HomeMy WebLinkAboutSDP201700034 Approval - Agencies 2017-10-13SIGHT DISTANCE IS
GREATER THAN 36o FEET IN
EACH DIRECTION. FIELD
VERIFIED BY ENGINEER.
EXISTING OVERHEAD
ELECTRIC POLE & LINES TO
REMAIN. ONSITE POWER
POLES & LINES TO BE
RELOCATED IF REQUIRED.
2 z= TO lNT
NN/ON V SS/pN I1lTy
t,4 I
PROPOSED LOCATION OF
MILL& OVERLAY. SEE DETAIL
ON SHEETC3-03.
EXISTING ROWS-
9 OF MAILBOXES y�
TO REMAIN
GRAPHIC SCALE
15 30 60
( IN FEET )
1 inch = 30 ft.
I.,fNOTE: ALL TRAILS ARE REQUIRED IRED TO HAVE APPROPRIATE SIGNAGE AND
KINGS AT ROAD CROSSINGS PER VDOT STANDARDS. ATA MINIMUM
SING SIGNS AND SIDEWALK PAVEMENT MARKINGS MUST BE PLACED
HE ROADWAY, WITH STOP SIGNS AND WARNING SIGNS ON THE TRAIL.
-BACKED 6
STA a+3o) / PRgOSED GROUND
ER, SEE SF EET o
TEMP RY CONTRACTOR TO
CONSTRUON / INSTALLAVDOT TD.
EASEMENT EW-i ATAiS°SK .SEE
/ / I THIS SHEET FOR TAIL.
Cq STR ET SIGN TO; \ \
3 +00 I \ \I l
BE ELOCATED/ �2,� \ �\ _�_ �
/mil nIi 00
EXISTI G j
/ PRIV TE SI /
TO fFEMAIN
Win, OAEESTING\P�11'
TR bO� %�ET.(D.B'.4673, G3)
/PR POSED/ 8'CLA SATYPI �\
% �/ / ➢ \I I PEDESTRIAN PATH \�
/ �O �/
\ UriI P9 I APPROVED W
b DITCH TYPE A
00 EXISTING TEMPORARY J \ 2
x\ CONSTRUCTION EASEMENT.
CONTRACTOR TO TIE DB 4673' PG' 37
PROPOSED PAVEMENT INTO
CONTRACTOR TO INSTALL A MO (FIE D
/ /Ul / \ / �� \ EXISTING DRIVEWAY WITH A \
SMOOTH TRANSITION VDOT MH iAI OUTLET OF EXISTING 30"
CMP. RIM TO BE FIELD FITTED, JUST BELOW \
\ \ ASBUILTPAVE PATH WAY FINAL GADE.
\ 3 \/
PROPOSED o"CL.IIRCPJ \
(INVERT IN g3o.zo', INVERT OUT=6 6.5o)
w/ PROPOSED VDOT STD. CL. AiS ONE
(fA2
5 1-2
1 1 15 1� )L )/�/�
Albemarle County General Construction Notes for Private Roads
1. Prior to any construction within any existing public right-of-way, including connection to any existing road, a permit shall be
obtained from the Virginia Department of Transportation (VDOT). This plan as drawn may not accurately refledthe requirements
of the permit. Where any discrepancies occur the requirements of the permit shall govern.
2. Construction inspection of all proposed roads within the development will be made by the County. The contractor must notify
the Department of Engineering (296-5861) 48 hours
in advance of the start of construction.
3. All materials and construction methods shall conform to current specifications and standards of VDOT. All excavation for
underground pipe installation must comply with
OSHA Standards forthe Construction Industry (29 CFR Part 1926).
4. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and must be
installed prior to any clearing, grading or other construction.
5. Upon completion of fine grading and preparation of the roadbed subgrade, the contractor shall have CBR tests performed on
the subgrade soil. Three (3) copies of the test results shall be submitted to the County. If a subgrade soil CBR of io or greater is not
obtainable, a revised pavement design shall be made bythe design engineer and submitted with the test results for approval.
6. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum allowable slope is 2:2
(horizontal:vertical). Where reasonably obtainable, lesser slopes of
4:1 or better are to be achieved.
7. Surface drainage and pipe discharge must be retained within the public right-of-way orwithin easements prior to acceptance by
the County. All drainage outfall easements are to be extended to a boundary line or a natural watercourse.
8. Guardrail locations are approximate. Exact length, location and appropriate end treatments will be field determined at the time
of construction. Additional guardrail may be required at locations not shown when, in the opinion of the Director of Engineering,
orthe Director=s designee, it is deemed necessary. When guardrail is required, it shall be installed four(4)feet offset from the
edge of pavement to the face of guardrail, and
roadway shoulder widths shall be increased to seven (7) feet.
g. Where urban cross sections are installed, all residential driveway entrances shall conform to VDOT CG-g(A, B or Q.
1o. Where rural cross sections are installed, all residential driveway entrances shall conform to VDOT standard PE-1.
22. Paved, rip -rap or stabilization mat lined ditch may be required to stabilize a drainage channel when, in the opinion of the
Director of Engineering, orthe Director=s designee, it is deemed necessary.
22. A minimum clear zone of eight (8) feet from the edge of pavement shall be maintained on all residential subdivision streets.
13. Compliance with the minimum pavement width, shoulder width and ditch sections, as shown on the typical pavement section
detail, shall be strictly adhered to. Exceptions will not be allowed.
14. Upon completion of the roadway construction, street name signs shall be installed by the developer at all street intersections.
Signs and their installation shall conform to "Albemarle County Street Name Sign Requirements". The developer shall be
responsible for maintenance of signs until roads have been accepted.
15. Road plan approval is subject to final subdivision plat validation. Should the final plat forthis project expire priorto signing and
recordation, then approval of these plans shall be null and void.
16. Traffic control or other regulatory signs or barricades shall be installed by the developer when, in the opinion of the Director of
Engineering, or the Director=s designee, they are deemed necessary in order to provide safe and convenient access. All signs or
other regulatory devices shall conform with the Virginia Manual for Uniform Traffic Control Devices.
,
30
,
I
EXISTING TEMPORARY
C) CONSTRUCTION EASEMENT.
\ \ (3) DB 4673, PG. 312
/APPROVED APPROVED
DITCfi TYPEA C� GUARDRAILS-J!
r,
Iz+00
(STING \ \
645
PROPOSED VDOT
STD. GR-zA
EXISTING 30" CM
CULVERT TO REMAIN & TO
BE EXTENDED. (L=50.17',
INV. IN=631.66', INV.
OUT=630.30')
PROPOSED VDOT STD.
E W-1 w/ A 150 SKEW TO
BE INSTALLED ON
EXISTING CULVERT
CONTRACTOR TO INSTALL A
MODIFIED VDOT MH-1 AT THE
OUTLET OF THE EXISTING 30"
CMP. RIM SHALL BE FIELD
FITTED & BE PLACED JUST
BELOW ASBUILT PAVED
PATHWAY FINAL GRADE.
645
(MODIFIED)
2
.31
4
630.2o TO
PROPOSED VDOT STD.
E W-2 w/ A 30° SKEW TO
BE INSTALLED WITH
PROPOSED EXTENSION
PROPOSED VDOT STD.
CL. A2 STONE (L=iS,
D=2', W2=7.5; W2=8.5'
I
I
16
0+5oSCALI
EXISTING CULVERT EXTENSION 1--5,(y)
J =50' (H)
I
I
I
I
I
PROPOSED
PARK IEW
DRIVE
/P
640
PRO
8" WA
OSED
ERLINE
640
PROPO
ED
PARKV117W
\
GRAD(
G
\
XISTI
G
4
4'
PARKVIEW
635
GRADING
635
\
STR:MH-1
STA.o+S
SIGHT DISTANCE INTERSECTION OF
68o
SIGHT DISTANCE
-INTERSECTION OF PARKVIEW DRIVE & THREE NOTCH'D ROAD
68o
66o
SNAPDRAGON LANE &PARKVIEW DRIVE 660
675
675
655
655
670
w T Ln
w =
670
65oEs
— —
65o
665
0
----
— —
wxl
mWr�
665
645
O
n
u
m
=o
m
ao645
_ —
2
66o
660
640
m
x
rmi640
655
655
635
-1
635
6 o
5
SCAL
: H=Too', V=20'
65°
63o
SCALE:
H=Too' V=20'
630
m
N
o
1P
N
cc
m
N
�0
N
0
o
v0)
�
o
goo
m
N
0
m
i
H
ko
kD
Lo
�o
�D
W
UM
2
0+00 1+00
2+00 3+00 4+00 5+00 6+oo 7+00
0
0+00 1+00 2+00 3+00
EXISTING 30"
TO REMAIN
INVERT IN-631.66
INV. OUT= 630.30
0) o I
-APPROL _
DITCH TYPE A
14+00
SIGN KEY
OSTOP SIGN R1-1 w/STREET SIGNS
OSP® LIMIT SIGN R2-1 (15 MPH)
O STOP AND STREET SIGH (PARKVIEW DRIVE PVT. &
SNAPDRAGON LANE PVT.)
OWNER SHALL ENSURE TRAFFIC CONTROL SIGNS TO BE IN
PLACE PRIOR TO ISSUANCE OF FIRST CERTIFICATE OF
OCCUPANCY.
ALL SIGNS SHALL BE IN ACCORDANCE WITH 2O09 M.U.T.C.D.
STANDARDS,
2
i) FOR TYPICAL STREET SECTION, SEE SHEET C3-03
z) UTILITY POLES TO BE ADJUSTED AS NECESSARY TO MAINTAIN MINIMUM
CLEARANCE BETWEEN LINE AND FINAL GRADE. CONTRACTOR SHALL
COORDINATE WITH UTILITY COMPANY.
3) DEVELOPMENT WILL AVERAGE 8 TRIPS PER DAY, PER DWELLING UNIT.
THIS TOTALS AN ESTIMATED 208 TRIPS ADDITIONAL PER DAY ON
PARKVIEW DRIVE. AT THE TIME OF THE ORIGINAL PLANS APPROVAL,
PARKVIEW DRIVE SERVED 5 DWELLINGS AND A BARN STRUCTURE. THIS
CONSERVATIVELY EQUATED TO 6o TRIPS/DAY. PARKVIEW DRIVE WILL HAVE
A PROJECT TOTAL OF 268 TRIPS PER DAY.
4) ALL SLOPES GREATER THAN 3:1 SHALL BE SEEDED WITH CROWN VETCH
Q2 MODIFICATIONS TO PARKVIEW DRIVE: REVISED VERTICAL ALIGNMENT
QPAVEMENT MILL & OVERLAY & MAINTENANCE OF TRAFFIC PLAN ADDED TO
THE PARKVIEW DRIVE ROAD PLAN.
SCOTT R. COLLINSZ
Lie. No. 035791
10NAI
z E
1 UPDATED THE STORM PIPE & CULVERT CROSSING UNDER PARKVIEW DRIVE. 0
o- I
O UPDATED SITE DETAILS AND GENERAL NTOES FOR THE PROJECT. Un g
Ln m �
' ••
PRIVATE ROAD
w
Z
US
z
J L
O
o
a
H
u
>
w
r
i
15+00 (15MPH)
v �-
,
AV
X TCH TYP A } } �j/ ,
CONTRA TOR \\
IN ALLA3 DOTTSTD. �� ,�-���'�
\ EW- ATA SKE .SEE _ A_
+00 \THISS EET FOR DETAIL
UJ
17+00
•
6 RA/ &
0
z
! ®�
W
® Cn
M
M
LLM
w
N
C
G
W M
Q
z
W
Q
N
ZCF)
N
L LJ
J
W
LL
Q
®
r Lu
I --I
v
0
J
J
/,
0.
a-
Q
W
O
Z
Q
C
G
J
a_
J
V)
a
U
UlLU
0
L
Y
Z
�
�
O
- U)
U
LU
z
�
O
U)
w
0 W
LU
w
U rQ�
V
J
w
w
w
JOB NO.
172133
SCALE
AS SHOWN
c
SHEET NO.
C3-01
I