottesville, VA 22902 Re: Review Comments for Letter of Revision to SDP202100038 Dear Ms. Gleason: Please find below responses to comments made on October 21— November 4, 2021 for case number SDP202100038: MCAWRRF In -Plant Clarifier and Lime Silo Demolition Please reach out if you have any questions or would like to discuss further. My contact information is included below. Community Development (11/4/21) Mariah Gleason 1. [32.5.2(a)] Tax map parcel. The first sheet of the plan currently lists only the neighboring parcel under the Tax Map/Parcel notes. Please revise these notes to include the tax map and parcel number of the subject property on which the proposed improvements are located (e.g. TMP 77-38B) Response: The tax map labels have been changed to each adjacent site of the parcel where improvements are proposed. 2. [32.5.2(n)] Proposed Improvements. (a) On the first Sheet, expand the area labeled "Proposed Change to Site Plan" to align with the proposed limits of disturbance shown on the second sheet. Response: Proposed LOD now shown. 3. [32.5.2(n)] Proposed Improvements. (b) If a structure or building is to be constructed on the proposed "Concrete Pad for Switchgear Building." Please revise the note to make it clear that a structure is proposed. In addition, provide the proposed dimensions and height of the proposed building. Note: Per Sec. 26Afor Industrial zoning district, the height of the structure cannot exceed 65 feet. Response: Note revised to "Proposed Pad -mounted switchgear building". Dimensions of the structure are 24' x 15' and 10' in height; and are included in Note 2 of C20. Structure is to be centered on a 16' x 17' concrete pad. hazenandsawyer.com Hazen Albemarle County — Community Development November 10, 2021 4. [32.5.2(n)] Sheet number. LORs are meant to supplement previously approved site plans. In the previously approved site plan, Sheet C13 was used to demonstrate the detailed demolition of two in -plant clarifiers and areas around them. The proposed LOR Sheet should not replace the aforementioned Sheet C13 of the approved plan, as is. Please revise the sheet to either include information reviewed and approved on the original sheet, or rename the sheet such that it acts as an attachment, or new sheet, within the previously approved plan. Response: Sheet number has been changed to C20 for this LOR submission. S. [Comment] Reminder that revised plans must include the original date of drawing and the revision date(s) of each subsequent version of the plan. These dates should be consistent across al sheets included in the revised plan. Response: The titleblock and revision dates have been changed to matched the original site plan drawings or this LOR submission. Subsequent contract drawings will use the proposed project's titleblock and revisions. Please do not hesitate to contact me should any questions or concerns arise. Sincerely, Adam March Assistant Engineer, Hazen and Sawyer amarch@hazenandsawyer.com (919)-863-1029 Page 2 of 2 hazenandsawyer.com