Loading...
HomeMy WebLinkAboutWPO202100054 Bond Estimates 2021-11-24Project Name: Keswick Family Pool, WPO-2021-00054 WPO file number: WP02021-00054 TM P(s): 08000-00-00-008ZO Date Estimate Completed: 11-24-21 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch ft $13.00 $0.00 z standard manhole frame lop (not inlet) ea $500.00 $0.00 3 drop inlet or grate ea $3,500.00 $0.00 4 manhole structure (per ft. rise) ft $450.00 $0.00 5 pipe, rcp, cmp (15 to 48") 15.0 in 2 ES-1,2 2 EC-1 ft $35.00 $12,185.00 6 12", assume cost = 15' DIA Pipe 15.0 in 0 ES-1,2 0 EC-1Ift ft $35.00 $5,320.00 7 24.0 in 0 ES-1,2 0 EC-1ft $50.00 $0.00 8 36.0 in 0 ES-1,2 0 EC-1 $70.00 $0.00 9 aggregate base or drainage stone 0.0 in d 0.0 ft L 0.0 ft W 0.0 ton $35.00 $0.00 24 trees 0 ea $275.00 $0.00 25 shrubs 0 ea $50.00 $0.00 26 seedlings 0 ea $5.00 $0.00 27 underdrain (LF) 0 ft $5.00 $0.00 28 biofilter soil mix (CY) 0 cy $45.00 $0.00 29 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 30 maintenance access road (LF) $50.00 $0.00 31 rip -rap, placed depth ft length _ft -Aft 32 (only Outfall Rip -Rap from BMP incl width (tons) 0 $60.00 $0.00 33 survey and layout (price per 0.1 mi.) acres basins _ $1,840.00 34 Permeable Pavement (typ.) 35 Materials see sheet C6.3: 328, 2171,745,821,817,1465,1057 at 7404 sf $26.40 $195,465.60 36 Note: permeable pvmnt estimate' Earthwork = 7,404sf 547 cy $13.00 $7,105.01 37 based on Timmons, A. Allison Labor 101285 Is $101,285.31 34 mobilization $2,500.00 35 as -built drawings (per facility) ea $2,000.00 $4,000.00 36 materials testing (per facility) ea $2,000.00 $4,000.00 37 compaction testing (per dam) ea nea $3,000.00 $3,000.00 38 Survey and platting of Open Space $2,500.00 $0.00 Rid van Niekerk (Timmons) email, November 12, 2021 9:18 AM, Lane Enterprises Material quote, 11-12-2021 1.0 LS $65,642.00 Engineering estimate: LABOR =0.5 x Lane Enterprises Material quote, 11-12-2021 1.0 LS $32,821.00 cost sum $336,700-92 11/24/2021 Project Name: Keswick Family Pool, WPO-2021-00054 WPO file number: WP02021-00054 TM P(s): 08000-00-00-008ZO Date Estimate Completed: 11-24-21 Stormwater Management Plan Bond Estimate Item Item Number Estimate based on Timmons Group 5110/19 permeable pvmnt estimate for Kesvrick Hall Spa • 1.2 (inflation /pandemic) WPO202100054 Keswick Family Pool_SWM_bond_112421ja No. Unit Unit Cost Cost (installed) contingency $33,670.09 Total $370,380 11/24/2021