HomeMy WebLinkAboutVA200300005 Action Letter 2003-05-29 • `�RCIN\P COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road, Room 227 Charlottesville,Virginia 22902-4596 FAX(434)972-4126 TELEPHONE(434)296-5832 TTD(434) 972-4012 May 29, 2003 Charles I. Lunsford, III 4769 Plank Road North Garden, VA 22959 Re: Residential Alteration Project at Tax Map 09900-00-00-01000 Permit # 03-503 AR Dear Mr. Lunsford: Pursuant to my brief meeting with you, Ms. Lunsford, Valerie Long and John Shepherd last Friday, the extent of work that may proceed under the posted Stop Work Order is being expanded. In addition to the allowances stated in my letter of May 22, you may continue with structural improvements, which are related to the main beam that supports the existing second floor. Sincerely, Ja Schlothauer Building Official JS/js cc: Keith Huckstep Dwayne Via Amelia McCulley John Shepherd Valerie Long—McGuireWoods, LLP Troy Yancey—T.E.A.L. Construction 03-503 AR Reading File l I'I .9C f U•v ® fi R] `tRCiN1.P COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road, Room 227 Charlottesville,Virginia 22902-4596 FAX(434) 972-4126 TELEPHONE(434)296-5832 TTD (434)972-4012 May 22, 2003 Charles I. Lunsford, III 4769 Plank Road North Garden, VA 22959 Re: Residential Alteration Project at Tax Map 09900-00-00-01000 Permit# 03-503 AR Dear Mr. Lunsford: Due to a finding that the referenced building permit was issued in conflict with certain provisions of the Albemarle County Zoning Ordinance, the Zoning Administrator has ordered the reversal of the zoning office's approval of the permit. With the rescindment of that approval, the permit must now be considered void. Consequently, since it is a violation of Section 109.1 of the 2000 Virginia Uniform Statewide Building Code (Va. USBC) to build without a valid building permit, a Stop Work Order is posted at the referenced building site. This Order is issued in accordance with Section 119.0 of the 2000 Va. USBC. Except for what is necessary to make the roof and walls of the alteration weather-tight, no further construction work is to be performed on this project. Upon re-issuance, or re-instatement, of the permit, this Stop Work Order will be lifted. At that time, you must make arrangements for this office to perform all field inspections necessary to approve the work that has progressed to date. Sincerely, Jay Schlothauer Building Official JS/js cc: Keith Huckstep Dwayne Via Amelia McCulley John Shepherd Valerie Long—McGuireWoods, LLP Troy Yancey—T.E.A.L. Construction 03-503 AR Reading File