Loading...
HomeMy WebLinkAboutSDP202100009 Correspondence 2021-11-30 (2)SHIMP ENGINEERING, P.C. Design Focused Engineering November 30, 2021 David James County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Response Letter #3 for SDP2021-9 999 Rio Road — Final Site Plan Dear David, Thank you for your review of the final site plan for 999 Rio Road. This letter contains responses to County comments dated November 19, 2021.Our responses are as follows: 1. REV 3: 4 Sheets 3/7/12 — a. Add a note that sidewalk shall be 7" thick at emergency access entrance b. Add note to curb details that a 6" 21-A or better stone base is required. i. (Rev. 2) Not addressed. No note provided. Provide a callout to a detail sheet. ii. (Rev. 3) Partially addressed. Show the extent of heavy-duty sidewalk and CG-3 curbing use. It's not clear from drawing. RESPONSE: Hatching is now included to clarify the extents of heavy-duty sidewalk and CG-3 curbing use. C3 Site Plan includes a legend of this hatch and a reference to Cl 1, where the heavy- duty sidewalk detail indicates that a thickness of 7" is required at this emergency access entrance. 2. (Rev. 1) Easement deed & plat needs to be recorded prior to site plan approval. a. (Rev. 3) Comment still valid. RESPONSE: Comment received. Easement deed & plat review is ongoing. If you have any questions or concerns about these revisions, please feel free to contact me at Rachel@shimp-en ing eering com or by phone at 434-227-5140. Regards, Rachel Moon Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com