HomeMy WebLinkAboutSP202100005 Approval County 2021-10-20,S.{.OF AL8
County of Albemarle
Community Development Department - Planning
November 12, 2021
Margaret Haupt
Margaret B Haupt Trust & Richard A Haupt Trust
7181 Batesville Rd
Afton VA 22920
RE: SP202100005 Haupt Property Action Letter
Dear Ms. Haupt,
Andy Reitelbach
areitelbach@albemarle.ora
Telephone: (434) 296-5832 ext.3261
On October 20, 2021 the Board of Supervisors took action on your Special Use Permit on Tax Map Parcel Numbers
085000000003AO and 085000000003A1 in the Samuel Miller District.
The Special Use Permit was approved by the Board's adoption of the attached Resolution and Conditions.
Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no
uses on the property as approved above may lawfully begin until all applicable approvals have been received and
conditions have been met. This includes:
• compliance with the approved SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN; and
• approval of a ZONING COMPLIANCE CLEARANCE.
Should you have questions regarding the above -noted action, please contact me.
Sincerely,
Andy Reitelbach
Senior Planner
Planning Division
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
RESOLUTION TO APPROVE
SP202100005 HAUPT PROPERTY
WHEREAS, upon consideration of the staff report prepared for SP 202100005 Haupt Property and
the attachments thereto, including staffs supporting analysis, the information presented at the public
hearing, any comments received, and all of the factors relevant to the special use permit in Albemarle
County Code §§ 18-10.2.2(20) and 18-33.8(A), the Albemarle County Board of Supervisors hereby finds
that the proposed special use would:
I. not be a substantial detriment to adjacent parcels;
2. not change the character of the adjacent parcels and the nearby area;
3. be in harmony with the purpose and intent of the Zoning Ordinance, with the uses permitted by
right in the Rural Areas district, with the applicable provisions of Albemarle County Code § 18-5,
and with the public health, safety, and general welfare (including equity);
4. be consistent with the Comprehensive Plan; and
WHEREAS, upon the recommendation of the Agricultural and Forestal Districts Advisory
Committee, the Board determines that the camp and the proposed pavilion allowed by the special use
permit are consistent with the purposes of Chapter 3, Agricultural and Forestal Districts, of the Albemarle
County Code.
NOW, THEREFORE, BE IT RESOLVED that the Albemarle Comity Board of Supervisors
hereby approves SP 202100005 Haupt Property, subject to the conditions attached hereto.
aaa
1, Claudette K. Borgersen, do hereby certify that the foregoing writing is a true, correct copy of a
Resolution duly adopted by the Board of Supervisors of Albemarle County, Virginia, by a vote of six to
zero, as recorded below, at a meeting held on October 20 2021.
L�h&' ,--
Clerk, Board of County Super i rs
Ave Nay
Mr. Gallaway
Y
Ms. LaPisto-Kirtley
Y
Ms. Mallek
Y
Ms. McKeel
Y
Ms. Palmer
Y
Ms. Price
Y
SP202100005 Haupt Property Special Use Permit Conditions
1. Development of the use must be in general accord (as determined by the Director of Planning and
the Zoning Administrator) with the concept plan entitled, "SP202100005 Haupt Property Day
Camp, Day Camp Map," prepared by B. Clark Gathright, LLC, dated September 25, 2021. To be
in general accord with the exhibit, development must reflect the following essential major
elements:
• Location of the camp entrance
• Location of the staff parking and drop-off/turnaround areas
• Location and size of the future pavilion
• Location of outhouses/privies
• Minimum grading and clearing possible may be allowed to locate sanitary facilities
and pavilion as shown on the Haupt Property Day Camp concept plan
Minor modifications to the plan which do not conflict with the elements above, with the approval
of the Zoning Administrator and the Director of Planning, may be made to ensure compliance
with the Zoning Ordinance and State and Federal laws.
2. The hours of operation: five days per week, Monday through Friday, for a maximum of 45 days
per year, from June through August, beginning no earlier than 8:00 AM and ending no later than
5:00 PM. Overnight boarding or camping is not permitted.
3. No more than 50 people are permitted at each daily session of this camp use, including both camp
staff and camp attendees.
4. Bus and carpool trips must be the primary means of transportation for camp staff and attendees.
Documentation must be provided to Community Development staff prior to the issuance of
Zoning Clearance with a plan identifying how buses and carpools will be used to transport camp
participants.
5. Daily trip generation from this use must not exceed the requirements of VDOT for a low volume
commercial entrance. VDOT approval of such an entrance is required prior to issuance of a
Zoning Clearance.
6. Health Department approval is required for all well, septic, and outhouse facilities prior to
issuance of a Zoning Clearance.
7. Prior approval by the Fire Department will be required prior to all outdoor cooking and/or
campfires.
8. All outdoor lighting must be only full cut-off fixtures and shielded to reflect light away from all
abutting properties. A lighting plan limiting light levels at all property lines to no greater than 0.3
foot-candles must be submitted to the Zoning Administrator or their designee for approval.
9. Sound amplification of any type is not permitted.