Loading...
HomeMy WebLinkAboutSP202100015 Resubmittal 2021-11-15Resubmittal of information for Special Use Permit PROJECT NUMBER THAT HAS BEEN ASSIGNED: SP202100015 Owner/Applicant Must Read and Sign I hereby certify that the information provided with this resubmittal is what has been requested from staff Signature of Owner, Contract P rc 4ser Charles E. Ward, Jr. Print Name November 15, 2021 Date 434-484-0364 Daytime phone number of Signatory FEES to be Paid after aDDlication For original Special Use Permit fee of $2,366 ❑ First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $1,183 ❑ 4% Technology surcharge $47.32 TOTAL SPECIAL USE PERMIT RESUBMISSION FEE $1 230.32 For original Special Use Permit fee of $1,183 ® First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $592 ❑ 4% Technology surcharge $23.68 TOTAL SPECIAL USE PERMIT RESUBMISSION FEE $615.68 FOR OFFICE USE ONLY Fee Amount S Date Paid By who? Receipt# Ck# By: County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 Revised 7/1/2021 Page l of I Booth & Associates November 15, 2021 VIA Email/Online Submittal Mr. Scott M. Clark Senior Planner, Planning Division County of Albemarle Community Development Department - Planning Division sclark(&albemarle.org Subject: SP202100015 Midway -Martin's Store 115kV Transmission Line Dear Scott: We are in receipt of your letter regarding Central Virginia Electric Cooperative's submittal for a special use permit application. Please find your review comments below in black with responses in blue italics. Engineering (Frank Pohl) Show the limits of the 100-yr floodplain on all sheets, where applicable. New poles are allowed "by -right" to be located within the floodplain overlay district (18-30.3.11), however, a Floodplain Development Permit is required if any are located within the district. If the Structure Mat Pads are located with the floodplain, please provide pad dimensions and a detail/section of the pad, including existing and proposed grade and pad elevations. 0 The following poles lie within the 100-year floodplain elevations and are shown on the attached drawings. A Floodplain Development Permit is anticipated. • 21A • 22 • 23 • 26A • 33 • 36 No structure mat pads are located within the floodplain areas. Rubber tracked vehicles will be utilized in order to protect sensitive areas. Please provide the total land disturbance area, including areas to be cleared and the disturbance related to installing the Structure Pads. Please provide a detail of the Structure Mat Pads, including dimensions at leach location. A VSMP permit is required prior to the start of land disturbing activities if the cumulative land disturbance area exceeds 10,000 sf (Chapter 17, Albemarle County Code). o The total land disturbance area is 76.36 acres. o Area to be cleared is 1.56 acres. o Structure pad area is 0.05 acres. Structure pads are laid over the native soil and vegetation and minor to no disturbance is anticipated from the matting. The area will be reseeded and stabilized after matting is removed per the regulations. 5811 Glenwood Avenue 919.851.8770 office Raleigh, NC 27612 919.859.5918 facsimile www.booth-assoc.com Mr. Scott M. Clark November 15, 2021 Page 2 • Show the stream buffer on all sheets, where applicable (17-600). o A 50-foot buffer has been shown off the Mechums River and its tributaries per Albemarle County Water Protection Ordinance (WPO). Please describe the "bridge matting" to be used on indicated stream crossings: does the matting span the streams that being crossed, or does it rest on the streambed and banks? (If the latter, staff may recommend a condition requiring alternative structures to span the streams, to avoid impacts to the streams.) o A metal bridge will span 70' across the creek, will extend shoreline to shoreline and will not be removed until the work is completed. S o Indicate the potential impacts on streamside soil and vegetation; and list measures the measures that will be used to restore the bridge matting area after the matting is removed. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reaches on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. • On Sheet 1, at pole location 2, there is a "clearing area" that appears to extend outside the existing right-of-way. Is new right-of-way required for this area, or is this only temporary clearing being done for construction -access purposes? o The clearing area on Sheet 1 at Pole 2 is now shown within the right-of- way. Any access -related activity outside of the existing right-of-way is for construction access purposes only and does not require new right-of- way. To clarify the relationship between this use and the recently -proposed soar facility for TMP 85-17B - on page 8 of the application narrative, response #3 says, "The Midway Solar Project will not interconnect to the CVEC 115kV transmission line." If this is the case, what will the solar project connect to? Is a new line planned, either along this existing corridor or otherwise? o The Midway Solar Project is totally independent of the Midway - Martin's Store 115kV Transmission Line Project. The Midway Solar Project will not interconnect to the CVEC 115kV transmission line. The solar project will connect to an existing distribution line within the existing easement. The existing distribution runs parallel to the existing 115 kV transmission line. The existing 115 kV transmission line will be removed once the new 115 kV transmission line is constructed. The existing distribution line will remain untouched where the Midway Solar project will interconnect. There is not any new distribution line planned or required. * Booth & Associates Mr. Scott M Clark November 15, 2021 Page 3 Sincerely, BOOTH & ASSOCIATES, LLC 1� 1 Briana D. Eddy BDE/dmc cc: Attachments 21-10053-9005 C =0 (S� OF AL8 County of Albemarle o i, en Community Development Department - Planning Division G�RGIN�Q' November 5, 2021 Mr. Charles E. Ward, Jr., PE Central Virginia Electric Cooperative PO Box 247 Lovingston VA 22949 RE: SP202100015 Midway -Martin's Store 115kV Transmission Line Dear Mr. Ward, Scott Clark sclark@al bemarle.or¢ tel: 434-296-5832 ext. 3249 fax:434-972-4126 Thank you for the recent submittal for this special use permit application. Please find review comments for the application included in this letter. Review Comments Engineering (Frank Pohl) Show the limits of the 100-yr floodplain on all sheets, where applicable. New poles are allowed "by - right" to be located within the floodplain overlay district [18-30.3.11], however, a Floodplain Development Permit is required if any are located within the district. If the Structure Mat Pads are located with the floodplain, please provide pad dimensions and a detail/section of the pad, including existing and proposed grade and pad elevations. Please provide the total land disturbance area, including areas to be cleared and the disturbance related to installing the Structure Mat Pads. Please provide a detail of the Structure Mat Pads, including dimensions at each location. A VSMP permit is required prior to the start of land disturbing activities if the cumulative land disturbance area exceeds 10,000 sf [Chapter 17, Albemarle County Code]. Show the stream buffer on all sheets, where applicable [17-600]. Planning (Scott Clark) • Please describe the "bridge matting' to be used on indicated stream crossings; does the matting span the streams that being crossed, or does it rest on the streambed and banks? (If the latter, staff may recommend a condition requiring alternative structures to span the streams, to avoid impacts to the streams.) o Indicate the potential impacts on streamside soil and vegetation; and list measures the measures that will be used to restore the bridge matting area after the matting is removed. • On Sheet 1, at pole location 2, there is a "clearing area' that appears to extend outside the existing right- of-way. Is new right-of-way required for this area, or is this only temporary clearing being done for construction -access purposes? • To clarify the relationship between this use and the recently -proposed solar facility for TMP 85-17B - on page 8 of the application narrative, response #3 says, "The Midway Solar Project will not interconnect to the CVEC 115kV transmission line." If this is the case, what will the solar project connect to? Is a new line planned, either along this existing corridor or otherwise? Action After Receipt of Comments After you have read this letter, please take one of the actions identified in the "Action After Receipt of Comment Letter" memo that is attached. Resubmittal If you choose to resubmit, please use the attached form. Note that, as listed on the form, further resubmittals for these applications will require a fee of $538. Feel free to contact me if you wish to meet or need additional information. I can be reached at sclark@albemarle.org. Sincerely, Scan M. c1ar1l Scott Clark Senior Planner, Planning Division DEPARTMENT OF COMMUNITY DEVELOPMENT ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit/request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and/or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule.) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty-two (22) days prior to the Board of Supervisors public hearing. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Fees may also be paid by credit card using the secure online payment system, accessed at http://www.albemarle.org/department.asp?department=cdd&relpage=21685. FOR OFFICE USE ONLY SP # or ZMA # Fee Amowd $ Date Paid By who? Receipt# ck7 By: Resubmittal of information for Special Use Permit or Zoning Map Amendment PROJECT NUMBER: PROJECT NAME: ❑ Resubmittal Fee is Required ❑ Per Request ❑ Resubmittal Fee is Not Required Community Development Project Coordinator Signature Date Name of Applicant Phone Number Signature Date FEES Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,075 ❑ First resubmission FREE ❑ Each additional resubmission $538 Resubmittal fees for original Special Use Permit fee of $2,150 ❑ First resubmission FREE ❑ Each additional resubmission $1,075 Resubmittal fees for original Zoning Map Amendment fee of $2,688 ❑ First resubmission FREE ❑ Each additional resubmission $1,344 Resubmittal fees for original Zoning Map Amendment fee of S3,763 ❑ First resubmission FREE ❑ Each additional resubmission $1,881 ❑ Deferral of scheduled public hearing at applicant's request —Add'1 notice fees will be required $194 To be Daid after staff review for Dublic notice: Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. 11 AI \ 7 WIN: I Oro 1110 l I[171r1111O1 WK11 aI_\ 112 016VA I_\'711 afl7\V I Al DIOI II_V IF21111A 11A 111011 YV 11 eV/ al KO WA 1 a1C11[K11WON a 11 N Preparing and mailing or delivering up to fifty (50) notices $215 + actual cost of first-class postage Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice + actual cost of first-class postage Legal advertisement (published twice in the newspaper for each public hearing) Actual cost minimum of $280 for total of 4publications)