HomeMy WebLinkAboutSUB202100026 Correspondence 2021-11-18® COLLINS ENGINEERING
November 12, 2021
Emily Cox
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Brookhill Blocks 16 & 17—Road Plan (SUB 202100026)
20o GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
��434.293.3719 PH 434.293.2813 FX
www.collins-eng ineeri ng.com
Thank you for your comments dated March 15, 2021 on the above referenced project. Below are our responses to the remaining
comments on the site plan.
Engineering (Emily Cox):
1. Comment acknowledged.
2. Comment addressed.
3. Comment addressed.
4. Greenway parcel DB & PG has been shown on Sheet 4.
5. Comment addressed.
6. Comment addressed.
7.
Comment addressed.
8.
Comment addressed.
9.
Comment addressed.
10.
Comment addressed.
11. Street trees have been relocated 5' away from storm pipes along Marcella Street and throughout the plan.
Planning (Cameron langille):
1. Comment acknowledged.
2. Comment acknowledged. A special use request will be submitted to the Board of Supervisors for approval.
3. Comment addressed.
4. Comment addressed.
5. Comment addressed.
6. Comment addressed.
7. Comment addressed.
8. Comment addressed.
9. Comment addressed.
10. Sablewood Trail has been changed to Sablewood Drive, per recommendation from E911.
11. Comment addressed.
12. Comment addressed.
13. Comment addressed.
VDOT (Adam Moore):
1. "No Parking' signs have been shown and labeled on both sides of Halsey Avenue.
2. Blocks 16 and 17 will be constructed at the same time.
3. Turn lane analysis for Polo Grounds Road onto Halsey Avenue has been provided with this submittal.
E911(Elise K(ewra):
1. Sablewood Trail has been changed to Sablewood Drive.
Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com.
Sincerely,
<_1C.bI,-
Scott Collins, PE