Loading...
HomeMy WebLinkAboutSP199000108 Staff Report 2021-11-17STAFF PERSON: WILLIAM D. FRITZ PLANNING COMMISSION: JANUARY 29, 1991 BOARD OF SUPERVISORS: FEBRUARY 20, 1991 ZMA-89-16 AND SP-90-108 J. W. TOWNSEND Petition: J. W. Townsend petitions the Board of Supervisors to rezone 10.3 acres from R-1, Residential to LI, Light Industry and issue a Special Use Permit to allow a contractor's office and equipment storage yard with retail sales exceeding 15% of the gross floor area [Section 27.2.2(13)] as proposed by ZTA-90-08. Property, described as Tax Map 32, Parcel 22B (part of), is located on the west side of Route 29 approximately 2,000 feet south of the bridge over the North Fork Rivanna River. Character of the Area: The vacant. The property to the fabric outlet. Property to but was recently rezoned to to accommodate a mobile home APPLICANT'S PROPOSAL: site is currently wooded and south is developed with a the north is currently vacant, HI, Heavy Industry with proffers refurbishing/sales business. The applicant is proposing to rezone 10.3 acres to LI, Light Industry and obtain a special use permit in order to allow a landscape contractors office and equipment storage yard with retail sales. The special use permit for retail sales is envisioned by ZTA-90-08. Y The applicant has submitted the following proffers (Attachment A): 1. Not limiting uses by right or by special use in the LI, Light Industrial District. Any use will be in general accordance with the submitted sketch. The proffered plan is provided as Attachment B. SUMMARY AND RECOMMENDATIONS: Staff has reviewed this request for compliance with the purpose and intent of the Zoning ordinance and the Comprehensive Plan and recommends approval with the acceptance of proffer number two. PLANNING AND ZONING HISTORY: The rezoning request was deferred by the Planning Commission on June 19, July 10, 1990 and November 20, 1990. This area is recommended for Industrial Service. Uses recommended in the Industrial Service Areas are found in Table 46 on page 161 of the Comprehensive Plan (Attachment C). SUMMARY AND RECONMENDATION• ZMA-89-16 It is intended that LI districts may be established in areas having all of the following characteristics: - Areas served by water and sewer facilities or if such facilities are reasonably available; Areas served by major highway, rail or air service, or secondary road improved to standards approved by the county; - Areas having clearly demonstrated suitability for intended uses with regard to physical characteristics and relationship to surrounding development. This site is served by public water. However, sewer capacity is not currently available. Health Department approval has not been obtained at this time and will be required during site plan review. Soils on this property have only moderate limitations for sanitary facilities and building construction. The proposed development will be served by Route 29. The Virginia Department of Transportation has stated that the crossover located immediately to the south of this site is scheduled to be closed due to lack of sight distance and turn lanes (Attachment D). It is uncertain at this time as to whether the applicant will be required to close this crossover at the time of site plan review. The entrance does not meet the site plan provisions of a 500 foot separation from the crossover [32.7.2.2]. Entrance improvements will be determined at the time of site plan review. The applicant's proffered sketch does indicate a right turn lane. Vehicles traveling north on U.S. 29 will be required to make a U-turn at a crossover located 950 feet north of this proposal to enter this site. 2 The site is currently wooded and the applicant's proffered plan retains a buffer between the developed area and adjacent properties. The applicant's proffered plan provides for a building setback of approximately 100 feet from property recommended for residential use. Required setback is 50 feet. In addition the required undisturbed buffer has been increased from 30 feet to a minimum of approximately 40 feet. The applicant's plan shows that parking will be located approximately 400 feet from Route 29 and only limited clearing is proposed on the front of the property. New landscaping is proposed across the frontage of the property. In the opinion of staff, the proffered plan addresses the concerns of the Comprehensive Plan. Setbacks from Route 29, the preservation of existing vegetation and installation of new landscaping are in keeping with the Planning Commission and Board of Supervisors' concern of Route 29 as an entrance corridor. The applicant's proffers do not limit any of the uses in the LI, Light Industrial Zone. Staff does not recommend the acceptance of the applicant's first proffer as it is intended as information. However, staff opinion is that the proffered plan limits the developable area such that staff would not recommend deletion of any uses. The site is not served by public sewer and any industrial use would require Health Department approval and compliance with Section 4.14 of the Zoning Ordinance (Performance Standards). Development of this property will result in U-turns, some of which would occur at a currently existing crossover within less than the minimum required distance from an entrance. Staff opinion is that this should be addressed at time of site plan review. Staff opinion is that this rezoning request with its proffered plan is consistent with the recommendations of the Comprehensive Plan, Section 1.4, 1.5, & 1.6 of the Zoning Ordinance and the purpose and intent of the Light Industrial District. Therefore, staff recommends approval subject to acceptance of the applicant's second proffer. 1. Any use will be in general accordance with the submitted sketch. SP-90-108 The applicant proposes a contractor's office with retail sales on this site. The applicant proposes to have approximately 23,705 square feet of area devoted to retail sales. The breakdown of space devoted to the contractors 3 use and retail use is found in Attachment E. About 33% of the total area will be devoted to retail sales. Staff believes the amount of sales area is subordinate to the primary use as a landscape contractor's office and equipment storage yard. The increased area is due to the nature of materials stored on site, which are to be trees and shrubs, mulch and topsoil. These items cannot be stacked and require large storage areas. Staff opinion is that approval of this request will not result in an unwanted mix of industrial and non -industrial traffic due to the site's location on Route 29. Staff has reviewed various trip generation rates to determine if this use will result in an increase in traffic. Uses permitted in the LI zone could generate 52-56 vehicle trips per acre based on ITE. No figures are available for the specific landscape retailing use proposed by the applicant, however a nursery use could generate 86 vehicle trips per acre. Staff opinion is that the proposed retail sales will likely generate trips at a somewhat lower rate than a nursery, which should be consistent with the rates possible under general LI uses. In addition, this use would not be of substantial detriment to adjacent properties as the proffered plan notes increased setbacks which will provide sufficient buffers to adjacent land and Route 29. This site is subject to the recently adopted Entrance corridor District. Staff opinion is that this special use permit request is consistent with Section 31.2.4.1 of the Zoning Ordinance and staff recommends approval subject to the following conditions: RECOMMENDED CONDITIONS OF APPROVAL 1. Material and area devoted to retail sales shall be in accordance with that noted in Attachment E; Compliance with ZMA-89-16. ATTACHMENTS A. Applicant's Proffers B. Proffered Plan C. Table 46 of the Comprehensive Plan D. Virginia Department of Transportation Comments E. Applicant's Land Use Summary F. Tax Map ATTACEPUTr A J.W. TOWNSEND, INC. LANDSCAPE CONTRACTOR June 9, 1990 Mr. William D. Fritz Albemarle Planning and Community Development 401 MClntire Road Charlottesville, VA 22901-4596 In re: ZMA 89-16, J. W. Townsend Dear Bill, I am writing to clarify and revise any and all previous correspondence regarding proffers on this property. Specifically, 1) I do not wish to limit any uses by right or special use permit in the light industrial district. 2) Any use will be in general accordance with the sketch submitted on April 27, 1990. If you have any further questions, please do not hesitate to contact me. Thank you for your assistance with this matter. JWT/aet Sincerely, d.jwmsend' P.O. BOX 5551 CHARLOTTESVILLE, VA. 22905 804/973-1154 Commonwealth of Virginia Class A Contractors License #028007 19E n q Q C y 8 3, 9 n a o„ n A D N N N C a 25 o-0 S d o w m m m a m b 7 a o n 3 n^ Y 0 m c� �� b o .o' � O m r N D m N 3 d 30 ry J oa f mZ m = N A J O w N A O N � "O C W O^ 0 N O y N P i O O O° m o m°X u n J-n<�a Jz^.- �dr noomR°>>�3maom bw ° <O _. b c m n 9 n= °° aw„ o m O1 i, 7 O G a 9 3 A J O +. N N T b c W rOi c N n' m - 0'O "O w .4 Oma ^ °� °' „ b �� J w - m + T o i & 3 iE -. O N O O A A s�Z m o S Ci 3 e,v o c ° o m m •^ 3 H n' ^ S 5-0 � u n b Fm °'O '� Oc. e3i o< n n o d�.S G ' p' ry °- �. o > v �2 m o 0 n° o b n A rn m 3 R m n J G o v' �'^� N^^ O b 3 v b G c n c� aD F,� ^•x u_^^i aL rAo m o :2 NO An o m w m m-2ft AS"O �� c O o o ^ ATPACHMENT D Page 2 April 19, 1990 Mr. Ronald S. Keeler Special Use Permits & Rezonings 5. ZMA-89-16 J. W. Townsenduoute 29 N,1- The Comprehensive Plan shows industrial zoning which is what this request is for. This request would result in an increase in traffic from the current zoning. This property is either right at or just north of crossover #35, which is shown to be closed in the 29 Corridor Study. Therefore, the Department recommends that this crossover be closed off in conjunction with this rezoning request, should it be approved. There are no left turn lanes in the median for this crossover and there is inadequate sight distance at the crossover. 6. SP-90-26 Commonwealth Gas Pipeline Corporation, Route 20 N. - The gas transmission line will need to be bored under Route 20 for the crossing at this location. 7. SP-90-35 Covenant Church of God, Route 643 - This section of Route 643 is currently tolerable. This request would result in a considerable increase in traffic from what could be generated from the RA Zoning. Due the alignment of Route 643, there may be a problem obtaining adequate sight distance for the commercial entrance to serve this property. 8. SP-90 33 Hillsboro Baptist Church, Route 797 - This section of Route 797 is currently tolerable. This request would result in some increase in traffic. A tree needs to be removed east of the eastern entrance to obtain adequate sight distance. There should be adequate onsite parking to accommodate the church. 9. SP-90-32 Holy Trinity Church, Route 640 - This section of Route 640 is currently tolerable. This request would probably not result in much increase in traffic, depending upon the usage of the building addition. The existing private driveway does not have adequate sight distance in either direction. A minimum of 350 feet of sight distance is required and tree trimming or removal is needed in both directions and possibly some grading of the bank is needed to the east. Sight easements may also be needed in both directions to assure that the sight distance is obtained and maintained. The Department recommends that the access to this property be upgraded to a commercial entrance with adequate sight distance. ATTACHMENT E NOV 7 19M J.W. TOWNSEND, INC. LANDSCAPE CONTRACTOR November 5, 1990 Mr. William D. Fritz County of Albemarle Department of Planning and Community Development 401 McIntire Road Charlottesville, VA 22901 In re: ZTA-90-08, ZTA-90-09, ZTA-90-10, SP-90-108 Dear Bill, I am writing to follow-up on our meeting of November 1, 1990 with Ron Keeler. The property, as you know, is now 10.3 acres, not 9.9 acreas, as previously listed. The enclosed plan is revised and includes the walking nature trails, and storage areas which we discussed Thursday. The inclusion of these spaces would update the square footages from our March 16, 1990 figures to the following: Approximate Square Footage Contracting Arbory Main Office Area 1,900 950 Storage Areas: A. 4,435 2,190 B. 4,435 2,190 C. 7,790 3,835 D. 4,740 2,335 E. 11,230 5,620 F. 6,000 1,000 G. 7,365 5,585 Summary 67% 33% P.O. BOX 5551 CHARLOTTESVILLE, VA. 22905 804/973-1154 Commonwealth of Virginia Class A Contractors License 4028007 ATTACHMENT E Page 2 Mr. William D. Fritz November 5, 1990 Page 2 of 2 I hope that this information is helpful. If you have any questions, please let me know. I look forward to reviewing your preliminary findings; if you are unable to reach me (I will be out of town Thursday and Friday, November 8 - 9), please forward the preliminary report to Lindsay Barnes at McCallum & Kudravetz. Thank you in advance for your assistance with this matter. Sil\ ee/Irely, r I A MJ. T wnsend Enclosure cci Mr. Ronald Keeler Mr. Lindsay Barnes, Esq. J.W. TOWNSEND, INC., LANDSCAPE CONTRACTOR, P.O. BOX 5551, CHARLOTTESVILLE, VA. 22905 804/973-1154 Commonwealth of Virginia Class A Contractors License #028007 31 ALBEMARLE COUNTY 20 ATTACHMENT F (A uV• N9 N[ 3 O N1 v IA CNRI, 911.1.E L9RE� 4A T I NIAR 3A \ 4J 2 •I 4 44 = A ELOT ( 4R ' SE 11'NN 4. .9 I n• (T 98 lz • ZMA-89-16 J.W. Townsend. Inc.' _ pN ( G , YP9f9 22N 196x � 22LI ,r, 221 P 22L 19G E23 % ...... f0 ) LEYp.. - to , 90111 �z/z, ,. 22 23 1 90 O4E / ^ � �• I/ nlw,nu I] t� I az F I6 I 20Cv 21 PW YI. PA 2p1r 6G \ • 20 q,l Ygd IY IIE � .WagT RCRER \\ \ \ t99! /a9 99C. OEE� jj s6 P \ / �I 9E(IION 3:4:/41 a• \ IN 2� 116 R9 j39 \ iRx M1 t9f 19.JL\ /419 3'• JNI ,ra t'N 41M \ 49E •���Y' SE2iloF zo E��� aEoVA ,y \1(, 1'/yam`,' 45 44 54/ { 24 59 5C / 1 46 WALE INt"' RIVANNA DISTRICT SECTION 32