Loading...
HomeMy WebLinkAboutSUB201800115 Bond Reduction 2021-11-30 (2)Project Name: Salamander Street Plan #: SUB201800115 TMP(s): Salamander Road Right-of-way Date Estimate complete: 10/26/2020 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item No. Unit Unit Cost Cost installed % compete cost remaining Road Name Begin station 10+00.00 End station 21+12.50, road length 1112.5 ft aggregate base 6.0 in d 1112.5 fl L 2 fl W 856.6 ton $35.00 $29,981.88 80% $5,996.38 blotted or prime&double seal 1112.5 ft L 0. ft W 0.0 sy $10.00 $0.00 80% $0.00 asphalt base in 1112.5 fl L 22. fl W 599.6 tons $120.00 $71,956.50 80% $14,391.30 asphalt surface in d 1112.5 ft L 22. ft W 449.7 tons $140.00 $62,961.94 0% $62,961.94 curb CG-2 r"Mft $16.00 $704.00 80% $140.80 curb CG-6 1993.0 ft $19.00 $37,867.00 50% $18,933.50 underdrain, JD-4 ft $6.00 $0.00 0% $0.00 sidewalk, concrete (6') 1785.0 ft $25.00 $44,625.00 80% $8,925.00 ramp CG-12 125 ft $350.00 $43,750.00 80% $8,750.00 street name sign 1 each $200.00 $200.00 80% $40.00 traffic control sign 11 each $200.00 $2,200.00 0% $2,200.00 Street Landscape Each 62 each $150.00 $9,300.00 0% $9,300.00 guardrail ES @) 3000 0.0 ft $17.00 $0.00 0% $0.00 barricade 3.0 each $1,500.00 $4,500.00 0% $4,500.00 drop inlet or grate 2 each $3,500.00 $7,000.00 80% $1,400.00 standard manhole frame top (not inlet) 0 each $500.00 $0.00 0% $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 0% $0.00 4" pvc cross drain in d ES-1,2 0 EC-1 540.0 ft $40.00 $21,600.00 80% $4,320.00 pipe, rap, crop (12") in d ES-1,1 0 EC-0 0.0 ft $25.00 $0.00 0% $0.00 pipe, rep, crop (15 to 48') 12-- in d 0 ES-1,2 0 EC-1 30.0 ft $35.00 $1,050.00 80% $210.00 pipe, rep, crop (15 to 48') in d 0 ES1,e EC-1 0.0 ft $40.00 $0.00 0% $0.00 pipe, rap, and (60 to 108') in d O.ESIEC-1 0.0 t $$60.00 $0.00 0 % $0.00 rip -rap, placed ft d 0. fl L 0.0 ton $60.00 $0.00 0% $0.00 matting, EC-2 or 3 0. ftL 0.0 sy $2.00 $0.00 0% $0.00 dear and grub (for wooded sites) 0. ft L 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading 3625.0 cy $6.00 $21,750.00 80% $4,350.00 fill grading 6810.0 cy $12.00 $81,720.00 80% $16,344.00 as -built drawings (lk+price per 0.1 mi.) 1112.5 ft L 0.2107 mi. 3 Isum $2,000.00 $7,000.00 80% $1,400.00 survey and layout (price per 0.1 mi.) 1112.5 ft L 0.2107 mi. 3 Isum $2,000.00 $7,000.00 80% $1,400.00 mobilization -Isum $5,000.00 $5,000.00 80% $1,000.00 materials testing 1112.5 ft L 2.225 inc of 500' 3 each $200.00 $660.00 80% $132.00 compaction testing 1112.5 ft L 2.225 inc of 500' 3 each $200.00 $660.00 80% $132.00 CBR tests (1 every 0.1 mi. per road) 1112.5 ft L 2.225 inc of 500' 3 each $200.00 $660.00 80% $132.00 stone depth inspections 1112.5 ft L 2.225 inc of 500' 3 each $200.00 $660.00 80% $132.00 pavement inspections 1112.5 ft L 2.225 inc of 500' 3 each $200.00 $660.00 80% $132.00 pipe and drainage video inspections ($500 min) -ft $1.00 $570.00 80% $114.00 hltps://albemarlecountyva-my.sharepoint.com/personal/ecox2_albemarle_orgIDocuments/Reviews/Brookhill/SUB201800115/Bond Reduction/SUB21800115_RP_bond_est_REDUCTONA ®Y1 Project Name: Salamander Street Plan #: SUB201800115 TMP(s): Salamander Road Right-of-way Date Estimate complete: 10/26/2020 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item No. Unit Unit Cost Cost installed % compete cost remaining Road Name VDOT surety (1 lane) 1112.5 ft L 0.21 mi. Lanes $3,000.00 $15,000.00 0% $15,000.00 VDOT Inspection fee (1 In rd, 1 yr) 1112.5 ft L 0.21 mi. Lanes MI-anes $150.00 $880.00 0% $880.00 VDOT admin. Cost recovery fee(1 lane) 1112.5 ft L 0.21 mi. $250.00 $1,550.00 0% $1,550.00 cost sum $481,466.31 $184,766.91 Contingency $48,146.63 $18,476.69 Total $529,620 $203,250 https://albemarlecountyva-my.sharepoint.com/personal/ecox2_albemarle_orgIDocuments/Reviews/Brookhill/SUB201800115/Bond Reduction/SUB21800115_RP_bond_est_REDUCTMOGAW1