ALBEMARLE COUNTY, VIRGINIA
DESIGN CALCULATIONS & NARRATIVE
DECEMBER 30, 2020
REVISED: MARCH 19, 2021
REVISED: JUNE 249 2021
REVISED: SEPTEMBER 14, 2021
REVISED: NOVEMBER 29, 2021
�00000
0 •
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
Prepared by: Clint Shifflett, PE
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
434.327.1690
CLINT W. Z:
S FFLET >�
Lie. N $
4380 tea:
11/29/2021
IW-NON eL OG `�,
Table of Contents
Section Title
1. Project Narrative
2. LD-204 Inlet Calculations
3. LD-229 Pipe Calculations
4. LD-347 Hydraulic Grade Line Analysis
5. LD-269 Existing Culvert Adequacy Analysis
6. Pre and Post Developed HydroCAD Calculations
7. Virginia Runoff Reduction Method Worksheet Summary
8. Nutrient Credit Availability Letter
9. Clean Water Diversion Calculations
Project Narrative:
This project includes the construction of a new commercial building and parking lot with
associated utilities and landscaping. The limits of disturbance is 0.79 acres.
Water Ouality:
The site is being treated as New Development. In the proposed condition there will be
0.07 acres of forest, 0.41 acres of turf, and 0.55 acres of impervious cover. Per the
Virginia Runoff Reduction Redevelopment Spreadsheet, this will require that 0.96 lbs/yr
of phosphorous be removed. Credits shall be purchased from a DEQ-Approved Nutrient
Credit Bank in Accordance with VA code 62.1-44.15:35.
Water Ouantity
The site drains to an existing pipe under Ivy Road. A 54" CMP storage system is being
proposed to detain the increase in flow. The CMP storage system detains the post -
developed 1-year storm to meet the energy balance equation, and reduces the post -
developed 10-year 24-hour storm to be less than the pre -developed 10-year 24-hour
storm.
FORM LD 204 STORMWATER INLET COMPUTATIONS SHEET 1 OF 2
ROUTE
PROJECT Ivy Proper
DESIGNER: KF
CHECKED:
DATE 6/8/2021
UNITS:NGLISH
---®---
111•
�
11
�
11
11 11
11 1:
�
111
�
11:
� 11�:
111
����
. 111
®
111
11
1111
�--__--
---_---
1 1 •
��O-
1 1 11
1 1 1 :
®
111
®
1 1 :
� 11 � :
-®-----------__-®
INLETSOFT BY ENSOFTEC DATE: 6/8/2021
FORM LD 204 STORMWATER INLET COMPUTATIONS SHEET 2 OF 2
ROUTE
PROJECT Ivy Proper
DESIGNER: KF
CHECKED:
DATE 6/8/2021
UNITS:NGLISH
INLET
F.
Q
p
Sag
Inlets Only
z0
2G
SE
O
S�
S
"
3^
gym,
_
of
=,
ou
x
F
V
u
u
u
au
u
F
3
wFf
`3
a
r.,
i5
cox
J
a
u
v
o r
iF
�
a
u�uU
r�
$�
z=
RO.
v
Z
y6
V
0•
.r
,=
LCY
0F
0
5 885
0
0
Ahead/Rt
1.407
0.0100
2000
2
1 407
3.482
1> 80 ft
Ex. 100
DI-1
2.000
0.200
0.90
0.18
Back/Lt.
0.000'RIGFY
0.170
0.25
0.0425
Back/Lt.
0.223
4.929
1.099
0
Back/Lt.
0
1 4.929
1 0
1 0
Ahead/Rt.
1.099
0.0100
2000.
2
1.099
2.953
1
Weir Flow
INLETSOFT BY ENSOFTEC DATE: 6/8/2021
LD-229
STORM SEWER DESIGN COMPUTATIONS
STORM FREQUENCY 10
PROJECT:
LOCATION:
COUNTY:
Ivy Proper
Free Union
Designed by: KF
Checked by:
UNITS ENGLISH
PIPE
FROM POINT
TO POINT
DRAIN.
AREA
"A"
Acre
(3)
RUNOFF
COEER
"C"MENT
(4)
CA
INLET
TIME
Minutes
(7)
RAIN
FALL
In/Hr
(8)
RUNOFF
INVERT ELEVATIONS
LENGTH
of Pipe
Ft.
(12)
SLOPE
Ft./Ft.
(13)
SIZE
(Dia. Or
Span/Rise)
In.
(14)
SHAPE
Number
of Pipes
Capacity
CFS
(15)
Friction
Slope
Ft./Ft.
NORMAL FLOW
FLOW TIME
REMARKS
(18)
INCRE-
(5)
ACCUM-
ULATED
(6)
Late7Tota)ISQ
CF
UPPER
END
(10)
LOWER
END
(11)
Depth of
Flow, do
Ft.
Area of
Flow, An
SgFt
Hrn
Ft.
Vn
Ft/Sec
(16)
En
Ft.
INCRE-
MENT
Minutes
(17)
ACC11M11NO.
-LATER
Minutes
(17)
REFERENCE
(1)
STA.
REFERENCE
(2)
STA.
101
102
Ex. 100
0.01
0.90
0.01
0.25
5.18
5.83
0.00
16.89
512.50
511.70
80.33
0.00996
24
Circular
1
24.46
0.00490
1.22
2.01
0.56
8.40
2.32
0.16
5.34
103
104
102
0.00
0.00
0.24
5.07
5.86
0.00
16.84
512.88
512.50
50.34
0.00755
24
Circular
1
21.30
0.00490
1.34
2.24
0.58
7.52
2.22
0.11
5.18
105
SWM A
104
0.00
0.00
0.00
5.00
0.00
0.00
15.45
513.00
512.95
6.80
0.00735
24
Circular
1
21.01
0.00410
1.28
2.11
0.57
7.31
2.11
0.02
5.02
107
108
1106
0.08
0.74
0.06
1.37
5.15
5.84
0.00
8.08
514.53
513.67
57.42
0.01498
18
Circular
1
13.93
0.00530
0.82
0.99
0.40
8.17
1.86
0.12
5.27
109
110
108
0.07
0.71
0.05
1.31
5.04
5.87
0.00
7.73
515.41
514.63
52.25
0.01493
18
Circular
1
13.91
0.00480
0.80
0.96
0.39
8.08
1.81
0.11
5.15
111
112
110
3.37
0.38
1.26
1.26
5.00
5.89
0.00
7.44
515.81
515.51
19.87
0.01510
18
Circular
1
13.98
0.00450
0.78
0.93
0.38
8.04
1.78
0.04
5.04
113
114
SWMA
0.20
0.63
0.13
0.13
5.00
1 5.89
1 0.00
0.74
515.30
514.29
50.71
0.01992
15
Circular
1
9.88
0.00010
0.23
0.16
0.14
4.74
0.58
0.18
5.18
115
116
104
0.49
0.49
0.24
0.24
5.00
5.89
0.00
1.41
513.25
513.06
19.04
0.00998
15
Circular
1
6.99
0.00040
0.38
0.32
0.22
4.46
0.69
0.07
5.07
LD-347 PROJECT: Ivy Proper DESIGNED BY: KF
HYDRAULIC GRADE LINE ANALYSIS
Checked: CS
INCIDENCE PROBABILITY 10 Year
INLET
OR
JUNCTION
STA.
INVERT
EL.
OUTFLOW
PIPE
DEPTH
OF FLOW
OUTFLOW
PIPE
OUTLET
WATER
SURFACE
ELEV.
DIA.
PIPE
Do
(In/mm)
DESIGN
DISCH.
Do
(CFS/CMS)
LENGTH
PIPE
Lo
(FtlM)
FRICTION
SLOPE, Sfo
(FT/FT)
(M/M)
FRICTION
LOSS
Hf
(FVM)
JUNCTION LOSS
SURFACE
FLOW
Adj. Ht
1.3
Ht
(FllM)
Inlet
Shaping?
YIN
0.5
Ht
(Ft/M)
FINAL
H
(FllM)
Inlet
Water
Surface
Elevation
Top of MH
Top of Inlet
Elev.
APPROX.
Adjustment?
Vo
Contr.
Ho
(FtlM)
Vi
V'2/2g
Hi (Expo)
0.35'MAX.
(Vi2/2g)
SKEW
Angle
K
Bend
H
(FtlM)
Sum
HL
(Ft/M)
1
2)
3
4
5
6
7)
8
9
10
11
12)
(13
14
15
16)
16
17
18
19
106
1
513.670
108
513.670
1.50
514.870
18
8.078
57.42
0.00527
0.302
8.173
0.259
8.078
1.013
0.355
0.0
0.00
0.000
0.614
0.345
0.614
YES
0.307
0.609
515.479
522.050
O.K.
110
514.630
1.50
515.830
18
7.733
52.25
0.00483
0.252
8.078
0.253
8.036
1.003
0.351
0.0
0.00
0.000
0.604
0.294
0.604
YES
0.302
0.554
516.384
521.740
O.K.
112
515.510
1.50
516.710
18
7.439
19.87
0.00447
0.089
8.036
0.251
0.000
0.000
0.000
0.0
0.00
0.000
0.251
7.439
0.326
YES
0.163
0.252
516.962
520.500
O.K.
LD-347 PROJECT: Ivy Proper DESIGNED BY: KF
HYDRAULIC GRADE LINE ANALYSIS
Checked: CS
INCIDENCE PROBABILITY 10 Year
INLET
OR
JUNCTION
STA
INVERT
EL.
OUTFLOW
PIPE
DEPTH
OF FLOW
OUTFLOW
PIPE
OUTLET
WATER
SURFACE
ELEV.
DIA.
PIPE
Do
INmm
DESIGN
DISCH.
Do
CFS/CMS)
LENGTH
PIPE
Lo
(FVM
FRICTION
SLOPE, Sfo
(FT/FT)
M/M
FRICTION
LOSS
Hf
FUM
JUNCTION LOSS
SURFACE
FLOW
Adj. Ht
1.3
Ht
FUM)
Inlet
Shaping?
Y/N
0.5
Ht
FUM
FINAL
H
FUM
Inlet
Water
Surface
Elevation
Top of MH
Top of Inlet
Elev.
APPROX.
Adjustment?
VO
Cont'.
Ho
FVM)
Vi
Vi'2/2g
Hi (Expo)
0.35'MAX.
2/2)
SKEW
Angle
K
Bend
H
(FUM)
Sum
HL
(FUM)
1
2
3
4
5
6
7
8
9
10
(11)
12
(13)
(14)
15
16
16
17
18
19
SWM A
514.290
114
514.290
1.25
515.290
15
0.742
50.71
0.00012
0.006
4.736
0.087
0.000
0.000
0.000
0.0
0.00
0.000
0.087
0.742
0.113
YES
0.057
0.063
515.532
519.830
O.K.
PROi Ivy Proper
I
SHEET
UNITS
OF
ENGLISH
CULVERT
DESIGNER:
REVIEWER:
DESIGN
KF
CS
FORM LD-269
DATE: 3/9/2021
DATE:
ROAD COUNTY Albemarle (Zone 1)
CULVERT Ec Clvrt. VA
NOAA Shition Free Union
HYDROLOGICAL DATA
Method: RATIONAL
Domingo Aim 4.81 Acres
Time ofConcen6alion 5 Minutes
DESIGN FLOWS
SMdr.
EISF-
Eli=
L=
S=
SKEW=
Elev_D
ELHWd= 51356
51160 R
SILO ft
4987 ft
106Ya
00
Roadway Width 30 R ROADWAY
ft
ft _ _______________________________________________
Her
I ______ ___________________
DEPRESSION 0
..n"Bed 0013
ELEVATION
Stream Bed
__________
516.00 a
_________________________
El,
Road L.,1h 100
Freeboard=
ShW Ekv. Rt=—ft
H
TWDEPTH
TW TW VEL
Chamml low El
_
Sl07 A
SoPce Type PAVED
XVALUEI R
L08 ft
322 fps
511.07 R
R,L(yeam)
FLOW (COO
10
Design
1157
2
Check
9.70
25
Max.
1576
CULVERT DESCRIPTION:
TYPE: Single/Multiple Conforming
Inlet Edge Dwriptioo:
Square edge w/heedwnll
TOTAL
FLOW
U
c6
FLOWRM
BARREL
ON
c@
HEADWATER
CALCULATIONS
CONTROL
HEADWATER
ELEV
ft
OUTLET
VEL
fps
MOiIMUM
SHOULDER
ELEV.
R
COMMENTS
INLET CONTROL
OUTLET CONTROL
Sin a/Multi le Condemnor/Broken Beek C.I eM
H`Vm
HWi
ft
FALL
It
ELHWi
It
TW
a
do
ft
(d Dy2
ft
M
a
ke
H
a
ELHWo
R
M)tTERIAI.
SHAPE
Sim (in)
N
Mi.ngs
n
CMPMedC,.
CircWm
24
1
003
11.57
11,6
0,98
1.83
000
51343
L08
122
161
161
0.50
0.88
513.56
513.56
407
970
97
0.92
L63
000
51323
L98
1.11
1,56
1,56
0.50
062
51324
51324
402
1576
15A
140
228
0.00
513,88
126
143
1,72
1,72
0.50
162
51441
51441
502
Broke. Back Cldvert
TAILWATER DATA:
TAILWATER RESULTS:
ROADWAY DATA:
ROADWAY OVERTOPPING:
LENGTH
Elev.
SKEW°
Lncl Shape
Tncceeha
-
0.035
Dischor,,e
efs
aim.
ft
Flow
depih
it
Velocdy
fps
Shearforce
PSF
eadway WMdSft
30
D.W,
c6
0—pp-8
Dkcharge
Cf5
Oveeeppng
Ekvadon
ft
3i,..WMlb,a
Side Slope Lb (H:1V)
Side Slope RL(H:1V)
Channel Slope. RlR
2.00
eiriffine Type
PAVED
1.50
DeW -
512.15
108
322
0,67
rop of Road Elevator, 0
518
si
0
000
1.00
Clxck
51205
0.98
3.07
0,61
-englb of Road, If
100
heck
0
ON
0.0100
51233
126
3.49
0,79
0
ON
Dismnce
levadon
TECHNICAL FOOTNOTES:
(1) USEQ/NBFORBOXCULVERTS
(4) ELhi=HWi+ ELi(INVERT OF INLET CONTROL SECTION)
(6)he-7W
or(do + W)(WHICHEVER IS GREATER)
(2)HWi/D= HW/D OR HWi/D FROM DESIGN CHARTS
(5)TW BASED ON DOWNSTREAM CONTROL OR FLOW
(7)H=[I+ke+(29n2L/R13'V/2g
(3) FALL =HWI-(ELHWd-ELst); FALL IS ZERO FOR CULVERTS ON GRADE
DEPTH IN CHANNEL
SUBSCRIPT DEFENTOONS:
COMMENTS / DISCUSSION:
CULVERT BARREL SELECTED
HWd DESIGN HEADWATER i
INLET
SIZE:
n
Hwi HW IN INLET CONTROL 0
OUTLET
SHAPE:
MATERIAL:
HWo HW IN OUTLET CONTROL sf
Smoothed
ENTRANCE:
@ culvert face
CULVERTSOFT by ENSOFTEC, INC.
ERO3EL17 Ivy Proper I CULVERT DESIGN FORM LD-269
ROAD COUNTY Albemarle (Zone 1) SHEEF OF DESIGNER: u DATE: 3/9n021
CULVERT ExClvrt. VA UNITS ENGF iCD REVIEWER: CS DATE:
WA \ Station I'rec Un,on
H.W. ELEV VIS DISCHARGE
014.o
514.4 -
514.2 -
>514.0
W
&13.8
+>513.6
x
513.4
513.2 -
513.0
0 2 4 6 8 10 12 14 16 18
DISCHARGE
OUTLET VELOCITY VIS DISCHARGE
6.0
5.0
4.0
0.0 1 1 1 1
0 2 4 6 8 10 12 14 16 18
DISCHARGE
TW DEPTH VIS DISCHARGE
IA
TW VELOCITY VIS DISCHARGE
12
3.6
3.5
3.5
3.4
1.0
y 0.8
3.4
tl
-
o
3.3
3-2
-_
2 0.6
F
0.4
>
2 32
32
3.1
0.2
1
3.1
-
0.0
0 2 4 6 8 10 12 14 16 18
DISCHARGE
3.0
0 2 4 6 8 10 12 14 16 18
DISCHARGE
CULVERTSOFf by ENSOFfEC, INC.
1S 2S
Pre Developed ite Pre Developed ON Site
PRE
S4 Reach X 4on Llnk
4S
5S
Post Offsite uted
ost ON Site Routed
6P
(new ond)
8S
i %$
�ted Post Off Site Un
P st ON Site Unrouted
9L
(new Link)
Ivy Proper Pre -Post 54in
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 ©2020 HydroCAD Software Solutions LLC Page e
Area Listing (all nodes)
Area CN Description
(acres) (subcatchment-numbers)
3.400 61 >75% Grass cover, Good, HSG B (1S, 2S, 4S, 5S, 7S, 8S)
2.880 98 Paved parking, HSG B (1S, 2S, 4S, 5S, 7S, 8S)
3.360 60 Woods, Fair, HSG B (1S, 2S, 4S, 8S)
9.640 72 TOTAL AREA
Ivy Proper Pre -Post 54in
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 ©2020 HydroCAD Software Solutions LLC Page
Soil Listing (all nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000
HSG A
9.640
HSG B 1S, 2S, 4S, 5S, 7S, 8S
0.000
HSG C
0.000
HSG D
0.000
Other
9.640
TOTAL AREA
Ivy Proper Pre-Post_54in
Prepared by Timmons Group Printed 11/8/2021
Ground Covers (all nodes)
HSG-A
HSG-B
HSG-C
HSG-D
Other
Total
Ground
Subcatchment
(acres)
(acres)
(acres)
(acres)
(acres)
(acres)
Cover
Numbers
0.000
3.400
0.000
0.000
0.000
3.400
>75% Grass cover, Good
1 S, 2S,
4S, 5S,
7S, 8S
0.000
2.880
0.000
0.000
0.000
2.880
Paved parking
1S, 2S,
4S, 5S,
7S, 8S
0.000
3.360
0.000
0.000
0.000
3.360
Woods, Fair
1S, 2S,
4S, 8S
0.000
9.640
0.000
0.000
0.000
9.640
TOTAL AREA
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 ©2020 HydroCAD Software Solutions LLC Paoe 5
Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1 S: Pre Developed Offsite Runoff Area=3.860 ac 25.91% Impervious Runoff Depth>0.63"
Flow Length=740' Tc=20.1 min CN=70 Runoff=2.68 cfs 0.204 of
Subcatchment2S: Pre Developed ON Site Runoff Area=0.970 ac 34.02% Impervious Runoff Depth>0.77"
Tc=6.0 min CN=73 Runoff=1.43 cfs 0.063 of
Subcatchment4S: Post Offsite Routed Runoff Area=3.380 ac 21.89% Impervious Runoff Depth>0.59"
Flow Length=740' Tc=20.1 min CN=69 Runoff=2.15 cfs 0.167 of
Subcatchment5S: Post ON Site Routed Runoff Area=0.650 ac 70.77% Impervious Runoff Depth>1.62"
Tc=6.0 min CN=87 Runoff=1.94 cfs 0.088 of
Subcatchment7S: Post ON Site Unrouted Runoff Area=0.310 ac 29.03% Impervious Runoff Depth>0.73"
Tc=6.0 min CN=72 Runoff=0.43 cfs 0.019 of
Subcatchment8S: Post Off Site Unrouted Runoff Area=0.470 ac 55.32% Impervious Runoff Depth>1.21"
Tc=6.0 min CN=81 Runoff=1.08 cfs 0.047 of
Pond 6P: (new Pond) Peak Elev=514.71' Storage=0.023 of Inflow=2.87 cfs 0.255 of
Outflow=2.50 cfs 0.254 of
Link 3L: PRE Inflow=3.01 cfs 0.267 of
Primary=3.01 cfs 0.267 of
Link 9L: (new Link) Inflow=2.97 cfs 0.320 of
Primary=2.97 cfs 0.320 of
Total Runoff Area = 9.640 ac Runoff Volume = 0.588 of Average Runoff Depth = 0.73"
70.12% Pervious = 6.760 ac 29.88% Impervious = 2.880 ac
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment 1S: Pre Developed Offsite
Runoff = 2.68 cfs @ 12.15 hrs, Volume= 0.204 af, Depth> 0.63"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
1.390
60 Woods, Fair, HSG B
1.470
61 >75% Grass cover, Good,
HSG B
1.000
98 Paved parking, HSG B
3.860
70 Weighted Average
2.860
74.09% Pervious Area
1.000
25.91 % Impervious Area
Tc Length
Slope Velocity Capacity
Description
(min) (feet)
(ft/ft) (ft/sec) (cfs)
10.3 100
0.0150 0.16
Sheet Flow,
Grass: Short n= 0.150 P2= 3.65"
8.4 500
0.0200 0.99
Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
1.4 100
0.0600 1.22
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.0 40
0.0312 16.54 51.95
Pipe Channel,
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.010 PVC. smooth interior
20.1 740 Total
Ivy Proper Pre -Post 54in Type 11 24-hr 1 Year Rainfall=3.01 "
Preaared by Timmons Group Printed 11/8/2021
3
1
Subcatchment 1S: Pre Developed Offsite
Hydrograph
2.68 GIs
Type Il 24-hr
Wear Rainfall T3.01"
---Runoff Arecl=1860-6c-
Ru"off', Volume=0.'204', of
Runoff DepthP-0.63"
Flow Lehgttth=740' -C
Time (hours) I
❑ Runoff
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 2S: Pre Developed ON Site
Runoff = 1.43 cfs @ 11.98 hrs, Volume= 0.063 af, Depth> 0.77"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
0.580
60
Woods, Fair, HSG B
0.060
61
>75% Grass cover, Good, HSG B
0.330
98
Paved parking, HSG B
0.970
73
Weighted Average
0.640
65.98% Pervious Area
0.330
34.02% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 2S: Pre Developed ON Site
Hydrograph
1.43 cfs ❑ Runof
Type 0 24-hr
1Year Rainfall-3.01"
Runoff Area=0.970 ac
Runoff Volume=0.',063 of
Runoff Depth?0.77r
T'c=610 min
(,N=73
11 12 13 14 15 16 17 18 19
Time (hours)
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment 4S: Post Offsite Routed
Runoff = 2.15 cfs @ 12.16 hrs, Volume= 0.167 af, Depth> 0.59"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
1.250
60 Woods, Fair, HSG B
1.390
61 >75% Grass cover, Good,
HSG B
0.740
98 Paved parking, HSG B
3.380
69 Weighted Average
2.640
78.11 % Pervious Area
0.740
21.89% Impervious Area
Tc Length
Slope Velocity Capacity
Description
(min) (feet)
(ft/ft) (ft/sec) (cfs)
10.3 100
0.0150 0.16
Sheet Flow,
Grass: Short n= 0.150 P2= 3.65"
8.4 500
0.0200 0.99
Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
1.4 100
0.0600 1.22
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.0 40
0.0312 16.54 51.95
Pipe Channel,
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.010 PVC. smooth interior
20.1 740 Total
Ivy
Pre -Post 54in Type 1124-hr 1Year Rainfall=3.01"
Timmons Group Printed 11/8/2021
Subcatchment 4S: Post Offsite Routed
Time (hours)
i i i ■Runoff
--- }Tye@a� 24�hF
Wear kainfallT3.01"
Runbff Areci=3.380 i3c
Ru Ooff', Vo l u mip=0.',167', of
Runoff Depth;o0.69"
---Ptow-LEhgth=74W-
Tc=20,1 Min
dN=,69
5
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 5S: Post ON Site Routed
Runoff = 1.94 cfs @ 11.97 hrs, Volume= 0.088 af, Depth> 1.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
0.000
60
Woods, Fair, HSG B
0.190
61
>75% Grass cover, Good, HSG B
0.460
98
Paved parking, HSG B
0.650
87
Weighted Average
0.190
29.23% Pervious Area
0.460
70.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 5S: Post ON Site Routed
Hydrograph
2 1.94 cfs
Type 0 24-hr
1Year Rainfall-3.01"
Runoff Area=0.650 ac
Runoff Volume=0.',088 of
Runoff Depth?1.62"
T'c=610 min
(,N=87
10 11 12 13 14 15 16 17 18 19
Time (hours)
❑ Runaff
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 7S: Post ON Site Unrouted
Runoff = 0.43 cfs @ 11.98 hrs, Volume= 0.019 af, Depth> 0.73"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
0.000
60
Woods, Fair, HSG B
0.220
61
>75% Grass cover, Good, HSG B
0.090
98
Paved parking, HSG B
0.310
72
Weighted Average
0.220
70.97% Pervious Area
0.090
29.03% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 7S: Post ON Site Unrouted
Hydrograph
0.46
r
0.44
-�
--------'-------L____�_ � V.ry
0.42
- �I
0.38
- __L_
0.34
I
0.32
--- J----L- -L----L---J----L-
_ 0.28
--- - ---'i-------'i---J----� -
e
0.2fi_L
_J _L
0 0.22
-__J____L___J____L___J____L_
LL
0.2
-J
I
0.16
_J
0.14
- -�
0.12
0.1
I I I I I I
0.06
- -_ JI I ____ L___J____L___J____L_
I I I I
L I J I J
-- ''I-TypeA-24thu
9-Y9ar-RairrfaHT3:0 "-
iZun6ff Are & 31 a iae-
Rudoff VoKffM--9:�t9_e
-r-- Runoff Delpth:�0-33"_
-
_L___J____ Tt;=_fs1_flMin__
__ r___ J____ r___r____ r___ N� ef0_
_I _ I _L___ i____L _1 L
_r _y _r _I _r _i _r
I I
I II
-r-------r--------r--------r-
I
11 12 13 14 15 16 17 18 19 20
Time (hove)
■ Runoff
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 8S: Post Off Site Unrouted
Runoff = 1.08 cfs @ 11.98 hrs, Volume= 0.047 af, Depth> 1.21"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 1Year Rainfall=3.01"
Area (ac) CN Description
0.140
60
Woods, Fair, HSG B
0.070
61
>75% Grass cover, Good, HSG B
0.260
98
Paved parking, HSG B
0.470
81
Weighted Average
0.210
44.68% Pervious Area
0.260
55.32% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 8S: Post Off Site Unrouted
Hydrograph
1.08 cfs ❑Runoff
Type 0 24-hr
1Year Rainfall-3.01"
Runoff Area=0.470 ac
Runoff Volume=0.',047 of
Runoff Depth?1.21"
T'c=610 min
(,N=81
10 11 12 13 14 15 16 17 18 19
Time (hours)
Ivy Proper Pre-Post_54in Type 11 24-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD@ 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 14
Summary for Pond 6P: (new Pond)
Inflow Area = 4.030 ac, 29.78% Impervious, Inflow Depth > 0.76" for 1Year event
Inflow = 2.87 cfs @ 12.01 hrs, Volume= 0.255 of
Outflow = 2.50 cfs @ 12.16 hrs, Volume= 0.254 af, Atten= 13%, Lag= 9.0 min
Primary = 2.50 cfs @ 12.16 hrs, Volume= 0.254 of
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 514.71' @ 12.16 hrs Surf.Area= 0.018 ac Storage= 0.023 of
Plug -Flow detention time= 6.1 min calculated for 0.254 of (100% of inflow)
Center -of -Mass det. time= 4.9 min ( 820.4 - 815.5 )
Volume
Invert
Avail.Storage
Storage Description
#1
513.00'
0.066
of 54.0" Round Pipe Storage
L= 180.0'
Device
Routing
Invert
Outlet Devices
#1
Primary
513.00'
7.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#2
Primary
514.40'
16.0" W x 8.0" H Vert. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3
Primary
516.91'
3.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=2.49 cfs @ 12.16 hrs HW=514.71' (Free Discharge)
11=Orifice/Grate (Orifice Controls 1.75 cfs @ 5.69 fps)
2=Orifice/Grate (Orifice Controls 0.74 cfs @ 1.79 fps)
3=S ha rp-C rested Rectangular Weir( Controls 0.00 cfs)
Pond 6P: (new Pond)
Hydrograph
I I I I I
2.50 cfs
I I I I I I
I I I I I I
I I I I I I
I I I I I I
Z I I I I I I
I I I I I I
I I I I I I
V I I I I I
I I I I I I
I I I I I
LL I I I I I I
I I I I I I
I I I I I I
I I I
I I I
I I
Time (hours)
❑ Inflow
❑ Primary
Inflow Area=4.030 ac
Peak Elev=514.71'
Storage=0.023 of
I I I I
I I
17 18 19
Ivy Proper Pre -Post 54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons GrouD Printed 11/8/2021
w
Pond 6P: (new Pond)
Stage -Discharge
Discharge (cfs)
Pond 6P: (new Pond)
Stage -Area -Storage
Storage (acre -feel)
■ Primary
■ Storage
Ivy Proper Pre-Post_54in Type 1124-hr 1Year Rainfall=3.01"
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 16
Summary for Link 3L: PRE
Inflow Area = 4.830 ac, 27.54% Impervious, Inflow Depth > 0.66" for 1Year event
Inflow = 3.01 cfs @ 12.13 hrs, Volume= 0.267 of
Primary = 3.01 cfs @ 12.13 hrs, Volume= 0.267 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
I I I I I
I I I I
I I I I �.
____r___-____�
I I I I I 3.(
3
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I -I -t -Y -F -Y
I I I I I I
2
I I I I I I
I I I I I I
I I I I
3
I I I I I I
0
I I I I I I
LL
I I I I I I
I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
Link 3L: PRE
■ r I____r___1____ ■ Primary
I nflpw Area=14.8$0 ac
I I I
I I
I I I I I I I
I I I I I I I
I I I I I I
I I I I I I
I I I I I
I I I I I
I I I I I I
I I I I I I I
I I I I I I I
I I I I I I I
LL
►/O91�0iMM000V/ZO0RZFOiMM/�����
1 11 12 13 14 15 16 17 18 19 20
Ivy Proper Pre-Post_54in
Prepared by Timmons Group
Type 11 24-hr 1 Year Rainfall=3.01 "
Printed 11/8/2021
Summary for Link 9L: (new Link)
Inflow Area = 4.810 ac, 32.22% Impervious, Inflow Depth > 0.80" for 1Year event
Inflow = 2.97 cfs @ 12.03 hrs, Volume= 0.320 of
Primary = 2.97 cfs @ 12.03 hrs, Volume= 0.320 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link 9L: (new Link)
❑ Inflow
❑ Primary
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ivy Proper Pre-Post_54in
Prepared by Timmons Group
Type 11 24-hr 10Year Rainfall= 5.50 "
Printed 11/8/2021
Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1 S: Pre Developed Offsite Runoff Area=3.860 ac 25.91% Impervious Runoff Depth>2.20"
Flow Length=740' Tc=20.1 min CN=70 Runoff=10.16 cfs 0.707 of
Subcatchment2S: Pre Developed ON Site Runoff Area=0.970 ac 34.02% Impervious Runoff Depth>2.46"
Tc=6.0 min CN=73 Runoff=4.48 cfs 0.199 of
Subcatchment4S: Post Offsite Routed Runoff Area=3.380 ac 21.89% Impervious Runoff Depth>2.11"
Flow Length=740' Tc=20.1 min CN=69 Runoff=8.55 cfs 0.596 of
Subcatchment5S: Post ON Site Routed Runoff Area=0.650 ac 70.77% Impervious Runoff Depth>3.78"
Tc=6.0 min CN=87 Runoff=4.31 cfs 0.205 of
Subcatchment7S: Post ON Site Unrouted Runoff Area=0.310 ac 29.03% Impervious Runoff Depth>2.38"
Tc=6.0 min CN=72 Runoff=1.38 cfs 0.061 of
Subcatchment8S: Post Off Site Unrouted Runoff Area=0.470 ac 55.32% Impervious Runoff Depth>3.19"
Tc=6.0 min CN=81 Runoff=2.73 cfs 0.125 of
Pond 6P: (new Pond) Peak Elev=516.91' Storage=0.061 of Inflow=9.66 cfs 0.801 of
Outflow=9.12 cfs 0.799 of
Link 3L: PRE Inflow=11.34 cfs 0.906 of
Primary=11.34 cfs 0.906 of
Link 9L: (new Link) Inflow=11.18 cfs 0.985 of
Primary=11.18 cfs 0.985 of
Total Runoff Area = 9.640 ac Runoff Volume = 1.893 of Average Runoff Depth = 2.36"
70.12% Pervious = 6.760 ac 29.88% Impervious = 2.880 ac
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 19
Summary for Subcatchment 1S: Pre Developed Offsite
Runoff = 10.16 cfs @ 12.14 hrs, Volume= 0.707 af, Depth> 2.20"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
1.390
60 Woods, Fair, HSG B
1.470
61 >75% Grass cover, Good,
HSG B
1.000
98 Paved parking, HSG B
3.860
70 Weighted Average
2.860
74.09% Pervious Area
1.000
25.91 % Impervious Area
Tc Length
Slope Velocity Capacity
Description
(min) (feet)
(ft/ft) (ft/sec) (cfs)
10.3 100
0.0150 0.16
Sheet Flow,
Grass: Short n= 0.150 P2= 3.65"
8.4 500
0.0200 0.99
Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
1.4 100
0.0600 1.22
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.0 40
0.0312 16.54 51.95
Pipe Channel,
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.010 PVC. smooth interior
20.1 740 Total
Ivy Proper Pre -Post 54in Type 1124-hr Wear Rainfall=5.50"
Prepared by Timmons Group Printed 11/8/2021
Subcatchment 1S: Pre Developed Offsite
11 i i i i i it it i i i i i ___ � RunoH
10.16 cfs
----- ---- -- ---------------------------
10 1 1
Type II 2&hr
s
i OYear I�airifaIIr5.90"
___J _1 J _1 _L _J___--- I____1____L--- J---- L___I---- 1____
e ' Rtunbff Areal=3.860 i3c
Runoff Vo1um7=0I707?af
Runoff )6p 2.20,E
3 -- - -
M 5 ibw Lehgth=740�
----;--- ----T&20',T-rain
I
N- 11T
1
2
1 12 13
Time (hours)
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 21
Summary for Subcatchment 2S: Pre Developed ON Site
Runoff = 4.48 cfs @ 11.97 hrs, Volume= 0.199 af, Depth> 2.46"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
0.580
60
Woods, Fair, HSG B
0.060
61
>75% Grass cover, Good, HSG B
0.330
98
Paved parking, HSG B
0.970
73
Weighted Average
0.640
65.98% Pervious Area
0.330
34.02% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 2S: Pre Developed ON Site
Hydrograph
5-
4.48 cfs ❑ zunof
Type 0 24-hr
4 10Year Rainfall-5.50"
Runoff Area=0.970 ac
3. Runoff Volume=0.199 of
Runoff Depth?2.46"
,T'c=6,0 min
2 trN=';73
10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 22
Summary for Subcatchment 4S: Post Offsite Routed
Runoff = 8.55 cfs @ 12.14 hrs, Volume= 0.596 af, Depth> 2.11"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
1.250
60 Woods, Fair, HSG B
1.390
61 >75% Grass cover, Good,
HSG B
0.740
98 Paved parking, HSG B
3.380
69 Weighted Average
2.640
78.11 % Pervious Area
0.740
21.89% Impervious Area
Tc Length
Slope Velocity Capacity
Description
(min) (feet)
(ft/ft) (ft/sec) (cfs)
10.3 100
0.0150 0.16
Sheet Flow,
Grass: Short n= 0.150 P2= 3.65"
8.4 500
0.0200 0.99
Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
1.4 100
0.0600 1.22
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.0 40
0.0312 16.54 51.95
Pipe Channel,
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.010 PVC. smooth interior
20.1 740 Total
Ivy
Type/1 24-hr 10Year Rainfall=5.50"
Timmons Group Printed 11/8/2021
Subcatchment 4S: Post Offsite Routed
8
_---`--------`--------'- I .55cfs cfs I I I
I I I I I
I I I I
I I
I
_J _L
6
... 5
I
I
I I I
3
LL
I
I
I I
j
I
I
I
I
I I I
I I I I
3
___ I____I__-I____I____I__
I
I
I
I
I I
I I
I I
I I
2
I
I
Time (hours)
I I I I I I I
____`_----i----'----'----�--- ■Runoff
Type11 2"r
10Yea r _lka i nfaU r 5.9.0" _
I I I I I I I
Runbff Areal=3.380 i3c
' Ruooff', Vol',ump=0.',596'1 of
--_ Runof( Depth�2-.14"
I I I I I I I
- - - IHow-Lehgtth--740-'
Tc=2( rI-M
it-,N=169
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 24
Summary for Subcatchment 5S: Post ON Site Routed
Runoff = 4.31 cfs @ 11.97 hrs, Volume= 0.205 af, Depth> 3.78"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
0.000
60
Woods, Fair, HSG B
0.190
61
>75% Grass cover, Good, HSG B
0.460
98
Paved parking, HSG B
0.650
87
Weighted Average
0.190
29.23% Pervious Area
0.460
70.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 5S: Post ON Site Routed
Hydrograph
4.31 cfs ❑ zunof
Type I� 24-hr-
4 10Year RainfallT5.50"
Runoff Area=0.650 ac
3 Runoff Volume=0.',205 of
Runoff Depth?3.78"
Tc=610 min
0=87
10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment 7S: Post ON Site Unrouted
Runoff = 1.38 cfs @ 11.97 hrs, Volume= 0.061 af, Depth> 2.38"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
0.000
60
Woods, Fair, HSG B
0.220
61
>75% Grass cover, Good, HSG B
0.090
98
Paved parking, HSG B
0.310
72
Weighted Average
0.220
70.97% Pervious Area
0.090
29.03% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 7S: Post ON Site Unrouted
Hydrograph
1.38 cfs
Type 0 24-hr
0Year Rainfall-5.50"
Runoff Area=0.310 ac
1
LRunoff Volume=0.',061 of
Runoff DepM>2.38"
T'c=610 min
0=72
10 11 12 13 14 15 16 17 18 19 20
Time (hours)
❑ Runoff
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
Runoff =
Summary for Subcatchment 8S: Post Off Site Unrouted
2.73 cfs @ 11.97 hrs, Volume= 0.125 af, Depth> 3.19"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10Year Rainfall=5.50"
Area (ac) CN Description
0.140
60
Woods, Fair, HSG B
0.070
61
>75% Grass cover, Good, HSG B
0.260
98
Paved parking, HSG B
0.470
81
Weighted Average
0.210
44.68% Pervious Area
0.260
55.32% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 8S: Post Off Site Unrouted
Hydrograph
❑ Runoff
Type 11 24-hr
10Year Rainfall=5.50"
Runoff Area=0.470 ac
2 Runoff Volume=0.125 of
Runoff Depth>3.19"
T'c=610 min
�N=81
1
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ivy Proper Pre-Post_54in Type 11 24-hr 10Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 27
Summary for Pond 6P: (new Pond)
Inflow Area = 4.030 ac, 29.78% Impervious, Inflow Depth > 2.38" for 10Year event
Inflow = 9.66 cfs @ 12.06 hrs, Volume= 0.801 of
Outflow = 9.12 cfs @ 12.16 hrs, Volume= 0.799 af, Atten= 6%, Lag= 5.9 min
Primary = 9.12 cfs @ 12.16 hrs, Volume= 0.799 of
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 516.91' @ 12.16 hrs Surf.Area= 0.013 ac Storage= 0.061 of
Plug -Flow detention time= 5.3 min calculated for 0.799 of (100% of inflow)
Center -of -Mass det. time= 4.4 min ( 799.4 - 795.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
513.00'
0.066
of 54.0" Round Pipe Storage
L= 180.0'
Device
Routing
Invert
Outlet Devices
#1
Primary
513.00'
7.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#2
Primary
514.40'
16.0" W x 8.0" H Vert. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3
Primary
516.91'
3.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=9.08 cfs @ 12.16 hrs HW=516.90' (Free Discharge)
11=Orifice/Grate (Orifice Controls 2.80 cfs @ 9.11 fps)
2=Orifice/Grate (Orifice Controls 6.29 cfs @ 7.07 fps)
3=S ha rp-C rested Rectangular Weir( Controls 0.00 cfs)
Pond 6P: (new Pond)
Hydrograph
❑ Inflow
9.66 cfs ❑ Primary
10 9.12 cfs Inflow Area=4.030 ac
9 I U1 Peak Elev=516.91
8
.� 6 i
___I____i____rr___r
3
4 i
7____i ___T____i____i
p
1
I�
Time (hours)
Storage=0.061 of
Ivy Proper Pre -Post 54in Type // 24-hr Wear Rainfall=5.50"
Prepared by Timmons GrouD Printed 11/8/2021
w
Pond 6P: (new Pond)
Stage -Discharge
Discharge (cfs)
Pond 6P: (new Pond)
Stage -Area -Storage
Storage (acre -feel)
■ Primary
■ Storage
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 29
Summary for Link 3L: PRE
Inflow Area = 4.830 ac, 27.54% Impervious, Inflow Depth > 2.25" for 10Year event
Inflow = 11.34 cfs @ 12.08 hrs, Volume= 0.906 of
Primary = 11.34 cfs @ 12.08 hrs, Volume= 0.906 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
12
I I I
T--- _I---- r___
T____r
I I
I I
I I I I
10
'
I I
9
'
I I I
----------------
I I I I
I I I I I
6
___�-------- �'----- L
0
LL
5
4
I I I I
3
I I I I
I I I I
2
i
I I I I
I
I
Link 3L: PRE
I I I I I I I
____ ________ I____ T_______
■Inflow
■ Primary
34 cfs
I n�lpw?Area=4.$U 41c
r--- ,---- r___
I I I I I I
I I I I I
____1___J____L___J____L
I I I I I ___
I I I I I
I I I
_L _J _L
I I I I I I
I I I I I
I I I I
I I I
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ivy Proper Pre-Post_54in Type 1124-hr 10 Year Rainfall= 5.50 "
Prepared by Timmons Group Printed 11/8/2021
HydroCAD® 10.10-4a s/n 08663 @ 2020 HydroCAD Software Solutions LLC Page 30
Summary for Link 9L: (new Link)
Inflow Area = 4.810 ac, 32.22% Impervious, Inflow Depth > 2.46" for 10Year event
Inflow = 11.18 cfs @ 12.01 hrs, Volume= 0.985 of
Primary = 11.18 cfs @ 12.01 hrs, Volume= 0.985 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link 9L: (new Link)
----- I-------L--- L - - -
I I I
12
I I
I I I
11.18
c
I I I
,0
I I I
----I----i----'.--
I
I I I I
I I I I
y� 7
I
_J _I _1 _I _L _J
V
I I I I
I
6
0
I I I I
LL
I I I I
4
I I I
I I I
3
I I I
z
I I I
L___ J____ L___
I I I I I I I
■ Inflow
■ Primary I
Inflpw!Area=4.810c _
1
1
_I _L _J _L
I I I I I
1
_I _L _J _L
I I I I
I I I I
I I I I
I I I
I I I I I
I I I I I
I I I I I
_J _L
I I I I
I I I
I I I I
I I I
I I I
I I I
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Virginia Runoff Reduction Method! Mrksheet
DEq Virginia Runoff Reduction Method New Development Compliance Spreadsheet - Version 3.0
BMP Design Specifications List: 2013 Draft Stds & Specs
Site Summary Project Title: Ivy Proper
Date: 44449
Total Rainfall= 431nches
Site Land Cover Summary
A soils
B Soils
C Soils
D Soils
Totals
%of Total
Forest/Open (acres)
0.00
0.07
0.00
0.00
0.07
7
Managed Turf (acres)
1 0.00
0.41
0.00
0.00
0.41
40
Impervious Cover (acres)
1 0.00
0.55
0.00
0.00
0.55
53
1.03
100
Site Tv and Land Cover Nutrient Loads
Site Rv
0.59
Treatment Volume ft
2,202
TP Load (lb/yr)
1.38
TN Load (lb/yr)
9.90
Total TP Load Reduction Required (lb/yr) 0.96
Site Compliance Summary
Total Runoff Volume Reduction (ft)
0
Total TP Load Reduction Achieved (lb/yr)
0.00
Total TN Load Reduction Achieved (lb/yr)
0.00
Remaining Post Development TP Load
1.38
(lb/yr)
Remaining TP Load Reduction (lb/yr)
0.96
Required
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Drainage Area Summary
D.A. A
D.A. B
DA. C
D.A. D
D.A. E
Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0.00
Managed Turf(acres)
0.00
0.00
0.00
0.00
0.00
0.00
Impervious Cover (acres)
0.00
0.00
0.00
0.00
0.00
0.00
Total Area (acres)
0.00
0.00
0.00
0.00
0.00
0.00
Drainage Area Compliance Summary
DA. A D.A. B DA. C D.A. D DA. E Total
TP Load Reduced (Ib/vr) 0.00 0.00 0.00 0.00 0.00 0.00
Summary Print
Virginia Runoff Reduction Method Worhsheet
TN Load Reduced (lb/yr) 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00
Drainage Area A Summary
Land Cover Summan
A Soils
BSoils
CSOIIS
DSoils
Total
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf (acres)
1 0.00
1 0.00
0.00
0.00
0.00
0
Impervious Cover (acres)
1 0.00
1 0.00
0.00
0.00
0.00
0
0.00
BMP Selections
Managed Turf
Impervious
BMP Treatment
TP Load from
Untreated TP Load
TP Removed
TP Remaining
Downstream
Practice
Credit Area
[over Credits
I
Volume (Tt (
Upstream
to Practice (16s)
(16/yr)
(Ih/yr)
Treatmentto be
(acres)
Area (acres)
practices (Ihz)
Employed
Total Impervious Cover Treated (acres)
0.00
Total Turf Area Treated (acres)
0.00
Total TP Load Reduction Achieved in D.A.
(lb/yr)
0.00
Total TN Load Reduction Achieved in D.A.
(lb/yr)
0.00
Drainage Area B Summary
Land Cover Summary
A Soils
BSoils
CSoils
DSolis
Total
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf (acres)
1 0.00
1 0.00
0.00
0.00
0.00
0
Impervious Cover (acres)
1 0.00
1 0.00
0.00
0.00
0.00
0
0.00
BMP Selections
Managed Turf
Impervious
BMPTreatment
TP Load from
Untreated TP Load
TP Removed
TP Remaining
Downstream
Practice
Credit Area
Cover Credit
I
z
Volume (ft (
Upstream
to Practice (16s)
(16/yr)
(Ih/yr)
Treatmentto 6e
(acres)
Area (acres)
practices (Ihz)
Employed
Total Impervious Cover Treated (acres)
0.00
Total Turf Area Treated (acres)
0.00
Total TP Load Reduction Achieved in D.A.
(lb/yr)
0.00
Total TN Load Reduction Achieved in D.A.
(lb/yr)
0.00
Summary Print
Virginia Runoff Reduction Method Worhsheet
Drainage Area C Summary
Land Cover Summary
A Soils
BSolls
CSolls
DSolls
Total
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
coo
o
Managed Turf (acres)
1 0.00
1 0.00
0.00
1 0.00
coo
I o
Impervious Cover (acres)
1 0.00
1 0.00
0.00
1 0.00
coo
I o
0.00
BMP Selections
Managed Turf
Impervious
BMP Treatment
TP Load from
Untreated TP Load
TP Removed
TP Remaining
Downstream
Practice
Credit Area
Cover Credit
I
Volume (fts (
Upstream
to Practice (Ihs)
(16/yr)
(Ih/yr)
Treatmentto 6e
(acres)
Area (acres)
practices (Ihs)
Employed
Total Impervious Cover Treated (acres)
0.00
Total Turf Area Treated (acres)
0.00
Total TP Load Reduction Achieved in D.A.
(lh/yr)
0.00
Total TN Load Reduction Achieved in D.A.
(lh/yr)
0.00
Drainage Area D Summary
Land Cover Summan
A Soils
B Soils
C Soils
D Soils
Total
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf (acres)
1 0.00
1 0.00
0.00
1 0.00
0.00
1 0
Impervious Cover (acres)
1 0.00
1 0.00
0.00
1 0.00
0.00
1 0
0.00
BMP Selections
Managed Turf
Impervious
BMP Treatment
TP Load from
Untreated TP Load
TP Removed
TP Remaining
Downstream
Practice
Credit Area
Cover Credit
I
Volume (fts)
Upstream
to Practice (Ihs)
(16/yr)
(Ih/yr)
Treatmentto 6e
(acres)
Area (acres)
practices (Ihs)
Employed
Total Impervious Cover Treated (acres)
0.00
Total Turf Area Treated (acres)
0.00
Total TP Load Reduction Achieved in D.A.
(lh/yr)
0.00
Total TN Load Reduction Achieved in D.A.
(lh/yr)
0.00
Drainage Area E Summary
Summary Print
Virginia Runoff Reduction Method VVorksheet
Land Cover Summary
A Soils
BSoils
CSolls
DSo0s
Total
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf (acres)
1 0.00
1 0.00
0.00
1 0.00
0.00
1 0
Impervious Cover (acres)
1 0.00
1 0.00
0.00
1 0.00
0.00
1 0
0.00
BMP Selections
Managed Turf
Impervious
BMP Treatment
TP Load from
Untreated TP Load
TP Removed
TP Remaining
Downstream
Practice
Credit Area
Cover Credit
I
a
Volume (Tt)
Upstream
to Practice (Ihs)
(16/yr)
(Ih/yr)
Tre6e
(acres)
Area (acres)
practices (Ihz)
EmployEmployedd
Total Impervious Cover Treated (acres)
0.00
Total Turf Area Treated (acres)
0.00
Total TP Load Reduction Achieved in D.A.
0.00
(Ih/yr)
Total TN Load Reduction Achieved in D.A.
0.00
(Ih/yr)
Runoff Volume and CN Calculations
1-yearstorm 2-year storm 10-year storm
Target Rainfall Event (in) I 0.00 0.00 0.00
Drainage Areas
RV & CN
Drainage Area A
Drainage Area B
Drainage Area C
Drainage Area D
Drainage Area E
CN
0
0
0
0
0
RR (f?)
0
0
0
0
0
1-year return period
RV wa RR (. -in)
0.00
0.00
0.00
0.00
0.00
RV w RR (wnln)
0.00
0.00
0.00
0.00
0.00
CN adjoined
0
0
0
0
0
2-year return period
RV wo RR (.in)
0.00
0.00
0.00
0.00
0.00
RV w RR (wsin)
0.00
0.00
0.00
0.00
0.00
CN adjusted
0
0
0
0
0
10-year return period
RVwa RR
0.00
0.00
Ow
0.00
0.00
-(--in)
RR
RV w (wsin)
0.00
0.00
0.00
0.00
0.00
CN adjusted
0
0
0
0
0
Summary Print
ECOSYSTEM SERVICES, LLC
1739 Allied Street, Suite A
Charlottesville, VA 22903
540.578.4296
www.ecosystemservices.us
jongecosystemservices.us
June 21, 2021
Kevin Flynn, PE
Project Engineer
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
RE: Nutrient Offset Credit — Credit Availability Letter
Ivy Proper Project
TMP: 058A2-00-00-01400 & 058A2-00-00-02000
Project HUC: 020802040402
Bank HUC: 020802040202
Bank Address: 1705 Lambs Road, Charlottesville, VA 22901
Dear Mr. Flynn,
We appreciate the opportunity to provide a credit availability letter for 0.64 pounds of phosphorus for
the above referenced project. This letter is to certify that as of today, June 21, 2021, Ivy Creek Nutrient
Bank has 131.39 pounds of phosphorus (TP), 202.10 pounds of nitrogen (TN), and 41,432.12 pounds of
TSS available for transfer to those entities requiring offsets in accordance with the Chesapeake Bay
Watershed Nutrient Credit Exchange Program (VA Code § 62.1-44.19:14 et seq.). Those offsets are also
transferable in accordance with the Virginia stormwater offset program (VA Code § 62.1-44.15:35) and
the Virginia Soil and Water Conservation Board's Guidance Document on Stormwater Nonpoint Nutrient
Offsets approved on July 23, 2009, to those regulated entities qualifying for nutrient credits.
We can certainly accommodate your needs and could offer to fulfil the order of 0.64 pounds of
phosphorus.
Please feel free to contact us with any questions. I hope we have the opportunity to work together on this
project.
Sincerely,
Ecosystem Services, LLC
By:
* ^ 1t.
Jonathan R. Roller, AOSE PSS CNMP
Manager —Authorized Representative
Worksheet for CWD 2-Year
Project Description
Friction Method
Manning
Formula
Solve For
Normal Depth
Input Data
Roughness Coefficient
0.035
Channel Slope
0.050 ft/ft
Left Side Slope
0.050 H:V
Right Side Slope
0.667 H:V
Discharge
3.59 cis
Results
Normal Depth
19.3 in
Flow Area
0.9 ft2
Wetted Perimeter
3.5 ft
Hydraulic Radius
3.1 in
Top Width
1.15 ft
Critical Depth
17.3 in
Critical Slope
0.089 ft/ft
Velocity
3.88 ft/s
Velocity Head
0.23 ft
Specific Energy
1.84 ft
Froude Number
0.763
Flow Type
Subcritical
GVF Input Data
Downstream Depth
0.0 in
Length
0.0 ft
Number Of Steps
0
GVF Output Data
Upstream Depth
0.0 in
Profile Description
N/A
Profile Headloss
0.00 ft
Downstream Velocity
Infinity ft/s
Upstream Velocity
Infinity ft/s
Normal Depth
19.3 in
Critical Depth
17.3 in
Channel Slope
0.050 ft/ft
Critical Slope
0.089 ft/ft
Bentley Systems, Inc. Haestad Methods Solution FlowMasler
Ivy Proper Exist Pipe Capacity1mri Center [10.03.00.03]
9/8/2021 27 Stemon Company Drive Suite 200 W Page 1 of 1