Loading...
HomeMy WebLinkAboutWPO202100054 Review Comments WPO VSMP 2021-11-22�q off nig 401 McIntire Road, North Wing County Charlottesville, VA 22902-4579 of Albemarle Telephone: 434-296-5832 COMMUNITY ��BGIN�Q' DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VSMP Permit Plan Review Project title: Keswick Family Pool Project file number: WPO2021-00054 Plan preparer: Jessica Denko, PE /Timmons Group Jessica.denko(Ltimmons.com Craig Kotarski, PE, Timmons Group — 608 Preston Ave, Suite 200, Charlottesville, VA 22903 [crais.kotarski(&,,timmons.com ] Owner or rep.: Keswick Club LLC — 701 Club Drive, Keswick, VA 22947 itrevenen(a_keswick.com Plan received date: 30 Sep 2021 (Rev. 1) 15 Oct 2021 (Rev. 2) 10 Nov 2021 (Rev. 3) 10 Nov 2021 (TG email, November 11, 2021 8:17 AM) Date of comments: 7 Oct 2021 (Rev. 1) 29 Oct 2021 (Rev. 2) 10 Nov 2021 (Engineering email sent November 10, 2021 12:16 PM) (Rev. 3) 22 Nov 2021 [2 submittals received 10-Nov 2021; combined comments.] Reviewer: John Anderson, PE County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied for limited reasons listed below (1 item, SWM; 1 item, ESQ, SWPPP requires revision, as well. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Revise SWPPP title page to include ref. to WP0202100054. (Rev. 1) Addressed. 2. Please check to see if file `flatten' issue may have affected SWPPP submittal by stripping information, thanks for discussing this with me 10/6/21. (Rev. 1) Addressed. 3. (Rev. 1) As follow-up: (Rev. 2,3) Addressed. a. SWPPP, Sec. 1 (Registration Statement) i. Sec. V.: Registration statement must be signed prior to WPO plan approval. Timmons Group is eligible /appropriate, since TG prepared the SWPPP for Keswick Family Pool. ii. Sec. IV.B.: Please check `yes' box since an ESCP has been submitted for review. b. SWPPP, Sec, 6, PPP: i. Sec. 6.A PPP Exhibit: Please indicate an initial location for rain gauge. ii. Sec. 6.E: List named individual responsible for PPP (TBD or list individual). c. Sec. 8: List named individual responsible for ESC compliance inspections (TBD, or list individual) d. Sec. 9: Signed Certification: please sign. (Rev. 2,3) Addressed. 4. Note: Once SWPPP approved, Engineering should be positioned to register project with DEQ for VAR10 permit. A VAR10 permit is required prior to scheduling pre -construction for Keswick Family Pool. 5. New (Rev 2.3): As follow-up, email sent to Applicant requesting Sec. 1 of SWPPP be revised to list Ilex Construction (November 22, 2021 10:16 AM). Engineering Review Comments Page 2 of 4 B. Pollution Prevention Plan (PPP) —see SWPPP, item 3.b., above. (Rev. 2, 3) Addressed. The PPP content requirements can be found in County Code section 17-404. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons listed at item 2.a-/c., below. (Rev. 2,3) SWM plan is approved pending recordation of easement plat. The stonmwater management plan content requirements can be found in County Code section 17-403. Note: Pre -construction is point project receives a grading permit, but grading permit is also contingent upon _ nutrient credit purchase. Please coordinate purchase documents (Affidavit /bill of sale) with Ana Kilmer, CDD Management Analyst, at earliest convenience = is a set value. 434.296-5832-x3246; akilmer(iWbemarle.org. (Rev. 2,3) Please ref. Process section, below, for status of Nutrient Credit Purchase 1. General a. Add WPO202100054 to calculation packet cover. (Rev. 1) Addressed. b. Add WPO202100054 to plan title sheet. (Rev. 1) Addressed. 2. C4.0 a. Show /label public drainage easement (SWM facility outfall pipe). (Rev. 1) Partially addressed. As follow-up: On C6.6, label easement over SWM facility outfall pipe `public drainage easement' rather than 20' permanent stormwater management facility easement. SWM facility and public drainage easement deeds are distinct, each deed references platted easements, which should be labeled either SWM facility easement (variable SWM... ), or 20' public drainage easement. (Rev. 2,3) Addressed. b. Show /label SWM facility easeme (Rev. 1) Addressed. c. Please find easement plat application a (Rev. 1) Addressed. Note: SUB202100191 received 10/27/21. https://www.albemarle.org/home/showpublisheddocument/1052/637624089314100000 3. C5.0 a. Note 3: Please ensure comment allowing contractor discretion with rooftop storm routing is consistent with post -developed hydraulic routings in calculation packet. Allowing the contractor flexibility to route roof leader lines to `nearest inlet' is inconsistent, and may cause discharge higher than reported in the calculation packet, if runoff intended to reach detention bypasses detention. (Rev. 1) Addressed. b. Recommend label, note, or legend identify permeable pavers as Level 1 permeable pavers. (Rev. 1) Addressed, 4. C6.2 a. Include Construction Installation steps from VA DEQ Stormwater Design Specification No. 7. (Rev. 1) Addressed. b. Include underground detention Mfr. specifications, typical details, and specific details for proposed SWM facility. (Rev. 1) Addressed, 5. C6.3 a. Check upgradient drainage areas for Area 2 and Area 3, since it appears upgradient areas may drain to permeable pavers in these areas. (Rev. 1) Addressed. b. Check CDA ratio, 3.09:1, permeable pavement drainage area 4, since VA DEQ Stormwater Design Spec. Level 1 max. CDA ratio is 2.5:1. Revise, as needed. (Rev. 1) Addressed. 6. C6.0 a. Stormwater Narrative: Please revise /clarify lb. nutrient credits proposed (033 or 0.26 lb.) (Rev. 1) Addressed. Plan, SWPPP, VaRRM.xls, Calculations are consistent: 0.34 lb. purchase required. D. Erosion and Sediment Control Plan (ESCP) Engineering Review Comments Page 3 of 4 Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reason listed item La. The erosion control plan content requirements can be found in County Code section 17-402. 1. C3.0 a. Check sediment trap #2 wet storage provided (61.9 cy) v. storage required (65.5 cy). (Rev. 1) Partially addressed. As follow-up: ST#2 revised, but ST#1 wet storage required > storage provided. Please revise design ST# 1. (Rev. 2,3) Not addressed. Ref email to Applicant, November 22, 2021 10:51 AM. 2. C3.2 a. Compare area of disturbance, 1.75 Ac., with VRRM.xls 1.53 Ac. Please reconcile. (Rev. 1) Addressed, 1.68 Ac. LOD now consistent across 0.2, VRRM.xls, notes, labels, etc. b. Label STI floor dimensions, L x W. (Rev. 1) Addressed. Process: After approval, plans will have to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will have to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will have to be approved and signed by the County Attorney and County Engineer. This may take 24 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also have to be completed and are recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will have to be submitted along with court recording fees. This project requires separate easement plat application, review, and approval. Once plat is reviewed and comments are addressed, Engineering will format template deeds (SWM / public drainage) to be recorded with the plat. Please submit SWM facility /public drainage easement plat application at earliest convenience. This plan proposes 0.34 lb. nutrient credit purchase. Although nutrient credit purchase is not required for WPO plan approval, it is required prior to pre -construction, to receive a Grading Permit. Status of nutrient credit purchase, easement plat, maintenance agreement, and WPO plan bond: Nutrient purchase: Review of documents completed, A. Kilmer email, November 16, 2021 9:57 AM Easement plat: • Transmitted for (internal) county attorney review, November 18, 2021 1:31 PM • Formatted deeds sent to Applicant (TG, WmMullens), November 18, 2021 1:33 PM Maintenance Agreement: Recorded at Book/Page 05641 / 0653-00661 WPO plan bond: Pending, Engineering to estimate bond Amt. using Mfi. estimate (TG email, November 12, 2021 9:18 AM) After bonding and agreements are complete and easement is recorded, county staff will enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will have to be paid directly to the state. For fastest processing, this is done electronically with the emalls provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. Engineering Review Comments Page 4 of 4 After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference foam, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSW and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under Engineering Applications: httos: //www. albemarle. org/govemment/community-development/apDIy-for/engineering-gppl is ations Thank you. Please call if any questions — tel. 434.296-5832-x3069, or email 4anderosn2&aIbemarle.org. WPO202100054—Keswick Family Pool-112221rev2,3