Loading...
HomeMy WebLinkAboutWPO202100056 VSMP - SWPPP 2021-11-30Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Waverly Residence Opposite 7085 Batesville Road Afton, VA 22920 Prepared by: Line and Grade, LLC Prepared for: Cyrena Sparkman SWPPP Preparation Date: November 30, 2021 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) CONTENTS: 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs A. Corrective Action Log B. SWPPP Amendment Log C. Grading and Stabilization Activities Log Section 1. Registration statement VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) REGISTRATION STATEMENT 2019 Application type. 2 NEW PERMIT ISSUANCE (CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ EXISTING PERMIT RE -ISSUANCE Section I. Operator/Permittee Information. PERMIT #: PLAN/ID #: TECHNICAL CRITERIA: IIB ❑ IIC ❑ A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit). Operator Name: C rena Sparkman, Property Owner (Contractor TBD Contact person: Cyrena Sparkman, Property Owner (Contractor TBD Address: 41 Wicket Way; POB 2304 City, State and Zip Code: Cashiers, NC 28717 Phone Number: 703-200-1947 Primary and CC Email: cy@sparkman.net; charles.lee.sparkman@gmail.com B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES and include a valid email. May we transmit correspondence electronically? YES {3 NO ❑ Section II. Construction Activity Information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site. B. Project site location information. Construction Activity Name: Waverly Residence Address: Near 7085 Batesville Road City and/or County and Zip Code: Afton, VA 22920 Construction Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): 37.995005,-78.743951 Latitude and Longitude (6-digit, decimal degrees format): 37.995650,-78.743861 C. Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest one -hundredth of an acre. Total land area of development (include entire area to be disturbed as approved in the Stormwater Management Plan): 55.45 ac Primary estimated area to be disturbed (include portions with Erosion and Sediment Control Plan approval only): 3.23 ac Off -site estimated area to be disturbed (if applicable): D. Property Owner Status: FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE 2 E. Nature of the Construction Activity Description (i.e. commercial, industrial, residential, agricultural, environmental, utility): Residential / Agricultural F. Municipal Separate Storm Sewer System (MS4) name(s) (if the site is discharging to a MS4): G. Estimated Project Dates (MM/DD/YYYY). Start Date: 02/01/2022 Completion Date: 02/01/2023 H. Is this construction activity part of a larger common plan of development or sale? YES ❑ NO 2 PAGE 1 1 6 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 I. 6 ^ Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page. HUC NAME(S) OF RECEIVING WATERBODY 020802040101 Stockton Creek - Mechums River Section Ill. Off -site Support Activity Location Information. List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional areas on a separate page. Off -site Activity Name: Address: City or County: Off -site Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Latitude and Longitude (6-digit, decimal degrees format): Is this off -site activity an excavated material disposal area? YES ❑ NO ❑ If this off -site activity is an excavated material disposal area, list the contents of the excavated fill material: Willa separate VPDES permit cover this off -site activity? YES ❑ NO ❑ Section IV. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESC Authority for review? YES is NO ❑ Erosion and Sediment Control Plan Approval Date (for the estimated area to be disturbed MM/DD/YYYY): C. Has land -disturbance commenced? YES ❑ NO 2 D. Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications (AS&S), attached the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section 1): E. Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Billing Name: Contact Name: Address: City, State and Zip Code: Phone Number: Primary and CC Email: Rev 11/2020 PAGE 2 16 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively, or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature (signed in ink): Date Signed: Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authorityplease send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deg.yirginia.goy Rev 11/2020 PAGE 3 16 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (DEQ coverage letter to be provided when obtained) Section 3. Nature of activity Project Description: This project consists of the construction of a single family residence and associated access. The existing site is 55.45 acres of vacant wooded land bordered to the north by Stockton Mill Creek and to the south by Batesville Road. Erosion and Sediment Control Sequencing: 1. CONTRACTOR SHALL CONDUCT A PRE -CONSTRUCTION MEETING WITH THE PLAN APPROVING AUTHORITY PRIOR TO ANY LAND DISTURBANCE OR E&S CONTROL INSTALLATIONS. 2. INSTALL CONSTRUCTION ENTRANCE, SEDIMENT TRAP, AND PERIMETER CONTROLS PRIOR TO ANY DISTURBANCE. 3. ONCE INITIAL MEASURES ARE IN PLACE, REQUEST AN INSPECTION OF THE INITIAL EROSION AND SEDIMENT CONTROL MEASURES FROM THE COUNTY OF ALBERMARLE E&S INSPECTOR. CALL 24-HOURS IN ADVANCE OF INSPECTION. 4. PROTECT PERMANENT VEGETATION FOR THE DURATION OF THE PROJECT. 5. COMMENCE DEMOLITION NECESSARY TO PERFORM PROPOSED WORK ONLY (INCLUDING EXCAVATION WORK). 6. CONTRACTOR TO LEAVE EXISTING STABILIZED AREAS IN A NON -EROSIVE CONDITION UNTIL NECESSARY TO INSTALL PROPOSED IMPROVEMENTS. DISTURBED AREAS NOT IMPROVED SHALL BE SEEDED WITHIN 14 DAYS OF DISTURBANCE. 7. CONSTRUCT STORM STRUCTURES, IF APPLICABLE, STARTING AT THE DOWNSTREAM TERMINUS OR TIE-IN. BACKFILL ALL EXCAVATIONS AND TRENCH AREAS. 8. COMMENCE CONSTRUCTION OF PROPOSED PAVING AND SITE ELEMENTS, WITH THE EXCEPTION OF ANY PROPOSED BMPS. 9. FOR GRASSY AREAS: INSTALL PERMANENT SEEDING AND MULCH. STABILIZE ALL DISTURBED AREAS. 10. FOR GRAVEL AREAS: RESTORE GRAVEL AFTER TRENCHING AND EXCAVATION OPERATIONS ARE COMPLETE. 13. REPAIR ANY EROSION AND REMOVE ANY SEDIMENT. 15. DRESS AND OVER -SEED ALL DISTURBED AREAS AS NECESSARY TO AFFECT PERMANENT VEGETATIVE COVER. STABILIZE ALL REMAINING DISTURBED AREAS WITH TOPSOIL, SEED, AND MULCH ONCE WORK IS COMPLETE. 16. REMOVE SEDIMENT TRAP AND ASSOCIATED DIVERSION DIKES ONCE PERMANENT VEGETATIVE COVER HAS BEEN ESTABLISHED ON SITE. 17. BEGIN INSTALLATION OF ANY PROPOSED BMPS ONCE ALL CONTRIBUTING AREAS ARE STABILIZED AND FREE OF DEBRIS. REFER TO INSTALLATION CHECKLIST AND INSPECTION MILESTONES FOR CONSTRUCTION MILESTONES. INSTALL PERMANENT CONVEYANCE CHANNELS TO BMPS AT THIS TIME, STABILIZING IMMEDIATELY WITH EC-2 TYPE 1 MATTING. 18. AFTER FINAL SITE STABILIZATION AND APPROVAL FROM THE APPROPRIATE EROSION AND SEDIMENT CONTROL AUTHORITY, THE SILT FENCE, INLET PROTECTION AND OTHER STABILIZATION MEASURES SHALL BE REMOVED. Section 4. Erosion and Sediment Control Plan. EROSION & SEDIMENT CONTROL NARRATIVE: EROSION AND SEDIMENT CONTROL MEASURES: MAINTENANCE: PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A SINGLE FAMILY RESIDENCE AND ASSOCIATED ACCESS. THE DISTURBANCE AREA ASSOCIATED WITH THIS PROIELTIS 1:323AC L140.6]6 SR. IT IS ANTIUPAMDTWITTHE WORK WILLUAK IN FEBRUMYMD VST J2 MONTHS. E4STING SITE CONDITIONS: THE SITE CONSISTS OF VACANT WOODED LAND BORDERED TO THE REM BY STCCKTON MILL CHEM. ME SLOPES WITHIN THE PROJECT AREA RANGE FROM3TO3OPERCE1W. ADJACFMAREAS: THE PROPOSED PROJECT IS BORDERED BY SINGLE FAMILY RESIDENCES ON ALL BIDS, BY STO KTON MILL CREED( TO THE NORTH, AND BY BATESVILLE CORD OTHEWIJ H. OFIESITEAREAS: T IS NOT ANTICIPATED THAT ANY OFFSITE FIBERS WILL BE DISTURBED DURING CONSTRUCTION. UNSUITABLE MATERIALS RESULTING FROM THE OMMUSED WVRKSHALL BE HW LED FROM THESTEAND DISPOSED OFATPN APPROVED DISPOSALSM PERMITTED SEPARATELY FROM THIS PROJECT. SOILS: SEETHE USDASOUS DELINEATION MAPBHEETC3.0. COMMLAREAS: THISSITE W15NOCRITICALMR lNTIIEIMMEDATEVICINMOFTIIEMOPOSEDMWTRUMON.HOWEVER,PROWRERMONMWROLMEASURESAS SHOWM ON THE PLANS SHALLBE PDT IN PACETO PREVENTSHT FROM LEAVING THE PROJECTAIM AND ENTERING MESTREAM BUFFER MMHRL EROSION as SEDIMENT CONTROL MEASURES: MERE TO THIS SHEET MR UST OFALL PROPOSED EROSION AND SEDIMENT CONTROL MEASURES TO BE USED ON SIZE. RERNMENTSTABILIZATION: THE SIZE WILL BE STABIU]ED THROUGH THE USE OF PERMANENT SEEDING, STONE AND RIPUP, LWDSCAPNG, AND PAVEMENT. SEEDING INFORMATION, DATES AND AMENDMENTS ME INCLUDED ON THE PANS. SOIL TESTING SHALL P BE COMPLETED THE CONTRACTOR TO DETERMINE THE SUITABILITY OF FASTING SOILS AND THE NEED FOR MY SOIL AMENDMENTS TO ENSURE THAT PERMANENT SEEDING WILL GROW EFFECTIVELY. STORM WATER RUNOFF CONSIDERATIONS: 6TORMWATER RUNOFF DURING CONSTRUCTION WILL BE DIRECTED THROUGH APPROPRIATE EROSION AND SEDIMENT CONTROLS TO CLEAN WATER BEFORE DISCHARGING TO AN ADEQUATE OUTI PROTECTED FROM EROSION AND SEDIMENT AS SHOWM ON THE PLANS. MAINTENANCE: ALL FIVE MEASURES SHALL BE INSPECTED REGULARLY AS REQUIRED BY STATE STANDARDS AND MAINTANED IN GOOD WORMNG ORDER. REQUIRED REPAIRS SHALL BE MADE I MMEDATELY. SEE THE MAINTEMANCE NARRATIVE ON THIS SHEET FOR SPECIPC hW NTENANCE ITEMS AND INSPECTION TIMES. ALBEMARLE COUNTY EROSION & SEDIMENT CONTROL NOTES: General mnstruedon notes for Erosion and Sediment Control plans I. The plan approving authority ..it be notified one week prior to th"it-oaswetion onf venee, one week prior to the commencement of land disturbing Activity, said one week ,nor .,he final inspection. All erosion and sediment control measures will be comtmcad and maintained according to arminnitim naaidards and specifications Offlm Virgin Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion indictment mewl measures Are to be Placed Prior to or as the first step in -luring. 4. A copy ofre approved erasion and sediment control plan dell be maintained As Use site at All fime . 5. Prior m conmmcing land disturbing activities in areas other than indicated On these plans lincluding, but not limited m, off -site borrow or waste area), the contractor shell submit a supplementary erosion control plan to the owner for review and appraisal by the plan approving aaftHt, 6. The mnnomar is respoulble for im it tim ofany addidwal mminn canwl meawres necessary to pmrmn erosion and sdimentation As determined by the plan approving authority. - All disturbed anus arc to drain to approved sediment mntml messmes at all times during land disturbing asouUses and consist site dcvebpment until Goal slaMlivtim is achieved. 8. During dewsecong opernims. water all be pumped into an approved filtering device. 9. The comet air still ti peatall mossion control meavms wriest lly and after each CHI producing RioSH cv iiY ��aca�Y. cmi. a. cIF.... A w...a... t.R. tRF cRccnvcaeas of the ressi control deuces shall be de immediately, M All fill material W be alkali from m approved, designated bowwaret, 11. All waste materials shall be rakm m an approved waste area. Earth fill shall be ireN materials only, free ofaion, stump; wood, mbbish, and ores debris. 12. Boww as waste areas are to be reclaimed within] days of completion per Zoning Ordinance section 5.1.28. 13. All i.eo materials shall be transtomd in mmplimca win, somen 13-301 of the Cade of Almonds, 14. Botrow, fill or waste activity involving industnal-type powm saimpmem shall be limited to the hours of 1 Ooam m 9:OUym. 15. BAww, fill or waste activity shall be conducted in a air manner thm maintains lateral mpllmr, or order to minimize my havrd ro tenons, Physical damage to adjacent land and commitments, and damage to my public street bemuse it slides, malicong, or collatm. 16. The developer shall reserve the right to install, maintim, remove Or waived W pemuinent stonmwater maangemut facilities where applicable all erosion control measures required by this plan regardless ofthe sale olmy, [or, unit, building or other proton ofthe property. IT Temporary smbdvatim shall be micaryrery, mad, and mulching. Seeding is m be ALL 75 1 harsere, and in the months Of September to February to crosiat a 50150 mu of Amua1 Ryeareas and Cereal Winter Rye, of in March and April to consist of Annual Rye, or May Ilaough Augum m consist ofGermn Millet. Straw mulch n to be appliedat 8016v10Ust. Alternatives are subject To.pprovd by the County erosion mnral inspector. ,S. Pcommint stabilisation shell be lime and Gardiner, pemuaiem seeding, And mulch. Agrimlmml guide lion eAlail be applied at 90NMIOXUC inmryomted into the Lisp 4-6 inchesofmil. Feldilinershall be aglied at lIl(glbslacre mdcOtvsirt Ofa 10-20.10 nutriem nuis, Pewmeait seding shall Iw tplied At 180ficam a and consist oF95%Kenmdry 31 m Tall Fescue and 0-5% Peremiai Ryrgmss or Kentucky Blueg , S. mulch is 0 be andiiedat IHIRM/100I AlteoativesaowbjWtoapmvtdbyre COmtyeemsionem I insectemer. 19, Malaiaeaiann: All a msuree are m be inspecad wetkly and after each mint.]]. Anydamage or clogging ro swctuml measures is to be repair immenmly. Silt traps ere ro be cleaned when 50%of the wet storage Volume is fined with sdimut. AIL seeded areas am m be eweded when necessary to mhiwea good staid Of gross. Silt frnceanddiversiondykes which are mllening sedimem ro half their height most be deand and repaired mmdpeoner 20. ALI fLmi si prom it roti nsindn, wh s merit onwl omsu need a subjw d win, l by a of Cousite comenrmtion, whm measures are no lorSmmeded, eubjmt to approval byn,e County erosion control inspector, UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MNNTMNED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SFFCIRCATIONS OF THE LATEST EDITION OF ME VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS AND VESC HANDBOOK OR COUNTY OF ALBERMARLE STANDARDS, WHICHEVER ARE MORE STRINGENT. A STAB UZED STONE PAD WITH A FILTER FABRIC UNDERLINER LOCATED AT POINTS OFVEHICUW! INGRESS AND EGRESS ON ACONSTRULTON SITE SILT FENCE-3.05 A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC ALTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED. ASEDIMENTFlLTER LOCAMDATTHE IMETTO STORM SENNM CULVERTS. A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED ATTIRE TOP OR RASE OFASLOPLNG DISTURBEDPREA ATEMMRPRY PONDINGAREA FORMED BY CONSTRUCTING AN MORRIS EMBANKMENT WITH ASTONE OIRIET. OUTIET POTECTON-3.1G A PERMANENT ODREF PROTECTION MEASURE THAT CONSISTS OF STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED AT THE OUTLETS OF ALL PIPES OR PAYED CHANNEL SECTIONS. TEMPORARY SEEDI NG - 3.31 THE ESTABLISHMENT OFATEMPORARY VEGETATIVE COVER ON DISTURBED AREA$ THAT WILL NOT BE BROUGHT TO ANAL GRADE FOR PERIODS OF SO DAYS TOONE YEAR BY SEEDING WITH APPROPRIATE RPPOLYGROWING ANNUAL PIANI PERMNUENTSEEDING-332 THEESTABLSHMENT OF PERENNIALVEGETATIVE COVER BY PLANTING SEED ON FOUGHGRMLED AREAS R-ol NOT BE BROUGHTTO ANAL GRADE FORA YEAR OR MORE OR WHERE PERMANENT VEGUATNE COVER IS NEEDED ON ANEGRADED AREAS IN ACCORDANCE WOH EROSION AND SEDIMENT CONTROL TECHNICAL BULLETIN NO.4: NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES. MULCHING-3.35 APPLICATION OF PANT RESIDUES OR OTHER SUITABLE MATERIALS TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERIAND FLOW VELOCITIES. FOSTERS PLANT GROWTH BY INCREASING AMMILABLE MOISTURE AND PROVIDING INSULATION AGAINST EXTREME HEAT OR COLD. SHOULD BE APPLIED TO ALL SEEDING OPERATION, GR EG PUNT MATERIALS WHICH CO NOT PROVIDE ADEQUATE SOIL PROTECTION BY THEMSELVES, AND RARE MGM WHICH CANNOT BE SODDED DUE TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT SOIL LOSS. THE INSTALLATION OF PROTECTIVE COVERING (BLANKED OR A SOIL STAMUZARON MAT ON A PREPARED PLANTING AREA OF A STIES SLOPE CHANNEL, OR SHORELINE. DUST CONTROL-3.39 REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMJUTION, AND CONSTRUCTION ACTIVITIES. GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES3: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACIICFS WILL BE CONSTRUCTED AND hW NTAINED ACCORDING TO MINIMUM STANDARDS AND $MORMONS OF THE MRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINA REGULATIONS VR 62502G] EROSION AND SEDIMENT CONTROL REGULATIONS (4VACSD30). ES2: THE PIANAFPROMNG AUTHORITY MUST ED NOTIFIED ONE WED PRIOR TO THE PREmNSTRUCIION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACrl AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO THE PL INMPROWNG AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE L NDDISTURBING ACTMW SHOWN ON THE APPROVED PLW.IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE LANDDISTURBING ACTIVITY, THE PLANS APPROVAL WILL BE REVOKED. ES3: All EROSION AND SEDIMENT CONTROL MEASURES ME TO BE PLACED PRIOR TO OR AS SOON AS THE FIRST$MR IN CLEARING. ES-: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN 8.1 BE hWNTAINED ON THE SITE ATALLTIMES. MR: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN MGM GREG THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED MEAS, THE MNR OR SHALL SUBMIT A SUPPIEMENTMY EROSION CONTROL PLAN TO THE OWNER MR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ESG: THE CONTRACTOR IS RESPONSBIE FOR INSTALATON OF MY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES]: ALL DISTURBED AEA$ ME TO GRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTWTES AND DURING SITE DEVELOPMENT UNTIL FINAL $TMILIUTION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLA MPROMNG AUTHORITY, THE CONTROLS SHALL BE REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF TEMPORARY MEASURES SHALLBE PERMANENTYSTMIUZEDTO PREVENT FURTHER EROSION AND SEDIMENTATION. ESB: DURINGDEWATERING OWMnONS,WAMRWILLBEWMPMIWOMMF M RLTERINGDEVICE Ma: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND IMMEDIATELY AFTER FACH RUNOFF£RODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO hW NTAIN THE EFFECTVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. ES30: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRMSPORTED ONTO A PAYED OR PUBLIC ROAD SURFACE STILL: SEEDING OPERATIONS SHALL BE INLMTED WITHIN ] Dan AFTER REACHING FINAL GRACE OR UPON SUSPENSION OF GRADING OPERATIONS FOR M ANTICIPATED DURATION OF GREATER THAN 14 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR ASPECIFIC All ES32: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND MR MOVEMENT OF DUST FROM EXPOSED Was WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR FROM ANIMAL OR PUNT UFE. ES13: A VSMP IS REQUIRED FOR FROJECS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED CHEMPEAKE AY PRESMVATON AREA (CHIRAL OR ONE ACRE OR GREATER OUTSIDE THE CBPA FOR MORE INFORMATION VISIT ME VIRGINA STORMWATER MANAGEMENT PROGRAM PERMITTING Will RAREST: LRtaJ/wwx.Try.eirginia.gw/ROgmms/V/aNr/SHormwateRAata�memasm Fkr; I FGFNn Sal FENCE SF SILT FENCE ® TREE PROTECTION �® LIMITS OF DISTURANCE ® DIVERSION DIKE IP IMF PROTECTION OP ODRETPROTECDON CULVERT IMF PROTECTION CD CHECK DAM CE CONSTRUCTION ENTRANCE SOS TEMPORARY/PERMANENTSEEDING AND MULCHING REMOVE TREE SAW WIT ® DEMOLISH PAVEMENT MANNED STEEP SLOPES FROM COUNTY GIs WATEROIECIIONORDINMCF BUFFEw SOY FL00DPWN IN GENERAL. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED GAILY AND AFTER EACH RAINFALL EVENT GREATER THAN 025 INCHES. MEASURES SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULEANDTHE VIRGINN EROSION AND SEDIMENT CONTROL HANDBOOK. THE FOLLOWING WILL BE CHECKED IN PARTICULAR 1- THE CONSTRUCTION ENTRANCES AND CONSTRUCTION ROAD $TPBILIUTION AREAS SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS(DFWAY THROUGH PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND/OR WASHING AND REWORKING OF DURING STONE. 2. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SILT FENCE AFTER EACH MNFPll. UNDER NO CIRCUMSTANCES SHALL DEPOSITS BE ALLOWED TO ACCUMULATE ABOVE WllF ME HEIGHT OF ME FENCE. DAMAGED OR UNDERCUT SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SHOULD SILT FIERCE BECOME INEFFECOVE OR REACH THE END OF THE EXPECTED USEABLE LIFE FABRIC SHALL BE REPLACED IMMEDIATELY. ORION SILT FENCE REM_ DRESS MY SEDIMENT DEPOSITS TO CONFORM WITH EXISTING GRADE AND SEED. 3. INLET PROTECTION SHALL BE CHECKED REGULARLY FOR SEDIMENT. IF EXCESSIVE SEDIMENT IS PRESENT, OR IF SOMME PONDING OCCURS AFTER RAINFALL, THE MINE SHALL BE PULLED AWAY AND CLEANED OR REPLACED. 4. STONE USED IN CULVERT INLET PROTECTION SHALL BE INSPECTED REGULARLY FOR CLOGGING AND REPLACED AS NEEDED TO MAINTAIN FULL FUNCTIONALITY. UNDER NO CIRCUMSTANCES SHALL SEDIMENT BE ALLOWED TO ACOUMUTATE ABOVE ONEHNF OF THE HEGHT OF THE INLET PROTECTION. ACCUMULATED SEDIMENT SHALL BE REMOVED AND UPOREAM MGM PERMW EARLY STABILIZED BEFORE THIS CONTROL IS REMOVED. 5. CHECK DAMS SHALL BE INSPECTED REGULARLY TO ENSURE THE CENTER OF THE DAM IS LOWER TWOS THE EDGES. SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE HALF THE HEGHT OF THE DAM. 6. MY MIL WITHIN TREE PROTECTION ARM THAT IS INaDVER1ENTLY COMPACTED SHAH BE AERATED WITH AN IRON RAR EVERY M INCHES TO A DEPTH OF 32INCHES. PHYSICAL DAMAGE TO TREES SHAH a REPAIRED AS OIRUNED IN THE VIRGINA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.38, TREES THAT ME STRESSED OR DAMAGED SHALL RECEIVE AN APPROPRATE APPLICATION OF FERTILIZER TO AID RELYIVERY. ]. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREA$ SHOULD BE FERTILIZED AND RESEEDED PS NEEDED. S. ALL TEMPORARY EROSION AND SEDIMENT MEASURES SHALL BE DISIMSED OF WITHIN THIRTY(SOL DAYS AFTER ANAL SITE STABILIZATION IS ACHIEVED AND VEGETATION IS ESTABLISHED. FINAL SIZE STABILIZATION SHAH BE APPROVED BY THE OWNER AFTER THE INSPECTOR HAS DETERMINED THAT ME SITE IS STABILIZED. MANAGEMENT STRATEGIES: THE FOLLOWING SEQUENCE OF DENTS AND EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE MR THIS PROTECT AND SHALL APPLY TO ALL CONSTRUCTION ACINTIES WITHIN PROJECT LIMITS. 1. CONSTRUCTION WILL BE SEQUENCED SO THAT TRENCHING AND EXCAVATION OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBIF. 2. SOIL STOCKIPLES WILLED PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES. STOCKPILES REMAINING FOR MORE THAN 14 DAYS SHALL BETEMPORAMLYSEEDED. 3. THE CONTRACTOR SHALL ME APPROPRIATE CONSTRUCTION METHODS TO MINIMIZE DISTURBANCE ALONG MMMED SLOPS AND EXISTING STEEP SLOPS WHERE EROSION HAZARD IS HIGH. A ALL STORM SEWER INUM THAT ARE MADE OPEMBIE DURING CONSTRUCTION SHALL BE PROTECTED WITH INLET PROTECOON SO THAT SENMENTU MWATERGNNOTE ME EMMV MCESYSTEM. 5. PREVIOUSLY GRASSED AREASSHALL BESEEDED AND STRAW MULCHED IMMEDIATELYARER TRENCHING OPERATION. 6. ALLTHEEROSION AND SEDMENTCONTROL MEASURESSHALLBE INSPECTED46 HOURSMTER EVERY RAIN DENT GRDTEfl THAN 0.251NCHESAND EVERY 5 DAVS EVEN IFA RAIN EVEMDOES NOTOCW R. REQUIRED REPAIRS SHALL BE MADEAS NEEDEDTO MMNTAIN DESIGNEDSTANDARD. ]. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVERED IS ACHIEVED THAT IB UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 6, THE CONTRACTOR SHALL SE RESPONSIBLE FOR ALL THE INUALIATION AND MAINTENANCE OF PII EROSION AND SEDIMENT CONTROL PRACTICES. MINIMUM STANDARD COMPLIANCE: MSl HAVE TEMPI AND PERMANENT STABILIZATION BEEN ADDRESSED IN THE NARRATIVE? HAVE ME PROPOSED PRACTICES BEEN SHOWN ON THE PUN] YES SEEDSPECIRCKRON YES MULCHING YES GRAVEL YES MS2 WAS STABILIZATION OF SOIL STOCKPILES BEEN ADDRESSED IN THE NARRATIVE? YES. IS SEDIMENTTRPPPNG MEASURES PROVIDED? YES. MS3 W15MMIN CEOFPMR ENTSTABIUZATIONBMNADDRESSEDMREXPOSEDMEAS?YES. MS4 MESMIMEMTRAFPINGFACIUnBTOBEMNSTRUCTEDMARRSrS lNIDA?YES MS5 HAS STABILIZATION OF EARTHEN STRUCTURES BEEN ADDRESSED? YES. MSG ME SEDIMENT WINS REQUIRED WHERE NEEDED?EJA MS] HAS STABILIZATION OF COTANDFlLL SLDFFS BEEN MEQUATFLY ADDRESSED?YES. MSS ME PAVED FLUMES, CHANNELS OR SLOPED DRAJNB REQUIRED WHERE NECESSARV?L MS9 HAS STABILIZATION THROUGH SURFACE ROUGHENING OR OIRIFT PROTECTION BEEN ADDRESSED? YES. MGM IS ADEQUATE INLET PROTECTION REQUIRED ON ALL OPERATIONAL STORM BEFRR IMF"] YES. Ml HAS MMNT VICE OF PERMAENT STABILIZATION BEEN ADDRESSED FOR CONVDMCE AND RECEIVING CHANNELS? YES. Ml MEINSTREAM CONSTRUCTION MEASURES REQUIRED $O THAT CHARNEL DAMAGE IS MINIMIMD?WA, MS33 ME TEMPORARY STREAM CROSSINGS OF NON£RODIBIE MATERIAL REQUIRED WHERE APPLICABI£I NLA. MS34 THIS REGUUTION REQUIRES THAT ALL MPLJG9LE FEDERAL.STATE AND LOCAL REGULATIONS PEMANING TO WORKING IN OR CROSSING LIVE WATERCOURSES BE FOLLOWED. L MS35 HAS RESTMILIZATION OF MGM SUBJECT TO INSTREAM CONSTRUCTION BEEN ADEQUATELY ADDRESSEW NlA MS36 IS STABILIZATION OF UOUTY TRENCHES ADDRESSED? YES. Ml ISTHETRMSPORT OFSOILAND MUD ONTO PUBLIC ROADWAYS PROPERLY CONTROLLED? U.E CONSTRUCTION ENTRANCES, WASH RACKS, GAILY CURNNING OF MADWAYS, TRANSPORT OF SEDIMENT TO ATRAPPLNG FACILTY) YES. MSSS HMTIREREMOVALOFMMMWYPRAL SSaNAWRMM?YES. HMM NNT NCEOFPRACTICESBEENMDRMM?(I.EREPAIROFSIRUCTIJRESMDRE"J OFAMUMU"MDMDIMEMLYES. MS39 ME FROPERRESAND WATERWAYS DOWNSTREAM FROM DEVELOFMENTAOEQATELYPROTECTED FROM EROSION AND SEDIMENT DEPSIIION DUETOINCR EMINPMKSTORMWATERRUNOFF?YES. EROSION AND SEDIMENT CONTROL SEQUENCING: L WNmACFORSHA WNDUUAMEJDINSTRUCFIONMEEPNGWOHTHEP APPRWINGAU RO MIORTOAWY DDISWRWNCEORMWMROL INSTALIAPONO 2. INSTALL WNSTRUMON ENT WWCE, SMIMENTTAP,MD PEAIMETEx WNFROLS PRIORTOANY DLSNRBWCE. 3. ONCE INIPAL MFASURMME IN PACE. RMUMM INSPECTION OFTHE INIBALEROSIONMOSEDIMEM CONTROL MEASURES EWMTHE WUNTYOF ALBERMMLE EPS INSPECTOR. CALL 24HOURS IN AOVMCEOF INSPECTION. A MOTECTPAMM WGPATONMRMEDURMONOFTHEMWEU. 5. WMMMCEDEMOUIIONNECE$SMYTOP MRMMOMSEDWORKONL (INCWDINGEXrwVAIIONWORp. 6. WNTRM.TORRILEAVEMX NG9T lULI MFASINANONEMASNECONDIPONUNnLNECF.59ARYTOINST4 MOPASEDIMMMEMEMT DI6URBM MEASNUIMPROVEDSHAIIMSEEDWWITHIN14AYSOFDL R& CE. ]. WNSMUMMORMSTRUMR6,IFAWLICALE,BTARTINGAT EWWNCTBFAMTEAMINUSORTIHN.RACNPLLALLIXGVATOMSMDTRENCHMFAS. S. COMMENCE CONSTRUCTION OF PROPOSED PAVING AND SIZE ELEMENTS, WITH THE ANCEPTION OFANY PROP ED MM. 9. FOR GRASSYMFAS: INSTALL PERMANENT SEEDING AND MULCH. STMILIZEALL DISTURBED MRS. an. FOR GRAVELMEAS: RESTORE GRAVEL AFTER TRENCHING AND MGVAPON OPERATIONS ARE COMPETE. 13. REPAW ANY EROSION AND REMOVE ANY SEDIMENT. 15. DRESS AND OYERSEED ALL DISTURBED MOM AS NECESyWY TO AFFECT PEAMW ENT YEGE WCOVER. STAIN LIZE ALL REM Ni NO D6NRBED MOM WITH TOMMIL, SEED, AND MULCH ONCE WORK IS COMPERE. 16. REMOVE SEDIMENT MAP AND ASSOCIATED DIVERSION DINES ONCE PEAMWENT VEGETATIVE ROVER HAS BEEN ESTABLISHED ON SITE. v. BEGIN INSTALGnoN OF MY MR EO BMPS ONCE ALL MNMIBLTTING AREAS ME WMIUAM AND FREE OF DEBRIS. REAR TO I NSTALIACON CH CONTROL AND INSPECTION an DEALINGS FOR CONSTRUCTION M ILESTON M. INSTALL PERMAN ENT CONVEYMCE CHAIN NETS TO BM M AT TO B TIME, STAUNUMING IMMEDATELY WRH EG2 TYPE I MALLI 1B AFTER PNALSITE STABI LIUTION AND APPROVAL FROM THE APPROMCOTE MOSION AND SMIM ENT CONTROL AUTHORITY, THE SILT FENCE, IN LET PROTECTION AND OTHER STABILIZATION MEASURES SHALL BE HEMMED. W Z J w U z DO LU OO 0 In 0 CA LI-I O X N } 2a v LU Ga Q C liJ cr cr Q Z J O cr h z O U I- z LLJJ G Lit U) Z Q Z O U) O X LU G APPROVED DCH SUBMISSION NO. 2 T H E W 0 R H O F L I N E + G R A D E C! .0 LLI v — — — — — — — \\ z u=irs IFswverea rroroceavrar _— -- � \ \ �` \ —� � /� ///// %/// / / / / I > IS DWUIC] ERP�FA O.E6AC _ _ _ — /DD) \ V A GRRDING PRDP09E➢ \ m � � : � u � 23Sffi BOTTOM ®]2&Q SONS1flUMONMAGIK DPMNING ® V V A / TDPK STORAGE]3o.16' ® \ ( O \ I MR DRY STORAGE]3163' \ \ \ \ \ O , \ / / U cr TDP E4IRRNNMEM 732.63' \� \ 1 \ \ 1 \ _ \ / \ Z OK U' Lu N z Z o J w \ / 3 � T.M. 85-I0 TRACT Z W � 1 II I\ \ \� ` _ — ` '3p �•� '3z (I I I I DRNnu �eAREA�ia�oAc \ \ = I �` / / 5545 ACRES I \ \ — — \ _ — ��l \ \ \ I / > > SO CYRENA W. SPARfMAN \ \ — \ \ 9 �� �< C \ 1 I \ / p D.B. 5439-179 D.B. 5433-/35 8 L36 PLAT \\ / — — \ \ \ 1, \ \ mDmonuPnRwNGIEN eDn i ZONED RA USE RES/DENTIAL I I / / / — — — \ — \ \ \ \ \ 1\ fil]mr sE334ILF co w \ \ \ > > dD I I v V v v / / // ����-�� 6F37� AWRET o aampvoa�erTrvgnu✓w \ I \I use aEsrpwrm[ APPROVED )CH ,, SUBMISSION NO. 2 PROJECT 2107007 LI NEE T+ GRADE z, ;1 EROSION AND SEDIMENT CONTROL PLAN PH 1 C2.1 i•-3a:0 SO SO /— ---- \ — carers srwvereo r¢rocruver _ ` LOD ICO6]6SF� / EG3 TPESINSLPIIFD FDR CD' CDWNHILLOF LEVEL S%iEADER _ \ IAST PFIFR SIZE IssrARluzm / / _ _ / It / / / �_/- ✓ / % LOW MANTENAN GROUND CO 'On SLOPES s.1 OR STEEPER -SEE PUNS FOR SEED MR l.'ONSTRUCTlon STAG N-!/� AND AREIN \ ram' // \ 1 I W Z J ® iu'a, \, ®y :O%I%�%, • \ 4 .A, a 4761F EG2rYPE1LL] \ \ \ \ 36L\ \ \ \ 1 \ I \ \ \ \r\ \ / oENEonurn 'sPERE ROCM ISREvm F- LQ Ps WO- Z 0 P w CN z o 4'�' — v� 'S/ I A/ xc o w `, � �` lEVE1 $%IFA➢ER TO fiE INSLPIIF➢ I ��� \ ® T.M. 85-I0 TRACTZ SF it D IAsrnnER snE is srnau]en — ��� \ \ �� w a w 55.45 ACRES I A — — — v — v v �� ��� / / Q a � CYRENA W. SPARfMAN \ \ / _ ` — \ \ C RE d6 LF \ 1 - J D.B. 5439-179 D.B. 5433-/35 8 L36 PLAT ;'-1 \ smlMEnr RnP / Z 1` I \ DMINhGEAHEA ]A3 AC \ ` N / Q RDDmONCI PARKING ZONED RA / ' � -- — \ _ � \ 1 1 I 1 .� IF NEEDED I / USE RES/DENTIAL ECGOW3 NST1 IDFO`wI \ \\ 6F � H110FME/ OLu / I \ I \ I I I I I I I 1 \ / I / / // � I I I I \ \ \\ \ \\\ \`\ \`\ \\ \ � \� I \ 'I' ,•,,,, hW �� i �,N F, PROMDEDRANAGETOSIA6HRACE \ \ I I I \ / / // / // \ \ I I I I 1 \ \ \ \ \ \ \ \ \ > 7 � •J 'Ifl � e� ✓ " i52 n/� 1 I\ �v Av vvv / /// / RF3]I V r� e « be 455 ^� 6ANIELL HVER a - \ / / / / / ` l RA YMONOA1195. MREFTr RA/NEV I •9IOH14 ��� 09 395 PG r�A � \I1ll�REsI.IAL APPROVED DCH suemissloN No. s PROJECT 2107007 THE W 0 R H 0 F L N E + GRADE z, ;1 EROSION AND SEDIMENT CONTROL PLAN PH 2 C2.2 1•-W:O SO m yIS / . �M��'a' xW. FI1 .YgaEWIE 4aE YaaOFIL STONE ° a CONs,RVCIION nCCE55 ASPNTy} pM{JI � Wg511aILa Zx M F�YEm lax ,a' ulx. """6E uu i0Pm. OF NOT. PHO E6NIS, TFRHcEVIGE a: PLAN �1z' ulx. 1a a wrwcE nvEN amx NnPPxc�REwcL SECTION A —A A Imbmon Water 0,, of I hmL Real De filelnOM Mi e a Ilwlhlaml l DOOR IMRI aNnoH VMrz s,P,"., a LIMA hose witl, a NnmNee of L3 hl<h. fol."IMe COIWa11 V,['+alue. WacLwMe mist Le [rimed awau'frow,he aNalce tom ONMEME IaMfivYWen m,enore aedpmY All sedpnon allnh LeVmmted fiol„ eanvu sloe, dnne. IWCLes m wnle[oloaea. PAVED WASH RACK NO PROME O CONSTRUCTION ENTRANCE WITH WASHRACK DETAIL I SECTION A -A Ima3Xu,nr LNr NnuuTnxa. ugasnN a rro mrrw NO OEC-3 (OUTLET PROTECTION) DETAIL 2 SECTION A -A CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. GET THE STAKES. 2. EXCAVATE A fX 4- TRENCH UPELOpE ALONG THE NNE OF STARES awl a ^ u a lr / _ III . 5. STAPL. FILTER MATERIAL 4. RACATILL ANR COMPACT TO STAFFER AND EXTEND THE EXCAVATED SOIL. IT INTO THE TRENCR. F III �I SHEET FLOW INSTALLATION (PERSPECTIVE WIGO I I A POINTS A SHOUTED RE NICKER THAN POINT S. Source: Adapted from Installation ofS raw W Falbric FitLy Barriam for Sediment Control Sherwood and Wyant Plate 3.05-2 O 3.05-2 SILT FENCE TABLE 3314, LREVISEDJUNE2003) TEMPoRPRYSEEDING SPECIFICATIONS OUICN REFERENCE FOR P11 REGIONS AEEMCAF.N SPscus AIRT MTFs REENT.—C, ENE. —DEFTER mnox FERTILIZER & LIME rweieeareW smev TOPHE 3.32A (REVISED TUNE 2003) PFRALNFNTSFFOINA SCFtlFlfJTONS FOR PUMMONT AREA SEED VNO URE SPERS. PMJGTONMTER FENACNE �q e� ENE 111-1 o. 11 FEE C-1— TEE INEN, r—PREIZER&DIME �R,p +m..STIONC�PERI EI ea SEDIMENT TRAP VOLUME COMPUTATIONS ST-1 IXaILI Area RNEI RaquIre115mre0a Elevatlona 1 caxrouR Incr. mcr. cum. 1aa 1sz cr L W Ana Vol. Vol. Vol. el oryp r30.16 flewtlan IFY) IFY) ISFI ICFI ICY) (LV) RE Dry STISI 731.0 rID.OJ 39 ii Br6 0 0 0 TWO ]�� ]30.W K 31 1-a 21W 85 85 WET CRY anNmkmenl 6a 33 R1E6 3592 131 216 TEMPORARY DIVERSION DIKE ]f mm �PIOn illH I Source: Va DSWC Plate 3JOIOI O 3.09-1 DIVERSION DIKE SILT FENCE CULVERT INLET PROTECTION LIME, Nmm ems mE OPTIONAL STONE COMBINATION** Source: Adapted f om VDOT Staodmd Sheets and V. DSWC O SEEDING SCHEDULE -PIEDMONT O 3.08-1 CULVERT INLET PROTECTION Plate 3.06-I TEMPORARY SEDIMENT TRAP TRAP L I- "I REGIONS n GJM/. N ti a, w mnmE MEREMPERET CROSS SECTION OF OUTLET NNIMIX SUM OEM g�� PREN 1 "CWRSE OGR WR S LL BE VOOT AA. f33] ca i5 OUTLET (PERSPECTIVE VIEW) Source: Va. DSWC PLOT, 3.13-2 O 3.13-2 SEDIMENT TRAP (STONE OUTLET) TYPICAL TREATMENT - i (SOIL STABILIZATION BLANKET) INSTALLATION CRITERIA s opax.x. am _ Nag e.o- lw�amm �Iy� fO'b' ww Ym If. FOM.11 PEP FORMM F— n�OFFee FULMON TO rr r s � PLAN V W~ STAPLING DIAGRAM °r mu � � ran w mi mlwl54iw°rwanµx m rrMlr�rm,r �`�rLONNrwvr T T Source: VDOT Road and Bridge Standards O 3.36-2 EC-2 INSTALLATION W Z J LL ] O a W o oC? In "Pi LU x N } >a> v W a Q i V/ J F W J O cr F- z O O F- z w w U) Z a z O U] O Ir Lu G APPROVED DCH SUBMISSION NO. 2 Plate 3362 T H E W 0 R K O F I N E GRADE C2.3 Section 5. Stormwater Management Plan 1 � I � � / / LEGEND lj II / /�``�''�I u Ix I- IMPEPVIDL6 APFP BA BA 369—�_� �i/i/ii�//� j/i/ /// // / / 000�0 0 FDflFSTEDAPu \� s z umlrs or DISTURBANCE LIMITS 5(NPEYEO TpPoGRGPHY / / / / / / TIME OF CONCENTRATION PATH/ OF — — — A A / / / / / / / / / / \ \ \ � \ \ \ ... -= ' / / / / / / / / / / / DRAINAGE DIVIDE u suPFACE nowaflflow 41 lF4�[ WATER PROMOTION ORDINANCE Lu BUFF BUFFERnaaYEARrE<n FLWDRIAIn MANAGED BELIEF SLOFES // FROW Fflom cauNivGa i ® ® ® ®r____ __ ----------- SHIFT sNEETFLOW AREA e AC ------------ N / ODS 6BE LLJLLJ v C5 SHEET FLOW APGA.. \\ \ SHEETFlDWAPEAC,\`I \\l / /w� Z \ \ \ \ \ \ \ I \ \ LAS AC \ 051 AC C Z o K G V A A A A V A \ A V I I A (nNQ XNo }o0 g I \/ / �3< o T.M. 85-/0 TR4CTZ I \ \� —,— _ v\ �v v w a w 55.45 ACRES _ v ' — — v ® A > g GO u� / Q CYRENA W. SPARifMAN I V A / -- — v v v ��`C a� I A C �i Z D.B. 5439-179 D.B. 5433-135 8 L36 PLAT / ' / \ — — — \ \ \ \ \ v - ' 1 ``J` ie / Lu ZONED RA AI / / v— v v A �V I a USE: RESIDENTIAL — — v V A A \ I I A �'� / w > Lu IT a If STORMWATER MANAGEMENT NARRATIVE DAx Lc.NYER > AEESOXIMATELY 313 AC ES4g676SFI OF THIS SITE ME TO BE DISTURBED FOR THE CONSTRUCTION OF A SINGLE FAMILY be W. e55 RESIDENCE PLEASE NOTE THAT AT THIS TIME, TREES WIIXIN THE DISTURBANCE AREA HAVE ALREADY BEEN CLEARED. FOR BEERMWATER MANAGEMENT PURPoSEGTHESRE MWNSDEREDTOBEFOE3TEDIN1MMnNGCONNTIONS.ADDmON Y, THE SIZE 15100E USEDFOR AGRICULTURAL ELSE ROSES (ORCHARD +RAY OPERATIONS), THEREFORE MGM NOT DIRECTLY / THESI TEO TO BE USEVENT CONSTRUCTION OFTHE SINGLE ROSFAMILY RESIDENCE ARE NOT INCLUDED ON EFORETHIS %PN. \ I / IXISnNG DRAINAGE PAITERNSARE IAAGELY PflESFAVED, WIM ALLMAIOfl DRNNAGEPAEAS PELESED A$SHEEf FLOW FROM nIE APPROVED DCH sRENELIZ WATER ROM MTHE SIM EDSEVE15PEPD CONFORMWEEED ATA"70,66TPATECOUOAMRAI RTO CHANNEOMORMIS ARGETHANTHEOSHEEFFLOWTO CONFORM ME THE LEMELSH IUDE SINAME BEEN DESIGNED MINI FEAR SUBMISSION NO. 2 REMTSOM TH FROM TH T I. DTXAN STORM. THISENITYDESIGNSTORM, THEIFIEL SPREADERS RAVE BEENDESIGNEN TORM.A1 ROWSFflOMiE IDYFPA NOT T THISENINEERED LE/VAC2G6]O66FDOWWILL FOR TXEAITI) EI CUSOM,A. Ai PROJECT 21D]OO2 LARGE SMASHINDIRIDAL CIS (SEE ARCHITECTURAL C DIRECTED TORN R DETAIILSEDHIS ELSUREPDER, FLOW WTLL BE DISSTORM WITH CLISAGE ENT /AGH EMENi FOR�SINGLEFAMILY RESIDENCESFISAD ERED'TU.IS ENSURES PIBEMMLECOUNT"$SiOflMNATER MANAGEMENT T H E W 0 R N D F LINE + GRADE SINTHE DTHE IGNOFn ESPRDES DD.DONHIF LOWM SPLOCMSRANGE FRM DETERMINED,TICUTANLSPRECARE ASBEENTAHENIN THE SUCH TESPREADERS.DOWNXILLALLOIR IS LESIEM n%OFTEENDEIFRMINEq ANDY.THISFRFADFRSWIVEBEEN DESIGNEDSUCHENTRTHE DOWNHILL, WERTXEWEIR ISOCIEES M33%OFTHEALLOW ADDITION. TW1T,A5 PREDEVELOPMENT STORMWATER MANAGEMENT PLAN RUNOFF TENSIPECONCE UT D.00wnXML nOWABLE NSONSFIo .2.a+E NOT IXCEEceD.IN ADOmoN,AconsERVATWERunFAu C5.0 �1 jC IrvTENSITY Has BF>;u useD. sFc cuaunarvs ory sHFEres.2. 1'-W: 0 3o Go �jLEGEND uFRESH. z v ImPENVIOL¢AflEa � 0000000 FDflEsreDAflu - - — — / umlrs or DlsruflsANCE TIME OF WNCENIRATION PAM C E SF— — — — \ \ / / DRAINAGE DIVIDEDA u o W SURFACE FLOWARROW c Tc-d �v — WATER HKLLECTON ORDINANCE W BUFFER/106YEARFLOODPIAIN DANACED STEEPSLDPES Z FOOMWUNTYGIS (INCLUDES TOTPLDES OR1�69F ( IV I II nxo I / 6XFE RDw PREAC TOTAL DA=O.SSAC�� \ \ i \CULNERTAI v 7, `\DA0�16AC—\\ \/ /W _ e36oULfl - \ TC5MIN L0A' C VDA0Ac� 'az / \ x (n N� SHEEf FLDWAREAA \ \ \ \�iC=5MIN $ 1 w Z TOTAL DA=181 AC \ \ _ INCLUDES LEVEL vv v� �< C \ \ T. M. 65`0 TRA\ T 2 \ \ 1 \ \ — — \ \ a F \ \ \ \\ I \\D'A 0.4AC / ; C-0A0 Q5545 1CRES > DO CYRENW. SJR3N ccDESAREATO CULVERTAI)iU MIN D a,543��9D.E�/,5 116P4A rvON Fe V A USE'`* SID N�ALA I I 1 / _ \ V A V I I V �{,� uvELSPREADERA2 \\ \V VI �' A I I I A V�� \C�--036 AC -(ICCL51VIN CULVERTAE) dD I _ �m WaaF=°rYqa Z�ED IA �,DNAU° APPROVED DCH SUBMISSION NO. 2 PROJECT 2107007 T H E W 0 R H 0 F L I N E + G R A D E z, ;1 POSTDEVELOPMENT STORMWATER MANAGEMENT PLAN C5.1 1'-W: o So ED 69EOIIED ON PLANS Elev (R) BKtlaE Depth (fl) � 2' COVER 6'+6' PRESSURE TREATED TIMI LENGTH PER PUN RUBS ON FABRIC HIM -0 6 "FRENCH DRAIN" -y WIOTX PER PLANS - 6- 3' o s 3. SEE LANDSCAPE -6 FOR $PLASH SLACK MATERIAL 6 6 SLOPE UPTO LEVEL SPREADER T39� ON 1 2%MM, FOR 10TO FX. GRADE -� WASHED, ANGULAR VDOT NET STONE 6 LINESiILUNG BASIN WITH EC 3 LINING. GEOTE%TILEFPBRICWNTINUOUSLV LINING TO BE CONPNUOUS WITX WLVEITOURET _- -_ J- WEEP HOLES, DRILLED I8"O. C. T39.N O.b 'BURRITO AROUND STONE PROTECT ION LINING WHEN CULVERT IS PRESENT. --- - - OWSCHEDULE409EBFORATED WCTO 25i0NE OVERLAP ON IM1IIN. 1'pVERLAP ON i09) V DAttIGHTATLOCATION SHOWN ON%ANS BELOW NOµµpyEN GEOIIXDLE FlLIER FABRICLEN N4USTSHWARTEDTRATEG O.C.MI FOR (PER SURETERNPONS SHAL BE APPROVED UNDERECLGUNING,MIR 2'OYERLA9 MIN LOWESTIMBERS. RE&ARSIWLL PENETRATE GROUND 12'MIN. BELOW LOWEST TIMBER. WENGINEER) NOTES L MNNTAIN2 MIN.SLOPEONPPE 2. WNTRACTORTO FAOVIDECLEANOUTATUPSTREAM END OFSYSIEMANDATALL ROOF LEADER RERNS ISOM AND ALL OTHER LOCATIONS SPECIFIED ON PANS. !E 3. PIPES SHALL BE ORIENTED TO MAINTNN AROW OF PERFORATIONS AT THE INVEST OF THE PER. NOTES: A GEOTEXILE FABRIC SHALL BE NON- WOVEN WEH A ROW RATE OF 110 GPM PER SF OR GREATER, AND PUNCTURE STRENGTH OF 20R UPS OR GREATER. L LEYELSPRFA MU95HALLBECOMPETELYLEVE ONG FNIIRELENGTH. EE 5. All CONNECTIONS TO THE FRENCH DRAIN SYSTEM SHAL BE COMPLETELY WRAPPED IN NON-WOYEN 2. ENDS SHALLBE KEYED INTOADUACENTSLOPEA MINIMUM OF WTO PREVENT=URING/SHORTCIRCUDING AROUND ENDS. GEOTEXILE FABRIC TO PREVENT SOIL INFlLTRATION INTO STONE AROUND CONNECTION MINT. 3. RE& SH BEPACEDNOMORETHW -MOMTIMBERENDS. 731TA] I HIM 6. CONTRACTORTOPAOVIDERODENTSCREENONALLMMGHTEOPPFS. A CONTRACTOR SHALL NOT COMPW7 STILLING B651N AREA OR ALLOW HEAVY EQUIPMENT IN THE STILLING BASIN VICINITY TO ALLOW MR INFlLOPUION OF FORCED RUNOFF BEHIND LEVEL SPREADER. 0 1 2 3 • 5 8 ] B 9 FRENCH DRAIN LEVEL SPREADER O DITCH TO Al CROSS SECTION O 0 1 2 O El. (R) Section NPUI (n) T46m 1.E0 T0.6M 7,15,00 LEVELG 1DE61GN STORM TOTALAREA TO .1 DOWRALOPE DOWN5LOPE MINIMUM LENGTH PROVIDEDIEENGTH EDOWNMOFE RIOID UP SPREADER INTENSITY LEVEL6PRFAOER FLOW ALLOWABLE OF RIGID LIP OF RIGID LIP VELOCITY BELOW L6 ...... e... FACTOR ....... �. .. �. .�.�. GROUNWOVER .......,r...�. ..,. .�� �. MATERMI T4480 0 1 2 3 4 5 DITCH TO A2 CROSS SECTION �M GB VFLWTY�ME6 LOW0.WCENMR FLMY WNLR WWNHILLO MEL E%tFALERAFIERMEEFFECDVELYSFAVCECF3 FLOWMSSISSED. CULVERT DATA TABLE CULVERT NAME CULVERTDESCRIPTION HYDROLOGY I TOTAL FLOW X ITn) FLOW PER BARREL Q/N( o HEADWATERCALCUTATION8 ELEVATION VFIWHY WT V9s1 LOW POINT ELEVATION FREEBOARD UO MBbrlal-0M90d1i0 L, BI (mini (In/MI AREA (An) SLOPE (%) IEOR) (XI INIETCWTROL W11ET C011TROL IV 0 MWI FALL Elx� MYP M Ho ke H Elxo CONTROL CONTROL H IXVo WVIn MARRIALOM(in A3130.YR STORM) 112'MPE 1 i33A4 i38.50 ROPE 12 031 S 1.03 0IS BAT% SBA4 OA2 OA2 030 0.34 53B i3884 O.W 03i 03i 0.50 6BS 13B81 13&94 728 738.30 036 A 1125-YR3TORM) L12'IOFE 1 i33A5 i38.Up ROPE 12 037 5 1.93 O16 BAT% SSAA OAT OAT 037 0.37 5.32 7388T 0.00 O3 038 CGO OBS 13B88 73UBI i34 138.50 D33 02110-YRSTORMI 1]2'IOFE 1 iA3.i0 i4A50I POPE 12 1 5 783 040 114% 70M 181 181 060 OW Lee 74510 OW 042 042 OW 090 i4492 i4510 483 748.41 LIEU -YPBTCAMI T,UEHICKI il 743701744501 HERE 1 12 102. 5 793 040 114% 70M 114 114 065 065 145 74536 OCR 045 045 050 090 i4195 1-- .1. 14B.61 118 DESIGN CHANNEL CROSS SECTION ANALYSIS ISOaI .....Mlon I RNtlon I ClmnnM _U-it Slope 1m 0.50 aro -050 B ] B 0 W Z J LU a U Ur) Z 0 LU O 00 CA ALU O x N } a W a Q G- APPROVED DCH SUBMISSION NO. 2 PROJECT 2107007 T H E W 0 R H O F L I N E + G R A D E C5.2 Section 6. Pollution Prevention Plan. (reference State Regulation 9VAC25-880-70 part II section AA) D. Plan showing pollution activities and prevention practices —_— ��\ \� \�-----__----i'iiiiii i i iii��/�lllll / / 1 ( W / z / /�\ '/' ////'// EG3 TPESINSiPllID FOR 40' //// / // // � //'/// // —// �� =j --- _\\` \\\\ \ `_` ✓ DawnHlu of EVFSs �Efl/// / // // // // // // � LEVEL SPREADER iO IASTnFE STEISSTnRIuzEO MAIMENANCEGROunDcovER ON SLOPES 3:10R STEEPEN -SEE RUINS MR EEO MIX / / L / ( � ( / V II �, I �/ / / i ' / / � �_�_ orvsr nory sinews ��„fi7;J'1;l�; � _ ` / / e / / / ♦ / / / ...QQQ c aoc STAGINGAREA S4761F i>ZQ PoRM1HN � 1 A 1 � / � \ \ \ \ 36L\ \ \ \ 1 \ I \ \ \ \ 1\ \ SPREADER 5 E ONCE TRAP MOVED \ MAIDNG 1 STOCHPoE w \ / U Lo Q \ / Z Q Z Z W O Z % w�0 w — SFT.M. 85-/D TRACT TflELSFRFADER TO RE INSTPIIFD \ / Lu a w O 5545ACRES \ \— ---� _T— ��� ��`� �I v.' g / QUa F- CYRENA W. SIOARKMAN \ \ j — — \ \ sF ``� I oP \) > J D.B. 5439-/79 D.BA. 5433-/35 B 156 PLAT \ _/ ' ~ — \ \ \ �1 :' I 1 \ SEDIMENTT O CZOONED. RAA� / _ r- \ _ \ \ \ 1 ( I 1 �� I`� FDDIDONAIFPNEEOED ARKING DMINhGEMEA) AC u I / USL.- R SIDEVTIAL I I / /' �. \ \ \ \ / I I EOSTMEIINSTALEDFORW \` � \ \\ a _--GAUGE A AL&COROMDEVED CAW TOSILT 1/^,�^ 1 \ 1 \ \ \ \ \ ; ONDE DNJN4GETOSILT FENCE 14Vl AYMo O ETTY �E �siC5NTIAL APPROVED DCH SUBMISSPROECTION N2107007 THE WORK OF L I N E + G RADE NOTE: CONTRACTOR TO MARK UP PLANS WITH ANY CHANGES IN THE FIELD POLLUTION PREVENTION PLAN' X1.0 1'-W: 0 3o GO E. Sources of Pollutants, locations, and prevention practices Pollutant, or Pollutant Prevention Practices, Generating Activity Location on site Control Measures F. Sources of Pollutants, continued. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and on- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip Paving operations Roads and driveways pans and absorbentloil dry for all paving machines to limit leaks ands ills Direct concrete wash water into a leak - Concrete washout Current location and detail shown proof container or leak -proof settling and cement waste on plan basin that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting, and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Water shall be filtered, settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan. Designated areas for material delivery Material delivery and storage Designated area shown on plan and storage. Placed near construction entrances, away from waterways and drainage paths Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. waste collection area will not receive a substantial amount of runoff from upland Solid waste disposal Current designated container areas areas and does not drain directly to a on plan waterway. Containers have lids covered before periods of rain, or are in a covered area Scheduled collection to prevent Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures overfilling. MATERIALS NOT TO BE BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be Sanitary waste Current locations shown on plan provided, and located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or Wash Waters Wash areas shown on plan better control as specified on plan. Minimize the discharge of pollutants from equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. G. Non-stormwater discharges (9VAC25-880-70-E) Discharge Pollutants or Pollutant Constituents Location on Site Vehicle washout Sediment, paints, oils See pollution prevention plans Dust control spray Adhesives, sediment See ESC plans Pavement and building wash Soaps, detergents, residual material See ESC plans Landscape irrigation Fertilizers, sediments See landscape and ESC plans Concrete washout Lime, concrete admixtures See pollution prevention plans Paint/masonry washout Paint, oils, construction materials See pollution prevention plans K Persons responsible for pollution prevention practices Name: Owner, Cyrena Sparkman (until contractor is selected) Address: 41 Wicket Way; POB 2304 Cashiers, NC 28717 Email: cy@sparkman.net Phone Number: (703) 200-1947 I. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows, All spills will be cleaned up immediately upon discovery. Spent absorbent materials and rags will be hauled off - site immediately after the spill is cleaned up for disposal at the nearest landfill. Report all spills, leaks and discharges as follows, Spills large enough to discharge to surface water will be reported to the National Response Center at 1-800-424-8802. J. Pollution Prevention Awareness All employees will be trained via biweekly tailgate sessions. The sessions will address the following topics: Erosion and Sediment Control Practices, Non-Stormwater Pollution Prevent Practices, Waste Management and Materials Storage Practices, and Emergency Procedures specific to the construction site. Formal training will be provided for staff with specific stormwater responsibilities, such as installing and maintaining BMPs. The formal training will cover all design and construction specifications, and will occur before any BMPs are installed on the site. Section 7. Discharges to impaired waters, surface waters within an applicable TNML wasteload allocation, and exceptional waters. Runoff from this site discharges to I UC 020802040101 Stockton Creek — Mechums River, which is listed as impaired on the DEQ Integrated List of All Waters in Virginia. Causes of impairment are Benthic Macroinvertebrates Bioassessments. Section 8. Qualified personnel The following personnel are responsible for inspections; Name: Daniel Hyer, PE (until another consultant is selected) Address: 113 4 h St NE STE 100 Charlottesville, VA 22902 Email: dhyer@line-grade.com Phone Number: (434)262-0163 Section 9. Signed Certification "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Operator Name: Company: Title: Signature: Date: Section 10. Delegation of authority. Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: Date: Section 11. General permit copy To be included with final SWPPP. Section 12. Inspection logs Section 12a. Corrective Action Log Project Name: Waverly Residence SWPPP Contact: Inspection Date Inspector Name(s) Description of Deficiency Corrective Action Needed (including planned date/responsible person) Date Action Taken/Responsible person Section 12b. SWPPP Amendment Log Project Name: Waverly Residence SWPPP Contact: Amendment No. Description of the Amendment Date of Amendment Amendment Prepared by Names and Title Section 12c. Grading and Stabilization Activities Log Project Name: Waverly Farm SWPPP Contact: Date Grading Activity Initiated Description of Grading Activity Date Grading Activity Ceased (Indicate Temporary or Permanent) Date When Stabilization Measures are Initiated Description of Stabilization Measure and Location